DAEWOO ENERTEC,

INC

ENERPIA Heating Film Guideline of Installation

#148-21, Nam-san 2 DongJung-Gu, KoreaOffice, FactoryTel: 82-53-474-8050Fax: 82-53-474-8050E-mail : [email protected]

Page 2: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

INSTALLATION SPECIFICATION

◈ Thank you for purchasing ENERPIA Heating Film.◈ Please install the film after reading this instruction carefully◈ Keeping this instruction will help you solve any problems.

CONTENTS

① Tool, Material, Trial operation tool ② Structure and installation Diagram ③ Sequence of installation ④ Preparation and floor cleaning ⑤ Cutting heating film and thermal insula-

tion ⑥ Setting thermal insulation ⑦ Electric insulation of the film⑧ Arrayal and Attaching of the film

⑨ Electric power connection⑩ installation of heat controller and sensor

⑪ Power connection of heat controller ⑫ Operation manual of heat controller ⑬ Trial operation and finishing arrangement ⑭ After service ⑮ Appended data

Page 3: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

No Parts Name Standard Uses

1 Long nose 6”,150mm Electric

2 Stripper 0.13~6mm “

3 Driver(+-) Middle “

4 Tape measure 7.5~10M Measuring

5 Wire press 1.25_8 ㎟ Wiring

6 Cutter knife Middle Film cut

7 Scissors Middle Film cut

8 Terminal press Middle Wiring

9 Terminal Copper “

10 Plug 220V/15A Power

11 Hot melt glue gun

40W, ¢ 11 Insulation

12 Measure (Iron) 1M Film cut

No Parts Name Standard Uses

1 Insulation tape 5mm Insulation

2 Y type wire termi-nal

2 ㎡ ,3.5 ㎟ Wiring

3 Glue spray3M77 Insulation

4 Wire mold Wiring

5 OPP(BOX) Tape General Parts fixing

6 Wire sleeve Wiring

7 Shrinking tube 5 ¢ Wiring

8 Insulation tape General Insulation

9 Electric wire 2/3.5 ㎟ Power

No Parts Name Standard Uses

1 Surface thermome-ter

2 Current measure 1,000mA

3 Tester

4 Mega tester Leak test

Tools Materials

Trial operation tools

1. INSTALLATION SPECIFICATION

Page 4: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

2. Structure and Installation Diagram(Ⅰ)

▶ENERPIA Heating Film is pro-duced by accurate(under 1 mi-cron) printing technology by coating carbon on PET film to radiate heat. The film is so strong that you can not cut it without scissors because the material was heat-treated over 150℃.

▶Steady temperature range and resistance variation - Coating high density carbon particle

- Cutting edge doping technology for uniformly printed surface

-Continuous development of special equipment for heating film

- World class film with the character of insulation and anti-flame

- Preventing spark on carbon surface by specialized design - Special waterproof treatment - Laminated insulation film

Structure

Safeness

0.2mmFabric, PE Foam (Select)

0.275 or 0.338mmHeating Film

Thickness 3mm∼10mmHeat Insulator Installation

Concrete Floor

Insulator

Setting Material

Film Protector

Cross section view

Sensor1

Power

Thermostat

Sensor2

Installation diagram

“Performance of heating film is decided by NANO particle coating technology according to the viscosity and resistance of carbon and sil-ver particle.”

Page 5: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

2. Structure and Installation Diagram (Ⅱ)

0.2mm Fabric,PE Form(Select)

0.275 or 0.338mm Heating Film

Film Protector

(Floor Paper:Protecting Board, Floor Board:Nonwoven Fabric,PE Form)

ENERPIA Heating Film

Insulator(Electricity, Humidity)

Concrete Floor

Setting Material (Floor Paper, Floor Board)

Thickness 3mm ∼ 10mmHeat Insulator Installation

Concrete Floor

Heat Insulator

Floor Paper, BoardFabric, PE Foam etc.

◈ General Installation Cross Section

Page 6: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

2. Structure and Installation Diagram(Ⅲ)

◈ Deco-Tile, Floor Board Installation Cross Sec-tion

Concrete Floor

Heat Insulator

단열재난방필름

Plywood or Board

합판

Deco tile,Floor Board

Deco tile,Floor Board

3mm ~ 10mm

5mm~10mm

Heating Film

Page 7: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

2. Structure and Installation Diagram(Ⅳ)

◈ Floor Board Installation Cross Section

Concrete Floor

Heat Insulator

단열재난방필름

Fabric, PE Foam (Select)

합판

Floor Board

Floor Board

5mm ~ 10mm

0.2mm

Heating Film

Page 8: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

2. Structure and Installation Diagram(Ⅴ)

◈ Floor Paper Installation Cross Section

Concrete Floor

Heat Insulator

단열재난방필름

Plywood,Board

합판

Floor Paper

Floor Paper

5mm ~ 10mm

5mm

Heating Film

Page 9: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

3. Sequence of installation

Preparation

Floor cleaning

Cutting insula-tion

Setting insula-tion

Cutting film

Connecting terminal

Waterproof taping

Setting film

Controller

Heating test

Test operation

Finishing ar-rangement

Page 10: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

4. Preparation and Floor Cleaning

1) Check the material and tools once again.2) Check the total electrical power of the building to prevent any problem using heating film and other device at the same time. When electric capacity is not enough, you must increase the capacity.3) Check whether the voltage is 380V when you install in a restaurant or factory.4) Check the uses , lowest temperature and thermal insulation of the building to decide how much portion of floor you will install. And be-

fore working, check putting place and connecting method of the controller and ground line.5) Check the humidity to decide whether setting down vinyl or tarp on the place. Also

you must discuss it with customer before installation.6) All conditions of the site must be double checked before deciding installation schedule. 7) Clean up the minute dust to make thermal insulation adheres easily.

Never use Stiroform(styrene) on the floor. It could cause a fire.

Page 11: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

5. Cutting heating film and thermal insulation

1) Cut the film according to the direction of installation. (Measurement of Width & length) 2) Use scissors or cutting knife for proper cutting. 3) Be careful not to cut the carbon coated area on the film.4) Maximum series cutting length. This is decided by capacity of the thermostat ca-pacity.

5) Do not plug in two controller at one outlet because the capacity of two hole out-let is usually less than 2Kw. It’s very dangerous to be overloaded.6) You must refer to the attached standard when using capacity of more than 2Kw.

Sec-tion

Current / 3.3㎡

Maxim length

600W 2.7A

50Cm × 16M

80Cm × 10M

1M × 8M

Section Quantity of using heating film

600W

50Cm×15M × 2.2 column (3.3 × 5 ㎡ )

50Cm×10M × 2 column (3.3 × 5 ㎡ )

1M×8M × 2 column (3.3× 5 ㎡ )

Table 1) maximum lengthTable 2) Quantity of heating film when using 4Kw controller

Page 12: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

6. Electric insulation of the film

1) Clean up the floor and remove all minute dust.2) Put some heavy things on the edge because the area does not attach on the floor 3) Use 10 cm of the space with the wall to pass the electric wire. When the wire passes through between each insulations, you have to leave a margin space of more than 2 cm 4) In case the floor has high humidity, You have to complete water proof treatment with vinyl or tarp on the floor to prevent electric leaking.5) Use the adhesives for floor for this process.6) Fix each insulations with OPP tape.

※ Caution : Always use the anti-flammable insulation

Page 13: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

7. Setting Thermal Insulation

1) Heating film needs electric insulation on cut area.2) Electric insulation is one of most important process of pre-installation work. Install the film by considering electric leakage because the film could sink

under water by a natural disaster even though the place is safe in normal. 3) Wrap the copper area with water proof tape and ,in cut area, attach the in-

sulation tape on one side with some margin and wrap it fully after turn it 4) Wrap the tape completely on the cut area.5) Cut the film exactly as the drawing. And be careful to cut it some 20cm

shorter than the length of the floor ( measure the length between the wall and film)6) For exact cutting, using supporting device is recommended. It is effective to

cut the film with insulation. But, insulation must be cut as the same size of the

floor.

Page 14: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

8. Arrayal and Attaching of the Film

1) On the exactly set thermal insulation, attach the electrically insulated heating film evenly. Then connect the controller with thermal sensor and overheating sensor after fix the sensors with tape behind the film. (leave the margin space of minimum 1Cm between each films)2) Connect the wire not to be crossed and arrange carefully with wire pipe or wire mold to protect them. 3) Check the structure of room or arrangement of furniture to array the film as the

type of room. Thermal insulation should be set all of the floor to adjust highs and lows of

the floor.4) Arranging wire is important for function and view. The places where wire is con-

nected are thick and hard. So, it is good to cover them with thermal insulation for conve-

niences of customer.

Page 15: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

9. Electric Power Connection

1) Connecting electric wire is the most important process of installation. Exact connection guar-

antees the long safe use. 2) Wires should have more than 2 ㎟ thickness to prevent overheating in excessive current.3) Fix the ground terminal on the copper part with press not to be loose.4) Insulate it with tape of water proof and electric insulation.5) Designated controller by ENERPIA should only

be used to prevent any problems, and also the AC plug that is connecting controller must be a standard one.6) Connected part with copper and wire should be treated by hot melt bond, shrinking tube or butyl tape, and then finish it by wrapping with insulation tape once again.7) When there’s damage by heat on back of the

film after connection, prevent the possibility of

leakage by treating hot melt bond ,insulation tape and butyl tape

Example 1 Example 2

※ Connect the electricity always in paral-lel

※ Use different colors of wire(+,-) to pre-vent mistake

Page 16: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

10. installation of heat controller and sen-sor

1) “A” is the part of connection of the2) The solid line from the controller expresses the temperature sensor that cuts the power

at fixed temperature and maintain the 3) The dotted line from the controller ex-

presses the over heating sensor that cuts the

power. This complement the temperature sensor

when the controller is out of order.4) The length of the sensor lines are respec-

tively 2M, and the sensors should be installed on

the place considering the structure of the floor

and should be installed in some distance like

the picture. If the sensor line(VW-1, 300V,AWG 24×2) is short, connect it with other line

(Maximum length 100M) 5) After installation of controller and all con-

nection, measure the Current(A) and check the heat-

ing performance and any problem of the prod-

uct.

Page 17: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

11. Power connection of heat controller

UTH 70 UTH 200 UTH 170

OVER HEATING SENSOR

TEMPERA-TURE SENSORIN OUT

Page 18: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

12. Operation manual of heat controller

1) This temperature controllers go to market with basic set up. Use them after setting up

according to the installation place.2) When you push ‘▲,▼’ button more than 5 second at the same time, It starts function

with displaying ‘HH’ mark. Then whenever you push each button, the function will be

changed. You can fix the temperature after adjusting by pushing ‘▲,▼’ button at the same

time . Then you will move another function automatically. When you set up ‘over heatingprevention’ stage, present temperature will be displayed and operation starts. work.

Function Display Basic set up

Set up range Remark

Heating/Cooling H-C HH HH,CC HH-Heating, CC - Cooling

Minimum range t-L 20℃ -20℃~120℃ Minimum set up range

Maximum range t-H 80℃ -20℃~120℃ Maximum set up range

Temp. deviation dIF 1℃ 1℃~-5℃ On or Off between this sep up Temp.

Display delay time dLy 20 sec. 1sec ~60sec Delaying operation time when On,off

Over heating change

Oht 85℃ -20℃~120℃ Power cut when over heating

3) Set exactly according to the table above for best operation and safe use. The over heating

prevention function should be less than 50℃ for safety. 4) You could be burned when you set the temperature more that 50℃.5) Set up the Temp. deviation on 3℃ for electricity saving and reducing relay noise.6) Installer must set up the controller on his/her own. Then train the users not to

change the set up and not to pile up clothes or thick bedquilts on the place far from the over

heating sensor

Page 19: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

13. Trial operation and Finishing arrangement

1) Trial operation – You have to do trial operation after installation.

(1) Check out the operation after power connection. If the power breaker is off, check out the electric wire and insulation to see the possible electric leakage or short circuit.

(2) Measure the current after maximize the temperature. When the current is smaller than installed space, Check out the electric wire and insulation once again.

(3) Check out the normal increase of temperature on all the film space , Over heating and any exterior deform.

(4) If the power breaker works, you can think it the problem of electric capacity. (5) Install the finishing material after checking out all of the above. 2) Finishing arrangement

(1) You should clean up any garbage like scraps of insulations, films or boxes to pre-vent any damage on the film during next work like flooring.

(2) Instruct the next workers about possible damage of the film. (3) Make sure to leave a contact list to prepare any problem on film. (4) Instruct them finishing material according to the each construction process

Page 20: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

14. After Service

1) Take a quick and exact steps prior to other installation when costumers ask for A/S. This is

directly related with the image of the company and products.2) Type of A/S (1) Temperature of the floor do not rise. This happens usually by wrong first setting up or customer’s mistaken setting up. Set

up the controller again. (2) Power breaker works whenever turn on the system. ① The capacity of heating film is bigger than the power breaker. ② Floor under the film is humid – complement the floor with vinyl or moisture proofing

material ③ Damage on the part of electric wire connection under the film (3) Noisy from film Change the left and right electric wire that is coming out from the film to the con-

troller. Have to do ground connection because this is closely related with grounding. (4) The film is damaged by heat ① Check the grounding when damaged area is near electric wire. ② Take a measure to prevent over heating on certain place when the center part is

damaged. ③ Change the wire capacity higher when the wire is burned.

Page 21: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

15. Appended data

Permitted Current for each Wire Ca-pacity

Cross section( ㎟ )Permitted Current

(A)

3.5 ㎟ 37

5.5 ㎟ 49

8 ㎟ 61

14 ㎟ 88- Select the input and output wire equally

• Plug and consent wire should be the same.

• If 3.5 ㎟ wire is used in the plug, more than

3.5 ㎟ wire should be used in consent.

Page 22: DAEWOO ENERTEC, INC ENERPIA Heating Film Guideline of Installation #148-21, Nam-san 2 Dong Jung-Gu, Korea Office, Factory Tel: 82-53-474-8050 Fax: 82-53-474-8050.

Cautions for Usage to Prevent Partial Over-heating

1. Sofa,Drawer,Show case,Furniture etc.

Avoid installation under the place where heavy weight is directly and widely placed as under sofa,Drawer,Show case,Furniture etc.

2. Bed clothes,Floor cushion etc. Don’t get the Bed clothes or floor cushions piled up on certain

place to avoid possible partial overheating.

3. Electric blanket, Mat etc. Avoid using other Heating products(Electric Mat etc.) at one time.

After film being heated, the shape of floor materials could be de-formed.

You can pre-vent partial

overheating by installing

Temperature Censor or

Overheating Censor.