Government of India Ministry of Water Resources
River Development & Ganga Rejuvenation Central Water & Power Research Station
Khadakwasla, Pune – 411 024
Issue No.: 04 April 2017 ____________________________________________________________________
CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________
1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 04
2. REPORTS SUBMITTED 05
3. RESEARCH PAPERS
3.1 Submitted 06
3.2 Published 06
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 06
5. LECTURES DELIVERED 07
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 07
6.2 Other Committees 07
7. TRAINING OF PERSONNELS 07
8. IMPORTANT VISITORS 08
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 08
10. TRAINING PROGRAMMES ORGANIZED 09
11. OTHER INFORMATION 09
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in
2
Summary Information For 2009-2017
Years Jobs Awarded
_____________________
Nos. | Amount (Rs.)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnel
Training Programmes/ Conferences Organized
2009-10 118 14,46,68,747 94 57 39 36 30 59 04
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
2015-16 85 13,95,89,971 106 65 51 74 17 120 10
2016-17 111 25,90,34,704 95 90 114 97 23 315 17
STUDIES AWARDED FOR CURRENT YEAR 2016-2017
April -17 12 3,04,76,390 08 06 01 00 05 29 02
Estimate submitted to Client but yet to be awarded
April 2017 16 4,23,09,430 - - - - - - -
CWPRS Information Bulletin April 2017
3
1. ESTIMATES
1.1 Submitted: (16 Nos. totaling to Rs. 4,23,09,430/-)
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1. Running Maintenance of New wave model of Mormugao Port, Goa during 2017-2018
The Chief Engineer Marmugao Port Trust, Administrative office, Headland Sada, Marmugao, Goa-403804
PH-I 13,68,080/-
2. Desk and wave Flume studies for the design of Coastal Protection work at INHS ASVINI, Colaba, Mumbai.
Garrijan Engineer (DD) office of the GNP (Mumbai), Lian Gate, SBS Road, Mumbai-400023
CHS-II 6,09,870/-
3. Mathematical model studies for Hydrodynamics and Siltation around the Proposed Kandla oil terminal South of oil jetty No.1 in Kandla Greek Gujarat.
The Chief Executive officers LSB, IMC Limited, Chennai-600018
PH-I 14,48,910/-
4. Shoreline changes along the Coast line of Mumbai and Sediment movement Pattern due to dumping of dredge material at Site DS3, Mumbai using remote Sensing techniques, for M/s JNPT.
S. V. Madabhavi chief Manager (PPSD) Jawaharlal Nehru Port Trust Administrative Building Sheva, Navi Mumbai-400707
RSA 15,16,860/-
5. Study for the Assessment of Shoreline changes near Muldwarka Port Breakwater, Gujarat, using Satellite remote Sensing techniques on behalf of M/s WAPCOS Ltd., Pune, Maharashtra.
Shri Bal Krishna Dy. Chief Engineer WAPCOS Ltd, Pune office Swastik Building 2nd Floor, Gulmohar Path
RSA 5,15,230/-
6. Analysis and interpretation of Seismological data for Indira Sagar Power Station, Narmada Nagar, dist-Khandwa, MP. (Period Jan 2017 to Dec 2018)
The Sr. Manager (Dam) Indira Sagar Power Station NHDC office Complex, Narmada Nagar Dist-Khandwa-450119 M.P
ES 28,45,640/-
7. Maintenance of existing 3-D Physical wave model of Paradeep Port during the year 2017-2018
Chief Engineer Civil Paradeep port Trust, Dist-Jagatsingpur Paradeep Port-754142, Odisha.
CHS 15,81,160/-
8. Laboratory studies towards identification of suitable joint sealant material for controlling seepage through the monolith joints of Temghar dam, Maharashtra.
The Deputy Executive Engineer, Bhama Ashked Dam Division, Swargate, Near Mutha Canal, Pune-411037 Maharashtra.
CT 10,33,910/-
9. Monitoring of blast Vibrations during under water blasting for deepening and widening of Mumbai Harbour Channel & JN Port Channel (Phase-II) at JNPT, Maharashtra.
The Manager (PPD-III) Jawaharlal Nehru Port Trust, Administration Bldg, Sheva, Navi Mumbai-400707, Maharashtra.
VT 14,82,180/-
10. Performance Testing of Sample Submessible Pumps for Irrigation Department Uttar Pradesh, Lucknow-2017
Superintending Engineer, Central Equipment & Flores procurement Cell, irrigation & water resources department Uttar Pradesh Ganga Sinchai Bhawan Telebagh, Lucknow-226025
HMC 1,20,690/-
11. Studies of Various physical parameters at repair materials
M/S BASF India Ltd. Plot 37, Chandivali Mumbai 400072,
CT 10,04,060/-
CWPRS Information Bulletin April 2017
4
manufactured by M/s BASF India Ltd. in connection with repair of hydraulic structures.
Maharashtra.
12. Desk & wave flume studies for the design of breakwaters for the protection to the jetty from wave action in the Neil Harbour at Neil Island, Andaman & Nicobar Islands
Chief Engineer & Administrator, Andaman Lakshdweep Harbour Works, Port Blair-744101.
CHS-II 15,44,340/-
13. Mathematical Model studies for wave tranquility for proposed breakwaters in the Harbour at Neil Island, Andaman & Nicobar.
Chief Engineer & Administrator, Andaman Lakshdweep Harbour Works, Port Blair-744101.
PH-II 11,78,420/-
14. Physical Model studies for the proposed four lane road bridge across river Brahmaputra between Gohpur on NH-52( on north bank) and Numaligarh on NH-37 (on South Bank) in the State of Assam
Dr. Navin Kumar Singh Principal Storm Water Design Engineer, Louis Berger Consulting Pvt. Ltd., Surinder Jakhar Bhavan Plot No.3, Tower-B, 5th Floor, IFFCO Complex, Sector-32 Gurgaon-122001, Haryana.
RH 2,31,97,790/-
15. On Site Measurement of Pump Parameters of Mhaisal Lift irrigation Scheme (LIS) at Warnali Dist-Sangli, Maharashtra.
Executive Engineer, Takari Machanical & Electrical DIVN Warnali, Dist-Sangli-416415 Maharashtra.
HMC 4,25,800/-
16 Hydraulic model studies for proposed MRTS bridge across river Yamuna between of Wazirabad Barrage and Signature Bridge at New Delhi
Shri Anil Kumar Shrangarya, Chief Project Manager in Delhi Matro Rail Corporation, Seed Bed Park, Opposite Gurudwara, Shakarpur, New Delhi-110092
RH 24,36,490/-
1.2 Awarded: (12 Nos. totaling to Rs. 2,71,83,680/- + 32,92,710/-for calibration works 09 Nos.)
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1. Selection, supervision, calibration, Testing and assistance in installation of dam instruments for Polavaram Dam, Andhra Pradesh
Polavaram Project Authority, H. No. 11-4-648 (1st Floor), Krishna Godavari Bhavan, A.C. Guards, Hyderabad - 500 004
Hyd-Inst 24,85,140/-
2. Running and Maintenance of existing Kosi river model in the reach of 32 km upstream to 80km downstream of Kosi barrage during 2016-18 and conducting a study to project and restore Eastern Kosi Embankment in the reach of 78 to 84 downstream of Kosi barrage
Engineer-in-chief, Water Resources Department, Govt. of Bihar, Sinchai Bhawan, Patna 800 015, Bihar
RH 1,18,80,550/-
3. Mathematical Model Studies for wave tranquility near GMB jetty at Rozi Port, Jamnagar, Gujarat
Superintending Engineer (Civil) HQ Gujarat Maritime Board, Gandhinagar, Gujarat - 382 010
MMCE 4,03,130/-
4. Hydraulic model studies for activation of central channel in a length of 3km from 500m downstream of Kosi barrage and activation of natural channel in a length of 17 km from 4km downstream of Kosi barrage in Nepal portion
Chief Engineer, Flood Control and Drainage Water Resources Department, Birpur, Bihar - 854 340
RH 26,30,570/-
5. Hydraulic model studies for activation of central channel downstream at Kosi Mahasetu in a length of 4.60 km in river
Chief Engineer, Flood Control and Drainage Water Resources Department,
RH 15,92,870/-
CWPRS Information Bulletin April 2017
5
Kosi, Bihar Birpur, Bihar - 854 340
6. Mathematical Model Studies for evaluation of Hydrodynamics and Siltation aspects for the development of fish landing Centre at Hangarkatta & Kodi Bengre, Udupi, Karnataka.
Executive Engineer, Port Fisheries Division, Bannanje, Udupi, Karnataka.
MMCE-II 9,63,100/-
7 Desk & wave Flume Studies for the design of breakwater for the development at fish landing Centre at Hangarkatta & Kodi Bengre, Udupi, Karnataka.
Executive Engineer, Port Fisheries Division, Bannanje, Udupi, Karnataka.
CHS-II 9,35,470/-
8 Land Survey work of Shetrunji reservoir, Gujarat.
The Executive Engineer, Bhavnagar, Irrigation Division, Sichai, Sankul, Panvadi, Bhavnagar, Gujrat-364001
Hyd-INST
10,15,720/-
9 Sedimentation survey work of Shetrunji reservoir Gujarat.
The Executive Engineer, Bhavnagar, Irrigation Division, Sichai, Sankul, Panvadi, Bhavnagar, Gujrat-364001
Hyd-INST
11,30,800/-
10 Geotechnical stability studies for proposed breakwaters at 2nd stage development of Karwar Port, Karnataka.
The Executive Engineer, Port Division, Karwar Karnataka-581302
GE 7,76,580/-
11 Laboratory Studies towards cementitious grout material mix design and estimation of engineering properties of self compacting design mix concrete for controlling seepage through dam body of Temghar dam, Maharashtra.
The Deputy Executive Engineer, Bhama Ashked Dam Division, Swargate, Near Mutha Canal, Pune-411037. Maharashtra.
CT 17,94,030/-
12 Hydraulic model studies for activation of natural channel in front of spur at 27.88 km to 24.78 km upstream of Kosi barrage in river Kosi, Bihar
Chief Engineer, Flood Control and Drainage Water Resources Department, Birpur, Bihar - 854 340
RH 15,75,720/-
2. REPORTS SUBMITTED: (08 Nos.)
Sl. No.
Title Report No
Month/Year
1. Desk and wave Flume studies for the design of Coastal Protection works at Thalal Fishery harbour, Kannur, Kerala.
5484 April, 2017
2. Revised Design Parameters Through the analysis of Storm Data for at Kundankulam Nuclear Power Plant site at Kundankulam
5485 April, 2017
3. Hydraulic Model Studies for activation of Channel (impunt of Sport at 27.88 km to 24.88 km) in river Kosi, Upstream of Kosi barrage, Bihar.
5486 April, 2017
4. Estimation of Site specific design parameters of Kankar irrigation Projct U.P.
5487 April, 2017
5. Estimation of Site Specific Design Parameters for Rupaligad Regulating dam, India/Nepal for WAPCOS (I) Ltd.
5488 April, 2017
6. Mathematical Model Studies for Hydronamics and Siltation for the development of Training Walls/Groynes at the river mouth near Navibandar, Porbandar, Gujarat.
5489 April, 2017
7. Revised study of storm surge analysis & storm wave hind casting for the proposed Nuclear Power Plant at Mithi Virdi, Gujarat
5490 April, 2017
CWPRS Information Bulletin April 2017
6
8. Hydraulic Model Studies for Jiagaon Dam Spillway, Maharashtra, 1:100 scale 3-D comprehensive Model
5491 April, 2017
3. RESEARCH PAPERS
3.1 Submitted – (02 Nos.)
1. Paper Titled " Diversion tunnel of hydropower projects for sediment management” by M.K. Verma,M.Z. Qamar, Mrs. Neena Isaac, Dr. (Mrs)V.V. Bhosekar, for possible publication in International Conference on Recent Advances in Civil Engineering (ICRACE) 2017.
2. Paper Titled " Intranet System: A solution for interaction, Transformation and submission of the Information” by P. S. Solanki, P.R. Khatarkar for possible publication in International journal of Applied Research on Information Technology & Computing (IJARITC).
3.2 Published: (06 Nos.) 1. Paper Titled ”Role of Hydraulic model studies in finalizing the design of spillway and energy
dissipator for Dhauliganga Hydroelectric project, Uttarakhand, India" by B.S. Sunderlal, M. R. Bhajantri, Dr. V.V. Bhosekar, B.M. Shimpiger, Mrs. Sangeeta Patnaik, Mrs. Vaishali Gadhe published in “CBIP - Water and Energy International Journal" volume No.59, of March pp.64-75.
2. Paper Titled " Design of Hydraulic Power Pack System for Servo- Hydraulic Random Sea Wave
Generators for Design of Port Layouts" by V. Prabhakar Chary, R.S. Eranade, S.D. Ranade, M.D. Kudale, published in "Cosmic Journal Group (IJRMET) Volume 7, issue 1, Nov 2016 -April 2017 pp. 80-88.
3. Paper Titled” " Nadhi jodo yojana yeva iskey mukya pahalu" by M.K. Pawar, Kum Madhavi Gajre Published in " Vadodara ke Rashtriya Hindi - Thakaneeki sanghosti pathrika 2017" April 2017.
4. Paper Titled “Nadhiyon ko jodneyse jal hothey yeva vikas mey yoghdhan" A.K. Singh, Naval Jagtap, L.R. Ranganath published in" National Journal in Rastriya Jal Vikas Abhikaran, Vadodara" April 2017.
5. Paper Titled “Review of Hydraulic model studies for Port Development” by Sagar M. Gawande, P.A. Kashyape, H.B. Jagadeesh published in" International Research Journal of Engineering and Technology (IRJET) " Volume - 04 issue: April 2017 pp-ISSN:2395-0072.
6. Paper Titled “Application of Unstructured Mesh Modeling in evolving Safe Grade Elevation of an Airport at the confluence of multiple Rivers in a Macro Tidal Region" by A.A.Purohit, M.M. Vaidya, M.D. Kudale published in " International Journal of Environment, Chemical, Ecological, Geological and Geophysical Engineering" Volume:11, No.3, 2017, pp.227-241
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES/ - (01 Event, 01 Participant)
Sl. No. Title Place, Date Name of Officer
1. Status and future of worlds large rivers
Vigyan Bhawan, Premier Convention Centre of Govt. of India, New Delhi 18-21April 2017
Dr. S.A. Burele., Sci-B
CWPRS Information Bulletin April 2017
7
5. LECTURES DELIVERED – NIL 6. PARTICIPATION IN MEETINGS: 6.1 Technical Committee Meetings: (05 Nos.)
Sl. No.
Name of Committee Date and Venue Participant(s)
1. Meeting with DGNP, Vishakapatnam regarding Varsha Project
CWPRS, Pune 06.04.2017
Dr. M. K. Sinha Director
2. Meeting for prepartion of action plan to achieve twin objective of comprehensive flood management plan and navigability of river Jhelum chaired by Secretary MoWR, RD & GR
New Delhi 17.04.2017
Dr. M. K. Sinha Director
3. Attended the review meeting called by Hon’ble Minister (WR, RD & GR)
New Delhi 26.04.2017
Dr. M. K. Sinha, Director
4. Attended meeting of Tender Evaluation Committee of NHP
New Delhi 28.04.2017
Dr. M. K. Sinha, Director
5 Technical Advisory Committee, Chilka Development Authority
17-18, April 2017 Bhubaneswar
Shri M.D. Kudale, Additional Director
6.2 Other Meetings: (3 Nos.)
Sl. No.
Name of Committee Date and Venue Participant(s)
1. Attended meeting of MERI, Nasik, WRD, Maharashtra regarding Mathematical Model Studies for prediction of flood levels along rivers Godavari and Nasardi, Nasik City.
19,April 2017 Nasik, Maharashtra
Shri P. Vijayagopal, Sci-B Shri S.D. Marulkar, Sci-B Shri S.N. Ali, Sci-B
2. Participated in panel discussion on “Climate Change in Water Resources” organized by Institute of Engineers India, Pune
18, April 2017 Pune.
Shri R.S. Jagtap, JD Shri C. Ramesh, Sci - C
3. To review the Parliamentary Standing Committee to be held at Goa.
01.05.2017 Goa
Dr. M. K. Sinha Director
7. TRAINING OF PERSONNEL – (03 Trainings and 29 Personnel)
Sl. No.
Title Event, Place, Date Name of Officer
1. BIS Young standardizers Programme
BIS., Manak Bhavan, New Delhi - 110 002 21April 2017
Shri Jyothi Prakash A, Sci-B Shri T.K. Sahu, Sci-B
2. Selection, Operation and Maintenance of Centrifugal/V.T Pumps
CWPRS, Pune 04-06 April 2017
Shri Bist Mahender Singh, Sci-C Shri Kuldeep Malik, Sci-B Shri Murthy G.V.R. Sci-B Mrs. Bhonde K.G., Sci-B Shri Ghule S.J., Sci-B Shri Sonawane N.A , ARO Shri Farande K.U, ARO Shri Sahu T K, ARO Shri Vishal Telgote, ARO Shri Kulkarni S.V., Asstt.Engineer
CWPRS Information Bulletin April 2017
8
Shri Sarsamkar D.D.,Asstt.Engineer Shri Yognath, Jr. Engineer
3. Computer basics and IT usage In-house Training
CWPRS, Pune 03 - 05 April, 2017
Shri Liman Govind, MTS Shri B.Bhimani Asif Abbas, MTS Shri Darwatkar Laxman B.,MTS Shri Rindhe Khandu L., MTS Shri Chavan Raju Subhash., MTS Shri Mate B.D., MTS Shri Jawlkar Maruti Baban., MTS Shri Arora P.K, MTS Shri Paigude S.S., MTS Shri Tanpure S.R., MTS Shri Mate R.D., MTS Shri Thite V.N., MTS Shri Bhoi B.R., MTS Shri Mate N.T., MTS Shri Nangare D.D., MTS
8. IMPORTANT VISITORS: 1. Shri Akhil Kumar, Joint Secretary, MOWR attended screening committee meeting for
assessment for promotion from Sci-C to Sci-D at CWPRS., Pune on 29.04.2017. 2. Shri A.S. Mascarenhas, AGM, Mazgaon dock ltd. Visited Mumbai Port model on 01.03.2017. 3. Major General M.k. Dutta, Comdt. MILIT visited Mumbai port model on 08.03.2017. 4. Shri Sinha, Retd. IAS and advisor, Capt. Subhash Kumar, Marine consultant for proposed
Vadhavan Port along with V.G. Gharat, Manager (PPD), JNPT visited CWPRS on 22.03.2017. 5. Shri S. R. Sarma, DGNP(V) & Vice Admiral visited to CWPRS on 06.04.2017 to discuss issues
related to flood mitigation & additional studies for project Varsha. 6. Shri S. M. Devagiri, CCE(R&D) visited to CWPRS on 21.04.2017 to discuss studies for
contemplated developments in Naval Basin of Vishakhapatnam .
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No.
Name of Person Designation Group Division Date
New Entrants
NIL
Promotions
NIL
Retirement
1. Shri G.P. Rajkumar Suptd. B Bills 30.04.2017
2. Shri M.K. Surendran Suptd. B CPC 30.04.2017
3. Shri D.G. Walje LA-I C MMCE-I 30.04.2017
Voluntary Retirement
NIL
Repatriation/Transfer
1. Shri Hareswaran SRO A SWH 07.04.2017
Resignation
CWPRS Information Bulletin April 2017
9
NIL
Demises
1. Shri S.R. Malvadkar LA-I C CSWCS 18.04.2017
10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: (02 Nos.)
1. Computer basics and IT usage for MTS batch-VII 03-05 April 2017 at CWPRS, Pune.
2. Training course on Selection, Operation and maintenance of centrifugal/ V.T. Pumps during 04-06
April 2017 at CWPRS, Pune.
11. OTHER INFORMATION: NIL