CV sample for a Data-Entry vacancy
-
Upload
mahmoud-elnaggar -
Category
Documents
-
view
14 -
download
7
description
Transcript of CV sample for a Data-Entry vacancy
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Curriculum Vitae
Personnel information:
Name: Moustafa Ibrahim Mahmoud
Nationality: Egyptian
Date of Birth: August 31st.
1951
Martial Status: Married
Current Occupation: Contracts General Manager
Company: Western Desert Operating Petroleum Co. (Wepco)
Site Location Head Office
Educational Records:
- B.SC. Science – Special Chemistry – June 1974
Faculty of Science
Alexandria University
- High Diploma in Management – 1988
Faculty of Commerce
Alexandria University
- Certified as Paint Inspector from ( NACE)
Employment Records:
From2004 up till now:
Contracts General Manager Setting Forth Business Plan for Contracts Division
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
- Ensuring proper application
of tendering & Contracting
Procedures
- Negotiating Terms &
Conditions Conflicts with
Contractors
- Highlighting Company’
Benefits of Renewing the
existing Contracts or issuing
new tenders
- Providing support to Contracts
Division Staff
- Reporting Progress Status of
Tendering & Contracting
Activities in the Course of
accelerating the process by
overcoming the bottle necks.
2002-2004: Exeprt General Manager and consultant to Mr
chairman for al hamra terminal and
technical affairs
1999-2002: Contracts A. General Manager
1996 – 1999 Support Services Manager
Warehouse Activities
Stock Control Activities
Marine Logistics & Maintenance
Administration & Personnel Activities
Training & Developing in-house Activities
Catering and Camping Activities
Cost Control Activities
1978 - 1996 Laboratory Research & Development,
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
at Abu Qir Natural Gas Fields
1976 – 1978 Alamein – Umbarka Crude Oil Fields
1975 – 1976 Misr Industrial Chemicals Co.
(Soda Ash Plant)
1974 – 1975 Steam Power Stations
(Water Treatment Plant)
Membership of Professional Societies :
Member of:
National Corrosion Engineers (NACE)
Egyptian Corrosion Society (ECS)
Career Development
Carrier Development has been directed to the research &
development concerning the following fields
Oil & Gas Chemical Additives
Reservoir PVT Studies
Process Simulation and Optimization of Crude Oil
& Natural gas Facilities
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Career Development had been directed to improve
Managerial and training skills where the under mentioned
courses & summits had been attended
Budget Concepts 1995
Top Management 1995
Decision making Process 1996
Management Development 1997
Crisis Management 1997
Globalization 1998
Strategic Planning 2001
Letter of Credits 2001
Negotiation Skills 2002
Internal Auditing 2003
Courses & Conference Attendance :
Gas–Liquid Chromatography Application in Oil & Gas Fields Norwalk N.Y.
(U.S.A.)
Advanced Management Skill from Middle East Management Center (U.K.)
Corrosion Control in Oil & Gas Plants - NACE (U.S.A.)
Coating & Paint Inspector –NACE (U.S.A.) & Vancouver (Canada )
PVT Reservoir Evaluation Core Lab. (U.S.A.)
Chemshare Process Simulation Application (U.K.)
Natural Gas Processing – CPS (U.K.)
Analytical Control Instrumentation Analysis in Gas Composition- (
Netherlands)
Annual Conference in Water Technology – Alexandria (Egypt)
Annual Petroleum Conference – Cairo (Egypt)
Training of Trainers and Developing in- house Training – IPR (U.S.A.)
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Oil and gas transaction : negotiating, contracting and dispute management –
universal network Intelligence (UNI) Cairo August 2007
Activities as a Lecturer, Trainer and Auditor:
Participating as a member for Wepco In-house Training Team
Effective Communications
Decision Making
Modern Management Techniques
Drafting contracts in the oil and gas fields
Chemical Additives in Oil & Gas Fields – KOC – Kuwait (1993)
Composition Model Approach of Abu Qir Gas Reservoir
Speaker in the (Thirteen Annual) Petroleum Conference –
Cairo 1994 (Egypt)
PVT and Reservoir modeling – Hassi Messoud – Algeria ( IHRDC )
1995
PVT and Reservoir modeling – Hassi Messoud – Algeria ( IHRDC )
1996
Sulfur sediments in Production tubing and scale problems in Oil and Gas
Production ( IHRDC SPC Jbessa Oil Fields, Syria ) ( 2000)
LNG Processing ( Rashipetco ) (2004)
Prepared and managed on site training program in safety awareness, fire
fighting and pollution control in petroleum facilities, for Syrian Petroleum
Co. newly employees.
Execute HSE auditing Programs and EIA, EIS studies for MOBIL Egypt.
Participated as a part time consultant and lecturer in Petrosafe (Petroleum
Safety & Environmental Services Co.)
Modern oil & gas marine terminal operations & Management Dubai UAE
January 2007.
Modern oil & gas marine terminal operations & Management Dubai UAE
March 2007.
Corrosion problems in oil-gas fields & corrosion monitoring systems
Petromaint Alex 2008
Contract a administration Doha Qatar May 2007.
Corrosion problems in oil gas fields & corrosion monitoring systems
Waste Water Treatment and Re-use Alex. February 2008.
Oil spill management & Beach cleaning Dubai UAE April 2008.
Oil spill management & Beach cleaning Kuala Lumpor Malaysia Nov. 2008.
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Modern oil & gas marine terminal operations & Management Dubai UAE
March 2009.
Oil Movement, Storage & Gauging in Oil Production and Refineries Cairo
October 2009.
Oil Movement, Storage & Gauging in Oil Production and Refineries Dubai
UAE APR 2010
Modern oil & gas marine terminal operations & Management
Canadian Nexen petroleum Yemen DEC. 2010
Oil Movement, Storage & Gauging in Oil Production and Refineries Dubai
UAE DEC. 2010
Oil Movement, Storage & Gauging in Oil Production and Refineries Dubai
UAE APR. 2011
Oil spill management & Beach cleaning Dubai UAE April 2011.
Oil spill management & Beach cleaning Dubai UAE JAN 2012
Corrosion Mechanism. and Risk Based Inspection (RBI). Dubai UAE
JAN 2012
Oil Movement, Storage & Gauging in Oil Production and Refineries Dubai
UAE JAN. 2012
Lecturer in OGS (OIL & GAS SKILLS) Petroleum sector company (water
separation and emulsion problems),(LIMS, Lab. Quality management ),
(corrosion , water treatment ) (contracts)
Lecturer in PETROMAINT Petroleum sector company (water separation
and emulsion problems),(LIMS, Lab. Quality management ), (corrosion ,
water treatment ) (contracts)
Studies:
Formation Water Disposal of Alamein Dolomite.
LPG Recovery from A/Q Feed Gas & Badr El-Din sales Gas.
West Abu Qir sealine pipe sizing
Solution of recurring discrepancies between crude oil pumped
from Alamein and quantities received at Al-Hamra terminal
through 12inch pipeline July 2003.
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Special Assignments :
1. Head of Company’ Business Plan Committee
2. Head of Company’ Human Resources Committee
3. Head of Company ‘Standardization for supplying and
Contracting Committee
4. Member of Company ‘Policies Committee
PVT Reservoir Studies:
Formation water Disposal System of Alamein
Dolomite.
The PVT studies by constructing a pressure
depletion model as recycle sequence modules
equipment in order to simulate the reservoir
depletion in unsteady state.
The composition analysis and properties at
different bottom hole pressures during the
reservoir depletion.
The predictive % cumulative recovery from the
original gas in place.
The retrograde condensation level as LVv % or
quantity of residual liquid Bbls/ MMSCFT gas
produced.
The pressure volume relation of the reservoir
fluid
The expected residual liquid fluid physical
properties at reservoir conditions.
The predictive surface facilities operating
parameters at well head and separator
conditions.
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
The predicted quantities of yield data produced
from the vented gas reported as: Sales gas,
LPG, Light Gasoline, Condensate product.
PVT reservoir studies have been carried out for
:
o Abu Qir
o South Umbarka – South Seothes
o West Abu Qir
Process Studies :
LPG Recovery from A/Q Feed gas & Badr
Eldin sales gas.
West Abu Qir sealine pipe sizing
Optimization of blow down system for the
existing LTS & LPG plants.
Flare Radiation levels and heat intensity on
structures in Vicinity.
Liquid Holdup and pipeline slugging study of
W-A/Q – P-II 6” pipeline.
Condensate Recovery from Umbarka field
associated gas plant design.
Condensate Air Cooler (E-204) Rating.
Study the load capacity of Stabilizer Tower T-
201
Study the effect of flowing Badr Eldin gas on
Molecular Sieve drying package.
Preliminary study of Recover Ethane from A/Q
Natural Gas.
Study the Condensate Heater H-201 Efficiency
and Optimizing the Stabilizer Tower Operating
Conditions.
Checking of the LPG Molecular Sieve drying
package design parameters.
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Amerya LPG recovery plant Absorber tower
calculation
LPG Plant Optimization to adjust the Vapor
Pressure at certain value.
Interconnection of LPG Regen Gas to the LTS
Plant.
Predictive Separator composition during A/Q
Reservoir Pressure Depletion.
Umbarka Tank Battery to well head 2 7/8”
pipelines.
Meadia – Merghim 8” surface pipelines
Butane recovery Optimization using JT or
Turbo Expander machinery.
Effect of Pressure on Water Condensate
Separation of On-shore Water Treatment Units.
Minimizing of Water Vapor Condensate
separation of On-shore Water Treatment Units.
Minimizing of water vapor content of A/Q
Natural gas using TEG Absorber Tower.
Calculating Liquid equivalent of vapor weights
above LPG liquid in storage tanks V-13
Selection of some Utilities equipment.
Laboratory Research & Development
Asphaltene Control
Bacteria Control
Combination Products
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
Corrosion Management
Emulsion Management/Water Clarification
H2S, Mercaptan, and Souring Control
Hydrate Inhibition
Iron Sulfide Cleanup and Control
Naphthenate Control
Paraffin, Pour Point & Wax Control
Scale Management
Job Duties:
Corrosion Control: All of corrosion mitigation and
control methods and testing procedures according to
NACE standard e.g.
i. Analyze the corrosion data gathered by corrosion
control section staff and estimates the corrosion rates
(MPY) of different production facilities in order to:
a) Suggest the optimum corrosion inhibitor injection
dose.
b) Issuance the periodical corrosion control report.
c) Highlight the high corrosion potentials points.
d) Evaluate the separated/formation water total iron
content in order to determine the corrosion level.
e) Corrosion rate calculation using Corrosimeter
reading.
f) Determine the magnitude of rust, sand and scale
analysis.
ii. Perform lab. Tests for new corrosion inhibitors such
as:
a) Side stream test (in site).
b) Wheel test.
c) Emulsion stability test.
d) Static test.
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]
e) Copper ion displacement test.
f) Gunking materials test.
iii. Control corrosion caused by Sulphate Reducing
Bacteria (SRB’s):
a) Bacteria counting and calculate the optimum biocide
injection dose.
b) Biocide selection and testing using serial dilution
method.
c) Test the new Biocide using a special media (culture)
for optimum injection dose and performance
iv. Corrosion Inhibitor Optimization:
a) Corrosion inhibitor optimum dose calculation.
b) Corrosion inhibitor concentration and dilution ratio.
v. Production quality control and testing.
Trust International For Industrial and Petroleum
Services - Limited
حراسج الذوليت للخذمبث الصنبعيت والبخروليت
راث مسئوليت محذودة-
جمهورية مصر العربية–األسكىدرية – سموحة ميدان علي به أبي طالب، برج الباوسيه، ِ ابراج السرايا،
6162-425-03-002: فاكس - 6262-425-03-002 : تليفون ِ Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd Floor, Smouha, Alexandria, Egypt
Tel: 002-03-425-6262 - Fax: 002-03-425-6162 - www.trusteg.com - Email: [email protected]