Cycling Network Implementation Plan
J u n e 2 0 1 2
District of West Vancouver Cycling Network Implementation Plan
Acknowledgements This report has been prepared by Howes Technical Advantage Ltd. as a collaborative effort with the District of West Vancouver staff and the Cycling Network Implementation Plan Technical Committee. There are a number of individuals who are thanked and recognized for their insights and time. The Cycling Network Implementation Plan Technical Committee: Bart Copeland Heather Drugge Peter Scholefield Stefen Elmitt District of West Vancouver Staff: John McMahon, P.Eng. Emily Willobee Norm Wong, P.Eng. External consultants: Donna Howes, P.Eng., Howes Technical Advantage Ltd. Richard Drdul, Drdul Community Transportation Planning
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 i
TABLE OF CONTENTS
1. Introduction and Context .......................................................................... 1 1.1 Background ...................................................................................... 1 1.2 Goals and Objectives .......................................................................... 1 1.3 Research ......................................................................................... 1
2. Consultation ........................................................................................... 5 3. Analysis ................................................................................................ 6
3.1 Previous work review: ......................................................................... 6 3.2 Current Review: ................................................................................ 6 3.3 Marine Drive: .................................................................................... 7 3.4 Implementation Strategy: ................................................................... 13
3.4.1 Phased Implementation .............................................................. 13 3.4.2 Priorities within Phases .............................................................. 15
4. Estimated Project costs ............................................................................ 20 5. Conclusions ........................................................................................... 20 6. Recommendations .................................................................................. 20
Appendices
A. Terms of Reference: Cycling Network Plan Implementation Technical Committee B. 2007 Cycling Network and Greenway Plan C. Phase 1: Costs for Implementation
Tables
Table 1: List of Proposed New Routes to the Cycling Network Plan Table 2: List of Proposed Removal of Routes from the Cycling Network Plan Table 3: List of Other Routes Considered but not included in the Cycling Network Plan Table 4: Phase 1 Projects Table 5: Phase 2 Projects Table 6: Phase 3 Projects Table 7: Phase 4 Projects
Figures
Figure 1: Cycling Target Markets Figure 2: Cycling Trip Distances by Trip Type Figure 3: Cycling Trip Distances as a Percentage of Trips Figure 4: Map of Proposed New Routes to the Cycling Network Plan Figure 5: Map of Proposed Route Removals from the Cycling Network Plan Figure 6: Proposed New Cycling Network Map Figure 7: Example of a Bicycle Guide Sign Figure 8: Examples of warning signs that can be used where needed Figure 9: Example of Road Marking Figure 10: Map of Phased Implementation of the Cycling Network Plan
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 ii
This page intentionally left blank.
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 1 Document Number: 556776
1. INTRODUCTION AND CONTEXT
1.1 Background
The District’s Cycling Network and Greenway Plan was developed in 2007 (2007 Plan) and approved by Council in that year. The Plan describes the vision of a network of bicycle routes, both on-street facilities and pathways, connecting major destinations and many neighbourhoods across the municipality. The District’s Strategic Transportation Plan (STP) was completed in March 2010, and was subsequently received by Council. The STP presents a vision for the future of all modes of transportation, and included a recommendation that the 2007 Plan be updated. Staff recently reviewed the Plan and concluded that the policy goals were consistent with the STP and the majority of the proposed network was still valid and relevant for implementation. Therefore, staff felt that it was more appropriate to focus on fine tuning implementable routes, establishing priorities and identifying potential funding options than completing an updated Cycling Network and Greenway Plan. This work was called the development of a Cycling Network Implementation Plan. This report summarizes the proposed changes to the Cycling Network and provides a prioritized list of projects as the key deliverable.
1.2 Goals and Objectives
The primary goal of the Cycling Network Implementation Plan is to attract new cyclists in West Vancouver, and encourage cycling within the community. The secondary goal is to improve conditions for cyclists who currently use West Vancouver streets for cycling. The key objectives of the Cycling Network Implementation Plan were identified as the following:
To review the current Cycle Network and Greenway Plan for continuity, appropriateness, and feasibility for implementation;
To categorize the routes for phased implementation; and To estimate budgets for future implementation where possible.
1.3 Research
Staff reviewed previous research undertaken to ensure that the work being proposed was in step with current trends. TransLink conducted market research in order to understand the different markets for cycling, barriers that prevent people from cycling more often and people’s preferences for cycling facility improvements. According to the research, Metro Vancouver’s adults can be grouped into one of four categories based on their inclinations toward cycling. Figure 1 below highlights the findings of this market research documented in TransLink’s Regional Cycling Strategy (June 2011). A small proportion of Metro Vancouver adults already bicycle regularly. Regular cyclists considered in the “strong and fearless” and “enthused and confident” categories are depicted
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 2 Document Number: 556776
in blue and red in Figure 1. These cyclists make up approximately one quarter of the population and are comfortable and confident enough to ride using the existing roadways and cycling facilities. At the other end of the spectrum, approximately one third of the population has no interest in cycling, which is depicted in purple, “no way, no how” category. The remaining residents fall somewhere between these two groups - as shown in yellow in Figure 1– were categorized as “interested but concerned”. This group is made up of occasional cyclists who cycle at least once per month, infrequent cyclists who cycle at least once per year, and potential cyclists who do not currently cycle but have considered doing so. This group of residents is interested in cycling more but is deterred from doing so by factors such as safety, lack of time, fitness, or challenges with carrying heavy items. The single greatest deterrent to cycling for this group is concern about riding a bicycle near motor vehicle traffic. These “interested but concerned” cyclists are a crucial target audience in West Vancouver in order to reduce auto dependency and achieve the vision of the Strategic Transportation Plan.
Figure 1: Cycling Target Markets1
In 2007, TransLink partnered with researchers at the University of British Columbia to study factors that influence the decision to cycle in the Cycling in Cities Project. Researchers used opinion surveys to collect data from current and potential cyclists. They found that “interested but concerned cyclists” are more likely to use cycling routes that feature low traffic volumes, safe intersections and that provide connections to frequent destinations. However, feedback from the frequent cyclists who are more confident riding with traffic suggested that this group look for improved connectivity and safety for on-street cycling routes that they already use. Staff considered both groups when creating the Cycling Network Implementation Plan.
1 Richard Drdul, October 2011
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 3 Document Number: 556776
Additional research by TransLink suggests that the majority of bicycle trips in Metro Vancouver are 7.5 kilometres or less with a median trip distance of 3.6 kilometres, and very few trips longer than 10 kilometers. These data indicates that the greatest potential to increase bicycle mode-share is for short, urban trips. Figure 2 and Figure 3 illustrate the results of these surveys.
Figure 2: Cycling Trip Distances by Trip Type2
2 TransLink Regional Cycling Strategy, June 2011
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 4 Document Number: 556776
Figure 3: Cycling Trip Distances as a Percentage of Trips3
This information was used by staff to guide the development of implementation priorities, as well as the phasing of projects. While staff considered both the regular cyclists and the “interested but concerned” cyclists when creating the Cycling Network Implementation Plan, greater focus was placed on increasing the number of participants from the latter group.
3 Richard Drdul, October 2011
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 5 Document Number: 556776
2. CONSULTATION
There was considerable consultation completed during the original development of the original 2007 Cycling Network and Greenway Plan. (This is documented in the original report). For this work, a Cycling Network Implementation Plan Technical Committee (Committee) was established to obtain specialized input on behalf of the broader community. The Committee included members of the North Shore chapter of the Vancouver Area Cycling Coalition (recently renamed HUB), which is a non-profit society whose goal is to make cycling an attractive choice for everyone. Through advocacy, education and events, this organization is a cycling resource for the entire Metro Vancouver region. Several members of the North Shore chapter are residents of the municipality, have served on the District’s Working Groups in the past, and volunteered to participate on the Committee. The Terms of Reference for the Cycling Network Implementation Plan Technical Committee is provided in Appendix A. There were five meetings held on December 5, 2011, January 30, 2012, February 9, 2012, February 21, 2012 and April 17, 2012 respectively. The Committee provided input to staff on the proposed routing changes, the prioritization of the tasks identified and the phased implementation. As avid cyclists and community proponents of cycling, they provided valuable input from the end user perspective. A number of internal meetings were also held between Engineering and Planning during this process. Current development applications as well as future planning for local areas was discussed to insure that cycling proposals were consistent with proposed land use changes.
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 6 Document Number: 556776
3. ANALYSIS
As described above, the work involved a review of the 2007 Plan with a view to identifying implementable options and the potential for phasing.
3.1 Previous work review:
The report associated with the 2007 Plan was reviewed to identify how the routes were established. The previous map is included in Appendix B and is located on the District website. The report provides a fair amount of depth regarding the Spirit Trail, but did not provide much detail on the other routes. The technical cycling expert engaged for the 2007 work was also hired for this study to provide insights into the previous process, as a resource on current standards in the Lower Mainland, and to provide suggestions that would help with integration, implementation and staging of the network.
3.2 Current Review:
The existing network map was reviewed to assess the ease of implementation, as well as the rationale of routes in relation to ridership, lower volume roads and connections to destinations. Both the Committee and staff provided valuable insight to the various routes identified. In general, most routes in the existing 2007 Plan made sense. There were a few routes where changes were identified to address a gap in connectivity. Suggestions were proposed by the Committee which were also reviewed onsite by staff. Additional feedback was also obtained from the technical expert and was incorporated into the review. Routes were reviewed based on the following criteria:
presence of on-street parking, width of pavement, grade, traffic volume and speed, and connectivity to key destinations.
Research findings from the Cycling in Cities Project, introduced in Section 1.3 of this report, informed the selection of these criteria. The research suggested that “interested but concerned” cyclists prefer to cycle on routes separated from motor vehicle traffic or residential streets with traffic calming and less motor vehicle traffic. A qualitative review was carried out for each route based on staff observations onsite. No additional data collection was undertaken for this study. The proposed changes are shown on Figure 4 and Figure 5. Figure 4 illustrates the routes to be added while Figure 5 depicts the routes proposed for removal. Figure 6 presents the final proposed Cycling Network Plan. The proposed New Cycling Network Map is shown in Figure 6.
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 7 Document Number: 556776
The background to the changes is listed in three tables where details are provided as to why changes are being proposed and replacement routes:
Table 1: List of Proposed New Routes to the Cycling Network Plan Table 2: List of Proposed Removal of Routes from the Cycling Network Plan Table 3: List of Other Routes Considered but not included in the Cycling Network Plan
3.3 Marine Drive:
There was considerable discussion regarding Marine Drive and its role in the network especially between 13th Street and 25th Street. It was agreed that Marine Drive is a major arterial transportation corridor through the District and should be included in the cycling network. It was identified that where possible, it would be advantageous to widen the curb lane along Marine Drive to a shared lane width of 4.3m. This is primarily anticipated to occur with redevelopment and/or where capital work is being undertaken, but it is recognized that cycling considerations will be balanced with enhanced pedestrian objectives and the need for on-street parking. An alternative route to Marine Drive will be established in the Ambleside area using Bellevue Avenue. Work on this alternative has commenced as part of the Ambleside Village Centre Streetscape Standards Project and will be further refined through public consultation for the alignment of the Spirit Trail. North/south crossings of Marine Drive were confirmed as an important consideration and improving these was also identified as a short term priority.
Argyle
MainSt
TaylorPl
VarleyLn
Carr Lnbolt
Shad
Constantine Way
Chairlift Rd
Chairlift Rd
SkiliftRosebery
Ave
28th St
PlShamrock
Queens Ave
Palmerston Ave
PlAltamont
Palmerston Ave
Altamont
Tower
Hill
29th St
Gisby St
27th St
26th St
Ottawa Ave
Nelson Ave
Mathers Ave
Lawson Ave
Kings Ave
25th St
Marine Dr
Mathers Ave
Lawson Ave
Kings Ave
Je�erson Ave
Inglewood Ave
wood AveHay
Gordon Ave
Fulton Ave
22nd St
21st St
20th St
Gordon Ave
Ave
Argyle
LnSherw
ood19th St
Esquimalt Ave
18th St
17th St
Ambleside Lane
15th St 14th St
17th St
16th St
Esquimalt Ave
Gordon Ave
Fulton Ave
Haywood Ave
Clyde Ave
Duchess Ave
Clyde AveKeith Rd
Esplanade AveMarine Dr
Marine DrKeith
Rd
Evelyn Dr
Eden Pl
8th St
And ersonCr
Dr
Youn etteSentinelLn
Dr
Aubeneau Cr
Braeside Cr
Leyland St
Inglewood Ave
Je�erson Ave
LnCrocodile
Taylor Way
11th St
12th St
13th St
Inglewood Ave
Esquimalt Ave
Duchess Ave
Clyde Ave6th St
Taylor Way
Taylorw
oodPl
Margaree Pl
Keith Rd
Gordon AvePl
KeithPl
3rd St
MacBeth Cr
wood
InglePl
Newcroft Pl
dale
New
Pl
Rd
PllanN
ewds
Rd
KeithRd
Upper Levels Hwy
3rd St
Lawson
Mathers Ave
Mulgrave PlBurhill Rd
Hadden Dr
Taylor Way
East
Rdens
StevDr
HolmburyPl
HaddenD
r
West
cotRd
West cotPl
Pl
Wildewood Ln
Bur l
eyPl
9th St
Burley Dr
Mathers Ave
Lawson Ave
Kings Ave
Pl Pl
Netley
Nepal Cr
Palmerston Ave
Ottawa Ave
Inglewood Ave
Je�erson Ave
Duncan
St
15th St
14th St
SinclairSt
Ct
heM
at Ctrs20th St
19th St
21st St
22nd St
19th St Pl
St Denis
St
de
West
an
Cr
Palmerston Ave
17th St
Pl
Ott
awa
Nelson Ave
Rosebery AveRena Cr
Ottaburn Rd Ottawa AvePalmerston Ave
Queens Ave
11th Stton
Ren
12th St
Sutton Pl
Tyrol Rd
ekCross
Rd
CamridgePl
15th St
Tyr ol Ct
Pl
Camelot Rd
Cam well Dr
Cammeray Rd
Whitby Rd
Cam ridge RdWesthill DrCt
Westhill Dr
CtChip dalepen Rd
Westhill Pl
Wynd Westhill
st hill W
e Cl
West hill Way
Chipdale
pen Rd
Er ri gal Pl
Finch Hill
Langton Pl
Marlowe Pl
DrPinecrest Chart well Dr
Chartwell Dr
Bram well Dr Chartwell D
r
Eyremount Dr
Rd
Vinson Creek
Crest well
Rd
PlSandh ur stwell
ChartDr
Burnsid
eRd
Chart
well Dr
well Chart
Cr
Pl
King Georges Way
mile Fair
Rd
ford Pyr Rd
Cre Cross Rdek
mo
Eyreunt D
r
Eyremount Dr
Fairmile Rd
Sout
hbor
ough
Dr
mar ock
oon
Kn
Rd
rges
GeoKing
Way
Thet
ford
Pl
leigh
Farm
RdEyremount
Drand
velGro
Rd
Pl
Row
Elveden
woo
dKe
n
Rd
RdRo
bH
ood
in
Pl
St. A
ndre
ws R
d
wood
Green
Rd
verdo
An
Cr
amnh
Bar
Rd
ide
llsHi
ood
nw
Ke
Rd
ough
hbor
Sout
Dr
Hawste
adPltre
am
Mill
s
Pl
Barnham
Barn hamPl
Gile
sSt
.Rd
dre
St. A
n w
s Rd
PlPl
Rd
Ballantre
e
Rd
Stevens Dr
Deep DenePl
Morv en Dr
Gle
nmor
e garry
Glen
Dr DrD
r LaurieCr
Craigmohr
Dr
Pl
uirm
DesswoodPl
onan
Kild
Rd
tream
Mills
Rd
lineCrest
Rd
stonGil Rd
untmoEyre Dr
side Rdand
HighlDr
and velGro Rd
Pl
Hen
low
RdMillstream Rd
and velGro
Ct
Ave
Raindan
ceCt
Sund
ance
CtTy
ee Ct
Cr
Brid
ge
Rd
tha Dr
waHia
Welch St
Mat
hias Rd
Khatsil
ano Rd
Rivers
Rd
Capi
lano
Rd
Jaco
bs C
rJa
cobs
Cr
Jacobs St
Paitsmauk
Lawa
Welch St
nnW
hoock
St
KlahanieCt
ough Dr
bor
South
Parkside Rd
esden
BiddPl onro
GlenmaD
r
Stevens
Dr
urH
i dhst
Pl
ryBu Ln
cot
Rabbit
Ln
Moyne Dr
esJa
Stm
Cr
Moy
neD
r
RabbitLn
Onslow
Pl
Nor
nbym
aCr
ley
BurDr
Russet Way Orchard
Way
Orchard Ln
Queens
Shafton PlRosebery
Ave
29th
St
M
aersth
Cr
CrMathers Ave
30th St3
0th
St
Mathers Ave
Marine Dr
31st
St31st St
Proct e r Ave
Travers Ave
inDick s on Cr
Radcli�e Ave
GabLnles
Map
leLn
Oxl
ey S
tN
orth
Hill
cres
tSt
Mathers Ave
ey
Oxl
StS
Thompson Cr
Rockview Pl
Crai gend
Westmount RdWestm ount
Ct
CedaridgePl Westmount
Pl
Thompson Pl
Be nbow Rd
Rosebery Ave
Spenc er Dr Cl
Pl
Spencer Ct
Sout
hrid
gePl
Bayri
dge
Ave
We st
e
holm
Ave
Mc hK ce nie Ave Ave
Cree ry
Hay
esSt
set Ave
Marine Dr
Bayridge
Ave
Ave
rid
eg
WestridgeAve
Wen tw or th Ave
Cypress Bo wl Rd
Cyp ss re Pl
De er Ri dge
Dr Cl Pl
Cyp ss re Bo wl Rd
Marr Creek
Ga de
Chairlift
Ct
CtRd
ChairliftCl
ChelseaCt
ChelseaPl
Clo
se
rn
Highway
28th St
AveBellevue
Pa rk Ln
Orchard
Way
23rd St
24th St
Pl
Cypress
Ln
Pl
Highgrove
Lions
Gat
e Brid
ge
Mews
Highvi ew
Pl
Ln
Pl
Folke stone
BinningLn
BoulderCourt
Chippendale Rd
WilloRdughby
Halston Ct
Kadlec
CtDunl
Pl
Willoughby
PlTwin ekCre
Way
FolkestoneSkilift
Rd
Hudson Ct
ewey
Cre
Sun
Bellevue Ave
Hill
Bow
l
Highland
Drive
Burley Dr. Park
John Lawson Park
Dundarave Park
26th St Park
Altamont Beach Park
Procter Park
West Bay Park
Oxley St. Park
McKechnie Park
BenbowPark
AltamontPark
ChairliftPark
BrissendenPark
FinchHill Park
WesthillPark
ShieldsDam Park
DouglasWoodward
Park
ChartwellPark
AndoverPark
BallantreePark
GlenmorePark
HoulgateCreekPark
CapilanoGolf Club(Private)
HaddenPark
CapilanoView
Cemetery
Hugo RayPark
BrothersCreekPark
KleeWyckPark
KlahaniePark
AmblesidePark
LeylandPark
MemorialPark
HayPark
ChatwinPark
JohnRichardson
Park
IrwinPark
HollyburnCountry Club
(Private)
Cross Creek Park
Mount MoyneSquare
NormanbyPark
HillsidePark
Proposed new cycling routes
Figure 4Map of Proposed New Routes to the Cycling Network Plan
19 June 2012 8
Argyle
MainSt
TaylorPl
VarleyLn
Carr Lnbolt
Shad
Constantine Way
Chairlift Rd
Chairlift Rd
SkiliftRosebery
Ave
28th St
PlShamrock
Queens Ave
Palmerston Ave
PlAltamont
Palmerston Ave
Altamont
Tower
Hill
29th St
Gisby St
27th St
26th St
Ottawa Ave
Nelson Ave
Mathers Ave
Lawson Ave
Kings Ave
25th St
Marine Dr
Mathers Ave
Lawson Ave
Kings Ave
Je�erson Ave
Inglewood Ave
wood AveHay
Gordon Ave
Fulton Ave
22nd St
21st St
20th St
Gordon Ave
Ave
Argyle
LnSherw
ood19th St
Esquimalt Ave
18th St
17th St
Ambleside Lane
15th St 14th St
17th St
16th St
Esquimalt Ave
Gordon Ave
Fulton Ave
Haywood Ave
Clyde Ave
Duchess Ave
Clyde AveKeith Rd
Esplanade AveMarine Dr
Marine DrKeith
Rd
Evelyn Dr
Eden Pl
8th St
And ersonCr
Dr
Youn etteSentinelLn
Dr
Aubeneau Cr
Braeside Cr
Leyland St
Inglewood Ave
Je�erson Ave
LnCrocodile
Taylor Way
11th St
12th St
13th St
Inglewood Ave
Esquimalt Ave
Duchess Ave
Clyde Ave6th St
Taylor Way
Taylorw
oodPl
Margaree Pl
Keith Rd
Gordon AvePl
KeithPl
3rd St
MacBeth Cr
wood
InglePl
Newcroft Pl
dale
New
Pl
Rd
PllanN
ewds
Rd
KeithRd
Upper Levels Hwy
3rd St
Lawson
Mathers Ave
Mulgrave PlBurhill Rd
Hadden Dr
Taylor Way
East
Rdens
StevDr
HolmburyPl
HaddenD
r
West
cotRd
West cotPl
Pl
Wildewood Ln
Bur l
eyPl
9th St
Burley Dr
Mathers Ave
Lawson Ave
Kings Ave
Pl Pl
Netley
Nepal Cr
Palmerston Ave
Ottawa Ave
Inglewood Ave
Je�erson Ave
Duncan
St
15th St
14th St
SinclairSt
Ct
heM
at Ctrs20th St
19th St
21st St
22nd St
19th St Pl
St Denis
St
de
West
an
Cr
Palmerston Ave
17th St
Pl
Ott
awa
Nelson Ave
Rosebery AveRena Cr
Ottaburn Rd Ottawa AvePalmerston Ave
Queens Ave
11th Stton
Ren
12th St
Sutton Pl
Tyrol Rd
ekCross
Rd
CamridgePl
15th St
Tyr ol Ct
Pl
Camelot Rd
Cam well Dr
Cammeray Rd
Whitby Rd
Cam ridge RdWesthill DrCt
Westhill Dr
CtChip dalepen Rd
Westhill Pl
Wynd Westhill
st hill W
e Cl
West hill Way
Chipdale
pen Rd
Er ri gal Pl
Finch Hill
Langton Pl
Marlowe Pl
DrPinecrest Chart well Dr
Chartwell Dr
Bram well Dr Chartwell D
r
Eyremount Dr
Rd
Vinson Creek
Crest well
Rd
PlSandh ur stwell
ChartDr
Burnsid
eRd
Chart
well Dr
well Chart
Cr
Pl
King Georges Way
mile Fair
Rd
ford Pyr Rd
Cre Cross Rdek
mo
Eyreunt D
r
Eyremount Dr
Fairmile Rd
Sout
hbor
ough
Dr
mar ock
oon
Kn
Rd
rges
GeoKing
Way
Thet
ford
Pl
leigh
Farm
RdEyremount
Drand
velGro
Rd
Pl
Row
Elveden
woo
dKe
n
Rd
RdRo
bH
ood
in
Pl
St. A
ndre
ws R
d
wood
Green
Rd
verdo
An
Cr
amnh
Bar
Rd
ide
llsHi
ood
nw
Ke
Rd
ough
hbor
Sout
Dr
Hawste
adPltre
am
Mill
s
Pl
Barnham
Barn hamPl
Gile
sSt
.Rd
dre
St. A
n w
s Rd
PlPl
Rd
Ballantre
e
Rd
Stevens Dr
Deep DenePl
Morv en Dr
Gle
nmor
e garry
Glen
Dr DrD
r LaurieCr
Craigmohr
Dr
Pl
uirm
DesswoodPl
onan
Kild
Rd
tream
Mills
Rd
lineCrest
Rd
stonGil Rd
untmoEyre Dr
side Rdand
HighlDr
and velGro Rd
Pl
Hen
low
RdMillstream Rd
and velGro
Ct
Ave
Raindan
ceCt
Sund
ance
CtTy
ee Ct
Cr
Brid
ge
Rd
tha Dr
waHia
Welch St
Mat
hias Rd
Khatsil
ano Rd
Rivers
Rd
Capi
lano
Rd
Jaco
bs C
rJa
cobs
Cr
Jacobs St
Paitsmauk
Lawa
Welch St
nnW
hoock
St
KlahanieCt
ough Dr
bor
South
Parkside Rd
esden
BiddPl onro
GlenmaD
r
Stevens
Dr
urH
i dhst
Pl
ryBu Ln
cot
Rabbit
Ln
Moyne Dr
esJa
Stm
Cr
Moy
neD
r
RabbitLn
Onslow
Pl
Nor
nbym
aCr
ley
BurDr
Russet Way Orchard
Way
Orchard Ln
Queens
Shafton PlRosebery
Ave
29th
St
M
aersth
Cr
CrMathers Ave
30th St3
0th
St
Mathers Ave
Marine Dr
31st
St31st St
Proct e r Ave
Travers Ave
inDick s on Cr
Radcli�e Ave
GabLnles
Map
leLn
Oxl
ey S
tN
orth
Hill
cres
tSt
Mathers Ave
ey
Oxl
StS
Thompson Cr
Rockview Pl
Crai gend
Westmount RdWestm ount
Ct
CedaridgePl Westmount
Pl
Thompson Pl
Be nbow Rd
Rosebery Ave
Spenc er Dr Cl
Pl
Spencer Ct
Sout
hrid
gePl
Bayri
dge
Ave
We st
e
holm
Ave
Mc hK ce nie Ave Ave
Cree ry
Hay
esSt
set Ave
Marine Dr
Bayridge
Ave
Ave
rid
eg
WestridgeAve
Wen tw or th Ave
Cypress Bo wl Rd
Cyp ss re Pl
De er Ri dge
Dr Cl Pl
Cyp ss re Bo wl Rd
Marr Creek
Ga de
Chairlift
Ct
CtRd
ChairliftCl
ChelseaCt
ChelseaPl
Clo
se
rn
Highway
28th St
AveBellevue
Pa rk Ln
Orchard
Way
23rd St
24th St
Pl
Cypress
Ln
Pl
Highgrove
Lions
Gat
e Brid
ge
Mews
Highvi ew
Pl
Ln
Pl
Folke stone
BinningLn
BoulderCourt
Chippendale Rd
WilloRdughby
Halston Ct
Kadlec
CtDunl
Pl
Willoughby
PlTwin ekCre
Way
FolkestoneSkilift
Rd
Hudson Ct
ewey
Cre
Sun
Bellevue Ave
Hill
Bow
l
Highland
Drive
Burley Dr. Park
John Lawson Park
Dundarave Park
26th St Park
Altamont Beach Park
Procter Park
West Bay Park
Oxley St. Park
McKechnie Park
BenbowPark
AltamontPark
ChairliftPark
BrissendenPark
FinchHill Park
WesthillPark
ShieldsDam Park
DouglasWoodward
Park
ChartwellPark
AndoverPark
BallantreePark
GlenmorePark
HoulgateCreekPark
CapilanoGolf Club(Private)
HaddenPark
CapilanoView
Cemetery
Hugo RayPark
BrothersCreekPark
KleeWyckPark
KlahaniePark
AmblesidePark
LeylandPark
MemorialPark
HayPark
ChatwinPark
JohnRichardson
Park
IrwinPark
HollyburnCountry Club
(Private)
Cross Creek Park
Mount MoyneSquare
NormanbyPark
HillsidePark
Figure 5Map of Proposed Routes for Removal from Cycling Network Plan
Routes proposed for removal
19 June 2012 9
Argyle
MainSt
TaylorPl
EagleCreek Pl
VarleyLn
Carr Lnbolt
Shad
Constantine Way
Chairlift Rd
Chairlift Rd
SkiliftRosebery
Ave
28th St
PlShamrock
Queens Ave
Palmerston Ave
PlAltamont
Palmerston Ave
Altamont
Tower
Hill
29th St
Gisby St
27th St
26th St
Ottawa Ave
Nelson Ave
Mathers Ave
Lawson Ave
Kings Ave
25th St
Marine Dr
Mathers Ave
Lawson Ave
Kings Ave
Je�erson Ave
Inglewood Ave
wood AveHay
Gordon Ave
Fulton Ave
22nd St
21st St
20th St
Gordon Ave
Ave
Argyle
LnSherw
ood19th St
Esquimalt Ave
18th St
17th St
Ambleside Lane
15th St 14th St
17th St
16th St
Esquimalt Ave
Gordon Ave
Fulton Ave
Haywood Ave
Clyde Ave
Duchess Ave
Clyde AveKeith Rd
Esplanade AveMarine Dr
Marine DrKeith
Rd
Evelyn Dr
Eden Pl
8th St
And ersonCr
Dr
Youn etteSentinelLn
Dr
Aubeneau Cr
Braeside Cr
Leyland St
Inglewood Ave
Je�erson Ave
LnCrocodile
Taylor Way
11th St
12th St
13th St
Inglewood Ave
Esquimalt Ave
Duchess Ave
Clyde Ave6th St
Taylor Way
Taylorw
oodPl
Margaree Pl
Keith Rd
Gordon AvePl
KeithPl
3rd St
MacBeth Cr
wood
InglePl
Newcroft Pl
dale
New
Pl
Rd
PllanN
ewds
Rd
KeithRd
Upper Levels Hwy
3rd St
Lawson
Mathers Ave
Mulgrave PlBurhill Rd
Hadden Dr
Taylor Way
East
Rdens
StevDr
HolmburyPl
HaddenD
r
West
cotRd
West cotPl
Pl
Wildewood Ln
Bur l
eyPl
9th St
Burley Dr
Mathers Ave
Lawson Ave
Kings Ave
Pl Pl
Netley
Nepal Cr
Palmerston Ave
Ottawa Ave
Inglewood Ave
Je�erson Ave
Duncan
St
15th St
14th St
SinclairSt
Ct
heM
at Ctrs20th St
19th St
21st St
22nd St
19th St Pl
St Denis
St
de
West
an
Cr
Palmerston Ave
17th St
Pl
Ott
awa
Nelson Ave
Rosebery AveRena Cr
Ottaburn Rd Ottawa AvePalmerston Ave
Queens Ave
11th St
ton
Ren
12th St
Sutton Pl
Tyrol Rd
ekCross
Rd
CamridgePl
15th St
Tyr ol Ct
Pl
Camelot Rd
Cam well Dr
Cammeray Rd
Whitby Rd
Cam ridge RdWesthill DrCt
Westhill Dr
CtChip dalepen Rd
Westhill Pl
Wynd Westhill
st hill W
e Cl
West hill Way
Chipdale
pen Rd
Er ri gal Pl
Finch Hill
Langton Pl
Marlowe Pl
DrPinecrest Chart well Dr
Chartwell Dr
Bram well Dr Chartwell D
r
Eyremount Dr
Rd
Vinson Creek
Crest well
Rd
PlSandh ur stwell
ChartDr
Burnsid
eRd
Chart
well Dr
well Chart
Cr
Pl
King Georges Way
mile Fair
Rd
ford Pyr Rd
Cre Cross Rdek
mo
Eyreunt D
r
Eyremount Dr
Fairmile Rd
Sout
hbor
ough
Dr
mar ock
oon
Kn
Rd
rges
GeoKing
Way
Thet
ford
Pl
leigh
Farm
RdEyremount
Drand
velGro
Rd
Pl
Row
Elveden
woo
dKe
n
Rd
RdRo
bH
ood
in
Pl
St. A
ndre
ws R
d
wood
Green
Rd
verdo
An
Cr
amnh
Bar
Rd
ide
llsHi
ood
nw
Ke
Rd
ough
hbor
Sout
Dr
Hawste
adPltre
am
Mill
s
Pl
Barnham
Barn hamPl
Gile
sSt
.Rd
dre
St. A
n w
s Rd
PlPl
Rd
Ballantre
e
Rd
Stevens Dr
Deep Dene
Pl
Morv en Dr
Gle
nmor
e garry
Glen
Dr DrD
r LaurieCr
Craigmohr
Dr
Pl
uirmBonnyBonnymuir
PlDesswood
Pl
treean
BalRd
onan
Kild
Rd
tream
Mills
Rd
lineCrest
Rd
stonGil Rd
untmoEyre Dr
side Rdand
HighlDr
and velGro Rd
Pl
Hen
low
RdMillstream Rd
and velGro
Ct
Ave
Raindan
ceCt
Sund
ance
CtTy
ee Ct
Cr
Brid
ge
Rd
tha Dr
waHia
Welch St
Mat
hias Rd
Khatsil
ano Rd
Rivers
Rd
Capi
lano
Rd
Jaco
bs C
rJa
cobs
Cr
Jacobs St
Paitsmauk
Lawa
Welch St
nnW
hoock
St
KlahanieCt
ough Dr
bor
South
Parkside Rd
esden
BiddPl onro
GlenmaD
r
Stevens
Dr
urH
i dhst
Pl
ryBu Ln
cot
Rabbit
Ln
Moyne Dr
esJa
Stm
Cr
Moy
neD
r
RabbitLn
Onslow
Pl
Nor
nbym
aCr
ley
BurDr
Russet Way Orchard
Way
Orchard Ln
Queens
Shafton PlRosebery
Ave
29th
St
M
aersth
Cr
CrMathers Ave
30th St3
0th
St
Mathers Ave
Marine Dr
31st
St31st St
Proct e r Ave
Travers Ave
inDick s on Cr
Radcli�e Ave
GabLnles
Map
leLn
Oxl
ey S
tN
orth
Hill
cres
tSt
Mathers Ave
ey
Oxl
StS
Thompson Cr
Rockview Pl
Crai gend
Westmount RdWestm ount
Ct
CedaridgePl Westmount
Pl
Thompson Pl
Be nbow Rd
Rosebery Ave
Spenc er Dr Cl
Pl
Spencer Ct
Sout
hrid
gePl
Bayri
dge
Ave
We st
e
holm
Ave
Mc hK ce nie Ave Ave
Cree ry
Hay
esSt
set Ave
Marine Dr
Bayridge
Ave
Sharon
Pl
Bayridge
Ct
Pl Ave
S herm
an
St
Marine Dr
So uthrid
eg
WestridgeAve
Westridge Ave
View ridgePl
Ba y rid geCr
Bayridge Ave
Ripple
Rd
Rip
plePl
Ripple RdBurkehill
Rd
Rose CrRoseCr
Bur k
ehill Rd
BurkehillPl
Burkerid
g e Pl
Almon del Ct
Almondel
Rd
Rocken
dPl
RockridgePl
Rock bankPl
Rock
ridge
Ro ckridge
Cr
Rocke
ridgRdKeith Rd
Mor
angCr
Ev er gre
en
Ct
FerndaleAveEr win Dr
Stea
rman
Rd
Ave
Ross
Cr
Ross Ln
Stone
CtStone Cr
Regen
c y Pl
Picc
dilaly
Nor th
Nor th
Piccddilly
aCherbourg
Dr
Cr
kee
Rd
Willow
WillowPl
Ca
fe
ul
ild DrCaulfeild
Pl
Este
vanPl
Caul
feild
Cr
Caul feild Dr
Rut l
and
Rd
Ca feildulDr
netPi ree
Cr
VisPl
ta
Clollyve
Walk
DeerLn
Kei th RdBirch f ldei
Pl
eildfaul
CLnurcy
ocDeCt
Clo llyve Walk
McKe nzie Dr
Mar ine Dr
Picda dilly
SouthDogw
odo
Ln
ot
lPi
Hou se
way
hgHi
TheDale
Water Ln
HeadlandPl
Ct
Ct Pl
adMe feild Rdadlan
He
d
Cl
Edendale
Ct
Pl
Meadfeild
Cl
How
ardCtCt
Martin
ea
ilddfe
M
Wynd
West VistaCt
MonteBreCr
Ct
Pl
Dr
Al
feder
ildPl
Ash
feild
Pl
RdSpruce feild
lanHe
ad
dDr
adfei
Me
ldRd Tim
feber
ild
PlDr
ad fe
Me
di l
Rd
Ln
Aspne
rC
Kei th Rd
Gre len afe
Rd
nteveM
odi
Pl
Gr eeernt
eRd
rrac
eTe
The
Ken
osingt n
Cr Brookside
weKRd
lf
uG
Pl
Kei t
hRd
Kei th Rd
Marine D
r
iPit
n
ca
r
Pl
MarinerCl
CrosswayByway
The
we
oH Hap
pyVa
lley
Ln
ndSo
u
Ln
r
Bea
Ln
onBeacLn
SeasidePl
weK
Cli�Rd
Par eth nonPl
Ln
O ec a nPl
Marine Dr
Gallagher Pl
Keith RdE
le
ag
Harb
uroRd
AvalonPl
LarsonPl
Tr ai l
aM
lepS
eva
iew
Rd
Pl
Telegr aph
Pl
Ctes
W
Rd
tport
nW
yd
Da�o
id lDr
Ln
Marine DrKoltha
Crmmer D
rCr
anle
y
Blue
bellD
r
We st opr tRd
Pl
est ah venW
RdCt
es
Wth
avenRd
Plth
a
Wes
ven
Wyn
d
port
Wes
tRd
orN thwoodPl
West w ood DrPl
TheGlen
Wod
oburn
Ct
W odbru
o
Rdn
Wod
ob
rnu Pl
View PlPort
Meadfeild
Ln
Dr
dgreWoo en
dleyWo Dro
dley
W
Droo
siWo
dod e Pl
Woodview
Pl
WoodridgePl
Woodvalley Pl
Woodgrove
Pl
dgreW
enoo Dr
dgWo
e
o
ren
Dr
Dr
Ct
PlDr
Woo
dpar
kRd
Woodcre Rdst
Cranley Dr
RavenPl
Fa conRd
l
CondorPl
Eagle ridge Dr
PlEagle
ridge
Dr
Ma rine Dr
Gle ne agD
rle
s
BonnieBay Pl
Gleneagles
Cl
Glenw
ynd
PlGl
e
Plgl
esne
aBonnie
Blink
Rd
East ntmo
DrCan dia Pl Over stone Orch li l
Rd
Pl
Summ
it
Ave
Ov
ston
e er
Dr
Taylor Dr
N
Aveno
els
St. G
eor
e gs
CrPl
St.Geor
e g
s Ave
Mar
ine
Dr
Pitt St
Fox St
Ro beryse Keith
RdImp
Ave ire
al
MarineDr
RoseberyAveIm
perial
AveNe
lson
Ave
i g h
eRal
St
ChathamSt
Arg y le Ave
Do uglas StRoya
l Ave
Bruce StBay
St
e i
W
ton
Plng
ll
WolseleySt
Wel
lingt
onAv
e
Mad
rona
Cr
Du�erin
Ave
Isle view Rd
Hyc
roft Rd
Hyc
roft
Copp
erCo
ve R
d
Pl
Cli� Rd
laRock
nd
WyndArbutu
s Rd
Pl
Marine D
r
Wen tw or th Ave
Cypress Bo wl Rd
Cyp ss re Pl
De er Ri dge
Dr Cl Pl
Cyp ss re Bo wl Rd
Marr Creek
Ga de
Chairlift
Ct
CtRd
ChairliftCl
ChelseaCt
ChelseaPl
Clo
se
rn
Upper
Highway
Levels
Upper
Hwy
Levels
28th St
AveBellevue
Pa rk Ln
Orchard
Way
23rd St
24th St
Pl
l
Cypress
Ln
Pl
Highgrove
Hw
y.99
Overla
nd
Rout
e
Bay
Drive
Hor
sesh
oe
Lions
Gat
e Brid
ge
Prim
rose
Mews
Highvi ew
Pl
Ln
Pl
Folke stone
BinningLn
BoulderCourt
Chippendale Rd
WilloRdughby
Halston Ct
Kadlec
CtDunl
Pl
Willoughby
PlTwin ekCre
Way
FolkestoneSkilift
Rd
Hudson Ct
ewey
Cre
Sun
Bellevue Ave
Hill
Bow
l
Highland
Drive
CypressFallsPark
Burley Dr. Park
John Lawson Park
Dundarave Park
26th St Park
Altamont Beach Park
Procter Park
West Bay Park
Oxley St. Park
McKechnie Park
Sandy Cove Park
Erwin Park
Sharon Pk
North Piccadilly Park
Caulfeild Park
The Dale Park
Trails Park
Klootchman Park
Gulf Beach Park
Kew Beach Park
Friday Park
West Vista Park
Plateau Park
Eagle Harbour Park Parc
Verdun
TallTreesPark
Larson Bay Pk
Gleneagles Public Golf
Course
GarrowBay Pk
Tantalus Pk
BatchelorBayPk
Whytecli� Park
HorseshoeBay Pk
NelsonCanyon
Park
Westwood Pk
CypressTrails
Pk
WestridgePark
BenbowPark
AltamontPark
ChairliftPark
BrissendenPark
FinchHill Park
WesthillPark
ShieldsDam Park
DouglasWoodward
Park
ChartwellPark
AndoverPark
BallantreePark
GlenmorePark
HoulgateCreekPark
CapilanoGolf Club(Private)
HaddenPark
CapilanoView
Cemetery
Hugo RayPark
BrothersCreekPark
KleeWyckPark
KlahaniePark
AmblesidePark
LeylandPark
MemorialPark
HayPark
ChatwinPark
JohnRichardson
Park
IrwinPark
HollyburnCountry Club
(Private)
Cross Creek Park
Mount MoyneSquare
NormanbyPark
Douglas Pk
HillsidePark
EAGLE LAKE
LIGHTHOUSEPARK
EAGLEISLAND
Figure 6Proposed New Cycling Network Map
On-street cycling routeOff-street multi-use pathwayPotential Spirit Trail routeSpirit Trail Other jurisdiction routes
19 June 2012 10
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 11 Document Number: 556776
Table 1: List of Proposed New Routes to the Cycling Network Plan
Street Name From To Status Description
Mathers 11th Street 25th Street New – needs approval
Provides connections to schools, is a good alternative to the extension of Kings through private land.
13th Street Bellevue Keith / Clyde New – needs approval
Provides connection to Spirit Trail and Keith Road.
Fulton 14th Street 21st Street New – needs approval
Preferred over Esquimalt – has a complete connection, connects Community Centre, Municipal Hall.
21st Street Fulton Bellevue New – needs approval
Preferred over 20th Street – connects to Spirit Trail, has a full signal at Marine Drive.
25th Street Mathers Bellevue New – needs approval
Preferred over 26th Street – better grade, connects to Spirit Trail, has a full signal at Marine Drive.
15th Street Mathers Highway 1 New – needs approval
Needs further review, internal design, some consultation
Highland Drive Taylor Way Cross Creek New – needs approval
Needs further review, internal design, some consultation
Skilift 21st Street Chairlift New – needs approval
Ties in with new development on Skilift
Chairlift Skilift Chippendale New – needs approval
Needs further review, internal design, some consultation
Chippendale extension
Chairlift Cypress Bowl Road
New – needs approval
Road still under construction – need to tie into mountain trail
13th Street At Marine New – needs approval
Priority crossing of Marine Drive, needs special treatment for bikes at signal crossing
21th Street At Marine New – needs approval
Priority crossing of Marine Drive, needs special treatment for bikes at signal crossing
25th Street At Marine New – needs approval
Priority crossing of Marine Drive, needs special treatment for bikes at signal crossing
Southridge/ Westmount/ Thompson
Mathers Southridge New – needs approval
Replaces Mathers and Bayridge, better grade than Mathers and continuous for bikes
Bellevue 13th Street 25th Street New – needs approval
Need to co-ordinate with Spirit Trail, possible “Greenway” route
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 12 Document Number: 556776
Hugo Ray Linkage Capilano River
Hugo Ray New – needs approval
Needs review with MoT, replace route through park/cemetery, needs design and some construction work.
Table 2: List of Proposed Removal of Routes from the Cycling Network Plan
Street Name From To Status Description
11th Street Marine Kings On bike map Too steep, no connection to Spirit Trail
Esquimalt 14th 20th On bike map Not continuous for bikes, bridges would need to be widened, too costly.
TC Trail route 14th 26th On bike map Replaced by Mathers, too costly, needs to cross private property
Haywood / Lawson 25th 28th On bike map Not continuous, narrow
28th Street Marine Drive Lawson On bike map Too steep, need safe crossing of Marine, replaced by 25th Street
26th Street Marine Drive Queens On bike map Too steep, narrow, replaced by 25th Street
20th Street Fulton Bellevue On bike map Too narrow, no access through Library, no connection to Bellevue and Spirit Trail
Mathers Thompson Bayridge On bike map Not continuous for bikes, needs widening, too costly
Bayridge Mathers Southridge On bike map Too steep
Hugo Ray Trail Capilano River
3rd St On bike map Needs to connect through park – better alternative to use existing paved area next to Highway 1
Skilift Chairlift Cypress Bowl Rd On bike map No access road exists – too expensive, not feasible
Chippendale Chairlift Cypress Bowl Rd On bike map Old alignment , replaced by new alignment
Table 3: List of Other Routes Considered but not included in the Cycling Network Plan
Street Name From To Status Description
13th Street Keith Kings New – needs approval
14th Street is preferred as it on the bike map, is wider, connects with the TransCanada Trail, not as steep.
22nd Street Highway 1 Jefferson New – needs approval
Too steep, guide signage exists on Highway 1
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 13 Document Number: 556776
3.4 Implementation Strategy:
3.4.1 Phased Implementation
One key objective of this project was to determine the most efficient and effective way to implement the routes on the network. The first criterion used to prioritize the routes was the ease of implementation and the associated relative costs. A second key criterion was to target denser areas with higher levels of connectivity that will provide better service and encourage more mode shift. Based on the information presented in Section 1.3, a 3km radius was used around the Ambleside Village Centre. Based on this radius, staff and the Committee agreed that the main focus area initially would be the area south of Highway 1, west of Taylor Way, and east of 25th Street. This is the focus of Phase 1. The new Cycling Network Plan contains many routes and even with these two criteria there was still a need to sub-divide the individual projects. Four phases were identified which are summarized below:
PHASE I: Easy to implement, primarily signage and road marking only, low cost; in area below Highway 1, east of 25th Street, west of Taylor Way.
PHASE 2: Easy to implement, signage and road marking only, low cost – outside of the main focus area.
PHASE 3: Easy to implement, need some further review in house (e.g. survey, data collection, minor design), some minor civil work, medium cost.
PHASE 4: Needs further study, likely external expert advice, consultation required, likely significant civil work, potential property issues, and expected higher cost requiring a separate capital budget item.
The Phase 1 and 2 areas will mainly include signage and road marking to identify the route. The type of signage to be used will be based on the Manual of Uniform Traffic Control Devices (MUTCD) and be consistent with other signage on the North Shore. An example of a directional sign is shown in Figure 7. Examples of warning signs that can be used if necessary are shown in Figure 8 and a typical road marking that shows a shared use symbol (sharrow) is depicted in Figure 9.
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 14 Document Number: 556776
Figure 7: Example of a Bicycle Guide Sign
Figure 8: Examples of warning signs that can be used where needed
Figure 9: Example of Road Marking
The Phase 1 routes are shown below in Figure 10. The details of each phase and the associated routes are listed in the following tables:
Table 4: Phase 1 Projects Table 5: Phase 2 Projects Table 6: Phase 3 Projects Table 7: Phase 4 Projects
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 15 Document Number: 556776
3.4.2 Priorities within Phases
Within the Phase 1 projects, it was felt that the priorities should focus on the Ambleside Town Centre especially in relation to an east west route along Bellevue. In addition, where opportunities arise with redevelopment and capital projects, designs can be adjusted to accommodate the network. The implementation plan will be developed to allow for some logic and connectivity between routes. Implementation within Phase 2 will likely be driven by opportunities that arise with redevelopment or capital projects. Due to the level of resources and complexity required for Phase 3 and Phase 4 projects, individual projects have not been sub-prioritized in this plan. Many of these projects will be dependent on budget availability and on opportunities to combine with other capital works or development related projects. Over time, the objective of connecting the various routes and expanding the Spirit Trail is anticipated to be the primary focus of the Phase 3 and 4 projects.
Argyle
MainSt
TaylorPl
VarleyLn
Carr Lnbolt
Shad
Constantine Way
Chairlift Rd
Chairlift Rd
SkiliftRosebery
Ave
28th St
PlShamrock
Queens Ave
Palmerston Ave
PlAltamont
Palmerston Ave
Altamont
Tower
Hill
29th St
Gisby St
27th St
26th St
Ottawa Ave
Nelson Ave
Mathers Ave
Lawson Ave
Kings Ave
25th St
Marine Dr
Mathers Ave
Lawson Ave
Kings Ave
Je�erson Ave
Inglewood Ave
wood AveHay
Gordon Ave
Fulton Ave
22nd St
21st St
20th St
Gordon Ave
Ave
Argyle
LnSherw
ood19th St
Esquimalt Ave
18th St
17th St
Ambleside Lane
15th St 14th St
17th St
16th St
Esquimalt Ave
Gordon Ave
Fulton Ave
Haywood Ave
Clyde Ave
Duchess Ave
Clyde AveKeith Rd
Esplanade AveMarine Dr
Marine DrKeith
Rd
Evelyn Dr
Eden Pl
8th St
And ersonCr
Dr
Youn etteSentinelLn
Dr
Aubeneau Cr
Braeside Cr
Leyland St
Inglewood Ave
Je�erson Ave
LnCrocodile
Taylor Way
11th St
12th St
13th St
Inglewood Ave
Esquimalt Ave
Duchess Ave
Clyde Ave6th St
Taylor Way
Taylorw
oodPl
Margaree Pl
Keith Rd
Gordon AvePl
KeithPl
3rd St
MacBeth Cr
wood
InglePl
Newcroft Pl
dale
New
Pl
Rd
PllanN
ewds
Rd
KeithRd
Upper Levels Hwy
3rd St
Lawson
Mathers Ave
Mulgrave PlBurhill Rd
Hadden Dr
Taylor Way
East
Rdens
StevDr
HolmburyPl
HaddenD
r
West
cotRd
West cotPl
Pl
Wildewood Ln
Bur l
eyPl
9th St
Burley Dr
Mathers Ave
Lawson Ave
Kings Ave
Pl Pl
Netley
Nepal Cr
Palmerston Ave
Ottawa Ave
Inglewood Ave
Je�erson Ave
Duncan
St
15th St
14th St
SinclairSt
Ct
heM
at Ctrs20th St
19th St
21st St
22nd St
19th St Pl
St Denis
St
de
West
an
Cr
Palmerston Ave
17th St
Pl
Ott
awa
Nelson Ave
Rosebery AveRena Cr
Ottaburn Rd Ottawa AvePalmerston Ave
Queens Ave
11th Stton
Ren
12th St
Sutton Pl
Tyrol Rd
ekCross
Rd
CamridgePl
15th St
Tyr ol Ct
Pl
Camelot Rd
Cam well Dr
Cammeray Rd
Whitby Rd
Cam ridge RdWesthill DrCt
Westhill Dr
CtChip dalepen Rd
Westhill Pl
Wynd Westhill
st hill W
e Cl
West hill Way
Chipdale
pen Rd
Er ri gal Pl
Finch Hill
Langton Pl
Marlowe Pl
DrPinecrest Chart well Dr
Chartwell Dr
Bram well Dr Chartwell D
r
Eyremount Dr
Rd
Vinson Creek
Crest well
Rd
PlSandh ur stwell
ChartDr
Burnsid
eRd
Chart
well Dr
well Chart
Cr
Pl
King Georges Way
mile Fair
Rd
ford Pyr Rd
Cre Cross Rdek
mo
Eyreunt D
r
Eyremount Dr
Fairmile Rd
Sout
hbor
ough
Dr
mar ock
oon
Kn
Rd
rges
GeoKing
Way
Thet
ford
Pl
leigh
Farm
RdEyremount
Drand
velGro
Rd
Pl
Row
Elveden
woo
dKe
n
Rd
RdRo
bH
ood
in
Pl
St. A
ndre
ws R
d
wood
Green
Rd
verdo
An
Cr
amnh
Bar
Rd
ide
llsHi
ood
nw
Ke
Rd
ough
hbor
Sout
Dr
Hawste
adPltre
am
Mill
s
Pl
Barnham
Barn hamPl
Gile
sSt
.Rd
dre
St. A
n w
s Rd
PlPl
Rd
Ballantre
e
Rd
Stevens Dr
Deep DenePl
Morv en Dr
Gle
nmor
e garry
Glen
Dr DrD
r LaurieCr
Craigmohr
Dr
Pl
uirm
DesswoodPl
onan
Kild
Rd
tream
Mills
Rd
lineCrest
Rd
stonGil Rd
untmoEyre Dr
side Rdand
HighlDr
and velGro Rd
Pl
Hen
low
RdMillstream Rd
and velGro
Ct
Ave
Raindan
ceCt
Sund
ance
CtTy
ee Ct
Cr
Brid
ge
Rd
tha Dr
waHia
Welch St
Mat
hias Rd
Khatsil
ano Rd
Rivers
Rd
Capi
lano
Rd
Jaco
bs C
rJa
cobs
Cr
Jacobs St
Paitsmauk
Lawa
Welch St
nnW
hoock
St
KlahanieCt
ough Dr
bor
South
Parkside Rd
esden
BiddPl onro
GlenmaD
r
Stevens
Dr
urH
i dhst
Pl
ryBu Ln
cot
Rabbit
Ln
Moyne Dr
esJa
Stm
Cr
Moy
neD
r
RabbitLn
Onslow
Pl
Nor
nbym
aCr
ley
BurDr
Russet Way Orchard
Way
Orchard Ln
Queens
Shafton PlRosebery
Ave
29th
St
M
aersth
Cr
CrMathers Ave
30th St3
0th
St
Mathers Ave
Marine Dr
31st
St31st St
Proct e r Ave
Travers Ave
inDick s on Cr
Radcli�e Ave
GabLnles
Map
leLn
Oxl
ey S
tN
orth
Hill
cres
tSt
Mathers Ave
ey
Oxl
StS
Thompson Cr
Rockview Pl
Crai gend
Westmount RdWestm ount
Ct
CedaridgePl Westmount
Pl
Thompson Pl
Be nbow Rd
Rosebery Ave
Spenc er Dr Cl
Pl
Spencer Ct
Sout
hrid
gePl
Bayri
dge
Ave
We st
e
holm
Ave
Mc hK ce nie Ave Ave
Cree ry
Hay
esSt
set Ave
Marine Dr
Bayridge
Ave
Ave
rid
eg
WestridgeAve
Wen tw or th Ave
Cypress Bo wl Rd
Cyp ss re Pl
De er Ri dge
Dr Cl Pl
Cyp ss re Bo wl Rd
Marr Creek
Ga de
Chairlift
Ct
CtRd
ChairliftCl
ChelseaCt
ChelseaPl
Clo
se
rn
Highway
28th St
AveBellevue
Pa rk Ln
Orchard
Way
23rd St
24th St
Pl
Cypress
Ln
Pl
Highgrove
Lions
Gat
e Brid
ge
Mews
Highvi ew
Pl
Ln
Pl
Folke stone
BinningLn
BoulderCourt
Chippendale Rd
WilloRdughby
Halston Ct
Kadlec
CtDunl
Pl
Willoughby
PlTwin ekCre
Way
FolkestoneSkilift
Rd
Hudson Ct
ewey
Cre
Sun
Bellevue Ave
Hill
Bow
l
Highland
Drive
Burley Dr. Park
John Lawson Park
Dundarave Park
26th St Park
Altamont Beach Park
Procter Park
West Bay Park
Oxley St. Park
McKechnie Park
BenbowPark
AltamontPark
ChairliftPark
BrissendenPark
FinchHill Park
WesthillPark
ShieldsDam Park
DouglasWoodward
Park
ChartwellPark
AndoverPark
BallantreePark
GlenmorePark
HoulgateCreekPark
CapilanoGolf Club(Private)
HaddenPark
CapilanoView
Cemetery
Hugo RayPark
BrothersCreekPark
KleeWyckPark
KlahaniePark
AmblesidePark
LeylandPark
MemorialPark
HayPark
ChatwinPark
JohnRichardson
Park
IrwinPark
HollyburnCountry Club
(Private)
Cross Creek Park
Mount MoyneSquare
NormanbyPark
HillsidePark
Phase 1 route implementation
Figure 10Map of Phase 1 Routes for Implementation
19 June 2012 16
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 17 Document Number: 556776
Table 4: Phase 1 Projects
Street Name From To Status Comment
Keith Road / Clyde
14th Street Highway 1 On bike map Complies with criteria, Evelyn development will have wider outer lane on Keith Rd.
3rd / Inglewood Keith Taylor Way / Burley
On bike map Complies with criteria
Burley / Kings Taylor Way 14th On bike map Complies with criteria
Burley Drive Kings 11th On bike map Complies with criteria
11th Kings Hwy Pedestrian Crossing
On bike map Complies with criteria
Mathers 11th Street 25th Street New – needs approval
Provides connections to schools, is a good alternative to the extension of Kings through private land.
Queens 15th Street 26th Street On bike map Complies with criteria
14th Street Mathers Bellevue On bike map Complies with criteria, preferred over 13th
13th Street Bellevue Keith / Clyde New – needs approval
Provides connection to Spirit Trail and Keith Road
Inglewood / Jefferson / Haywood
14th Street 25th Street On bike map Complies with criteria
Fulton 14th Street 21st Street New – needs approval
Preferred over Esquimalt – has a complete connection, connects Community Centre, Municipal Hall.
21st Street Fulton Bellevue New – needs approval
Preferred over 20th Street – connects to Spirit Trail, has a full signal at Marine Drive.
20th Street Fulton Mathers On bike map Complies with criteria
19th Street Mathers Queens On bike map Complies with criteria
25th Street Mathers Bellevue New – needs approval
Preferred over 26th Street – better grade, connects to Spirit Trail, has a full signal at Marine Drive.
26th Street Queens Highway Pedestrian Crossing
On bike map Complies with most criteria - although connection is steep – it connects to the pedestrian crossing over Highway 1.
Bellevue 13th Street 25th Street New – needs approval
Complies with criteria - initially sign the route. Need to co-ordinate with Spirit Trail, possible “Greenway” route.
Glenmore To Cleveland Dam
On Bike Map Connector - need a sign to show connection to North Vancouver Trail System.
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 18 Document Number: 556776
Table 5: Phase 2 Projects
Street Name From To Status Description
29th Street Marine Mathers On bike map Complies with criteria
Mathers 29th Street Thompson On bike map Complies with criteria
Southridge/ Westmount/ Thompson
Mathers Southridge New – needs approval
Complies with some criteria, better grade than Mathers and Bayridge and continuous route for bikes
Southridge Bayridge Westridge On bike map Complies with criteria
Westridge/Ripple / Almondel / Woodcrest
Southridge Woodgreen On bike map Complies with criteria
Woodgreen Woodcrest Westport On bike map Complies with criteria
Kenwood/Groveland /Burnside / Chippendale
Southborough Chairlift On bike map Complies with criteria
Table 6: Phase 3 Projects
Street Name From To Status Description
15th Street Mathers Highway 1 New – needs approval
Needs further review, internal design, some consultation
Marine Drive 25th Street 31st Street On bike map Needs further review, internal design, some consultation
Eyremount / Crosscreek
Kenwood Highway 1 On bike map Needs further review, internal design, some consultation
Highland Drive Taylor Way Cross Creek New – needs approval
Needs further review, internal design, some consultation
Westcot School Taylor Way Mathers On bike map Needs further review, internal design, some consultation
21st Street Queens Skilift On bike map Needs review with MoT, tie in with new signal at 21st and Queens, tie in with new development on Skilift
Skilift 21st Street Chairlift New – needs approval
Tie in with new development on Skilift
Chairlift Skilift Chippendale New – needs approval
Needs further review, internal design, some consultation
Chippendale extension
Chairlift Cypress Bowl Road
New – needs approval
Road still under construction – need to tie into mountain trail
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 19 Document Number: 556776
Table 7: Phase 4 Projects
Street Name From To Status Description
Queens 15th Street On bike map Crossing with 15th Street needs review – signal?
14th Street Marine On bike map Need special treatment for bikes at signal crossing
13th Street Marine New – needs approval
Need special treatment for bikes at signal crossing
21th Street Marine New – needs approval
Need special treatment for bikes at signal crossing
25th Street Marine New – needs approval
Need special treatment for bikes at signal crossing
31st Street Marine Mathers On bike map Need bike button at ped signal
Westport Road Westport Pl
Marine On bike map Restripe for northbound bike lane, needs design and consultation
Taylor Way Inglewood Southborough On bike map Needs review with MoT
Hugo Ray Linkage
Capilano River
Hugo Ray Park New – needs approval
Needs review with MoT, replace route through park/cemetery, needs design and some construction work.
3rd St / Mathers / Hadden Dr
Hugo Ray Stevens Dr On bike map OK – implemented at the same time as Hugo Ray Linkage
Picadilly North Marine Highway 1 On bike map Needs detailed review - steep, not continuous for bikes
Meadfield Road Highway 1 On bike map Needs detailed review - steep, not continuous for bikes
Cypress Bowl Road Extension
Cypress Bowl Road
On bike map Future connection with redevelopment
Eagleridge Drive Highway 1 Marine Drive On bike map Recreational route, steep, continuity and connections - needs further review.
Eagleridge Trail Highway 1 Westport Road On bike map Recreational route, needs further review.
Water Lane Loop
Lighthouse Park
Marine Drive On bike map Recreational route, needs further review.
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 20 Document Number: 556776
4. ESTIMATED PROJECT COSTS
The estimated costs for Phase 1 as shown in Figure 10 are provided in Appendix C. Estimates for the future Phases will be developed as more information becomes available. Projects in Phases 3 and 4 will also require in-house and/or external assistance to confirm the extent of the projects prior to estimates being established. The estimated costs provided in Appendix C are based on the following assumptions:
Standard bicycle signage as per MUTCD Standard road marking as per MUTCD Small bike decals on the street names will be used to complement the guidance signage Warning signs will only be used where necessary
The total estimated cost for the Phase 1 projects is approximately $40,000. All opportunities will be explored for cost sharing on these projects to accelerate implementation.
5. CONCLUSIONS
The 2007 Cycle Map has been reviewed by staff in consultation with a Committee and a cycling expert where practical feedback was received on route applicability and implementation. A revised Cycling Network Map has been developed based this feedback which includes a number of route additions and deletions when compared to the 2007 Plan. A phased implementation plan has been developed to focus the first stage of implementation on those areas where there can be a greater impact. Phase 1 has been developed within the area below Highway 1, east of 25th Street, west of Taylor Way and includes projects that are easy to implement - primarily signage and road marking only, at a lower cost. The intent is to make use of existing funds, use opportunities with existing development and capital projects, and develop cost share arrangements.
6. RECOMMENDATIONS
It is recommended that:
1. The Cycling Network Implementation Plan be adopted as a guide for implementation of cycle routes in West Vancouver;
2. Council approval be sought for the updated plan as shown in Figure 6: Proposed New Cycling Network Map;
3. Phase 1 projects be given the highest priority; 4. Projects in subsequent Phases be implemented opportunistically until such time as they
are identified as the next projects in priority; 5. A wider outer lane (4.3 m) be considered for Marine Drive where feasible in
coordination with redevelopment and capital projects; 6. The District explore all opportunities for cost sharing to accelerate implementation;
and
District of West Vancouver Cycling Network Implementation Plan
20 June 2012 21 Document Number: 556776
7. This report be circulated to other relevant departments for use as a reference when planning projects, reviewing development applications and designing upcoming District capital works projects.
Appendix A
Terms of Reference for the Cycling
Network Plan Implementation Technical
Committee
Terms of Reference: Cycling Network Plan Implementation Technical Committee Duties The Cycling Network Plan Implementation Technical Committee will be established to develop a Cycling Network Implementation Plan with the assistance of staff and a consultant. It is envisioned that the Technical Committee will meet monthly, and meetings will be arranged at key milestones. It is likely that some additional meetings will be required based on progress and additional discussion. The main duties will include:
Provide input on prioritization of routes for further review;
Provide input on current signage plans;
Provide input on current and upcoming development applications, as it pertains to its relevance to achieving goals and objectives of the Cycling Network and Greenway Plan;
Comment on easily implementable routes on existing roads utilizing modest signage and pavement marking improvements and possibly limited parking removal;
Provide input on strategy to implement next phases of Spirit Trail; and
Provide input on refinement of future routes to preliminary design stage. Composition The Technical Committee will consist of 4 to 5 members of VACC-NS. Members are required to be residents of West Vancouver. Staff liaison and administrative services will be provided by the Engineering & Transportation Division. Consultant resources will be engaged by the District as necessary to work with the Working Group to develop the Implementation Plan. Term The Cycling Implementation Plan Working Group will complete its work within four months of its establishment.
Appendix B
2007 Cycling Network
and Greenway Plan
C a p i l a n o L a k e
100
200
300
400
500
600
700
800
400
300
500
200
100Happpyyy
LaneVaVVllleel
y
CCaulfa l eildeild
ffPl
TheheheDDDale
EEEdenda
Lnn
MMMararrr Creekek
GGarardend
nr
Chairliftiff
CtC
CtCtCRRRdd
MMMainain SStt
PPP lageaRoyal VVilloyaark Rark ark RPPPPPP
dge Cr
dgWWW
s
C onnector
C onCWWWilloi
AmblesidesidA l e
CedardaleC dard ld
SentineleSe tineHillHHill
GlenmoreeGGlenmormoG oGle o
Eagle Harbouruo r
noramaramaramPanoPanoPPPaanoramPanor
WWWestmountm testmountoumouBayridgeB y dged
ritishtishhBBrPropertiespe tiP op rtrt
DundaraveDundaraved
CanterburyrCanterbunteC elllChartweChaartwehaarta
ffecliifyteytetec fff
CypressCypresspr sspypParkarkk
CaulfeildaulfeildC
GleneaglesGlGleneGleGlGle e
WhitbWhit
HorseshoessHorseHorsessrorsHorsHorseBayaBBaaBB yy
AltamontAltamontAl tA
SunsettSuSu setsetununnnnsnssetsetsetsetetetttHighlandsHiHighlahla dsndsHigHigghghghghhlhlaaanannnndnddsdsss
CCrAAsAAAAAAAA
burnb rHollyboH ll bb
BBoulderouldCourt
CCyprypressss
BBoowlRRoadad
EagleEagleIslandd
gg
AAAAAA AAAAArrrrrrea Na a NNeeeaeaa a NNNNNNNNee orororooooooororrrth ofttthth ooththHHHHHHHHH oooooorseshorsrseseshhooororrsrsseseeeeessssshshhhhohooooor hohoooooe BBBeeeeee aaaaayyyyyyyyy
CCChipphhippenn RRRoadoadoaddaledaled l
'Futurure'e
'FUTU
RE'
TURE 'C'CONNECTOR'R'
BCR CR
Tunnel
RRRdddughbbghbooyyyyy
HalstHalstononn CtCt
Kadlec
CtCtCt
Willouugghhbbyybb
Dunlewewleweeyyy
SSttationatiFireMuunicipalnicipan
HHallHH
LibLibrarra yy
SStt tionononatiotioFireFire
eSSttationtatt
eneaglesmmunityg
ntree
Mead
feilddffC
ll
HHoww
aCt
CCCM
arartinti
CapilanoIndian
Reserve
3r3d S ttS
PPlazaInternational
Kawtin Rd
Skawshen Rd
Ikw
ikis
Rd
KwumkRKK
wum
Spuraway
Binninggin ininninng
C ypryCC ess
P ll
S eS eaa Rd
Rd
RdscascascapepeppePlP l
LnLnLn
DDrr
DrDr
C tC t
Cl
Cl
SSttationatioationonnFireFireFirereFiF
Bircchhffeef iill
Almmooonndeell
Bade
nad
en
Poww
ell
el
Trrai
lai
l
Westm
ounst
t
Court
CCed
ared
aid
ge
ge
PPll
MMcKenziecKenzie DDrrr47004
Northwood
Dr
K man
GGGGle
nm
ore
Dr
FireSta
GlenGGleComCCCenC
GleneaglesesglesPublicbGolfo
Courseeu
eaglesa le
onon
WhyteWhyWhyteytete
eneaeneeeeneaeeeeae
rrrr
KKKlol otchmch P arkkK m
LighthousethousghParkrkPa
CedCedCeedddCC
artwear eartwear e
EagleEagleEE Harbrragle HarbEaglE lEagleEaEagEEEEEEagleEEEaglE
ale Ctdaaa
HHow
arrddC
tCt
Ct in
HHow
aCtC
tC in
unlewewunlewew
itbyybybyPPl
h
itbPl
h
uryruryuryu
E dge Cr
Watate
rer sss
E dge Cr
Waate
r sss
ge
WWatatee
r’sss
Waate
r sss
WW
a
b
a
b
neammntre
SHHH
Rd
Rd
Rd
WhyhyWhyhy
N
W E
SCycling Network and Greenway Plan
OtherJurisdictionRailway
FutureAlignmentPathwayOn Street
Localized Improvements
Other Routes
Marine Drive
TransCanada Trail
Greenway
KeithKKeithKeith BayridgeBayridgeBayridgeBayridgeayrid
bobbboborbrbb
Appendix C
Phase 1: Costs for Implementation
ESTIMATED COSTS FOR PHASE 1: [Estimates based on $150/sign and $100/marking which includes labour]
Street Name From To Length (km)
Signs Cost Road Mark'gs
Cost Total
Keith Road 14th Street Highway 1 2.5 14 $2,100 6 $600 $2,700
3rd / Inglewood Keith Taylor Way / Burley 1.1 6 $900 2 $200 $1,100
Burley / Kings Taylor Way 14th 1.5 10 $1,500 4 $400 $1,900
Burley Drive Kings 11th 0.5 3 $450 0 $0 $450
11th Kings Highway Ped Xing 0.1 4 $600 0 $0 $600
Mathers 11th Street 25th Street 2.6 14 $2,100 4 $400 $2,500
Queens 15th Street 26th Street 2.0 10 $1,500 0 $0 $1,500
14th Street Mathers Bellevue 1.2 16 $2,400 4 $400 $2,800
13th Street Bellevue Keith / Clyde 0.4 12 $1,800 8 $800 $2,600
Inglewood / Jefferson / Haywood 14th Street 25th Street 2.1 14 $2,100 0 $0 $2,100
Fulton 14th Street 21st Street 1.0 6 $900 0 $0 $900
21st Street Fulton Bellevue 0.3 10 $1,500 8 $800 $2,300
20th Street Fulton Mathers 0.8 4 $600 0 $0 $600
19th Street Mathers Queens 0.4 2 $300 0 $0 $300
25th Street Mathers Bellevue 0.5 12 $1,800 8 $800 $2,600
26th Street Queens Highway Ped Xing 0.3 4 $600 0 $0 $600
Bellevue 13th Street 25th Street 2.4 6 $900 4 $400 $1,300
Glenmore To Cleveland Dam 0.1 2 $300 0 $0 $300
Other Items
Small bike decals on signs Allow for 200 at $15/decal $3,000
Warning signage where required Allow for 30 at $150/sign $4,500
Sub total $34,650
Contingency - 10% $3,465
TOTAL 149 $22,350 48 $4,800 $38,115
Say $40,000