DALLAS US 75 CORRIDOR - Keep It Moving Dallas€¦ ·  · 2015-07-23Next Steps: Anticipate public...

1
TEXAS DEPARTMENT OF TRANSPORTATION SUMMER • 2015 “Work with others to provide safe and reliable transportation solutions for Texas.” DALLAS DISTRICT 0350_112114 US 75 CORRIDOR SOURCE: Texas Department of Transportation. NOTE: Highlighted areas are not drawn to scale. TxDOT graphic 1. CSJs: 0047-06-145; 0047-07-219 Location: From I-635 to SH 121/Spur 399 Description: Perform a corridor study Existing HOV: 2 (HOV-C) from I-635 to Bethany Future Managed HOV: TBD Length: 18 miles Cost: $2.5 billion Next Steps: Anticipate public meeting, Spring 2015 Letting: TBD (unfunded and not in Mobility 2035 Plan) Existing HOV: Concurrent flow HOV lane 2. CSJs: 0047-06-156; 0047-07-225 Location: From I-635 to McDermott Description: Implement express lanes in existing HOV lanes Cost: $11 million Letting: TBD 3. CSJ: 047-06-133 Location: From PGBT to Park Blvd Description: Widen DC from PGBT to NB US 75 & SB US 75 to PGBT; Widen DART RR & Plano Pkwy underpasses; Auxiliary lane NB to Park exit ramp Cost: $37 million Letting: May 2015 4. CSJ: 0047-06-139 Location: From Spring Creek Parkway to Sam Rayburn Tollway Description: Widen 6-lane freeway to 8-lane freeway; Im- prove frontage roads and ramps Cost: $48 million Letting: December 2013 Status: Under construction ECD: May 2017 Contractor: MCM Construction Start: April 2014 5. CSJ: 0047-06-108 Location: From Spur 399 (SH 121 south) to U.S. 380 Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $106.6 million Contractor: Webber, LLC Construction Start: January 2012 ECD: July 2015 Approximate % Complete: 54% 6. CSJ: 0047-14-063 Status: Completed September 2011 Description: Reconstruct interchange Estimated Cost: $25.7 million 7. CSJ: 0047-14-065 Location: From north of U.S. 380 to south of Bloomdale Rd. Estimated Cost: $24.9 million Contractor: Texas Sterling Construction Co. Construction Start: 8/30/2010 ECD: October 2012 Approximate % Complete: 100% 8. CSJ: 0047-14-067 Location: From south of Bloomdale Rd. to County Road 275 Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $68.1 million Contractor: Zachry Construction Corp. ECD: July 2015 Approximate % Complete: 63% Construction Start: November 2012 9. CSJ: 0047-14-068 Location: From Telephone Rd. to Melissa Rd. Description: Widen 4-lanes to 6-lanes and 2-lane frontage roads in each direction Estimated Cost: $67 million Construction Start: November 2012 Approximate % Complete: 30% Estimated Completion Date: Oct. 2016 10. CSJ: 0047-14-069 Location: North of Melissa Rd. to south of FM 455 Description: Reconstruct and widen 4-lane to 6-lanes and 2-lane frontage roads in each direction Estimated Cost: $55 million Estimated Letting: December 2015 11. CSJ: 0047-14-074 Location: At FM 455 interchange in Anna Description: Construct interchange Estimated Cost: $24 million Estimated Letting: December 2015 12. CSJ: 0047-14-053 Location: From north of FM 455 to CR 375 (Grayson County Line) Description: Reconstruct and widen from 4-lane divided to 6-lane divided with 2-lane frontage roads Estimated Cost: $65 million Estimated Letting: August 2016 PROGRAMMING STATUS CSJ: 0047-14-053 • MTP (2035 Metropolitan Transportation Plan, 2014 Amendment): YES • UTP (2015 Unified Transportation Program): YES Authority - Plan • STIP (Statewide Transportation Implementation Program: YES - Phase-Engineering (07/2014 Revision: Approved 12/02/2014) CSJ: 0047-14-069; 0047-14-074 • MTP (2035 Metropolitan Transportation Plan, 2014 Amendment): YES • UTP (2015 Unified Transportation Program): YES - 2015 Authority - Develop • STIP (Statewide Transportation Implementation Program: YES - Phase-Engineering, Right-of-Way, Construction (07/2014 Revision: Approved 12/02/2014) PROJECT DETAILS CONTACT INFORMATION Suja Mathew, P.E. TxDOT Transportation Engineer Supervisor (214) 320-6184 [email protected] Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 78 78 78 75 289 DNT DNT DNT 289 121 121 121 121 982 205 190 190 544 546 543 543 380 380 380 380 5 2478 2478 3537 2862 1377 1827 3356 35E 635 635 30 Melissa Anna New Hope Princeton Lavon Lake Lake Ray Hubbard Lavon Wylie Lucas Parker Richardson St. Paul 66 289 Rowlett Addison 66 Rockwall Hebron Frisco ROCKWALL CO. McKINNEY Garland DENTON CO. COLLIN CO. McKinney Municipal Airport DALLAS CO. COLLIN CO. DALLAS CO. COLLIN CO. 5 miles N 75 75 78 190 5 5 5 COLLIN CO. GRAYSON CO. Concurrent Flow This project is not in Mobility 2035 Plan KEY 2 3 1 4 5 9 6 7 8 10 11 12 Dallas McKinney 20 35E Detail 121 121 78 75 75 80 380 377 635 35E 30 30

Transcript of DALLAS US 75 CORRIDOR - Keep It Moving Dallas€¦ ·  · 2015-07-23Next Steps: Anticipate public...

TEXAS DEPARTMENT OF TRANSPORTATION SUMMER • 2015

“Work with others to provide safe and reliable transportation solutions for Texas.”

DA L L A S D I S T R I C T

0350

_112

114US 75 CORRIDOR

SOURCE: Texas Department of Transportation. NOTE: Highlighted areas are not drawn to scale. TxDOT graphic

1. CSJs: 0047-06-145; 0047-07-219Location: From I-635 to SH 121/Spur 399 Description: Perform a corridor studyExisting HOV: 2 (HOV-C) from I-635 to Bethany Future Managed HOV: TBDLength: 18 milesCost: $2.5 billionNext Steps: Anticipate public meeting, Spring 2015Letting: TBD (unfunded and not in Mobility 2035 Plan)

Existing HOV: Concurrent flow HOV lane

2. CSJs: 0047-06-156; 0047-07-225Location: From I-635 to McDermottDescription: Implement express lanes in existing HOV lanesCost: $11 millionLetting: TBD

3. CSJ: 047-06-133Location: From PGBT to Park Blvd

Description: Widen DC from PGBT to NB US 75 & SB US 75 to PGBT; Widen DART RR & Plano Pkwy underpasses; Auxiliary lane NB to Park exit rampCost: $37 million Letting: May 2015

4. CSJ: 0047-06-139Location: From Spring Creek Parkway to Sam Rayburn Tollway

Description: Widen 6-lane freeway to 8-lane freeway; Im-prove frontage roads and rampsCost: $48 millionLetting: December 2013Status: Under constructionECD: May 2017Contractor: MCMConstruction Start: April 2014

5. CSJ: 0047-06-108Location: From Spur 399 (SH 121 south) to U.S. 380

Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $106.6 million Contractor: Webber, LLC Construction Start: January 2012ECD: July 2015Approximate % Complete: 54%

6. CSJ: 0047-14-063 Status: Completed September 2011Description: Reconstruct interchangeEstimated Cost: $25.7 million

7. CSJ: 0047-14-065Location: From north of U.S. 380 to south of Bloomdale Rd. Estimated Cost: $24.9 million Contractor: Texas Sterling Construction Co.Construction Start: 8/30/2010ECD: October 2012 Approximate % Complete: 100%

8. CSJ: 0047-14-067Location: From south of Bloomdale Rd. to County Road 275

Description: Reconstruct and widen from 4 to 8 lanes and 3-lane frontage roads Estimated Cost: $68.1 million Contractor: Zachry Construction Corp.ECD: July 2015Approximate % Complete: 63%Construction Start: November 2012

9. CSJ: 0047-14-068Location: From Telephone Rd. to Melissa Rd.

Description: Widen 4-lanes to 6-lanes and 2-lane frontage roads in each directionEstimated Cost: $67 millionConstruction Start: November 2012Approximate % Complete: 30%Estimated Completion Date: Oct. 2016

10. CSJ: 0047-14-069Location: North of Melissa Rd. to south of FM 455

Description: Reconstruct and widen 4-lane to 6-lanes and 2-lane frontage roads in each directionEstimated Cost: $55 millionEstimated Letting: December 2015

11. CSJ: 0047-14-074Location: At FM 455 interchange in AnnaDescription: Construct interchangeEstimated Cost: $24 millionEstimated Letting: December 2015

12. CSJ: 0047-14-053Location: From north of FM 455 to CR 375 (Grayson County Line)

Description: Reconstruct and widen from 4-lane divided to 6-lane divided with 2-lane frontage roadsEstimated Cost: $65 millionEstimated Letting: August 2016

PROGRAMMING STATUSCSJ: 0047-14-053• MTP (2035 Metropolitan Transportation Plan, 2014 Amendment): YES

• UTP (2015 Unified Transportation Program): YES Authority - Plan

• STIP (Statewide Transportation Implementation Program: YES - Phase-Engineering (07/2014 Revision: Approved 12/02/2014)

CSJ: 0047-14-069; 0047-14-074• MTP (2035 Metropolitan Transportation Plan, 2014 Amendment): YES

• UTP (2015 Unified Transportation Program): YES - 2015 Authority - Develop

• STIP (Statewide Transportation Implementation Program: YES - Phase-Engineering, Right-of-Way, Construction (07/2014 Revision: Approved 12/02/2014)

PROJECT DETAILS

CONTACT INFORMATIONSuja Mathew, P.E.

TxDOT Transportation Engineer Supervisor (214) 320-6184

[email protected]

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

DENTONCOUNTY

COLLINCOUNTY

78

78

78

75

289

DNT

DNT

DNT

289

121

121

121

121

982

205190

190

544

546

543

543

380

380

380380

5

2478

2478

3537

2862

1377

1827

3356

35E

635635 30

Melissa

Anna

NewHope

Princeton

LavonLake

LakeRay

Hubbard

LavonWylie

Lucas

Parker

Richardson

St. Paul

66289Rowlett

Addison

66Rockwall

Hebron

Frisco

ROCKWALL CO.

McKINNEY

Garland

DEN

TON

CO

.

COLL

IN C

O.

McKinneyMunicipalAirport

DALLAS CO.

COLLIN CO.

DALLAS CO.

COLLIN CO.

5 miles

N

75

75 78

190

5

5

5

COLLIN CO.

GRAYSON CO.

Concurrent Flow

This project is not in Mobility 2035 Plan

KEY

2

3

1

4

5

9

67

8

10

11

12

Dallas

McKinney

2035E

Detail

121

121

7875

75

80

380

377

635

35E

30

30