CV Pieter Senekal (October 2016)

16
PIETER SENEKAL Carel De Wetweg 104 – Brits – 0252 – SOUTH AFRICA Cellphone 082 892 5555 / 082 563 9807

Transcript of CV Pieter Senekal (October 2016)

Page 1: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Carel De Wetweg 104 – Brits – 0252 – SOUTH AFRICA

Cellphone 082 892 5555 / 082 563 9807

Page 2: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 2 of 16

CURRICULUM VITAE

BRIEFLY, I AM . . .

I see myself as a self-motivated person who can work independently and reach the target which

has been set for me. Quick learner, go-getter, diligent, loyal, honest, above average

communication skills. Responsible, can perform under pressure. Outgoing personality, reliable,

team player. Aptitude for planning and conducting new and innovative project, proven leadership

skills and managerial ability.

CURRENTLY, I AM …..

In my Career I have been exposed to various projects encompassing human relations to hardcore

mining techniques. In the build up to my eventual appointment I have been exposed to an

extreme variety of aspects of mining and have various achievements to my name as well as being

key to the successes of various individuals as well as departments. One of my specific

characteristics is that I have the ability to influence people. I work well in a team but are totally

equip and comfortable working on my own. I am capable of running multiple projects together as

well as focusing on a project at a time depending on the situation. I understand what it means to

adapt and recognize this as a necessary trademark to achieve should a situation arrives that

warrants it. My analytical sense is well developed and has helped me in various stages of my life

to find the optimal solution to a problem. This also gives me the ability to understand and

appreciate how various aspects and departments interact with one another and how they can

compliment each other. I am a significant role player in any organization and will be an asset to

yours as well.

Above all production and safety is important factors in my working environment.

Page 3: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 3 of 16

Residential Adress 104 Carel De Wetweg

Elandsrand

Brits

0250

Telephone Number (+27) 12 381 4049 (Work)

(+27) 82 892 5555 (Cell)

PERSONAL PARTICULARS

Christian Names Pieter

Surname Senekal

Identity Number 640726 5030 081

Date of Birth 26 July 1964

Gender Male

Marital Status Married (12/09/1987)

Dependents One

Nationality South African Citizen

Language Afrikaans

Other Language Fluent in Fanakalo and English (Speak, Read and Write)

Criminal Records None

Present Activities and Hobbies Suba Diving, Camping, Cycling

Outdoors

Page 4: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 4 of 16

VOLUNTERING EXPERIENCE

DAVRON (Drug Dependence Prevention Rehabilitation Support Network)

(Non-Profitable Organisation) – Started in January 2015 as part of the Management Team. Assist with Counselling

RFC (Royal Family Kids)

Started in October 2015 as part of the Personnel. Network of camps, children’s clubs, and child mentoring for abused, abandoned and neglected children in the foster care, system.

Chaplaincy (Full Gospel Church of God, SA)

Completed Level 1 in Minister people, who are hurting, lonely, depressed, in crisis and stressed to the breaking point. Do from time to time outreaching work at different organizations

SECONDARY EDUCATION

Last School Attended Technical High School

Rustenburg

Highest Standard Matric (Grade 12)

Subjects Passed Afrikaans

English

Mathematics

Science

Technical Drawings

Theory

COMPUTER EXPERIENCE

Programmes Microsoft, Windows ect.

(Spreadsheets, Word, Presentations)

Page 5: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 5 of 16

DEVELOPMENT COURSES

Budget Control and Planning

Whole Brain Learning (WPM)

Mobilift Course

Crane and Overhead Cranes

Rigging Course

Forklifts

Assessors Course NQF Level 5

Task Analysis Training Course

Risk Assessment

Business Risk Management (B.R.M)

Health, Safety and Environmental

ISO 14001, Plan Task Observation (P.T.O)

Safety Representative Course

Sandvik Crusher Course

Working at Heights and Rescue

Mentors Course

Trans 4 Miine Course (Mining Supervisory Programme)

POST SCHOOL STUDIES

Institution ATOMIC ENERGY CORPORATION

Nucor / Valindaba

Diploma Trade Test

WORKING EXPERIENCE

SURFACE Conveyor Belts

Conveyor Scrapers

Conveyor Scales and Installations

Conveyor Stringers

Feed and Discharge Chutes

Vibrators and Installations

Page 6: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 6 of 16

Installation of Belt Magnets

Installation of Vibrator Screens

Fine Ore Bins

Belt Idlers and Frames

Guards / Nip Guards

Rod Mills / Ball Mills

Trommel Screens

Discharge sumps

Floatation Cells and Banks

Scavenger Pumps

Third Cleaner Pumps

Final Tailings pumps

Rougher Pumps

Bredel Pumps

Spillage Pumps

Thickeners (60M)

Transfer Liners

Dryers

Mud Filters

Mud Press Filters

Tailings Pumps

60m Thickener

Tailings Sumps

60m Thickener drive and Steelwork

Pump Bases

Tailings Dams

Tailings Cages

Pipe Development

Construction and Erection

Planning

Maintenance

Production and Administration

Apron Feeders

JAW CRUSHERS

Nordberg

Sandvik

Symonds

Page 7: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 7 of 16

UNDERGROUND Machine Types :

Sandvik

LHD’s 514

LHD 208

Dump Trucks EJC533

Drill Riggs DD321

Drill Riggs DD210

Drill Riggs DS421

Drill Riggs DD421

Atlas

LHD ST 600

LHD ST 1030

Dump Trucks MT 436B

Dump Trucks MT 2010

Drill Riggs 282 Boomer

Drill Riggs SIMBA S7D

Drill Riggs SIMBA M6C

Drill Riggs SIMBA H1257

Aard

UV’s 80

UV’s 80 (Cranes)

UV’s 42

UV’s Getman

GHH

4.4 and

6.1

LDV Toyota Cruiser

Hoppers

Loco’s

Boesmans

Tipping Ramps

Grizzly Bars

Travelling Ladders

Construction

ARM Machine (Voest Alpine,Tamrock and Sandvik)

Incline and chairlifts

Winches

Rail Switches

Page 8: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 8 of 16

Installation of box front cylinders Kickbacks

Production and Administration

Seizers

Apron Feeders

JAW CRUSHERS

Allis Charlmers

Nordberg

Sandvik

Symonds

OPENCAST

LIEBHERR EXCAVATORS

(9350, 9250, 984, 974 and 964)

DUMP TRUCKS

CAT 785, 777, 773

Volvo A40,Terex TR 100,Bell BR 25

MOBILE JAW CRUSHERS

Sandvik 1211 Crawl Master

Sandvik 1208

Barmag

Air 100 Blower/Separator

Metso LT 104,105,106,110,1100 and 120

Metso GP 300

Komatsu – Garra Parros

FIXED PLANTS

Primary Crushers

Secondary Crushers

Allis Charlmers

Nordberg

Sandvik

Symonds

Page 9: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 9 of 16

AGGREGATES

Filter Sand

- 6.7 mm Crusher Dust

- 10 mm sand

- 13mm Crusher Run/Stemming

19mm Concrete/Road Stone

25mm Concrete/Road Stone

53mm Aggregate

- 100 mm Gravel capping

- 300 mm Rock fill

CAT Graders G15

Front End Loaders (CAT 992, 988)

Terex Mobile Drill Rigs

New Holland Peckers

Cat Peckers

Lister Petter Lighting Plants

John Deere Water Pumps

Different Types of Reef Grades

Evacuation and Safety Procedures that complies with

Blasting Regulations

PRESENT EMPLOYMENT HISTORY

Previous Position Senior Foreman

Name of Company South Deep Gold Mine – Gold Fields

Twin Shaft

Address 150 Helen Road

SANDTON

2196

Period January 2016 – Ongoing

Responsibilities TMM3 All Trackless Mining Machines

ISO 14001 / 9001

Maintenance Schedules

Production

Budget Control

Page 10: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 10 of 16

Orders

Reports

Supervision

Safety

Planning

Environmental Control

Meetings

PREVIOUS EMPLOYMENT HISTORY

Position

Name of Company

Address

Period

Responsibilities

Contract Manager

GHH Mining Machines

2 Kirschner Road

Anderbolt

BOKSBURG

1459

May 2014 – October 2015

ISO 14001 / 9001

Maintenance Schedules

Production

Budget Control

Orders

Reports

Supervision

Safety

Planning

Environmental Control

Meetings with Clients

Reason for Leaving Mine Closed Down – No Available Position in GHH

Page 11: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 11 of 16

Position

Name of Company

Senior Site Manager

Fraser Alexander

Bulk Mechanisation

Address PO Box 14618

WITFIELD

1467

1 Marlin Road

JETPARK, BOKSBURG

1467

Period 22 November 2013 – 28 April 2014

Responsibilities ISO 14001 / 9001

Maintenance Schedules

Production

Budget Control

Orders

Reports

Supervision

Safety

Planning

Environmental Control

Meetings with Clients

Reason for Leaving Mine Stopped Frazer Contract

Position Senior Site Manager

Name of Company B&E International

Address PO Box 26730

East Rand

1462

Page 12: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 12 of 16

93-94 Maple Street

Pomona, KEMPTON PARK

1619

Period 01 January 2013 – 31 October 2013

Responsibilities ISO 14001 / 9001

Maintenance Schedules

Production

Budget Control

Orders

Reports

Supervision

Safety

Planning

Environmental Control

Meetings with Clients

Reason for Leaving End of Contract

Position Sub-Ordinate Manager

Assistant Manager (19 August 2010 – 17 April 2012)

Crusher Foreman (03 February 2010 – 18 August 2010)

Crusher Technician (19 November 2008 – 02 February 2010)

Name of Company MCC

Eland Platinum Mine

Xstrata

Address PO Box 3797

Halfway House

MIDRAND

Period November 2008 – December 2012

Responsibilities ISO 14001 / 9001

Maintenance Schedules

Production

Page 13: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 13 of 16

Budget Control

Orders

Reports

Supervision

Safety

Planning

Rehabilitation

Environmental Control

Meetings with Clients

Crushers

Reason for Leaving Better Opportunities

Position

Senior Training Officer – Engineering

Name of Company Lonmin Academy

Centre of Excellence

Address Private Bag 1140

Marikana

0325

Period February 2007 – July 2008

Responsibilities Assessments

Specialized Training

Supervision and Learner Interviews

Monthly Reports

Orders and Budget Control

Acting from time to time as Training Consultant

Reason for Leaving Better Opportunities

Page 14: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 14 of 16

Position Boilermaker

Name of Company Western Platinum Mine

Rowland Shaft

Address Private Bag 1140

Marikana

0325

Period October 1999 – February 2007

Responsibilities Overseas Projects (Voest-Alpine, Tamrock and Sandvik)

Administration

Maintenance

Construction

Supervision

Fabrication

Reason for Leaving Promotion

Position Boilermaker

Name of Company Western Platinum Mine

Merensky/UG 2 Plant

Address Private Bag 1140

Marikana

0325

Period March 1988 – October 1999

Responsibilities Keep production going

Administration

Maintenance

Construction

Page 15: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 15 of 16

Supervision

Fabrication

Installation

Reason for Leaving Promotion

Previous Position Junior Operator / Artisan

Name of company Atomic Energy Corporation

Valindaba

Address Pretoria

Period January 1983 – February 1988

Responsibilities Make of Components

Fabrication

Turning Machines

D19 Components Cutters

General Duties

Reason for Leaving Better Opportunities

REQUEST : PLEASE TREAT AS HIGHLY CONFIDENTIAL

Page 16: CV Pieter Senekal (October 2016)

PIETER SENEKAL

Page 16 of 16