TEMPLATE / INSTALLATION INSTRUCTIONSEE PCI #IN1601268 20.10.16ARUN BVWA1SEE PCI #IN1601693 04.01.17ARUN BMWB 1
1285242-IN01
ARUN B
04.01.17A.i.
04.01.17 04.01.17
04.01.17JAYESHMW
REFER NOTESREFER NOTES
REFER NOTES
1:1
1 OF 1
NOTES
3) 4) 5)
PRINT AREA = 675x492 mm (26.58”x19.35”)
TITLE BLOCK & NOTES OUTSIDE PRINT AREA(2) SHOULD NOT TO BE PART OF PRINTING.
SHEET SIZE = A1 (ALTERNATE SHEET SIZE 23”x36”)
PAPER MATERIAL : MAPLITHO PAPER , 100 ± 5 GSM
SAMPLE COPY TO BE APPROVED BY KOHLER INDIA ENGINEERING TEAM PRIOR TO PRODUCTION.PRINTING COLOR : BLACK
1) D300_001 : KITCHEN SINK & LAVATORY CUTOUT TEMPLATE DESIGN.
12
6) THE ARTWORK MUST NOT BE SCALED. MUST BE PRINTED ON 100% (1:1) SCALE.6)
492 mm
675 mm
1
2
2
CUT-OUT TEMPLATE / INSTALLATION INSTRUCTION
76600IN-0Kankara Vessel With 1TH
TOOLS AND MATERIAL (Not supplied) Safety glassesPencil Scissors Measuring tapeP utty knifeP lumbers puttyHacksawKeyhole saw or saber sawDrill bit as requiredAdjust able wrenchPipe wrenchTube cutter
· · · · · · · · · · · ·
Roughing-In NotesFixture dimensions are nominal and conformto tolerances in ASME standard A112.19.2M.
ROUGH-INUnit: Inch (cm)
17-1
/4”(
43.8
)
5-1/
8”(1
3.0)
34”(
86.4
)
1-3/4”(4.5)
22-3/8”(56.8)
·
·
·
·
Place this template on the counter top and align with the finish wall markings.Ensure clearance as specified between outer rim of lavatory and finish wall.Trace the template and mark the centerstwo hole for faucet hose and drain.Remove the template.
INSTALLATION
SERVICE PARTS
Lift rod
Custom linkageAdjust here.
84474
REQUIRED PARTS:Bottle Trap: 75823IN-CP
IMPORTANT:
For pop-up drains, use the custom linkage 84474 instead of thelinkage supplied with the drain.
Item Code:- 84474Item description:- ASSEMBLY ADJUSTABLE LINKAGE
NOTE: BEFORE CUTTING COUNTER-TOP, ALLOW FOR FAUCET HANDLE CLEARANCEFINISHED WALL / BACK SPLASH
Floor
CAUTION: Risk of personal injury orproduct damage.· Large lavatories are very heavy.Get
help lifting the lavatory during installation.Temporarily position the lavatory in thecut-out and adjust to fit.Trace a pencil line around the outside edge of the lavatory.Remove the lavatory.
Make sure drain is installed beforeproceeding further.Make sure faucet is installed beforeproceeding further.
NOTE:
·
·
·
COMPATIBLE FAUCETS WITH ABOVE VESSEL (CHECK KOHLER CATALOGUE FOR FAUCET DETAILS)K-8657IN-CP Fairfax Single Control Lavatory With Lever Handle And Drain 12183IN-ND-CP Fairfax Lav Faucet, W/O Lift Rod K-37301IN-4ND-CP Cuff Single Control Lavatory Faucet W/O DrainK-5695IN-4ND-CP Viteo Single Control Lavatory Faucet With Lever Handle Without DrainK-8620IN-ND-CP Eolia Single Control Lavatory Faucet With Lever Handle Without DrainK-14402IN-4A-CP Purist Single Control Lavatory Faucet With DrainK-11545IN-4-CP Singulier Pillar Lavatory Faucet Without Drain10319IN-4-CP Loure Single Control Lavatory Faucet37327IN-4ND-CP Strayt Sc Lav Faucet Without Drain73050IN-7-CP Composed Sc Side Mount Lav Faucet. W/D7329IN-9ND-CP Toobi Single Control Lav Faucet13523IN-4ND-CP Qualis Sc Lav Without Drain14760IN-4ND-CP Stance Sc Lavatory Faucet
INSTALLATION CHECK LIST
Leakage between vessel and drain outlet.
Vessel orientation.
Visual inspection of applied sealant.
Rim of lavatory
1285242-IN01-B
Bottom of lavatory(Apply sealant on bottom edge)
ØØ
·
·
· Apply sealant at the joint of lavatoryand counter as shown.
·
·
Carefully position the lavatory inthe cutout, and ensure the bottomface of lavatory is resting properly.
· Verify the orientation of vessel with marking given on template.
CARE AND CLEANINGTo keep your lavatory looking new, make sure you clean it outthoroughly after each use. DO NOT USE ABRASIVES on thisproduct, as they will scratch and ruin the surface. Stubborn stains, paint, or tar can be removed with turpentine or paint thinner.
·
·
Immediately wipe off any excess sealant, and fill any voids if needed.Allow the sealant to set for at least 30 minutes before any further activities.
Orientation marking
C/L
C/L (Drain)
BEFORE YOU BEGIN Observe all local plumbing & building codes. Inspect the waste and supply piping for leakages or damage, replace if necessary. Before installation, unpack the new lavatory and carefully inspect it for any transit damage. Return the lavatory to its protective carton until you are ready to install it. Use this template to mark correct cut-out size of lavatory. Assemble the drain to the lavatory before installing it.
Assemble the faucet to the lavatory with help of tool (supplied) before installing it.
· ·
·
·
· ·
·
1282804
Ø3-3/16” (8.1)
Drain Hole
2”(5
.1)
Faucet Hole
6-1/4”(15.9)
Hole for faucet hose
6-1/16”(15.4)
Align the lavatory drain outlet hole with the hole on counter top.
· ·
Make a hole of 8.1cm as drain center.Drill 4 cm hole for faucet hose as marked.
Toll Free 1800 103 2244kohler.co.in
© 2016-17 Kohler Co.
2”(5.1)
2”(5.1)
Fini
shed
wal
l
Fini
shed
wal
l
Minimum
Minimum
Min
imum
Ø1-9/16” (4)