DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok •...

56
DAFNE upgrades C. Biscari 15 novembre 2002

Transcript of DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok •...

Page 1: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

DAFNE upgrades

C. Biscari

15 novembre 2002

Page 2: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

present next future

• Lmax = 0.8 10 32 cm-2 sec-1 1.5 10 32

• Lint/day = 4.5 pbarn-1 8

• I+ = 1.2 A 2• I- = 0.9, 1.4 A 2• N bunches = 50 , 100 100

Page 3: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Upgrades – future future

• Higher E ~ 1031 @ 1 + 1 GeV

• Higher L > 1033 @ 510 + 510 MeV

• BOTH with the same machine ?

Page 4: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Higher E ~ 1031 @ 1 + 1 GeV

Rinaldo Baldini will give us a talk (december 2002)on Fenice2 and other measurements at this energy

Riunione alla SIF (fine settembre 02)Bini, Zallo, Filippi Files pdf disponibili

Page 5: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

FENICE experiment @ ADONE

<L> = 5 1028 cm-2 sec -1

Lp = 1029 cm-2 sec -1

L int = 0.48 pb-1

With ~ 100 pb-1 answers to open questions on FF

Page 6: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Higher L > 1033 @ 510 + 510 MeV

Fabio Bossi and Gino Isidoriwill gave us a talk before before the end of the yearon the physics motivation for this request

Page 7: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

• High currents• 120 bunches - feedbacks• Impedance• Vacuum• Crossing angle - parasitic crossings• Coupling - beam sizes

Concerns @ DAFNE design

Page 8: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

DAFNE experienceNot critical• Feedbacks: challenging but ok• Crossing angle• Coupling• IP �*

Critical• Damping time still long• Non linearities• 2 IPs • Beam lifetime and background: Touschek

Page 9: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

1) Higher E

2) Higher L

3) 1) + 2)

1) Easy accelerator physicsHardwareCostsInjection/ramping

Challengingflat/roundhigh currentmore damping…

Page 10: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Possible scenarios

• Minimum modifications to increase the energy

• Change as much as needed to increase the luminosity

• and include whatneeded to increase the energy

Page 11: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Higher Energy : 2 GeV (1+1)

Easier luminosityNaturally increase radiation damping and

lifetime

But

hardware, costs, injection

Page 12: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

0

50

100

150

200

250

PL105 PL106 PL107 PS101 PS104 PS105 PS106 PS204 PS205 PS206 PL204 PL205 PL206

large quadrupolesI (510)I (1000)

I (A)

saturation

510 MeV1 GeV

QUADRUPOLES

0

100

200

300

400

500

600

700

PL101PL102PL103PL104PL108PL109PL110PS102PS103PS107PS108PS109PS110PS201PS202PS203PS207PS208PS209PL207PL208PL209PL210

small quadsI (510)

I (1000) lin

saturation

I (A)

Page 13: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

510 MeV1 GeV

SEXTUPOLES

0

50

100

150

200

250

300

PL102 PL103 PS101 PS102 PS103 PS202 PS203 PL202 PL203

LARGE SEXTS

I (510)I (1000)

I (A)

saturation

0

50

100

150

200

250

300

350

400

PL101 PL104 PS104 PS201 PS204 PL201 PL204

SMALL SEXTS

I (510)I (1000)

I (A)

Page 14: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

DIPOLES

Long: L =1.21mShort: L = 0.99 m

� = 1.4 mLT = 8.8 mB = 1.2 T

B = 1.76 T @ 1 GeV� = 245 °

Missing 115 ° = 2.8m

Page 15: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Substitute with SC dipoles, same total dimension

saving vacuum chamber

Add adyacent dipoles (pm, sc, …) simmetrically around each dipole, needed > 3 T to fit in the spaces

Modify layout, substitute with normal conducting dipoles, change arc vacuum chamber

Page 16: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

SPLITTERS Maximum current : 750 ANow 420 - 460

Compensators o.k. - Compensate the detector field

Others: correctors, skews, octupoles,….Can be adapted…

Low beta: control if combinations of KLOE + FINUDA quadscan be used to design a new low-beta

Wigglers o.k. – larger �, but still more radiation

Page 17: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Uo = 1.88 10-15 �3 E I2 (m-1)

Uo (keV) ~ I2 (m-1) @ 510 MeV

Uo (keV) ~ 15 I2 (m-1) @ 1 GeV

Now : I2 = 9.8 m-1 -> Uo = 9.4 keV

1GeV same �d, same wigglers:I2 = 7.2 m-1 Uo = 108 keV

increasing �d, same wigglers: I2 = 5.6 m-1 Uo = 85 keV

Energy lost per turn

Page 18: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Luminosity 5 1031 cm-2 sec-1

I = 1ANb = 50

fcoll = 153 MHzIb = 20 mA = 4 1010 part/bunch

�x �y = 4 10-8 m2

�x = 2 mm�y = 20 �

… easyRf …

Feedbacks …

Vacuum …

Page 19: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

L estimation at 2 GeV

Peak L should not decrease asthe energy increases

Now: Lav = 0.7 Lpeak ~ 5 1031

Injection at lower energy ~ factor 2 below:Lav = 0.35 Lpeak

Feasible to achievethe request of1pb-1/day = 1031 average

Page 20: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Higher luminosity at the � energy

Page 21: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

“Conservative” L upgrade

• Add damping: sc wigglers and/or sc dipoles• Increase crossing angle: increase rf frequency

and n. of buckets -> bunches• Increase V for lifetime • Eliminate 2nd IP• Minimize �* and bunch length• Background estimation and shielding• 2 independent injection chains

Page 22: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Damping

Radiated energy per turn Uo � E4 I2 I2 �

ds�

2�

Damping time:few tens of ms

1�

E3 I2

To

Page 23: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Wigglers

NOW

4 wigglers/ring ��= 0.94 mB = 1.8 TLTOT = 8mI2 ~ 5.7 m-1

--->

4 SC wigglers/ring ��= 0.34 mB = 5 TLTOT = 10mI2 ~ 60 m-1

Damping increased by a factor 10...

Page 24: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Wigglers added to optimize L at lower energies

For example:

LEPP, Cornell University (Laboratory for Elementary-Particle Physics)

Optimization of luminosity performance of the 768 m circumference e+e- collider CESR at 1.9 GeV is a critical objective of the CESR-c conversion project. In order to achieve a reasonable damping rate at the low energy approximately 18 m of 2.1 Tesla peak field wigglers will be installed. 90% of the synchrotron radiation power in the ring will be produced in the wigglers. The non-linear properties of the wigglers are a concern for high luminosity operation.

Page 25: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

AbstractThe superconducting 3.5 T wiggler was designed and fabricated for the ELETTRA storage ring (Italy) forthegeneration of synchrotron radiation with critical energy of9.3 keV. The presented wiggler is a 49 polesuperconducting magnet with maximum field of 3.5 Teslainserted into a special liquid helium cryostat. The wigglerdesign and main parameters are presentedin this article.Results of magnetic field measurements and wiggler testing in different modes of operation are discussed.. The general view of the magnet isshown in Fig.1.The main goal of the wiggler design was to obtain a magnetic field of 3.5 Tesla while keeping the periodof the magnet structure as short as possible. The wiggler period is 64 mm. The shape of the central pole is elliptical with axes 140 mm and 7 mm. The 45 central coils consist of two different sections which are wound one over another. Each section is energised by different currents in order to obtain the optimal field-current characteristics

A SUPERCONDUCTING 3.5 T MULTIPOLE WIGGLER FOR THEELETTRA STORAGE RINGA.Batrakov, V.Jurba, S.Khrushchev, G.Kulipanov, E.Kuper, M.Kuzin, A.Medvedko, N.Mezentsev,V.Shkaruba, BINP, Novosibirsk,Russia;D.Zangrando, B.Diviacco, R.P.Walker1 , Sincrotrone Trieste, Trieste, ItalyProceedings of EPAC 2002, Paris, France

Abstract

A SUPERCONDUCTI NG 3.5 T MULTIPOLE WIGGLER FOR THEELETTRA STORAGE RI NGA.Batrakov, V.Jurba, S.Khrushchev, G.Kulipanov, E.Kuper, M.Kuzin, A.Medvedko, N.Mezentsev,V.Shkaruba, BINP, Novosibirsk ,Russia;D.Zangrando, B.Div iacco, R.P.Walker1 , Sincrotrone Trieste, Trieste, ItalyProceedings of EPAC 2002, Paris, France

Page 26: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

ELETTRA wiggler – 3.5T

Page 27: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

A SUPERCONDUCTING 7T MULTIPOLE WIGGLER FOR BESSY II: MAIN CHALLENGES AND FIRST FIELD MEASUREMENTS�

D. Berger, Hahn-Meitner-Institut, Glienicker Str. 100, 14109 Berlin, Germany E. Weihreter, BESSY, Einsteinstraße 15, 12489 Berlin, Germany

N. Mezentsev, V. Shkaruba, BINP, Acad. Lavrentiev prospect 11, 630090 Novosibirsk, Russia Proceedings of EPAC 2002, Paris, France

Abstract To provide high flux hard X-ray beams with a critical energy of 16.8

keV for material research, a 17 pole superconducting 7T wigglerhas been built for the BESSY II ring. The scope of this paper is to describe the magnetic layout and the main technological challenges of this unique insertion device. Secondly we will report on first tests of the magnet at high fields including the quenching behaviour. Magnetic fields were measured using Hall-probes to determine the on-axis field distribution as well as the lifetime in the persistent current mode and the remanent field strength. A first evaluation of the measured fields including a comparison with 3D-field calculations indicates that the specified field quality could be met.

Page 28: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

BESSY wiggler – 7T

Page 29: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Increase rf frequency

Present: 369 MHzC = 98 m h = nmax = 120

Going to 500 MHzC = 100 m h = nmax = 160

Decrease bunch length

Distance between bunches:D = 0.8 m

D = 0.6 m

Increase fcoll

Page 30: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

2 independent injection chains

Ratio between integrated and peak luminosity depends

on:

•Beam lifetime •Injection efficiency

KLOE runs

Page 31: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Luminosity 1033 cm-2 sec-1

I = 5ANb = 140

fcoll = 467 MHzIb = 36 mA = 7 1010 part/bunch

�x �y = 1.8 10-8 m2

�x = 1 mm�y = 18 �

Page 32: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Ring for two energies

1�

E3 I2

To

16 UoD -4UoWUoD - UoWEnergy lost per turn

�oD / 8 - �ow / 2 �oD - �owDampingtime

2 �w�wWigglers

�o�oDipoles

3.31.7B� (T m)

1.00.5Energy(GeV)

� constantB ramping

B constant

Page 33: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

… ideas for higher L

• Round beam (Novosibirsk style)• Round beam + 2 IPs (H / V)

• AWM

Page 34: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Round beam (Novosibirsk style)

Page 35: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

From a seminar by Valishev @ KEK, march 2002

Page 36: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non
Page 37: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Hadron’s colliders:working point near the main coupling resonance

Page 38: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Ruggiero – Zimmermann (CERN) 2 Ips – H/V

The beam-beam effect between the horizontal and the vertical crossing is compensated

The luminosity increases with crossing angle and bunch length

Page 39: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

AWM: All Wiggler Machine

Page 40: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Starting point

Page 41: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Two rings, multibunchOnly 1 IP, 1 detector

Add SC wigglers / dipoles

Page 42: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Round beam = no coupling

90° 90°

D � Mode

1

2

D �

D �

One turn

detector

Page 43: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Interaction Region for flat and round beam

Ld

IP

d = Bd Ld/2B�����

C1 C2

FLAT beam: C1 = C2 = - 22.5°

ROUND beam: C1 = C2 = 22.5°

tot = 0

tot = 90°

Page 44: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Ld = 3m -> Bd ��������

(90° = 5.3 Tm @ 510 MeV)

Detector: 45°

Compensators: 45°/2 Lc = 20 cm -> Bc �������

Example:

Superconducting compensators inside the detector(Bassetti, Biscari, Milardi, 1993, L-11Alternative Interaction Region Design)

Page 45: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Flat�x* = 1m�y* = 2cm

Round�x* = 4cm�y* = 4cm

Betatron functions inside the detector

Page 46: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Ld

IP

C1 C2

Add focusing with ‘wiggling sc solenoids’

Positive Bs + Negative Bs = 0

C1 + C2 + Bd = 0 FLATC1 + C2 + Bd = 90° ROUND

Page 47: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Betatron functions inside the detector

Flat�x* = 1m�y* = 2cm

Round�x* = 2cm�y* = 2cm

Page 48: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Can we make an experiment on DAFNE?

Round beam with Finuda?

Finuda detector: BL = 2.6 Tm => 44 °

+ Compensators: 22° + 22 °

Almost 90°

Page 49: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

FINUDA IR - now

compensator

Page 50: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

FINUDA IR with equal �*

� *1 = � *2 = 20cm

� *1 = � *2 = 30cm

Page 51: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

But trajectory off-axis + rotation of 90° transform the horizontal separation into vertical

Page 52: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Off-axis + 90 °:

Two equal rings vertically separated

Round beam

Multibunch

Only 1 crossing point

Page 53: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

When?Present schedule:

2002 : KLOE + DEAR2003 : shutdown for FINUDA, KLOE, ...

FINUDA + KLOE runs2004: FINUDA + KLOE runs2005 - on

Page 54: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Some of the items to be studied

Higher energy• Ring structure (����, rf, bunch length,….)• Interaction region• New magnets design• Magnet Ramping with injection @ 510• Diagnostics• Cost estimation

Page 55: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Higher luminosity… everything

Flat/round beam => Ring structure• Wigglers• Rf• IR• Background• Injection system• …

Page 56: DAFNE upgrades - lnf.infn.it · DAFNE experience Not critical • Feedbacks: challenging but ok • Crossing angle • Coupling • IP * Critical • Damping time still long • Non

Next appointments

• Seminar bossi/isidori• Seminar baldini• Workshop @ Thuile (march 2003) – to

be organized• Workshop @ Alghero (june 2003) – to

be organized