Curriculum Vitae of Khairy (2015)

4
KHAIRY AHMED SAEID KHALIL. SENIOR MECHANICAL ENGINEER / PROJECT ENGINEER, PMP, CEng Email: [email protected] Cellular No.:+2 01000076023 Executive Summary & Objective: Certified PMP &Chartered Engineer (CEng) from Engineering Council, UK, Member of Institute of Mechanical Engineers (IMECHE), with 14 years experience in Oil & Gas Projects. 7 years spent as a Rotating Equipment Engineer in addition to another 7 years spent as a Mechanical Project Engineer Looking forward to develop my skills and gain experience in a healthy working atmosphere. Seeking an opportunity to direct my Knowledge and Expertise through a Multinational organization. Summary of Skills: Comprehensive knowledge of mechanical engineering practices, procedures, and delivery standards Extensive knowledge of compressor design, rotating equipment engineering, high-pressure fluids, and vibration analysis techniques In-depth knowledge of conducting root cause analysis and solving technical issues associated with rotating equipment Possess sound knowledge of identifying defected parts and assembling rotating equipment parts Familiar with the applicable standard international codes of rotating engineering Posses an excellent analytical skills and ability to communicate technical information, accurately and precisely EDUCATION & PROFESSIONAL CERTIFICATION: PMP Certificate from PMI (Project Management Institute),USA Chartered Engineer (CEng) from Institute of Mechanical Engineers (IMECHE), Engineering Council, UK Spec B.Sc. in Mechanical Power Engineering, Faculty of Engineering, Alexandria University. Joining Date : Sept. 1996 Graduation Date : June 2001

Transcript of Curriculum Vitae of Khairy (2015)

Page 1: Curriculum Vitae of Khairy (2015)

KHAIRY AHMED SAEID KHALIL.

SENIOR MECHANICAL ENGINEER /

PROJECT ENGINEER, PMP, CEng

Email: [email protected]

Cellular No.:+2 01000076023

Executive Summary & Objective:

Certified PMP &Chartered Engineer (CEng) from Engineering Council, UK,

Member of Institute of Mechanical Engineers (IMECHE), with 14 years experience

in Oil & Gas Projects.

7 years spent as a Rotating Equipment Engineer in addition to another 7 years

spent as a Mechanical Project Engineer

Looking forward to develop my skills and gain experience in a healthy working

atmosphere.

Seeking an opportunity to direct my Knowledge and Expertise through a

Multinational organization.

Summary of Skills:

Comprehensive knowledge of mechanical engineering practices,

procedures, and delivery standards

Extensive knowledge of compressor design, rotating equipment

engineering, high-pressure fluids, and vibration analysis techniques

In-depth knowledge of conducting root cause analysis and solving

technical issues associated with rotating equipment

Possess sound knowledge of identifying defected parts and assembling

rotating equipment parts

Familiar with the applicable standard international codes of rotating

engineering

Posses an excellent analytical skills and ability to communicate

technical information, accurately and precisely

EDUCATION & PROFESSIONAL CERTIFICATION:

PMP Certificate from PMI (Project Management Institute),USA

Chartered Engineer (CEng) from Institute of Mechanical Engineers

(IMECHE), Engineering Council, UK Spec

B.Sc. in Mechanical Power Engineering, Faculty of Engineering,

Alexandria University.

Joining Date : Sept. 1996

Graduation Date : June 2001

Page 2: Curriculum Vitae of Khairy (2015)

Accumulated grade : GOOD

General secondary certificate From Victory College School.

Duties &Responsibilities:

Developing basic design, detailed engineering and procurement related

activities of Rotating Equipment/packages such as pumps, compressors,

blowers, and refrigeration units.

Developing rotating equipment specifications and commissioning guidelines

for the equipment.

Providing rotating equipment information throughout the various proposal,

engineering and construction phases to the project team.

Provide the technical expertise to assist in achieving accuracy in project piping

and instrumentation drawings (P&ID’s).

Issuing requests for quotations, purchase specifications, bid evaluations, and

purchase requisitions.

Reviewing and approving vendor documentation for rotating equipment on

assigned projects.

Participating in inspections and testing of equipment as required.

Participating in equipment check-out and commissioning as required.

Facilitate the definition of project scope, goals and deliverables

Develop full scale project plans

Track project deliverables using appropriate tools

Constantly monitor and report on progress of the project to all stakeholders

Implement and manage project changes and interventions to achieve project

outputs

Risks identification & assessment (opportunities & threats); creating response

plans, monitoring & controlling during execution.

Ensures technical compliance with the contract requirements

Intervention with technical disciplines in solving faced hurdles within

recognized/innovated engineering practices.

Handle communications with contractor, interface sister companies, lenders

Career Development

PMP PREPARATION COURSE

NEGOTIATION SKILLS WORKSHOP

MEETING SKILLS WORK SHOP

EFFECTIVE MANAGEMENT SKILLS

CONFLICT MANAGEMENT

RISK MANAGEMENT

EFFECTIVE MEETINGS WORKSHOP

TIME MANAGEMENT WORKSHOP

TECHNICAL REPORT WRITING

GAS PROCESSING & TREATMENT.

PUMP SCHOOL (GOULDS)

RECIPROCATING COMPRESSORS

ENGINEERING MATERIALS SELECTION

LNG & NGL AWARENESS SESSION.

Page 3: Curriculum Vitae of Khairy (2015)

LANGUAGE &COMPUTER SKILLS:

WINDOWS, MICROSOFT OFFICE, MS-PROJECT (BASICS)

ARABIC (MOTHER TONGUE)

ENGLISH (FLUENT)

Projects Experience:-

Egyptian Ethylene & Derivatives (Ethydco) Co, Alexandria

April 2012- Present

- Managing/Monitor the performance/execution of Joint venture of TOYO Int.

& Enppi Co (JV Contractor) for 400,000 ton/year Poly Ethylene project.

- Responsible for Preparing Complex Interface Project Report (Showing all

Interfaces between Complex Projects)

- Responsible for Creating Additional Scope work packages for Interfaces,

Tender Evaluation, Monitor Execution/performance.

- Presenting Reports & Areas of concerns to Nexant (Loaner’s Technical

Advisor), Ethydco Executive Managemet, Client & Contractor Project Teams

- Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)

for 3 Ethylene Compressors driven by Steam Turbines.

- Witnessed Supplier FAT tests (Mechanical Run) for 2 General Purpose

Turbines

- Witnessed Supplier FAT tests (Mechanical Run) for 2 Turbo expanders.

- Supervised Installation works (Foundation Leveling, Mechanical Leveling,

Pre-alignment, Final Alignment)

East Bahyeria (EBAH) Power Station Project, Qarun

Company, Egypt (Share Holder: APACHE, USA & Egyptian

Petroleum CO.)

Mar. 2011- April 2012

- Project Engineering Management of a Detailed Engineering Services Cost

Reimbursable contract for 24 MW Power Station

KHAFJI Field Development Project, PHASE 1-OFFSHORE,

Saudi Arabia (Share Holder: Saudi Aramco & Kuwait Oil

Co.)

June 2008 – Mar. 2011

- Participate in Project Management for the Performance/Execution of Egyptian

Consortium (Enppi, Petrojet & PMS) companies for 6 New Platforms (3

power Distribution platforms + 2 Production Platforms + 1 Integrated Well

heads platform)

- Project Manager/Site representive for Modification of 8 Existing Platforms

(Deck Extensions + Replacement of existing commodities) & 2 Pipelines

laying (36” & 42”-32 KM) + 6 Submarine cables laying (Total Length = 150

Km)

Page 4: Curriculum Vitae of Khairy (2015)

Egyptian Linear Alkyl Benzene Project, Egypt

Jan. 2006 – May. 2008

- Participate in Project Management for the Performance/Execution of

Consortium (GS E&C, Enppi & Petrojet) for new Linear Alkyl benzene

Petrochemical Plant in Alexandria.

- Supervising/Monitoring Execution of Enppi scope as limited to Detailed

Engineering of Utilities Area, Tankage area (32 Tanks) & Off Plot Area (Tie-

In with 6 Sister companies in petroleum Sector for Feed supply + off spec.

product return) .

- Participated in Construction Supervision as Leading Installation works

(Foundation Leveling, Mechanical Leveling, Pre-alignment, Final Alignment)

for several Pumps, Air compressor

PETROBEL Pumping Station, Ismailia, Egypt (Share

Holder: Eni Cooperation)

Sept.2004 – Dec. 2005

- Performed all Engineering activities (Issuing Material requisitions, Evaluating

Offers, Vendor prints review) for 2 Barrel Multi stage pumps, Power rating =

1.3 MW

- Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)

- Supervised Installation works (Foundation Leveling, Mechanical Leveling,

Pre-alignment, Final Alignment)

- Participated in commissioning activities

United Gas Derivatives (UGD), Port Said, Egypt (Share

Holder: BP Co.)

April. 2004 – Aug. 2004

- Supervised Installation works (Foundation Leveling, Mechanical Leveling) for

Fire Fighting Pumps & Emergency Diesel Generator.

- Supervised Pre-commissioning activities for Fire Fighting Pumps (Jockey,

Main Electric/Diesel Pumps)

- Participated in commissioning activities

Fajr Compression station, Jordan

May 2003 – April 2004

- Participated with Mechanical leader in all Engineering activities (Issuing

Material requisitions, Evaluating Offers, Vendor prints review) for 3 Turbo

compressors, Power rating = 3 MW/Each

- Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)

- Supervised Installation works (Foundation Leveling, Mechanical Leveling,

Pre-alignment, Final Alignment)

- Participated in commissioning activities