Daily Progress Report - 12.6.14
Transcript of Daily Progress Report - 12.6.14
-
8/11/2019 Daily Progress Report - 12.6.14
1/13
BALANCE
1 Earthworks (at Zero Point) CM 56,000 77%
BALANCE
1 Asphalt MT 13,086 37%
BALANCE
1 Road Crossing Nos 172 72%
2 MV/Telecom Duct at NW Apron RM 1,378 15%
3 LV cable installed in Footpath RM 11,462 0%
UNIT TOTAL
1 Finishing works Nos 55
2 Plumbing & Electrical works Nos 55
TOTAL TODAY TILL DATE BALANCE
1Rip Rap / Stone Dumping (300mm
thick)CM 14,271 13,442 829 94.19%
2Grouting of 300mm thick stone on
slopes of embankmentSM 45,454 42,581 2,873 93.68%
3 Hexagonal Tiles 50mm thick SM 35,535 22,736 12,799 63.98%
4 Hand Railing along R1 & UPs RM 2,873 2,438 435 84.86%
Surface
Repair Water Filling Foam Injection Dewatering
Internal
Coating
1 Tank Repair 7.224 100% 100% 100% 93% 86%
Sr DESCRIPTION UNITQUANTITIES
% COMPLETE
WATER WORKS - TANK REPAIR - WATER PROOFING
Sr DESCRIPTIONCAPACITY IN
M.GALLONS
Percentage Complete
HAND RAILING ALONG ROAD 1 & UNDER PASSES
WATCH TOWERS
43,338
HAND BACK BY PACKAGE-8B/SIEMENS
123
210
UNITQUANTITIES PERCENTAGE
COMPLETE
PACKAGE 8A
ACHIEVED TILL DATESr #
0
NEW ISLAMABAD INTERNATIONAL AIRPORT PROJECT
Sr # DESCRIPTION UNITQUANTITIES
ACHIEVED TILL DATE
PERCENTAGE
COMPLETE
DAILY PROGRESS REPORT
PACKAGE 1
DESCRIPTION
ACHIEVED TILL DATE
4,898
Sr # DESCRIPTION UNITQUANTITIES PERCENTAGE
COMPLETE
ACTIVTIES
HEXAGONAL TILES INSTALLATION
STONE PITCHING AND GROUTING
% COMPLETE
73%
30%
-
8/11/2019 Daily Progress Report - 12.6.14
2/13
Package-8A: Security Watch Tower Status Sheet
Int
erior
Plaster
Exterior
Plaster
ME
PWORKS
SepticTank
Int
ernal&
External
Pa
int
Flo
orTile
Terrazo
BathTile
1 WT # 01 100% 100% 30% 100% 70% 100% 100%
2 WT # 02 100% 100% 30% 100% 70% 100% 100%
3 WT # 03 100% 100% 30% 100% 70% 100% 100%
4 WT # 04 100% 100% 30% 100% 70% 100% 100%
5 WT # 05 100% 100% 30% 100% 70% 100% 100%
6 WT # 06 100% 100% 30% 100% 70% 100% 100%
7 WT # 07 100% 100% 30% 100% 70% 100% 100%
8 WT # 08 100% 100% 30% 100% 70% 100% 100%
10 WT # 10 100% 100% 30% 100% 70% 100% 100%
11 WT # 11 100% 100% 30% 100% 70% 100% 100%
12 WT # 12 100% 100% 30% 100% 70% 100% 100%
13 WT # 13 100% 100% 30% 100% 70% 100% 100%
14 WT # 14 100% 100% 30% 100% 70% 100% 100%
15 WT # 15 100% 100% 30% 100% 70% 100% 100%
16 WT # 16 100% 100% 30% 100% 70% 100% 100%
17 WT # 17 100% 100% 30% 100% 70% 100% 100%
18 WT # 18 100% 100% 30% 100% 70% 100% 100%
19 WT # 19 100% 100% 30% 100% 70% 100% 100%
20 WT # 20 100% 100% 30% 100% 70% 100% 100%
21 WT # 21 100% 100% 30% 100% 70% 100% 100%
22 WT # 22 100% 100% 30% 100% 70% 100% 100%
23 WT # 23 100% 100% 30% 100% 70% 100% 100%
9
24
Sr. No
Description of Work
Watch Tower No's
-
8/11/2019 Daily Progress Report - 12.6.14
3/13
61
24 WT # 25
25 WT # 26
26 WT # 27
27 WT # 28
28 WT # 29
29 WT # 62 100% 100% 30% 100% 70% 100% 100%
30 WT # 63 100% 100% 20% 100% 70% 100% 70%
31 WT # 64 100% 100% 30% 100% 70% 100% 100%
32 WT # 65 100% 100% 30% 100% 50% 100% 100%
33 WT # 66 100% 100% 30% 100% 100% 100%
34 WT # 67 100% 100% 30% 100% 100% 100%
35 WT # 68 100% 100% 30% 100% 100% 100%
36 WT # 69 100% 100% 30% 100% 100% 100%
30%
62
27
72
OVER ALL PERCENTAGE
LIVEABLE WATCH TOWER MEP OVERALL %
Liveable+Non Liveable A+B Average %
-
8/11/2019 Daily Progress Report - 12.6.14
4/13
Ste
elRailing
Ste
elStair
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
100% 100% 96%
0%
0%
Ov
erall
percentage
-
8/11/2019 Daily Progress Report - 12.6.14
5/13
0%
0%
0%
0%
0%
0%
100% 100% 96%
100% 100% 93%
100% 100% 96%
100% 100% 94%
100% 100% 100%
100% 100% 100%
100% 100% 100%
100% 100% 100%
76%
73%
-
8/11/2019 Daily Progress Report - 12.6.14
6/13
NL - Finishing Works
Package-8A: Security Watch Tower Status Sheet
Internal &
External
Plaster
Roof
water i/c
Tile work Flooring
Roof
water
proofing
Steel Stair
& Railing
1 WT # 38 100% 100% 100% 100% 50%
2 WT # 39
3 WT # 40 100% 0% 100% 0% 50%
4 WT # 41
5 WT # 42
6 WT # 43 0% 0% 50% 0% 0%
7 WT # 44 0% 0% 50% 0% 0%
8 WT # 45 0% 0% 50% 0% 0%
10 WT # 46
11 WT # 47 0% 0% 50% 0% 0%
12 WT # 48 0% 0% 50% 0% 0%
13 WT # 49
14 WT # 50
15 WT # 51 100% 100% 100% 100% 100%
16 WT # 52 100% 100% 100% 100% 100%
17 WT # 53 100% 100% 100% 100% 100%
18 WT # 54
19 WT # 55 100% 100% 100% 100% 100%
20 WT # 56 100% 100% 100% 100% 100%
21 WT # 57 100% 100% 100% 100% 0%
22 WT # 58 100% 100% 100% 100% 100%
23 WT # 59
24 WT # 60 100% 100% 100% 100% 100%
Existing
Existing
Location will be decided after completion of
Boundary wall (Boundary wall design issue)
Location will be decided after completion of
Boundary wall (Boundary wall design issue)
Sr. No Watch Tower No's
Description of Work
Existing
Existing
Existing
Existing
-
8/11/2019 Daily Progress Report - 12.6.14
7/13
OVER ALL PERCENTAGE
-
8/11/2019 Daily Progress Report - 12.6.14
8/13
90%
0%
50%
0%
0%
10%
10%
10%
0%
10%
10%
0%
0%
100%
100%
100%
0%
100%
100%
75%
100%
0%
100%
Ov
erall
percentage
-
8/11/2019 Daily Progress Report - 12.6.14
9/13
42%
-
8/11/2019 Daily Progress Report - 12.6.14
10/13
-
8/11/2019 Daily Progress Report - 12.6.14
11/13
-
8/11/2019 Daily Progress Report - 12.6.14
12/13
Surface
Repair
Water
Filling
Foam
Injection
1 Potable Water Tank 1.1 0.615 8.5% 100% 100% 100%
2 Potable Water Tank 1.2 0.615 8.5% 100% 100% 100%
3 Potable Water Tank 1.3 0.615 8.5% 100% 100% 100%4 Potable Water Tank 2.1 0.615 8.5% 100% 100% 100%
5 Potable Water Tank 2.2 0.615 8.5% 100% 100% 100%
6 Potable Water Tank 2.3 0.615 8.5% 100% 100% 100%
7 Raw Water Tank 1.1 0.503 7.0% 100% 100% 100%
8 Raw Water Tank 1.2 0.503 7.0% 100% 100% 100%
9 Raw Water Tank 1.3 0.503 7.0% 100% 100% 100%
10 Raw Water Tank 2.1 0.503 7.0% 100% 100% 100%
11 Raw Water Tank 2.2 0.503 7.0% 100% 100% 100%
12 Raw Water Tank 2.3 0.503 7.0% 100% 100% 100%
13 Potable Water Pumphouse -1 0.260 3.6% 100% 100% 100%
14 Potable Water Pumphouse -2 0.260 3.6% 100% 100% 100%
7.224 100.0% 100% 100% 100%Total
WATER WORKS - TANK REPAIR - WATER PROOFING
Sr DESCRIPTIONCAPACITY IN
M.GALLONS
WEIGHT
FACTOR
Percentage C
-
8/11/2019 Daily Progress Report - 12.6.14
13/13
DewateringInternal
Coating
100% 0% 6.8%
100% 100% 8.5%
100% 100% 8.5%100% 100% 8.5%
100% 100% 8.5%
100% 100% 8.5%
100% 100% 7.0%
100% 100% 7.0%
100% 100% 7.0%
100% 100% 7.0%
100% 100% 7.0%
100% 100% 7.0%
100% 100% 3.6%
0% 0% 2.2%
93% 86% 97%
mplete Total
Percentage
Complete