CVFPB Meeting June 28, 2013 USACE INSPECTION RESULTS Ryan Larson
6
US Army Corps of Engineers BUILDING STRONG ® CVFPB Meeting June 28, 2013 USACE INSPECTION RESULTS Ryan Larson
description
CVFPB Meeting June 28, 2013 USACE INSPECTION RESULTS Ryan Larson. Knights Landing – Service Area 6 - Yolo Bypass West. - PowerPoint PPT Presentation
Transcript of CVFPB Meeting June 28, 2013 USACE INSPECTION RESULTS Ryan Larson
US Army Corps of EngineersBUILDING STRONG®
CVFPB Meeting June 28, 2013
USACE INSPECTION RESULTS
Ryan Larson
BUILDING STRONG®
Knights Landing – Service Area 6 - Yolo Bypass West
BUILDING STRONG®
BUILDING STRONG®
Unwanted Vegetation Growth
Sod Cover
Encroachments
Closure Structures
Slope Stability
Erosion/Bank Caving
Settlement
Depressions/Rutting
Cracking
Animal Control
0 50 100 150 200 250
Knights Landing - Service Area 6 - Yolo Bypass West Unacceptable Points
Unacceptable RedUnacceptable Yellow
Number of Points