Daily Work Report.xlsx

download Daily Work Report.xlsx

of 44

Transcript of Daily Work Report.xlsx

  • 7/29/2019 Daily Work Report.xlsx

    1/44

    SN User Name/Location Call priority Call Category Call description

    1 ADMIN High Network Network Check

    1 Admin High Network VC setup

    2 Main Gate High Network Punching Machine Power Off

    3 ADMIN HR High Network Network connection

    4 ADMIN HR High NetworkLAN cable Required for Network

    Printer

    1 ADMIN HR High Network LAN cable

    2 Admin High Network RIL LL Down

    3 Admin High Network Bombay Link issue

    1 Shreno 1 High Network Cable loose

    2 Admin High Network New patch cord require3 Admin High Network RIL LL UP

    4 Admin High Network Zirakhpur RTR Power OFF

    1 Admin High Network Network lost

    2 Admin High Network BSNL Down

    1 Admin-HR High Network cable remove

    2 Admin-HR High Network Network Lost

    3 Admin High Network ASA

    1 Admin High Network BSNL UP

    1st Sept. 2013

    2st Sept. 2013

    3rd Sept. 2013

    4th Sept. 2013

    7th Sept. 2013

    6th Sept. 2013

    5th Sept. 2013

  • 7/29/2019 Daily Work Report.xlsx

    2/44

    1 Admin High Network Mumbai SIFY Link Down

    1 Admin High Network Sify link down

    2 Admin High Network BSNL link down

    3 Admin-purchase High Network New LAN setup

    1 ARC High Network Netwrok down

    2 Shreno 1 High Network Mail problem

    3 Samsara High Network Network Problem

    4 Admin High Network WI-FI password

    5 Admin-HR High Network Network down

    6 Admin-Alchemy High Network Network survey

    10th Sept. 2013

    9th Sept. 2013

    8th Sept. 2013

  • 7/29/2019 Daily Work Report.xlsx

    3/44

  • 7/29/2019 Daily Work Report.xlsx

    4/44

  • 7/29/2019 Daily Work Report.xlsx

    5/44

  • 7/29/2019 Daily Work Report.xlsx

    6/44

  • 7/29/2019 Daily Work Report.xlsx

    7/44

  • 7/29/2019 Daily Work Report.xlsx

    8/44

  • 7/29/2019 Daily Work Report.xlsx

    9/44

  • 7/29/2019 Daily Work Report.xlsx

    10/44

  • 7/29/2019 Daily Work Report.xlsx

    11/44

  • 7/29/2019 Daily Work Report.xlsx

    12/44

    Call Resolution Remark

    Network stable

    VC setup as per Mail From Miss Mansi Mehta.

    Need to restart Punching machine.

    Mr. Shank had problem with LAN cable so recreamped LAN cable and resolved the problem

    Mr. Siijin required LAN cable for Network printer so we provided LAN cable

    Provide LAN cable to Mr. Bhaskar for his Laptop

    RIL LL down at panelav so raise TT & take follow up from RIL person

    Bombay RIL link check but issue of switch hang over there so reboot the switch

    cable not properly connected to pc end so check on both end

    New patch cord to Nitin Sir as old 1 is not okTake follow up from RIL & is UP

    Due to Power failure Zirakhpur Link down so take follow up & link up after 1 hour

    Due to switch hang at HR network not available so reboot the switch

    BSNL LL down at panelav so raise TT & take follow up

    remove cables from Hr

    Due to switch hang n/w lost so reboot the s/w

    take back up of ASA firewall

    Vadodara-panelav BSNL LL UP

  • 7/29/2019 Daily Work Report.xlsx

    13/44

    Raise TT at SIFY portal & keep taking follow up

    Sify link down at vadodara end so raised ticket and switch route on Reliance.

    BSNL link down for Vadodara-Panelav so raised ticket

    Visit purchase department

    Network down due to power failure

    Server upgradation work is under process so user face mail access.

    Site survey for new LAN setup work.

    User want wi-fi Password have to visit personaly

    User not able to access internet so I restarted switch and after this problem resolved

    Provide work done report again material consumtion to Mr.Megh in HR and Alchemy

  • 7/29/2019 Daily Work Report.xlsx

    14/44

  • 7/29/2019 Daily Work Report.xlsx

    15/44

  • 7/29/2019 Daily Work Report.xlsx

    16/44

  • 7/29/2019 Daily Work Report.xlsx

    17/44

  • 7/29/2019 Daily Work Report.xlsx

    18/44

  • 7/29/2019 Daily Work Report.xlsx

    19/44

  • 7/29/2019 Daily Work Report.xlsx

    20/44

  • 7/29/2019 Daily Work Report.xlsx

    21/44

  • 7/29/2019 Daily Work Report.xlsx

    22/44

  • 7/29/2019 Daily Work Report.xlsx

    23/44

    Severity

    High

    Medium

    Low

    Attended ByCall Reported

    Date & time

    Call Response

    Date & Time

    Call Resolution

    Date & TimeCall Status REMARK

    Piyush 8:15 AM 8:25 AM 9:00 AM RESOLVED

    Piyush 8:30 AM 8:35 AM 8:50 AM RESOLVED

    Piyush 9:00 AM 9:10 AM 9:30 AM RESOLVED

    Nakul 11:45 AM 11:55 AM 12:15 PM RESOLVED

    Piyush 1:30 PM 1:35 PM 1:50 PM RESOLVED

    Nakul/Piyush 11:00 AM 11:10 AM 12:05 PM Resolved

    Nakul 8:30 AM 8:40 AM 9:00 AM Resolved

    Nakul/Piyush 1:30 PM 1:40 PM 2:30 PM Resolved

    Nakul 9:30 AM 9:45 AM 10:20 AM Resolved

    Nakul 10:45 AM 10:50 AM 11:05 AM ResolvedNakul/Piyush 11:45 AM 11:50 AM 12:05 PM Resolved

    Nakul/Piyush 11:30 AM 11:40 AM 1:30 PM Resolved

    Nakul 9:00 AM 9:10 AM 9:30 AM Resolved

    Nakul 9:45 AM 9:50 AM 10:10 AM Resolved

    Nakul/Piyush 12:15 PM 12:20 PM 1:00 PM Resolved

    Piyush 6:00 PM 6:05 PM 6:20 PM Resolved

    Nakul/Piyush 4:00 PM 4:10 PM 4:45 PM Resolved

    Piyush 3:00 PM 3:10 PM 3:30 PM Resolved

  • 7/29/2019 Daily Work Report.xlsx

    24/44

    Piyush 10:30 AM 10:40 AM 11:00 AM Resolved

    keep taking

    follow up

    from sify

    Nakul 8:30 AM 8:35 AM 11:30 AM Resolved

    Nakul 11:30 AM 11:34 AM 12:30 PM Resolved

    Nakul 2:00 AM 2:30 AM 3:40 PM Resolved

    Piyush 9:30 AM 9:35 AM 10:30 AM Resolved

    Nakul 11:40 AM 11:46 AM 12:30 PM Resolved

    Piyush 2:30 PM 3:00 PM 5:20 PM Resolved

    Nakul 3:20 PM 3:25 PM 3:45 PM Resolved

    Nakul 4:20 PM 4:30 PM 5:30 PM Resolved

    Nakul 5:35 PM 5:40 PM 6:30 PM Resolved

  • 7/29/2019 Daily Work Report.xlsx

    25/44

  • 7/29/2019 Daily Work Report.xlsx

    26/44

  • 7/29/2019 Daily Work Report.xlsx

    27/44

  • 7/29/2019 Daily Work Report.xlsx

    28/44

  • 7/29/2019 Daily Work Report.xlsx

    29/44

  • 7/29/2019 Daily Work Report.xlsx

    30/44

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    ResolvedResolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

  • 7/29/2019 Daily Work Report.xlsx

    31/44

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    ResolvedResolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    ResolvedResolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

  • 7/29/2019 Daily Work Report.xlsx

    32/44

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    ResolvedResolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    ResolvedResolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

  • 7/29/2019 Daily Work Report.xlsx

    33/44

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    ResolvedResolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    Resolved

    ResolvedResolved

    Resolved

    Resolved

    Resolved

    Resolved

  • 7/29/2019 Daily Work Report.xlsx

    34/44

    Response Resolution

    10 Min 15 Min

    15 Min 30 Min

    15 Min 45 Min

    IF PENDING ??T2

    Resolution

    T1

    Resp

    onse

  • 7/29/2019 Daily Work Report.xlsx

    35/44

  • 7/29/2019 Daily Work Report.xlsx

    36/44

  • 7/29/2019 Daily Work Report.xlsx

    37/44

  • 7/29/2019 Daily Work Report.xlsx

    38/44

  • 7/29/2019 Daily Work Report.xlsx

    39/44

  • 7/29/2019 Daily Work Report.xlsx

    40/44

  • 7/29/2019 Daily Work Report.xlsx

    41/44

  • 7/29/2019 Daily Work Report.xlsx

    42/44

  • 7/29/2019 Daily Work Report.xlsx

    43/44

    Call Category Completed calls

    Hardware 0

    Soft/App 0

    Network 4

    Printer 0

    Voip-Phone 0

    Others 0

    Total 4

    0

    Completed Calls sumary Report -Category wise

  • 7/29/2019 Daily Work Report.xlsx

    44/44

    Completed calls Engineer Name Completed callsPending calls Dnyanesh Patil 0

    On Hold calls Ankit Gandhi 0

    Under obervation calls Tirthankar Saha 0

    Jayraj Nakum 0

    Hardik Prajapati 0

    Ravi Parikh 0

    Total 0

    Calls Status during the month Completed calls - Engineerwise

    SUMMARY REPORT