cvmsajida

download cvmsajida

of 6

Transcript of cvmsajida

  • 7/31/2019 cvmsajida

    1/6

    CURRICULUM VITAESubject:-Application for the post OF E&I QA/QC Inspector/Const.Supr.

    With the Aramco Approval :- (SAP# 70007260)CAREER OBJECTIVE:-

    To lean and know my work to the core and try to understand the synergy of my work to

    the organization as well as the larger environment to contribute through my work to the

    world. SUMMARY,,

    Over 16 years of hands on experience specializing in Electrical & Instrument and control

    system and administration.

    team player with exceptional communication skills, comfortable presenting to high and

    executives.

    ability to determine priorities schedule work well under pressure.

    well familiar about implementing company rules and regulation with the section.

    Co- ordinate with other work department crew such as Mechanical, Structure and Civil tocarry out corrective maintenance of equipment also co ordinate with warehouse &

    administration.

    PERSONAL DETAILS

    Name : Mohammad Sajid Alam

    Fathers Name : Mohammad Abuzaffar Malik

    Date of Birth : 02.05.1971

    Religion : Muslim/Islam

    Nationality : Indian

    Languages Known : English, Hindi, Urdu and Arabic

    Email ID -> [email protected]/[email protected] license : Mumbai, Saudi & Oman

    Educational Qualification : S.S.C & H.S.C Passed.

    Technical Qualification : Diploma Engineering in Instrumentation

    Computer skills : Basic Computer Knowledge

    Passport Details : Passport No. : E- 6616991Date of Issue : 21.03.2004

    Date of Expiry : 20.03.2014

    Place of Issue : Riyadh (K.S.A)

    Present Address Permanent Address

    Md. Sajid Alam

    C/o Mallick RoomRam Rahim Compound, Bharat Velvet Co.

    Andheri Kurla Road, Safedpool, Mumbai - 72

    Cell No.: +91 9967134180Tel no:-+91 22 28511408

    Md. Sajid Alam

    At/. Post - RayeesVia - Pakribarawan

    Dist - Nawadah

    Pin - 805124Cell No.: +91-9967134180/ 9931615767

    mailto:[email protected]:[email protected]
  • 7/31/2019 cvmsajida

    2/6

    EXPERIENCE DETAILS

    GULF EXPERIENCE :

    Company : C.C.C KUWAITDuration : 06 Jan 2008 to tillProject : OL2K II Kuwait(Equate)Designation : QA/QC Supervisor E&I

    Division : Construction work

    Company : C.C.C K.S.ADuration : 14th April 2006 to 10th August 2007Project : Khursania Gas Plant Projects

    Designation : QA/QC Inspector E & I

    Division : Construction work

    DUTIES & RESPONSIBILITIES

    Co-Ordinate with PMC Inspection Engineer & Construction Supervisors for the Inspection toassure the conformance to the requirement of the KGP/ IEC/ NEPA 70/ IEC Standards,

    Specification, Codes, Basic Engineering design Data, drawing, method state design pack, specified

    documents, procedures & company QA/QC RE requirement at minimum cost.Co-Ordination with field Engineering tem and QA/QC Manager regarding Non conformation of

    construction works, amendments field design. Modification (FDM) and as Built.

    Preparation/ Review of amendments, Electrical/Instrument work pack, Method statement/

    procedure, job safety Analyses sand Inspection test plan, indexes.Inspection of cable pulling, cable laying, cable insulating, cable termination, Installation, cable

    tray/ conduit, stanchion, Air line piping, impulse line and tubing testing or Inspection oftermination multi pair/ multi core cable from junction box to field instrument and equipments.

    SCOPE OF WORK

    Prepared all Quality Control Inspection Plan and all construction method, method of material

    control.

    Handling and storage, safety plan, quality control plan, method of test, Inspection with testmedium and equipment, test and Inspection format to be used. Inspection of all Electrical &

    Instrument equipment.Preparation of method statement as per project specification, attend QA/QC meeting with theClient, site quality control supervision and Surveillance, Compilation of quality record, auditing

    verification and follow up corrective actions and checked conformance of sub-contractors work

    with the project specification.

    Electrical/Instrument works, Instrument calibration,cable testing, cable puling, & cabletray/conduit inspection and power systems, lighting grounding, Fire Alarm, communication,

    telephone and Catholic protection, looking all over Electrical works for construction side. all

    Electrical & Instrument inspection as per the procedur and specification,code and standards usedon side IEEE, IEC, ANSI, NEMA, NEC, NESC, API, IPCEA, UL, ISA, NEPA and or Vander

    standards.

  • 7/31/2019 cvmsajida

    3/6

    Company : C.C.C OMANDuration : 16thNov. 2004 to 28th Feb. 2006Project : Shohar Refinery Plant Projects

    Designation : QA/QC Inspector E & I

    DUTIES & RESPONSIBILITIES

    Responsible for the Inspection of al Electrical & Instrument equipment & Trouble shooting of DCElectrical system, Generator panels system, Engines related Electrical system gauges, Starter,

    Monitor and alternator small vessel system, Inspection of all Electrical receiving material,

    Inspection of all Electrical receiving and distribution systems and other Electrical process

    equipment, Industrial Electrodes, HV/LV Transformer, switches gears DC power supplier, UPS,DCS, HV/ LV, Motor & Generator in the field of Construction in petrochemical plant.

    Inspection of main control center, capacitor power transformer & protection UPS Battery charger

    protection relay, MV Cable & Electro mechanical, speed sensor, sway detector, control valves withregulator, Use of Econ meter, Mono relay, lode cell, movement alarm resistance, thermometer,

    Taco meter, Oscilloscope, Phase sequence meter, Galvanometer etc.

    Inspection of Installation conduit, cable tray, cable laying, form junction box to field instrumentand field junction box to (IB) as per project specification Area classification requirement.

    Installation and termination of multi pair cable/ multi core cable from RIE to junction box and

    secondary cable junction box to field instrument.

    Continuity meggering with Client witnessed.Witness Hydro test on Impulse line/ tubing & Air line.

    Review and check complete plan to meet the right Installation and standard required procedure.

    Prepare daily accomplishment report & filling of all related document.

    Company : Saudi Ojer (K.S.A)Duration : 05th March 2002 to 20th Sep. 2004

    Project : Sabic & Royal Commission

    Designation : QA/QC Inspector E & IDivision : Construction work

    DUTIES & RESPONSIBILITIES

    Responsibilities of all Electrical & Instrument site inspection as per inspection test plan (ITP)

    Preparation of punch list supporting with subcontractor and Client, daily QC Surveillance report toQA Manager day by day, Inspection all construction activity and witness Calibration of Electronics& Pneumatics transmitter like FT, LT, TT, PDT, I/P and Indicator, level troll & Interface level troll

    and different types of gauges and switches testing of ESD Valves, SOV, control vale to check all

    Installed Instrument in there correct (Installation and location/ calibration) in accordance with thedrawing and projects specification. Re-work of Electrical/ Instruments like conduit, cable tray,

    cable laying and testing during construction and preparation of test report and QC record as per

    Client requirement, attend weekly QA/QC Introduction for improvement Quality on site Issue nonconformity report (NCR) to subcontractor, proper controlling of handover document and technical

    document for handover to Client.

  • 7/31/2019 cvmsajida

    4/6

    Company : FAFCO (K.S.A)Duration : 01st Dec. 1997 to 25th Dec. 2001

    Project : Uthmaniyah Gas Plant & Sadgum (Gosp-I & II)

    Designation : Site Supervisor (E & I)Division : Construction & Maintenance

    DUTIES & RESPONSIBILITIES

    To supervise construction activities according to project guide lines and Aramco standard.

    Preparation of Quality control document Implementation of Installation acceptance test,

    verification of Instrument loop drawings, Hookup drawing, ILD & P I D, Preparation of loopfolders and distribution to CCR or Supervised no of main power, arranging the necessary materials

    from the main store to sites & site store work with project site fabrication of support, junction box

    frame, bracket, stanchion and Installation of junction box, cable tray, conduit work and Instrumentstanchion, Instrument transmitters.

    Company : ISCO W.L.L.Duration : 20th Dec. 1994 to 13th Sep. 1997

    Project : Doha Power plant & Equate Ethylene PlantDesignation : Site Supervisor (E & I)

    Division : Construction & Maintenance

    DUTIES & RESPONSIBILITIES

    Supervised no of main power, arranging the necessary materials from the main store to sites & site

    store work with project site fabrication of support, junction box frame, bracket, stanchion and

    Installation of junction box, cable tray, conduit work and Instrument stanchion, Instrumenttransmitters. Secondary cable pulling, glanding, wiring, termination is in accordance with wiring,

    details drawing, cable and wires identification togged or identification as per project specificationand Air line, impulse line, tubing, compliance with the hookup, ILD/P &ID Drawing, Air line,

    Impulse line, tubing testing as project required with standards. All types of instrument work the

    check and review complete plan to right Installation of Electrical & Instrument.

    EXPERIENCE IN INDIA

    Company : ICB Ltd.

    Duration : 02nd May 1992 to 20th Nov. 1994Project : R.P.C.L HaziraDesignation : Site Supervisor (E & I)

    Division : Construction & Maintenance

    Company : PCT (I) Pvt. Ltd.

    Duration : 08th March 1989 to 28th July 1991

    Project : H.P.C.L ( A.P)Designation : Site Supervisor (E & I)

    Division : Construction & Maintenance

  • 7/31/2019 cvmsajida

    5/6

    DUTIES & RESPONSIBILITIES

    Inspection of hold/ witness/ review/ surveillance point assigned as per ITP for all ElectricalInstallation and construction work.

    Reviewing contracts, developing quality documentation, project specific quality plans, HSE Plans,Inspection and test plant, procedure, Risk and Job hazard Analysis for power industrial, Oil & gas

    and Petrochemical & refinery, technical submission during bids and after award of contracts.

    Overall responsibility for the implementations of the Quality control progress on the LNG Plant forall onsite and offsite construction and procurement surveillance activities.

    Responsibility for the management and coordination of the third party inspection contract and alliaisons with Client Inspector to ensure the timely of all certification permits to assist company

    facilitates License to operate.

    Provided monthly QA report of the project advising the status of the Quality control programs

    including problems areas with quality control certification and proposed action.

    Interview and provided recommendation to company for the hire deployment and coordination of

    all site QA personal, Supervisors, coordinate and provide effective leadership for all QA/QC

    Personal, lead and coordinate site construction audit.

    Ensure adequate inspection coverage for all site based QC activity including welder qualification,

    Electrical Qualification, Concrete testing, Pile Foundation testing, lifting and heavy Equipment

    Inspection, Soils/ Road, pavement equipment test and Hydro test.

    Well conversant with the project requirement of SHELL, KNPC (Kuwait National Petrochemical,

    RPMAA) (Re-Construction Project Mina Al-Ahmadi) and other oil field companies.

    Well conversant with all Electrical works, power systems (HV/LV)Lighting system, Earthing

    system, Cathodic protection, Telecommunication & Control of Fire systems.

    Advising the project Manager (E&I) of all project quality assurance and Quality control and HSE

    aspects and interface problems that effect the discipline operation of the project.

    Monitor the development, review, revision and issuing after approval for implementing the project

    Quality and project procedures.

    Review method statement/ Inspection and test plan and work pack to issued to client for

    compatibility with project specification and Quality systems Standards.

    Monitor and approve the reviews of Quality and HSE Related problems and verification that

    respective Nonconformance reports are action or Co-Ordinate on a frequent and effective basis.

    Assist project management team in ensuring that Document control is functioning and is effectiveto meet the contract requirement for the issued of Technical queries and concession.

  • 7/31/2019 cvmsajida

    6/6

    Supervise and control on a day-to-day basis the project QA/QC Surveillance activities and work.

    Develop checklist and perform contract compliance audit of major subcontractors.

    Carry out audit and assessments in according with company procedure and ensure that system

    defects are revealed and resolved.

    Liaise with clients QA Manager and respond to audits carried out by the Client. Monitorconstruction and installation activities such as manufacturing procedure 3 qualification etc.

    Arrange for the ongoing preparation of any project QA Dossier including spare parts and operation

    and maintenance manual, Handling over required by Client at the time of contract completion.

    Co-ordination with Client and consultant for getting Discipline acceptance certificate of

    provisional Acceptance of works.

    System complication and hand over to client according to schedule and project requirement, data

    base control through Win PCS, International latest Database program for system complication andHandover, fully knowledge of read, write and Updating all data in Win PCS, like DPL, MCPL,

    MCC, MC, PSC, IRFSU, HOP & RFSU.

    Date :

    _ MD SAJID ALAMPlace : Mumbai Signature of Applicant

    Cell no:-+91-9967134180