Daily R 29-10-12 (3) (4)
1
j Daily Report Summary Date: 05 Nov 2012 # Name of the Inspector /Safety Engineer Project No Name Of the Contract or Purpose of the Visit Summary Of the safety Deficiencies/ Issues 1 Mohammed Jai Sujiya Khan PIC A 1093A MASCO Regular Inspect ion Excavation, Housekeeping, Heavy Equipment, PPE, Positive Observations. 2 Kashirajyam Kammari 3 Fernando Q. Uligan PIC G 1507C Samama Regular Inspect ion Ladder, Work platform, Electrical, Open manhole, PPE and Housekeeping. 4 Reynaldo C. Pulgo PIC G 1626 BULGU Regular Inspect ion Electrical Hazard, PPE, Scaffolds, Barricades and Signage Submitted By: __________________ Kashirajyam Kammari (Acting Safety Supervisor)
-
Upload
mohammed-jai-sujiya-khan -
Category
Documents
-
view
217 -
download
0
description
s
Transcript of Daily R 29-10-12 (3) (4)
j Daily Report Summary
Date: 05 Nov 2012
# Name of the Inspector /Safety Engineer
Project No Name Of the Contractor
Purpose of the Visit
Summary Of the safety Deficiencies/ Issues
1 Mohammed Jai Sujiya Khan
PIC A 1093A MASCO Regular Inspection
Excavation, Housekeeping, Heavy Equipment, PPE, Positive Observations.
2Kashirajyam Kammari
3 Fernando Q. Uligan
PIC G 1507C Samama Regular Inspection
Ladder, Work platform, Electrical, Open manhole, PPE and Housekeeping.
4 Reynaldo C. Pulgo
PIC G 1626 BULGU Regular Inspection
Electrical Hazard, PPE, Scaffolds, Barricades and Signage
Submitted By: __________________
Kashirajyam Kammari
(Acting Safety Supervisor)