Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name:...

31
~-, * DARLINGTON Iii w i BOROUGH COUNCIL El1 CI disability m !i confident EMPLOYER SILVER AWARD COVENANT Proudly supporting those who serve. ECONOMIC GROWTH AND NEIGHBOURHOOD SERVICES Town Hall, Darlington DL1 5QT DX 69280 Darlington 6 web site: http://www.darlington.gov.uk Mr Paul O’Hara Date : 30 October 2019 Department for Transport Please ask for : Dave Winstanley Direct Line : 01325 406618 Email address : [email protected] [email protected] Your Reference : Our Reference : Document Name: Dear Mr O’Hara Local Highways Maintenance Challenge Fund Darlington Borough Council – A68 Growth Zone Maintenance Programme Please find enclosed our application for the A68 Growth Zone Maintenance Programme Challenge Fund. I have included a summary of the appendices below for information and ease of reference. I have also attached two excel documents that are used as part of our bid for the A68 corridor. These are also included at Appendix B3(a)(1). Appendix Description A2 Scheme Map B3(a)1 DfT Challenge Fund Proformas B3(a)2 Diversion Maps B3(a)3 A68 Road Traffic Casualty Dashboard B3(b)1 Skid Resistance (SCRIM) Plan Rural Section B3(b)2 Skid Resistance (SCRIM) Plan Urban Section B4 Equality Impact Assessment If there are any queries in relation to the application, please do not hesitate to contact me. The Tees Valley Combined Authority will also be submitting the full package of Tees Valley bids which will include this bid. Yours sincerely Dave Winstanley Assistant Director – Transport and Capital Projects

Transcript of Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name:...

Page 1: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

~-, ~ * DARLINGTON Iii w i BOROUGH COUNCIL

El1CI disability m!i confident EMPLOYER

SILVER AWARD

COVENANT Proudly supporting those who serve.

ECONOMIC GROWTH AND NEIGHBOURHOOD SERVICES Town Hall, Darlington DL1 5QTDX 69280 Darlington 6web site: http://www.darlington.gov.uk

Mr Paul O’Hara Date : 30 October 2019 Department for Transport Please ask for : Dave Winstanley

Direct Line : 01325 406618 Email address : [email protected] [email protected] Your Reference : Our Reference : Document Name:

Dear Mr O’Hara

Local Highways Maintenance Challenge Fund Darlington Borough Council – A68 Growth Zone Maintenance Programme

Please find enclosed our application for the A68 Growth Zone Maintenance Programme Challenge Fund. I have included a summary of the appendices below for information and ease of reference.

I have also attached two excel documents that are used as part of our bid for the A68 corridor. These are also included at Appendix B3(a)(1).

Appendix Description A2 Scheme Map B3(a)1 DfT Challenge Fund Proformas B3(a)2 Diversion Maps B3(a)3 A68 Road Traffic Casualty Dashboard B3(b)1 Skid Resistance (SCRIM) Plan Rural Section B3(b)2 Skid Resistance (SCRIM) Plan Urban Section B4 Equality Impact Assessment

If there are any queries in relation to the application, please do not hesitate to contact me.

The Tees Valley Combined Authority will also be submitting the full package of Tees Valley bids which will include this bid.

Yours sincerely

Dave WinstanleyAssistant Director – Transport and Capital Projects

Page 2: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

• Department for Transport

Local Highways Maintenance Challenge Fund

Application Form: bids for funding in 2019/20 The level of information provided on this form should be proportionate to the size and complexity of the works proposed. An Excel data proforma should also be completed.

Note that DfT funding is a maximum of £5 million per project for bids in 2019-20. An individual local highway authority may apply to bid for only one scheme. Funding will be provided in 2019/20, but it is recognised that construction may go into 2020/21 as well. The closing date for bids is 31 October 2019.

For schemes submitted by a Combined Authority for component authorities a separate application form should be completed for each scheme, then the CA should rank them in order of preference.

Applicant Information

Local authority name: Darlington Borough Council

Bid Manager Name and position: Steve Pryke, Head of Highway Asset Management

Contact telephone number: 01325 406663 Email address: [email protected]

Postal address: Darlington Borough Council 17 Allington Way Darlington

Postcode: DL1 4QB

Combined Authorities If the bid is from a local highway authority within a Combined Authority, please specify the contact and ensure that the Combined Authority has submitted a Combined Authority Application Ranking Form.

Name and position of Combined Authority Bid Co-ordinator: Tom Bryant, Head of Transport, Tees Valley Combined Authority

Contact telephone number: 01642 524463 Email address: [email protected]

Postal address: Tees Valley Combined Authority, Cavendish House, Prince’s Wharf, Thornaby, Stockton-on-Tees, TS17 6QY

When authorities submit a bid for funding to the Department, as part of the Government’s commitment to greater openness in the public sector under the Freedom of Information Act 2000 and the Environmental Information Regulations 2004, the local highway authority must also publish a version excluding any commercially sensitive information on their own website within two working days of submitting the final bid to the Department.

Please specify the weblink where this bid will be published:https://www.darlington.gov.uk/transport-and-streets/

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 3: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Trossachs Nat,onal Park

mJGlasgow 0 0

Paisley

am

Galloway Forest Park Newlon S(e-::-'iHt

le of M an

Oun~lsne

St irling

ifJ am

Dunfermline 0 North ~erwIc

Edinburgh

ml

Lockerble Dumfries •

0

Gre(n.80

Green

Garlisle

Ma~port

Work\_ng ton

White,!'aven

0

Lake D1str1ct

Poor,th 0

01,m ,

Nalional Park i,;rJ w,ndenne,ea Kendal

0

-e~outn

Berw•c pu~oo-Tweed

North Pennines

AON8

Dar lington fa c ilitat ing national north/south con n e-ct ivity

6em~urgh 0

Seahouses

Sunderland 0

am\ Al(M}

Barrow-lr,-Fumesso National Park

Lanc!ster Foresl of AONB

Nldderdsle \

Blackpool 0

Bowland AONB

G o g le Preston cm

Harrogate 0

Leeds Bradfordo 0 """'

York 0

Tees Va lley Com b ine d Au t h o ri ty Area

MaltOfl 0

Scarborough 0

Brldli.\'91on

Hom5ee

Hull D

SECTION A – Description of works

A1. Project name: A68 Growth Zone Maintenance Programme

A2. Headline description:

Proposed start date: February 2020

Estimated Completion date: October 2020

Brief description

The A68 is an important Principal Road connecting Edinburgh to Darlington. The route is part of the Primary Route Network (PRN) and Transport for the North’s (TfN) Major Road Network (MRN). It is an important route into the Tees Valley Combined Authority area, of which Darlington is a constituent authority.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 4: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

The A68 starts in Darlington town centre, forming part of the inner ring road, and then forms a radial route within the urban area connecting to the A1(M) at junction 58. Beyond this junction the route continues in a more rural setting heading northwards towards County Durham, Northumberland and then the Scottish Borders.

Importantly the A68 connects with the A1(M) at Darlington (J58) to form a north/south national route. The A68 is also a well-used alternative route to the A1(M) north of Darlington providing resilience and route choice which is utilised by HGV traffic.

The project is aimed at addressing condition issues on the route within the Tees Valley Combined Authority area but would also benefit the other geographic areas served by the route. It is presented in two distinct sections:

Urban Section

A 2.6km length of road that links the town centre to the A1(M). This is the most heavily trafficked road in the urban area with over 23,000 vehicles AADT flow. It is a multifunction highway providing strategic access to the Strategic Road Network (SRN) and access to local services such as two major hospitals, the town’s main college and one of the main employment sites at Faverdale.

Asset management information has identified the need for urgent maintenance to address both deteriorating road condition, that requires full reconstruction in places and skid resistance issues.

Some localised areas are within identified flood zones and there are known issues identified as part of the Councils Flood and Water Management Act responsibilities. As part of the proposed bid it is planned to improve resilience by improving gullies and drainage assets to manage surface water flooding. In addition, the cycle route alongside the A68 from Brinkburn Road, Cockerton to Rotary Way will be resurfaced to current specifications to increase mode shift.

Rural Section

A 5.8km length of road from A6072 Swan House roundabout to the Borough boundary. Asset management information has identified a requirement for urgent maintenance to address both deteriorating road condition, that requires full/partial reconstruction in places and skid resistance issues.

The project will employ innovative recycling techniques to reuse the existing materials to reduce cost and provide a carbon saving by retaining material on site.

The suitability of innovative materials will also be considered such as plastic or rubber, subject to affordability within the scope of the bid.

The A68 Growth Zone Maintenance Programme is a bid, developed from evidence that seeks funding to address known maintenance and resilience issues, plans to try new innovative surfacing techniques and adopt a preventative cost saving approach

Appendix A2 provides details of the affected sections of road.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 5: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

A3. Geographic area:

Please provide a short description of the location referred to in the bid (in no more than 50 words)

On the A68 within the Borough of Darlington and within the Tees Valley Combined Authority area. The route is on TfN’s Major Route Network. The urban section extends from A1(M) Junction 58 to Darlington town centre and the rural section extends from A6072 Swan House Roundabout to the Borough boundary.

Rural OS Grid Reference: 420765; 523583 – 425097; 520247 Postcode: DL2 2UJ

Urban OS Grid Reference: 427294; 516506 – 428576; 514780 Postcode: DL3 7BJ

Appendix A2(1) provides details of the affected sections of road

A4. Type of works (please tick relevant box):

DfT funding of up to £5 million in 2019/20

Structural maintenance, strengthening or renewal of bridges, viaducts, retaining walls or other key structures, footbridge or cycle bridge renewal

Major maintenance, full depth reconstruction of carriageways, structural maintenance of tunnels (Urban A68)

Resurfacing of carriageways including improvements to footways or cycleways that are within the highway boundary

(Rural A68 and Urban A68 cycleway)

Renewal of gullies and replacement of drainage assets (Urban and rural)

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 6: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

SECTION B – The Business Case

B1. The Financial Case – Project Costs and Profile

Before preparing a proposal for submission, bid promoters should ensure they understand the financial implications of developing the project (including any implications for future resource spend and ongoing costs relating to maintaining and operating the asset), and the need to secure and underwrite any necessary funding outside the Department’s maximum contribution.

Please complete the table below. Figures should be entered in £000s (i.e. £10,000 = 10).

Funding profile (Nominal terms)

£000s 2019-20 2020-21 DfT Funding Sought

2260 DfT funding not available in 2020-21

LA Contribution 150 603

Other Third Party Funding

Notes: 1) Department for Transport funding will be granted in the 2019-20 financial year but local highway authorities may carry that funding over to following financial years if necessary. 2) There is no specific amount for a local contribution by the local authority and/or a third party but if this is proposed please state what this is expected to be.

B2. Local Contribution / Third Party Funding

Please provide information on the following points (where applicable):

a) The non-DfT contribution may include funding from the local authority or a third party. This should include evidence to show how any third party contributions are being secured, the level of commitment and when they will become available.

The Council will fund a total of £753k from LTP Maintenance allocations. An indicative profile is shown in section B1 but the Council would be flexible and re-profile if that benefitted DfT requirements. This equates to a match of 25%. The bid has been developed in consultation with the Portfolio holder in forming spending plans for future years. This would need formal Cabinet approval in March 2020, if the bid is successful.

A local authority contribution of £753k in 2020/21 will commit 45% of the total Annual Highways Maintenance Block Funding grant to this project alone. This is a significant contribution to address the condition issues on this important corridor.

b) Please list any other funding applications you have made for this project or variants of it and the outcome of these applications, including any reasons for rejection (e.g. applications made through any similar competition). n/a

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 7: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

B3. Strategic Case (sections (a) to (g) below)

This section should briefly set out the rationale for making the investment and evidence of the existing situation, set out the history of the asset and why it is needs to be repaired or renewed. It should also include how it fits into the overall asset management strategy for the authority and why it cannot be funded through the annual Highways Maintenance Block Funding grant.

a) What are the current problems to be addressed by the proposed works? (Describe economic, environmental, social problems or opportunities which will be addressed by the scheme).

Current Problems

In Section A2 we identified a significant section of the A68 is requiring urgent maintenance.

10% of the rural section from Swan House roundabout to the Borough boundary has been identified as RED on the Scanner Category. This is requiring resurfacing and partial/full reconstruction. However, a further 49% is identified AMBER meaning it is deteriorating and will require more significant reconstruction and more expensive intervention if left untreated.

However, this is not the only issue why this corridor is in urgent need of funding. The latest asset management information reported in October 2019 relating to Skid Resistance (SCRIM data) indicates that 34% of the rural section from Houghton Bank to Swan House roundabout may be deficient in terms of Skid Resistance.

In the urban area 5% of the corridor is identified as RED on the Scanner Category. This is requiring resurfacing and partial/full reconstruction. However, a further 27% is identified AMBER meaning it is deteriorating and will require more significant reconstruction and more expensive intervention if left untreated.

Again, this is not the only issue why this corridor is in urgent need of funding. Asset Management information relating to Skid Resistance (SCRIM data) indicates that 55% of the urban section may be deficient in terms of Skid Resistance.

The urban section passes through an area of high flood risk around West Beck which needs addressing.

The Council is challenged with difficult decisions that are based on evidence from good asset management planning information. Whilst, the A68 is a high priority the Council is not able to fund all the high priorities identified despite increased resources being injected into road maintenance by the Council. Unfortunately, this means that the Council cannot always adopt good asset management principles on some assets. The A68 Growth Zone Maintenance Programme is a bid, developed from evidence that seeks funding to address known maintenance and resilience issues, plans to try new innovative surfacing techniques and adopt a preventative cost saving approach. This follows best practice and the principles being encouraged by DfT through innovation funding, taking a life cycle approach to ensure in time maintenance interventions.

Economic

The A68 is both a key urban route connecting Darlington town centre to the A1(M) Junction 58 and a long-distance rural route to County Durham, Northumbria, Scottish Borders and finally to Edinburgh City Bypass. It is a Primary Route that forms part of the TfN Main Road Network (MRN), Tees Valley Key Road Network (KRN) and is a key link to the Strategic Road Network (SRN).

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 8: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

A68 to/from Scotland '

A68 Rural Section Walworth

Al(M)J58 •

. Al(M)J59

Al(~) ~ Coatham Nort/"' Mundeville

A68 Urban Section

Al(M) South

\ I Darlmgton q,

Memom:il Hospital

!nfield

Al(M) J57

Low Comschtte

Cleasby

Darlington

A66

A66

Sadberge A66

Strategic Road Network East West SRN Link between Darlington and other TVCA LT As

Middleton St George

Teesside International

Airport •

The local roads through Darlington play a strategic role in the connectivity of the region. This arises from an issue with the configuration of the Strategic Road Network. Junction 57 on the A1(M) has NO north facing slip roads. This effectively means there is a missing link of SRN between the A1(M) and the A66, which results in strategic type traffic using local roads and particularly the A68 to connect between the A1(M) SRN at Junction 58 and the A66 SRN. Keeping the roads well-maintained, with minimal roadworks is key to supporting the economy.

The Tees Valley is a significant industrial area with Teesport being the largest exporting port in England. Logistics and distribution is identified in the Strategic Economic Plan as a key sector in the Tees Valley. Both Aldi and Argos have regional distribution centres on the A68 next to A1(M) junction 58, which attract transport from Teesport and nationally. Arriva Bus also has a regional depot located at Faverdale Industrial Estate that generates a significant number of bus services commencing and completing their shifts using the A68.

The road carries an abnormally high % of HGVs (7% on parts of the urban section close to the A1(M)) and this is likely to increase due to further logistics and distribution developments at Faverdale Industrial Estate.

The relocation of Darlington Farmers Auction Mart to a new site immediately adjacent to the A68 north of Junction 58 A1(M) and commercial developments in County Durham will add to higher levels of HGVs and with this the increased maintenance requirements and higher deterioration levels from this type of traffic.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 9: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

The A68 is also one of our main arterial transport corridors between two of the town’s main employment sites, Faverdale Industrial Estate and the Town Centre. Along the A68 growth corridor there are further Economic Growth initiatives. Large scale housing developments are planned as part of existing consented development and Local plan allocations. This includes Burtree Garden Village which was recently designated Garden Village status by The Ministry of Housing, Communities and Local Government. Further substantial housing development is under construction at West Park and proposed at Coniscliffe Park. The A68 will therefore be subject to additional traffic, including construction traffic.

Addressing the maintenance and management of the A68 is key to securing Economic Growth for the area and the condition of the asset supports the planned Economic Growth. The opportunities for the A68 Growth corridor have significant economic benefit. The bid seeks to address a significant issue with the current funding level against the identified urgent maintenance needs from asset management planning information.

Environmental

The urban section of the scheme carries in excess of 23,000 vehicles per day and is Darlington’s busiest arterial route with traffic levels higher than the A66 Strategic Road Network around Darlington. These traffic volumes are beyond the theoretical link capacity making them extremely sensitive in terms of resilience and congestion. There are higher levels of reactive maintenance on this road given its condition resulting in numerous temporary road works which increase congestion and associated emissions and journey time.

Maintaining a reactive approach to this road or delivery of the scheme in phases will undoubtedly lead to more emissions, congestion and journey time delays. Delivering the scheme as a single project will have significant improvement on these factors. The table below shows the number of streetworks that have been carried out on A68 over the last 5 years and indicate an upward trend in these reactive interventions.

Year Number of Streetworks 2014/15 39 2015/16 76 2016/17 62 2017/18 63 2018/19 88

The diversion for any works on the urban section if a road closure is required is an additional 16.2km. Using the traffic volumes on the road this equates to an additional 375,256km of unnecessary road travel per day of a closure. This is a 20-minute additional journey time per vehicle which equates to 460,000 minutes additional delay per day.

In the rural section traffic levels are in excess of 6,000 vehicles per day. The diversion route is an additional 9.3km adding a 10-minute delay, which equates to an additional 56,181km of unnecessary road travel and 60,000 minutes additional mileage and delay, per day.

Two proformas requested by the DfT have been attached to the bid at Appendix B3(a)(1) for each section. These provide traffic data and details of proposed diversion routes, maps of which are attached at Appendix B3(a)(2).

If this project is delivered over a 10-year phased period in line with our annual maintenance funding allocation this will result in a significant increase in emissions compared to a single project due to

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 10: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

multiple planned closures for the various phases and the associated additional mileage and delays and additional mileage arising from more frequent unplanned reactive maintenance

The current condition of the road will result in increased noise levels. The proposed new surfacing provides an opportunity to reduce noise levels particularly in the urban area.

Opportunities will be explored to reduce the environmental impact of the construction works by recycling materials in the rural section and to utilise innovative materials in the surfacing including plastic and/or rubber. We will also consider use of “warm” materials to reduce carbon emissions.

The scheme will include resurfacing of an old section of cycle route in the urban area which will encourage greater use and mode shift.

The A68 corridor passes through an area identified by the Environment Agency as being at risk of flooding so improvements to drainage assets are important and will compliment flood alleviation schemes in the area. Gullies and drainage assets will be maintained or improved where appropriate to address drainage/localised flooding.

Social problems/opportunities

Physical Activity

The bid incorporates the maintenance and upgrading of the riding surface of one of our main radial cycle and pedestrian routes. This will encourage greater levels of active/sustainable travel and route will be the subject of travel marketing through our “Let’s Go Tees Valley” travel behaviour change programme.

Journey Quality

The existing road surface is scarred with patches and public utility reinstatements which provides a worsening riding surface. This can be a particular issue for highway users with muscular skeletal injuries or conditions such as arthritis.

Roadworks are a cause of driver stress and frustration. The number of roadworks (planned and unplanned) will increase unless the condition of the carriageway is addressed by this scheme.

Accidents

Since 2009 there have been 297 casualties on the A68 within Darlington. There have been 3 fatalities on the rural section and 46 serious injuries. Analysis is included at Appendix B3(a)(3) The ratio of Serious to Slight Casualties is high. An improved road surface can have a positive impact on road safety as it has a higher skid resistance and a better riding surface. Issues arising from damaged or inefficient drainage systems can also have an impact on road safety. The maintenance and replacement of damaged drainage assets will help to avoid ponding on the carriageway and reduce the risk of collisions occurring.

Personal Affordability

There are significant volumes of people using this road on a daily basis to access jobs, services and education. The additional journey costs arising from diversion over a prolonged period and delays at road works will have an impact particularly on low income families.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 11: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Access to Services

The condition of the road and roadworks has an impact in relation to access to the following:

The A68 is a key bus route for both local and sub-regional journeys. In addition, to these services Arriva Bus have their regional depot at Faverdale Industrial Estate on the A68 meaning significant number of buses using the route at the start and end of shifts. Roadworks and congestion have an impact on bus services providing access to local services, punctuality and reliability. A piecemeal approach to maintenance increases disruption to bus services and poorly maintained roads have an impact on the journey experience.

The A68 is a main arterial route into the town centre with a District Centre at Cockerton along the route and key services such as Darlington Memorial A&E Hospital (regional hospital) and West Park Hospital Trust (Tees, Esk and Wear Valleys NHS Foundation Trust HQ).

The A68 is also a route to access Darlington Rail Station, which is a key East Coast Mainline Station for the Tees Valley, North Yorkshire and South Durham.

The A68 links key existing and proposed employment and residential sites. Faverdale Industrial Estate is an important employment site, hosting Aldi and Argos distribution centres as well as a range of medium and large industrial and service sector businesses. The northern Faverdale area is home to the proposed Burtree Garden Village which was recently designated Garden Village status by The Ministry of Housing, Communities and Local Government. The garden village can accommodate up to 2,000 new homes and 200,000m2 of employment space, creating up to 6,000 jobs. Further details are available at https://hellens.co.uk/garden-village-success/. A further 2,700 homes are proposed at West Park and Coniscliffe Park both of which rely on A68 for access.

Queen Elizabeth College is located near to the A68 towards the Town Centre. It is Darlington’s main academic FE College with 2000 students and serves the wider hinterland with pupils coming from North Yorkshire, south and west Durham and Teesside, utilising 11 chartered coaches each day.

b) Why the asset is in need of urgent funding?

Two proformas requested by the DfT have been attached to the bid at Appendix B3(a)(1). One covers the rural section and the other the urban section of the A68, both of which have different traffic and physical characteristics. In summary, they highlight that:

The Rural Corridor

10% of the corridor identified is RED on the Scanner Category. This is requiring resurfacing and partial/full reconstruction. However, a further 49% is identified AMBER meaning it is deteriorating and will require more significant reconstruction and more expensive intervention if left untreated. If the AMBER was to move into RED this could increase the cost of repairs significantly from the current estimated. A successful bid could avoid these costs and pressures.

However, this is not the only issue why this corridor is in urgent need of funding. The latest asset management information reported in October 2019 relating to Skid Resistance (SCRIM data) indicates that 34% of the rural section from Houghton Bank to Swan House roundabout may be deficient in terms of Skid Resistance. A plan showing the extent of the carriageway that has been identified through SCRIM data as being deficient in terms of skid resistance (red sections) is attached at Appendix B3(b)(1).

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 12: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

The Urban Corridor

5% of the corridor identified is RED on the Scanner Category. This is requiring resurfacing and partial/full reconstruction. However, a further 27% is identified AMBER meaning it is deteriorating and will require more significant reconstruction and more expensive intervention if left untreated. If the AMBER was to move into RED this could increase the cost of repairs significantly.

However, this is not the only issue why this corridor is in urgent need of funding. The latest asset management information reported in October 2019 relating to Skid Resistance (SCRIM data) indicates that 55% of the urban section may be deficient in terms of Skid Resistance. A plan showing the extent of the carriageway that has been identified through SCRIM data as being deficient in terms of skid resistance (red sections) is attached at Appendix B3(b)(2).

The urban section of A68 is very heavily trafficked and has a high HGV and PSV content which will accelerate deterioration of the red and amber sections. Given the significant housing and employment sites in the area it is likely that the number of vehicles using the road will increase, specifically HGVs meaning that the rate of deterioration will be exacerbated.

The Local Transport Plan (LTP) sets out the Council’s priorities for transport and investment. The Council’s policy is that the LTP Funding will be allocated in the following priority order:

1. Maintain the existing highway asset;2. Manage the existing highway network; 3. Improve the highway network.

The Council’s Asset Management Policy and Strategy set a framework to determine priorities and funding decisions in relation to maintaining the highway asset. (see link below) https://www.darlington.gov.uk/transport-and-streets/highways/highway-infrastructure-asset-management/

Our approach to highway asset management is twofold: 1. to focus on maintenance schemes that support Darlington’s economy; and 2. to reduce or minimise long term maintenance liabilities.

Darlington’s HIAM Strategy states.

Carriageways (roads) are the asset group with the largest need for attention and the desired outcome of this Strategy is to improve their overall condition. The Strategy targets increased investment in them in order to arrest the progressive deterioration that was occurring prior to 2011/12.

Desired Outcome: to deliver a sustainable improvement in overall condition.

Higher levels of investment have been targeted towards maintenance. However, the latest Whole of Government accounts indicated that the carriageway element alone has an accumulated depreciation of £45.150m. Darlington Borough Council’s Maintenance Block Grant is £1.689m per year for ALL the Council’s Highway assets resulting in significant urgent competing demands for the funding available.

Competing demands on high priority maintenance issues has resulted in the Council needing to allocate additional resources over the last 3 years from Council funding. The Council has needed to inject circa £3.1million additional Council Funding to address significant deterioration of the unclassified network and key maintenance issues on bridges and structures, resulting in less investment in other assets.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 13: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

This demonstrates that the annual highways maintenance block funding grant is NOT enough to address the competing demands of urgent prioritised maintenance works.

The unclassified road network and structures could not be left un-checked and still require significant investment to arrest an alarming decline in condition; meaning potentially more difficult choices and prioritisation. This will mean reduced investment in other assets and further pressures and deterioration on the principal road network. The A68 is a key corridor for the Tees Valley and for the sub regional and national links.

The condition data is showing there is a need for intervention and a successful bid enable intervention at a point where it will be more cost effective. This asset condition and why the investment is need is summarised further in section B3(b)

c) What options have been considered and why have alternatives have been rejected?

A number of options have been considered: -

1. Do nothing

Deterioration of the asset will accelerate leading to more costly and time-consuming maintenance interventions. The Accumulated Depreciation of the carriageway asset will increase. The Sections that are currently identified as ‘red’ on the scanner data may need more reactive repairs. The areas identified as amber on the Scanner data will become red leading to more widespread issues, greater structural damage to the carriageway foundations and increased delays on the road due to numerous road repairs. The recently reported SCRIM data has highlighted a greater risk relating to skid resistance which has worsened considerably over the last 12 months.

This option was rejected as the asset data identifies the Council must take action and failure to act would be likely to lead to more costly long-term repairs and a greater increase in the depreciation of the carriageway asset.

2. Doing something

Phased Approach over 10-15 years using the Highways Maintenance Block Funding grant. This would increase costs (preliminaries/inflation/multiple traffic management set ups) and increase disruption to traffic/businesses/residents through annual works and long diversion routes. The condition of other parts of the network will deteriorate due to funding being prioritised towards the A68 corridor leading accelerated deterioration of the wider highway asset.

This was rejected as it would result in greater traffic delays and disruption leading to increased mileage and carbon emissions due to traffic being diverted multiple times. Phased work on the same road corridor is not popular with residents and road users and has a negative impact on public satisfaction. It is viewed as poor planning by the public. It would result in more costly repairs due to the condition of the A68 deteriorating, particularly on later phases. It would also lead to a deterioration in the rest of the principle road network and the wider highway network.

3. Additional Council funding

The latest Whole Government accounts indicate that the carriageway element of the highway asset has an accumulated depreciation of £45.150m. Despite focussing spend on maintenance priorities the Council has needed to allocate additional resources in the last 3 years equating to circa £3.1million in addition to Local Transport Plan funding to address significant deterioration of the unclassified network and key maintenance issues on bridges and structures.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 14: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

This was rejected as the Council has already prudentially borrowed additional funds to improve structural assets and the unclassified network. The Council has to balance the needs all residents across a range of general and focussed services. Further additional funding cannot be justified at a time when spending on other statutory services is being reduced significantly.

d) What are the expected benefits / outcomes?

• Reduction in the percentage of principal roads requiring planned maintenance - NI130/1 • Increase in public satisfaction with the condition of roads as measured by the NHT survey, which

is currently very low and below the national average • Reduction in the Accumulated Depreciation value for carriageways (Whole Government Accounts) • Improved skid resistance, as measured by annual SCRIM data • Reduction in distance travelled due to diversions • Reduction in carbon emissions due to diversions • Reduction in road traffic collisions on A68 • Increase in cycling • Better value for money in terms of proactive in-time maintenance taking account of whole life costs • Reduction in third party insurance claims • Reduction in traffic noise • Improved efficiency of the highway network in terms of journey time delay • Greater resilience in terms of flooding

f) What will happen if funding for this scheme is not secured? Would an alternative (lower cost) solution be implemented (if yes, please describe this alternative and how it differs from the proposed scheme)?

It would NOT be financially viable to deliver the proposed level of intervention if the funding was not secured.

Darlington’s annual Highways Maintenance Block Funding grant, (including incentive funding) is £1.689m for all assets. The calculation of block funding explanatory note (published by Government) covering the period 2015/16 to 2020/21 indicates that funding is allocated on the basis of: -

Asset Percentage allocation Annual DBC Block Allocation (£) Roads 75% 1,266,750 Split evenly between:

- A Roads 25% 422,250 - B and C Roads 25% 422,250 - Unclassified Roads 25% 422,250

Bridges 14% 236,460 Lighting 2% 33,780 Cycleway and Footways 9% 152,010 Source: DfT Highways maintenance funding allocations: 2015/16 to 2020/21 23 December 2014 2018/19 onwards indicative

Even if Darlington was to allocate all of the indicative Principal A Road network grant of £422,250 on an annual basis it would take 7-8 years to complete the work identified in the bid. During that time costs would have increased as condition of latter phases would have deteriorated further. In reality probably moving towards a 10-year phased programme. This would have a negative impact on economic growth potential as keeping the road well-maintained, with minimal roadworks is key to supporting the economic activity on this corridor.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 15: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Allocating all the funding to one road is clearly not an acceptable approach and would have a substantial impact on the ability to carry out maintenance on the remainder of the network leading to more costly interventions in the future on other parts of the network and other key assets.

There are some serious and urgent maintenance issues on this corridor that the Council would need to address from a safety and serviceability basis. This would be on a prioritised basis within the resources available over a long phased approach, possibly 10-15 years.

This approach will result is further reactive maintenance and further deterioration of the route, with higher long-term costs impacting on network condition and the travelling public. The position we are in is that we currently are required to employ less than ideal policy and strategy approaches that move away from DfT guidance and best practice because of funding issues and competing demands on those limited resources.

A successful bid would avoid additional costs arising from multiple phases of works with associated traffic management and site set up costs, as well as cost increases due to inflation and additional structural damage to the carriageway due to deferred maintenance.

g) What are the economic, environmental and social impacts of completing this project?

There are a significant number of positive outcomes from completing this project:

Economic impacts

The project supports the economic plans for the Western Growth Zone, assisting the development of the Burtree Garden Village as well as other major housing and employment sites on the A68 corridor. It also protects the productivity of existing businesses, in particular those in the logistics and distribution sector, and Arriva Bus.

The A68 is a key arterial route into the District Centre at Cockerton and town centre for residents of Darlington. Darlington town centre is a key destination for retail and other services for a wider hinterland in south County Durham.

The project will improve value for money through the intervention of in-time maintenance avoiding the risk of further costly damage to the structure of the carriageway. This will decrease the Accumulated Depreciation of the carriageway asset in the Whole Government Accounts and reduce the percentage of principle roads requiring planned maintenance as measured by NI130/1.

Environmental impacts

The A68 is a heavily trafficked arterial route and each time there are roadworks on the route it creates congestion on the town’s other arterial routes and connector routes. This leads to slower traffic speeds and greater emissions resulting in poorer air quality. Long diversion routes during road closures add to this impact. Therefore, condensing the works into a single programme will reduce delay and have a lesser impact on air quality. There will be increased resilience from flooding events, through better maintenance of the highway drainage asset.

Social impacts

The scheme will reduce the risk of road traffic collisions occurring through the construction of a new higher friction carriageway surface.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 16: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Maintaining access to key services along this corridor, including access to health, retail, education, leisure and employment sites, is important for Darlington residents and others from the wider sub region in the Tees Valley and County Durham. Services provided by the Acute Hospital, Foundation Trust and College have a wide catchment area.

Journey quality for all road users will be improved through the provision of a smooth carriageway surface and reduced noise. This will include the maintenance of an off-road cycle route alongside the urban section of the route.

There will be an increase in public satisfaction with the condition of local roads.

B4. Equality Analysis

Has any Equality Analysis been undertaken in line with the Equality Duty? Yes No

See Appendix B4

B5. The Commercial Case

This section categorises the procurement strategy that will be used to appoint a contractor and, importantly for this fund, set out the timescales involved in the procurement process to show that delivery can proceed quickly.

What is the preferred procurement route for the scheme? For example, if it is proposed to use existing framework agreements or contracts, the contract must be appropriate in terms of scale and scope.

Framework contract

Direct labour

Competitive tender

Darlington Borough Council leads on a Regional Surfacing Framework that is in place for all North East Authorities as part of the North East Highways Alliance. This framework is in place and offers a competitive market tested approach to engage specialist surfacing contractors effectively and efficiently. The Programme will be managed and supported by the Council’s Asset Management Team and Direct Labour Organisation. The package of works can be delivered within the timeframes as a result of having the frameworks in place. The Council also has frameworks and contracts in place for the all the supporting services and materials associated with the project. For example, traffic management, road marking, drainage and gully materials.

*It is the promoting authority’s responsibility to decide whether or not their scheme proposal is lawful; and the extent of any new legal powers that need to be sought. Scheme promoters should ensure that any project complies with the Public Contracts Regulations as well as European Union State Aid rules and should be prepared to provide the Department with confirmation of this, if required. An assurance that a strategy is in place that is legally compliant and is likely to achieve the best value for money outcomes is required from your Section 151 Officer below.

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 17: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

B6. Delivery of project

Are any statutory procedures, such as planning permission, required to deliver the project? If yes please provide details below;

Yes No

Details of statutory procedures before works can commence

n/a

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 18: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

SECTION C: Declarations

C1. Senior Responsible Owner Declaration As Senior Responsible Owner for A68 Corridor Maintenance Programme I hereby submit this request for approval to DfT on behalf of Darlington Borough Council and confirm that I have the necessary authority to do so.

I confirm that Darlington Borough Council will have all the necessary powers in place to ensure the planned timescales in the application can be realised. Name: Ian Williams Signed:

Position: Director of Economic Growth and Neighbourhood Services

C2. Section 151 Officer Declaration As Section 151 Officer for Darlington Borough Council I declare that the scheme cost estimates quoted in this bid are accurate to the best of my knowledge and that Darlington Borough Council

- has allocated sufficient budget to deliver this scheme on the basis of its proposed funding contribution

- will allocate sufficient staff and other necessary resources to deliver this scheme on time and on budget

- accepts responsibility for meeting any costs over and above the DfT contribution requested, including potential cost overruns and the underwriting of any funding contributions expected from third parties

- accepts responsibility for meeting any ongoing revenue requirements in relation to the scheme - accepts that no further increase in DfT funding will be considered beyond the maximum

contribution requested - has the necessary governance / assurance arrangements in place - has identified a procurement strategy that is legally compliant and is likely to achieve the best

value for money outcome - will ensure that a robust and effective stakeholder and communications plan is put in place

Name: Paul Wildsmith Managing Director and S151 Officer

Signed:

Submission of bids:

The deadline for bid submission is 5.00pm on 31 October 2019 Successful bids for Challenge Fund Tranche 2B are to be funded in 2019/20. An electronic copy only of the bid including any supporting material should be submitted to:

[email protected] copying in Paul.O’[email protected]

Highways Maintenance Challenge Fund 2019/20 Application Form

Page 19: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

0

m

Ho

ti~se. . lantn

' . I . ' . ' . , -::---

72 .-,· , ..

High Carlbury1 Fm I : -, ~

~

bin

0 83

• •

.:;;:.~ =::: = - .;: r ' H

· iffe J

JI

II - -

. 8

;. ycliffe ncfostrl'' 1°1:s ~:I -

I: 3,ii-iiiiii"ffl'm~

0 :I P n1=-=::;;.:;..;; ::i

3• ' ·~ig¥n=sJ1'" .,

~~l~y' Fm Coa\ham

-. Hous Fm ,,

• t-iigh I I

=OHlgh Cope

ON FE

5

□ □ 0

0 0 0

0 0 0 0 0

• DARLINGTON I BOROUGH COUNCIL

APPENDIX A2

Borough

Boundary

Swan House

Roundabout

Darlington

Farmers

Auction Mart

1

2

4

5

6

3

7

Key:

Rural Section

Urban Section

1

Burtree Garden Village (upto 2,000 homes)

2

West Park Housing (1,200 homes)

3

Coniscliffe Park Housing (1,500 homes)

4

5

Faverdale Industrial Estate (Employment)

· Aldi Distribution Centre

· Argos Distribution Centre

· Arriva Regional Bus Depot

Cockerton District Centre

6

Darlington Memorial Hospital

7

Queen Elizabeth Sixth Form College

8

Town Centre

9

Darlington Station (East Coast Mainline)

This map is reproduced from Ordnance Survey material

with the permission of Ordnance Survey on behalf of

the Controller of Her Majesty’s Stationery Office. © Crown copyright. Unauthorised reproduction infringes

Crown copyright and may lead to prosecution or civil

proceedings. Licence Number 100023728. 2010

Rev./Amdt.

Amendment Date Approved

17 Allington Way

Darlington

Tel : (01325) 405000

DL1 4QB

Fax: (01325) 388724

Project No. Project Title

Drawing Title

Drawn By Date Drawing No.

Scale

Approved By Date

Rev./Amdt.

001 A68 Corridor

8 A68 Growth Zone Maintenance Programme

9

GR 23/10/19

001

NTS

NW 23/10/19 0/-

Page 20: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

APPENDIX B3(a)(1)

Challenge Fund Toolkit

A68 Growth Zone Maintenance Programme (Urban) Scheme Name

Scheme Promoter Darlington Borough Council

Scheme Details Scheme Opening Year 2021 Apprasial period: 30 years

If you are bidding for multiple schemes please fill out a proforma for each scheme. Blue indicates data needs to be added.

SCHEME COST (£1000s)

Financial Year 2019 2020 2021 2022 2023 Totals: DfT Funding Sought 853,413 - - - - 853,413

LA Contribution - 284,471 - - - 284,471 Other Third Party Funding - - - - - -

Total 853,413 284,471 - - - 1,137,884

All Schemes

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Length of Scheme 2.613 (Km) Number of vehicles on affected section (split by vehicle type if possible) 23,164

(Total vehicles - AADT) Measured at an automatic traffic counter site

Cars 22,531 (Cars - AADT) LGV 60 (LGV - AADT) HGV 344 (HGV - AADT) PSV 229 (PSV - AADT) Average Speed on Route 38.6 (Km/h) Measured at an automatic traffic counter site

Type of Road

(Motorway, Trunk, Principle or Minor)

Principal Road, Primary Route, TfN Major Road Network (MRN) and Tees Valley Key Road Network (KRN)

Whilst the proforma focuses on Scanner data outputs, anther key dataset, SCRIM data, Other salient information for indicates that 55% of the urban section is deficient in terms of skid resistance. A plan the VfM Case showing the extents of the road that has been identified through SCRIM data as being

deficient in terms of skid resistance is attached at Appendix B3(b)(2).

Carriageways

SCANNER CATEGORY Proportion of the road

Average RCI Number

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Red 5% 116 Amber 27% 63 Green 68% 8

Cycleways

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Number of Cyclists 107 Cyclists/day Measured at an automatic cycle counter site

Diversion

Input Data Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Page 21: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Bridges

Please give information about the diversion Route

The diversion route is along roads of a similar standard to the A68, predominantly principal classified roads - the A1(M) cant be used as part of the diversion as some

vehicles are banned on motorways. From A68/Faverdale roundabout north west along A68, across A1(M) to A6072 Swan House roundabout, then north along A6072 to B6444 Heighington Lane roundabout.

From the roundabout east along B6444 to roundabout with St Andrews Way, then south and east along St Andrews Way to the A167 roundabout junction. South along A167,

over A1(M) through Darlington to the Town Centre at A68 Northgate roundabout. From there south west along A68 to Bondgate then north west along Bondgate to the

Woodlands Road/Bondgate signal controlled junction. Copy of diversion route attached at Appendix B3(a)(2)

Length of any diversion route, if closure is required (over and above existing route) 16.2 km

The existing route is 2.6km and the diversion route is 18.8km

Average extra time per vehicle on diversion route (over and above existing route) 20 mins

It typically takes 5 minutes to travel along the section to be closed in light traffic conditions. It typically takes 25 minutes on the diversion route in similar conditions.

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Please give information about any current or planned weight restriction n/a What year is this restriction due to come into place (if preexisting please put 2018) n/a

Number of days per year the restriction is in effect n/a

What vehicle class does the restriction apply to? Cars n/a LGV n/a HGV n/a PSV n/a

Flooding

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Number of closures due to flooding per year n/a

(number of closures/year)

(Average) Duration of closure due to flooding n/a

(duration of closure - hrs)

Page 22: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Challenge Fund Toolkit

A68 Growth Zone Maintenance Programme (Rural) Scheme Name

Scheme Promoter Darlington Borough Council

Scheme Details Scheme Opening Year 2021 Apprasial period: 30 years

If you are bidding for multiple schemes please fill out a proforma for each scheme. Blue indicates data needs to be added

SCHEME COST (£1000s)

Financial Year 2019 2020 2021 2022 2023 Totals: DfT Funding Sought 1,406,364 - - - - 1,406,364

LA Contribution 150,000 318,788 - - - 468,788 Other Third Party Funding - - - - - -

Total 1,556,364 318,788 - - - 1,875,152

All Schemes

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Length of Scheme 5.8 (Km) Number of vehicles on affected section (split by vehicle type if possible) 6,041

(Total vehicles - AADT) Measured with a carriageway tube traffic counter

Cars n/a (Cars - AADT) not available LGV n/a (LGV - AADT) not available HGV n/a (HGV - AADT) not available PSV n/a (PSV - AADT) not available Average Speed on Route 86.9 (Km/h) Measured with a carriageway tube traffic counter

Type of Road Principle

(Motorway, Trunk, Principle or Minor)

Primary Route, TfN Major Road Network (MRN) and Tees Valley Key Road Network (KRN)

The rural section is made up of two distinct sections. A 3.3 km section from Swan House Roundabout to Houghton Bank has been identified as needing resurfacing due to

a recent SCRIM survey indicating that 34% of the carriageway is deficient in terms of Other salient information for skid resistance. A 2.5 km section from Houghton Bank Lane to the Borough Boundary the VfM Case has been identified as needing resurfacing and partial reconstruction as the result of a

scanner survey. A plan showing the extents of the road identified through SCRIM data as being deficient in terms of skid resistance is attached at Appendix B3(b)(1).

Carriageways

SCANNER CATEGORY Proportion of the road

Average RCI Number

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Red 10% 128

This information relates to the 2.5km section of A68 that has been dentified as needing resurfacing and partial reconstruction as the result of a scanner survey.

Amber 49% 66 Green 41% 13

Cycleways

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Number of Cyclists n/a Cyclists/day not available

Diversion

Page 23: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Bridges

Input Data Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Please give information about the diversion Route

From the A68/B6275 junction in a north westerly direction to the A688 junction along the A688 in a north easterly direction to its junction with A6072, then in a south easterly

direction along A6072 to the Swan House roundabout. Copy of diversion route attached at Appendix B3(a)(2)

Length of any diversion route, if closure is required (over and above existing route) 9.3 km

The existing route is 5.8km and the diversion route is 15.1km

Average extra time per vehicle on diversion route (over and above existing route) 10 mins

It typically takes 4 minutes to travel on the section to be closed in free flow traffic conditions. It typically takes 14 minutes on the diversion route in the same conditions.

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Please give information about any current or planned weight restriction n/a What year is this restriction due to come into place (if preexisting please put 2018) n/a

Number of days per year the restriction is in effect n/a

What vehicle class does the restriction apply to? Cars LGV HGV PSV

Flooding

Input Data Specific Data Units

Other Supporting Data / Information (either input directly or provide reference to supporting information reported elsewhere)

Number of closures due to flooding per year n/a

(number of closures/year)

(Average) Duration of closure due to flooding n/a

(duration of closure - hrs)

Page 24: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

APPENDIX B3(a)(2)

A68 Growth Zone Maintenance Programme

A68 Urban section diversion route

Route DescriptionThe diversion route is along roads of a similar standard to the A68, predominantly principal classified roads - the A1(M) can’t be used as part of the diversion as some vehicles are banned on motorways.

From A68/Faverdale roundabout north west along A68, across A1(M) to A6072 Swan House roundabout, then north along A6072 to B6444 Heighington Lane roundabout. From the roundabout east along B6444 to roundabout with St Andrews Way, then south and east along St Andrews Way to the A167 roundabout junction. South along A167, over A1(M) through Darlington to the Town Centre at A68 Northgate roundabout. From there south west along A68 to Bondgate then north west along Bondgate to the Woodlands Road/Bondgate signal controlled junction.

Page 25: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

A68 Growth Zone Maintenance Programme

A68 Rural section diversion route

Route DescriptionFrom the A68/B6275 junction in a north westerly direction to the A688 junction along the A688 in a north easterly direction to its junction with A6072, then in a south easterly direction along A6072 to the Swan House roundabout.

Page 26: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

~ Data Filters (Adv. Filter

Year Casualty Sev ...

Multiple ... v All V

Local Authority

Oarlingtoo V

Police F ... Casualty c ...

All V All V

Road User Group

All V

Age Group Child/Adu ...

All V All V

Casualties by 5 Year Age Group

©Co 4

.,.,, 6

1116 12

>620 36

2125 37

2&:l<) 35

31"' 17

, ..... 26

'<1--45 21

*"' 22

s, 56 25 .. ,,, 16 ., .. 12

~ro 9

7175 8

7680 8

811!5 3

North East Englan d Road! User Casualty Dashboard Number and Severity of Casualties by Year

Hotspot Plan

Casualties by Year and Severity Location and Severity of Road User Casualties iear Fatal Serious Slight

2009 5 26 2010 4 20 2011 8 33 2012 ,

31

2013 1 4 21 _2014 1 ., ·37

2015 14 2016 ' 1 19 2017 5 22 2018 10 ·15 2019 4 10 Total 3 45 249

Car Occupant

201

Total

31 ,. 41 33 .. 26

-40 .. 14 21 27 ·25 .. 14

297

40

30

20

10

0 /" 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 201g

Year

SCHOOL AYQ.IFFf

Newton / Aycliffe f

Severity e Falal e Serious e s light

Casualties by IRoad User Group Walworth

Pedestrian Pe<lal Cyclist

26 , -0

Bus, Minibus or... Motorcyclist

17

Goods Vehicle Occupant

13

WALWORTH

Piercebridge

l> Bing

Casualty Severity e Fatal e Serioos e s lighf NB. Due to the amount of data availableJ thi s

plan only shows a sample of injury locations at high zoom levels. For the most accurate data

on casualties in small areas1 use fitters to reduce number of points displayed to under 3,500, Please note that all data front the e1o1.rrettt and previo1.1s year are provisional, ancl are subject to change. L,3s,: Upda1e 001ober 201&.

APPENDIX B3(a)(3)

A68 Growth Zone Maintenance Programme

A68 Road Traffic Casualty Dashboard

Page 27: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Issues

Br ack enb ury Leases

158.8m

Sto b Hill

GP

174.2m

Tr ack

Co Con st , U A & CP Bdy

CRAG LANE

Wellfield House

Stone Croft

RH

The C ou nt ryman

Tr ack

Drain

Co Con st , U A & CP Bdy

Tr ack

201.2m

King's Head

Lay-by

Sand fo rth Moor

Bo lam G range

200.0m

Co Const , U

A & CP Bdy

RH

134.4m

RH

Ponds

House

The Smithy

180.7m

Ne w big gin M oor

Issues

FF

Ox M oor H ouse

So uth

FW

Ne w biggin

Ro se

152.7m

116.1m

Li ng B eck

Pond

Def

Pond

HOUGHTON

BANK LANE

Gre at B o lde arns Hill

179.5m

Def

The

FB

Po nds

Beck

HOUSE LANE

Tr ack

183.5m

174.7m

Grim sha w Hill

Grimshaw Cottage

RH

Pond

RH

RH

RH

Tr ack

Drain

HIGHSIDE ROAD

113.4m

FarmHa lliwell

RH

COWFOLD LANE

Tr ack

Re dw or th Estate

121.3m

Smithy CR O SS

FB

Heap (dis)

20

18

(Pond)

Shelter

119.8m

Drain

ROAD

4

1a

1

PINEW OO D C RESCENT

25

33

15

GREEN HILL ROAD

36

151.5m

10

13

9

Pond

The Maple

11

Ch urc h of England

RH19

Ho 25

Millbank

1517a

WATER LANE

The

PO

Co at sa y Moor

11

GARTHLANDS

13

11

11a

1

Stone

2

1

33

Phoenix

140.5m

18

A 6 072

Gardens

13

PH

Appeldoorn

COURT

COATSAY MOOR LANE

12

10

3

16

18

St on ycrof t

Tr ack

Mast

Co C

onst

, UA

& C

P Bd

y

Path (um)

156.8m

Drain

170.8m

Paddock House

TCB

FarmHo useWh ite

Farm

Ivy House

West House

Township Farm

Ford

Brown Side

Trac

k

ED B dy

King's Head Cottage

UndRH

Pond

Der e Stre e t

Drain

112.5m

122.5m

To yt op Fox Covert

To yt op Plantation

The Byre

House

188.4m

Foot

173.7m

Def

Toyt op Farm

Issues

Ponds

Whygarth

Su nny dale

South

RH

Li ng B ridge

Ne w biggin

Def

126.2m

Garden

RH

Def

View

Tr ack

RH

Beck

166.1m

Tr ack

Sinks

Sinks

Hill

Todd Fa ll Farm

Issues

GP

Elm G range

Tr ack

141.1m

Tr ack

Moor

Pond

Ponds

Broom

Red House

WALW

ORT

H RO

AD

Def

Ruin

AUCKLA ND ROAD

Tr ack

Issues

Pond

Drain

LB

Pond

Tennis Courts

Pump11

Pumping

3

17

Tw insburn Lodge

MA IN R OAD

49

68

BATT LANE

32

2

11

Ho pe Ho use Farm

15

36

14

LB

113.7m

35

14

The C ottages

117.1m

Drain

MILL

BANK

1

56

Pri mary School

GP

3

1a

Pond

1a

33

Square

12

West G reen

Dovecote

10

SOUTH VIEW

Redlands

130.5m17

Heighington

23

113.3m

13

1

18

6

RH

11

20

Tr ack

Pond

20a

Dovecote

Vicarage

108.5m

9

47

138.4m

108.2m

22

SCHOO L AYCLIFFE LANE

Pond

Tk H

Path (um)

Tr ack

195.2m

Cattle Grid

Garden

Quarry Cot t age

Quar ry G

range

Path (um)

Killr iggs

G allop

Bolam

Collects

Workings

Ch ur ch Farm

Drain

RH

Tawny Croft

Def

CHA RTE R LANE

RH

Co Con st , U A & CP Bdy

Ford

205.4m

201.5m

RH

Def

197.8m

A 68

To y Top

Issues

Issues

188.1m

RH

Bridge

Pond

Issues

Li ng Beck

Ho ughton Plantation

Ho ughton Bank

RH

Tr ack

122.5m

A 68

View

Co tt age

Farm

Issues

FB

CentreLe arning

Pond

Def

123.4m

HOUG

HTON

LAN

E

RH

Hil ls ide

Earthworks

Meadows

O x C lose Farm

HOUG

HTON

BAN

K LA

NE

Bryncroft

CORN ER BANK LANE

Shelter

WHITE

Issues

186.5m

Issues

186.2m

Lodge

Def

Windmill(disused)

Tr ack

Tr ack

Pond

Tanks

179.2m

RH

178.6m

Pond

No rth

Issues

Dykes

Red House

Farm Cottage

Tr ack

Bu rr ell M oor

A 68

A 6072

WALW

ORTH R

OAD

Drain

1

2

HOM

E FARM

COURT

118.6m

37

RH

Pond

1 10

7

13

118.3m

30

15

20

41

16

30

1

CLOS

E

11b11a

10

2

124.1m

141.1m

28

151.2m

WALW

ORTH ROAD

The

Orchard

2321

COUR TINE

GP

Buck

143.9m

Shelter

Sh elter

13

Tr ack

2

1

16

A 6 8

15

Hal l Farm

COATSAY MOOR LANE

45

A 607

2

4a

6

Pendle

War d Bdy

Drain

RH

Tr ack

North Field

Lou gh H ouse

Woodside

FF

Tr ack

168.3m

House

188.2m

Tr ack

Tk H

Tr ack

200.9m

The Lough

Track

DUNW

ELL

LANE

PH

Drain

Def

DefFF

Farm

Def

Dunwell Field

FW

RH

ROMAN ROAD

GP

RHCo Con

st & UA Bdy

B 62

75

ROMAN ROAD

Ro yal O a k Farm

198.1m

116.1m

Und

RH

Path (um)

Path (um)

Moor House

High

NEWBIGG IN LANE

Sinks

Blu e H ou se Farm

Def

Farm

180.4m

Issues

Fow ler House

RH

Oa kw ood

Tenement Beck

Und

Th e Green

Pond

152.4m

Jub ilee Tr out Farm

FW

FW

Sinks

Mount Pleasant

Tr ack

HOUS

E LANE

Tr ack

Barn

Gallo

p

Def

A 68

FW

Fort

Tr ack

RH

Tr ack

Par k H ouse

Path (um)

Def

Sinks

138.1m

Pond

The Cottage

Red House M ill

(PH)

The D og

Re dw or th H all Hotel

SHILDON ROAD

RH

Mast

High Side Bank

Workings (dis)

119.8m

Issues

1

8

6

Tw ins Burn

Issues

4

20

3

18

Redworth

116.9m

39

142.3m

Nursery

12

48

50

2

11

Playg round

BURNB ECK PLACE

Deneville11

114.0m

28

33

13

Tr ack

Hopelands

12

1

(disused)

147.5m

27

2954

17

(PH)

4

2

LB

2737

36

Sports Facility

Stobbvale

Sub Sta

TC B

10b

12b

6

Tr ack

14a

11b

14 18

CHURCH

HALL L ANE

The Cumby Arms

105.2m

VIEW

Rowan Garth

9

4

35

11b

5

12

WE ST AU CKLAND ROAD

1

26

MAN OR

STATION

Tudo r Ct

ROAD

1

10

Ruin

Trafalgar House

Brackenbury Leaz es Farmhouse

STO BHILL LANE

155.2m

167.4m

189.3m

176.9m

RH

Old School

RH

Prospect Cottages

Drain

Garth Cottage

194.5m

Pond

FB

Tr ack

Issues

Drain

Drain

BROWN SIDE LANE

SUMM

ERH

OUSE

BAC

K

A 68

RH

Drain

Issues

Def

ROMAN ROAD

Co C

onst

, UA

& C

P Bd

y

B 6275

166.4m

B 6275Dere Street

CR

188.1m

Eas t L ime ki ln Banks

Issues

Pond

196.6m

Ponds

A 68

Kit ch ing's

Sinks

Def

Coach

Pump

178.9m

172.5m

174.7m

Ho ug hto n Grange

View

FW

Tr ack

Barn

158.2m

121.6m

Pond

East

Issues

House

181.1m

Tanglewood

Def

Valley

Pond

GP

Quarriston

Def

FW

140.8m

186.2m

Farm

Be llow B an ks Hill

RH

PA RK

Drain

Sh ac k le ton Beacon

PA RK HO USE LANEWest Lodge

Def

Hal liw ell Beck

Def

Lodge

179.8m

120.1m

124.4m

28

Po nd

15

A 68

Issues

12

Def

HUMBLE CARR LANE

3

14

10

GRAN GESIDE

15

38

Well

39

WE STWO OD AVENUE

El Sub Sta

23

25

11

Dene Beck

1817

27

26

46a

36

15

149.0m

16

Def

El

142.0m

WE ST AU CKLAND ROAD

Lilacs

Lynholme

HOPE

LAN

DS C

OURT

78

2

26

13

1

Cen t re

El

12a

Playin g Field

Tor val

GP

20

4

35a

Weig hbridge

32

16

39

11a

Cottage

The

110.6m

Issues

Def

8

6

1

1

14

Healy House

Alexander Cottage

De ne B r idge Farm

A 607

2

184.3m

RH

RH

Trac

k

Issues

ED B dy

Pr ospect

Moresby House

House

Chapel House

183.3m

Ch urch

Meadow View

Tr ackTr ack

Co ver tside

RH

Dobinson's Rush

LANE

King's Head Cottage

Legs Cro ss(restored)

Def

FF

129.5m

201.5m

B 6275

CR

ROMAN ROAD

Ponds

Sinks

202.7m

FarmLeg g's Cross

Pond

Hig h H o use Farm

Def

DefLi ng B eck

Tr ack

FF

Pr imr ose Farm

Moorfie ld

Wood

NEWBIGG

IN LANE

RH

Jub ilee W ood Farm

RH

Tr ack

Farm

FF

Corne r Beck

Chapel House

Ling P lantations

Field

Houghton Lodge

176.8m

Manor House

FW

175.6m

House The

Tr ack

Issues

Kittythir st Spring

Mast (Telecommunication)

Redw ort h Wood

RH

Shackleto n Beacon

FF

Pond

Rowan Cottage

Path (um)

RH

RH

RH

Walw o rt h M oor Farm

Pond

Br oo klyn

WA LWO RTH ROAD

The Stables

The Gr een

170.1m

Pond

Sinks

HIGH

To wn F arm

All otm ent Gardens

156.1m

EDEN CLOSE

1

1

Lay-by

HIG HSID E ROAD

MILL LANE

38

26

143.6m

32

Pond

1

11

Pond

A 6 072

South Barn

15

1

9

TWINS BURN

4

23

The

Tr ack

Copse

The B ay Horse

27

Pond

12

2

9

2a

4

18

MoorCottage

Vicarage

East Green

Dene Bridge

49

43

Court

Nu rs ery

4

2

6a

4

Jepson C ottage

STATION ROAD

RH

Well

Drain

RH

165.9m

LB

Pear Tree House

Drain

The Old Vicarage

FarmSo uth View

Summersdale

CRAG LANE

(dis)

Crag Pla n tation

Sewage Works

190.8m

Ford

RH

Broad AcresHighclose

Dunwell Field

Issues

Def

RH

FF

Co Const , U

A & CP Bdy

FF

Ro ya l Oak

Def

Der e Stre e t

207.9m

Def

RH

Foot Br idge

Denton Grange Moor

M oo r F arm

Def

Sid e Hill

Drain

156.7m

Ho ughton Bank

Tr ack

FF

Cottage

Slurry Bed

Ho ughton -le-Side

Drain

Pontoon

Ho ug hto n B ank Farm

135.6m

Issues

Elm Bank Cottage

Def

175.0m

White

Ho ughton Ba nk Plantation

Red H ouse

163.7m

Todd

162.5m

HIGHSIDE ROAD

158.8m

RED HO USE LANE

Def

Pond

CottWalworth

Issues

Farm

A 6072

Br oo m D ykes

Pond29

26

175.9m

HIGH ROAD

WE ST

Plan t ationSwa llow Hole

Sw al low Hole

19

Hall

119.2m

Twi ns b urn Farm

SURT

EES

ROAD

Station

Shelter

Issues

1115

West Barn

2

59

26

Redw ort h Grange

58

61

14

Ppg Sta

22

Westholme

26

1

RED WO RTH ROAD

34

2

14

25

5

15

46

4a

2

TWINS

BURN ROAD

12

11

3

8

1

7

11

Rock Lee

14

2

2a

Holmlea

27

TH E

1

16

Hea l t h

3130

105.5m

Pp

42

2

Pag e Farm

Pump

DAR LING TON ROAD

HallVillage

Sto bb H ouse Farm

War M emorial

COURTVIC ARAGE

9

37a

Coatsay

116.4m

MOOR LANE

37

141.7m

Hall

5

20

99.1m

133.5m

Ford

Cattle Grid

RH

Gas Burner

170.4m

158.8m

Farm

FW

Path

(um

)

NORT

H LANE

Tr ack

Chapel Barn

198.6m

St A n dr ew's

RH

Wid ehope

Amirene

Kennels

190.5m

Tr ack

Issues

190.2m

FW

BLIND LANE

RH

Def

202.4m

207.0m

RH

189.6m

Der e

Stre

e t

203.0m

RH

To y Top

Issues

RH

Plan t ation

The Gr anary

Tr ack

FW

CottageRose

Meadow View

Bramble

150.6m

112.8m

HOUG

HTON

LAN

E

RH

121.9m

RH

RH

Garden

Tr ack

The Ivy Cottage

South

Pp

Def

Issues

Cottage

179.8m

Issues

176.5m

Hal liwell

HIGHSIDE ROAD

Fall

Tr ack

Path (um)

Sinks

155.8m

A 68

STO NY BANK

Redw ort h Wood

Co ck In n Farm

Br oo m D ykes

RH

Red House

Oakcroft

175.9m

Leab ank Farm

Twi ns Burn

Co w fo ld Farm

LA N ES

Sinks

Po nd

The G reen

RH

TC B

Runnymede

Re dw or th H all Wood

The Byre

Def

1

27

Trac

k

Twi ns Burn

15

2

ST M ICHA EL'S CRESCENT

WALW

ORTH R

OAD

19

JUD ITH CLOSE

4

11

17

Pit

SNACK GATE LANE

Sub S t a

47

18

12

Hei gh ington

REDWORTH ROAD

150.6m

5

1829

15

10

12

Def

Sports Pavilion

11

15

22

St M ich ael's Church

10

(PH)

Lew iston

8 10

The Cumby B ungalow

COATSAY

House

House

41

9a

75

Tennis

5a

3

BEECH CRESCENT

A 6072

The Arches

This map is reprodu ced from Ordnance Su rvey material w ith the permission of Ordnance Su rvey on behalf of the Controller of Her Majesty ’s Stationery Office. © Crow n copyrig ht.

1:15,000Scale:Date:A68 Ru ral Section

2018 Scrim Deficiency, at or below investig ation level 07/10/19

7

8

2

2

1

5

4

2

1

1

6

6

1

1

1

1

1

9

6

9

2

1

1

1

3

3

2

3

6

4

2

9

1

3

1

7

3

PC

Swan House Roundabout

Houghton Bank

Borough Boundary

A68

A68

APPENDIX B3(b)(1)

,,..~ ... lail DARLINGTON iiWi BOROUGti COUNCIL

Page 28: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Ch apel

2

31

Sq uare

3

14

22

10

12

15

32

WATER SIDE

School

Chur

ch

7472

SC H O O L ST

61

38

2

19

10

15

Beck

1 15

1431

39

24

14

5

18

48

66

23

204

18

20 to 24

The

Cotta

ge

29 27

28a

46

31

5

31

1

Pines7

33

CAR

ME

L R

OA

D NO

RTH

1

12

1129

23

3547

5

El Sub Sta

36

252250

260

1b1c

1026

64

225

1

Tho rnlea

274

50.0m

Sq uir es Court

Libr ary

56.8m

Thornfie ld

TH O R N BU RY RISE

Surgery

98

56.1m

31

SP R IN G COURT

12

2

56.3m

24

139

129

6

19

27

209

58.5m

Tem

pes

t An

ders

on H

ouse

22

46

43

Sta

Sub Sta

14

45

53

WE

STLA

NDS ROAD

45

85

CB

28

50.4m

14 to 19

44

126

HOL

ML

ANDS ROAD

170

78

Mast

El

121

18a

1

8

1

48

DE N E SID E ROAD

111

124

Pavilion

26a

PIE

RR

EMO

NT C

RESC

ENT

154

Outfall

44a

2a

TC BPIE R R EM O NT GARDENS

41

8

12

65

58.9m

30

M ews

CR

27

5 to 8

BL IS S C LOSE

BR IN K B U R N DRIVE1

20

53

30

TCB

2

6

47

16

15

33

PIER R EM

ONT GA

RDEN

S25b

Youth andCommunity

42

24

139

BRIN

KB

UR

N DR

IVE

68

96

8

33b

1

1

CF

5

135

14

28

38

41

51.2m

12

LB2

11

95 95a

2

115

54.7m

22

THE W

OO

DLANDS

11a

56

69

50

10

6

23

14

East

Clock Tower

57

53.3m

38

2

44

21

60 56

145 141

2

1

4

56

99

CLEV

ELA

ND AVENUE

19

43

CO URT

43

32

20

10

37

Brinkbu rn Dene

40

1

24

DEF

1

4

1a

O RC H A R D ROAD

15

Villas

96

3a3

3

98

1

Drain

1

14 to 19

70

Co mm un ity Centre

1160

467

71

Ba lanci ng Tank

Sta n ton

Westlea House

El Sub Sta

1

2

24

51

65

57

Hospital

Re id S tr eet Pr imary School

24

M A N SL EY COURT

35

Cocker

5038

2

15

16

58.6m

123

Chapel

El Sub Sta

35

48

FB

33

2816

BRA

WTO

N

23

26

44

23

33 23

76

15a

513

20

59

25

23

CF

Hone

ypo

t Lan

e

58 .0m

El Sub Sta

7858

129

143

193

Playg round

77

SE D G WI CK STREET

23

44

41

47

47.7m

2

24

49

2

5

1

57

1426

59

98

92DA R R O W

B Y DRIVE

CW

0.25

23

374

39

1238

SALI

SBUR

Y

1325

WIL

SON

STR

EET

72

2

18

MP 1

CR

3

1 to 27

El Su

b Sta

Co urt

14 to 15

43

47

Works

5

28

7765

40

62

55

53a

57

59a to 62

17

2321

Bo w ling Green

13

34

3448

29

2058

55

1

2

17

7

14

16

68

66

57.9m

14

14

1115

6

17

1a

14a

Ho ly F amily

16

8

LA NE

10

5

19

12

10

2

10

49.4m

36

Wes t B eck

Allo t ment Gardens

17

32

1 to 9

2

22

Hous

e

34

25

2

16

32

Yew

Lodg

eTh

e

LB

CR

13

32

38

57.0m

52.7m

3953

49

54.5m

48

248

14

53

4

TH

1to 6

86

2

15

21

MO

OR

LAN

DS ROAD

21

124

212

2

LB

134

23

30

31

TCB

15

Tand rid ge Court

NEW

LAN

DS ROAD

34

29

1

199

AUC K LA

N D AVEN

UE

55

187

78

26

22a

Stand

56

164

2

106

55

39

The

Syc a

mores

Tennis C ourts

20

27

181

Play A rea

26

Club

65

29

2627

16

Ce dars

103

14

169

6

8439

7

Brinkburn D

ene

40

WIL LO W ROAD

Green

Pavilion

90

28

3

150

Meadholme

El Sub Sta

Co urt

1 to 4

6

47

28

30

FB

98

138

5

51

13

24

27

39

67

54

69

Path

Lakeland Estates Business Park

28a

78

125

57

56.3m

4

1

Tanks

33

2

Dentdale

51

101

39

14 to 17

51

11

84

113

23

46

49

14

48101

91

50

1

22

CO URT

LA NE

107

CF

17

Bo w ling Green

34

129

1 to 6

WILLOW ROAD

23

FA RN HAM

Posts

37

84

11

Orc

har

d C

ourt

M eth odistPier r emont

18

10

TR IS TR A M AVENUE

20 to 31

1

65

TCB

1274

25

Pond

Tk F

D Fn

49 to 54

56

48

28

1

12

17

Ha ll

71

El Sub Sta

War

82

44

2a

27

83

131

Sloping masonry

Oaklea House

Po sts

CW

14 24

1323

War d Bdy

16

3

Allo t ment Gardens

24

49

502

10

G RO VE

3

18

21

DA R R OWB Y DRIVE

ALD

GR

OVE

WAY

Ho ne yp ot La ne C aravan Site

26

4

31

48 .6m

18

13

1

8

HE N S FIE LD GROVE

43

206

10

2

12

23

49

3

1

33

51.2m

25

38

28

Playg round

25

4

10

103

62

69

LB

7273

1

37

66

to 66

11

4

66

BAR

NIN

GH

AM

STREET

2

28

9

76

BR IN K B U RN ROAD

12

11

1

Tanks

55.0m

3

9

47

DO D D S S TREET

11

OAK

LA

NDS

TERRACE

81

2

35

39

20

37

28

47

CO C K E R TO N GREEN

14

58

56.8m

23

12

9

9

18

War d Bdy

1

27

15

6

Cock

erto

n

1

12

7

STA IN D R OP ROAD

CO C K E R TO N GREEN

49.4m

28

17

BA TE S AVENUE

27

29

11

206

14

Cart H

ouse

34

39

15

14

213

Coach

Groom

s

28 26Ba nk

16

54

37

LB

13

28

192

TCB

CO M PT O N GROVE

FOR

CET

T STREET

War d Bdy

CR

43

58.5m

CAR M

E L R

O AD N

ORTH

254

LB

60

Ga rdens

84

O R

1

268270

Mast

14

72

57.1m

52.9m

14

1

Club

WIL LO W ROAD

146

223

214

2

SM

76a

36

28

138

13

2a

14

45

138

BOY

ES

HIL

L GR

OVE

1a

156

52.6m

75

TH O R N BURY

28

63

67

52.1m

50.6m

38

50

128

13

Miniat

ure R

ifle Ra

nge

64

70

Play A rea

The O aks

HE A TH ER W O OD GROVE

1 to 16

28

183

13

Sub

HOL

ML

ANDS ROAD

3927

Ath le ti c Ground

88

95

LB

6

156

46a

O VAL

96

50.0m

37

57

40

28

7

88

M ILB A N K ROAD

BRA C

K EN R

OAD

2833

22

100

2

3

62

The Milburns

War d Bdy

141

2

1

1

33a

2

21

15

90

5

129

2

26

BR IN K BURN

84

1159

74

19

3

53.5m

Dentdale West

84

93

El Sub Sta

48

14

BRIN

KB

UR

N AVENUEMA RW

OOD C RESCENT27

16

15

81

1

1

El Sub Sta

STO NE D A LE CRESCENT

1 to 8

68

153

158

1

6

Honeypot Lane

61

73

14 to 25

3

19

38

50

37

14

14

10

92

90

28 to 35

O AK H U R S T ROAD

49

FB

83

BE LL BURN66

Sports Facility

CR

Club

24

52.5m

38

VIN E ST REET

121

HAM

STER

LEY STREET

HO NEY WOOD

56.7m

8

12

16

43

30

18

Path (um)

Clar emont

Clar emont

St M att hew &

54.2m

38

TR IN ITY M EWS

32 to 43

20

HOL L

Y HU R

ST RO

AD

60

Vicarage

7686

2

1a

43 to 48

4438

30

CR A IG S TREET

13

El Sub Sta

The B rinkburn

21

Honeypot Lane

E M et

Ha ll

Po sts

1

70

TCB

BR IN K B U RN ROAD

39 37

19

TRA

FALG

AR

TERRACE

37

FW

RE ID S TREET

51.1m

2

128

1

93 to 109

15

Chy

RO S E B ER Y STREET

24

24

24

HAR

RIS

ON

TERRACE

25

57.1m

30

14

SchoolNu rs ery

Darli ngton

11

42DA

R R OWB Y D

RIVE

67

54

121 to 127

191

1

71

13

SK E LD A LE GROVE

45

37

111

218

NO R T H COTE

5

12

1

1

19a

49

60

95

119

2

57.2m

13

Vic

8

24a

17

14

17

96

Sub

2 2

48

47

36

3119

4

618

155

ELM TREE STREET

58

63

216

41

6678

89g

15

46

42

26

35

24

51

1228

8

1

5

Carmel ite Convent

1 to 6

40

DRIVE

11

12

1

16 to 24

8

14

41

Cocker

1

22

3

Ho ly Fa mily RC

11

16

11

3

O SB O R N E CLOSE

16

42

36

El Sub Sta

WE

STG

ATE

CRE

SCEN

T

303

27

26

Grey

stone

s

25

22

Sub

PRIO

R D

ENE

43

5

Car Park

3337

63

CR

El Sub Sta

1d

50.8m

28 to 40

75

91

WE S T A U CK L AND ROAD

65

30

2

6

14 to 56

CR

48.8m

148

Lodge

3

110

117

25

282

5

GAR

TH

LAN

DS ROAD

215

206

21

19a

38

25

197

47.8m

134

3

173

1

1230

82

58

27

26

202

Stand

57W

ES

TAUC

KL

AND

ROAD

Sub

37

25

3430

176

65

183

60

58

117

11a

187

Courts

77

132

95

18

BA R L O W S TREET

1 to 6

17 to 28

25

1a

Darli ng t on Railway

23

105

25

30

15a

Post

The

49.7m

116

12

2

25

BAN

KLA

NDS ROAD

1 to 4

Banklands Court

83

33

Mast

Ave ley

49.2m

49.7m

24

Ar ms trong

78

LB

145

2a15

BLU

EBE

LL C

LOSE

12

56

13

33

90

CED

AR

ROAD

131

Bus Depot

6

52

143

14

13

25

79

40

1

56

79

39

PIER

REM

ONT ROAD

43

WA YL AN D T ERRACE3

64

2

9

64

4650

50a

26

3646

Allo t ment Gardens

15

VIN E ST REET

36

52.7m

24 to 27

PIERREMONT

50

27

1

12

MO R N IN G TON LANE

12

El Sub Sta

99

4

Ho llyhurst

26

39

59

47

52

74

Skatepark

52.4m

11

37

42

2

46

Ho me f o r th e Aged

War d Bdy

124

52

43

23

7 to 12

112

15

28

33

67 65

2

1 to 12

(Hea

lth

Cen

tre)

13

14

Ch urch

El Sub Sta

35

10

CA L LU M CLOSE

Und

36

2

32

Ch urch

86

46

49.9m

St M atthew's

164

66

1

Pond

LB

17

24

77

137

Willow

Hous

e

3942

L Tw r

82

2

ROAD

14

4

WOO DLAND

Birchfield House

70

23

49

69

14

Trinity House

60

25

6

CRWar d Bdy

57

4

73

26

25

37

1

22

1

26

26

Ge orge Dent

12

11

74b

3018

1

2

7

197

CP

20

31

43

WE S T C R ESCENT

170

194

WID D O W FIE LD STREET

4

1

13

13

50

9WY C O M B E STREET

27

91

1011

WA R R EN S TREET

1371

84

16

80

29

59

20

81 53.7m

Slop

ing

mas

onry

61

2

22a

1 to 4

52

1

6815

CFW

ar d Bdy

POR T

LAN D

PLAC

E

2232

5391

8989b

16

67

Und

54

59

51.8

m

31

50

44 to 56

51

25

BAR

RO

N S

TREE

T45

7

35

17

39

3046

Ca rmel

16

7

59

COCKERTON

8280

7

1

11

1

Meth

odis

t 45

29

157

SW IN B RIDGE

210

Ab bey Sp rings

1

30

14

12

11

2

4

CRO S

S FIE

LD RO

AD

WE

STE

RHOP

E

20

Wood

land

Vill

a

52

51

56.8m

46

26

49

War d Bdy

58.2m

30

23

11

Surgery

219

2

GRE

YST

ONES

323

16 to 22

16

50

25

Barn

SM I TH Y LANE

Path

22

23

Car isbrooke

11

2458

89

13

24

32

HIG HB U R Y ROAD

2

150

32

22

FAV E RDALE

39

93

264

4a

Sta inwood

Co ckerton

13

3

76

22

10

133

141

4

13

17

20

7

178

57

129

136

2

21332

1

49

153

101

RISE

45

193

1

Ho use

75

50.9m

74

Shelter

16

7 to 12

62

32

113

30

118

12

10

175

1

21

15b

1 to 6

44

2

63

165

107

68 to 68

32

159

War d Bdy

146

12

93

1

14

BR IN K B U RN ROAD

BLO

SSO

M C

LOSE

14

War d Bdy

37

8

13

CR

44

21

2525a

51.1m

12

57.2m

4161a

57

81

48

51.3m

O RC H A R D ROAD

37

16

3761

6

1

4

127 to 13

3

15

17

38

11

54.9m

52

El Sub Sta

2

16

WB

15

14

122

15a

25

13

36

23

To w er Mews

26

14

2a

99

56.8mBELLB UR N LANE

18

32

54

43

135

152

26

91

53.1m

20

12

49

1511

44

38

33

13

2

1

2

BL O O M F IELD ROAD

25

38

26

2

89

27

13

14

13

26

El Sub Sta

HAW

K ESB U RY

MEW

SRose

b ay Co

urt

5a

1

87

28

St Luk e's

25

1

DR IVE

55.8m

1 to 6

7 to 12

24 to 29

2

13

VAN

COUV

ER STREET

11

8

62

Sloping masonry

TCB

War d Bd

y

143

WO O D L A ND R O A D SOUTH BACK

53.6m

FW

LB

29

43

13

13

45

4

ROAD

58

48

25

36

11

16

111 to 121

52.7m

36

36 34

47

10

Tanks

Brinkbu rn Dene

75

24

28

15

15

11

74

37

11

52.9m

50.4m

199

49.9m

22

21

ST EW A RT STREET

CO R O N A TIO N STREET

1

77

WE

ST

CR

ESCE

NT

182

TE RR ACE

10

5

7

3

322

37

72

108

4

FAIR

FIE

LD S

TREE

T

1

104

17

19

18

124

117

82

89

CHA

ND

OS

STR

EET

8

37

1

45

103

7

1

20

LB

1

2

Vinc

ent H

ouse

29

90

87

4

80

BA R L BY DRIVE

WE D ERLY

6

1 to 12

1

CottChurch

1325

47

72

14

CR

11

40

55.3m

152

42

32

60

56

Co urt

34

39

29

YOR EDALE

33

30

57

76

SU G A R H ILL GROVE

16

28

PE N N INE CLOSE

Foot

Sunday

53

6

MU LH E IM CLOSE12

LO C O M OTION

PA R AD ISE WAY

4 10

9

3TCB

60

Ch urch

Pri mary School

9

56

2

56.7m

611

19

Lodg

e

8

14

34a

11

4

Birc

h Vie

wSta

bles

25

32a 30

Nora Fenby House

G RA N TLY

225

El

Sta

24

LB

LB

10 8

6

25

57.8m

242

1a

53.0m

66

WE

ST

AU

CKL

AND

ROAD

87

57.9m

Allo t ment

CW

Hall

14

M ILB A N K COURT

26

M ILB A N K ROAD

IELD

141

2105

RO AD

28

11

El Sub Sta

89

1

267

3

47.5m

133

19

175

14

9

39

144

163

1

1 to 5

84

28

125

14 13

87

41

76

119

182

El Sub Sta

58

62

3327

Tennis

AUC K LA

N D AVEN

UE

111

WOOD

L AND

TERR

ACE

154

17b

45

47

9317

50.3m

DEN E

GRO

VE

Und Playg round

86

70

38

24

40

110

24

1

El Sub Sta

Industrial Estate

37 35 33a

47

1

26

7 to 16

14

BR IN K B U R N DRIVE

38

Post

Le vy In dust rial Estate

LEVY

WAY

4145

52

155

21

32

23

2

3

71

11

45

138

13

114

27

3961

9

4

50.3m

PIER R

EMON

T ROA

D

7

124

118

15

11

9

1

137

3

7674

86

50.9m

1

43

55.8m

6

1115

9a11

TCP

65112

26

12

4

66

37

55.2m

70

54

CON

ISTO

N STREET

1

15

14

29

101

22

50.3m

50

2

87

15

31

39

76

90

St Cuth

ber tsPlace

WO O D L A ND ROAD

9

50

138

1

98

84

55.2m

LIM E H U R ST ROAD

1

32

126 LAU

REL

STR

EET

50

14

GA RDENS

35

38

26

HA R D IN G T ERRACE

2a

11

7

14 to 19

15

40

5

15

Benw ell

2242

Ve nt ress

1b

(dis)

30 to 38

2

2619

25

Sub Sta

73

Cycle Playground

Ho use

SAD D LE

WOOD

MEW

S

1

2

46

51.2m

DES

MO

ND W

AY

36

War d Bdy

Elm

Hou

se

CO L U M B IA STREET

12

5333

48

57

Beck

28

1 14

Ho ly Tr in it y Church

4

6

HA R T INGTON WAY

11a

31

34

34

2236

79

1120

12

74a

6250

4725

33

1

48

GRE

EN

BANK ROAD

169

203

37

1

16

35

TCB

20

44

158

230

254

242

2

28

50

TCBs

68

15

36

MP

28

26

22

10

SALI SB

UR

Y TERRACE

110

89

86

69

64

19a

MAU D

E S T

REET

63

921

24

74

90

31

55.4m

M er cia

68 to 80

1

CHE

LMSF

OR

D STREET42

54

FB

89f

3

50

79

POU

LTO

N C

LOSE

GRE

EN

BANK

ROA

D

3555

15

34

Chy

20

45.9m

63

Ho pe to w nPark

31

STA I

N DR O

P CR

ESCE

NT

48.8m

69

15

4

10

11

CR

32

1

Bridge

3

13

3

1

Wo rsle y P

ark

Cottage

12

39a

Presbytery

Pond

PR IO R S TREET

14

2

COU

RT

22

1615

Syca

mor

e

CS

War d Bdy

16

37

13

CF

1115

27

CAR

DIN

AL

GARD

ENS

21

The

23

19

15

26

2 to 6

217

223

50.3m

12

35

57.4m

2

7

TCB

Tudor

1

3149

55.3m

Wes tgate

25615

301

2

93

1

270

1 to 12

War d Bdy

4

20

53.4m

5

26

WO O D L A ND ROAD

El Sub Sta

BR IN K B U RN ROAD

1

18

140

13AU

C K LAN D AV

ENUE

1

17a

181

27

11

11

M P

140

143

17

7

123

204

24

34

46

851 to 8

174

48

31

29

59.1m

14

25

2a

16

LB

49.6m

23

AU C K LAND

Faverdale Industrial Estate

50.0m

1413

Cock er Beck

El Su

b Sta

WO O D L A ND ROAD

3026

97

106

13

Bow ling

20

5

100

119

214

13

FAV E RDALE

33

1

13

18

85

23

11FA

VE

RDA

LE

NORT

H

23

3527

23

20

10

4

Centre

31

8

79

36

110

85

10

8

MILB

AN

K C

RESCENT

PIER R

EMON

T DRIV

E

8

88

1

RY E HILL

41

15

25

53.2m

30

57

62

7280

11

AV ENUE

Faver dale B lack Path

1a

35a

77a

OLYM

PIC STREET

15

13

TH E WOOD LANDS

Elm Court

74

90 80

57

83

Mast

46

13

2

11

7

103

47

51

148

MILK WOOD

11

IV YWOOD

53.6m 100

10

18

42

133

ACA

CIA

STREET

23

12

22

29

30

7775

Tank

22

8

WIT B

ANK R

OAD

14109 99

19

6

16

5

2

1

4

11

Dr ain

11

23

1

50.7m

56

84

FB

14

Will ow Road

LAD

Y K

ATH

RYN

GRO

VE

TCB

4533

29

61

(PH)

5161

Walk ington

81

NE W FO U N D LA ND STREET

HOL

LYHU

RST

34

MA

JOR

STREET

LB

1a

53.6m

7

69

47

42

91

Allotment Gardens

15

54

Acton House

22

(Private)

35

2a

2

Und

Su rg ery

11

33

74

WIL LO W R O AD EAST

1a

1

11

48

29

ELM

S R

OAD

ESS

ESS

12

7682

CAR

TM

ELL TERRACE

17

68

1

2

195

201

2 Und

FB

81

17

58.7m

5

41

For syt h House

31

119

146

26

El Sub Sta

1

1a

Wes t Lodge

19

1

G ree nba nk Court

11 to 42

54

27

1511

24

52.9m

75

93

14

22

11

WO O D L A ND ROAD

5 to 8

TCBs

47

Tr avelling Crane

52.1m

2076

49

21

89c

2a

to 74

14

12

2

Sh utt's

56

154

31

42

Hall

MA

RSH

ALL

STREET

57

70

53

150148

42

BR A N K SO M E TERRACE

2

8244

NU N N E RY LANE

1

71

SA N D R IGGS

CF

Par eil

DR IVE

5

17

8

Asto

n T

erra

ce

HILL G

ARTH

7

27

56.7m

Grantley

11

1 35

13

41

Ro ma n C atholic

LEAC

H G

ROVE

24

Sub Sta

Sub Sta

25

9

5 8 17

26

4

33

50

34

1

14

39

3

25

25a

15

21

32

38

211

DRIV

E

3

1 to 10

3

13

35

FAVE

RDA

LE R

OAD

War

d Bd

y

55 .1m

313

2

1

7

15

13

BOWE N ROAD

Ho use

232240

War d Bd

y

12

1e1f

2022

228

73

a

26

82

3

30a

262

276

42

12

12

24

Co urt

22

122

SM

53.2m

CF

Gas G ov

7

23

18021

205

LA IN G S TREET

CR

51

32

15

31

30

25

NEW

LAN

DS ROAD

80

53

132 130

Football Ground

No rw ard

WO

OD

LA

ND T

ERRA

CE

9 to 15

42

25

WE

STLA

NDS ROAD

23

66

14

Tank

72

3

The H aw thorns

179

46

13

177

Cricket Ground

18

33

16a

15

49.5m

1315

Outfall

Ter races

7

95

PIER R EM

ONT CR

ESCE

NT

2a

22

Faverdale

1

51

El S ub Sta

34

3529

8

147

DA L E R OAD

COU

RT

LAN

DS ROAD

9

4

6

7

140

16

2

58

Tanks

6

132

23

26

31

50.9m

LB

Pierr emont

BL O O M F IELD ROAD

83 81

76113

50

54

TOW

ER RO

AD

163

Cock er Beck

64

9

49

29 to 31

WOO DL AND S COURT

18 to 21

64

69

51.0m

100

BE LL B U RN LANE

25 to 31

55

52

274

35

14

45

50

15

TOW

ER R

OAD

7

15

104

3

M ILB A N K ROAD

14

2

6

2

24

25 15

5

90

HAZ

EL AVENUE

Outfall

1 to 6

4

55.2m

CR

68

Da mso n Court

58.6m

Faver dale B lack Path

7 to 19

1

85 83

29a

El

HA R T INGTON WAY

Cedar

Hous

e

Memorial

51.3m

10

Dr ain

Th ornville

12

LB

CR

43

M A N SL EY COURT

Pond

Tk F

50.9m

47

58

13

36

15

61

6240

4

5

17

6339

13

Tank

15 13a

13

2

42

2

18

147

157

181

CR

1

16

20

5

1

SILD AL

E CLO

SE

TH ER B Y CLOSE

51.2m

67

53.3m

1

14

11

12

1

40

1a

BEA

CO

NSF

IELD STREET

83

107 96

3

40

25

24

17

9177

60

12

10

2

9

Bakers Court

55

3031

5966

47.0m

TERR

ACE

LB

57

17

11

51.2m

6810

54

15

4

27

91

89d

89a

3

CLO

SE

Ho pet ow n Junction

Tank

Co urt

1

27

18

20

141

169

75

65

7

1

63 to 66

50.3m

144

2

KIN G S TO N STREET

127

670

This map is repro duced fro m Ordnance Survey material with the permis s io n o f Ordnance Survey o n b ehalf o f the Co ntro ller o f Her Majes ty’s Statio nery Office. © Cro wn co pyright.

1:7,500Scale:Date:A68 Urb an Sectio n

2018 Scrim Deficiency, at o r b elo w inves tigatio n level07/10/19

1

SL

1

2

4

2

1

2

El

6

1

9

PH

El

N

2

6

F

PC

3 2

PO

4

5

PH

6

El

1

7

El

4

2

7

El

Sta

2

PO

2

Sta

DarlingtonMemorialHospital

CockertonDistrictCentre

A68 WoodlandsRoad

A68 West Auckland Road

APPENDIX B3(b)(2)

GTON COUNCIL

Page 29: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

APPENDIX B4

Initial equality impact assessment screening formThis form is an equality screening process to determine the relevance of equality to an activity, and a decision whether or not a full EIA would be appropriate or proportionate.

Directorate: Economy & Neighbourhood Services

Service Area: Transport & Capital Projects

Activity being screened: Maintenance Challenge Fund bid for funding

Officer(s) carrying out the screening: Sue Dobson

What are you proposing to do? Submit a bid to the Department for Transport to accelerate maintenance of the highway as follows:

A68 Urban Corridor – From Woodlands Road/Greenbank Road Traffic signal-controlled junction to West Auckland Road/Faverdale roundabout – requires major maintenance and full reconstruction in places, based on the asset management scanner data. Gullies and drainage assets will be replaced to improve resilience to surface water flooding. In addition, the cycle route alongside the A68 from Brinkburn Road, Cockerton to Rotary Way will be resurfaced/redesigned to current specifications.

A68 Rural Corridor – From A6072 Swan House roundabout to the Borough boundary. One section requires urgent resurfacing and full depth edge reconstruction in sections that are red on the scanner data and further resurfacing on amber sections to extend the life of the road. This will be done using recycling of the existing materials to reduce cost and provide a carbon saving by retaining material on site. Innovative materials will be used such as plastic or rubber, subject to final costs. A second section requires resurfacing as the latest SCRIM data has identified potential skid resistance issues.

Why are you proposing this? What are the desired outcomes?

It cannot be funded from our annual Maintenance Block allocation and therefore are bidding for additional funding. Outcomes: -• NI130/1 Reduction in the percentage of

principal roads requiring planned maintenance. • Reduction in the number of people killed or

seriously injured on A68

Appendix B4 Equality impact assessment form -1 of 3-

Page 30: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓

• Increased satisfaction with highway asset – NHT survey

• Reduction in the Accumulated Depreciation value for carriageways

• Reduction in distance travelled due to diversions

• Increase in cycling • Reduction in third party claims • Reduction in traffic noise • Improved efficiency rather than a programme

of small schemes on a rolling programme resulting in delays/ queues/diversions.

Does the activity involve a significant commitment or removal of resources? Please give details

Significant commitment of resources from Department for Transport plus additional local contribution from existing Local Transport Plan resources.

Is there likely to be an adverse impact on people with any of the following protected characteristics as defined by the Equality Act 2010, or any other socially excluded groups?

As part of this assessment, please consider the following questions:

• To what extent is this service used by particular groups of people with protected characteristics?

• Does the activity relate to functions that previous consultation has identified as important?

• Do different groups have different needs or experiences in the area the activity relates to?

If for any characteristic it is considered that there is likely to be a significant adverse impact or you have ticked ‘Don’t know/no info available’, then a full EIA should be carried out where this is proportionate.

Protected characteristic

Yes No Don’t know/ Info not available

Age Disability Sex (gender) Race Sexual Orientation Religion or belief Gender reassignment Pregnancy or maternity Marriage or civil partnership

Appendix B4 Equality impact assessment form -2 of 3-

Page 31: Darlington Borough Council – A68 Growth Zone Maintenance ... · Our Reference : Document Name: Dear Mr O’Hara . Local Highways Maintenance Challenge Fund Darlington Borough Council

Other Carer (unpaid family or friend) Low Income Rural Location Does the activity relate to an area where there are known inequalities/probable impacts (e.g.disabled people’s access to public transport)? Please give details.

During the roadworks there will be disruption to bus services but also walking and cycling routes as well as diversions for vehicular traffic, which may be lengthy in the rural areas. Traffic management will be put in place to provide suitable alternatives so that those with certain types of disabilities / people with pushchairs / older people will still be able to navigate around the works. The improvement scheme itself will improve the physical environment assisting those with mobility difficulties, visual impairment, audio impairment (limited) and anyone using a bike or pram.

Will the activity have a significant effect on how other organisationsoperate? (e.g. partners, funding criteria, etc.). Do any of these organisations support people with protected characteristics? Please explain why you have reached this conclusion.

n/a

Decision (Please tick one option)

EIA not relevant or proportionate:

Continue to full EIA:

Reason for Decision The funding bid will save the Council money (and reduce budget pressures) and the resulting outcomes will benefit all road users, including more vulnerable road users (those with a disability, pedestrians, cyclists and those using public transport). There will be some disruption during the work, but this will be managed through effective traffic management.

Signed (Assistant Director) Date 25 October 2019

Appendix B4 Equality impact assessment form -3 of 3-