CV

19
1 Name Ahmed Mahmoud Fawzy, PMP Page 1 of 13 2 Years of Experience 11 years 3 Position Instrumentation and Control Engineer (I&CA) /Project Engineer/Project coordinator 4 Nationality Egyptian 5 Birth Date 13 December 1983 6 Contacts 0097470167785-00201113668262 7 Email [email protected] 8 Language - Arabic - English 9 Academic Qualificatio n B.S.C in Industrial Electronics, Electrical, instrumentation, control and SCADA system Academic Degree Date Certified Name of Institution Country Very good 2005 University of Menoufia, Egypt 10 Organization s PMI Membership Member ID 446881 Engineering & Consulting Offices Accrediting Committee State of Qatar Syndicate of Egyptian Engineers Certificatio ns PMP Certified, PMI - USA, License Number: 1930934 11 Training - PMP Course by (Al Darayn Academy online) - Online Primavera Course P6. R8 - Online Microsoft project 2016. - Etap14.1 power system. - Functional safety (SIL) in the process industry by (KROHNE Academy online) - Basics of Explosion Protection by (KROHNE Academy online) - Pipeline leak detection by (KROHNE Academy online) 1

Transcript of CV

Page 1: CV

1 Name Ahmed Mahmoud Fawzy, PMP Page 1 of 13

2 Years of Experience 11 years

3 Position Instrumentation and Control Engineer (I&CA) /Project Engineer/Project coordinator

4 Nationality Egyptian

5 Birth Date 13 December 1983

6 Contacts 0097470167785-00201113668262

7 Email [email protected]

8 Language- Arabic- English

9

Academic Qualification

B.S.C in Industrial Electronics, Electrical, instrumentation, control and SCADA system

Academic Degree Date Certified Name of Institution Country

Very good 2005 University of Menoufia, Egypt

10 Organizations PMI Membership Member ID 446881

Engineering & Consulting Offices Accrediting Committee State of QatarGrade: BSyndicate of Egyptian Engineers

Certifications PMP Certified, PMI - USA,License Number: 1930934

11

Training

- PMP Course by (Al Darayn Academy online)- Online Primavera Course P6. R8- Online Microsoft project 2016.- Etap14.1 power system.- Functional safety (SIL) in the process industry by (KROHNE Academy

online)- Basics of Explosion Protection by (KROHNE Academy online)- Pipeline leak detection by (KROHNE Academy online)

1

Page 2: CV

12 Key Experience to the Project

Deep understanding of Water treatment and wastewater treatment process, including

good control and desalination plants.

Control, SCADA system and Instrumentation equipment’s technical supplier submittal

review with the reference to contract documents.

Design and supervision for irrigation control system (irrigation controllers, irrigation

control cable routings, Loop diagram, communication system, irrigation control

center).

Estimating for electrical, instrumentation and control works.

Studying of Technical Offers and evaluation (Electrical & Automation works)

Inspection of materials and equipment’s` in accordance with approved specs,

drawings and contract condition, and requirements.

Very good experience with Instrumentation related to Water industry.

Design and review piping and instrumentation diagram P&ID with details according to

ISA standard

Design and review loop diagram and block diagram according to ISA standard

Review workshop drawing for Electrical, control panels, and local control box

according to ISO standard

Field experience including Start-Up, Commissioning, and As-Built activities

Experience in writing Instrumentation and Control Specifications

Supervised several Engineers and Designers.

Involved in all stages of projects; from Initiation until the Closing of projects.

Developed schedules and cost estimation, Bill of Material, P&IDs, Cable & Wire

Schedule, I/O List, Instrument Index, Logic Diagrams, and Block Diagrams.

Monitored day-to-day activities of projects to ensure safety and compliance to codes

and standards

Design fiber optic cables route and supervision on construction works

2

Page 3: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

August-2015 Present Senior, I&CA(Design and supervision)

Louis Berger International

QATAR: -ASHGHALAl Dhakhira Project includes the following: -- Sewage Treatment plant

56,000m3/day SBR Technology- Transfer pump station TPS.

- Modification in PS-K pump station and pipeline bet. it

Design review P&ID and philosophy of operations

Design review Electrical works (MCC/VFD/soft starter panels, transformer/ LVDB panels, control PLC/HMI and SCADA system and instrumentation) design and technical submittal.

Design review SCADA Systems/MIMIC art-work.

Design Review Fire Alarm system.

Design reviewing Public address, access control system, Intercom system, BMs system, CCTV system, voice and data system.

Design review interlock system,logic diagrams, loop diagrams, block diagrams.

Design review Etap real time system.

Design review Fiberoptic cable layout drawings, linked budget calculation..

Supervision all above works.

3

Page 4: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

April 2015 July-2015 Senior I&CA (Design, Design Review, and Supervision)

Egyptian Group for Engineering Consultation EGEC (S.A.E), Egypt

Saudi Arabia and the Ministry of Housing Projects- Wadi El Dawaser – Infrastructure.- Mezneb – Badaei – Oqlat Al Soqour

Infrastructure.- Onaizah Infrastructure.(4 Water Tank 10000m3 &Pump Station -4, Irrigation Tank 2500 M3& Pump Station, Irrigation Control System for Irrigation Network,4 Sewage Pump Station)

Preparing complete design of control system, SCADA system and Instrumentation for Sewage, Water and Irrigation pump station.

Preparing Bill of Quantity.

Irrigation control system for all landscape.

Preparing the Control and SCADA Specifications.

Preparing SCADA architectural drawings.

Preparing instrumentation data sheet.

KSA-Ministry of Water and Electricity- Yuksel Insaat Saudi Co. Ltd. - Doga Dam Pump station 20,000 m3/day

Preparing Piping and Instrumentation Diagram.

Preparing SCADA Architectural drawing.

Preparing Instrumentation List.

Preparing Bill of Quantity.August 2013 April 2015 Senior I&CA

(supervision Electrical and Automation system)

ARTELIA GROUP (SOGREAH GULF) Consultant Engineer, KSA

KSA-National Water Company NWC RiyadhManfouha Sludge Dewatering Centrifuged Plant (4 centrifuges Line / 24hrs / 7 days in operation; Treat 8000 m3 sludge/day @ 3% DM)

Supervision for all installation for electrical works, instrumentation, and control in this plant.

Review and approve all electrical and instrumentation devices will use in this plant.

4

Page 5: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

Review As-built drawing of Electrical works (MCC panels, LVDB panels, Transformer, RMU, control and SCADA system and instrumentation).

Review SAT test for SCADA System

Review PLC programming and HMI pages.

Reviewing SCADA pages and SCADA reports.

Review SAT test for control panels.

Review and test power and control cables.

Start-Up & Commissioning.

KSA-National Water Company NWC Jeddah) Abu ljadayel Co. for. Construction of Water. Operation and Maintenance (South Jeddah Pump Station Al humra main lift station24 Pump each one 1 m3/s (12 duties+12 standby)

Capacity 12 m3/s?

Preparing complete design of control system, SCADA system, and Instrumentation.

Preparing Input/output list for PLC configuration.

Preparing SCADA architectural drawings.

Preparing instrumentation data sheet.

Preparing P&ID with details.Qatar -Ashghal Al Dhakhira Plant (in bidding stage with QDVC contractor)

Prepare Design Basis Report for I&C Scope.

Prepare outline specifications to allow 5

Page 6: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

pump stations and modification PS “K” and pipeline between it)

the contractor to get prices.

Prepare BOQ for I&C scope.

Preparing P&ID.

Preparing instrumentation List.October 2011 April 2015 Senior I&CA (Part-

time Design Engineer)

Egyptian Group for Engineering Consultation- EGEC KSA

KSA- Military Industrial Corporation Water Treatment Plant (MIC) WTP

27000m3/day Waste-water Treatment Plant SBR

7500m3/day in KSA

Preparing complete design of control system, SCADA system, and Instrumentation

Preparing the Control and SCADA Specifications.

Preparing BOQ.

Preparing P&ID drawing.

Instrumentation list.

SCADA architectural drawings.

KSA- Ministry of Water and Electricity -Aljazeera Projects Company Trading & Contracting Qanuna water treatment plant with

capacity 18,000M3/d Yobba water treatment plant with

capacity 20,000M3/d.

Preparing complete design of Electrical, control system, SCADA system and Instrumentation.

Prepare tender Bill of Quantity BOQ.

Preparing Fire alarm design system

Preparing P&ID drawing.

Preparing input/output list for PLC configuration.

Instrumentation list.

SCADA architectural drawings.

6

Page 7: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

Design review for the control system and instrumentation technical submittal.

Design review for SCADA system technical submittal.

KSA- Royal Commissioning RC Yanbu Sewage, Irrigation, and Water

Pump station (C2, C-3 Contract) Yanbu Tama-road Storm Pump station

(1, 2)

Preparing complete design of control system and Instrumentation

Preparing P&ID, Loop diagram.

Preparing Instrumentation list.

Preparing control, Instrumentation and irrigation cables list.

Prepare complete irrigation control system for irrigation network.

February 2013 July 2013 Senior I&CA (Design Engineer)

Misr Consult Environment & Infrastructure Studios, Egypt.

EGYPT-Construction Agency for Potable Water and Wastewater (CAPW) Abo Owikel Water Treatment plant with

capacity 500,000 m3/day.

Preparing the Control and Instrumentation Tender Specifications

Prepare tender Bill of Quantity BOQ.

Preparing Instrumentation list.

Sudan- Minister of Environment and Water Utilities in Khartoum State GADAREF sewerage Treatment Plant

with capacity 100,000 m3/day and ten sewage lift station.

Preparing the Control and Instrumentation Tender Specifications

Prepare tender Bill of Quantity BOQ.

Preparing Instrumentation list.

February 2010 October-2011 Design I & C

Engineer (Part Time)Misr Consult environment & Infrastructure Studios, Egypt.

EGYPT-Construction Agency for Potable Water and Wastewater (CAPW) Orascom Construction Industries S.A.E

Review complete design of control system, SCADA system and Instrumentation.

7

Page 8: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

Raw water Intake and booster for 6 of October with capacity 1.7million m3/day.

Review Process and Instrumentation diagram (P&ID)

Preparing Instrumentation hook-up drawing.

Preparing Cable list and cable routing.

Preparing Make Material Take off

EGYPT-Construction Agency for Potable Water and Wastewater (CAPW) 6_October Wastewater Treatment Plant

with capacity (100,000m3/day). Extension Tanta Wastewater Treatment

Plant with capacity (90,000m3/day). Nemera Al Bassal Wastewater Treatment

Plant with capacity (8,000m3/day). Sanadded and Awlad Safi Wastewater

Treatment Plant with capacity (8,000m3/day).

Bilbes Potable Water Treatment Station WTP.

Hihea Potable Water Treatment Stations WTP.

Review complete design of control system, SCADA system and Instrumentation.

Design review for Control System technical submittal.

Design review for SCADA system technical submittal.

Design review for P&ID and Instrumentation technical submittal.

Reviewing control cable list and control cable routing.

Reviewing control room layout.

Reviewing MIMIC artwork layout.

Reviewing SCADA and HMI pages and reports.

Holding Company for WaterAnd Wastewater (HCWW) AL yossr desalination R.O water Stations

Preparing Control and Instrumentation Specifications.

8

Page 9: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

with capacity (15,000m3/day). Preparing the B.O.Q.

Preparing PLC, I/O list.

Preparing Instrument data sheet.

Review design and evaluation technical Submittal.

Septamber-2011

March-2013 Estimator/Design I & C Engineer

AL-MASHARIQ Trading and Contracting, KSA

Various Water Pump Stations & Waste Water Treatment Plants in KSA AL azizayia Water pump station and

deep well in Al-Khobar (in hand). Connect 20well with steel tank

@Dammam (in hand) AL-lethi Wastewater Treatment Plant

26,000 m3/d (bidding stage) Quonfiza Wastewater Treatment Plant

26,000 m3/d (bidding stage) Ras Alkher Wastewater Treatment Plant

Royal Commissioning “Ras Alker” (bidding stage).

Safwa Extension wastewater treatment plant 26,000 m3/d (bidding stage).

Contract #097-C73 Royal Commissioning (bidding stage).

preparing Technical submittal

Preparing the electrical, Control and Instrumentation Specifications

Preparing P&ID with details

Preparing cable list from to

Preparing cable routing

The preparing proposal offers.

Preparing the Control and Instrumentation Specifications.

Preparing P&ID with details.

Estimate cost for electrical, control and instruments items

Preparing complete design of control system, SCADA system, and Instrumentation

Preparing proposal offers

Preparing the Control and Instrumentation Specifications

Estimate cost for electrical, control and

9

Page 10: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

instruments items April 2009 October 2011 Design I&C EngineerEgyptian Group

for Engineering Consultant EGEC (Egypt-KSA)

EGYPT-Construction Agency for Potable Water and Wastewater (CAPW)

North Coastal 22-booster pump stations from Alex to Matrouh.

Abu-Talat Wastewater Treatment Plant (84,000m3/day).

Sheebin Al Qanater Wastewater Pumping Stations.

Madabegh Industrial Wastewater Treatment Plant 30,000m3/d.

Preparing complete design of control system for retrofit 22 booster pump station, SCADA system, and Instrumentation

Preparing the Control and Instrumentation Specifications

Design review for technical submittal, P&ID, Loop Diagram.

Inspection of all Instrumentation, control panels, Local Control Box, SCADA System.

Holding Company for WaterAnd Wastewater (HCWW)

National Project (250Village “Booster Pump station and Wastewater Treatment Plant”)

Extensions New Asyut Potable Water Treatment Plant.

Preparing complete design of control system for retrofit 22 booster pump station, SCADA system, and Instrumentation

Preparing the Control and Instrumentation Specifications

Design review for technical submittal, P&ID, Loop Diagram.

Inspection of all Instrumentation, control panels, Local Control Box, SCADA System.

KSA- Royal Commissioning RC

Jubail Wastewater, Irrigation and Water

Preparing complete design of control system and Instrumentation

10

Page 11: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

Pump station RC-Task 14(C25, C-26, and C-27).

Jubail wastewater Pump station RC-Task 10.

Jubail Irrigation pump station and irrigation network RC-Task 5).

Preparing P&ID, Loop diagram.

Preparing Instrumentation list.

Preparing control, Instrumentation and irrigation cables list.

Prepare complete irrigation control system for irrigation network.

Holding Company for WaterAnd Wastewater (HCWW)

EL Sheik Zowayed RO desalination pump station (5000m3/d).

Rafah desalination RO Water pumps station (5,000m3/d)

EL Arish(1) desalination RO Water Pump station (5,000m3/d)

EL Arish(2) desalination RO Water Pump station (5,000m3/d)

Extensions Tibia Potable Water Treatment Plant (400) Littre/s

Review complete design of control system, SCADA system and Instrumentation.

Design review for Control System technical submittal.

Design review for SCADA system technical submittal.

Design review for P&ID and Instrumentation technical submittal.

Reviewing control cable list and control cable routing.

Reviewing control room layout.

Reviewing MIMIC artwork layout.

Reviewing SCADA and HMI pages and reports.

EGYPT-Construction Agency for Potable Water and Wastewater (CAPW) ELShrouk Wastewater Pump Station

Review complete design of control system, SCADA system and Instrumentation.

11

Page 12: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

(60,000) m3/day Katamdy Wastewater Pump Station

(80,000) m3/day Extensions Dumyat water Treatment

Plant.

Design review for Control System technical submittal.

Design review for SCADA system technical submittal.

Design review for P&ID and Instrumentation technical submittal.

Reviewing control cable list and control cable routing.

Reviewing control room layout.

Reviewing MIMIC artwork layout.

Reviewing SCADA and HMI pages and reports.

August 2007 March 2009 Design office Automation Engineer

Research and Development Technology R&D TECH (System Integrator to Schneider electric)

Various Water Pump Stations, Lifting pump station, irrigation pump station, Waste Water Treatment Plants WWTP and Water Treatment Plant WTP in Egypt.

Preparing single line diagram

Preparing MCC schematic drawing and internal and external layout

Preparing power and control cables list

Preparing P&ID according to ISA standard.

Preparing block diagram and loop diagram according to ISA standard.

Preparing Input/output list.

Preparing makeup sheet.

Programming Modicon Micro, Premium PLC.

12

Page 13: CV

Name Ahmed FawzyPeriod (month/year) Designation:

PositionEmployer’s Name and Address

Project Name and Description Duties and ResponsibilitiesFrom To

Drawing schematic drawing as per ISO standard.

Prepare submittal offer for MCC panel, electrical cable, control and instrumentation.

Supervision of manufacturing in factoryDecember 2006August 2007 Site Electrical

EngineerArab Contractors, Egypt

Holding Company for WaterAnd Wastewater (HCWW) Bihwash potable water treatment Plant

WTP 50 Little/s.

Start up and commissioning.

Operation and maintenance.

December 2005December 2006

Site Electrical Engineer

International Environmental Technologies Co “INTECH”, Egypt.

Holding Company for WaterAnd Wastewater (HCWW) El-Salaa Water Treatment Plant WTP

50little/s.

Start up and commissioning.

Operation and maintenance.