CURRICULUM VITAE Curiculum Vitae 1 Name: Adi Wikanto Position for this Assignment: Stucture & Foundation Engineer Nationality: Indonesia Contact information: 0813.6003.0168 or 0852.7058.1688 Adrres: Jl. Sei Padang No.117 Medan - SUMUT Language Skills: Indonesia English Educational and other Qualifications: Civil Engineering,Diponegoro of University (UNDIP),1995 Members ATAKI ( Assosiasi Tenaga Ahli Kontraktor Indonesia ) HAKI ( Himpunan Ahli Konstruksi Indonesia ) HASTAG ( Himpunan Ahli Struktur Tahan Angin & Gempa Indonesia ) Summary of Experience: On April 2000 as Project Coordinator Structure on Refenery in PALMINDO in KIM 2 Belawan Medan in PT.SIS . In this project we know lot of aspect how to coordinate Design Expert, from survey up to constructions. Investigation Test and Building Sub Structure Analysis for Storage Tank Foundation on Pelitung – Dumai District property of PT. Kawasan Industri Dumai (KID) WILWAR GROUP, Structure Engineer on Detail Engineering Design for Palm Oil Storage Tank Facilities in Dumai Port. Relevant Experience (From most recent): Period: From – To Name of activity/ funding organisation: Job Title and Activities undertaken: February 10 th , 2012 –May 20 th , 2012 Structure & Foundation Engineer on Pengadaan & Pemasangan Kubikel 20 KV dan Penyempurnaan Bay Trafo 150 KV serta Pemasangan Trafo 60 MVA 150 KVA/20 VA di GI Tebing Perbaungan Kab.Sedang Bedagai PLN UPT SIANTAR Purposed and giving guidance to Personnel in administration and finance. Preparing project administration , letter of agreement with client, and. Always braid communication with Owner November 10 th , 2012 – February 20 th , 2012 Structure & Foundation on Pengadaan & Pemasangan Kubikel 20 KV dan Penyempurnaan Bay Trafo 150 KV serta Pemasangan Trafo 60 MVA 150 KVA/20 VA di GI Sibolga PLN UPT SIANTAR Purposed and giving guidance to Personnel in administration and finance. Preparing project administration , letter of agreement with client, and. Always braid communication with Owner February 10 th , 2012 –May 20 th , 2012 Structure & Foundation Engineer on Pengadaan & Pemasangan Kubikel 20 KV dan Penyempurnaan Bay Trafo 150 KV serta Pemasangan Trafo 60 MVA 150 KVA/20 VA di Lamhotma Medan Labuhan PLN UPT MEDAN Purposed and giving guidance to Personnel in administration and finance. Preparing project administration , letter of agreement with client, and. Always braid communication with Owner

description

moga bermanfaat

Transcript of CV SKA Struktur

CURRICULUM VITAE

Curiculum Vitae 1

Name: Adi Wikanto Position for this Assignment: Stucture & Foundation Engineer Nationality: Indonesia Contact information: 0813.6003.0168 or 0852.7058.1688 Adrres: Jl. Sei Padang No.117 Medan - SUMUT Language Skills: Indonesia

English Educational and other Qualifications: Civil Engineering,Diponegoro of University (UNDIP),1995

Members ATAKI ( Assosiasi Tenaga Ahli Kontraktor Indonesia )

HAKI ( Himpunan Ahli Konstruksi Indonesia ) HASTAG ( Himpunan Ahli Struktur Tahan Angin & Gempa

Indonesia )

Summary of Experience: On April 2000 as Project Coordinator Structure on Refenery in PALMINDO in KIM 2 Belawan Medan in PT.SIS . In this project we know lot of aspect how to coordinate Design Expert, from survey up to constructions. Investigation Test and Building Sub Structure Analysis for Storage Tank Foundation on Pelitung – Dumai District property of PT. Kawasan Industri Dumai (KID) WILWAR GROUP, Structure Engineer on Detail Engineering Design for Palm Oil Storage Tank Facilities in Dumai Port. Relevant Experience (From most recent): Period: From – To Name of activity/ funding

organisation: Job Title and Activities undertaken:

February 10th, 2012 –May 20th, 2012

Structure & Foundation Engineer on Pengadaan & Pemasangan Kubikel 20 KV dan Penyempurnaan Bay Trafo 150 KV serta Pemasangan Trafo 60 MVA 150 KVA/20 VA di GI Tebing Perbaungan Kab.Sedang Bedagai PLN UPT SIANTAR

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

November 10th, 2012 –February 20th, 2012

Structure & Foundation on Pengadaan & Pemasangan Kubikel 20 KV dan Penyempurnaan Bay Trafo 150 KV serta Pemasangan Trafo 60 MVA 150 KVA/20 VA di GI Sibolga PLN UPT SIANTAR

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

February 10th, 2012 –May 20th, 2012

Structure & Foundation Engineer on Pengadaan & Pemasangan Kubikel 20 KV dan Penyempurnaan Bay Trafo 150 KV serta Pemasangan Trafo 60 MVA 150 KVA/20 VA di Lamhotma Medan Labuhan PLN UPT MEDAN

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

CURRICULUM VITAE

Curiculum Vitae 2

Oktober 10th, 2011 –January 20th, 2012

Structure & Foundation on Pengadaan & Pemasangan Kubikel 20 KV dan Penyempurnaan Bay Trafo 150 KV serta Pemasangan Trafo 60 MVA 150 KVA/20 VA di Leung Bata Banda Aceh PLN UPT BANDA ACEH

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

10 Maret 2006 Structure & Foundation Engineer on Soil Investigation Bailey Bridge Abutment are 6 (six) sites in Simeulue Island CONCERN

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2009 – July 16th, 2011

Structure & Foundation Engineer on Detail Engineering Design of Construction for Puskesmas SIKABUin Pariaman, West of Sumatera AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2009 – July 16th, 2011

Structure & Foundation Engineer on Detail Engineering Design of Construction for Puskesmas PADANG ALAI in Pariaman, West of Sumatera AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2009 – July 16th, 2011

Structure & Foundation Engineer on Detail Engineering Design of Construction for Puskesmas KOTA BANGKO in Pariaman, West of Sumatera AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2009 – July 16th, 2011

Structure Engineer on Detail Engineering Design of Construction for Puskesmas PAUH KAMBA in Pariaman, West of Sumatera AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2009 – July 16th, 2011

Structure & Foundation Engineer on Detail Engineering Design of Construction for Puskesmas BATU BASA in Pariaman, West of Sumatera AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2009 – July 16th, 2011

Structure & Foundation Engineer on Detail Engineering Design of Construction for Puskesmas S.GERINGGING in Pariaman, West of Sumatera AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2009 – July 16th, 2011

Structure & Foundation Engineer on Detail Engineering Design of Rehabilitation of BAPPEDA in Padang, West of Sumatera

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

CURRICULUM VITAE

Curiculum Vitae 3

UNDP

Always braid communication with Owner

Mei 1th, 2008 – November 1th, 2008

Structure Engineer on Detail Engineering Design of Reconstruction of Sub District LOLOMATUA in Teluk Dalam, West of NIAS AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 1th, 2008 – November 1th, 2008

Structure Engineer on Detail Engineering Design of Reconstruction of Sub District LOLOWAU in Teluk Dalam, West of NIAS AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 1th, 2008 – November 1th, 2008

Structure Engineer on Detail Engineering Design of Reconstruction of Sub District AMANDRAYA in Teluk Dalam, West of NIAS AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 1th, 2008 – November 1th, 2008

Structure Engineer on Detail Engineering Design of Reconstruction of Sub District LAHUSA in Teluk Dalam, West of NIAS AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 1th, 2008 – November 1th, 2008

Structure Engineer on Detail Engineering Design of Reconstruction of Sub District GOMO in Teluk Dalam, West of NIAS AUSID

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

November 14th, 2005 –January 20th, 2006

Structure Engineer on the Fishponds Rehabilitation in the Jeumenang, Pasi Lhok, Lancang Villages, Kembang Tanjung Sub District , Pidie District, Nanggroe Aceh Darussalam Province FRENCH RED CROSS

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

19 Juli 2005 - 20 November 2005

Structure Engineer on Mapping and Basic Data Revisi dan Updating Data Peta Dasar Kota Medan Skala 1 : 1.000 dan 1 : 5.000 Urban and Building Planning Agency – Medan City

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Mei 17th, 2005 – July 16th, 2005

Structure Engineer on Detail Engineering Design of Reconstruction for Nursing School in Meulaboh Nanggroe Aceh

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

CURRICULUM VITAE

Curiculum Vitae 4

Darussalam Province WORLD RELIEF

Always braid communication with Owner

Maret 5th, 2005 – March 12th, 2005

Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Developing of Telkomsel Tower be located in I Jalan Pintu Air Silaen PT. FAJAR ADHISURYA PERKASA

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

March 2nd, 2005 - Maret 15th, 2005

Structure Engineer on Design Certification and Documentation of UNHCR Permanent Housing Solution for Tsunami Victim in West Coast Aceh Nanggroe Aceh Darussalam Province United Nation High Commissioner for Refugees (UNHCR)

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

7 Februari 2005 – 12 February 2005

Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Developing of Telkomsel Tower be located in Damuli Kabupaten Labuhan Batu PT. FAJAR ADHISURYA PERKASA

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

2 February 2005 – 5 February 2005

Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Developing of Mesjid Al-Falah Tower be located in Jalan Murni Medan Mesjid Al-Falah - Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Oktober 3rd, 2004 – October 2004

Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Developing of Private House in Citra Garden on the B3 Nomor 18, 20 dan 22 Position be located in Jalan Jamin Ginting (Ex. Kavalery) Medan Citra Garden

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Sep 17th, 2004 – Oct 30th, 2004

Structure Engineer on Topografi Survey for Developing 240 Ha area Property of PT. Karya Panca Sakti Nugraha in Sampali Percut PT. KARYA PANCA SAKTI NUGRAHA

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

14 Sep. 04 Structure Engineer on Soil Investigation Test for Developing for Building Sub Structure Design of Steam Electrical Power

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

CURRICULUM VITAE

Curiculum Vitae 5

Resources (PLTU) with Capacity 3 x 35 MW in Belawan Sicanang Medan Belawan, PT. CAHAYA SAKTI

Always braid communication with Owner

September 12th, 2004 Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Developing of Crystal Square Hotel be located in Jl. Imam Bonjol No. 6 Medan Crystal Square Hotel

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

September 5th, 2004 Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Developing of Tear House Army Hospital be located in Jalan Putri Hijau Medan ARMY HOSPITAL

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

Agustus 5th, 2004 Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Development of Water Treatment Installation in Desa Klambir Hamparan Perak Sub District – Medan PT. TIRTA KREASI AMRITA

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

24 Okt 2003 – 22 December 2003

Structure Engineer on Roads Data Base Arrangement for All Sub District in Labuhan Batu District Settlement and Regional Infrastructure Agency - Labuhan Batu District

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

September 1. – November 30th, 2003

Structure Engineer on Project Construction Office Building Bank BNI Kabanjahe & Belawan, North Sumatera Bank BNI Kanwil I Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner September 26. – December 5th, 2003

Structure Engineer on City Facilities and Infrastructure Digital Mapping in Payakumbuh City, West Sumatera Board of Regional Development Planning - Payakumbuh City

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

CURRICULUM VITAE

Curiculum Vitae 6

July 18th, 2003 – October. 12th, 2003

Structure Engineer on Project Manager on Composing the Concept of Medan City Waste Water Developing and Optimalization Medan Metropolitant Housing Infrastructure Upgrading Sub Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

April 25th, 2003 –Juni 23th, 2003

Structure Engineer on Project Manager for Composing the Environment Management Effort and Environment Monitoring Effort for Development and Operational Management Of INDODES Packaging Drinking Water PT. Sumber Jadi Tirta Makmur Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

November 28th, 2002 Structure Engineer on Hydro Oceanography Survey & Mathematic Modeling for (Spreading of Heat, Wave, Current Pattern PLTU Labuhan Angin) PT. PLN (Persero) Proyek Induk Pembangkit dan Jaringan Sumut & Aceh

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

November 13th, 2002 – February 8th. 2003

Structure Engineer on Composing the Environment Impact Analysis for Development and Operational SUN PLAZA - Medan PT. Manunggal Wiratama

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner October 3rd 2002. –December 10th, 2002

Project manager on Study of the General City Spatial Planning for Kota Pinang Sub District. Settlement and Regional Infrastructure Agency of Labuhan Batu District

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

26 Agustus 2002 Structure Engineer on Soil Investigation Test and Building Sub Structure Analysis for Storage Tank Foundation on Pelitung – Dumai District property of PT. Kawasan Industri Dumai PT. KAWASAN INDUSTRI DUMAI ( WILMAR GROUP )

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

CURRICULUM VITAE

Curiculum Vitae 7

22 Juli 2002 Structure Engineer on Topography Survey and Mapping for Worker Housing Property of PT. BKR Dumai PT. BUKIT KAPUR REKSA ( WILMAR GROUP )

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

10 Juli – 3 Des. 2002 Structure Engineer on Study of the Environment Impact Analysis Rating School Development in Pangkalan Brandan Departement Comunication Trainning and Education Board Jakarta

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

10 Juni – 6 Sep. 2002 Structure Engineer on Composing the Environment Management Document of St. Elisabeth Hospital – Medan St. Elisabeth Foundation Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner 9 Agt. – 5 Okt. 2001 Structure Engineer on Composing

the Environment Impact Analysis for Off Shore Sea Sand Exploitation in Pintu Air Pangkalan Susu Area - Langkat Distric and Bagan Kuala - Tanjung Beringin Area Deli Serdang District – North Sumatera Province PT. Rahmad Nauli Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

3 Juli – 28 Okt. 2001 Structure Engineer on Composing the Environment Impact Analysis for Special Port and Container Terminal Development in Tualang - Perawang Sub Distric Siak Distric Riau Province PT. Perawang Kemasindo Perkasa

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

9 April – 23 Mei 2001 Structure Engineer on Composing the Environment Management Effort and Environment Monitor Effort Document for Haji Hospital Haji Hospital Foundation Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

12 Feb. – 13 Maret 2001 Structure Engineer Composing the Environment Management Effort and Environment Monitor Effort Document for Vina Estetica Hospital – Medan Vina Estetica Hospital Foundation Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

CURRICULUM VITAE

Curiculum Vitae 8

14 Nop. – 13 Des. 2000 Structure Engineer on Composing the Environment Management Effort and Environment Monitor Effort Document for Horas Insani Hospital – Pematang Siantar PT. Horas Insani Hospital Pematang Siantar

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

28 Agt. – 18 Des. 2000 Structure Engineer on Composing the Environment Impact Analysis for Tanjung Pinang Port Development PT. Pelabuhan Indonesia I - Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

29 Juli – 24 Nop. 2000 Structure Engineer on Composing the Transmigration Settlement Unit Planning and Technical Road Planning on Settlement Unit 1 and 3 Sibagindar - Dairi District Transmigration Project – North Sumatera

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

23 Maret – 31 Des. 2000 Structure Engineer on ISO 9002 Certification Consultancy on Material Shipping in Belawan Port and Shipping Servicing in Pekanbaru and Tanjung Pinang Port. PT. Pelabuhan Indonesia I - Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

9 Feb. – 8 Mei 2000 Structure Engineer on Detail Engineering Design (DED) SPL-OECF INF-23LG Tebing Tinggi City Public Work Agency of Tebing Tinggi City -

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

14 Des. 1999 – 14 Maret 00 Structure Engineer on Detail Engineering Design for Communication and Road Development in the South Tapanuli South Tapanuli Communication and Road Development Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

14 Sep. 1999 – 26 Agt. 2000 Structure Engineer on Soil Investigation Test and Building Sub Structure Analysis for Storage Tank Foundation on Pelitung – Dumai District property of PT. Kawasan Industri Dumai PT. Kawasan Industri Dumai ( WILMAR GROUP )

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

CURRICULUM VITAE

Curiculum Vitae 9

14 Sep. 1999 – 2 November 1999

Structure Engineer on Soil Investigation Test for Building Sub Structure Design on Developing of Building Sub Structure Design of Palm Oil Expeller dan Refinery Plant in Dumai Port PT. SMART CORPORATION

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

14 Sep. – 18 Nop. 1999 Structure Engineer on Project manager on Study of the Environment Impact Analysis for Development for Dumai Refinery & Expeller PT. SMART Corporation PT. SMART CORPORATION

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

17 Maret – 9 Sep. 1999 Structure Engineer on Consultancy for Implementation of ISO 9002 in Belawan and Dumai Port PT. Pelabuhan Indonesia I - Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

10 Juli – 8 Sep. 1999 Structure Engineer on Project manager for Composing the Environment Impact Analysis for Tanjung Pinang Port Development PT. Pelabuhan Indonesia I - Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

30 Okt. 1998 – 15 Des. 1999

Structure Engineer on Detail Engineering Design for West and East Deli Serdang Area Drainage North Sumatera Settlement Infrastructure Upgrading Project (Loan ADB-1587 INO)

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

24 Agt. 1998 – 5 Feb. 1999 Structure Engineer on Detail Engineering Design for Palm Oil Storage Tank Facilities in Dumai Port. PT. Dumai Paricipta Abadi

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner Feb 9th, 1998. – March 10th, 1998

Structure Engineer on Hydrographic Survey in Port Basin in Lhok Seumawe Port property of PT. Asean Aceh Fertilizer with area 350.000 M2

PT. Asean Aceh Fertilizer

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

15 Jan. – 12 Feb. 1998 Structure Engineer on Topografi Survey for Developing 240 Ha area Property of PT. Karya Panca Sakti Nugraha in Sampali Percut Sei Tuan Deli Serdang Regency PT. Karya Panca Sakti Nugraha

CURRICULUM VITAE

Curiculum Vitae 10

18 Nop. 1997 – 15 Juni 1998

Structure Engineer on Composing the Environment Management Effort and Environment Monitor Effort Document for Private Port for PT. Hargas Industries Indonesia in Lhokjamin Kabupaten South Aceh District PT. Hargas Industries Indonesia

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

31 Juli – 27 Des. 1997 Structure Engineer on General Planning and Detail Planning for Siais Tourism Area in South of Tapanuli.

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

6 Sep. 1996 – 4 Maret 1997 Structure Engineer on General Planning for Pekanbaru, Kampar, Bengkalis, Riau Kepulauan Tourism Area and Detail Planning for Fungsional Tanjung Pinang, Siak, Pulau Bintan Functional Tourism Area Riau Province Riau Province - Tourism Development Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

1 Agt. 1996 – 10 Jan. 1997 Structure Engineer on Infrastructure and Facilities Planning on the Kuala Namo Area in Deli Serdang District North Sumatera Province Public Work Departement

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

4 Juli – 3 Agt. 1996 Structure Engineer on Detail Engineering Design for Fishing Processing Facilities in Malahayati Port PT. Afaqindo Segara Jakarta

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner 16 Mei 1996 – 10 Jan. 1997 Structure Engineer on

Construction Supervision on 600 HH Transmigration Settlement in Rawa Kolang I, II and Sibagindar Location and Road Rehabilitation in Teluk Panji North Sumatera Transmigration Settlement and Environment

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

27 Okt. 1995 – 12 Feb. 1996 Structure Engineer on Study of Cannel and Basin Dragging Optimizing in Dumai Port. PT. (Persero) Pelabuhan Indonesia I Medan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

CURRICULUM VITAE

Curiculum Vitae 11

22 Juni – 26 Okt. 1995 Structure Engineer on House Hold Plot of land. Planning in Rianiate, Sinunukan I, II, III, Sikara-kara and Batahan South Tapanuli District North Sumatera Transmigration Settlement and Environment

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

19 Juni – 13 Juli 1995 Structure Engineer on Construction Supervision for Development of 2 (two) Unit Breasting Dolphin and 2 (two) Unit Mooring Dolphin in Mariana Palembang PT. Sinar Alam Permai

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

20 Feb. – 11 Nop. 1995 Structure Engineer on Construction Supervision for Letung Port Developing in Letung Port – Riau Province Riau Second Port Facilities Development Sub Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

6 Feb. – 6 Juni 1995 Structure Engineer on Detail Engineering Detail for Under developing Village Infrastructure in South Tapanuli District (IDP-IDT-OECF) South Tapanuli District Under developing Village Infrastructure Supporting Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

3 Nop. – 1 Mei 1994 Structure Engineer on Construction Supervision for Sausapor Port Developing in di Sausapor Irian Jaya Irian Jaya Second Port Facilities Development Sub Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

3 Nop. – 1 Mei 1994 Construction Supervision for Fafanlap Port Developing in Fafanlap Irian Jaya Irian Jaya Second Port Facilities Development Sub Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

1 Nop. – 29 April 1994 Construction Supervision on Construction Supervision for Kabare Port Developing in Kabare Irian Jaya Irian Jaya Port Facilities Development Project

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

CURRICULUM VITAE

Curiculum Vitae 12

7 Okt. – 26 Okt. 1994 Construction Supervision on Detail Engineering Design for Development of 2 (two) Unit Breasting Dolphin and 2 (two) Unit Mooring Dolphin in Mariana Palembang ( WILMAR GROUP ) PT. Sinar Alam Permai

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

7 Sep. – 6 Okt. 1994 Construction Supervision on Topography and Bathymetric for Private Port property of PT. Karya Prajona Nelayan in Kuala Tanjung - Asahan PT. Karya Prajona Nelayan

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

6 Juni – 2 Nop. 1994 Construction Supervision on General Planning and Detail Planning for Pulau Sembilan Tourism Area - Langkat District North Sumatera Tourism Board

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner 15 Maret – 5 April 1994 Construction Supervision on

Feasibility Study for Green Sunggal Boulevard Housing in Medan PT. Spasio Selaras DEV

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner 12 Feb. – 12 Juli 1994 Structure Engineer on Planning

and Construction Supervision for Deli Permai Housing in Desa Deli Tua - Namorambe Deli Serdang District PT. IES Putra Jakarta

Purposed and giving guidance to Personnel in administration and finance.

Preparing project administration , letter of agreement with client, and.

Always braid communication with Owner

References:

(Name/Title/Organization/Contact Information – Phone; Email)

Declaration: I confirm my intention to serve in the stated position and present availability to serve for the term of the proposed contract. Adi Wikanto