DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016...
Transcript of DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016...
![Page 1: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/1.jpg)
• DAR mandate/organization
• Milestones
• Programs outlook
Outline
0
![Page 2: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/2.jpg)
• Provide the Comd RCAF with advice,
recommendation and plans for the management
of aircraft fleets either for refurbishment or
replacement
• Acquire the equipment and systems to maintain
a combat capable Air Force
Mandate
1
![Page 3: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/3.jpg)
2
The DAR Team
Col Chouinard
DAR
LCol Godbout
DAR 2 (SAR/Air Mobility)
Maj Bourque
DAR 3 (Maritime/EW/AVS)
LCol Michaud
DAR 6 (GSE/Gear)
LCol John Whalen
DAR 8 (UAS)
LCol Tim Streek
DAR 9 (Tac Aviation)
![Page 4: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/4.jpg)
• Chinook
• C-17
• C-130J
• Vehicles
Milestones
3
![Page 5: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/5.jpg)
Programs Outlook
4
![Page 6: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/6.jpg)
5
JUSTAS
• Description: To provide an all-weather,
persistent, intelligence, surveillance,
reconnaissance and payload delivery capability
in support of CAF operations.
Current Phase: Options Analysis
![Page 7: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/7.jpg)
6
Aurora Incremental
Modernization Project (AIMP)
• Description: Equipment modernization and
structural life extension of 14 x CP140 Aurora
Aircraft
• Block IV– Link 16
– Wideband SATCOM (WGS)
– DIRCM
Current Phase: Implementation (Block III) and
(Block IV)
![Page 8: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/8.jpg)
7
Fixed-Wing Search and Rescue Aircraft Replacement (FWSAR) Project
• Description: To replace the CC115 and
CC130H to support the National Search and
Rescue program.
• Acquisition: competitive procurement
strategy with 20-year ISS integrator
(Canadian Contractor).
Current Phase: Definition
![Page 9: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/9.jpg)
8
Twin Otter Life Extension (TOLE)
88
• Extend CC138 operational life to 2025 to
ensure a continued Canadian Armed Forces
light transport capability in the Far North.
• Wing replacement to address structural life
issues.
Current Phase: Options Analysis
![Page 10: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/10.jpg)
9
Cormorant Mid-Life Upgrade (CMLU)
9
• Extend CH149 operational life to 2040.
• Return all-weather rotary wing Search and
Rescue capability to Trenton.
• Address obsolescence/maintenance issues.
• Provide capability improvements to enhance
its overall mission effectiveness.
Current Phase: Options Analysis
![Page 11: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/11.jpg)
Griffon Limited Life Extension
(GLLE)
:
• Griffon estimated life expectancy is 2021
• Fleet replacement project (TRUH) was
postponed to after 2030
• Avionics, instruments and display are
obsolete and must be replaced as an
integrated systems architecture
Current Stage: Options Analysis
![Page 12: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/12.jpg)
Omnibus Support Vehicle
Replacement
Description:
This project will replace 6 fleets of vehicles
that support airfield operations.
The first 3 are in Implementation.
Current Stage: Definition to Implementation
![Page 13: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/13.jpg)
Snow and Ice Control Capability
Recapitalization
Description:
This project will provide high speed snow
removal equipment designed for airfield
operation, to replace an aging fleet of
equipment.
Current Stage: Options Analysis
![Page 14: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/14.jpg)
Future Projects
• Canadian Multi-mission Aircraft (CMA)
• Strategic Tanker Transport Capability (STTC)
• Multi-Fleet Air Traffic Management Avionics (MFATMA)
• CC150 Life-Extension
• Tactical Reconnaissance Utility Helicopter (TRUH)
• Utility Transport Aircraft (UTA)
![Page 15: DAR PowerPoint Presentation to CADSI - Apr 2016 · DAR PowerPoint Presentation to CADSI - Apr 2016 Author: bourgeois.ce Created Date: 4/8/2016 10:07:46 AM ...](https://reader034.fdocuments.us/reader034/viewer/2022042909/5f3a00dd7b58eb02ac6b4d54/html5/thumbnails/15.jpg)
Questions