![Page 1: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/1.jpg)
CULVERT SLIPLINE DESIGN
John Owen Hurd, MS, PE
![Page 2: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/2.jpg)
Replace or Slipline?
![Page 3: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/3.jpg)
What Size Slipline Will Fit?
![Page 4: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/4.jpg)
Slipline OD < Min ID Host Pipe - Clearance
![Page 5: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/5.jpg)
Manufacturer’s Cut Sheet
![Page 6: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/6.jpg)
Measure Twice Cut Once!
Monitor the existing culvert until the liner is installed.
![Page 7: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/7.jpg)
Evaluate Hydraulic Performance
Is an increase in the existing headwater permissible; and if
so, how much?
![Page 8: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/8.jpg)
Consider
• What’s upstream (Design and 100 yr Discharge)
• Arbitrary controls (D+2 or D+4, Design Flood) (2D, 100 yr Discharge)
• Roadway Clearance (2ft below EP)
![Page 9: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/9.jpg)
Existing Culvert
• Check inlet control
![Page 10: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/10.jpg)
Existing Culvert
• Check Outlet Control
![Page 11: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/11.jpg)
Slipline
• If sliplineextends to entrance of existing pipe check inlet control
![Page 12: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/12.jpg)
Slipline
• If the slipline is recessed and a 4:1 to 6:1 taper provided check throat control
![Page 13: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/13.jpg)
Slipline
• Check outlet control
![Page 14: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/14.jpg)
If the hydraulic requirements can be met by the sliplined pipe, sliplining is a viable option.
![Page 15: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/15.jpg)
Consider Costs
![Page 16: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/16.jpg)
Costs for Culvert Replacement• Traffic control• Excavation and pipe removal• Pipe and pipe installation • Backfill and embankment• Pavement• Erosion control• Guardrail• Anything else?????
![Page 17: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/17.jpg)
Cost of detour to traveling public
$0.48 x detour length (mi.) x ADT per day
Does not include lost time
![Page 18: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/18.jpg)
Costs for Sliplining
• Traffic control?• Pipe and pipe installation• Grouting the voids
![Page 19: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/19.jpg)
Factors Favoring Culvert Replacement
• Lower ADT• Shallower cover• Smaller pipe • Shorter detour routes
![Page 20: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/20.jpg)
Factors Favoring Sliplining
• Higher ADT• Deeper cover• Larger pipe• Longer detour routes
![Page 21: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/21.jpg)
Structural Considerations
![Page 22: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/22.jpg)
Will the slipline pipe need to support the embankment?
In a large majority of cases when the host pipe can
accommodate a hydraulically adequate
slipline pipe, no.
![Page 23: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/23.jpg)
Will the slipline pipe need to withstand insertion?
Definitely
![Page 24: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/24.jpg)
Pushing ForcePF=Length x #/ft x FF
![Page 25: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/25.jpg)
Manufacturer’s Cut Sheet
![Page 26: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/26.jpg)
Resistance
Min wall area normal to flowx
Minimum tensile strength of pipe material
![Page 27: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/27.jpg)
Will the slipline pipe need to withstand grouting?
Definitely
![Page 28: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/28.jpg)
Buckling Resistance
Love’s Formula
Pcr =3EI/R3Hydrostatic pressure
on unsupported pipe
![Page 29: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/29.jpg)
Limit Deflection (d=f(Wr3/EI))
![Page 30: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/30.jpg)
Durability Requirements of the Slipline Pipe
![Page 31: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/31.jpg)
Required Minimum Median
Service LifeOhioDOT
• 75 years for freeways and other important roadways and high fills (16 ft F/L to finish grade)
• 50 years for other situations
![Page 32: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/32.jpg)
For New Installations
![Page 33: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/33.jpg)
For Culvert Replacements
Past performance of the
existing culvert material
should also be Considered
![Page 34: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/34.jpg)
Why?
![Page 35: CULVERT SLIPLINE DESIGN Hurd - TRB · Monitor the existing culvert until the liner is installed. Evaluate Hydraulic Performance ... be met by the sliplined pipe, sliplining is a viable](https://reader036.fdocuments.us/reader036/viewer/2022071608/6146cc30f4263007b13568c1/html5/thumbnails/35.jpg)
Standard Errors of Estimate