CV SHAW Allan B. 2013_04 (1)

8

Click here to load reader

Transcript of CV SHAW Allan B. 2013_04 (1)

Page 1: CV SHAW Allan B. 2013_04 (1)

SHAW Allan B.

Married Status: DivorcedDate of Birth: 7 April 1939Nationality: British

Academic Qualifications: G.C.E “O” Levels in :Mathematics,Chemistry,English Lang,Physics and Art.

O.N.C. in Mechanical Engineering,Applied Heat and Electricity H.N.C in Mechanical Engineering.1 st Year

Health.Very Good

PLANTS WORKED ON

Gas and Oil separation F.C.C.UCrude and Vacuum Distillation RheniformingPlatforming Static and CCR C3 and C4 DimersolSulphur Recovery NPK Fertilizer.Chlorine Production Gas and Liquid LPG meroxComputerised Water Treatment BBC/Siemens/GE gas Turbines.HF Alkylation ParaxyleneVisbreaking Isomax.Phosphoric Acid Production ButamerKero and Naphtha Hydrotreating Penex and MolexMixed Xylene seperation NH3 productionClassroom Training Sulpholane ProductionOn the Job Training Acceptance tests Punchlisting Plants for Mech completion Advisor to clientsVessel and Tower Inspections Writing operating manuals. Salt water De-Salination Pand ID reviews Combined Cycle Heat Recovery Boilers. Inspection of plants and materialReverse Osmosis Water Treatment. Writing operating manualsClients Advisor for commissioningHydrogen Production (using the Benfield and Pressure swing Absorption systems) DCS control systems Siemens,Yokogawa Honeywell.

1955-1961 Leeds Gas Council – Technical AssistantTech Asst on all types of coal gas producing plants from Horizontal, Vertical and Water gas Plants.Three years in Laboratory quality control.

1961-1965 Bahrein Petroleum Co-Arabian Gulf-Refinery OperatorFully trained by Caltex in Oil refinery Techniques for Crude Distillation and the Fluid Catalytic Cracking Unit,and all related ancillary equipment.Trained member of the Fire Fighting team.Training of local operators.

1965-1966 ICI North Tees Aromatics Plant-Shift Supervisor Start-up of Sulpholane,Unifiner,Platformer,Water treating and Steam raising plants

1966-1968 Constructors John Brown England-Commissioning EngineerCommissioned experimental Hydrazine for Fisons Widnes.Eight months doing inspection at various companies in the UK on behalf of CJB.Trained by Kodak UK in X-Ray technology and reading X-Rays.Wrote the start-up manual for CJB’s Russian client for the ICI process Paraxylene plant.This manual included all the procedures related to this plant,which was then translated into Russian before presentation to the client in Moscow.Commissione experimental sewage treating plant in Portsmouth.

GORDON-GILL Co

2

Page 2: CV SHAW Allan B. 2013_04 (1)

SHAW Allan B.

1968-1968 Commissioning Eng for U.O.P. Des Plaines, Illinois, USAOn hire to UOP as a Commissioning Eng in Jeddah S Arabia for Start-up of a Naphtha Unifiner.Platformer,Merox.Kerosine Unifiner and Tank Farm.

1968 Commissioning Eng for Snam Progetti in Madras India.Plant check out,punch listing,Unit flushing, Heater dry outs Crude Vacuum. Kero desulphurization, and Hydrogen plant start-ups.

1969 Study Assignment Arklow Ireland Studying a Phosphoric Acid and Fertilizer production plant

1969-1971 Commissioning Eng for Dorr-Oliver, Sabac, YogoslaviaCommissioning/Senior process operator for Phosphoric Acid production, filtration and evaporation.NPK fertilizer production.

1971 Comm Eng for Didier Werke (of Essen) in Nevinnimyssk RussiaStart-up of NPK fertilizer plant with Prill towers(Stamicarbon Process).

1971 Homs, Syria for Snam Progetti of Italy. Commissioning of a Steam/Naphtha Reformer,CO and O2 scrubbing NH3. Production and liquefaction.

1971-1972 Kermanshah Iran for Continental Eng Holland. Punchlisting,start up programs Field supervisor during final construction. All pre commissioning,dryouts , catalyst loading.Start up of Crude, Merox, LPG,Unifiner,Platformer,Kerosine De sulphuriser,Water treating and Steam raising plants

1971 Homs, Syria for Snam Progetti. Commissioning of a Steam/Naphtha Reformer, CO and O2 scrubbing. NH3. Production and liquefaction.

1972-1973 BP Baglan Bay Wales UK Commissioning of a 1000 T/D Chlorine plant. Electrolysis of Brine. Chlorine drying, compression and liquefaction. Sodium Hypochlorite plant.

1973 Refinera de Meditterranea ,Milazzo Sicily Italy Start up of a Vacuum and FCCU plant. Gas compression Units.

1973 Liquichimica Augusta Sicily Start-up of an Hydrogen and OXO unit for Selas Holland

1973 Amoseas Oil Nafoora Libya Solar Gas Turbine operation for gas production and oil well re-injection

1973 Total Oil Refinery VlissengenHolland for Badger Co LtdPre-commissioning line flushing, catalyst loading heater dry-outs for Hydrobon, Platforming (CCR).Sulphur recovery and Amine Units

1974 Saras Chimica Sarroch Sardinia for Badger Co LtdPre-Commissioning and Start-up of a Mixed Xylene plant using Partial and Total Decomposers with Hydroflouric acid and Boron Trifluoride. Process License by Mitsubishi Japan.

1974-1975 6 Months contract for Provincial refining Co Ltd Newfoundland CanadaArea Supervisor on running plants, Naphtha and Distillate Hydrobons, Platformer and Sour water stripping Units.

1975 Start-up for Badger In W.Germany Wilhelmshaven Punch listing of the clients refinery process units and offsite facilities for mechanical completion.

1975-1976 Start-Up Eng for Irving Oil New Brunswick,CanadaStart up supervisor for commissioning of a Napha Hydro treater, Rheniformer and Hydro desulphurisation Unit.

1976-1978 2 year contract with Uhde W. Germany in Brega Libya

GORDON-GILL Co

3

Page 3: CV SHAW Allan B. 2013_04 (1)

SHAW Allan B.

Commissioning of Fire-Fighting Diesels, Harbour installation, Power Stations, emergency Diesels. Brown Boveri Gas turbines and Waste heat boilers. Instrument air and fresh water cooling system. Air Liquide Nitrogen plant. Start-up of Methanol and Ammonia plant. Asst Utilities manager and advisor to client for technical and operational equipment.

Kirkuk Iraq for Mannesmann W. GermanyPre commissioning and start-up of a 95.000 BPD gas and Oil separation unit

1978 Start Up for Lummus in Karlsruhe W Germany Start up of a Sulphur Recovery Unit and witnessing a Vacuum Distillation start up.

1979-1980 Start Up of a Water treatment processing Stations.South Africa.Fully computerised WT plants for 6X660 MW power plants, at Matla and Duvha. With condensate polishing and Ammonex injection systems.

1980-1981 Oostvorne Holland for Lummus at BP’s RefineryPunchlisting, line checking, line test witnessing,pre-commissioning and start up of the FCCU Unit. This unit had a waste gas turbo blower (for regen air) coupled to a steam turbine, and generation set.Operating training given.

1981-1982 Bourgas Bulgaria for KTI and Krupp Koppers.Start up of a Hydrogen Plant with a four bed PSA system. Sole advisor to client for the safe running and training of the clients personnel.

1982 QUAPCO Refinery,Quatar. Training local and Egyptian personnel how to operate a 50T/day Sulphur Unit with Pelletizing plant.

1982-1983 Abidjan West Africa for KTI.Start up of a Hydrogen plant with a 10 bed PSA unit. Training of locals mandatory.

1983-1985 Teaching Saudi Arabian Students in Latina Italy.9 months classroom training given in Maths.Physics, Chemistry and Mathematics of Refinery Processes and operational techniques .Use of Autodynamics Simulator for hands on . An additional 1 year actual “On the Job” training at Irom refinery Venice.

1985 Petromin Refinery Riyadh Saudi ArabiaWriting operating manuals and training cards for process operators and supervisory staff,for start up and running,shutdown, normal and emergency. Preparation for maintenance. Unit concerned, Isomax, Oxidiser, Atmospheric distillation,Water treatment (using membrane system) Centrifugal and reciprocating gas compressors.

1985-1987 Hellenic Aspropogus Refinery (HAR)GreecePreparations of training programs,giving technical assistance for theoretical and “On the Job Training”. Evaluating and preparing test papers, to process 250 new refinery operators. This was followed by training and preparing HAR,s process engineers to “Butt List” all piping and mechanical equipment in the units. Co-ordinate with all the various contractors and solve piping and piping problems that arose. Training of all personnel (HAR’s) to witness all hydraulic and pneumatic testing. This was followed by being an advisor to HAR for all precomissioning and commissioning activities.

1987 Nigerian National Pet CO Warri NIGERIAThree months classroom training given to senior process and operating personnel in the twelve major process units of NNPC’s Port Harcourt Refinery expansion in Nigeria. Plus an additional short course in vessel and tower inspection techniques. punch listing procedures and material specification. All pre-commissioning and commissioning activities.

1988-1989 Training of Nigerian Personnel at HAR’s Refinery in GreeceIn depth training on HAR’s C3 Dimersol plant.Training in use of Yokogawas DCS

1989-1990 Q8 Refinery Oostvorne Holland for Braun Transworld USA.Pre-commissioning and commissioning and start up of a UOP Platformer, Unifiner, Penex and Molex units

1990 Chongqing China.Combined cycle heat recovery plant for HIPDC.Site representative for Standard Fasel Lentjes (SFL) Holland.Responsible for pre/commissioning of 3X 65 T/Hr HRSG’s generating 41 barg with DCS control.

GORDON-GILL Co

4

Page 4: CV SHAW Allan B. 2013_04 (1)

SHAW Allan B.

1990 Hyvinkaa FinlandDistrict water heating system for IVD Finland.Commissioning of SFL boiler with a 4900 MW hot water storage. DCS control system.

1990 Chongquing ChinaSFL representative for performance testing of a combined cycle.

1991 Gubei Power Station Shengli Oil field ChinaCombined Cycle heat recovery plant for CNTIC.Site representative for Standard Fasel Lentjes of Holland.responsible for commissioning 2 X 66 T/Hr at 40 barg Boilers.

1991 Liao He Power station China HRSG’s for CNTIC commissioning of 2 X 60 T/Hr at 40 barg steam generating boilers.

1991 Guiness Brewery Dublin Eire. Start up and test run of a corner tube gas and oil fired boiler 35 T/Hr

1991 RRB States of Jersey Channel Islands. Advisor to Von Roll (Suisse) for start up of one incinerator powered boiler. 35 T/Hr with condensing sets and Deareator.

1992 Estfahan Iran for NPC 3 X 80 T/Hr gas and oil fired boilers precommisssioning and commissioning SFL Holland.

1992 Shell refinery Coryton UK (Vendor SFL) Précommisssioning and commissioning of a 1 X 130 T/Hr Waste Heat recovery. Boiler with supplementary gas firing. Heat source a frame 5 GT.

1992 Estfahan Iran for NPC (Vendor SFL)Pre-commissioning and commissioning of the clients third boiler. Optimising the BMS system and controls.

1992 Extraction of salt from L.Faiyum Egypt for MAN W.GermanyProcess co-ordinator for the operation of Utilities. Water treatment, clarification, demin plant Boilers Steam turbine and Cooling water systems.

1993 Thai Oil Pattaya Thailand (Vendor SFL)Pre-commissioning and commissioning of a waste heat recovery boiler for Chiyoda Japan (110 barg at 140 barg). Alkaline boil out carried out.

1994 BNFL Sellafield for NNC in the UKPrecommissioning and commissioning of a 35T/Hr Gas and oil fired Boiler using low NOX burners with a Peabody Burner management system.

1995 FINA Antwerp, Fuel Oil upgrading plantPrecommissioning and commissioning Flare, cooling water and fuel oil upgrading Unit using the Chevron process.

1995-1996 Nan-Pu Power station Kaohsiung TaiwanCommissioning of six HP and LP HRSG Steam Boilers heat sources 6 x 110 MW Siemens gas and oil fired GT’s. All precommissioning and commissioning carried out. Including Acid cleaning, steam blowing of boilers and loop checking. Identifying of problems and correcting process problems. Witnessing and optimization of boilers for performance testing. Training of locals mandatory.

1997 Gevudo refuse plant Dordrecht HollandCity waste disposal unit utilizing activated carbon and a DeNOx unit with ammonia injection.

1997-1999 Hsinta Power Station in Kaohsiung TaiwanAdvisor to Taiwan Power Company for the pre-commissioning and start up of 15 Boilers in a combined cycle operation. I was responsible for the safe start ups, precommissioning, liase with the Siemens software engineers for program changes that ensure smooth startups. I also represented NEM the boiler manufacturers Interests. Each of the 15 boilers had a LP steam production of 6.0 kg/sec at 5 barg. The HP steam production was 48 kg/sec at 70 barg and 538 celcius. The units had a heat recovery rate of 55

GORDON-GILL Co

5

Page 5: CV SHAW Allan B. 2013_04 (1)

SHAW Allan B.

MW/boiler and were fully automatic in start-up. I had in the last six months to carry out all warranty items on the boilers and pumps. This included the supervision of contract labour and design changes to ensure long life, of the boilers. I was also responsible for the performance testing of each boiler.

1999-1999 Te Rapa Hamilton New Zealand for Anchor Dairies On loan to Evans Deakin of Brisbane Australia, from Nem to start their HRSG and Auxiliary Boilers and Balance of plants. The steam was required for the continuous production of powdered milk from 5 million litres /day of milk. Plant consisted of a EGT 40 MW, gas turbine, HRSG with supplementary firing, with HP and LP steam. Demin plant and CW systems.

1999 TPC Kaohsiung Taiwan for repairing and modifying Divertors.Identifying and modifying divertors Unit 20 and 30, for good operation.

1999-2000 Commissioning Manager for NEM Holland in Surabaya IndonesiaResponsible for all Nem’s subcontractors and Nem’s equipment, at the Emdeki Calcium Carbide plant. Commissioning of the HRSG,cooling water, Demin plant, 9MW Solar gas turbine, Siemens 7 MW steam turbine and boilers with supplementary burners.

2000-2001 Mitsubishi Heavy Industries,Damhead Creek UK. Technical advisor to MHI for Nem’s, two HRSG boilers. HRSG’s consisted of HP/IP/LP steam, total plant output 800 MW’s

2001- Oct 01 Siemens Netherlands at Ataer Izmir Turkey.Commissioning of Balance of plants. Including Air Cooled Condenser, HRSG, closed cooling water systems. Responsible for the commissioning and pre-commissioning. Alkaline boil-out and steam blowing, and safe startup and handover to the client

Nov 01-Oct 04 Siemens Netherlands at Adana Turkey.Commissioning Manager responsible for the co-ordination and start-up of the combined cycle plants at IZMIR, CANAKKALE, ADANA and MERSIN (Turkey). Balance of Plant included, reducing stations, HRSG’s, cooling water systems, air, etc …. Steam blowing and bringing plants ready for start-up. Reliability runs and performance testing.Completed all four plants in Turkey,including performance tests etc.

Jan 05 – BP Hythe UKCommissioning Manager for Siemens Netherlands and Erlangen for the CHP plant. Presently in our reliability run and performance test program..Responsible for start up and running of the plants for the clients acceptance

Jan -July 05 Working in the SNL office on the finalization of the Turkey projects and procedures for the Mymensingh,Bangladesh combined cycle power plant of 76 MW,s

07/05 – 07/06 Mymensingh Bangladesh as Commissioning Manager for Siemens and Site manager for a short period. Responsible for planning and coordinating the steam blowing procedures and designing blow routing. All chemical dosing and chemical control commissioned. Test runs and performance testing carried out. Solving and troubleshooting the plant.Siemens PCS 7 software used.

09/06 – 09/07 Siemens Bangladesh Completion of hand-over to client. Initiated a training program for all the clients personnel. Classroom and in the field training given.

Compiled and structured a examination and testing procedure for final Evaluation for the client.

12/07 – 10/08 Working in MOERDIJK, Holland for SIEMENS AG as Commissioning Leader.

10/08 – 2010 Working in Dubai for NEM as Commissioning Leader / TFA for Hyundai Eng Korea. 3 years on the Commissioning and Technical Advising for 4 x HRSG,s and 1 x Gas /Oil fired Auxiliary Boiler.Repeat visits up to 2011 for troubleshooting and resolving problems.

12/2010 Commissioning an HRSG 1 (with CO burners) modification in Sohar Refinery Qatar for NEM (1 month)

06 /2011 Commissioning Rasgas Refinery Ras Laffan Boiler Qatar 1 retrofit for lowering NOX levels.

GORDON-GILL Co

6

Page 6: CV SHAW Allan B. 2013_04 (1)

SHAW Allan B.

08-09/2011 Petkim Rrefinery   Aliaga Turkey Commissioning of Heater Upgrades, including Air Pre-Heaters,Gas and Oil fired burners.Heater dry outs and commissioning for Heurtey France (1 month).Technical advisor to Petkim also.

10/2011 Qatar RASGAS Refinery Ras LaffanBoiler 2 retrofit with FGR (Flue gas recirculation) for Low NOX improvement.Gas fired Boiler for NEM.

12/11-01/12 NUR Power Plant Kulim,Penang Malaysia                      Technical field advisor for construction modifications and upgrades for four HRSG,s

05-07/12       Occidental,s Mukhaizna Oil fields Muscat Oman for NEM Hengelo HollandTFA (Technical field advisor ) for construction modifications for a Once through HRSG.Also NEM TFA for the commissioning.

08/12 NEM – Denizli, Turkey power station steam blowing

09/12 NEM – Oman – modifying HRSG 1 & 2

12/12-02/13 NEM – Denizli, Turkey power plant + Oman

02/13 NEM – Oman – 2 weeks in Mukhainza again for modifying & starting up HRSG 1

02-02/13 Denizli Turkey,HRSG,s (2) on a triple pressure boilers on combined cycle with 2x Siemens GT,s 280MW,s two HRSG,s and on 1 x Siemens steam turbine.Total output around 800 MW,s.Steam blowing and  ACC cleaning and bringing boilers online.

04/13 Mukhainza oil fields The Oman modifying a once through HRSG for steam injection into the wells.06/13 Denizli commissioning and testing for final handover to client.

GORDON-GILL Co

7