Daily Report Summary
Date: 17 Nov 2012
# Name of the Inspector /Safety Engineer
Project No Name Of the Contractor
Purpose of the Visit
Summary Of the safety Deficiencies/ Issues
1Kashirajyam Kammari
2 Fernando Q. Uligan
PIC B 1191AArabia Electric(Siemens)
Regular Inspection
Electrical hazard, Open manholes, PPE, Chemical storage and Handling.
3 Reynaldo C. Pulgo
PIC A 1093A MASCO Regular Inspection
Heavy Equipment, Barricades & Signage, Machine Guarding, Gas Welding & Cutting
4 Mohammed Jai Sujiya Khan
PIC G-1095B
AL-HARBI Regular Inspection
Heavy Equipment, Manhole, PPE, Barricades and Signs, Welfare Facilities, Housekeeping.
PIC A-1011 JNCO RFI (1) Pouring of concrete grade for top slab.
Submitted By: __________________
Kashirajyam Kammari
(Acting Safety Supervisor)