Cultural Centre Berea USA

37
Communication Center Berea Offices LOS ANGELES, CA 129 N. KERN AV. E. LOS ANGELES CA. 90022 Fareh Aboganem JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 JUN.14,2009 Design Development

description

DD set for a multifunctional building, TV studio, radio station, private library.

Transcript of Cultural Centre Berea USA

Page 1: Cultural Centre Berea USA

CommunicationCenter Berea OfficesLOS ANGELES, CA129 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009

JUN.14,2009JUN.14,2009JUN.14,2009JUN.14,2009

Design Development

Page 2: Cultural Centre Berea USA

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

COMMUNICATION CENTER BEREA USA119 N. KERN AV.

LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 7/7/08

COVER SHEET

Page 3: Cultural Centre Berea USA

egress route

mechanical route

publicprivate- office

deliverypublic/ private

entrance/ exits

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 4: Cultural Centre Berea USA

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 5: Cultural Centre Berea USA

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

UNDERGROUND PARKING

A 101UNDERGROUND PARKING LOT

ELEV. SHAFT

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 6: Cultural Centre Berea USA

FIRST FLOOR PLAN

A 102

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

FIRST FLOOR PLANSCALE 1/8”=1’-0”

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 7: Cultural Centre Berea USA

SECOND FLOOR PLAN

A 103

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

SECOND FLOOR PLANSCALE 1/8”=1’-0”

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 8: Cultural Centre Berea USA

2.5 FLOOR PLAN

A 104

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

2.5 FLOOR PLANSCALE 1/8”=1’-0”

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 9: Cultural Centre Berea USA

THIRD FLOOR PLAN

A 105

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

THIRD FLOOR PLANSCALE 1/8”=1’-0”

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 10: Cultural Centre Berea USA

MASTER SUITE

A 106

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

MASTER SUITE FLOOR PLANSCALE 1/8”=1’-0”

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 11: Cultural Centre Berea USA

NORTH ELEVATION

A 201

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

NORTH ELEVATIONSCALE 1/16”=1’-0”

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 12: Cultural Centre Berea USA

WEST/EAST ELEVATION

A 202

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

EAST ELEVATIONSCALE 1/16”=1’-0”

WEST ELEVATIONSCALE 1/16”=1’-0”1 2

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 13: Cultural Centre Berea USA

SOUTH ELEVATIONSCALE 1/16”=1’-0”

SOUTH ELEVATION

A 203

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 14: Cultural Centre Berea USA

PEEL AWAY SECTION

A 303

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

SKIN SYSTEM

CURTAIN WALL

FLOOR SLAB

PRIMARY STRUCT.

OPERABLE WINDOWS

MULLIONS STRUCT.

SECONDARY STRUCT.

FLOOR DECKING

PRIMARY FLOOR SUPPORTFOUNDATION

Page 15: Cultural Centre Berea USA

SECTION A-ASCALE 1/16”=1’-0”

SECTION A-A

A 301

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 16: Cultural Centre Berea USA

ENLARGED SECTION A-ASCALE 1/8”=1’-0”

ENLARGED SECTION A-A

A 301.1

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 17: Cultural Centre Berea USA

SECTION B-BSCALE 1/16”=1’-0”

SECTION B-B

A 302

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 18: Cultural Centre Berea USA

ENLARGED SECTION B-BSCALE 3/32”=1’-0”

SECTION B-B

A 302

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 19: Cultural Centre Berea USA

SECTION C - C

A 303

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

SECTION C-CSCALE 1/16”=1’-0”

Page 20: Cultural Centre Berea USA

SECTION C - C

A 304

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

WALL SECTION CSCALE 1/8”=1’-0”

Page 21: Cultural Centre Berea USA

WALL SECTION B

A 402

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

WALL SECTION SCALE 3/8”=1’-0”

Page 22: Cultural Centre Berea USA

WALL SECTION A

A 401

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 23: Cultural Centre Berea USA

DETAIL SECTION A.1

A 501.1

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 24: Cultural Centre Berea USA

DETAIL SECTION B

A 502

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 25: Cultural Centre Berea USA

DETAIL SECTION A.2

A 501.2

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 26: Cultural Centre Berea USA

DETAIL SECTION D.1

A 504.2

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 27: Cultural Centre Berea USA

MATERIAL RESEARCH

A 701

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

S-LEC SSF is achieved by sandwiching a sound insulation resin layer and a colored layer between PVB, and evenly distributing solar control particles on that multi-layer structure.Now technology from Sekisui allows particles to be distributed evenly in a multi-layered, ultra-thin interlayer film.

Fire & Sound panels with steel surfaces are ideal for areas subject to a significant amount of traffic or exposure to hand trucks, forklifts, or other material handling equipment. These insulated metal wall panels come with one or two 24 gauge steel surfaces and have excellent sound deadening and thermal insulating properties.

PERMALAC is an air-dry lacquer, engineered to provide highly durable exterior protection on steel, aluminum, copper, silver and bronze as well as steel, wood, terracotta and concrete. The addition of UV and corrosion inhibitors to PERMALAC assures endurance in harsh conditions ranging from arctic freezing, to desert heat, to beachfront salt air to acid rain.

Page 28: Cultural Centre Berea USA
Page 29: Cultural Centre Berea USA
Page 30: Cultural Centre Berea USA
Page 31: Cultural Centre Berea USA
Page 32: Cultural Centre Berea USA
Page 33: Cultural Centre Berea USA
Page 34: Cultural Centre Berea USA

MATERIAL RESEARCH

M 101

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

MECHANICAL PLAN 1SCALE 1/8”=1’-0”

Page 35: Cultural Centre Berea USA

MECHANICAL PLAN 2SCALE 1/8”=1’-0”

MATERIAL RESEARCH

M 102

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 36: Cultural Centre Berea USA

MECHANICAL PLAN 2.5SCALE 1/8”=1’-0”

MATERIAL RESEARCH

M 102.1

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08

Page 37: Cultural Centre Berea USA

MECHANICAL PLAN 3SCALE 1/8”=1’-0”

MATERIAL RESEARCH

M 103

CommunicationCenter Berea OfficesLOS ANGELES, CA119 N. KERN AV.E. LOS ANGELES CA. 90022

Fareh Aboganem

Design Development

BUILDING DEPARTMENT SUBMITTAL 11/17/08