CURRICULUM_VITAE_OF_KHAIRY (2016)
-
Upload
khairy-khalil -
Category
Documents
-
view
170 -
download
0
Transcript of CURRICULUM_VITAE_OF_KHAIRY (2016)
KHAIRY AHMED SAEID KHALIL
SENIOR PROJECT ENGINEER, PMP, CEng
Email: [email protected]
Cellular No.:+2 01000076023
-----------------------------------------------------------------------------
/ 61 P a g e
Executive Summary & Objective:
Certified PMP &Chartered Engineer (CEng) with 14 years on hands experience in
Oil & Gas Projects.
My Experience was driven from Assignments in Several Oil/Gas Projects, On
Shore/Off shore, Green/Brown Field as well as Two Petrochemical Plants, most of
Assigned Projects were EPC Lump sum Turnkey.
Started My Career as a Rotating Equipment Engineer, then Diverted career to
Project Engineering/Project Management through Occupying Project Engineering
Leader/Project Engineer Positions.
Seeking a Senior Project Engineer Position in a Reputed Multinational
organization.
Projects Portofolio:-
Owner Rep., Senior Project Engineer
KIMA AMMONIA, UREA & UREA Granulation Project
APR 2016 - Present
Project Duties:- Managing/Monitoring the performance/execution of Technimont (TCM) for
New Ammonia, Urea & Urea Granulation Project located in Aswan, Egypt.
Reviewing Monthly Progress presented by TCM and resolving all hurdles
faced.
Assessing all Variation orders presented by TCM & Performing MOC for
new variations requested by PMC team along with cost/benefit analysis.
Follow up/Review of Contractor Procurement Cycle, involved in Pre-
Qualification of New suppliers, Participate in KOM, Pre-Inspection
Meetings with Suppliers, Review Suppliers Monthly Reports, TCM Monthly
update of Expediting/Inspection plan, Logisitics follow up Including
Concerned authorities approvals & Custom Fees payments till Commodities
delivery to site.
Presenting Reports & Areas of concerns to KIMA Executive Managemet.
Responsible for reviewing System Dossiers, Arranging Systems Walk
Through, Reviewing Punch list items prepared by TCM and follow up
Clearing up to System MC signature.
Poly Ethylene Senior Project Engineer & Ethydco Complex Interface Leader
Egyptian 400 KTA PolyEthylene Project, Ethydco Co., Egypt
APR. 2012 – APR 2016
Project Duties:- Managing/Monitoring the performance/execution of Joint venture of TOYO
& Enppi Co (JV Contractor) for 400,000 ton/year Poly Ethylene project.
Responsible for Preparing Complex Interface Project Report (Showing all
Interfaces between Complex Plants)
KHAIRY AHMED SAEID KHALIL
SENIOR PROJECT ENGINEER, PMP, CEng
Email: [email protected]
Cellular No.:+2 01000076023
-----------------------------------------------------------------------------
/ 62 P a g e
Responsible for Creating Additional Scope work packages for Interfaces,
Tender Evaluation, Monitor Execution/performance.
Presenting Reports & Areas of concerns to Nexant (Loaner’s Technical
Advisor), Ethydco Executive Managemet.
Responsible for reviewing System Dossiers, Arranging Systems Walk
Through, Reviewing Punch list items prepared by JV and follow up
Clearing up to System MC signature.
Acting as Commissioning Leader/Coordinator for Poly Ethylene Plant
Systems Mechanical Completion (Under Umbrella of Commissioning
Manager)
Enppi Project Engineering Leader
East Bahyeria (EBAH) Power Station Project, Qarun Company, Egypt
Apr.2011- Mar. 2012
Project Duties Engineering Management of a Detailed Engineering Services Cost
Reimbursable contract from Qarun for 24 MW EBAH Power Station
Track Project Engineering Deliverables Using Appropriate Tools
Provide direction and support to project team
Ensures technical compliance with the contract requirements
Intervention with technical disciplines in solving faced hurdles within
recognized/innovated engineering practices.
Reporting on Project Engineering Progress, Areas of concerns.
Enppi Project Engineer & Representative in KSA Site-office
KHAFJI Field Development Project, PHASE 1-OFFSHORE, Saudi Arabia
June 2008 – Mar. 2011
Project Duties:- Responsible for Engineering Interfaces/Modifications between Engineering
Disciplines & international Contractors for execution of Sub-Sea Piling
works, Sub-Sea cable Laying, Sub-Sea Pipe Lines laying.
Assuring Existence of Material for Modifications either by Local Supplying
or Diverting material of another Task & issuing RUP (Request of Urgent
Purchase) orders for Short.
Assuring the existence of all permits for Construction Crew for
Mobilizing/Demobilizing to/from land to Sea
Responsible for presenting Daily status report for Construction
activities/Man Power to Executive management, Client
Responsible for Issuing Claim/Change Orders to Client along with all
supporting documents for Out scoped works.
Directing the team for achieving Project Objectives focusing on available
resources, time frame, agreed quality aspects.
Acted as Project Manager for Modification of 8 Existing Platforms (Deck
Extensions + Replacement of existing commodities)
Enppi Project Engineer
Egyptian Linear Alkyl Benzene Project, Egypt
Jan. 2006 – Apr. 2008
KHAIRY AHMED SAEID KHALIL
SENIOR PROJECT ENGINEER, PMP, CEng
Email: [email protected]
Cellular No.:+2 01000076023
-----------------------------------------------------------------------------
/ 63 P a g e
Project Duties:- Participate in Project Management for the Performance/Execution of
Consortium (GS E&C, Enppi & Petrojet) for new Linear Alkyl benzene
Petrochemical Plant in Alexandria.
Supervising/Monitoring Execution of Enppi scope as limited to Detailed
Engineering of Utilities Area, Tankage area (32 Tanks) & Off Plot Area
(Tie-In with 6 Sister companies in petroleum Sector for Feed supply + off
spec. product return) as follows:-
Responsible for Integration/Coordination between Engineering
Disciplines & construction team regarding the modifications works
Responsible for Preparing of Integrated Engineering Documents
Register and follow up Disciplines for issuing Deliverables within
due time.
Responsible for all communications between Enppi and project
partners (GS E&C, ELAB, Petrojet)
Participated in Construction Supervision & Performance reporting under
GS E&C umbrella (Consortium Leader)
Enppi Project Manager
ABU-QIR, NAQ & PII Platforms Fire Detection/Fire Fighting System Upgrade,
Egypt
APR. 2011 – Dec. 2011
Project Duties:- Project Management of a Time Sheet Cost reimbursable basis for
Engineering & Procurement (EP) Services for North Abu Qir & PII
platforms which included Upgrading/Replacement of Existing fire Detection
System + Extension of Existing Fire Fighting water Spray network on NAQ
platform to accommodate new equipments supplied in ABU-QIR –NAQ
Platform Extension & Modifications project:-
Responsible for Preparing Site Visits for Engineering team for Data
Collection.
Responsible for Issuing Claim Letters to Owner regarding Spent time
sheet Man hours of team with allocated contract costs
Responsible for Integration between team for Data/Engineering
Sketches Transfer and issuing Final Engineering Drawings to
Client.
Responsible for leading Team with owner in Meetings for discussing
Project Progress, Concerns, Technical hurdles.
Responsible for Leading team with Third party in
Constructability/Accessability Sessions for Equipments placing.
Enppi Project Engineer/ Deputy Project Manager
BAPETCO, New Permanent Metering Station, Egypt
Jan.2005 – Dec. 2005
Project Duties:-
KHAIRY AHMED SAEID KHALIL
SENIOR PROJECT ENGINEER, PMP, CEng
Email: [email protected]
Cellular No.:+2 01000076023
-----------------------------------------------------------------------------
/ 64 P a g e
Project Management of an EPCC lump sum Contract for New Permanent
Metering Station at Obayeid Field which included 3 metering Skids (Gas,
Condensate & Water) beside all relevant associated Civil/Piping/Electrical
& Control works):-
Responsible for Preparing of Integrated Engineering Documents
Register and follow up Disciplines for issuing Deliverables within
due time.
Responsible for all communications between Enppi Client.
Responsible for leading Team with owner in Meetings for discussing
Project Progress, Concerns, Technical hurdles.
Lead Rotating Equipment Engineer
PETROBEL Pumping Station, Ismailia
Mar.2004– Jan.2005
Project Duties Performed all Engineering activities (Issuing Material requisitions,
Evaluating Offers, Vendor prints review) for 2 Barrel Multi stage pumps,
Power rating = 1.3 MW
Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)
Supervised Installation works (Foundation Leveling, Mechanical Leveling,
Pre-alignment, Final Alignment)
Participated in commissioning activities
Rotating Equipment Engineer
Fajr Compression station, Jordan
May.2003 – June 2004
Project Duties
Performed all Engineering activities (Issuing Material requisitions,
Evaluating Offers, Vendor prints review) for 3 Turbo compressors, Power
rating = 3.2 MW/Each ISO-Rating
Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)
Participated in Installation works (Foundation Leveling, Mechanical
Leveling, Pre-alignment, Final Alignment)
Field Rotating Equipment Engineer
UGD, Port Said
2 Month Period
Project Duties
Supervised Installation works (Foundation Leveling, Mechanical Leveling)
for Fire Fighting Pumps & Emergency Diesel Generator.
Supervised Pre-commissioning activities for Fire Fighting Pumps (Jockey,
Main Electric/Diesel Pumps)
KHAIRY AHMED SAEID KHALIL
SENIOR PROJECT ENGINEER, PMP, CEng
Email: [email protected]
Cellular No.:+2 01000076023
-----------------------------------------------------------------------------
/ 65 P a g e
EDUCATION & PROFESSIONAL CERTIFICATION:
PMP Certificate from PMI (Project Management Institute),USA
Chartered Engineer (CEng) from Institute of Mechanical Engineers
(IMECHE), Engineering Council, UK Spec
B.Sc. in Mechanical Power Engineering, Faculty of Engineering,
Alexandria University.
Joining Date : Sept. 1996
Graduation Date : June 2001
Accumulated grade : GOOD
General secondary certificate From Victory College School.
Main Duties:
LEAD THE PLANNING AND IMPLEMENTATION OF PROJECT
FACILITATE THE DEFINITION OF PROJECT SCOPE, GOALS AND
DELIVERABLES
DEFINE PROJECT TASKS AND RESOURCE REQUIREMENTS
DEVELOP FULL SCALE PROJECT PLANS
ASSEMBLE AND COORDINATE PROJECT STAFF
MANAGE PROJECT BUDGET
MANAGE PROJECT RESOURCE ALLOCATION
PLAN AND SCHEDULE PROJECT TIMELINES
TRACK PROJECT DELIVERABLES USING APPROPRIATE TOOLS
PROVIDE DIRECTION AND SUPPORT TO PROJECT TEAM
QUALITY ASSURANCE
CONSTANTLY MONITOR AND REPORT ON PROGRESS OF THE PROJECT TO
ALL STAKEHOLDERS
PRESENT REPORTS DEFINING PROJECT PROGRESS, PROBLEMS AND
SOLUTIONS
IMPLEMENT AND MANAGE PROJECT CHANGES AND INTERVENTIONS TO
ACHIEVE PROJECT OUTPUTS
PROJECT EVALUATIONS AND ASSESSMENT OF RESULTS
RISKS IDENTIFICATION & ASSESSMENT (OPPORTUNITIES & THREATS);
CREATING RESPONSE PLANS, MONITORING & CONTROLLING DURING
EXECUTION.
ENSURES TECHNICAL COMPLIANCE WITH THE CONTRACT REQUIREMENTS
INTERVENTION WITH TECHNICAL DISCIPLINES IN SOLVING FACED
HURDLES WITHIN RECOGNIZED/INNOVATED ENGINEERING PRACTICES.
KHAIRY AHMED SAEID KHALIL
SENIOR PROJECT ENGINEER, PMP, CEng
Email: [email protected]
Cellular No.:+2 01000076023
-----------------------------------------------------------------------------
/ 66 P a g e
HANDLE ALL COMMUNICATIONS WITH CONTRACTOR, INTERFACE SISTER
COMPANIES, LENDERS
TRAINING COURSES:
PMP PREPARATION COURSE
NEGOTIATION SKILLS WORKSHOP
MEETING SKILLS WORK SHOP
EFFECTIVE MANAGEMENT SKILLS
CONFLICT MANAGEMENT
RISK MANAGEMENT
EFFECTIVE MEETINGS WORKSHOP
TIME MANAGEMENT WORKSHOP
TECHNICAL REPORT WRITING
PUMP SCHOOL (GOULDS)
RECIPROCATING COMPRESSORS
ENGINEERING MATERIALS SELECTION
LANGUAGE &COMPUTER SKILLS:
Windows, Microsoft Office, MS-Project, Primavera
ARABIC (Mother Tongue)
ENGLISH (Fluent)