Daily Activity On The Job Training
Nama :Hertami Panji Sriyogo
NIM : 3.21.09.5.11
Mount : March 2012
No Time Activity Description Adviser
1 Wednesday,
March 7th 2012
Travel from Semarang to Balikapapan
2 Thursday,
March 8th 2012
Waiting Personal Protection Equipment
3 Friday, March
9th 2012
Briefing about safety and company profile Mr. M. Husin
4 Saturday,
March 10th
2012
Helping spare part down from the truck Mr. Bambang
5 Monday,
March 12th
2012
Training product knowledge and introduction
Renault Truck Product
Mr. Ishak and
Mr. Fadeli
6 Tuesday,
March 13th
2012
Disassembling gearbox type 16 S 2723 and easing
gearbox housing
Mr. Hanafi
7 Wednesday,March 14th
2012
washing gearbox housing and all component gearbox
Mr. Eko P
8 Thursday,
March 15th
2012
Assembly main shaft and assembly output shaft Mr. Eko P
9 Friday, March
16th 2012
Continue assembly output shaft Mr. Awaludin
10 Saturday,
March 17th
2012
Completing assembly gearbox and prepare to
painting gear box
Mr. Firman
11 Monday ,
March 19th
2012
Rapping finished gearbox Mr. Firman
12 Tuesday,March 20th
2012
Washing gearbox and continue assembly main shaft,disassembly input shaft
Mr. Firman
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
2/15
13 Wednesday,
March 21th
2012
Helping assembly input shaft Mr. Eko P
14 Thursday,
March 22th
2012
Washing gearbox housing and washing gearbox
components
Mr. Yoga T.P
15 Monday ,
March 26th
2012
List part gearbox component to assembly Mr. Awaludin
16 Tuesday,March 27th
2012
Assembly main shaft and counter shaft Mr. Awaludin
17 Wednesday,
March 28th
2012
Continuing helping assembly output shaft, washing
parts, and disassembly gearbox
Mr. Eko P
18 Thursday,March 29th
2012
Rapping finished gearbox type 16 S 2723 s/n353137; disassembly gearbox; and washing housing
gearbox
Mr. Eko P
19 Friday, March
30th 2012
House keeping workshop area and Washing gearbox
components
Mr. Hanafi
20 Saturday,
March 31th
2012
Disassembly gearbox and washing gearbox housing Mr. Yoga T.P
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
3/15
April 2012
No Time Activity Description Adviser1 Monday, April
2th 2012
Washing Paert component gearbox S/N 00322827 Mr. Eko P
2 Tuesday, April
3th 2012
Helping assembling gearbox S/N 00322827 &
washing part
Mr. Eko P
3 Wednesday,
April 4th 2012
Continue assembling gearbox S/n 00322827 Mr. Eko p
4 Thursday,
April 5th 2012
travel from PT. Indotruck Utama Balikpapan to
Tarakan on a plane, Trip from the airport to the port
speed boat, Speed boat ride to the Bulungan, Stay atthe hotel
Mr. Sugiono
5 Friday, April6th 2012
The journey from the hotel to the PT. SBS Kelubir,Bulungan
Mr. Sugiono
6 Saturday, April7th 2012
1. Unit DT 17a. Remove and install shock absorber
R/L (Replace)
b. Remove and install brake chamberaxel 3LH (Replace)
c. Replace Hexagonnut (Replace)
d. Remove and install support yoke
cabin R/L (Replace)e. Remove and install grill head lamp
(Replace)f. Remove and install bracket headlamp R/L (Replace)
g. Remove and install rubber hose
(Replace)h. Remove and install clam hose
intercooler (Replace)
i. Install alternator j. Remove and install contack stud
(Replace)
k. Remove and install Rubber bush
Bogie (Replace)2. Unit DT 16
a. Replace and install spring cabin
(cannibal DT 10)b. Replace and install hose cabin
(cannibal DT 10)
c. Remove and install prefilter (Replace)
Mr. Sugiono
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
4/15
d. Clean up housing air filter
e. Remove and install housing air
cleaner (Replace)
7 Sunday, April
8th
2012
Unit DT 16
1. Remove transmission, propeller shaft, discclutch, flywheel, steering pump, air compressor,PTO pump, starter motor, cable gas
transmission, bolt calter engine, pipe supply
radiator, engine mounting rear R/L, muffler, aircleaner hose, housing flywheel and remove
servo clutch
2. Install spring cabin RH
Mr. Sugiono
8 Monday, April
9th 2012
Unit DT 16
1. Clean up air compressor, steering pump, starter
motor
2. Install housing flywheel3. Install air compressor, steering pump, starter
motor, speed limiter, sensor engine, hose aircleaner, muffler
4. Connect socket cable speed limiter and sensor
engine
Mr. Sugiono
9 Tuesday, April
10th 2012
Unit DT 16
1. Tightening and torsi bolt housing flywheel2. Install flywheel
3. Tightening and torsi bolt flywheel
4. Install disc clutch
5. Tightening and torsi bolt disc clutch6. Install engine mounting rear R/L
7. Tightening and torsi bolt engine mounting R/L
8. Install transmission9. Install absorber cabin front RH (cannibal unit
DT 11)
10.Install head lamp front RH (cannibal unit DT11)
Mr. Sugiono
10 Wednesday,
April 11th 2012
Unit DT 16
1. Install gear selector transmission2. Remove and install tail lamp rear R/L (Replace)
3. Remove and install sill side RH (Replace)4. Install grill cabin5. Install servo clutch
6. Install PTO pump, propeller shaft, pipe supply
radiator, muffler, peredam engine7. Install and replace cable main switch battery
(cannibal DT 11)
8. Connect socket sensor gear selector
Mr. Sugiono
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
5/15
9. Remove and install fluid reservoir steering
(replace)
11 Thursday,
April 12th 2012
1. Inspection unit
a. Inspection unit DT 57, DT 10, DT 61 and DT
15b. Recommendet part DT 61 and DT 152. Unit DT 61
a. Remove and install pre filter (replace)
b. Remove and install fitting spring front LH(replace)
c. Install hose chamber front LH
d. Remove and install wing canopy R/L (replace)e. Install Cable ground battery
3. Unit DT 17
a. Install leaf spring front RH (replace)
b. Bleeding fuel systemc. Check canbus (fuse) wearing harns
d. Test running engine
Mr. Sugiono
12 Friday, April
13th 2012
1. Unit DT 16
a. Refill water radiator
b. Replace and install bulb lamp tail lamp rearR/L (Replace)
c. Replace and install o-ring pipings water
radiator (cannibal DT 11)2. Unit DT 57
a. Remove and install bracket head lamp front
R/L (cannibal DT 11)b. Remove and install detail of fuel filter(Replace)
c. Remove and install head lamp R/L (Replace)
d. Remove and install line air cleaner (Replace)e. Remove and install clam hose intercooler
f. Remove and install hose cabin (Replace)
g. Remove and install bracket spring (Replace)h. Remove and install hose intercooler (Replace)
i. Remove and install engine mounting rear LH
(Replace)
j. Replace and install bracket pump cabin(Cannibal DT 10)
k. Recommendet part
Mr. Sugiono
13 Saturday, April
14th 2012
Unit DT 16
1. Remove and install leaf spring front RH
(Replace)2. Modification leaf spring front RH
3. Remove and install U-bolt spring front RH
Mr. Sugiono
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
6/15
4. Modification pin spring
5. Tightening and torsi U-bolt spring front RH
6. Remove U-bolt spring front LH7. Remove leaf spring front LH
8. Modification leaf spring front LHNote : Location Extreme
DT 17 : Repair wearing harns temperature sensor
14 Sunday, April
15th 2012
1. Unit DT 16
a. Replace and install leaf spring front LHb. Modification pin spring
c. Tightening and torsi U-bolt spring
d. Install front bumpers and hose hydraulic2. Unit DT 11 campaign
a. Remove tire axel 4 R/L, Brake drum R/L,
Drain oil HUB R/L, Special nut HUB R/L,
Shaft axel R/L, wheel HUB R/L, Stabilizerrear R/L, Brake bracket R/L, Torque-Rod R/L,
Propeller shaft, Release brake chamber, Brake
chamber R/L, V-stay, Anti roll bar axel,Contact Stud R/L,
Mr. Sugiono
15 Monday, April16th 2012
1. Unit DT 16a. Add oil engine
b. Repair hose servo clutch
c. Replace and install fuse box and relayd. Replace filter APM
2. Unit DT 11
a. Remove housing axel beam rearb. Remove differentialc. Remove bracket torque-rood, bracket v-stay
d. Remove Stud bracket torque-rood and bracket
v-staye. Clean up component housing axel beam
Mr. Sugiono
16 Tuesday, April17th 2012
1. Unit DT 16a. Refill oil clutch and bleeding servo clutch
b. Repair pipe or connector steering pump
c. Repair hose air compressor
d. Repair wiring harness sensor PTO and sensor
level oil2. Unit DT 11
a. Install stud bracket torque-rood and v-stayb. Install bracket torque-rood and v-stay
c. Tightening and torque bolt bracket torque-
rood and v-stayd. Install housing axel beam rear
e. Install brake bracket R/L
Mr. Sugiono
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
7/15
f. Install brake lining R/L
g. Install bracket Z-cam brake R/L
h. Tightening and torque bolt brake bracket R/Li. Install wheel HUB R/L
j. Install special nut HUB R/Lk. Tightening and torque special nut HUB R/L
l. Install shaft axel R/Lm. Install HUB reduction R/L
n. Install brake drum R/L
o. Install torque-rood R/Lp. Install contact stud R/L
17 Wednesday,April 18th 2012
Unit DT 111. Install differential lock inter wheel
2. Install brake chamber
3. Install brake drum RH
4. Install stabilizer rear5. Install tire axel 4 RL
6. Clean up area working
Mr. Sugiono
18 Thursday,
April 19th 2012
Unit DT 13 Campaign
1. Inspection location area
2. Ensure the unit stand in a safe position3. Stand unit / chassis in a secure state
4. Remove tire axel 4 R/L
Mr. Sugiono
19 Friday, April
20th 2012
Unit DT 13
1. Release brake chamber R/L
2. Remove brake drum R/L
3. Remove brake lining R/L4. Drain oil HUB R/L
5. Remove shaft axle R/L
6. Remove special nut R/L7. Remove HUB reduction R/L
8. Remove wheel HUB R/L
9. Remove stabilizer rear R/L10.Remove yoke or bracket Z-cam R/L
11.Remove contact stud R/L
12.Remove bracket brake chamber R/L
13.Remove torque rood R/L
Mr. Sugiono
20 Saturday, April21th 2012 Unit DT 161. Remove and install propeller shaft, PTO pump,servo clutch, hose hydraulic
2. Remove and install transmission
3. Remove and install disc clutch4. Remove and install engine flywheel
5. Remove and install anti leak ring (seal
crankshaft) Replace
Mr. Sugiono
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
8/15
6. Tightening and torque bolt flywheel, disc clutch
7. Test engine running
21 Sunday, April
22th 2012
1. Unit DT 16
Repair wiring hardness PTO pump
2. Unit DT 13a. Remove bolt torque roodb. Remove bracket V-stay
Note : Rainy conditions
Mr. Sugiono
22 Monday, April
23th 2012
Unit DT 13
1. Remove torque rood R/L
2. Remove propeller shaft3. Remove V-stay
4. Remove housing axle beam
5. Remove differential
Note : Rainy conditions
Mr. Sugiono
23 Tuesday, April24th 2012 1. Unit DT 13a. Remove and install bracket V-stay and torque-rood
b. Remove and install stud bracket V-stay and
torque-roodc. Install differential
d. Install housing axle beam
e. Install torque-rood2. Unit DT 55
a. Mechanic check
b. Remove gear selector
c. Repair gear selectord. Install gear selector
Note : Transmission warranty DT 57
Mr. Sugiono
24 Wednesday,
April 25th 2012
Unit DT 13
1. Install rear axle beam
2. Install brake bracket R/L3. Torque bolt brake bracket
4. Install brake lining R/L
5. Install wheel HUB R/L
6. Torque special nut7. Install HUB reduction
8. Install big drum9. Install bracket chamber10.Install V-stay
11.Install propeller shaft
12.Install torque-rood13.Install contact stud
Mr. Sugiono
25 Thursday,April 26th 2012
Unit DT 121. Remove tire R/L
Mr. Sugiono
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
9/15
2. Remove brake drum R/L
3. Remove brake lining R/L
4. Remove special nut R/L5. Remove HUB reduction R/L
6. Remove wheel HUB R/L7. Remove brake racket R/L
8. Remove bracket chamber R/L9. Remove V-stay
10.Remove contact stud R/L
11.Remove torque-rood R/L12.Remove stabilizer
13.Remove propeller shaft R/L
14.Remove axle beam15.Remove bracket torque-rood R/L
16.Remove stud bracket torque-rood and V-stay
26 Friday, April27th 2012 Unit DT 121. Remove stud bracket torque-rood
2. Remove differential
3. Remove differential lock4. Install stud bracket V-stay
Note : Rainy conditions
Mr. Sugiono
27 Saturday, April
28th 2012
Unit DT 16
1. Install bracket torque-rood R/L
2. Install differential3. Install V-stay
4. Install torque-rood R/L
5. Install contact stud R/L6. Install brake bracket R/L7. Install brake lining R/L
8. Torque bolt brake bracket R/L
9. Install wheel HUB R/L10.Torque special nut R/L
11.Install HUB reduction R/L
12.Install brake drum R/L13.Install stabilizer
14.Install brake chamber R/L
15.Install propeller shaft R/L
16.Install tire
Mr. Sugiono
28 Sunday, April
29th 2012
Unit DT 12
1. Continue job install tire2. Monitoring unit operational
Mr. Sugiono
29 Monday, April30th 2012
1. Unit DT 57a. Replace and install hose inter cooler
b. Replace and install conduit
c. Replace and install pump cabin
Mr. Sugiono
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
10/15
d. Replace and install tail lamp rear LH
e. Replace and install wing canopy R/L
f. Replace and install clamp conduit, clamp hoseinter cooler, bulb lamp
g. Replace and install alternator2. Unit DT 61
a. Replace and install hose inter coolerb. Replace and install radiator
c. Replace and install air filter assy
d. Replace and install air line assy (Cannibal DT57)
e. Replace and install clamp hose inter cooler,
clamp conduit, clamp muffler, bulb lamp,strap
f. Replace and install tail lamp rear LH
g. Replace and install mufflerh. Replace and install pump cabini. Replace and install compressor
Information:
To (REPLACE) the replacement of new part
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
11/15
May 2012No Time Activity Description Adviser
1 Tuesday, May
1th 2012
Monitoring unit operational Mr. Sugiono
2 Wednesday,
May 2th 2012
1. Monitoring unit operational
2. Packing tool
Mr. Sugiono
3 Thursday, May
3th 2012
The journey from the mess to the speed boat
Ancam, increased speed boat to Tarakan, from the
port speed boat ride motorcycles to the airport,plane to Balikpapan
Mr. Sugiono
4 Friday, May 4th
2012Washing housing gearbox type 16 S 2230 s/n 64 52
82 and disassembly gearboxMr. Eko P
5 Saturday, May5th 2012
Audit warranty parts Mr. Ridwan
6 Sunday, May 6th
2012Continuing audit warranty parts Mr.Ridwan
7 Tuesday, May
8th 2012
Disassembly gearbox s/n 606849 Mr.Ridwan
8 May 9th 2012 Helping disassembly gearbox s/n 606849;
Assembly output shaft and install on gearbox s/n652907
Mr. Eko P
9 May 10th 2012 Helping assembly main shaft gearbox s/n 614374and install main shaft & counter shaft into gearbox
s/n 614374
Mr. Eko P
10 May 11th 2012 Washing gearbox components s/n 510313 Mr. Eko P
11 May 12th 2012 Writing TA in the boarding house
12 May 14th 2012 House keeping workshop area, disassembly andreassembly gear selector
Mr. Firman
13 May 15th 2012 Helping assembly gearbox s/n 614374 and gearboxs/n 626562
Mr. Eko P
14 May 16th 2012 Helping assembly gearbox s/n 457491 type 16
S2723
Mr. Eko P
15 May 17th 2012 Easter's holiday
16 May 18th 2012 Painting gearbox s/n 485832 type 16 S 2723 and
disassembly gearbox s/n 585566 type 16 S 2530
Mr. Eko P and
Mr. Firman
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
12/15
17 May 19th 2012 Writing TA in the boarding house
18 May 21th 2012 Helping disassembly gearbox s/n 586177 type 16
S2230 and disassembly gearbox s/n 459940 type 16
S 2723
Mr. Eko P
19 May 22th 2012 Release bearing race from countershaft Mr. Eko P
20 May 23th 2012 Washing geabox components s/n 594833 type 16
S2230
Mr. Eko P
21 May 24th 2012 Helping assembly main shaft, input shaft, and
output shaft s/n 614014 type 16 S 2230
Mr. Hanafi
22 May 25th 2012 House keeping workshop area and disassembly
gearbox s/n 491285 type 16 S 2723 PT. LCI
Mr. Eko P
23 May 26th 2012 Writing TA in the boarding house
24 May 28th 2012 Helping assembly (install input shaft and rear
splitter into gearbox housing) and running testgearbox s/n 614014 type 16 S 2230
Mr. Eko P
25 May 29th 2012 Helping disassembly gearbox s/n 569156 type 16
S2230 PT. SBS
Mr. Firman
26 May 30th 2012 Disassembly compressor and assembly rear splitter
gearbox type 16 S 221
Mr. Hanafi
27 May 31th 2012 Reassembly compressor; Checking and list spareparts stock; Update gearbox status progress
Mr. Hanafi
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
13/15
JUNE 2012
No Time Activity Description Adviser
1. June 1,2012Breafing,house keeping and washing gearbox
16 2723Mr Eko
2. June 4,2012Continue washing and prepare spare part to
assembly component gear box 16 S 2723Mr.Eko
3. June 5,2012 Assembly main shaft and input shaft Mr.Eko
4. June 6,2012Breafing and continue prepare housing gearbox
and install main shaft.Mr.Eko
5. June 7,2012Continue assembly gearbox,install counter
shaft etc.Mr.Eko
6. June 8,2012 Breafing and finishing assembly gearbox Mr.Eko
7. June 11,2012
Breafing and Assembly gearbox type 16 S
2723 s/n 510313 (install rear splitter) and
painting gearbox
Mr.Eko
8. June 12,2012
Rapping gearbox type 16 S 2723, Packing ex-
part gearbox, Painting gearbox, Disassembly
gearbox Hino
Mr.Eko
9 June 13,2012
Breafing,Remove syncronizer from main shaft
Hino Gearbox type 9 S 1315, Washing unit
from grease
Mr.Eko
10. June 14,2012 Washing gearbox components type 16 S 2723 Mr.Eko
11. June 15, 2012 Breafing and Assembly main shaft type 16 S
2723, Assembly input shaft, install mainshaft,
Mr.Eko
-
7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E
14/15
counter shaft, and input shaft into housing
12. June 18,2012Breafing,completing gearbox with gear
selector,rapping gearboxMr.Eko
13. June 19,2012
Continuing assembly gearbox type 16 S 2530
(install clutch housing, measuring shim, install
rear splitter and rear housing)
Mr.Eko
14. June 20,2012 Stock taking spare parts 2012 Mr.Bambang
15. June 21,2012 Continuing stock taking 2012 Mr.Bambang
16. June 24,2012Breafing,Disassembly main shaft gearbox
type 16 S 2723 and washing housing gear boxMr.Eko
17. June 25,2012
Continuing install bearing on counter shaft,
install main shaft and counter shaft on gearbox
housing
Mr.Eko
18. June 27,2012 recheck gearbox type 16 S 2723 Mr.Eko
19. June 28,2012 Disassembly and assembly gear box. Mr.Eko
20. June 29,2012 Presentation and prepare to back Semarang
21. June 30,2102 Back to Semarang.
-