DALLAS US 75 CORRIDOR - Keep It Moving Dallas€¦ · · 2015-07-23Next Steps: Anticipate public...
Transcript of DALLAS US 75 CORRIDOR - Keep It Moving Dallas€¦ · · 2015-07-23Next Steps: Anticipate public...
TEXAS DEPARTMENT OF TRANSPORTATION SUMMER • 2015
“Work with others to provide safe and reliable transportation solutions for Texas.”
DA L L A S D I S T R I C T
0350
_112
114US 75 CORRIDOR
SOURCE: Texas Department of Transportation. NOTE: Highlighted areas are not drawn to scale. TxDOT graphic
1. CSJs: 0047-06-145; 0047-07-219Location: From I-635 to SH 121/Spur 399 Description: Perform a corridor studyExisting HOV: 2 (HOV-C) from I-635 to Bethany Future Managed HOV: TBDLength: 18 milesCost: $2.5 billionNext Steps: Anticipate public meeting, Spring 2015Letting: TBD (unfunded and not in Mobility 2035 Plan)
Existing HOV: Concurrent flow HOV lane
2. CSJs: 0047-06-156; 0047-07-225Location: From I-635 to McDermottDescription: Implement express lanes in existing HOV lanesCost: $11 millionLetting: TBD
3. CSJ: 047-06-133Location: From PGBT to Park Blvd
Description: Widen DC from PGBT to NB US 75 & SB US 75 to PGBT; Widen DART RR & Plano Pkwy underpasses; Auxiliary lane NB to Park exit rampCost: $37 million Letting: May 2015
4. CSJ: 0047-06-139Location: From Spring Creek Parkway to Sam Rayburn Tollway
Description: Widen 6-lane freeway to 8-lane freeway; Im-prove frontage roads and rampsCost: $48 millionLetting: December 2013Status: Under constructionECD: May 2017Contractor: MCMConstruction Start: April 2014
5. CSJ: 0047-06-108Location: From Spur 399 (SH 121 south) to U.S. 380
Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $106.6 million Contractor: Webber, LLC Construction Start: January 2012ECD: July 2015Approximate % Complete: 54%
6. CSJ: 0047-14-063 Status: Completed September 2011Description: Reconstruct interchangeEstimated Cost: $25.7 million
7. CSJ: 0047-14-065Location: From north of U.S. 380 to south of Bloomdale Rd. Estimated Cost: $24.9 million Contractor: Texas Sterling Construction Co.Construction Start: 8/30/2010ECD: October 2012 Approximate % Complete: 100%
8. CSJ: 0047-14-067Location: From south of Bloomdale Rd. to County Road 275
Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $68.1 million Contractor: Zachry Construction Corp.ECD: July 2015Approximate % Complete: 63%Construction Start: November 2012
9. CSJ: 0047-14-068Location: From Telephone Rd. to Melissa Rd.
Description: Widen 4-lanes to 6-lanes and 2-lane frontage roads in each directionEstimated Cost: $67 millionConstruction Start: November 2012Approximate % Complete: 30%Estimated Completion Date: Oct. 2016
10. CSJ: 0047-14-069Location: North of Melissa Rd. to south of FM 455
Description: Reconstruct and widen 4-lane to 6-lanes and 2-lane frontage roads in each directionEstimated Cost: $55 millionEstimated Letting: December 2015
11. CSJ: 0047-14-074Location: At FM 455 interchange in AnnaDescription: Construct interchangeEstimated Cost: $24 millionEstimated Letting: December 2015
12. CSJ: 0047-14-053Location: From north of FM 455 to CR 375 (Grayson County Line)
Description: Reconstruct and widen from 4-lane divided to 6-lane divided with 2-lane frontage roadsEstimated Cost: $65 millionEstimated Letting: August 2016
PROGRAMMING STATUSCSJ: 0047-14-053• MTP (2035 Metropolitan Transportation Plan, 2014 Amendment): YES
• UTP (2015 Unified Transportation Program): YES Authority - Plan
• STIP (Statewide Transportation Implementation Program: YES - Phase-Engineering (07/2014 Revision: Approved 12/02/2014)
CSJ: 0047-14-069; 0047-14-074• MTP (2035 Metropolitan Transportation Plan, 2014 Amendment): YES
• UTP (2015 Unified Transportation Program): YES - 2015 Authority - Develop
• STIP (Statewide Transportation Implementation Program: YES - Phase-Engineering, Right-of-Way, Construction (07/2014 Revision: Approved 12/02/2014)
PROJECT DETAILS
CONTACT INFORMATIONSuja Mathew, P.E.
TxDOT Transportation Engineer Supervisor (214) 320-6184
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
DENTONCOUNTY
COLLINCOUNTY
78
78
78
75
289
DNT
DNT
DNT
289
121
121
121
121
982
205190
190
544
546
543
543
380
380
380380
5
2478
2478
3537
2862
1377
1827
3356
35E
635635 30
Melissa
Anna
NewHope
Princeton
LavonLake
LakeRay
Hubbard
LavonWylie
Lucas
Parker
Richardson
St. Paul
66289Rowlett
Addison
66Rockwall
Hebron
Frisco
ROCKWALL CO.
McKINNEY
Garland
DEN
TON
CO
.
COLL
IN C
O.
McKinneyMunicipalAirport
DALLAS CO.
COLLIN CO.
DALLAS CO.
COLLIN CO.
5 miles
N
75
75 78
190
5
5
5
COLLIN CO.
GRAYSON CO.
Concurrent Flow
This project is not in Mobility 2035 Plan
KEY
2
3
1
4
5
9
67
8
10
11
12
Dallas
McKinney
2035E
Detail
121
121
7875
75
80
380
377
635
35E
30
30