    Daily Activity On The Job Training

    Nama :Hertami Panji Sriyogo

    NIM : 3.21.09.5.11

    Mount : March 2012

    No Time Activity Description Adviser

    1 Wednesday,

    March 7th 2012

    Travel from Semarang to Balikapapan

    2 Thursday,

    March 8th 2012

    Waiting Personal Protection Equipment

    3 Friday, March

    9th 2012

    Briefing about safety and company profile Mr. M. Husin

    4 Saturday,

    March 10th

    2012

    Helping spare part down from the truck Mr. Bambang

    5 Monday,

    March 12th

    2012

    Training product knowledge and introduction

    Renault Truck Product

    Mr. Ishak and

    Mr. Fadeli

    6 Tuesday,

    March 13th

    2012

    Disassembling gearbox type 16 S 2723 and easing

    gearbox housing

    Mr. Hanafi

    7 Wednesday,March 14th

    2012

    washing gearbox housing and all component gearbox

    Mr. Eko P

    8 Thursday,

    March 15th

    2012

    Assembly main shaft and assembly output shaft Mr. Eko P

    9 Friday, March

    16th 2012

    Continue assembly output shaft Mr. Awaludin

    10 Saturday,

    March 17th

    2012

    Completing assembly gearbox and prepare to

    painting gear box

    Mr. Firman

    11 Monday ,

    March 19th

    2012

    Rapping finished gearbox Mr. Firman

    12 Tuesday,March 20th

    2012

    Washing gearbox and continue assembly main shaft,disassembly input shaft

    Mr. Firman

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    2/15

    13 Wednesday,

    March 21th

    2012

    Helping assembly input shaft Mr. Eko P

    14 Thursday,

    March 22th

    2012

    Washing gearbox housing and washing gearbox

    components

    Mr. Yoga T.P

    15 Monday ,

    March 26th

    2012

    List part gearbox component to assembly Mr. Awaludin

    16 Tuesday,March 27th

    2012

    Assembly main shaft and counter shaft Mr. Awaludin

    17 Wednesday,

    March 28th

    2012

    Continuing helping assembly output shaft, washing

    parts, and disassembly gearbox

    Mr. Eko P

    18 Thursday,March 29th

    2012

    Rapping finished gearbox type 16 S 2723 s/n353137; disassembly gearbox; and washing housing

    gearbox

    Mr. Eko P

    19 Friday, March

    30th 2012

    House keeping workshop area and Washing gearbox

    components

    Mr. Hanafi

    20 Saturday,

    March 31th

    2012

    Disassembly gearbox and washing gearbox housing Mr. Yoga T.P

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    3/15

    April 2012

    No Time Activity Description Adviser1 Monday, April

    2th 2012

    Washing Paert component gearbox S/N 00322827 Mr. Eko P

    2 Tuesday, April

    3th 2012

    Helping assembling gearbox S/N 00322827 &

    washing part

    Mr. Eko P

    3 Wednesday,

    April 4th 2012

    Continue assembling gearbox S/n 00322827 Mr. Eko p

    4 Thursday,

    April 5th 2012

    travel from PT. Indotruck Utama Balikpapan to

    Tarakan on a plane, Trip from the airport to the port

    speed boat, Speed boat ride to the Bulungan, Stay atthe hotel

    Mr. Sugiono

    5 Friday, April6th 2012

    The journey from the hotel to the PT. SBS Kelubir,Bulungan

    Mr. Sugiono

    6 Saturday, April7th 2012

    1. Unit DT 17a. Remove and install shock absorber

    R/L (Replace)

    b. Remove and install brake chamberaxel 3LH (Replace)

    c. Replace Hexagonnut (Replace)

    d. Remove and install support yoke

    cabin R/L (Replace)e. Remove and install grill head lamp

    (Replace)f. Remove and install bracket headlamp R/L (Replace)

    g. Remove and install rubber hose

    (Replace)h. Remove and install clam hose

    intercooler (Replace)

    i. Install alternator j. Remove and install contack stud

    (Replace)

    k. Remove and install Rubber bush

    Bogie (Replace)2. Unit DT 16

    a. Replace and install spring cabin

    (cannibal DT 10)b. Replace and install hose cabin

    (cannibal DT 10)

    c. Remove and install prefilter (Replace)

    Mr. Sugiono

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    4/15

    d. Clean up housing air filter

    e. Remove and install housing air

    cleaner (Replace)

    7 Sunday, April

    8th

    2012

    Unit DT 16

    1. Remove transmission, propeller shaft, discclutch, flywheel, steering pump, air compressor,PTO pump, starter motor, cable gas

    transmission, bolt calter engine, pipe supply

    radiator, engine mounting rear R/L, muffler, aircleaner hose, housing flywheel and remove

    servo clutch

    2. Install spring cabin RH

    Mr. Sugiono

    8 Monday, April

    9th 2012

    Unit DT 16

    1. Clean up air compressor, steering pump, starter

    motor

    2. Install housing flywheel3. Install air compressor, steering pump, starter

    motor, speed limiter, sensor engine, hose aircleaner, muffler

    4. Connect socket cable speed limiter and sensor

    engine

    Mr. Sugiono

    9 Tuesday, April

    10th 2012

    Unit DT 16

    1. Tightening and torsi bolt housing flywheel2. Install flywheel

    3. Tightening and torsi bolt flywheel

    4. Install disc clutch

    5. Tightening and torsi bolt disc clutch6. Install engine mounting rear R/L

    7. Tightening and torsi bolt engine mounting R/L

    8. Install transmission9. Install absorber cabin front RH (cannibal unit

    DT 11)

    10.Install head lamp front RH (cannibal unit DT11)

    Mr. Sugiono

    10 Wednesday,

    April 11th 2012

    Unit DT 16

    1. Install gear selector transmission2. Remove and install tail lamp rear R/L (Replace)

    3. Remove and install sill side RH (Replace)4. Install grill cabin5. Install servo clutch

    6. Install PTO pump, propeller shaft, pipe supply

    radiator, muffler, peredam engine7. Install and replace cable main switch battery

    (cannibal DT 11)

    8. Connect socket sensor gear selector

    Mr. Sugiono

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    5/15

    9. Remove and install fluid reservoir steering

    (replace)

    11 Thursday,

    April 12th 2012

    1. Inspection unit

    a. Inspection unit DT 57, DT 10, DT 61 and DT

    15b. Recommendet part DT 61 and DT 152. Unit DT 61

    a. Remove and install pre filter (replace)

    b. Remove and install fitting spring front LH(replace)

    c. Install hose chamber front LH

    d. Remove and install wing canopy R/L (replace)e. Install Cable ground battery

    3. Unit DT 17

    a. Install leaf spring front RH (replace)

    b. Bleeding fuel systemc. Check canbus (fuse) wearing harns

    d. Test running engine

    Mr. Sugiono

    12 Friday, April

    13th 2012

    1. Unit DT 16

    a. Refill water radiator

    b. Replace and install bulb lamp tail lamp rearR/L (Replace)

    c. Replace and install o-ring pipings water

    radiator (cannibal DT 11)2. Unit DT 57

    a. Remove and install bracket head lamp front

    R/L (cannibal DT 11)b. Remove and install detail of fuel filter(Replace)

    c. Remove and install head lamp R/L (Replace)

    d. Remove and install line air cleaner (Replace)e. Remove and install clam hose intercooler

    f. Remove and install hose cabin (Replace)

    g. Remove and install bracket spring (Replace)h. Remove and install hose intercooler (Replace)

    i. Remove and install engine mounting rear LH

    (Replace)

    j. Replace and install bracket pump cabin(Cannibal DT 10)

    k. Recommendet part

    Mr. Sugiono

    13 Saturday, April

    14th 2012

    Unit DT 16

    1. Remove and install leaf spring front RH

    (Replace)2. Modification leaf spring front RH

    3. Remove and install U-bolt spring front RH

    Mr. Sugiono

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    6/15

    4. Modification pin spring

    5. Tightening and torsi U-bolt spring front RH

    6. Remove U-bolt spring front LH7. Remove leaf spring front LH

    8. Modification leaf spring front LHNote : Location Extreme

    DT 17 : Repair wearing harns temperature sensor

    14 Sunday, April

    15th 2012

    1. Unit DT 16

    a. Replace and install leaf spring front LHb. Modification pin spring

    c. Tightening and torsi U-bolt spring

    d. Install front bumpers and hose hydraulic2. Unit DT 11 campaign

    a. Remove tire axel 4 R/L, Brake drum R/L,

    Drain oil HUB R/L, Special nut HUB R/L,

    Shaft axel R/L, wheel HUB R/L, Stabilizerrear R/L, Brake bracket R/L, Torque-Rod R/L,

    Propeller shaft, Release brake chamber, Brake

    chamber R/L, V-stay, Anti roll bar axel,Contact Stud R/L,

    Mr. Sugiono

    15 Monday, April16th 2012

    1. Unit DT 16a. Add oil engine

    b. Repair hose servo clutch

    c. Replace and install fuse box and relayd. Replace filter APM

    2. Unit DT 11

    a. Remove housing axel beam rearb. Remove differentialc. Remove bracket torque-rood, bracket v-stay

    d. Remove Stud bracket torque-rood and bracket

    v-staye. Clean up component housing axel beam

    Mr. Sugiono

    16 Tuesday, April17th 2012

    1. Unit DT 16a. Refill oil clutch and bleeding servo clutch

    b. Repair pipe or connector steering pump

    c. Repair hose air compressor

    d. Repair wiring harness sensor PTO and sensor

    level oil2. Unit DT 11

    a. Install stud bracket torque-rood and v-stayb. Install bracket torque-rood and v-stay

    c. Tightening and torque bolt bracket torque-

    rood and v-stayd. Install housing axel beam rear

    e. Install brake bracket R/L

    Mr. Sugiono

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    7/15

    f. Install brake lining R/L

    g. Install bracket Z-cam brake R/L

    h. Tightening and torque bolt brake bracket R/Li. Install wheel HUB R/L

    j. Install special nut HUB R/Lk. Tightening and torque special nut HUB R/L

    l. Install shaft axel R/Lm. Install HUB reduction R/L

    n. Install brake drum R/L

    o. Install torque-rood R/Lp. Install contact stud R/L

    17 Wednesday,April 18th 2012

    Unit DT 111. Install differential lock inter wheel

    2. Install brake chamber

    3. Install brake drum RH

    4. Install stabilizer rear5. Install tire axel 4 RL

    6. Clean up area working

    Mr. Sugiono

    18 Thursday,

    April 19th 2012

    Unit DT 13 Campaign

    1. Inspection location area

    2. Ensure the unit stand in a safe position3. Stand unit / chassis in a secure state

    4. Remove tire axel 4 R/L

    Mr. Sugiono

    19 Friday, April

    20th 2012

    Unit DT 13

    1. Release brake chamber R/L

    2. Remove brake drum R/L

    3. Remove brake lining R/L4. Drain oil HUB R/L

    5. Remove shaft axle R/L

    6. Remove special nut R/L7. Remove HUB reduction R/L

    8. Remove wheel HUB R/L

    9. Remove stabilizer rear R/L10.Remove yoke or bracket Z-cam R/L

    11.Remove contact stud R/L

    12.Remove bracket brake chamber R/L

    13.Remove torque rood R/L

    Mr. Sugiono

    20 Saturday, April21th 2012 Unit DT 161. Remove and install propeller shaft, PTO pump,servo clutch, hose hydraulic

    2. Remove and install transmission

    3. Remove and install disc clutch4. Remove and install engine flywheel

    5. Remove and install anti leak ring (seal

    crankshaft) Replace

    Mr. Sugiono

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    8/15

    6. Tightening and torque bolt flywheel, disc clutch

    7. Test engine running

    21 Sunday, April

    22th 2012

    1. Unit DT 16

    Repair wiring hardness PTO pump

    2. Unit DT 13a. Remove bolt torque roodb. Remove bracket V-stay

    Note : Rainy conditions

    Mr. Sugiono

    22 Monday, April

    23th 2012

    Unit DT 13

    1. Remove torque rood R/L

    2. Remove propeller shaft3. Remove V-stay

    4. Remove housing axle beam

    5. Remove differential

    Note : Rainy conditions

    Mr. Sugiono

    23 Tuesday, April24th 2012 1. Unit DT 13a. Remove and install bracket V-stay and torque-rood

    b. Remove and install stud bracket V-stay and

    torque-roodc. Install differential

    d. Install housing axle beam

    e. Install torque-rood2. Unit DT 55

    a. Mechanic check

    b. Remove gear selector

    c. Repair gear selectord. Install gear selector

    Note : Transmission warranty DT 57

    Mr. Sugiono

    24 Wednesday,

    April 25th 2012

    Unit DT 13

    1. Install rear axle beam

    2. Install brake bracket R/L3. Torque bolt brake bracket

    4. Install brake lining R/L

    5. Install wheel HUB R/L

    6. Torque special nut7. Install HUB reduction

    8. Install big drum9. Install bracket chamber10.Install V-stay

    11.Install propeller shaft

    12.Install torque-rood13.Install contact stud

    Mr. Sugiono

    25 Thursday,April 26th 2012

    Unit DT 121. Remove tire R/L

    Mr. Sugiono

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    9/15

    2. Remove brake drum R/L

    3. Remove brake lining R/L

    4. Remove special nut R/L5. Remove HUB reduction R/L

    6. Remove wheel HUB R/L7. Remove brake racket R/L

    8. Remove bracket chamber R/L9. Remove V-stay

    10.Remove contact stud R/L

    11.Remove torque-rood R/L12.Remove stabilizer

    13.Remove propeller shaft R/L

    14.Remove axle beam15.Remove bracket torque-rood R/L

    16.Remove stud bracket torque-rood and V-stay

    26 Friday, April27th 2012 Unit DT 121. Remove stud bracket torque-rood

    2. Remove differential

    3. Remove differential lock4. Install stud bracket V-stay

    Note : Rainy conditions

    Mr. Sugiono

    27 Saturday, April

    28th 2012

    Unit DT 16

    1. Install bracket torque-rood R/L

    2. Install differential3. Install V-stay

    4. Install torque-rood R/L

    5. Install contact stud R/L6. Install brake bracket R/L7. Install brake lining R/L

    8. Torque bolt brake bracket R/L

    9. Install wheel HUB R/L10.Torque special nut R/L

    11.Install HUB reduction R/L

    12.Install brake drum R/L13.Install stabilizer

    14.Install brake chamber R/L

    15.Install propeller shaft R/L

    16.Install tire

    Mr. Sugiono

    28 Sunday, April

    29th 2012

    Unit DT 12

    1. Continue job install tire2. Monitoring unit operational

    Mr. Sugiono

    29 Monday, April30th 2012

    1. Unit DT 57a. Replace and install hose inter cooler

    b. Replace and install conduit

    c. Replace and install pump cabin

    Mr. Sugiono

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    10/15

    d. Replace and install tail lamp rear LH

    e. Replace and install wing canopy R/L

    f. Replace and install clamp conduit, clamp hoseinter cooler, bulb lamp

    g. Replace and install alternator2. Unit DT 61

    a. Replace and install hose inter coolerb. Replace and install radiator

    c. Replace and install air filter assy

    d. Replace and install air line assy (Cannibal DT57)

    e. Replace and install clamp hose inter cooler,

    clamp conduit, clamp muffler, bulb lamp,strap

    f. Replace and install tail lamp rear LH

    g. Replace and install mufflerh. Replace and install pump cabini. Replace and install compressor

    Information:

    To (REPLACE) the replacement of new part

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    11/15

    May 2012No Time Activity Description Adviser

    1 Tuesday, May

    1th 2012

    Monitoring unit operational Mr. Sugiono

    2 Wednesday,

    May 2th 2012

    1. Monitoring unit operational

    2. Packing tool

    Mr. Sugiono

    3 Thursday, May

    3th 2012

    The journey from the mess to the speed boat

    Ancam, increased speed boat to Tarakan, from the

    port speed boat ride motorcycles to the airport,plane to Balikpapan

    Mr. Sugiono

    4 Friday, May 4th

    2012Washing housing gearbox type 16 S 2230 s/n 64 52

    82 and disassembly gearboxMr. Eko P

    5 Saturday, May5th 2012

    Audit warranty parts Mr. Ridwan

    6 Sunday, May 6th

    2012Continuing audit warranty parts Mr.Ridwan

    7 Tuesday, May

    8th 2012

    Disassembly gearbox s/n 606849 Mr.Ridwan

    8 May 9th 2012 Helping disassembly gearbox s/n 606849;

    Assembly output shaft and install on gearbox s/n652907

    Mr. Eko P

    9 May 10th 2012 Helping assembly main shaft gearbox s/n 614374and install main shaft & counter shaft into gearbox

    s/n 614374

    Mr. Eko P

    10 May 11th 2012 Washing gearbox components s/n 510313 Mr. Eko P

    11 May 12th 2012 Writing TA in the boarding house

    12 May 14th 2012 House keeping workshop area, disassembly andreassembly gear selector

    Mr. Firman

    13 May 15th 2012 Helping assembly gearbox s/n 614374 and gearboxs/n 626562

    Mr. Eko P

    14 May 16th 2012 Helping assembly gearbox s/n 457491 type 16

    S2723

    Mr. Eko P

    15 May 17th 2012 Easter's holiday

    16 May 18th 2012 Painting gearbox s/n 485832 type 16 S 2723 and

    disassembly gearbox s/n 585566 type 16 S 2530

    Mr. Eko P and

    Mr. Firman

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    12/15

    17 May 19th 2012 Writing TA in the boarding house

    18 May 21th 2012 Helping disassembly gearbox s/n 586177 type 16

    S2230 and disassembly gearbox s/n 459940 type 16

    S 2723

    Mr. Eko P

    19 May 22th 2012 Release bearing race from countershaft Mr. Eko P

    20 May 23th 2012 Washing geabox components s/n 594833 type 16

    S2230

    Mr. Eko P

    21 May 24th 2012 Helping assembly main shaft, input shaft, and

    output shaft s/n 614014 type 16 S 2230

    Mr. Hanafi

    22 May 25th 2012 House keeping workshop area and disassembly

    gearbox s/n 491285 type 16 S 2723 PT. LCI

    Mr. Eko P

    23 May 26th 2012 Writing TA in the boarding house

    24 May 28th 2012 Helping assembly (install input shaft and rear

    splitter into gearbox housing) and running testgearbox s/n 614014 type 16 S 2230

    Mr. Eko P

    25 May 29th 2012 Helping disassembly gearbox s/n 569156 type 16

    S2230 PT. SBS

    Mr. Firman

    26 May 30th 2012 Disassembly compressor and assembly rear splitter

    gearbox type 16 S 221

    Mr. Hanafi

    27 May 31th 2012 Reassembly compressor; Checking and list spareparts stock; Update gearbox status progress

    Mr. Hanafi

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    13/15

    JUNE 2012

    No Time Activity Description Adviser

    1. June 1,2012Breafing,house keeping and washing gearbox

    16 2723Mr Eko

    2. June 4,2012Continue washing and prepare spare part to

    assembly component gear box 16 S 2723Mr.Eko

    3. June 5,2012 Assembly main shaft and input shaft Mr.Eko

    4. June 6,2012Breafing and continue prepare housing gearbox

    and install main shaft.Mr.Eko

    5. June 7,2012Continue assembly gearbox,install counter

    shaft etc.Mr.Eko

    6. June 8,2012 Breafing and finishing assembly gearbox Mr.Eko

    7. June 11,2012

    Breafing and Assembly gearbox type 16 S

    2723 s/n 510313 (install rear splitter) and

    painting gearbox

    Mr.Eko

    8. June 12,2012

    Rapping gearbox type 16 S 2723, Packing ex-

    part gearbox, Painting gearbox, Disassembly

    gearbox Hino

    Mr.Eko

    9 June 13,2012

    Breafing,Remove syncronizer from main shaft

    Hino Gearbox type 9 S 1315, Washing unit

    from grease

    Mr.Eko

    10. June 14,2012 Washing gearbox components type 16 S 2723 Mr.Eko

    11. June 15, 2012 Breafing and Assembly main shaft type 16 S

    2723, Assembly input shaft, install mainshaft,

    Mr.Eko

  • 7/31/2019 Daily Activity on the Job Training_Hertami Panji Sriyogo_ME 3E

    14/15

    counter shaft, and input shaft into housing

    12. June 18,2012Breafing,completing gearbox with gear

    selector,rapping gearboxMr.Eko

    13. June 19,2012

    Continuing assembly gearbox type 16 S 2530

    (install clutch housing, measuring shim, install

    rear splitter and rear housing)

    Mr.Eko

    14. June 20,2012 Stock taking spare parts 2012 Mr.Bambang

    15. June 21,2012 Continuing stock taking 2012 Mr.Bambang

    16. June 24,2012Breafing,Disassembly main shaft gearbox

    type 16 S 2723 and washing housing gear boxMr.Eko

    17. June 25,2012

    Continuing install bearing on counter shaft,

    install main shaft and counter shaft on gearbox

    housing

    Mr.Eko

    18. June 27,2012 recheck gearbox type 16 S 2723 Mr.Eko

    19. June 28,2012 Disassembly and assembly gear box. Mr.Eko

    20. June 29,2012 Presentation and prepare to back Semarang

    21. June 30,2102 Back to Semarang.