D200 Pool, Building Report

download D200 Pool, Building Report

of 19

Transcript of D200 Pool, Building Report

  • 7/28/2019 D200 Pool, Building Report

    1/19

    Oak Park and River Forest H igh School

    Distri ct 200

    201 North Scoville Avenue Oak Park, IL 60302-2296

    Date: September 16, 2013

    To: Finance Committee Members

    From: Dr. Steven T. Isoye and Tod Altenburg

    Subj: Presentation of Potential Considerations from Long TermFacilities and Pool CommitteesBackground

    Last year the district had two committees in place to examine aspects of our facilities. The pool committeeworked with Stantec to determine feasible sites for the placement of a new pool given the needs of ourcurriculum and activities. The Long-Term Facility Committee was looking at building usage given the

    projected enrollment in student population.

    Last year in March the committee received the pool site evaluation from Stantec in regards to potentiallocations on our campus for a swimming pool. Based on the criteria the committee developed to assist in the

    process, the top three locations were the parking garage, East pool and south gym location, and the west pool

    into the field house.

    Since that report, the pool study moved to the Long Term Facility Committee. Our architects met with

  • 7/28/2019 D200 Pool, Building Report

    2/19

    The purpose at the Board meeting is to provide information to the Board and to gather questions from theBoard to understand what to further provide in the future when the Board will deliberate on final action.

  • 7/28/2019 D200 Pool, Building Report

    3/19

  • 7/28/2019 D200 Pool, Building Report

    4/19

  • 7/28/2019 D200 Pool, Building Report

    5/19

  • 7/28/2019 D200 Pool, Building Report

    6/19

  • 7/28/2019 D200 Pool, Building Report

    7/19

  • 7/28/2019 D200 Pool, Building Report

    8/19

  • 7/28/2019 D200 Pool, Building Report

    9/19

  • 7/28/2019 D200 Pool, Building Report

    10/19

  • 7/28/2019 D200 Pool, Building Report

    11/19

  • 7/28/2019 D200 Pool, Building Report

    12/19

  • 7/28/2019 D200 Pool, Building Report

    13/19

  • 7/28/2019 D200 Pool, Building Report

    14/19

  • 7/28/2019 D200 Pool, Building Report

    15/19

  • 7/28/2019 D200 Pool, Building Report

    16/19

    Long Term Facility Planning: Pool C ommittee Site AApril 10, 2013 These drawings are master plan conceptsfor discussion purposesonly. The Board of Education

    and D istrict Admi nistration have not endorsed or adopted these ideasfor implementation.

    Existing Site Plan

    Proposed First Floor Plan Proposed Upper Level Plan

    Proposed Second Floor Plan

    Stretch Pool

    Pool Support

    CoveredParking (80)

    Bleachers

    Mechanica

    CoveredParking

    (8) Tennis C

    LTFC Option: A

    These drawings are master plan conceptsfor discussion purposesonly. The

  • 7/28/2019 D200 Pool, Building Report

    17/19

    Long Term Facility Planning: Pool C ommittee Site BApril 10, 2013

    Education and D istrict Administration have not endorsed or adopted these id

    implementation.

    Existing Site Plan

    Proposed IndoorPool Location

    These drawings are master plan conceptsfor discussion purposesonly. The Board of Education

    and D istrict Admi nistration have not endorsed or adopted these ideasfor implementation.

    LTFC Option: B

  • 7/28/2019 D200 Pool, Building Report

    18/19

    Long Term Facility Planning: Pool C ommittee Site GApril 10, 2013

    Existing Site Plan

    Proposed First Floor Plan

    Proposed Upper Level Plan

    Proposed Second Floor Plan

    Pool Support

    Stretch Pool

    CoveredParking

    Mechanica

    Bleachers

    OpenParking

    THIS SITE LO C ATIO N IS VIABLE O N LY IF THE DISTRICT IS ABLE T

    AC Q UIRE THE PARKING G ARAG E STRUCTU RE. THE FEASABILITY

    CO ST AND TIME FRAM E ARE UN KNO WN AT THIS TIME.

    These drawings are master plan conceptsfor discussion purposesonly. The Board of Education

    and D istrict Admi nistration have not endorsed or adopted these ideasfor implementation.

    LTFC Option: C

  • 7/28/2019 D200 Pool, Building Report

    19/19

    Long Term Facility Planning: Pool C ommittee Site HApril 10, 2013

    Existing Site Plan

    Proposed First Floor Plan Proposed Upper Level Plan

    Proposed Second Floor Plan

    (8) Tennis CStretch Pool

    Shift Fields

    Mechanica

    Pool

    Bleachers

    Team RooBatting Ca

    Pool Support

    CoveredParking (80)

    These drawings are master plan conceptsfor discussion purposesonly. The Board of Education

    and D istrict Admi nistration have not endorsed or adopted these ideasfor implementation.

    LTFC Option: D