j Daily Report Summary Date: 05 Nov 2012 # Name of the Inspector /Safety Engineer Project No Name Of the Contract or Purpose of the Visit Summary Of the safety Deficiencies/ Issues 1 Mohammed Jai Sujiya Khan PIC A 1093A MASCO Regular Inspect ion Excavation, Housekeeping, Heavy Equipment, PPE, Positive Observations. 2 Kashirajyam Kammari 3 Fernando Q. Uligan PIC G 1507C Samama Regular Inspect ion Ladder, Work platform, Electrical, Open manhole, PPE and Housekeeping. 4 Reynaldo C. Pulgo PIC G 1626 BULGU Regular Inspect ion Electrical Hazard, PPE, Scaffolds, Barricades and Signage Submitted By: __________________ Kashirajyam Kammari (Acting Safety Supervisor)

description

s

Transcript of Daily R 29-10-12 (3) (4)

Page 1: Daily R 29-10-12 (3) (4)

j Daily Report Summary

Date: 05 Nov 2012

# Name of the Inspector /Safety Engineer

Project No Name Of the Contractor

Purpose of the Visit

Summary Of the safety Deficiencies/ Issues

1 Mohammed Jai Sujiya Khan

PIC A 1093A MASCO Regular Inspection

Excavation, Housekeeping, Heavy Equipment, PPE, Positive Observations.

2Kashirajyam Kammari

3 Fernando Q. Uligan

PIC G 1507C Samama Regular Inspection

Ladder, Work platform, Electrical, Open manhole, PPE and Housekeeping.

4 Reynaldo C. Pulgo

PIC G 1626 BULGU Regular Inspection

Electrical Hazard, PPE, Scaffolds, Barricades and Signage

Submitted By: __________________

Kashirajyam Kammari

(Acting Safety Supervisor)