API 510 Content:
1.0Applicables Regulation (codes) for the API 510 Certification2.0 API 510 cope
2.1 !eneral Application 2.2 pecific Applications
".0 #efinitions
$.0 %&ner'ser Inspection %rganiation
$.1 !eneral
$.2 API Authoried Pressure *essel Inspector +ualification and
Certification
$." %&ner'ser %rganiation Responsibilities
$.$ API Authoried Pressure *essel Inspector #ut,
5.0 Inspection Practices 5.1 Preparator, -or
5.2 /odes of #eterioration and ailure
5.2.1 Causes of deterioration (API 52)
5." Corrosion'Rate #eterination 5.$ /a3iu Allo&able -oring Pressure #eterination
-
8/10/2019 Curso API 510 Comimsa
2/83
API 510 Content: 5.5 #efect Inspection
5.4 Inspection of Parts
5. Corrosion and /iniu hicness 67aluation
4.0 Inspection and esting of Pressure *essels and Pressure'
Relie7ing #e7ices
4.1 !eneral
4.2 Ris'8ased Inspection
4." 63ternal Inspection
4.$ Internal and %n'trea Inspection
4.5 Pressure est
4.4 Pressure'Relie7ing #i7ices
4. Records
.0 Repairs9 Alterations9 and Rerating of Pressure *essels
.1 !eneral
.2 -elding
." Rerating
-
8/10/2019 Curso API 510 Comimsa
3/83
Continuacin del Contenido
;.0 Reglas Alternati7as para 63ploracin , Produccin de
Recipientes a Presin
;.1 Alcance , 63cepciones 6specificas
;.2 !losario de
-
8/10/2019 Curso API 510 Comimsa
4/83
1.0 Applicables Regulation (codes) for the API 510 CertificationAPI 5109 Pressure 7essel inspection code: aintenance inspection9
rating9 repair9 and alteration
API 510Cdigo de Inspeccin de Recipientes a Presin: Inspeccin del /anteniiento9 Clasificacin9 Reparacin ,Alteracin.
API Recommended practice 579 inspection of pressure
7eseels
!cope: his recoended practice co7ers the inspection of
pressure 7essels. It includes a description of the 7arious t,pes of
pressure 7essels and of standars for their construction and
aintenance. he reasons for inspection9 the causes of
deterioration9 the fre@uenc, and ethods of inspection9 the
ethods of repair9 and the preparation of records and reports areco7ered. afe operation is ephasied
Practica Recomendada API 579 Inspeccin de Recipientes a Presin
Alcance: 6sta practica recoendada cubre la inspeccin de recipientes a presin. Inclu,e una descripcin de 7arios
tipos de recipientes a presin , est?ndares para su anteniiento , construccin. a ran de inspeccin9 las causas
de deterioro 9 las frecuencias ,
-
8/10/2019 Curso API 510 Comimsa
5/83
1.0 Applicables Regulation (codes) for the API 510 Certification
API Recommended practice 57"9 Inspection of Pressure'Relie7ing #e7ices
!cope: his recoended prectice describes autoatic pressure'
relie7ing de7ices coonl, used in the oil and petrocheical
industries. As a guide to the inspection and control of these de7ices
in the userBs plant9 it is intended to ensure their proper perforence.
his publication co7ers such autoatic de7ices as spring'loaded
pressure relief 7al7es9 pilot'operated 7al7es9 and rupture diss.
Practica Recomendada API 57"9 Inspeccin de dispositi7os Presin'Rele7o
Alcance: 6sta practica recoendada describe los dispositi7os auto?ticos presin'rele7o conente usados en
las industrial petro@uDicas , del petrleo. Coo una guDa para la inspeccin , control de estos dispositi7os usados
el la planta9 intencionados para asegurar su desepeEo propio. 6sta publicacin cubre tales dispositi7os coo las
7al7ulas presin rele7o resorte' carga9 7?l7ulas operadas por pilotos9 , discos de rupturas.
-
8/10/2019 Curso API 510 Comimsa
6/83
1.0 Applicables Regulation (codes) for the API 510 Certification
#uide for inspection of refiner$ e%uipment
Charper II Conditions causing deterioration or failures #u&a de Inspecci'n de %uipo de Refiner&aCapitulo II= Condiciones @ue causan deterioro o fallas
A! !C*I+, -9 Fondestructi7e 63aination Ggeneral
re@uireents (article 1)9 radiographic e3aination (article 2)9
ultrasonic e3aination ethods for aterials and fabrication
(article 5)9 li@uid penetrant e3aination (article 4) , agneticparticle e3aination (article )H
A! !CCI+, I9 +ualification standard for &elding and
braing procedures9 &elders9 braers9 and &elding and braing
operators
A! !C*I+, -III /I-. I9 Rules for construction of pressure
7essels
A! !CCI+, -III /I-. 1Reglas para la construccin de recipientes a presin
-
8/10/2019 Curso API 510 Comimsa
7/83
.0 !cope.1 #eneral Application (API 510)
his inspection code co7ers the aintenance inspection9 repair9
alteration9 and rerating procedures for pressure 7essels used b, the
petroleu and cheical process industries. Pressure 7esselinspectors are to be certified as stated in this inspection code.
his inspection code applies to 7essels constructed in accordance
&ith the APIA/6 Code for nfired Pressure *essels or Petroleu
i@uids and !ases9 ection *III of the A/6 Code9 and other
recognied pressuere 7essel codesJ to nonstandard 7essels. hisinspection code is onl, applicable to 7essels that ha7e been placed in
ser7ice (including ites further described in 2.2) and ha7e been
inspected b, an authoried inspection agenc, or repaired b, a repair
organiation as defined in $.15.
.1 Aplicaci'n #eneral9 6ste cdigo de inspeccin cubre los procediientos de inspeccin en anteniiento9 reparacin9
alteracin , de reclasificacin de recipientes a presin usados en la industria de procesos @uDicos , del petrleo. os
inspectores de recipientes a presin son certificados coo es establecido en este cdigo de inspeccin.
6ste cdigo de inspeccin aplica para recipientes construidos en acordancia con el cdigo APIA/6 de recipientes a presin
desioniados para gases , petrleo li@uido9 seccin *III del cdigo A/69 , otros cdigos de recipientes a presin reconocidosJ
para recipientes no est?ndar. 6ste cdigo de inspeccin es solo aplicable para recipientes @ue han sido puestos en ser7icio
(inclu,endo los descritos en el inciso 2.2 as adelante) , @ue han sido inspeccionado por una agencia de inspeccinautoriada o reparado por una organiacin de reparacin coo es definida en $.15
-
8/10/2019 Curso API 510 Comimsa
8/83
.0 !cope
. !pecific Applications (API 510)
All pressure 7essels used for e3ploration and production (6KP)
ser7ice Gfor e3aple9 drilling9 producing9 gathering9 transporting9 lease
processing9 and treating li@uid petroleu9 natural gas9 and associated
sal &ater (brine)H a, be inspected under the alternati7e rules set
forth in section ;. 63cept for section 49 all of the sections in this
inspection code are applicable to pressure 7essels in 6KP ser7ice.
. Aplicaciones especificas
odos los recipientes a presin usados para ser7icios de e3ploracin , produccin Gpor eLeplo9 perforacin9 produccin9
recoleccin9 transporte9 procesos de al@uiler9 petrleo li@uido tratado9 gas natural , asociados de agua de sal (saluera)H
pueden ser inspeccionados baLo las reglas alternati7as seguidas en la seccin ; as adelante. 63cepto de la seccin 49
todas las secciones de este cdigo de inspeccin son aplicables para recipientes en ser7icio de e3ploracin , produccin.
0 !
-
8/10/2019 Curso API 510 Comimsa
9/83
.0 !cope
. !pecific Applications (continua)
he follo&ing are e3cluded fro the specific re@uireents of this
inspection code:
Pressure 7essels on o7able structures co7ered b, other Lurisdictionalregulations (see appendi3 A)
All classes of containers listed for e3eption fro construction in the
scope of section *III di7ision 1 of the A/6 code (see appendi3 A)
Pressure 7essels that do not e3ceed the follo&ing 7olues and
pressures:i7e cubic feet (0.1$1 cubic eters) in 7olue and 250 pounds per
s@uare inch (12".1 ilopascals) desing pressure.
%ne and a half cubic feet (0.0$2 cubic eters) in 7olue and 400
pounds per s@uare inch ($1"4.> ilopascals) desing pressure (see
appendi3 A)
os siguientes son e3cluidos de los re@ueriientos especDficos de este cdigo de inspeccin.
Recipientes a presin en estructuras 7iles cubiertos por otras regulaciones Lurisdiccionales.
oda las clases de contenedores listados por e3cepcin de construccin del alcance de la seccin *III9 di7isin I
del cdigo A/6 (7er ap ilopascal) enpresin de diseEo (7er ap
-
8/10/2019 Curso API 510 Comimsa
10/83
.0 /efinitions
.0 /efinitions
.1 AlterationA ph,sical change in an, coponent or a rerating
that has desing iplications that affect the pressure'containingcapabilit, of a pressure 7essel be,ond the scope of the ites
described in e3isting data reports. he follo&ing should not be
considered alterations: an, coparable or duplicate
replaceent9 the addition of an, reinforced nole less than or
e@ual to the sie of e3isting reinforced noles9 and the
addition of noles not re@uiring reinforceent.
.1 Alteraci'n n cabio fDsico en cual@uier coponente o reclasificacin @ue tiene iplicaciones de diseEo @ue
afectan la capacidad presin'contenido de un recipiente a presin as all? del alcance de las descripcin en
t
-
8/10/2019 Curso API 510 Comimsa
11/83
.0 /efinitions
. A! code: Abbre7iation and shortened title for the A/6 boiler
and pressure 7essel code.
he A/6 code is &ritten for ne& constructionJ ho&e7er9 ost of the
technical re@uireents for desing9 &elding9 e3aination andaterials can be applied in the aintenance inspection9 rating9
repair and alteration of operating pressure 7essels. If an ite is
co7ered b, re@uireents in the A/6 code and this inspection
code or if there is a conflict bet&een the t&o codes9 for 7essels
that ha7e been placed in ser7ice9 the re@uireents of thisinspection code shall tae precedence o7er the A/6 code
he phrase MApplicable re@uireents of the A/6 codeM 9 has been
used in this inspection code instead of the phrase Min accordance
&ith the A/6 codeN
. Codigo Asme: itulo abre7iado , acortado del cdigo A/6 de recipientes a presin , calderas.
6l cdigo A/6 es escrito para una construccin nue7aJ sin ebargo uchos de los re@ueriientos
t
-
8/10/2019 Curso API 510 Comimsa
12/83
.0 /efinitions
"." Authori3ed pressure 4essel inspector: An eplo,ee of an authoried
inspection agenc, &ho is @ualified and certified to perfor inspections
under this inspection code. Inspector Autori3ado en Recipientes a Presi'n: n epleado de una agencia de inspeccin autoriada @uien esta calificado ,
certificado para realiar inspecciones baLo este cdigo de inspeccin.
.. Authori3ed inspection agenc$: An, one of the follo&ing:
he inspection organiation of the Lurisdiction in &hich the pressure
7essel is used.
he inspection organiation of an insurance copan, that is licensed or
registered to &rite and actuall, does &rite pressure 7essel insurance. he inspection organiation of an o&ner or user of pressure 7eseels &ho
aintains an inspection organiation for his e@uipent onl, and not for
7essel intented for sale or resale
An independent organiation or indi7idual that is under contract to and
under the direction of an o&ner'user and that is recognied or other&isenot prohibited b, the Lurisdiction in &hich the pressure 7essel is used.
. Agencia de Inspecci'n Autori3ada Cual@uiera de las siguientes
a organiacin de inspeccin de una Lurisdiccin en la cual el recipiente a presin es usado.
a organiacin de inspeccin de una copaEDa aseguradora @ue esta autoriada o registrada para escribir , actualiar9
haciendo escrito seguros de recipientes a presin
na organiacin independiente de un dueEo o usuario de recipientes a presin @uien antiene una organiacin de
inspeccin solo para su e@uipo , no para recipientes intencionados para 7enta o re7enta
na organiacin independiente o indi7idual @ue esta baLo contrato , baLo la direccin de un dueEo'usuario , @ue esreconocida o de otra anera no es prohibida por la Lurisdiccin en la cual el recipiente a presin es usado.
-
8/10/2019 Curso API 510 Comimsa
13/83
.0 /efinitions
.5 Construction code: he code or standard to &hich a 7essel &as
originall, built9 tal as APIA/69 API or tate pecialnon'A/6
.5 C'digo de Construcci'n: 6l cdigo o est?ndar en el cual el recipiente fue originalente construido9 tal coo elAPIA/69 API o el establecido A/6 especialno especial.
." Inspection Code: shortened title for API 510 used in this publication
." C'digo de Inspecci'n: itulo acortado para el API 510 usado en esta publicacin.
.7 Inspector: Refers to an authoried pressure 7essel inspector in this
docuent.7 Inspector: Refiere a un inspector autoriado de recipientes a presin en este docuento.
.6 urisdiction: A legall, constituted go7ernent adinistration that
a, adopt rules relating to pressure 7essels..6 urisdicci'n: na adinistracin gubernaental constituida legalente @ue puede adoptar reglas relati7as a
recipientes a presin
-
8/10/2019 Curso API 510 Comimsa
14/83
.0 /efinitions
.8 a9imum allo:able :or;ing pressure: he a3iu gaugepressure peritted at the top of a pressure 7essel in its operating
position for a designated teperature. his pressure is based on
calculations using the iniu (or a7erage pitted) thicess for all
critical 7essel eleents9 e3clusi7e of thicness designated for
corrosion and loading other than pressure.8 Presi'n de *raba
-
8/10/2019 Curso API 510 Comimsa
15/83
.0 /efinitions
.10 inimum allo:able shell thic;ness: he thicness re@uired for
each eleent of a 7essel. he iniu allo&able shell thicness
is based on calculations that consider teperature9 pressure9 andall loadings.
.10 spesores del cuerpo (en4ol4ente) m&nimo permisible: 6l espesor re@uerido para cada eleento de unrecipiente . 6l espesor del cuerpo Dnio perisible es basado en c?lculos @ue consideran teperatura9 presin
, todas las cargas.
.11 +n>stream inspection: he inspection used to establish the
suitabilit, of a pressure 7essel for continued operation.Fondestructi7e e3aination (F#6) procedures are used to
establish the suitabilit, of the 7essel9 and the 7essel a, or a,
not be in operation &hile the inspection is being carried out.
8ecause a 7essel a, be in operation &hile an on'strea
inspection is being carried out9 an on'strea inspection eansessentiall, that the 7essel is not entered for internal inspection.
.11 Inspecci'n con ?luido (on>stream) a inspeccin usada para establecer la con7eniencia de un recipiente apresin para continuar en operacin. Procediientos de e3ainacin no destructi7a son usados para establecer
la con7eniencia de un recipiente9 , el recipiente puede o no puede estar en operacin ientras la inspeccin con
fluido se esta lle7ando a cabo9 una inspeccin con fluido significa esencialente @ue el recipiente no tiene
entrada para una inspeccin interna.
-
8/10/2019 Curso API 510 Comimsa
16/83
.0 /efinitions
.1 Presure 4essel: A container designed to &ithstand internal or
e3terna pressure. his pressure a, be iposed b, an e3ternal
source9 b, the application of heat fro a direct or indirect source9or b, an, cobination thereof.
.1 Recipientes a Presi'n: n contenedor diseEado para soportar presin interna o e3terna. 6sta presin puede ser ipuesta por
una fuente e3terna9 por la aplicacin de calor de una fuente directa o indirecta o por cual@uier cobinacin de abas.
(API 52) A pressure 7essel is a container that falls &ithin the scope
of section *III of the A/6 code and that is subLect to an e3ternal
or internal desing pressure greater than 15 pounds per s@uare
inch gauge (10" ilopascals)
.1 Pressure 4essel engineer: hall be one or ore persons or
organiations acceptable to the o&ner'user &ho are
no&ledgeable and e3perienced in the engineering disciplinesassociated &ith e7aluating echanical and aterial
characteristics &hich affect the integrit, and reliabilit, of pressure
7essels.1 Ingeniero de Recipientes a Presi'n: #eber? ser uno o as personas o organiaciones aceptables pata el dueEo'usuario
@uienes est?n e3perientado , conocen disciplinas de ingenierDas asociadas con e7aluaciones ec?nicas , caracterDsticas
de aterial los cuales afectan la integridad , confiabilidad de recipientes a presin.
-
8/10/2019 Curso API 510 Comimsa
17/83
.0 /efinitions
.1 @ualit$ assurance: All planned9 s,steatic9 and pre7entati7e
actions re@uired to deterine if aterials9 e@uipent9 or ser7ices
&ill eet specified re@uireents so that e@uipent &ill perfor
satisfactoril, in ser7ice.1 Aseguramiento de Calidad: oda planeacin9 sisteatiacin , acciones pre7enti7as re@ueridas
para deterinar si los ateriales9 e@uipos o ser7icios cuplen los re@ueriientos especDficos tal
@ue el e@uipo realia satisfactoriaente el ser7icio.
.15 Repair: he &or necessar, to restore a 7essel to a condition
suitable for safe operation at the design conditions. If an, repairchanges the design teperature or pressure9 the re@uireents for
rerating shall be satisfied. A repair can be the addition or
replaceent of pressure or nonpressure part that do not change
the rating of the 7essel
.15 Reparaci'n: 6l trabaLo necesario para restaurar un recipientes a la apropiada condicin para la
operacin segura en las condiciones de diseEo. i cual@uier reparacin cabia la presin o
teperatura de diseEo9 los re@ueriientos para reclasificacin deber?n ser satisfechos. na
reparacin puede ser la adicin o reeplao de partes a presin , a no'presin @ue no cabia la
clasificacin del recipiente.
-
8/10/2019 Curso API 510 Comimsa
18/83
.0 /efinitions
.1" Repair organi3ationAn, one of the follo&ing:
he holder of a 7alid A/6 certificate of authoriation that
authories the use of an appropriate A/6 code s,bol stap. An o&ner or user of pressure 7essels &ho repairs his or her o&n
e@uipent in accordance &ith this inspection code.
A contractor &hose @ualifications are acceptable to the pressure'
7essel o&ner or user and &ho aes repairs in accordance &ith
this inspection code.
An indi7idual or organiation that is authoried b, the legal
Lurisdiction
.1" +rgani3aci'n de Reparaci'n: Cual@uiera de las siguientes:
6l titular de un certificado 7alido de autoriacin A/6 @uien autoria el uso de un apropiado estapado de unsDbolo del cdigo A/6.
n dueEo o usuario de recipientes a presin @uien repara su o sus e@uipos en acordancia con este cdigo de
inspeccin
n contratista cu,as calificaciones son aceptables para el dueEo o usuario de recipientes a presin , @uien hace
reparaciones en acordancia con este cdigo de inspeccin
n indi7iduo o organiacin @uien esta autoriado por una Lurisdiccin legal.
0 / fi i i
-
8/10/2019 Curso API 510 Comimsa
19/83
.0 /efinitions
.17 Rerating: A change in either the teperature ratings or the
a3iu allo&able &oring pressure rating of a 7essel9 or a
change in both. he a3iu allo&able &oring teperature andpressure of a 7essel a, be increased or decreased because of a
rerating9 and soeties a rerating re@uires a cobination of
changes. #erating belo& original design conditions is a
perissible &a, to pro7ide for corrosion. -hen a rerating is
conducted in &hich the a3iu allo&able &oring pressure orteperature is increased or the iniu teperature is
decreased so that additional echanical test are re@uired9 it shall
be considered an alteration.
.17Reclasificaci'n: n cabio en cual@uier rango de teperatura o rangos de presin de trabaLo ?3ia perisible deun recipiente9 o un cabio en abos. a teperatura , presin de trabaLo ?3ia perisible de un recipiente
puede ser increentada o decreentada debido a una reclasificacin 9 , en algunos 7eces una reclasificacin
re@uiere una cobinacin de abas. Reducciones abaLo de las condiciones originales de diseEo es un caino
perisible para pro7eer corrosin. Cuando una reclasificacin es conducida en el cual la teperatura o presin de
trabaLo ?3ia perisible es increentada o la teperatura Dnia es decreentada tal @ue ensa,os ec?nicos
adicionales son re@ueridos9 esto deber? ser considerado una alteracin.
0 / fi iti
-
8/10/2019 Curso API 510 Comimsa
20/83
.0 /efinitions
.16 9aminer. A person &ho assists the API authoried pressure
7essel inspector b, perforing specific F#6 on pressure 7essels
but does not e7aluate the results of those e3ainations inaccordance &ith API 5109 unless specificall, trained and
authoried to do so b, the o&ner or user. In soe cases9 the
e3ainer a, be re@uired to hold other certifications as necessar,
to satisf, the o&ner or user re@uireents. 63aples of other
certification that a, be re@uired are Aerican ociet, forFondestructi7e esting (AF) F'C'1A9 or CP1;>9 or
Aerican -elding ociet, (A-) -elding Inspector Certification.
.16 9aminador: na persona @uien asiste al inspector autoriado de recipientes a presin en realiaciones especificasF#6 en recipientes a presin pero no e7ala los resultados de estas e3ainaciones en acordancia con API 5109 al
enos @ue este especDficaente capacitado , autoriado para hacerlo por el dueEo o usuario. 6n algunos casos el
e3ainador puede ser re@uerido para soportar otras certificaciones necesarios para los re@ueriientos de
seguridad del dueEo o usuario. 6Leplos de estas certificaciones pueden ser re@ueridas con sociedad aericana de
ensa,os no destructi7os F'C'IA o certificacin coo inspector de soldadura de la sociedad aericana de
soldadura
0 + ner ser Inspection +rgani ation
-
8/10/2019 Curso API 510 Comimsa
21/83
.0 +:ner>ser Inspection +rgani3ation
.1 #eneral9 An o&ner or user of pressure 7essels shall e3ercise
control of the the pressure 7essels inspections progra9
inspection fre@uencies9 and aintenance. he o&ner'user isresponsible for the functions of an authoried inspection agenc,
in accordance &ith the pro7isions of API 510. his o&ner'user
inspection organiation a, also control acti7ities relating to the
aintenance inspection9 rating9 repair9 and alteration of these
pressure 7essels.1 #eneral9 n dueEo'usuario de recipientes a presin deber? eLercer control en el prograa de inspeccin de recipientes a
presin9 frecuencias de inspeccin , anteniiento. 6l dueEo'usuario es responsable de la funcin de una agencia de
inspeccin autoriada en acordancia con las pro7isiones de API 510. a organiacin de inspeccin dueEo'usuario deber?
controlar las acti7idades relati7as a la inspeccin del anteniiento9 clasificacin9 reparacin , alteracin de recipientes a
presin.
. API authori3ed pressure 4essel inspection %ualification and
certification9 Authoried pressure 7essel inspectors shall ha7eeducation and e3perience in accordance &ith appendi3 8 of this
inspection code. Authoried pressure 7essel inspectors shall be
certified b, the API in accordance &ith the pro7isions of appendi3 8.
. Calificaci'n $ Certificaci'n del Inspector API Autori3ado de Recipientes a Presi'n: 6l inspector autoriado de recipientes a
presin deber? tener educacin , e3periencia en acordancia con el ap
-
8/10/2019 Curso API 510 Comimsa
22/83
.0 +:ner>ser Inspection +rgani3ation
. +:ner>user organi3ation responsibilities9 An o&ner'user
organiation is responsable for de7eloping9 docuenting9
ipleenting9 e3ecuting9 and assessing pressure 7essel
inspection s,stes and inspection procedures that &ill eet the
re@uireents of this inspection code. hese s,stes and
procedures &ill de contained in a @ualit, assurance inspection
anual and shall include the follo&ing:
%rganiation and reports of structure for inspection personnel
#ocuentation and aintenance of inspection and @ualit,
assurance procedures.
. Responsabilidades de la +rgani3aci'n /ueBo>usuario: na organiacin dueEo'usuario es responsable de
desarrollar9 docuentar9 ipleentar9 eLecutar , e7aluar los sisteas de inspeccin , procediientos de inspeccin derecipientes a presin @ue cuplan los re@ueriientos de este cdigo de inspeccin .6stos sisteas , procediientos
ser?n contenidos en un anual de inspeccin de aseguraiento de calidad , deber? incluir los siguientes:
6structura del reporte , organiacin del personal de inspeccin
#ocuentacin , anteniiento de los procediientos de inspeccin , aseguraiento de calidad.
-
8/10/2019 Curso API 510 Comimsa
23/83
.0 +:ner>ser Inspection +rgani3ation
. +:ner>user organi3ation responsibilities (continue)
#ocuentation and reports of inspection and test results.
Correcti7e action for inspection and test results.
Internal audits for copliance &ith the @ualit, assurance
inspection anual.
Re7ie& and appro7al of dra&ings9 desing calculations9 andspecifications for repairs9 alterations9 and reratings.
Assurance that all Lurisdictional re@uireents for pressure
7essel inspection9 repairs9 alterations9 and rerating are
continuousl, et
#ocuentacin , reportes de inspeccin , resultados de ensa,os
Accin correcti7a de inspecciones , resultados de ensa,os
Auditorias internas de cupliiento con el anual de inspeccin de aseguraiento de calidad
Re7isin , aprobacin de dibuLos9 c?lculos de diseEo9 , especificaciones de reparaciones9 alteraciones ,
reclasificaciones
Asegurar @ue todos los re@ueriientos Lurisdiccionales para la inspeccin de recipientes a presin9 alteracin ,
reclasificacin son cuplidos continuaente.
-
8/10/2019 Curso API 510 Comimsa
24/83
.0 +:ner>ser Inspection +rgani3ation
. +:ner>user organi3ation responsibilities (continue)
Reports to the authoried pressure 7essel inspector an,
process changes that could affect pressure 7essel integrit,
raining re@uireents for inspection personnel regarding
inspection tools9 techni@ues9 and technical no&ledge base
Controls necessar, so that onl, @ualified &elders and
procedures are used for all repairs and alterations Controls necessar, so that onl, @ualified nondestructi7e
e3aination (F#6) personnel and procedures are utilied
Reportes para inspector autoriado de recipientes a presin de cual@uier cabio en el proceso @ue pueda afectar la
integridad del recipiente a presin.Re@ueriientos de capacitacin para el personal de inspeccin respecto a las herraientas de inspeccin9 t
-
8/10/2019 Curso API 510 Comimsa
25/83
.0 +:ner>ser Inspection +rgani3ation
. +:ner>user organi3ation responsibilities (continue) Controls necessar, so that onl, aterials conforing to the
applicable section of the A/6 code are utilied for repairs andalterations
Controls necessar, so that all inspection easureent and test
e@uipent are properl, aintained and calibrated Controls necessar, so that the &or of contract inspection or
repair organiations eet the sae inspection re@uireents asthe o&ner'user organiation
Internal auditing re@uireents for the @ualit, control s,ste for
pressure'relie7ing de7ices
Control necesario tal @ue solo ateriales @ue conforan la seccin aplicable del cdigo A/6 son utiliados para
reparaciones , alteraciones.
Control necesario tal @ue tos los instruentos de inspeccin , e@uipos de ensa,os son correctaente antenidos ,
calibrados.
Control necesario tal @ue el trabaLo de la contratista de inspeccin o organiacin de reparacin cuplen los isos
re@ueriientos de inspeccin de la organiacin dueEo'usuario.
Re@ueriientos de auditorias internas del sistea de control de calidad de los dispositi7os presin'rele7o.
-
8/10/2019 Curso API 510 Comimsa
26/83
.0 +rgani3aci'n de Inspecci'n /ueBo>suario
. API authori3ed pressure 4essel inspector responsibilities
-hen inspections9 repairs9 or alterations are being conducted on
pressure 7essels9 an API authoried pressure 7essel inspectorshall be responsible to the o&ner'user for deterining that the
re@uireents of API 510 on inspection9 e3aination9 and testing
are et9 and shall be directl, in7ol7ed in the inspection
acti7ities.he API authoried pressure 7essel inspector a, be
assisted in perforing'7isual inspections b, other properl, trainedand @ualified indi7iduals9 &ho a, or a, not be certified 7essel
inspectors. Personnel perforing nondestructi7e e3ainations
shall eet the @ualifications identified in ".1; but need not be API
authoried pressure 7essel inspectors. Oo&e7er9 all e3ainations
results ust be e7aluated and accepted b, the API authoried
pressure 7essel inspector4.4 Responsabilidades del Inspector Autorizado API en Recipientes a Presin.
Cuando inspecciones, reparaciones, o alteraciones estn siendo conducidas en un recipiente a presin, un inspector autorizado API en recipientes a presin
deber ser el responsable para el dueo-usuario para determinar que los requerimientos de API en inspeccin, examinacin y ensayo son cumplidos y
deber estar directamente involucrado en las actividades de inspeccin. l inspector autorizado API en recipientes a presin puede ser asistido en la
realizacin de inspecciones visuales por tros individuos propiamente capacitados y cali!icados. l personal e"ecutando examinaciones no destructivas
deber cumplir las cali!icaciones identi!icadas en #.$ pero no necesita ser un inspector autorizado de recipiente a presin. %in embar&o, todos losresultados de las evaluaciones podrn ser evaluados y aceptados por el inspector API autorizado en recipientes a presin
-
8/10/2019 Curso API 510 Comimsa
27/83
5.0 Inspection Practices
5.1 Preparator$ :or;
afet, precautions are iportant in pressure 7essel inspection
because of the lieted access to and the confined spaces of pressure
7essels. %ccupational safet, and health adinistration (0OA)
regulations pertaining to confined spaces and an, other %OA safet,
rules should be re7ie&ed and folo&ed9 &here applicable.
or an internal inspection9 the 7essel should be isolared b, blinds or
other positi7e ethods fro all sources of li@uids9 gases9 or 7apors.he 7essel should be drained9 purged9 cleaned9 7entilated9 and gas
tested before it is entered. -here re@uired9 protecti7e e@uipent
shuold be &orn that &ill protect the e,es9 lungs9 and other parts of the
bod, fro specific haards that a, e3ist in the 7essel
5.1 *raba
-
8/10/2019 Curso API 510 Comimsa
28/83
5.0 Inspection Practices
5.1 Preparator$ :or; (continue)
he nondestructi7e testing e@uipent used for the inspection is
subLect to the safet, re@uireents custoaril, follo&ed in a gaseousatosphere .
he tools and personnel safet, e@uipent needed for the 7essel
inspection should be checed before the inspection. %ther e@uipent
that ight be needed for the inspection9 such as planing9 scaffolding9
bosunBs chairs9 and portable ladders9 should be a7ailable if needed.
5.1 rabaLo Preparatorio (continua)
6l e@uipo de ensa,os no destructi7os usados para la inspeccin est?n suLetos a los re@ueriientos de seguridad
habitualente seguidos en una atsfera gaseosa
as herraientas , e@uipos de seguridad personal necesarios para inspeccin de recipientes deberan ser checados
entes de la inspeccin. %tros e@uipos @ue puedan ser necesarios para la inspeccin9 tales coo tablones9 andaios9
sillas contraaestre , escalerasport?tiles deberan estar disponible si se necesitan
5 0 I i P i
-
8/10/2019 Curso API 510 Comimsa
29/83
5.0 Inspection Practices
5. odes of deterioration and failure
Containants in fluids handled in pressure 7essels9 such as sulfur9
chlorine9 h,drogen sulfide9 h,drogen9 carbon9 c,anides9 acids9 &ater9
or other corroding species a, react &ith etals and cause
corrosion. ignificant stress fluctuations or re7ersals in part of
e@uipent are coon9 particular, at points of high secondar,
stress. If stresses are high and re7ersals are fre@uent9 failure of parts
a, occur because of fatigue. atigue failures in pressure 7essels
a, also occur because of c,clic teperature and pressure changes.
ocations &here etals &ith different theral coefficients of
e3pansion are &elded together a, be susceptible to theral fatigue.
5. odos de deterioraci'n $ fallaContainantes en fluidos aneLados en recipientes a presin9 tales coo el aufre9 cloros9 sulfuro de hidrogeno9
hidrgenos carbn9 cianuros9 ?cidos9 agua o otros especies corrosi7os pueden reaccionar con el etal , causar
corrosin. luctuaciones de esfueros significantes o re7ersible en partes de e@uipos son counes9 particularente en
puntos de esfueros secundarios altos. i los esfueros son altos9 re7ersibles , frecuentes9 la falla de partes puede
ocurrir debido a fatiga. as fallas por fatiga en recipientes a presin pueden ade?s ocurrir debido a cabios de presin
, teperaturas cDclicas. ocaciones donde etales con coeficientes t
-
8/10/2019 Curso API 510 Comimsa
30/83
5.0 Inspection Practices
5. odes of deterioration and failure (continue)
#eterioration or creep a, occur if e@uipent is subLected to
teperatures abo7e those for &hich it is designed. ince etals&eaen at higher teperatures9 such deterioration a, cause
failures9 particular, at points of stress concentration. Creep is
depent on tie9 teperature9 stress9 and aterial creep strenght9 so
the actual or estiated le7els of these @uantities should be used in
an, a7aluations. At ela7ated teperatures9 other etallurgicalchanges a, also tae place that a, peranentl, effect
e@uipent.
5.1 odos de deterioraci'n $ falla (continua)
a deterioracin o terofluencia (tero deforacin) puede ocurrir en e@uipo suLetos a teperaturas arriba de la cual fue
diseEado. #esde etales debilitados a altas teperaturas 9 tal deterioracin puede causar falla9 particularente en
puntos de concentracin de esfueros. a tero deforacin es dependiente en tiepo9 teperatura9 esfuero ,
esfuero de tero deforacin del aterial9 de anera @ue el ni7el estiado o actual de estas cantidades deber? ser
usada en cual@uier e7aluacin. A teperaturas ele7adas9 otros cabios etalrgicos pueden ade?s dar lugar @ue
pueden peranenteente afectar el e@uipo.
5 0 I ti P ti
-
8/10/2019 Curso API 510 Comimsa
31/83
5.0 Inspection Practices
5. odes of deterioration and failure (continue)
or de7eloping an inspection plan for e@uipent operating at ele7ated
teperatures Ggenerall, starting in the range of 50'1000 ($00'
5$0C)9 depending on operating conditions and allo,H9 the follo&ing
should be considered in assessing the reaining life:
Creep deforation and stress rupture
Creep crac gro&th
6ffect of h,drogen on creepInteration of creep and fatigue
Possible atallurgical effects9 including a reduction in dictilit,
5.1 odos de deterioraci'n $ falla (continua)
Para desarrollar un plan de inspeccin para e@uipos operando a teperaturas ele7adas Giniciadas generalente en losrangos de 50'1000 ($00'5$0C)9 dependiendo sobre las condiciones de operaciones , aleacionesH as siguientes
deber?n ser consideradas en la e7aluacin de la 7ida reanente:
6sfuero de ruptura , deforacin t
-
8/10/2019 Curso API 510 Comimsa
32/83
5.0 Inspection Practices
5. odes of deterioration and failure (continue)
At subfreeing teperatures9 &ater and soe cheicals handled inpressure 7essels a, freee and cause failure
At abient teperatures9 carbon9 lo&'allo,9 and other ferritic steels
a, be susceptible to brittle failure. A nuber of failures ha7e been
attributed to brittle fracture of steels that &ere e3posed to
teperatures belo& their transition teperatures and to pressuregreater than 20 percent of the re@uired h,drostatic test pressureJ ost
brittle fractures 9 ho&e7er9 ha7e occurred on the first application of a
particular stress le7el (the first h,drotest or o7erload).
5.1 odos de deterioraci'n $ falla (continua)
A teperaturas baLo cero9 el agua , algunos @uDicos aneLados en recipientes a presin pueden congelarse , causar
falla.
A teperatura abiente9 aleaciones baLas , al carbn9 , otros aceros ferriticos pueden ser susceptible a falla fr?gil. n
nuero de fallas a sido atribuidas a fractura fr?gil en aceros @ue fueron e3puestos a teperaturas arriba de sus
teperaturas de transicin , a presiones a,ores al 20Q de el presin de ensa,o hidrost?tica re@ueridaJ uchas
fracturas fr?gil9 sin ebargo han ocurrido en la priera aplicacin de un ni7el de esfuero particular (el prierhidroensa,o o sobre carga)
5 0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
33/83
5.0 Inspection Practices
5. odes of deterioration and failure (continue)
Although the potential for a brittle failure because of e3cessi7e
operating conditions belo& the transition teperature shall be
e7aluated9 the potential for a brittle failure because of reh,drotestingor pneuatic testing of e@uipent or the addition of an, other
additional loadings shall also be e7aluated. pecial attention should
be gi7en to lo&'allo, steels (especiall, 21$ Cr'1/o) because the,
a, be prone to teper ebrittleent. Geper ebrittleent is a
loss of ductilit, and notch toughness due to post&eld heat treatentor high'teperature ser7ice (abo7e 00)("0C)H.
%ther fors of deterioration 9 such as stress corrosion cracing
(CC)9 h,drogen attac9 carburiation9 graphitiation9 and erosion9
a, also occur under special cincustances. hese fors of
deterioration are discussed in Chapter II of the API !uide forInspection for Refiner, 6@uipent.
5.1 odos de deterioraci'n $ falla (continua)
Aun@ue el potencial para una falla fr?gil debido a las condiciones de operacin e3cesi7a abaLo de su teperatura de transicin deber?n ser e7aluadas9 el potencial
para una falla fr?gil debido a ensa,os neu?ticos o rehidrostaticos de los e@uipos o la adicin de otras cargas deber?n ade?s ser e7aluados. Atencin especial
deber? ser dado a aceros de aleaciones baLas debido a @ue pueden estar dispuestos a fragiliacin por teple (perdida de ductibilidad , tenacidad (durea)
debido al trataiento t
-
8/10/2019 Curso API 510 Comimsa
34/83
5 0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
35/83
5.0 Inspection Practices
5..1 Causes of deterioration (API 57)
Corrosion
Corrosion is the prie cause of deterioration in a pressure 7essel
and a, occur on an, part of the 7essel. he se7erit, of the
deterioration is influenced b, the concentration9 teperature9 and
nature of the corrosi7e agents in the fluid and b, the corrosion
resistance of the construction aterials. API Recoended Practice
51 co7ers corrosion in detail.
he ost coon internal corrodents in refineries are sulfur and
chloride copounds. Caustics9 inorganic acids9 organic acids9 &ater
(especiall, &ater &ith a lo& PO)9 deposit or cellular attac cheicals9
and other cheicals used in a particular process a, also corrode
7essels.
5..1 Causas de deterioraci'n (API 57)
Corrosi'n
a corrosin es la causa principal de deterioracin en un recipiente a presin , puede ocurrir en cual@uier parte del recipiente. a
se7eridad de la deterioracin es influenciada por la concentracin9 teperatura , naturalea de los agentes corrosi7os en el fluido ,
por la resistencia a la corrosin de los ateriales de construccin.
6l corro,ente interno as con en refinerDas son el aufre , copuestos de cloruros. C?ustico9 ?cidos inorg?nicos , org?nicos9
agua (especialente agua con baLo PO)9 depsitos , @uDicos de ata@ue celular , otros @uDicos usados en un proceso particular
pueden ade?s corroer recipientes
5 0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
36/83
5.0 Inspection Practices
5..1 Causes of deterioration (API 57)
Corrosion (continue)
63ternal corrosion9 especiall, under insulation9 7aries &ith atospheric
conditions and increases &ith huidit,. It is often accelerated b,
containants in the atosphere. Atospheric conditions in industrial
areas and seashore locations are especiall, corrosi7e
5..1 Causas de deterioraci'n (API 57)
Corrosi'n (continuaci'n)
a corrosin e3terna9 especialente baLo el aislaiento9 7aria con las condiciones atosf
-
8/10/2019 Curso API 510 Comimsa
37/83
5.0 Inspection Practices
5..1 Causes of deterioration (API 57)
rosion
6rosion is the attrition of a surface fro the ipingeent of solidparticles or li@uid drops on the surface. It is usuall, found &here
restrictions in flo&9 changes in direction9 or disturbances result in local
high 7elocities.
%ccasionall,9 corrosion and erosion cobine to increase rates of
deterioration. he cobination of corrosion and erosion a, occuropposite noles in the botto of fractionators of fluid catal,tic
cracing units
5..1 Causas de deterioraci'n (API 57)
rosi'n
a erosin es el desgaste de una superficie del cho@ue de partDculas slidas o descargas (gotas) de fluidos en la
superficie9 6sto es esencialente encontrado donde restricciones en fluLo9 cabios de direcciones o disturban cDas
resultados de altas 7elocidades locales.
%cosionalente9 corrosin , erosin se cobinan para increentar las 7elocidades de deterioracin. a cobinacin de
corrosin , erosin puede ocurrir en bo@uillas opuestas en el fondo de fraccionadores de unidades de agrietaiento de
fluidos catalDticos
5.0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
38/83
5.0 Inspection Practices
5..1 Causes of deterioration (API 57)
etallurgical and ph$sical changes
Pressure 7essel etals are e3posed to ser7ice conditions that a,
cause icrostructural or etallurgical changes in the etal9 hese
changes often affect the echanical properties of the etal and a,
result in cracing or other deterioration. /icrostructural changes a,
result either fro iproper heating and cooling of the etal or froetallurgical cheical changes in the etal. 63aples of these
changes are graphitiation9 high'teperature h,drogen attac9
carbide precipitation9 intergranular corrosion and ebrittleent.
5..1 Causas de deterioraci'n (API 57)
Cambios f&sicos $ metalrgicos
os etales de recipientes a presin son e3puestos a condiciones de ser7icio @ue pueden causar cabios etalrgicos o
icro estructurales en el etal. 6stos cabios a enudo afectan las propiedades ec?nicas del etal , pueden resultar
en grietas o otras deterioraciones. os cabios icro estructurales pueden resultar del calentaiento o enfriaiento
ipropio del etal o de cabios @uDicos etalrgicos en el etal. 6Leplos de estos cabios son grafitiacin9 ata@ue
por hidrogeno a altas teperaturas9 precipitacin de carburos9 corrosin Dnter granular , fragiliacin.
5 0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
39/83
5.0 Inspection Practices
5. Corrosion rate determination
or a ne& 7essel or for a 7essel for &hich ser7ice conditions are
being changed9 one of the follo&ing ethods shall be eplo,ed to
deterine the 7esselBs probable corrosion rate. he reaining &allthicness at the tie of the ne3t inspection can be estiated fro this
rate.
A corrosion rate a, be calculated fro data collected b, the
o&ner or user on 7essels pro7iding the sae or siilar ser7ice.
If data on 7essels pri7iding the sae or siilar ser7ice are not
a7ailable9 a corrosion rate a, be estiated fro the o&nerBs or
userBs e3perience or fro published data on 7essels pri7iding
coparable ser7ice
5. /eterminaci'n de 4elocidad de corrosi'nPara un recipiente nue7o o para un recipiente del cual las condiciones de ser7icio estan siendo cabiadas9 uno de los
-
8/10/2019 Curso API 510 Comimsa
40/83
5.0 Inspection Practices
5. Corrosion rate determination (continue)
If the probable corrosion rate cannot be deterined b, aither ite a
or ite b abo7e9 on'strea deterinations shall be ade afterappro3iatel, 1000 hours of ser7ice b, using suitable corrosion
onitoring de7ices or actual nondestructi7e thicness easureents
of the 7essel or s,ste. ubse@uent deterinations shall be ade
after appropriate inter7als until the corrosion rate is established.
If it is deterined that an inaccurate corrosion rate has beenassued9 the rate to be used for the ne3t period shall be increased or
a, be decreased to agree &ith the actual rate
5. /eterminaci'n de 4elocidad de corrosi'n (continuaci'n)
i la 7elocidad de corrosin no puede ser deterinada por los incisos a , b de arriba9 deterinaciones con fluido
deber?n ser hechas despu
-
8/10/2019 Curso API 510 Comimsa
41/83
5.0 Inspection Practices
5. a9imum allo:able :or;ing pressure determination
he a3iu allo&able &oring pressure for the continued use of a
pressure 7essel shall be besed on coputations that are deterinedusing the latest edition of the A/6 Code or the construction code to
&hich the 7essel &as built. he resulting a3iu allo&able &oring
pressure fro these coputations shall not be greater than the
original a3iu allo&able &oring pressure unless a rerating is
perfored in accordance &ith .".
Coputations a, be ade onl, if the follo&ing essential details
copl, &ith the applicable re@uireents of the code being used:
head9 shell9 and nole reinforceent desingsJ aterial specificationsJ
allo&able stressesJ &eld efficienciesJ inspection acceptance criteriaJ
and c,clical ser7ice [email protected]. /eterminaci'n de presi'n de traba
-
8/10/2019 Curso API 510 Comimsa
42/83
5.0 Inspection Practices
5. a9imum allo:able :or;ing pressure determination
(continue)
In corrosi7e ser7ice9 the &all thicness used in these coputationsshall be the actual thicness as deterined b, inspection (see 5.)
but shall not be greater than the thicness reported in the aterial
test report or the anufacturers data report9 &here a7ailable9
inus t&ice the estiated corrosion loss before the date of the
ne3t inspection9 e3cept as odified in 4.$. Allo&ance shall beade for the other loadings in accordance &ith the applicable
pro7isions of the A/6 Code
5. /eterminaci'n de presi'n de traba
-
8/10/2019 Curso API 510 Comimsa
43/83
5.0 Inspection Practices
5.5 /efect Inspection
*essels shall be e3ained for 7isual indications of distortion. If an,
distortion of a 7essel is suspected or obser7ed9 the o7erall
diensions of the 7essel shall be checed to confir &hether or
not 7essel is distorted and9 if it is distorted9 to deterine the e3tend
and seriousness of the distortion. he parts of the 7essel that
should be inspected ost carefull, depend on the t,pe of 7essel
and its operating condition. he authoried pressure 7essel
inspector should be failiar &ith the operating conditions of the
7essel and &ith the causes and characteristics of potential defects
and deterioration
5.5 Inspecci'n de defectos
os recipientes deber?n ser e3ainados de indicaciones 7isuales por distorsin. i cual@uier distorsin de un
recipiente es sospechada o obser7ada9 las diensiones totales del recipiente deber?n ser checadas para para confirar
si el recipiente esta distorsionado9 si esta distorsionado9 se deterinara la e3tensin , seriedad de la distorsin. as
partes de los recipientes @ue deber?n ser as cuidadosaente inspeccionados dependen del tipo de recipiente , de las
condiciones de operacin. 6l inspector autoriado en recipientes a presin deber? estar failiariado con los
condiciones de operacin del recipiente , con las causas , caracterDsticas de defectos potenciales , de deterioracin
5 0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
44/83
5.0 Inspection Practices5.5 /efect Inspection (continue)
Carefull 7isual e3aination is the ost iportant and the ost
uni7ersall, accepted ethod of inspection. %ther ethods that a,
be used to suppleent 7isual inspection include: agnetic>particle e9amination for cracs and other elongated
discontinuities in agnetic aterials
?luorescent or d$e>penetrante9aminationfor disclosing cracs9
porosit,9 or pin holes that e3tend to the surface of the aterial and for
outlining other surface iperfections9 especiall, in nonagneticaterials
Radiodraphic e9amination
ltrasonic thic;ness measurement and fla: detection
dd$ current e9aminationetallographic e9amination
5.5 Inspecci'n de defectos (continuaci'n)
a e3ainacin 7isual cuidadosa es el as iportante , el as uni7ersalente
-
8/10/2019 Curso API 510 Comimsa
45/83
5.5 /efect Inspection (continue)
Acoustic eission testingJ haer testing &hile not under pressure
Pressure testing
he t,pe of surface preparations re@uired depends on the indi7udualcircustances9 but surfece preparations such as &ire brushing9
blasting9 chipping9 grinding9 or a cobination of these preparations
a, be re@uired. (ection * A/6)
If e3ternal or internal co7erings9 such as insulation9 refractor, protecti7e
linings9 and corrosion'resistant linings9 are in good condition and thereis no reason to suspect that an unsafe condition is behind the9 it is
not necessar, to reo7e the for inspection of the 7esselJ ho&e7er9 it
a, be ad7isable to reo7e sall portions of the co7erings to
in7estigate their condition and effecti7eness and the condition of the
etal underneath the.5.5 Inspecci'n de defectos (continuaci'n)
(g) 6nsa,o de eisin acstica9 ensa,o de artillo (golpe) ientras no este baLo presin , (h) ensa,o a presin.
os tipos de preparacin de superficies re@ueridos dependen de las circunstancias indi7iduales9 pero las preparaciones de
superficies coo cepillado con alabre9 chorro (e3plosin)9 raspado (re7entado)9 rectificado (trituracin9 eserilado) o una
cobinacin de estas preparaciones puede ser re@uerido.
i coberturas e3ternas o interna9 tales coo aislaiento9 recubriientos de proteccin refractarios , recubriientos resistentes a la
corrosin9 est?n en buenas condiciones , no e3iste ran para sospechar @ue una condicin insegura ha, debaLo estos9 no es
necesario reo7erlos para inspeccin del recipiente9 sin ebargo9 puede ser con7eniente reo7er pe@ueEas porciones de lascoberturas para in7estigar su condicin , efecti7idad , la condicin del etal debaLo estos
5.0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
46/83
5." Inspection of parts
he follo&ing inspectiones are not all inclusi7e for e7er, 7essel9 but
the, do include the features that are coon to ost 7essels and that
are ost iportant. Authoried pressure 7essel inspectors ustsuppleent this list &ith an, additional ites necessar, for the
particular 7essel or 7essels in7ol7ed.
63aine the surfaces of shells and heads carefull, for possible
cracs9 blisters9 bulges9 and other signs of deterioration. Pa, particular
attention to the sirt and support'attachent and nucle regions of theheads. If e7idence of distirtion is found9 it a, be necessar, to ae a
detailed chec of the actual contours or principal diensions of the
7essel and to copare those contours and diensions &ith the original
desing details
5." Inspecci'n de partes
as inspecciones siguientes no son todas e3clusi7a para cada recipiente9 pero inclu,en las fallas @ue son as counes
en uchos recipientes , @ue son as iportantes. 6l inspector autoriado en recipientes a presin puede supleentar
esta lista con cual@uier artDculos (eleentos) adicionales necesario para el recipiente particular o recipientes in7olucrados.
63aine las superficies de cuerpos , cabeas cuidadosaente de posibles grietas9 apollas9 cur7aturas
(abultaientos) , otros signos de deterioracin. Poniendo particular atencin a el faldn , accesorios soportados ,
regiones de articulacin de las cabeas. i e7idencias de distorsin son encontrados9 puede ser necesario hacer un
che@ueo detallado del contorno actual o diensiones principales del recipiente , coparar estas diensiones ,
contornos con los detalles de diseEo original.
-
8/10/2019 Curso API 510 Comimsa
47/83
5.0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
48/83
5.0 Inspection Practices
5.7 Corrosion and minimum thic;ness e4aluation
Corrosion a, cause a unifor loss (a genaral9 relati7el, e7en
&astage of a surface area) or a, cause a pitted appearance(irregular surface &astage). nifor corrosion a, be difficult to
detect 7isuall,9 and thicness readings a, be necessar, to
deterine its e3tent. Pitted surfaces a, be thinner than the,
appear 7isuall,9 and &hen there is uncertaint, about the original
surface location9 thicness deterinations a, also be necessar,.
5.7 4aluaci'n de corrosi'n $ espesores m&nimos
a corrosin puede causar una perdida unifore (en general9 hasta relati7aente desperdicio de una ?rea desuperficie) o puede causar una apariencia de picaduras (desperdicio de superficie irregular). a corrosin unifore
puede ser dificil de detectar 7isualente9 , lecturas de espesores puede ser necesario para deterinar su e3tensin.
as superficies con picaduras pueden ser as delgadas de lo @ue aparentan 7isualente , cuando e3iste una
incertidubre acerca de la ubicacin de la superficie original9 deterinaciones de espesores pueden ade?s ser
necesarios.
5.0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
49/83
5.7 Corrosion and minimum thic;ness e4aluation (continue)
he iniu actual thicness and a3iu corrosion rate for an,
part of a 7essel a, be adLusted at an, inspection. -hen the
iniu actual thicness or a3iu corrosion rate is to beadLusted9 one of the follo&ing should be considered:
An, suitable nondestructi7e e3aination9 such as ultrasonic or
radiographic e3aination9 that &ill not affect the safet, of the 7essel
a, be used as long as it &ill pro7ide iniu thicness
deterinations. -hen a easureent ethod produces considerable
uncertaint,9 test holes a, be drilled9 or other nondestructi7e
techni@ues9 such as ultrasonic A'scan9 8'scan9 or C'scan9 a, be
eplo,ed. Profile radiograph, a, be also eplo,ed
5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n)
6l espesor Dnio actual , la 7elocidad de corrosin ?3ia de cual@uier parte de un recipiente puede ser aLustada en
cual@uier inspeccin. Cuando el espesor Dnio actual o la 7elocidad ?3ia de corrosin esta siendo aLustada9 uno de los
siguientes deber? ser considerado:
Cual@uier e3ainacin no destructi7a adecuada9 tal coo la e3ainacin por ultrasonido o radiogr?fica9 tal @ue no afecte
la seguridad del recipiente puede ser usada grandeente pre7iendo deterinaciones de espesores Dnios. Cuando un
-
8/10/2019 Curso API 510 Comimsa
50/83
5 0 p
5.7 Corrosion and minimum thic;ness e4aluation (continue)
If suitable openings are a7ailable9 easureents a, be taen
through the. he depth of corrosion a, be deterined b, gauging the
uncorroded surfaces &ithin the 7essel &hen such surfaces are in the
7icinit, of the corroded area.
or a corroded area of considerable sie in &hich the
circuferential stresses go7ern9 the least thicness along the ostcritical eleent of the area be a7eraged o7er a length not e3ceeeding
the follo&ing:
or 7essels &ith inside diaeters less than or e@ual to 40 inches
(150 centieters)9 one'half the 7essel diaeter or 20 inches (50
centieters)9 &hiche7er is less.5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n) i aberturas adecuadas est?n disponibles9 las edidas pueden ser toadas a tra7
-
8/10/2019 Curso API 510 Comimsa
51/83
5.7 Corrosion and minimum thic;ness e4aluation (continue)
or 7eseels &ith inside diaeters greater that 40 inches (150
centieters)9 one'third the 7essel diaeter or $0 inches (100
centieters)9 &hiche7er is less.-hen the area contains an opening9 the distance on either side of
the opening &ithin &hich the thicnesses are a7eraged shall not
e3tend be,ond the liits of the reinforceent as defined in the A/6
Code. If9 because of &ind loads or other factors9 the longitudinal
stresses go7ern9 the least thicness in a siilarl, deterined lengthof arc in the ost critical plane perpendicular to the a3is of the 7essel
also shall be a7eraged for coputation of the longitudinal stresses.
he thicness used for deterining corrosion rates at the respecti7e
locations shall be the a7erage thicness deterined as in the
preceding.5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n)
Para recipientes con di?etros interior a,or @ue 40 P! (150 centDetros)9 un tercio del di?etro del recipiente o $0 P! (100 centDetros)9
cual@uiera es enor.
Cuando el ?rea contiene una abertura9 las distancias en abos lados de las aberturas dentro el cual los espesores son proediados no deber?
e3tender as all? de los liites de los refueros coo es definido en el cdigo A/6. i debido a cargas de 7ientos o otros factores los esfueros
longitudinales gobiernan9 el espesor enor en una longitud de arco deterinada siilarente en el as critico plana perpendicular al eLe del
recipiente ade?s deber? ser proediado por c?lculos del esfuero longitudinal. os espesores usados para deterinar 7elocidades de corrosin en
la ubicaciones respecti7as deber?n ser espesores proedios deterinados coo los anteriores.
5.0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
52/83
p
5.7 Corrosion and minimum thic;ness e4aluation (continue)
-idel, scattered pits a, be ignored as long as the folo&ing are
true:
Fo pit depth is greater than one'half the 7essel &all thicness
e3clusi7e of the corrosion allo&ance.
he total area of the pits does not e3ceed s@uare inches ($5
s@uare centieters) &ithin an, ;'inch (20.centieter) diaeter circle. he su of their diensions along an, straight line &ithin the
circle does not e3ceed 2 inches (5 centieters)
5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n)
Picaduras apliaente dispersadas pueden ser ignoradas a lo largo cuando los siguientes son 7erdades:
Finguna profundidad es a,or @ue una itad del espesor de pared del recipiente e3clusi7e (no incluido) de la
corrosin perisible
6 l ?rea de las picaduras no e3cede pulgadas cuadradas ($5 centDetros cuadrados) dentro cual@uier circulo de ;
Plg (20 centDetros) de di?etros.
a sua de sus diensiones a lo largo de cual@uier lDnea recta dentro del circulo no e3cede 2 pulgadas (5
centDetros)
5 0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
53/83
5.0 Inspection Practices
5.7 Corrosion and minimum thic;ness e4aluation (continue)
As an alternati7e to the procedures Lust described9 an,
coponents &ith thinning &alls that9 because of corrosion or other&astage9 are belo& the iniu re@uired &all thicnesses a, be
e7aluated to deterine if the, are ade@uate for continued ser7ice.
he thinning coponents a, be e7aluated b, eplo,ing the
design b, anal,sis ethods of section *III9 #i7ision 29 Appendi3 $9
of the A/6 Code. hese ethods a, also be used to e7aluateblend ground areas &here defects ha7e been reo7ed. It is
iportant to ensure that there are no sharp corners in blend ground
areas to iniie stress concentration effects.
5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n)Coo una alternati7a para los procediientos descritos Lustaente9 cual@uier coponente con paredes delgadas
@ue debido a corrosin u otros desperdicios9 est?n abaLo del espesor de pared Dnio re@uerido pueden ser e7aluados
para deterinar si son adecuados para la continuidad en el ser7icio. 6stos coponentes delgados pueden ser
e7aluados epleando
-
8/10/2019 Curso API 510 Comimsa
54/83
p
5.7 Corrosion and minimum thic;ness e4aluation (continue)
-hen the surfaces at a &eld &ith a Loint factor of other than 1.09
as &ell as surfaces reote fro the &eld9 is corroed9 anindependent calculations using the appropriate &eld Loint factor
ust be ade to deterine if the thicness at the &eld or reote
fro the &eld go7erns the allo&able &oring pressure.
or this calculation9 the surface at a &eld includes 1 inch (2.5
centieters) on either side of the &eld or t&ice the iniuthicness on either side of the &eld9 &hiche7er is greater.
5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n)
#onde la superficie en una soldadura con un factor de Lunta diferente a 1.0 asD coo superficies reotas (distante)de la soldadura9 esta corroDda9 un calculo independiente usando el factor de Lunta de soldadura apropiada puede ser
hecho para deterinar si el espesor en la soldadura o reota de la soldadura gobierna la presin de trabaLo
perisible.
Para estos c?lculos9 la superficie en una soldadura inclu,e 1 pulgada (2.5 centDetros) en abos lados de la
soldadura o dos 7eces el espesor Dnio sobre abos lados de la soldadura9 cual@uiera es a,or
5.0 Inspection Practices
-
8/10/2019 Curso API 510 Comimsa
55/83
p
5.7 Corrosion and minimum thic;ness e4aluation (continue)
-hen easuring the corroded thicness of ellipsoidal and
torispherical heads9 the go7erning thicness a, be as follo&s:
he thicness of the nucle region &ith the head rating calculated b,
the appropriate head forula.
he thicness of the central portion of the dished region9 in &hich
case the dished region a, be considered a spherical segent &hose
allo&able pressure is calculated b, the code forula for spherical shells.he spherical segent of both ellipsoidal and torispherical heads shall
be considered to be that area located entirel, &ithin a circle &hose
center coincides &ith the center of the head and &hose diaeter is
e@ual to ;0 percent of the shell diaeter.
5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n)
Cuando las edidas de espesores corroDdos de cabeas elipsoidales , torisfericas9 los espesores gobernantes pueden ser coo sigue:
os espesores de la regin de articulacin (nucle) con los rangos de cabeas calculados por las apropiadas forulas de cabea.
os espesores de la porcin central de la regin abobada9 en el caso la regin abobada puede ser considerada un segento
esf
-
8/10/2019 Curso API 510 Comimsa
56/83
p
5.7 Corrosion and minimum thic;ness e4aluation (continue)
he radius of the dish of torispherical heads is to be used as the
radius of the spherical segent (e@ual to the diaeter of the shellfor standard heads9 though other radius ha7e been peritted). he
radius of the spherical segent of ellipsoidal heads shall be
considered to be the e@ui7alent apherical radius T1#9 &here # is
the shell diaeter (e@ual to the aLor a3is) and T1is gi7en in table
1. In table 19 h is one'half the legth of the inor a3is Ge@ual to theinside depth of the ellipsoidal head easured fro the tangent line
(headbend line)H.
or an, ellipsoidal heads9 #2h e@uals 2.0
5.7 4aluaci'n de corrosi'n $ espesores m&nimos (continuaci'n)
os radios de el abobaiento de cabeas torisfericas son usados coo el radio de los segentos
esf
-
8/10/2019 Curso API 510 Comimsa
57/83
".0 Inspection and *esting of Pressure -essels and Pressure>
-
8/10/2019 Curso API 510 Comimsa
58/83
p g
Relie4ing /i4ices
".1 #eneral
Pressure 7essels shall be inspected at the tie of installation.
Inteal field inspections of ne& 7essels are not re@uired as long as
a anufacturerUs data report assuring that the 7essels are
satisfactor, for their intended ser7ice is a7ailable. o ensure 7essel
integrit,9 all pressure 7essels shall be inspected at the fre@uencies
pro7ided in this section.
In selecting the techni@ue(s) to be used for the inspection of a
pressure 7essel9 both the condition of the 7essel and the
en7ironent in &hich it operates should be taen into
consideration.".0 Inspecci'n $ ensa$o de recipientes a presi'n $ dispositi4os presi'n>rele4o(ali4io)
".1 #eneral
os recipientes a presin deber?n ser inspeccionados en el oento de su instalacin. Inspecciones internas de capo
de nue7os recipientes no son re@ueridas ientras los datos reportados por el fabricante est?n disponibles garantiando
@ue el recipiente es satisfactorio para su ser7icio destinado. Para garantiar la integridad del recipiente9 todo recipiente a
presin ser? inspeccionado en las frecuencias pre7istas en esta seccin.
6n la seleccin de las t
-
8/10/2019 Curso API 510 Comimsa
59/83
Relie4ing /i4ices
".1 #eneral (continue)
Internal inspection is preferred because process side degradation
(corrosion9 erosion9 and en7ironental cracing) can benonunifor throughout the 7essel and9 therefore9 difficult to locate
b, e3teal F#6. %n'strea inspection a, be acceptable in lieu
of internal inspection for 7essels under the specific circustances
defined in 4.$. In situations &here on'strea inspection is
acceptable9 such inspection a, be conducted either &hile the7essel is out of ser7ice and depressuried or on strea and under
pressure. 63cept in response to an apparent need9 such as &hen
en7ironental cracing is suspected9 inspection techni@ues
e3ceeding the e3aination re@uireents used in the design and
fabrication of the 7essel are not re@uired.".1 #eneral (continuaci'n)a inspeccin interna es preferible debido a la degradacin del lado del proceso (corrosin9 erosin , abiente
agrietador) @ue puede ser no unifore a lo largo del recipiente , por lo tanto difDcil de localiar por F#6 e3terna. a
inspeccin con fluido puede ser aceptable en lugar de una inspeccin interna para recipientes baLo baLo las
circunstancias especificas definidas en 4.$. 6n situaciones donde la inspeccin con fluido es aceptable9 tal inspeccin
puede ser conducida ientras el recipiente esta fuera de ser7icio , despresuriado o con fluido , baLo presin. 63cepto
con respecto a una necesidad e7idente9 tal coo cuando el abiente de grietas se sospecha9 las t
-
8/10/2019 Curso API 510 Comimsa
60/83
Relie4ing /i4ices
". Ris;>Dased Inspection
Identif,ing and e7aluating potential degradation echaniss are
iportant steps in an assessent of the lielihood of a pressure
7essel failure. Oo&e7er9 adLustents to inspection strateg, and tactics
to account for conse@uences of a failure should also be considered.
Cobining the assessent of lielihood of failure and the
conse@uence of failure are essential eleents of ris'based inspection
(R8I).
-hen an o&neruser chooses to conduct a R8I assessent9 it ust
include a s,steatic e7aluation of both the lielihood of failure and the
associated conse@uence of failure. he lielihood assessent ust be
based on all fors of degradation that could reasonabl, be e3pected
to affect a 7essel in an, particular ser7ice.".1 Inspecci'n basada en riesgo (RDI).
a identificacin , e7aluacin de ecanisos de degradacin potencial son pasos iportantes en una e7aluacin de la
probabilidad de falla en un recipiente a presin. in ebargo9 aLustando las t?cticas , estrategias de inspeccin para
e3plicar las consecuencias de fallas deber? ade?s ser considerado. Cobinacin de e7aluacin de la probabilidad de
falla , las consecuencias de falla son eleentos esenciales de R8I.
Cuando un dueEousuario elige conducir una e7aluacin con R8I9 puede incluir una e7aluacin siste?tica de la
probabilidad de falla , las consecuencias asociadas a la falla. a e7aluacin de la probabilidad puede ser basada en
todas las foras de degradacin @ue pueden raonableente ser esperadas @ue afecten al recipiente en cual@uierser7icio particular
".0 Inspection and *esting of Pressure -essels and Pressure>Relie4ing /i4ices
-
8/10/2019 Curso API 510 Comimsa
61/83
Relie4ing /i4ices
". Ris;>Dased Inspection (continue)
63aples of those degradation echaniss include: internal or
e3ternal etal loss fro an identified for of corrosion (localied or
general)9 all fors of cracing9 including h,drogen assisted and stress
corrosion cracing (fro the inside or outside surfaces of a 7essel)9 and
an, other fos of etallurgical9 corrosion9 or echanical degradation9
such as fatigue9 ebrittleent9 creep9 etc. Additionall,9 the effecti7eness
of the inspection practices9 tools9 and techni@ues utilied for finding the
e3pected and potential degradation echaniss ust be e7aluated.
his lielihood of failure assessent should be repeated each tie
e@uipent or process changes are ade that could significantl, affect
degradation rates or cause preature failure of the 7essel.
".1 Inspecci'n basada en riesgo (continuaci'n).
6Leplos de estos ecanisos de degradacin inclu,e: perdida de etal interno o e3terno en una fora identificada de
corrosin (general o localiada)9 todas las foras de grietas9 inclu,endo la asistida por hidrgeno , agrietaiento por
esfuero de corrosin (CC) (de la superficie e3terior o interior de un recipiente) , otras foras de degradacin ec?nica9
etalrgica o corrosin9 tales coo la fatiga9 fragiliacin9 terofluencia9 etc. Adicionalente9 las efecti7idades de las
practicas de inspeccin9 herraientas , t
-
8/10/2019 Curso API 510 Comimsa
62/83
Relie4ing /i4ices
". Ris;>Dased Inspection (continue)
%ther factors that should be considered in a R8I assessent include:
appropriateness of the aterials of constructionJ 7essel design
conditions9 relati7e to operating conditionsJ appropriateness of the
design codes and standards utiliedJ effecti7eness of corrosion
onitoring prograsJ and the @ualit, of aintenance and inspection
@ualit, assurance@ualit, control progras. 6@uipent failure data
and inforation &ill also be iportant inforation for this assessent.
he conse@uence assessent ust consider the potential incidents
that a, occur as a result of fluid release9 including e3plosion9 fire9
to3ic e3posure9 en7ironental ipact9 and other health effects
associated &ith a failure of a 7essel.
".1 Inspecci'n basada en riesgo (continuaci'n).
%tros factores @ue deber?n ser considerados en una e7aluacin de R8I inclu,e: lo apropiado de ateriales de construccinJ
condiciones de diseEo del recipienteJ relati7o a la condiciones de operacinJ apropiados cdigos de diseEo , est?ndares
utiliadosJ eficacia del prograa de onitoreo de corrosinJ , la calidad del anteniiento , inspeccin de los prograas
de control de calidadaseguraiento de calidad. Inforacin , datos de las fallas de e@uipos son inforacin iportante
para esta e7aluacin. a e7aluacin de las consecuencias puede considerar los incidentes potenciales @ue pueden ocurrir
coo resultado del ali7io del fluido9 inclu,endo e3plosin9 fuego9 e3posicin to3ica9 ipacto abiental , otros efectos de
salud asociados con una falla del recipientes
".0 Inspection and *esting of Pressure -essels and Pressure>Relie4ing /i4ices
-
8/10/2019 Curso API 510 Comimsa
63/83
Relie4ing /i4ices
". Ris;>Dased Inspection (continue)
After an effecti7e R8I assessent is conducted9 the results can be
used to establish a 7essel inspection strateg, and ore specificall,better define the follo&ing:
he ost appropriate inspection ethods9 scope9 tools and
techni@ues to be utified based on the e3pected fors of degradation.
he appropriate fre@uenc, for internar9 e3ternas9 and onstrea
inspections.
he need for pressure testing after daage has been incurred or
after repairs or odifications ha7e been copleted.
he pre7ention and itigation steps to reduce the lielihood and
conse@uence of a 7essel failure.".1 Inspecci'n basada en riesgo (continuaci'n).
#espu
-
8/10/2019 Curso API 510 Comimsa
64/83
!eranischer lo,d.
R8I es parte de un sistea de adinistracin del anteniiento
@ue esta diseEado para peritirle a operadores el desepeEar
selecti7aente tareas de anteniiento , establecerprioridades.
R8I ha sido desarrollado para antener los re@ueriientos de
integridad , confiabilidad para instalaciones9 , es particularente
adecuado para plantas , e@uipos antiguos. n est?ndar I%
(I% 1";1>) esta siendo preparado actualente , e3iste undocuento base del API (API 5;1).
n R8I lle7ado apropiadaente a cabo conducir? hacia las
siguientes 7entaLas9 ientras se antenga el ni7el re@uerido de
integridad , confiabilidad:
Costos reducidos de inspeccin
Ahorros en la produccin debido a la reduccin de los paros
no planeados
#uracin enor de los paros planeados
de Presin'Rele7o
4.0 Inspeccin , 6nsa,o de Recipientes a Presin , #ispositi7osde Presin'Rele7o
-
8/10/2019 Curso API 510 Comimsa
65/83
de Presin'Rele7o!eranischer lo,d.
a etodologDa utiliada en el R8I es relati7aente siple ,
7aria de operador a operador. os
-
8/10/2019 Curso API 510 Comimsa
66/83
Relie4ing /i4ices
". 9ternal Inspection
6ach 7essel abo7eground shall be gi7en a 7isual e3teal inspection9
preferabl, &hile in operation9 at least e7er, 5 ,ears or at the sae
inter7al as the re@uired internal or on'strea inspection9 &hiche7er is
less. he inspection shall9 at the least9 deterine the condition of the
e3terior insulation9 the condition of the supports9 the allo&ance for
e3pansion9 and the general alignent of the 7essel on its supports. An,
signs of leaage should be in7estigated so that the sources can be
established. Inspection for corrosion under insulation (CI) shall be
considered for e3ternall,'insulated 7essels subLect to oisture ingress
and that operate bet&een 25 ('$C) and 250 (120C)9 or are in
interittent ser7ice.
". Inspecci'n e9terna
Cada recipiente sobre'suelo se le har? una inspeccin 7isual e3terna preferenteente ientras esta en operacin por lo
enos cada 5 aEos o el iso inter7alo coo se re@uiera inspeccionar internaente o con fluido9 cual@uiera es enor. a
inspeccin deber? al enos deterinar la condicin del aislaiento e3terior9 la condicin de los soportes9 las tolerancias
para la e3pansin , la alineacin general del recipiente sobre sus soportes. Cual@uier signo de fuga deber? ser in7estigado
tal @ue la fuente (origen) pueda ser establecido. a inspeccin por corrosin baLo el aislaiento deber? ser considerada
para recipientes aislados e3ternaente suLetos al ingreso de huedad , @ue opera entre los 25 ('$C) , 250 (120C)9 o
est?n en ser7icio interitente
".0 Inspection and *esting of Pressure -essels and Pressure>
-
8/10/2019 Curso API 510 Comimsa
67/83
Relie4ing /i4ices
". 9ternal Inspection (continue)
his inspection a, re@uire reo7al of soe insulation. It is notnorall, necessar, to reo7e insulation if the entire 7essel shell is
al&a,s operated at a teperature sufficientl, lo& Gbelo& 25 ('$C)H
or sufficiend, high Gabo7e 250 (120C)H to pre7ent the presence or
condensation of oisture under the insulation. Alteati7el,9 shell
thicness easureents done internall, at t,pical proble areas(for e3aple9 stiffening rings9 around noles9 and other locations
&hich tend to trap oistare or allo& oisture ingress) a, be
perfored during internal inspections.
". Inspecci'n e9terna (continuaci'n)
6sta inspeccin puede re@uerir reocin de parte del aislaiento. Fo es noralente necesario reo7er el aislaiento si
el cuerpo del recipiente entero es siepre operado a una teperatura suficiente baLa Garriba 25 ('$C) o suficienteente
alta Garriba 250 (120C)H para pre7enir la presencia o condensacin de la huedad baLo el aislaiento. Alternati7aente9
edidas de espesores del cuerpo hechos internaente en ?reas de probleas tDpicos (por eLeplo9 anillos de refuero99
alrededor de bo@uillas , otras ubicaciones la cual tienden a atrapar huedad o periten el ingreso de huedad) pueden
ser realiadas durante inspecciones internas.
".0 Inspection and *esting of Pressure -essels and Pressure>
-
8/10/2019 Curso API 510 Comimsa
68/83
Relie4ing /i4ices
". Internal and +n>!tream Inspection
he period bet&een internar or on'strea inspections shall note3ceed one half the estiated reaining life of the 7essel based on
corrosion rate or 10 ,ears9 &hiche7er is less. In cases &here the
reaining safe operating life is estiated to be less than $ ,ears9 the
inspection inter7al a, be the full reaining safe operating life up to
a a3iu of 2 ,ears.or pressure 7essels that are in noncontinuous ser7ice and are
isolated fro the process fluids such that the, are not e3posed to
corrosi7e en7ironents (such as inert gas purged or filled &ith
noncorrosi7e h,drocarbons)9 the 10 ,ears shall be the 10 ,ears of
actual ser7ice e3posed life.". Inspecci'n interna $ con fluido
6l periodo entre inspeccin interna , con fluido no deber? e3ceder una itad de la 7ida reanente estiada del recipiente
basada en la 7elocidad de corrosin o 10 aEos9 cual@uiera es enor. 6n casos donde la 7ida reanente operati7a se
estiada ser enor de $ aEos9 el inter7alo de inspeccin puede ser la 7ida operati7a segura copleta hasta un ?3io de
2 aEos. Para recipientes @ue est?n en ser7icio no corrosi7o , son aislados de los fluidos del proceso tal @ue no est?n
e3puestos a abientes corrosi7os (tales coo el gas inerte purgado o llenos de hidrocarburos no corrosi7os)9 los 10 aEos
ser?n los 10 aEos de 7ida e3puesta al ser7icio actual.
".0 Inspection and *esting of Pressure -essels and Pressure>
R li i /i i
-
8/10/2019 Curso API 510 Comimsa
69/83
Relie4ing /i4ices
". Internal and +n>!tream Inspection (continue)
Internar inspection is nonall, the preferred ethod of inspection and
shall be conducted on 7essels subLect to significant localiad
corrosion and other t,pes of daage. At the discretion of the
authoried pressure 7essel inspector9 on'strea inspection a, be
substituted for internal inspection in the follo&ing situations:
-hen sie9 configuration9 or lac of access aes 7essel entr, for
internal inspection ph,sicall, ipossible.
-hen the general corrosion rate of a 7essel is no&n to be less
than 0.005 inch (0.125 illieter) per ,ear and the estiated
reaining life is greater than 10 ,ears9 and all of the follo&ing
conditions are et:". Inspecci'n interna $ con fluido (continuaci'n)
a inspeccin interna es noralente el
-
8/10/2019 Curso API 510 Comimsa
70/83
Relie4ing /i4ices
". Internal and +n>!tream Inspection (continue)
he corrosi7a character of the contents9 including the effect of trace
coponents9 has been established b, at least 5 ,ears of the sae or
coparable ser7ice e3perience &ith the t,pe of contents being handled.
Fo @uestionable condition is disclosed b, the e3ternas inspection
specified in 4.".
he operating teperatura of the steel 7essel shell does not e3ceed
the lo&er teperatura liits for the creep'rapture range of the 7esselaterial.
he 7essel is not considered to be subLect to en7ironental cracing
or h,drogen daage fro the fluid being handled.
he 7essel is not strip'Iined or plate'Iined.
". Inspecci'n interna $ con fluido (continuaci'n)
6l car?cter corrosi7o de los contenidos9 inclu,endo los efectos de coponentes de rastreo han sido establecido por al enos 5 aEos
del iso o e3periencia de ser7icio coparable con los tipos de contenido @ue esta siendo aneLado.
Finguna condicin cuestionable es re7elada por la inspeccin especificada en 4.".
a teperatura de operacin del acero del cuerpo del recipiente no e3ceder? los liites de teperatura inferior para el rango de
tero fluencia (el?stica)' ruptura del aterial del recipiente.
6l recipiente no es considerado estar suLeto a abiente de grietas o daEo por hidrogeno por el fluido @ue esta siendo aneLado.
6l recipiente no es de encha@uetaiento alineado o placa alineada.
".0 Inspection and *esting of Pressure -essels and Pressure>
R li i /i i
-
8/10/2019 Curso API 510 Comimsa
71/83
Relie4ing /i4ices
". Internal and +n>!tream Inspection (continue)
-hen an on'strea inspection is conducted in lieu of an internar
inspection9 a thorough e3ainaron shall be perfored using
ultrasonic thicness easureents9 or radiograph,9 or other
appropriate eans of F#6 to easure etal thicnesses andor
assess the integrit, of the etal and &elds. If an on'strea
inspection is conducted9 the authoried pressure 7essel inspector
shall be gi7en sufficient access to all parts of the 7essel (heads9shell9 and noles) so that the inspector is satisfied that an accurate
assessent of the 7essel condition can be ade.
". Inspecci'n interna $ con fluido (continuaci'n)
Cuando una inspeccin con fluido es conducida en lugar de una inspeccin interna9 una e3ainacin copleta
deber? ser realiada usando edidas de espesores por ultrasonido o radiografDa o otros edios apropiados de F#6
para edidas de espesores del etal ,o e7aluar la integridad del etal , soldaduras. i una inspeccin con fluido es
conducida9 el inspector autoriado de recipientes a presin deber? tener el acceso suficiente para todas las partes del
recipiente (cabeas9 cuerpos , bo@uillas) para @ue el inspector este satisfecho de una e7aluacin precisa de la
condicin del recipiente puede hacerse.
".0 Inspection and *esting of Pressure -essels and Pressure>
Relie4ing /i4ices
-
8/10/2019 Curso API 510 Comimsa
72/83
Relie4ing /i4ices
". Internal and +n>!tream Inspection (continue)
he reaining life of the 7essel shall be calculated fro the follo&ing
forula:
Remaining Eife ($ears)V tactual= tiniucorrosion rate Ginches (illieters) per,earH
Where:
tactualV the thicness9 in inches (illieters)9 recorded at the tie of
inspection for a gi7en location or coponent.
tiniuV iniu allo&able thicness9 in inches (illieters)9 for a
gi7en location or coponent.
Corrosion rateV tpre7ious= tactual ,ears bet&een tpre7iousand tactual
tpre7iousV the thicness9 in inches (illieters)9 at the sae location
as tactual easured during a pre7ious inspection.
".0 Inspection and *esting of Pressure -essels and Pressure>Relie4ing /i4ices
-
8/10/2019 Curso API 510 Comimsa
73/83
g
". Internal and +n>!tream Inspection (continue)
A statistical anal,sis a, be used in the corrosion rate and reaining
life calculations for the pressure 7essel sections. his statistical
approach a, be applied for assessent of substituting an internal
inspection9 or for deterining the internal inspection inter7al. tatistical
anal,sis is not applicable to 7essels &ith significant localied corrosion.
or a large 7essel &ith t&o or ore ones of differing corrosion rates9
each one a, be treated independentl, regarding the inter7al bet&een
inspections or for substituting the internal inspection &ith an on'strea
inspection. If a ulti'one anal,sis is used9 the one &ith the shortest
reaining half'life shall be used as the liiting case for setting the
internal inspection inter7al or for substituting the internal inspection &ith
an on'strea inspection.". Inspecci'n interna $ con fluido (continuaci'n)
n an?lisis estadDstico puede ser usado en los c?lculos de la 7elocidad de corrosin , 7ida reanente de secciones de recipientes a presin. 6ste
enfo@ue estadDstico puede ser aplicado para la e7aluacin de sustitucin de inspeccin interna o para deterinar el inter7alo de inspeccin interna. 6l
an?lisis estadDstico no es aplicable para recipientes con corrosin localiada significante
a deterinacin de la 7elocidad de corrosin puede incluir datos de espesores colectados en as de dos tiepos diferentes.
Para un recipiente grande con dos o as onas de diferentes 7elocidades de corrosin9 cada ona puede ser tratada independienteente con
respecto a los inter7alos entre inspecciones o para sustituir la inspeccin interna con una inspeccin con f luido. i an?lisis ultiona es usado9 la ona
con la as corta itad de 7ida reanente deber? ser usada coo el caso liite para colocar el inter7alo de inspeccin interna o para sustituir la
inspeccin interna por una inspeccin con fluido
".0 Inspection and *esting of Pressure -essels and Pressure>
Relie4ing /i4ices
-
8/10/2019 Curso API 510 Comimsa
74/83
Relie4ing /i4ices
". Internal and +n>!tream Inspection (continue)
-hen probles are e3perienced &ith e3ternas loading9 fault,
aterial9 or fabrication the reaining life as deterined abo7e shallbe reduced to recognie those conditions. If deterioration due to
conditions such as those entioned in 5.2 is detected9 the
inspection inter7al ust be appropriatel, adLusted.
If both the o&nershi