List of Sectors sector_code sector_name 1 AIRPORTS 2 BRIDGES 3 BUILDINGS 4 BUILDINGS/ CONSTRUCTION 5 ENVIRONMENT ENGINEERING 6 FINANCE 7 GEO TECHNOLOGY 8 HIGHWAYS 9 HR 10 INFORMATION TECHNOLOGY 11 MATERIALS MANAGEMENT 12PORTS AND WATER RESOURCES 13 POWER 14PRIVATISATION AND CONCESSION 15 QUALITY ASSURANCE 16 QUALITY SYSTEMS 17 RAILWAYS 18 ROLLING STOCK 19 ROPEWAYS 20 SIGNAL & TELECOMMUNICATION 21 TRAINING 22TRANSPORTATION AND ECONOMICS 23 TUNNELS 24 URBAN TRANSPORT

description

free

Transcript of cv Format

Page 1: cv Format

List of Sectorssector_code sector_name

1 AIRPORTS2 BRIDGES3 BUILDINGS4 BUILDINGS/ CONSTRUCTION5 ENVIRONMENT ENGINEERING6 FINANCE7 GEO TECHNOLOGY8 HIGHWAYS9 HR

10 INFORMATION TECHNOLOGY11 MATERIALS MANAGEMENT12 PORTS AND WATER RESOURCES13 POWER14 PRIVATISATION AND CONCESSION15 QUALITY ASSURANCE16 QUALITY SYSTEMS17 RAILWAYS18 ROLLING STOCK19 ROPEWAYS20 SIGNAL & TELECOMMUNICATION21 TRAINING22 TRANSPORTATION AND ECONOMICS23 TUNNELS24 URBAN TRANSPORT

Page 2: cv Format

List of Sub Sectorsub_sector_codeAP-1AP-10AP-11AP-12AP-13AP-14AP-15AP-16AP-2AP-3AP-4AP-5AP-6AP-7AP-8AP-9BRI-1BRI-10BRI-11BRI-12BRI-13BRI-14BRI-15BRI-16BRI-17BRI-18BRI-19BRI-2BRI-20BRI-21BRI-22BRI-3BRI-4BRI-5BRI-6BRI-7BRI-8BRI-9BLD-1BLD-10BLD-11BLD-12BLD-13BLD-17BLD-2BLD-3

Page 3: cv Format

BLD-4BLD-7BLD-8BLD-9BLD-14BLD-15BLD-16BLD-5BLD-6ENV.-1ENV.-10ENV.-11ENV.-12ENV.-13ENV.-14ENV.-2ENV.-3ENV.-4ENV.-5ENV.-6ENV.-7ENV.-8ENV.-9FIN-1FIN-10FIN-11FIN-12FIN-13FIN-14FIN-15FIN-16FIN-17FIN-18FIN-2FIN-3FIN-4FIN-5FIN-6FIN-7FIN-8FIN-9GT-1GT-2GT-3GT-4GT-5GT-6HW-1

Page 4: cv Format

HW-10HW-11HW-12HW-13HW-14HW-15HW-36HW-37HW-16HW-38HW-17HW-39HW-18HW-40HW-19HW-2HW-20HW-41HW-21HW-22HW-23HW-24HW-25HW-26HW-27HW-28HW-29HW-3HW-30HW-31HW-32HW-33HW-34HW-35HW-4HW-5HW-6HW-7HW-8HW-9HR-1HR-10HR-11HR-12HR-2HR-3HR-4HR-5

Page 5: cv Format

HR-6HR-7HR-8HR-9IT-1IT-10IT-2IT-3IT-4IT-5IT-6IT-7IT-8IT-9MSM-1MSM-2MSM-3MSM-4MSM-5MSM-6MSM-7MSM-8PIW-1PIW-10PIW-11PIW-12PIW-13PIW-14PIW-15PIW-16PIW-2PIW-3PIW-4PIW-5PIW-6PIW-7PIW-8PIW-9PS-1PS-2PS-3PS-4PS-5PS-6PS-7PS-8PC-1PC-2

Page 6: cv Format

PC-3PC-4QA-1QA-10QA-11QA-12QA-13QA-14QA-15QA-16QA-17QA-18QA-19QA-2QA-20QA-21QA-22QA-23QA-24QA-25QA-26QA-27QA-28QA-29QA-3QA-30QA-31QA-32QA-33QA-34QA-35QA-36QA-37QA-38QA-39QA-4QA-40QA-41QA-42QA-43QA-44QA-5QA-6QA-7QA-8QA-9QS-1QS-10

Page 7: cv Format

QS-11QS-12QS-13QS-14QS-2QS-3QS-4QS-5QS-6QS-7QS-8QS-9RLY-1RLY-10RLY-11RLY-12RLY-13RLY-14RLY-15RLY-16RLY-17RLY-18RLY-19RLY-2RLY-20RLY-21RLY-22RLY-23RLY-24RLY-25RLY-26RLY-27RLY-28RLY-29RLY-3RLY-30RLY-31RLY-32RLY-33RLY-34RLY-35RLY-36RLY-37RLY-38RLY-39RLY-4RLY-40RLY-41

Page 8: cv Format

RLY-42RLY-43RLY-44RLY-45RLY-46RLY-5RLY-6RLY-7RLY-8RLY-9RS-1RS-10RS-11RS-12RS-13RS-14RS-15RS-16RS-17RS-18RS-19RS-2RS-20RS-21RS-22RS-23RS-24RS-25RS-26RS-27RS-28RS-29RS-3RS-4RS-5RS-6RS-7RS-8RS-9RW-1RW-10RW-11RW-12RW-2RW-3RW-4RW-5RW-6

Page 9: cv Format

RW-7RW-8RW-9ST-1ST-2ST-3ST-4ST-5ST-6TRG-1TRG-2TRG-3TRG-4TRG-5TRG-6TRG-7TE-1TE-10TE-11TE-12TE-13TE-14TE-15TE-16TE-17TE-2TE-3TE-4TE-5TE-6TE-7TE-8TE-9TUN-1TUN-10TUN-11TUN-2TUN-3TUN-4TUN-5TUN-6TUN-7TUN-8TUN-9UT-1UT-10UT-11UT-12

Page 10: cv Format

UT-13UT-14UT-15UT-16UT-17UT-18UT-19UT-2UT-20UT-21UT-22UT-23UT-24UT-25UT-26UT-3UT-4UT-5UT-6UT-7UT-8UT-9

Page 11: cv Format

List of Sub Sectorsub_sector_nameTRAFFIC STUDYAIRFIELD LIGHTINGCOST ESTIMATE/FINANCIAL ANALYSISPMC / CONSTRUCTION SUPERVISION - QUALITY CONTROLPMC / CONSTRUCTION SUPERVISION - TENDER/CONSTRUCTION PHASEENVIRONMENTAL IMPACT ASSESSMENT STUDYFINANCIAL ADVISORY FOR PPP PROJECTSHELIPORTSTOPOGRAPHICAL SURVEY / OBSTACLE LIMITATION SURVEYGEOTECHNICAL INVESTIGATIONENGINEERING STUDY - FEASIBILITY REPORT - NEW AIRPORTENGINEERING STUDY - FEASIBILITY REPORT - MODIFICATIONS TO EXISTING AIRPORTENGINEERING STUDY - DETAILED PROJECT REPORT - NEW AIRPORTENGINEERING STUDY - DETAILED PROJECT REPORT - MODIFICATIONS TO EXISTING AIRPORTDESIGN OF RUNWAY PAVEMENT - NEW AIRPORTEVALUATION OF PAVEMENTS USING HEAVY WEIGHT DEFLECTOMETERTRAFFIC STUDYDESIGN OF FOUNDATION AND SUBSTRUCTURE- HIGHWAYSDESIGN OF SUPERSTRUCTURES - PSC / RCC-HIGHWAYSDESIGN OF SUPERSTRUCTURES -STEEL - RAILWAYSDESIGN OF SUPERSTRUCTURES- COMPOSIT STEEL STRUCTURE - RAILWAYSDESIGN OF SUPERSTRUCTURES - STEEL-HIGHWAYSDESIGN OF SUPERSTRUCTURES- COMPOSIT STEEL STRUCTURE - HIGHWAYSDESIGNER SUPPORT DURING CONSTRUCTIONCOST ESTIMATE / FINANCIAL ANALYSISENVIRONMENTAL IMPACT ASSESSMENTCONTRACT DOCUMENT AND TECHNICAL SPECIFICATIONSGEOTECHNICAL INVESTIGATIONENGINIEERING STUDY- DETAILED PROJECT REPORT- RAILWAY BRIDGESPMC / CONSTRUCTION SUPERVISION - QUALITY CONTROLPMC / CONSTRUCTION SUPERVISION - TENDER / CONSTRUCTION PHASETOPOGRAPHIC SURVEY/HYDROGRAPHIC SURVEY FOR HYDRAULIC MODEL STUDIESHYDRAULIC DESIGN OF BRIDGES-HYDRAULIC DESIGN PARAMETERS, RIVER MIGRATION STUDIESENGINEERING STUDY - RAILWAY-FEASIBILITY REPORT / PRELIMINARY ENGINEERING REPORTENGINEERING STUDY - HIGHWAY-FEASIBILITY REPORT / PRELIMINARY ENGINEERING REPORTENGINIEERING STUDY- DETAILED PROJECT REPORT- HIGHWAYAPPROACH ALIGNMENT OF BRIDGES- SURVEY AND DESIGNDESIGN OF FOUNDATION AND SUBSTRUCTURE- RAILWAYSTOPOGRAPHIC SURVEYDESIGN OF ELECTRICAL SERVICES SYSTEM - SERVICE BUILDINGS,RESIDENTIAL, EDUCATIONAACCESS ROAD AND INTERNAL SERVICE ROAD SYSTEM.DESIGN OF FIRE SAFETY SYSTEMCOST ESTIMATE/FINANCIAL ANALYSISGREEN BUILDING RATINGGEOTECHNICAL INVESTIGATIONENGINEERING STUDY - FEASIBILITY REPORT

Page 12: cv Format

ENGINEERING STUDY - DETAILED PROJECT REPORTDESIGN OF WATER SUPPLY SCHEMESDESIGN OF DRAINAGE SCHEMESDESIGN OF SEWERAGE SCHEMESPMC / CONSTRUCTION SUPERVISION - QUALITY CONTROLPMC / CONSTRUCTION SUPERVISION - TENDER/CONSTRUCTION PHASEENGINEERING STUDY - INDUSTRIAL PROJECTSDESIGN OF BUILDINGS/ STRUCTURES - LAY OUT/ ARCHITECTURAL PLANSDESIGN OF BUILDINGS/ STRUCTURES - STRUCTURAL DESIGN/ DRAWINGSENVIRONMENTAL IMPACT ASSESSMENT STUDYCOST REVENUE STUDIESENVIRONMENTAL AUDITECOLOGICAL STUDIES (FISHERIES, FORESTRY AND WILDLIFE)AIR AND NOISE POLLUTION STUDIESENVIRONMENTAL TRAINING AND CAPACITY DEVELOPMENT COST REPLACEMENT STUDIESSOCIAL IMPACT ASSESSMENT AND RESETTLEMENT PLANDESIGN OF WATER SUPPLY DISTRIBUTION SETWORKSDESIGN OF SEWERAGE NETWORKSDESIGN OF STORM WATER DRAINAGE NETWORKSCONSTRUCTION MANAGEMENT OF WATER SUPPLYCONSTRUCTION MANAGEMENT OF SEWERAGECONSTRUCTION MANAGEMENT OF DRAINAGESOLID WASTE MANAGEMENT STUDIESPLANNING AND FINANCIAL REPORTING.RISK MANAGEMENTPAYROLL MANAGEMENTPOST RETIREMENT BENEFITSPF ACCOUNTING & MANAGEMENTFINANCIAL MANAGEMENT CONSULTANCY FOR FINANCIAL MANAGEMENT STUDIESFINANCIAL MANAGEMENT CONSULTANCY FOR PROJECT FINANCINGFINANCIAL MANAGEMENT CONSULTANCY FOR DESIGN AND IMPLEMENTATION OF COMMERCIAL &FINANCIAL MANAGEMENT CONSULTANCY FOR DESIGNING FINANCIAL MANAGEMENT INFORMATIONFINANCIAL MANAGEMENT CONSULTANCY FOR DEVELOPMENT OF MANUALS FOR ACCOUNTING ANDDISBURSEMENT, RECEIPTS AND DOCUMENTATION.REGULATORY COMPLIANCE- TAX MANAGEMENT AND REGULATIONSREGULATORY COMPLIANCE- AUDITPROJECT - FINANCIAL MANAGEMENT ASPECTSPROJECT COSTING & OVERHEAD ACCOUNTINGPROJECT MANAGEMENT- COST AND PROFITABILITY ANALYSISFOREIGN PROJECT ACCOUNTING AND SYSTEMTREASURY AND WORKING CAPITAL MANAGEMENTGEOTECHNICAL INVESTIGATIONEXPLORATORY DRILLINGGEOPHYSICAL INVESTIGATIONGEOLOGICAL MAPPINGHYDAULOGICAL INVESTIGATIONROUTE SELECTION FOR RAIL, ROAD, OIL + GAS PIPELINE AND POWER TRANSMISSION LINESTRAFFIC STUDY

Page 13: cv Format

DESIGN OF ROAD SAFETY FEATURES AND ROAD APPURTENANCESLANDSCAPING AND ABORICULTUREDESIGN OF TOLL PLAZA AND WAYSIDE AMENITIESENVIRONMENTAL IMPACT ASSESSMENT STUDYSOCIAL IMPACT ASSESSMENTDESIGN OF BRIDGES - FOUNDATION & SUBSTRUCTUREPROJECT SUPERVISION - PAVEMENTDESIGN OF BRIDGES - SUPERSTRUCTURE CONCRETEPROJECT SUPERVISION - BRIDGE CONSTRUCTION- SUB STRUCTURE AND FOUNDATIONDESIGN OF BRIDGES - SUPERSTRUCTURE STEELPROJECT SUPERVISION - BRIDGE CONSTRUCTION- SUPERSTRUCTURE CONCRETEDESIGN OF BRIDGES - RIVER PROTECTION WORKSPROJECT SUPERVISION - BRIDGE CONSTRUCTION- SUPERSTRUCTURE - STEELDESIGN OF ROAD PAVEMENT- FLEXIBLEENVIRONMENTAL IMPACT ASSESSMENT STUDYINVENTORY & CONDITION SURVEY OF EXISTING ROAD, PAVEMENT & STRUCTURESDESIGN OF ROAD PAVEMENT- RIGIDSOCIAL IMPACT ASSESSMENTCOST ESTIMATE/ECONOMIC ANALYSIS/FINANCIAL ANALYSISENGINEERING STUDY - FEASIBILITY REPORTENGINEERING STUDY - DETAILED PROJECT REPORTPROJECT CLEARANCESTENDER / CONTRACT DOCUMENTS / BID PROCESS MANAGEMENTPROJECT SUPERVISION- TENDER/ CONTRACT DOCUMENTSPROJECT SUPERVISION - QUALITY CONTROL- MATERIAL ENGINEERINGPROJECT SUPERVISION - PAVEMENTPROJECT SUPERVISION - BRIDGE CONSTRUCTION- SUB STRUCTURE AND FOUNDATIONHYDRAULIC AND HYDROLOGICAL INVESTIGATIONSPROJECT SUPERVISION - BRIDGE CONSTRUCTION- SUPERSTRUCTURE CONCRETEPROJECT SUPERVISION - BRIDGE CONSTRUCTION- SUPERSTRUCTURE - STEELTHIRD PARTY QUALITY ASSURANCE - CIVIL INSPECTIONROAD SAFETY AUDIT - DEVELOPMENT PHASEROAD SAFETY AUDIT - CONSTRUCTION PHASEPMC/CONSTRUCTION SUPERVISION/ INDEPENDANT ENGINEER - HW PROJECTSTOPOGRAPHIC SURVEYGEOTECHNICAL INVESTIGATIONCONSTRUCTION MATERIAL INVESTIGATIONDESIGN OF EMBANKMENTGEOMETRIC DESIGNDESIGN OF DRAINAGE SYSTEMSTAFFING PLAN AND ORGANISATION PLANCAREER PLANNINGCORPORATE SERVICESEMPLOYEE RELATIONS AND WELFARETRAINING PLANNINGRECRUITMENT - TALENT ACQUISITIONPERFORMANCE MANAGEMENT SYSTEMCOMPENSATION PLANNING

Page 14: cv Format

COMPETENCY MAPPINGLEADERSHIP DEVELOPMENTENABLING CREATIVITY AND INNOVATIONHR STRATEGY - TETENTION PLANSHARDWARE PROCUREMENTSIZING OF SYSTEM /SYSTEM REQUIREMENTSSOFTWARE DEVELOPMENTWEB SITE DEVELOPMENTNET WORKING/INTERNET SUPPORTPROJECT MANAGEMENT CONSULTANCY FOR ITTRAINING - ITAMC SUPPORT FOR SOFTWAREIDENTIFICATION OF HARDWARE AND SOFTWARE REQUIREMENTSEXP. OF STANDARD ERP PACKAGES AND IMPLEMTATION EXPERTISEPROCUREMENT AGENTADVISING CLIENT ON PROCUREMENT MANAGEMENTLOGISTICS MANAGEMENTCAPACITY BUILDING FOR PROCUREMENT GUIDELINES & PROCEDURESINDEPENDENT PROCUREMENT AUDITPROCUREMENT POST REVIEWINVENTORY MANAGEMENTSCRAP MANAGEMENTTRAFFIC STUDYCOST ESTIMATE/FINANCIAL ANALYSISPROJECT SUPERVISION - QUALITY CONTROLPROJECT SUPERVISION - TENDER/CONSTRUCTION PHASESTUDY ON RESERVOIRSSTUDY ON MATERIAL HANDLING FACILITIESENVIRONMENTAL IMPACT ASSESSMENT STUDYSURVEY, PLANNING , DESIGN AND ENGINEERING FOR IRRIGATION CANALSTOPOGRAPHIC SURVEY/HYDROGRAPHIC SURVEYGEOTECHNICAL INVESTIGATIONENGINEERING STUDY - FEASIBILITY REPORT - NEW PORTS & HARBOURSENGINEERING STUDY - FEASIBILITY REPORT - MODIFICATIONS TO EXISTING PORTS & HARBOENGINEERING STUDY - FEASIBILITY REPORT - INLAND WATERWAYENGINEERING STUDY - DETAILED PROJECT REPORT - NEW PORTS & HARBOURSENGINEERING STUDY - DETAILED PROJECT REPORT - MODIFICATIONS TO EXISTING PORTS &ENGINEERING STUDY - DETAILED PROJECT REPORT - INLAND WATERWAYPOWER GENERATION THROUGH CONVENTIONAL SOURCES- PLANNING & DESIGN AND PMCPOWER GENERATION THROUGH RENEWABLE ENERGY SOURCES - PLANNING & DESIGN AND PMCPOWER TRANSMISSION - PLANNING & DESIGN AND PMCPOWER DISTRIBUTION - PLANNING & DESIGN AND PMCPOWER SYSTEMS FOR INDUSTRIAL, COMMERCIAL & RESIDENTIAL COMPLEXES - PLANNING & DEELECTRICAL & MECHANICAL SYSTEMS FOR INDUSTRIAL, COMMERCIAL & RESIDENTIAL COMPLEXSCADA MANAGEMENT SYSTEMINSPECTION & QUALITY ASSURANCE OF ELECTRICAL & MECHANICAL SYSTEMS INCLUDING EQUIADVISORY ON STRUCTURING OF PROJECT FOR IMPLEMENTATION ON PPP BASISTRANSACTION ADVISORY SERVICES FOR PPP PROJECTS

Page 15: cv Format

PROVIDING SERVICES FOR PROJECT MONITORING DURING CONSTRUCTION & OPERATION PHASE.EQUITY PARTICIPATION AND MANAGEMENT OF CONCESSIONSMECHANICAL INSPECTIONPOWER SECTOR INSPECTIONPOWER TRANSFORMERS INSPECTIONDISTRIBUTION TRANSFORMERS INSPECTIONPOWER CABLES INSPECTIONLT CABLESOIL SECTOR INSPECTIONFERTILIZER SECTOR INSPECTIONSTEEL SECTOR INSPECTIONPHE SECTOR INSPECTIONCOAL SECTOR INSPECTIONELECTRICAL INSPECTIONHEALTH SECTOR INSPECTIONROLLING STOCK CARRIAGE INSPECTIONROLLING STOCK WAGON INSPECTIONROLLING STOCK DIESEL LOCOSROLLING STOCK ELECTRIC LOCOSROLLING STOCK EMUS, DMUSMACHINE TOOLS INSPECTIONPRESSURE VESSEL INSPECTIONEOT CRANES INSPECTIONHEAVY EARTH MOVING EQUIPMENT INSPECTIONCIVIL INSPECTIONSTEEL STRUCTURE & FABRICATION ITEMS INSPECTIONPIPES STEEL, DI, CI & VALVES INSPECTIONPLASTIC INCLUDING PVC/HDPE/LDPE PIPES INSPECTIONRCC PIPES AND OTHER RCC PRODUCTS INSPECTIONRUBBER PRODUCTS INSPECTIONSAIL CONVERSION INSPECTIONBRIDGE GIRDER INSPECTIONBEE SERVEILLANCEBIS SERVEILLANCEULTRASONIC TESTING CERTIFICATION LEVEL I, II, III AND VALIDITY OF CERTIFICATETRACK ITEMS INSPECTIONMAGNAFLUX TESTING CERTIFICATION LEVEL I, II, III AND VALIDITY OF CERTIFICATELIQUID PARTICLE TESTING CERTIFICATION LEVEL I, II, III AND VALIDITY OF CERTIFICARADIOGRAPHIC TESTING CERTIFICATION LEVEL I, II, III AND VALIDITY OF CERTIFICATEEDDY CURRENT TESTING CERTIFICATION LEVEL I, II, III AND VALIDITY OF CERTIFICATEAPI CERTIFICATION LEVEL I,II,III AND VALIDITY OF CERTIFICATERAIL INSPECTIONMETALLURGICAL INSPECTIONELECTRONICS , TELECOM, S&T INSPECTIONINSTRUMENTATION INSPECTIONTEXTILE INSPECTIONISO 9000CDM

Page 16: cv Format

CARBON FOOT PRINTINGENERGY AUDITSAFETY AUDITCUSTOMER SATISFACTION SURVEYISO 14000ISO 18000ISO 22000IS 15700ISO TS 16949SA 8000ISO / IEC 17020ISO / IEC 17025TRAFFIC STUDY FOR NEW LINE/YARD/ SIDING, MODIFICATION IN YARDSTUDY ON ASSET EVALUATIONDPR/DE : BOX PUSHINGPMC : BOX PUSHINGPRE CONSTRUCTION SURVEY : NEW RAILWAY LINEFEASIBILITY STUDY/DETAILED PROJECT REPORT: ROUTE SELLECTION FOR OIL /GAS/ POWERM&P PROCUREMENT SERVICES- TENDER / SUPPLY / COMMISSIONING.ENGINEERING SERVICES FOR RAILWAY INFRASTRUCTUREFEASIBILITY STYDY/PRELIMINARY ENGG REPORT - NEW LINE/YARD/ SIDINGDETAILED PROJECT REPORT - NEW LINE/YARD/ SIDINGFEASIBILITY STUDY/PRELIMINARY ENGG. STUDY- GAUGE CONVERSION OF RAILWAY LINEGEOTECHNICAL INVESTIGATION FOR RAILLWAY WORKSDETAILED PROJECT REPORT- GAUGE CONVERSION OF RAILWAY LINEFEASIBILITY STUDY/PRELIMINARY ENGG. STUDY - MODIFICATIONS TO EXISTING LINE/YARDDETAILED PROJECT REPORT - MODIFICATIONS TO EXISTING LINE/YARDDPR / DETAILED ENGINEERING FOR NEW RAILWAY SIDING /YARDPMC FOR NEW RAILWAY SIDING /YARDDPR / DETAILED ENGINEERING - MODIFICATION TO EXISTING RAILWAY SIDING / YARDPMC - MODIFICATION TO EXISTING RAILWAY SIDING / YARD

FEASIBILITY STUDY FOR IMPROVING SPEED POTENTIAL OF THE EXISTING RAILWAY LINE/SSTUDY ON IMPROVEMENTS IN OPERATION OF EXISTING RAILWAY SYSTEMDETAILED PROJECT REPORT FOR IMPROVING SPEED POTENTIAL OF THE EXISTING RAILWAYDESIGN OF BANKDESIGN OF STATION BUILDINGSPMC / CONSTRUCTION SUPERVISION - QUALITY CONTROLPMC / CONSTRUCTION SUPERVISION - TENDER/CONSTRUCTION PHASEOPERATION & MAINTENANCE OF RAILWAY LINE / SIDINGFEASIBILITY STUDY-RAILWAY ELECTRIFICATIONDETAILED PROJECT REPORTS-RAILWAY ELECTRIFICATIONPMC- RAILWAY ELECTRIFICATION (SIDINGS & MAIN LINES)FEASIBILITY STUDY- RAIL CONNECTIVITY TO PORT/MODIFICATION OF EXISTING RAIL NET WFEASIBILITY STUDY - NEW WORKSHOP / MAINTENANCE DEPOT FOR ROLLING STOCK INCLUDINGDETAILED PROJECT REPORT- RAIL CONNECTIVITY TO PORT/MODIFICATION OF EXISTING RAILFEASIBILITY STUDY- RAIL CONNECTIVITY TO STEEL PLANTS/MODIFICATION OF EXISTING RA

FEASIBILITY STUDY- FOR DOUBLING OF  EXISTING SINGLE LINE RAIL NET WORK WITH YARDDETAILED PROJECT REPORT- FOR DOUBLING OF  EXISTING SINGLE LINE RAIL NET WORK WIT

Page 17: cv Format

DETAILED PROJECT REPORT- RAIL CONNECTIVITY TO STEEL PLANTS/MODIFICATION OF EXISTPMC / CONSTRUCTION SUPERVISION OF ROAD OVER BRIDE (ROB) / ROAD UNDER BRIDGE (RUBDESIGN OF BRIDGES - RIVER PROTECTION WORKS WATERWAY DETERMINATIONCOST ESTIMATE/FINANCIAL ANALYSISFEASIBILITY STUDY/PRELIMINARY ENGINEERING REPORT - NEW RAILWAY LINE/YARD / RAILWDETAILED PROJECT REPORT - NEW WORKSHOP / MAINTENANCE DEPOT FOR ROLLING STOCK INCFEASIBILITY STUDY - MODIFICATIONS TO EXISTING WORKSHOP / MAINTENANCE DEPOT FOR RDETAILED PROJECT REPORT - MODIFICATIONS TO EXISTING WORKSHOP / MAINTENANCE DEPOTSTUDY ON MATERIAL HANDLING FACILITIESSTUDY ON INVENTORY CONTROL IN WORKSHOPS / MAINTENANCE DEPOTSELECTRIC LOCOMOTIVES / ELECTRIC MULTIPLE UNITS - DESIGNDIESEL LOCOMOTIVES / DIESEL MULTIPLE UNITS - REPAIR / MAINTENANCECARRIAGES - DESIGNCARRIAGES - PROCUREMENTCARRIAGES - LEASINGCARRIAGES - UPGRADATION / REHABILITATIONCARRIAGES - REPAIR / MAINTENANCEWAGONS - DESIGNWAGONS - PROCUREMENTWAGONS - LEASINGWAGONS - UPGRADATION / REHABILITATIONELECTRIC LOCOMOTIVES / ELECTRIC MULTIPLE UNITS - PROCUREMENTWAGONS - REPAIR / MAINTENANCESPECIAL TRACK VEHICLES - DESIGNSPECIAL TRACK VEHICLES - PROCUREMENTSPECIAL TRACK VEHICLES - LEASINGSPECIAL TRACK VEHICLES - UPGRADATION / REHABILITATIONSPECIAL TRACK VEHICLES - REPAIR / MAINTENANCESTUDY ON SELECTION OF LOCOMOTIVES / MULTIPLE UNITS / CARRIAGES / WAGONS / SPECIASHIPPING & LOGISTICSPROJECT MANAGEMENT FOR TURNKEY PROJECTSENGINEERING STUDY - DETAILED PROJECT REPORTELECTRIC LOCOMOTIVES / ELECTRIC MULTIPLE UNITS - LEASINGELECTRIC LOCOMOTIVES / ELECTRIC MULTIPLE UNITS - UPGRADATION / REHABILITATIONELECTRIC LOCOMOTIVES / ELECTRIC MULTIPLE UNITS - REPAIR / MAINTENANCEDIESEL LOCOMOTIVES / DIESEL MULTIPLE UNITS - DESIGNDIESEL LOCOMOTIVES / DIESEL MULTIPLE UNITS - PROCUREMENTDIESEL LOCOMOTIVES / DIESEL MULTIPLE UNITS - LEASINGDIESEL LOCOMOTIVES / DIESEL MULTIPLE UNITS - UPGRADATION / REHABILITATIONTOPOGRAPHIC SURVEYPROJECT SUPERVISION - QUALITY CONTROLPROJECT SUPERVISION - TENDER/CONSTRUCTION PHASEENVIRONMENTAL IMPACT ASSESSMENT STUDYGEOTECHNICAL INVESTIGATIONENGINEERING STUDY - FEASIBILITY REPORT - ROPEWAY FOR GOODS TRAFFICENGINEERING STUDY - FEASIBILITY REPORT - ROPEWAY FOR PASSENGER TRAFFICENGINEERING STUDY - DETAILED PROJECT REPORT - ROPEWAY FOR GOODS TRAFFICENGINEERING STUDY - DETAILED PROJECT REPORT -ROPEWAY FOR PASSENGER TRAFFIC

Page 18: cv Format

DESIGN OF ROPEWAY FOR GOODS TRAFFICDESIGN OF ROPEWAY FOR PASSENGER TRAFFICCOST ESTIMATE/FINANCIAL ANALYSISENGINEERING STUDY - FEASIBILITY/ PRELIMINARY ENGINEERING REPORTENGINEERING STUDY - DETAILED PROJECT REPORT / DETAILED ENGINEERING REPORT SYSTEMDESIGN OF SIGNAL & TELECOMMUNICATION WORKSCOST ESTIMATE / FINANCIAL ANALYSIS / BID INVITATION & EVALUATIONPROJECT SUPERVISION - QUALITY CONTROL, PROJECT MANAGEMENT CONSULTANCY, ACCEPTANCPROJECT SUPERVISION - CONSTRUCTION PHASE, ANNUAL MAINTENANCE OF SOGNALLING SYSTETRAINING - CIVIL ENGINEERING SYSTEMSTRAINING - ELECTRICAL ENGINEERING SYSTEMSTRAINING - SIGNAL ENGINEERING SYSTEMSTRAINING - TELECOMMUNICATION ENGINEERING SYSTEMSTRAINING - ROLLING STOCKTRAINING - MANAGEMENT / PERSONNEL / FINANCE/ OTHER SUBJECTSTRAINING - ORGANISATIONAL STRUCTURE /MANAGEMENT STUDIESREVIEW OF EXISTING FACILITIES AND ARRANGEMENTSTOTAL TRANSPORT SYSTEM STUDIESTOURISM DEVELOPMENT STUDIESSOCIO-ECONOMIC / POVERTY ALLEVIATION / IMPACT ASSESSMENTFEASIBILITY STUDY RELATING TO RAIL CONNECTIVITYRECONNAISSANCE SURVEYPLANNING , DESIGN AND COST ESTIMATES OF RAILWAY CONNECTIVITYGEO TECH INVESTIGATION, PLANNING & DESIGN OF WATER WAYS AND BRIDGESDPR AND DE FOR DEVELOPMENT OF RAIL INFRASTRUCTURE FOR POWER PLANTS, COAL, STEEL,TRAFFIC AND MARKET SURVEYSTRAFFIC PROJECTIONSINTER MODAL ALLOCATION OF TRAFFICREVIEW AND ASSESSMENT OF RAIL FACILITIESTRAIN OPERATIONAL PLANLOGISTICS SOLUTIONSFINANCIAL AND ECONOMIC APPRAISAL OF TRANSPORT PROJECTSPROJECT STRUCTURING ON PPP ROUTETRAFFIC STUDYENVIRONMENTAL AND IMPACT ASSESSMENT STUDYCONTRACT DOCUMENT AND SPECIFICATIONSTOPOGRAPHIC SURVEYGEOTECHNICAL STUDIES / GEOTECHNICAL INVESTIGATIONENGINEERING STUDY - FEASIBILITY REPORT / PRELIMINARY ENGINEERING REPORT - (RAILWENGINEERING STUDY - FEASIBILITY REPORT / PRELIMINARY ENGINEERING REPORT - (HIGHWENGINEERING STUDY - DETAILED PROJECT REPORT - (RAILWAY TUNNEL)ENGINEERING STUDY - DETAILED PROJECT REPORT - (HIGHWAY/ WATERWAY TUNNEL)DETAILED DESIGN AND CONSTRUCTION SUPERVISION SERVICESCOST ESTIMATE / FINANCIAL ANALYSISCOMPREHENSIVE TRAFFIC TRANSPORTATION PLANS, MOBILITY PLANSTRANSPORT POLICY STUDIESDESIGN OF ELEVATED / VIADUCT STRUCTURES.DESIGN OF SUBWAYS/ RUB/ROB / FLYOVER / ELEVATED ROAD

Page 19: cv Format

PROOF CHECKING OF DESIGN FOR CIVIL STRUCTURESDEASIGN OF STATION BUILDINGSPLANNING & SYSTEMS DESIGN OF POWER SUPPLYPLANNING & SYSTEMS DESIGN OF SIGNALING & TELECOMMUNICATIONS, AUTOMATIC FARE COLLPLANNING & DESIGN OF BUILDING MANAGEMENT SYSTEMPLANNING & DESIGN OF ELECTRICAL & MECHANICAL SYSTEM OF STATIONS & MAINTENANCE FPLANNING & DESIGN OF MAINTENANCE FACILITIES OF URBANTTRANSPORT SYSTEMS.TRAFFIC ENGINEERING/ MANAGEMENT AND MULTIMODAL INTEGRATION SCHEMES, INCLUDING TRINDEPENDENT ENGINEER/PROJECT MANAGEMENT/GENERAL CONSULTANCYBID PROCESS MANAGEMENTINDEPENDENT QUALITY MONITORTUNNEL VENTIILATION SYSTEMINTERIM CONSULTANCYPRE-FEASIBILITY/FEASIBILITY/DPR FOR CONSTRUCTION OF ROB/RUB/SUB WAY/FLYOVER/ELEVGENERAL CONSULTANCY FOR METRO RAILWAYSURBAN TRANSPORT SYSTEMS STUDIES, INCLUDING STANDING CONSULTANCY TO CITY AGENCIESFEASIBILITY STUDIES FOR RAIL BASED TRANSPORT SYSTEMS.FEASIBILITY STUDIES FOR BUS RAPID TRANSIT SYSTEMSDETAILED PROJECT REPORT -RAIL BASED TRANSPORT SYSTEMS.DETAILED PROJECT REPORT -BUS RAPID TRANSIT SYSTEMSPUBLIC TRANSPORT NETWORK AND SYSTEMS PLANNING (BUS /RAIL)TRAFFIC SIMULATION AND IMPACT ASSESSMENT STUDIES.

Page 20: cv Format

Education Details

10855 B.E. - Civil 1992

Emp. No.

Qualifcation

Year of Pass

% / Division

Institution & Place

Membership of Professional Association

76% First Division

A.I.T. Chickmaglur,

Mysore University

Page 21: cv Format

10855 B.E. - Civil 1992 76% First Division

A.I.T. Chickmaglur,

Mysore University

Page 22: cv Format

Trainings and Certifcations Languages Known

Training Name

4 Days India English

Hindi

Training Period

Day or Month or Year

Training Institute

Countries of Work Experience

Languages Known

Design and Construction of High Embankment on Soft

Soil and Geosynthetics Soil

Structures

NITHE, NOIDA

Page 23: cv Format

4 Days IndiaDesign and Construction of High Embankment on Soft

Soil and Geosynthetics Soil

Structures

NITHE, NOIDA

Page 24: cv Format

Languages Known Employment Record

Speaking Reading Writing Designation Organization

Good Good Good 1 RITES Ltd

Good Good Good 2 Manager (HW) RITES Ltd

3 RITES Ltd

Serial No of Employement Record

DGM (C)

Contract Engineer

Page 25: cv Format

4

5

6 Site Engineer

7 Site Engineer

Assistant Residence Engineer

Scott Wilson Kirkpatrick (India) Pvt.

Ltd.

Technical Officer Scott Wilson Kirkpatrick (India) Pvt.

Ltd.

M/s. Modi Construction Company, Ranchi

M/s. Pradhan Construction Company,

Ranchi

Page 26: cv Format

Employment Record Key Areas of Expertise

From To Nature of Work

01.08.2013 1

01.02.2006 01.07.2013 2

30.12.2000 01.02.2006 3

Serial No of Exprtise

Over all Incharge of all Building Projects and also invoilve in project management & preperation of Tender Document of Test Tracks works.

PROJECT SUPERVISION - Quility Control for consutuction of Test Tracks & Construction supervision of Flyovers, Underpasses , Bridges & Culvets for NH Project.

Preparation of Contractor IPC , Varition Statemetn , EOT, MPR, Claims , Cost

Estimate etc. & Quility Control for Construction of NH Project

Page 27: cv Format

01.10.1997 30.12.2000 4

01.07.1996 01.10.1997

01.02.1994 01.07.1996

01.11.1992 01.02.1994 Construction of road & Culverts

PROJECT SUPERVISION - BRIDGE CONSTRUCTION- SUB STRUCTURE AND

FOUNDATION

Construction supervision of roads & cross drainage structure. Preparation of IPC & other Technical document such as EOT, Vatition, etc.

Construction of embankment of flexible pavement, preparation of bills

Page 28: cv Format

Key Areas of Expertise Work / Project Undertaken that Best Illustrates Capability

Sector Project

HIGHWAYS HW-27 1

HIGHWAYS HW-16 2

HIGHWAYS HW-17 3

4

Sector-Code

Serial No of Project

Construction of Automotive Test Tracks for National Automotive Test Tracks (NATRAX) at Pithampur.

Construction & improvement to 6-lane from km 44.300 to km 66.000 on NH-1 in the state of Haryana

Short Term Improvement and Routine Maintenance of Panipat – Jalandhar Section of NH–1 in the states of Haryana / Punjab.

Construction Supervision of Four laning of Bangalore – Salem – Madurai section of NH-7 in the state of Tamilnadu at Thoppur Ghat Project

Page 29: cv Format

HIGHWAYS HW-28 5

6

7

8

9

Construction Supervision of fly-over (760.00 mtrs. Long, 6 lane) at National Park, Borivli (E), Mumbai, Under Maharashtra State Road Development Project (from Aug.1998 to Dec 2000)

Construction Supervision of Road & Cross Drainage works under World Bank Aided Bihar Plateau Development Project, Ranchi.

Construction Supervision of Road & Cross Drainage works under World Bank Aided Bihar Plateau Development Project, Ranchi.

Construction of Road and Drainage work at Talchar STPP, N.T.P.C, Keniha (Orissa)

Construction of building & inside road & culvert , at Rachhi city.

Page 30: cv Format

Work / Project Undertaken that Best Illustrates Capability

Nature of Work & duration

Duties included reviewing and approving work program, construction methods, interpretation of contract documents including technical specifications and review of construction drawings; approval of Mix Design, field and laboratory testing of materials and completed works as per ISI, MoSRT&H, IRC, ASTM, preparation of commencement reports, construction supervision manual, quality assurance documents, daily/ monthly progress reports, bills and variations.

Duration : From 31.01.2010 to Till date

As a Assistant Bridge Engineer responsible for construction supervision of 2 Nos. flyovers (having PSC Box girders of 40m span, RCC Box girders of 20m span and Pile foundation), 3 Nos. Minor bridges, 2 Nos. underpasses, having well and open foundation, building works of laboratory and site office having open foundation & 29 Nos. pipe/slab culverts. Other activities involved were checking and fixing of bearing (POT cum PTFE) and expansion joints, Checking of shuttering, scaffolding and bar bending schedules. Methodology approval, site meetings, preparation of variation orders, certification of bills, measurement, monitoring of physical progress,monthly/quarterly progress reports, bills, variations and completion reports.

Duration : From Feb .2006 to Jan. 2010

Duties included reviewing and approving construction methods, interaction and liaison with local authorities, regular inspection and supervision of works, approving sources of material, supervising testing of materials, review and check mix design for Bituminous mixes (includes With Modified Bitumen CRMB-60) & concrete, studying materials reports and test results, issuing orders for replacement of unsuitable materials and of defective works, preparation of monthly and quarterly progress report, checking quality of completed works, preparation of bills, Checking of Contractor’s bill, Maintaining the Daily Progress work and Measurement book, Estimation of quantities for Non-Schedule items, Rate analysis for Non-Schedule items, Duration : From Feb .July 2002 to Feb. 2006

Duties included approval of Borrow Areas for embankment/sub grade and quarries for aggregates, Mix design for different grade of Concrete, Mix design for, Dense Bituminous Macadam and Bituminous Concrete, Job mix formula for Bituminous Macadam, Wet Mix Macadam and Granular Sub base, Laboratory test on Soil, G. S. B., W. M. M, Aggregates and Cement, Field test for density for different Road components, as per MORTH frequency, Maintaining the results and records of all the laboratory test and field test, Checking of Contractor’s bill in respect of materials and issuing quality certificate.Duration : From Dec. 2000 to Jun 2002

Page 31: cv Format

Duties included checking of Lay-out of Piles and approving the levels of soft rock and hard rock for Pile foundation, Checking the Reinforcement of piles, Pile caps and Deck slab, Checking the casting and Erection of Pre-Stress pre cast I section Girder of 17.60 m. length, Supervision of fixing of different types of bearing, Supervision of casting of 4 No of Box Girders of length 48.5 mts and 40 mts, supervision of construction of RE walls & retaining walls. Checking of Anti-Corrosive Treatment for Reinforcement, Interaction with Client Engineer for clarification, Maintaining the Daily Progress work and Measurement book, Checking of Contractor’s bill.Duration : From Aug. 1998 to Dec. 2000

Duties included checking the Layout of Bridges and Culverts, Checking of reinforcement, Shuttering and Formwork of Bridges involving open foundation with Scour Protection works, supervision of the Construction of Road with Rigid and Flexible Pavement, Hume pipe culverts of different diameters and slab culverts of different span, checking of Bar Bending Schedule for R.C.C structures, checking of RA bill for contractor and Prepared the monthly, physical and financial progress report.

Duration : From Oct. 1997 to August 1998

Duties included survey works for Roads, Bridges & Prepared the Drawing of longitudinal section and cross section for fixing of proposed road level. Supervision of construction of Road works involving earthwork, water bound macadam, Moorum Surfacing, Mix seal surface etc. as per MORTH specifications. Supervision of construction of Hume Pipe Culverts of different diameters and slab culverts of different span. Supervision and checking of testing of the materials through different routine tests in accordance with MORTH Specification.Duration : From July 1996 To Oct 1997

Duties include construction of Embankment, Subgrade, Sub-Base and Base course for 15 Km road of Flexible pavement with slab/ pipe culverts. Preparation of bills and maintaining the daily site records.Duration : From Feb. 1994 to July 1996

Duties included construction of residential buildings, preparation of Estimate, Design as well as Execution of Road works and Cross drainage works.Duration : From Nov. 1992 to Feb 1994

Page 32: cv Format

Work / Project Undertaken that Best Illustrates Capability

Project Cost

510 Crores

95 Crores

35 Crores

21 Crores

Page 33: cv Format

17 Crores

09 Crores

2.8 Crores

5 Crores