Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1...

14
Dan Tiberio, Beaver Valley Simulator Supervisor Stanley Chan, Chief Technology Officer BVPS I/O System Replacement

Transcript of Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1...

Page 1: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Dan Tiberio, Beaver Valley Simulator Supervisor

Stanley Chan, Chief Technology Officer

BVPS I/O System Replacement

Page 2: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Topics❑ What we upgraded & how we scheduled ❑ I/O upgrade

➢Challenges ➢Unique interfaces

❑ Future challenges

1/16/2017 2

Page 3: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Upgraded Components❑ DRPI interface replaced with Arduino module

1/16/2017 3

Page 4: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Upgraded Components❑ Power Supplies

1/16/2017 4

Page 5: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

BVPS I/O Upgrade❑ Replaced RTP I/O with CTI CAN I/O

➢Approximately 22 gateways per unit ➢Each gateway supports serial extension

1/16/2017 5

Page 6: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

BVPS I/O Upgrade

Special thanks to Arkansas Nuclear One

Denver Walker Darrell Jones

1/16/2017 6

Page 7: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

1/16/2017 7

And, yes, that is Dave O’Farrell doing actual WORK

➢ We let him work on our stuff…

…but maintained very close supervision

Page 8: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Upgraded Components❑ Simulation computer

➢Dell Precision Tower 7910 ➢Windows 7 64-bit OS ➢Previous Simulation

computers were limited by the I/O interface

1/16/2017 8

Page 9: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Installation Challenges❑ XtremeView & JADE graphics not functional

➢Database modifications required

❑ Gateways overloaded with too many Analog Outputs ➢Lacked enough energy to provide all DOs ➢Split out those gateways

❑ Stray voltages from I/O cards cycle recorder power ➢Traced to dip switch settings on cards

1/16/2017 9

Page 10: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

❑ Upgrading DRPI display ➢Not standard I/O…uses Graycode packets decoded by

DRPI boards

❑ Difference in RTP (old I/O) output voltage (~15v) and CTI CAN I/O output (24v) ➢Thought it always was 24v ➢Relay failed for Rod Control Reset Pushbutton (digital

step counters) ➢Overdriving DRPI (caused “ghost” lights)

Installation Challenges

1/16/2017 10

Page 11: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Installation Challenges❑ Identified 2 legacy issues

1/16/2017 11

➢Floating grounds • Original

installation Westinghouse terminal strips

• Original I/O was not as precise

• Controller operation was biased – ground affected -5v to +5v zero point

Page 12: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Installation Challenges

• Pre-existing issue not identified before testing

• 2 integrated circuit chips were swapped inside

1/16/2017 12

➢SR Audio Count Rate Drawer • Not integrating and pulsing properly

Page 13: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Future Challenges ❑ Electrical and Thermohydraulic Model upgrades

❑ Network administration ➢Ovation DCS incorporated in Unit 1 ➢Future Arduino Modules ➢How to configure and monitor traffic

1/16/2017 13

Page 14: Dan Tiberio, Beaver Valley Simulator Supervisor Stanley ......Ovation DCS incorporated in Unit 1 Future Arduino Modules How to configure and monitor traffic 1/16/2017 13 Dan Tiberio,

Dan Tiberio, Beaver Valley Simulator Supervisor

Stanley Chan, Chief Technology Officer

Questions?

Thanks!