WW Hastings Indian Hospital BCMA (PSB 3*42) Deployment Site Visit March 24 – April 4, 2014.
CUPHD WW Application 2-24-15
-
Upload
brad-johnson -
Category
Documents
-
view
24 -
download
2
Transcript of CUPHD WW Application 2-24-15
Central Utah Public Health Department
Waste Water System Permit Application
Office Only:
Permit Number: _________
Archive ID: ______________
____
Applicant Information:
Name: ________ Phone: _____________
Mailing Address: _______________ ________ ____
Waste Water System Location: ______________________________________________
County: __________ Town/City: ___________________ GPS: _____________________
System dimensions, lot layout, trench cross section, and other required information must be shown on the diagram page.
Water Source: Public: Name of system: ______________________________________
Private: Well (grouted Y/N) or Spring or Other: ___________
Distance from Waste Water System: _______________________________
Installation Contractor: __________________________ License Number: _________________
This Waste Water System will meet min. requirements of the Central Utah Public Health Department if constructed as proposed. Permit
application and fee must be submitted and a permit issued prior to any construction. Also, system must be inspected prior to backfilling.
Signed: Date: Permit Fee:
(Environmental Health Scientist)
This waste water system is designed for:
A. Single Family Dwelling.
No. of Bedrooms ______________
Unfinished Basement? Y / N
B. Other _______________________
No. People Served _____________
gallons per day estimated waste
water flow ___________________
Size of tank* required:
__________________________gallons *Tank must be from an approved manufacturer.
Total sq ft absorption area required*:
________________________________ *As determined by est. flow and soil type.
Type of absorption system:
A. Standard Trench
B. Chambered Trench
C. Absorption Bed
D. Deep Wall Trench
E. Other: _____________________
Notes: __________________________
________________________________
System Designer Certification: I, _______________________________ certify that I hold a current level two onsite system
professional certification and I have designed the system in accordance to the standards of UT Admin Code R317-4 Onsite
Waste Water Systems.
Certificate Number: ______________________ Signature: ____________________________________ Date: ___________
Central Utah Public Health Department Soil Log/Percolation Test Record Sheet
Name: ________________________________ Date: ___________
Soil
Percolation
Test #
Total Depth of
Hole (ft)
Period of
Time Hole
Presoaked
Period of
Time Soil
Allowed to
Swell
Initial
Depth of
Water
Beginning
Time
Final
Depth of
Water
Ending
Time
Distance
Water
Dropped
Elapsed
Time
Perc.
Rate in
Min/in
Final Stabilized Percolation Rate _________ Minutes per Inch
Particle Size Distribution (percent)
Soil Layer
Depth Intervals
Soil Texture
Soil Structure
USCS
Group
Symbol
Stone
Cobbles
Gravel
Sand
Silt &
Clay
1. Maximum Seasonal Ground Water Elevation: _______________
2. Distance from Wells Within 1500’ of System: ________________
I, _________________________ certify the above information to be an actual description of the Physical Site
Characteristics of the proposed subsurface wastewater disposal system.
Signature: _______________________________________ Certification No.: _______________________ (Certified Soil Tester)
Central Utah Public Health Department
N
Sketch Wastewater System diagram in this space
Standard & Deep Wall Trench Cross Section:
Name: ______________________________________________________________________________________ Date: _____________
Site Location: __________________________________________________________________________________________________
(Show street address or attach legal description of system location)
System Designer: __________________________ (Please Print)
Other Absorption System Cross Section: (i.e. Chambered, Absorption Bed, etc…)
Sketch Cross Section in this Space if Applicable
Earth Backfill (6” min.)
Barrier Material Straw (2”min.) or pervious
material (i.e. synthetic filter fabric)
Perforated Distribution Pipe
(min. 4” diameter)
Drain Media Sewer Rock (3/4 -2.5” diameter)
-2” min. Over Pipe
-6” min. Under Pipe
Coarse Drain Media Drain Media Rock
(3/4-12” diameter)
Standard Trench
(2’ min. separation)
Deep Wall Trench
(4’ min. separation)
Max. Ground Water
Elevation
This Area for
Use in Deep
Wall Trenches
Trench
Width ______
Total
Max. Depth ______
Min.
Depth
of Rock ______
Under
Pipe
4’ min.
Separation
Unsuitable Soil or
Bedrock Formation
Show All Measurements 1. Locate all features which pertain to the wastewater disposal system
in the site area indicated above. Plan must include the following:
a. Buildings
b. Water Service Lines
c. Property Lines Within
15’of Sewer System
d. Wells
e. Septic Tanks
f. Absorption System
g. All Water Courses
h. Soil Test Locations
i. Driveways
j. Existing trees
k. Contour Lines with
Reference marks
Note: This application is only a guide. However, all information required on this form must be submitted. Other plans and information may be
submitted as a substitute or in addition to this application.
Overfill slightly to allow for
settling
Ground Surface
│
│ __ __
Waste Water System Permit Frequently Asked Questions By Brad Johnson, LEHS
Central Utah Public Health Department So, you want to settle out in the country, enjoy the peace, quiet, and open spaces. But you just can’t get away from big city luxuries like indoor plumbing. You’ll need a waste water system for that. Here’s answers to common questions about the waste water system permit process to help you along. How do I get a waste water system permit? You need to fill out an application that includes a system design and soil test. The application is usually filled out by the person who does the soil test and system design. Once the application has been reviewed and approved by the health department a waste water system permit can be issued after fees are paid. How much does a permit cost? Fees are based on the required tank size of the system. For systems with tank sizing of 1000 -2500 gallons the fee is $365.00. For systems with tanks sized 2501 – 5000 gallons the fee is $395.00. Where can I find a list of soil testers?
The state keeps an updated list on the following website: http://www.waterquality.utah.gov/Onsite/OnsiteProfList.pdf
How long is a permit good for? Permits expire after a year from the day it was issued. It can be extended for up to two years but you will need to contact the Health Department before it expires for an extension. Can I install a system myself? A homeowner can install their own system. But we highly recommend using a licensed contractor with experience in installing septic systems. What if I want to change the system design after the permit is issued? The Health Department will need to review and approve any changes to the system design to ensure it still meets code. Where can I go for more information on septic systems? Check out our website at: http://www.centralutahpublichealth.com/wastewater.html