Current PHENIX pt resolution
description
Transcript of Current PHENIX pt resolution
Current PHENIX pt resolution
Upgraded improves pt/pt 5X at 40 GeV/c for W e
West carriage Resolution
East carriage Resolution
Schedule and Cost• 24 Months from Start to Finish• Cost
– $900k Electronics– $250k Electronics Infrastructure– $200k Mechanics(Detector+Infrastructure+Radiators)– $100k Gas System Upgrade
Total $1.45M Capital +$100k R&D Operating$500k Xenon Gas Operating
Summary• High pt upgrades extend PHENIX’s strengths into new andexciting areas of physics • Extensive list of topics to investigate in AA, pA and pp• Well matched to machine plans for increased luminosity
High pt Physics with PHENIX• Heavy Flavor Physics
– J/suppression in A-A vs Centrality,pt,– J/’ , production /suppression– J/ vs Charm, DY continuum via single leptons, e pairs– J/ at different rapidities central vs muon arms– Single Leptons as probe of B production, B contribution to
J/ – Charm production, high pt photons and J/ ’ in pA
physics to disentangle gluon shadowing, nuclear absorption• Jet Physics
– Jet quenching at high pt with leading charged particle >5 GeV/c
• Spin Physics– W+/W- production, W e
Charged Particle Rejection with TRD
4 plane TRD
6 plane TRD
90% Electron Efficiency
PHENIX Central SpectrometerUpgrade high pt resolution in the
West arm and electron ID in both arms with Tracking/TRD
• Increases pt resolution in West Arm by 5X at 40 GeV/c
• Increases electron ID capability 100X for pt > 3 GeV/c
• Enhances EMCal e/hadron rejection with better E-p match
• Combine TRD, RICH and EMCal for particle ID coverage upto 12 GeV/c
Expected Statistics for High Luminosity RHIC Operation
Assume: – L of RHIC 10X current design value, Au-Au,
30 week run, NN(J/nb
Central Arms Central 10%
Min Bias Muon Arms Central 10%
Min Bias
J/ 700k 2M J/ 3.5M 10M
14k 40k 70k 200k
800 2.5k 1.6k 5k
DY(M > 4GeV) 2.5k 7k DY(M > 4GeV) 15k 40k