CURRICULUM VITAE DILIP KUMAR H. No. 1247 MahaLaxmi Garden Rajandra Park Gurgaon (HARYANA) Pin Code No. 122001 E-mail [email protected] Contact No. 8800393326, 9818553493 Passport No.: P4847647 Objective Aspiring for a career that places me in challenging position within a fast paced and learning oriented environment for developing my technical and inter personal skillsThrough working with dedication and determination on suitable projects .with my abilities and skills I aspire to contribute to the organization my level best for the symbiotic growth of the organization and self. Expectations An opportunity for long term professnal and personal growth and development through The process of encouragement and recognition Healthy atmosphere with superiors who can be a source of inspiration and peers, a Source of completion. Educational Qualification Passed Matriculation in 1993 from Bihar Board Education, Patna ( Bihar ) Passed Intermediate in 1995 from Patna Inter-council (Bihar) Technical Qualification Diploma in Electrical Engineeringfrom Govt. Polytechnic Purnea (Bihar) with 61% marks in aggregate In Sep. 2000. Work Experience A result oriented professional with over 14 years of practical experience in the field of Electrical at various levels in Project division with Operation & Maintenance division . 1. Presently working with M/S OKAMURA HOMES PVT. LTD. (A sister cons ions of RAHEJA Development LTD.)Sec.11/14 Sohna, Gurgaon as a Manager (MEP) Since 21 st September 2015 to Till Date. 2. Presently working with M/S Umaritha Infrastructure Development LLP (A joint venture of ATS INFRASTRUCTURE LTD)Sec.109 Gurgaon as an

Transcript of CV_of_Dilip

Page 1: CV_of_Dilip

CURRICULUM VITAE

DILIP KUMARH. No. 1247MahaLaxmi Garden Rajandra ParkGurgaon (HARYANA)Pin Code No. 122001E-mail [email protected] No. 8800393326, 9818553493Passport No.: P4847647

Objective

Aspiring for a career that places me in challenging position within a fast paced and learning oriented environment for developing my technical and inter personal skillsThrough working with dedication and determination on suitable projects .with my abilities and skills I aspire to contribute to the organization my level best for the symbiotic growth of the organization and self.

Expectations

An opportunity for long term professnal and personal growth and development through The process of encouragement and recognition Healthy atmosphere with superiors who can be a source of inspiration and peers, a Source of completion.

Educational Qualification

Passed Matriculation in 1993 from Bihar Board Education, Patna ( Bihar )

Passed Intermediate in 1995 from Patna Inter-council (Bihar)

Technical Qualification

Diploma in Electrical Engineeringfrom Govt. Polytechnic Purnea (Bihar) with 61% marks in aggregate In Sep. 2000.

Work Experience

A result oriented professional with over 14 years of practical experience in the field of Electrical at various levels in Project division with Operation & Maintenance division.

1. Presently working with M/S OKAMURA HOMES PVT. LTD. (A sister cons ions of RAHEJA Development LTD.)Sec.11/14 Sohna, Gurgaon as a Manager (MEP) Since 21stSeptember 2015 to Till Date.

2. Presently working with M/S Umaritha Infrastructure Development LLP (A joint venture of ATS INFRASTRUCTURE LTD)Sec.109 Gurgaon as an Assistant Project Manager Since 10th December 2013 to 05th August 2015

3. Worked with M/S BPTP LTD (BPTP CREST Plot no.15 UdhyougVihar Phase IV Gurgaon Haryana) as a Senior Project Engineer Since 9th July 2013 to .9th December 2013.

4. Worked with M/S DLF PROJECT LTD ( DLF City Phase V , Gurgaon (H.R) As a Junior Electrical Engineer Since 23rd nov.2010 to 08th July 2013.

5. Worked with M/S DLF Building Services in Wellington Estate, DLF City Phase V, Gurgaon (H.R.) as a Shift In charge Since 27th March .2005 to 15th Nov.2010.

6. Worked with M/S PARAGON ERECTORS Pvt. Ltd., 19, RajandraBhawan, Rajandra Place, New Delhi-110008 as a Junior Electrical Engineer 17th Oct., 2001 to 21st March 2005

Page 2: CV_of_Dilip

Job Responsibilities

i. Mobilizing of site activities including handling of erection crew and contractors. Overall responsibility for Electrical system

Project experience of layout, installation, erection and commissioning of the electrical Component of the processing plants.

To look after all Electrical works in Internal, External & Substation cable tray, cable laying Rising MeinExecution of installation & electrifications job related to lift elevators &Escalators. .

To look after installation, testing & commissioning of DG Sets, Fire Detection System, Security/ Access Control and Door phone System

Works to be executed as per drawings and to monitor the progress as Quality Norms.

To co-ordinate between various agencies involved and releasing monthly Progress Report and to give technical feed back

ii. Involve in the MEP maintenance of following equipment’s.

Coordinating with the MEP operations, planning and execution of the operation and maintenance strategies.

Operation & Maintenance of 11 KV/.415 KV substation, HT Panel, LT Panel, and sub station equipment’s protection devices.

Inspection and Maintenance of the lift elevators & escalators and prepare project reports. Setting guidelines & instructing operators.

Operation & Maintenance of D.G. set up to 1500 KVA Cummins, syncronisining of Generators and AMF Panel work.

Motors over hauling & repair all type starters such as DOL, Star Delta, and Pole Changing, reverse forward, Slip ring motors starter etc.

All Type Air Circuit breakers (L & T, ABB and GEC Althomas make etc.) vacuum circuit breaker, Siemens make oil circuit breaker Crompton greaves makes.

Name DILIP KUMAR

Father’s Name SHRI RAJ KAPOOR RAI

Date of Birth 30th Jan.1979

Marital Status Married

Languages Known Hindi & English

Nationality Indian

All the above stated facts to support my candidature are true to the best of my knowledge andbelief.I hope my application will be considered favorable.

Thanking youPlace: Gurgaon

Date: DILIP KUMAR

Personal details