CST0004 CAPITAL CAPITAL DEVELOPMENT DEVELOPMENT BOARD BOARD Page: 1 Date 11/13/21 PROJECT PROJECT STATUS STATUS REPORT REPORT Time 4:02 Project Number: 006 006-100 100-011 011 PM NAME: Craig Butler 436 Craig Butler 436 Project Status: AP Active Project Region: 3 Project Type: PLA: Y Description: Capital Building North Wing Renovation Agency: Office of the Architect of the Capitol Analyst: Amber Evans Location: Capitol Building - Springfield County: 167 - Sangamon ________________________________________________________________________________ Leg. Districts: House: 96 - Sue Scherer Senate:48 - Doris Turner : CURRENT STATUS 06-29-21 : : : A/E Id: 29611 : : A/E Name: Henneman Engineering Inc. : : A/E Contact: : : A/E Telephone: (217)359-1514 : : Date Selected: : : Contract Date: ________________________________________________________________________________ Est. Project Cost: 207,450,000.00 FUND SUMMARY FUND SUMMARY ____________________________________________________________________________________________________________________________________ ***Appropriated*** ***Released*** Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed Approp 141 24,266,589.00 10-26-21 24,266,589.00 10-26-21 23,816,589.00 10,522,180.15 450,000.00 .00 Total 24,266,589.00 24,266,589.00 23,816,589.00 10,522,180.15 450,000.00 .00 ____________________________________________________________________________________________________________________________________ PHASE NUMBER: PHASE NUMBER: 1 (D ) 100.00% Description: Description: Capital Building North Wing Renovation Capital Building North Wing Renovation Appndx A Actual Diff Appndx A Revised Actual Diff Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0) C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0) CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-06-20 ( 0) Design Devel: ( 0 ) Prime Re-Bid: ( 0) 25%: ( 0 ) Subst Compl: ( 0) 50%: ( 0 ) Final Accept: ( 0) 75%: ( 0 ) A/E Cont End: 95-100%: 01-23-20 01-30-20 ( 7 ) Ground Break: Dedication: CONSTRUCTION CONTRACT STATUS CONSTRUCTION CONTRACT STATUS ____________________________________________________________________________________________________________________________________ Contract NOA ATP Substantial Completion Final Acceptance Contract Number Scheduled Revised Actual Diff Scheduled Actual Diff End Date Henneman Engineering Inc. CAP19.01 ( 0) ( 0) Henneman Engineering Inc. 20003110 ( 0) ( 0) CONTRACT AMOUNTS/PAYMENTS CONTRACT AMOUNTS/PAYMENTS ____________________________________________________________________________________________________________________________________ Contract El Award Amt Change Orders Contract Payments to Date Contract % Number Cd Amount # To Date Amount # Balance Comp Henneman Engineering Inc. CAP19.01 10 10,568,000.00 3,701,990.00 3 14,269,990.00 8,315,118.59 33 5,954,871.41 58 Henneman Engineering Inc. 20003110 10 .00 .00 0 .00 .00 0 .00 100 ***** Contract Totals ***** ***** Contract Totals ***** 10,568,000.00 3,701,990.00 3 14,269,990.00 8,315,118.59 33 5,954,871.41 58

Transcript of CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

Page 1: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 1Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 006006--100100--011011 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: PLA: YDescription: Capital Building North Wing RenovationAgency: Office of the Architect of the Capitol Analyst: Amber EvansLocation: Capitol Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 06-29-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)359-1514 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 207,450,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 24,266,589.00 10-26-21 24,266,589.00 10-26-21 23,816,589.00 10,522,180.15 450,000.00 .00

Total 24,266,589.00 24,266,589.00 23,816,589.00 10,522,180.15 450,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Capital Building North Wing RenovationCapital Building North Wing Renovation

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-06-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 01-23-20 01-30-20 ( 7 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. CAP19.01 ( 0 ) ( 0 )Henneman Engineering Inc. 20003110 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. CAP19.01 10 10,568,000.00 3,701,990.00 3 14,269,990.00 8,315,118.59 33 5,954,871.41 58Henneman Engineering Inc. 20003110 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 10,568,000.00 3,701,990.00 3 14,269,990.00 8,315,118.59 33 5,954,871.41 58

Page 2: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 2Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 006006--100100--011011 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: PLA: YDescription: Capital Building North Wing RenovationAgency: Office of the Architect of the Capitol Analyst: Amber EvansLocation: Capitol Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: William Devine : :A/E Telephone: (217)359-1514 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 207,450,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 24,266,589.00 10-26-21 24,266,589.00 10-26-21 23,816,589.00 10,522,180.15 450,000.00 .00

Total 24,266,589.00 24,266,589.00 23,816,589.00 10,522,180.15 450,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 15.00% Description:Description: Capital Building North Wing Renovation ECapital Building North Wing Renovation E

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-17-21 ( 0 )

Design Devel: 02-14-20 02-21-20 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 03-31-20 01-06-21 (281 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

R.D. Lawrence Construction C CAP21.03 05-13-21 06-02-21 03-18-22 ( 0 ) 04-17-22 ( 0 ) 04-17-2304-17-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

R.D. Lawrence Construction C CAP21.03 81 9,546,599.00 .00 0 9,546,599.00 2,207,061.56 5 7,339,537.44 23***** Contract Totals ********** Contract Totals ***** 9,546,599.00 .00 0 9,546,599.00 2,207,061.56 5 7,339,537.44 23

Page 3: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 3Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 006006--100100--011011 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: PLA: YDescription: Capital Building North Wing RenovationAgency: Office of the Architect of the Capitol Analyst: Amber EvansLocation: Capitol Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)359-1514 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 207,450,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 24,266,589.00 10-26-21 24,266,589.00 10-26-21 23,816,589.00 10,522,180.15 450,000.00 .00

Total 24,266,589.00 24,266,589.00 23,816,589.00 10,522,180.15 450,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 33 (D ) 100.00% Description:Description: Capital Building North Wing Renovation SCapital Building North Wing Renovation S

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-15-20 12-26-20 (255 ) Prime Bid: 10-27-21 ( 0 )

Design Devel: 06-15-20 04-27-21 (316 ) Prime Re-Bid: 10-27-21 ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 09-15-20 08-23-21 (342 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 4: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 4Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 006006--100100--011011 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: PLA: YDescription: Capital Building North Wing RenovationAgency: Office of the Architect of the Capitol Analyst: Amber EvansLocation: Capitol Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)359-1514 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 207,450,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 24,266,589.00 10-26-21 24,266,589.00 10-26-21 23,816,589.00 10,522,180.15 450,000.00 .00

Total 24,266,589.00 24,266,589.00 23,816,589.00 10,522,180.15 450,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 44 (D ) 90.00% Description:Description: Capital Building North Wing Renovation (Capital Building North Wing Renovation (

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: 02-28-20 03-05-20 ( 6 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 07-10-20 10-09-20 ( 91 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 12-04-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 5: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 5Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 007007--010010--023023 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate Supreme Court BuildingAgency: Illinois Courts Analyst: Erin EoffLocation: Supreme Court of Illinois, Sangamon Co.County: 167 - Sangamon Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 29192 : :A/E Name: 42/40 Architecture Inc : :A/E Contact: Tom Brauer : :A/E Telephone: (312)341-1155 : :Date Selected: 04-13-10 : :Contract Date: 06-09-10 ________________________________________________________________________________Est. Project Cost: 15,864,882.83

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 16,365,157.16 11-20-18 16,365,157.16 11-20-18 15,874,530.44 15,705,512.58 168,917.86- 659,544.58971 235,000.00 01-26-10 235,000.00 01-26-10 234,594.44 234,594.44 .00 405.56

Total 16,600,157.16 16,600,157.16 16,109,124.88 15,940,107.02 168,917.86 659,950.14____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Renovate Supreme Court BuildingRenovate Supreme Court Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-29-10 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 07-23-10 09-28-10 ( 67 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 59,809.86 Schem Design: 03-11-11 05-18-11 ( 68 ) Prime Bid: 09-07-11 01-15-13 ( 0 )

Design Devel: 03-30-12 04-02-12 ( 3 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-17-12 07-18-14 ( 0 )50%: 06-18-12 06-12-12 ( 6-) Final Accept: 12-12-12 01-31-18 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1212-31-12 01-31-1901-31-1995-100%: 11-16-12 12-19-12 ( 33 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

42/40 Architecture Inc 10004510 ( 0 ) ( 0 ) 01-31-1901-31-19Vasconcelles Engineering Cor 5969 ( 0 ) ( 0 )Henson Robinson Company 13054583A ( 0 ) ( 0 )Korte & Luitjohan Contractor 13054381 05-15-13 06-03-13 06-03-14 07-18-14 07-18-14 ( 45 ) 09-18-14 06-29-15 (284 ) 09-18-1509-18-15Henson Robinson Company 13054482 05-15-13 06-03-13 06-03-14 07-18-14 07-18-14 ( 45 ) 09-18-14 07-30-14 ( 50-) 09-18-1509-18-15Henson Robinson Company 13054583 05-15-13 06-03-13 06-03-14 07-18-14 07-18-14 ( 45 ) 06-30-19 07-21-19 ( 21 ) 12-31-1912-31-19Henson Robinson Company 13054684 05-14-13 06-03-13 06-03-14 07-18-14 07-18-14 ( 45 ) 06-30-19 07-31-19 ( 31 ) 12-31-1912-31-19B & B Electric, Inc. 13054785 05-14-13 06-03-13 06-03-14 07-18-14 07-18-14 ( 45 ) 09-18-14 03-26-15 (189 ) 09-18-1509-18-15F. J. Murphy & Son, Inc. 13054882 05-15-13 06-03-13 06-03-14 07-18-14 07-18-14 ( 45 ) 09-18-14 12-31-14 (104 ) 09-18-1509-18-15

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

42/40 Architecture Inc 10004510 10 238,000.00 1,846,817.00 9 2,084,817.00 1,987,799.14 45 97,017.86 95

Page 6: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 6Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Vasconcelles Engineering Cor 5969 11 1,800.00 .00 0 1,800.00 1,800.00 1 .00 100Henson Robinson Company 13054583A 11 .00 12,830.08 1 12,830.08 12,830.08 1 .00 100C D B/Art In Architecture ART 89 72,000.00 .00 0 72,000.00 .00 0 72,000.00 0Korte & Luitjohan Contractor 13054381 81 7,222,500.00 525,943.66 48 7,748,443.66 7,748,443.66 22 .00 100Henson Robinson Company 13054482 82 200,347.00 245,342.22 11 445,689.22 445,689.22 18 .00 100Henson Robinson Company 13054583 83 1,240,800.00 150,089.97 10 1,390,889.97 1,390,889.97 17 .00 100Henson Robinson Company 13054684 84 1,555,000.00 53,574.97 10 1,608,574.97 1,608,574.97 18 .00 100B & B Electric, Inc. 13054785 85 2,136,000.00 319,722.24 27 2,455,722.24 2,455,722.24 17 .00 100F. J. Murphy & Son, Inc. 13054882 82 278,850.00 1,633.74 4 280,483.74 280,483.74 11 .00 100***** Contract Totals ********** Contract Totals ***** 12,945,297.00 3,155,953.88 120 16,101,250.88 15,932,233.02 150 169,017.86 99

Page 7: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 7Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 007007--010010--024024 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Driveway and Parking LotAgency: Illinois Courts Analyst: Erin EoffLocation: Supreme Court of Illinois, Sangamon Co.County: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 34127 : :A/E Name: Dewberry Engineers Inc. : :A/E Contact: : :A/E Telephone: (309)282-8000 : :Date Selected: 12-10-19 : :Contract Date: 04-20-20 ________________________________________________________________________________Est. Project Cost: 762,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 692,800.00 12-10-19 692,800.00 12-10-19 77,260.00 47,286.37 615,540.00 .00

Total 692,800.00 692,800.00 77,260.00 47,286.37 615,540.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 55.00% Description:Description: Repair Driveway and Parking LotRepair Driveway and Parking Lot

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-18-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 07-03-20 07-23-20 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-03-20 07-23-20 ( 20 ) Prime Bid: 06-23-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-21 ( 0 )50%: 03-03-21 03-25-21 ( 22 ) Final Accept: 01-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2209-30-2295-100%: 04-21-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Engineers Inc. 20033110 ( 0 ) ( 0 ) 09-30-2209-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Engineers Inc. 20033110 10 17,920.00 59,340.00 1 77,260.00 47,286.37 4 29,973.63 61***** Contract Totals ********** Contract Totals ***** 17,920.00 59,340.00 1 77,260.00 47,286.37 4 29,973.63 61

Page 8: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 8Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 022022--010010--015015 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Repair and Replace WindowsAgency: Appellate Court / Second District Analyst: Erin EoffLocation: Appellate Court Building - ElginCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 11-02-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: Ed Torrez : :A/E Telephone: (312)567-1000 : :Date Selected: 08-14-18 : :Contract Date: 09-27-18 ________________________________________________________________________________Est. Project Cost: 593,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 593,500.00 10-12-21 593,500.00 10-12-21 518,500.00 224,631.10 75,000.00 .00

Total 593,500.00 593,500.00 518,500.00 224,631.10 75,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 35.00% Description:Description: Repair and Replace WindowsRepair and Replace Windows

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-18-18 09-18-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-04-19 03-13-19 ( 9 )

Design Devel: ( 0 ) Prime Re-Bid: 04-30-19 ( 0 )25%: ( 0 ) Subst Compl: 11-29-19 11-24-20 ( 0 )50%: 10-29-18 11-14-18 ( 16 ) Final Accept: 01-10-20 12-08-20 ( 0 )75%: ( 0 ) A/E Cont End: 11-29-2011-29-20 04-15-2204-15-2295-100%: 12-24-18 01-03-19 ( 10 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauer Latoza Studio Ltd. 19020310 ( 0 ) ( 0 ) 04-15-2204-15-22Advanced Window Systems, Inc 19051981 06-24-19 09-18-19 03-16-20 ( 0 ) 04-15-20 ( 0 ) 04-15-2104-15-21Old Veteran Construction, In 21SM0381 02-05-21 02-05-21 03-05-21 ( 0 ) 04-06-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 19020310 10 45,200.00 11,704.00 2 56,904.00 37,682.00 4 19,222.00 66Advanced Window Systems, Inc 19051981 81 473,000.00 473,000.00- 1 .00 .00 0 .00 100Old Veteran Construction, In 21SM0381 81 17,987.00 .00 0 17,987.00 .00 0 17,987.00 0***** Contract Totals ********** Contract Totals ***** 536,187.00 461,296.00- 3 74,891.00 37,682.00 4 37,209.00 50

Page 9: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 9Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 023023--010010--019019 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade for Security Improvements/ADA &Agency: Appellate Court / Third District Analyst: Erin EoffLocation: Appellate Court Building - Ottawa, LaSallle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 11-01-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: : :A/E Telephone: (312)567-1000 : :Date Selected: 07-13-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,932,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,932,000.00 07-13-21 2,932,000.00 07-13-21 .00 .00 2,932,000.00 .00

Total 2,932,000.00 2,932,000.00 .00 .00 2,932,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Upgrade for Security Improvements/ADA &Upgrade for Security Improvements/ADA &

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauer Latoza Studio Ltd. 22031010 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 22031010 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 10: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 10Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 024024--020020--006006 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Windows, Grilles and DoorsAgency: Appellate Court / Fourth District Analyst: Erin EoffLocation: Waterways Building - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 16668 : :A/E Name: Evan Lloyd Associates, Inc. : :A/E Contact: : :A/E Telephone: (217)789-7011 : :Date Selected: 07-13-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,232,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,232,300.00 07-13-21 1,232,300.00 07-13-21 .00 .00 1,232,300.00 .00

Total 1,232,300.00 1,232,300.00 .00 .00 1,232,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace Windows, Grilles and DoorsReplace Windows, Grilles and Doors

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Evan Lloyd Associates, Inc. 22040210 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Evan Lloyd Associates, Inc. 22040210 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 11: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 11Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 025025--010010--030030 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate Building Interior and ExteriorAgency: Appellate Court / Fifth District Analyst: Erin EoffLocation: Appellate Court Building - Mt. VernonCounty: 81 - Jefferson ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 10-15-21 :: :

A/E Id: 31754 : :A/E Name: Trivers Associates, Inc. : :A/E Contact: James Roseberry : :A/E Telephone: (618)451-2900 : :Date Selected: 03-12-19 : :Contract Date: 07-16-19 ________________________________________________________________________________Est. Project Cost: 1,553,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,553,800.00 03-21-19 1,553,800.00 03-21-19 175,560.00 105,366.00 1,378,240.00 .00

Total 1,553,800.00 1,553,800.00 175,560.00 105,366.00 1,378,240.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Renovate Building Interior and ExteriorRenovate Building Interior and Exterior

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-16-19 ( 0 ) Assgn Bid: 03-03-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 08-27-19 10-02-19 ( 36 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-30-20 03-17-21 (230 )

Design Devel: 03-17-20 ( 0 ) Prime Re-Bid: 06-23-21 ( 0 )25%: ( 0 ) Subst Compl: 10-01-21 ( 0 )50%: ( 0 ) Final Accept: 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-22-2208-22-2295-100%: 05-28-20 10-27-20 (152 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Trivers Associates, Inc. 19012810 ( 0 ) ( 0 ) 08-22-2208-22-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Trivers Associates, Inc. 19012810 10 29,663.00 145,897.00 1 175,560.00 105,366.00 8 70,194.00 60***** Contract Totals ********** Contract Totals ***** 29,663.00 145,897.00 1 175,560.00 105,366.00 8 70,194.00 60

Page 12: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 12Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--060060--052052 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: BI Budget Impasse Hold PLA: NDescription: Repair Hays House Roof and Correct WaterAgency: Department of Agriculture Analyst: Erin EoffLocation: DuQuoin State Fairgrounds - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-03-21 :: :

A/E Id: 31398 : :A/E Name: Baysinger Architects, PLLC : :A/E Contact: Michael Baysinger : :A/E Telephone: (618)993-8250 : :Date Selected: 12-11-12 : :Contract Date: 03-28-13 ________________________________________________________________________________Est. Project Cost: 988,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 28,900.00 07-01-16 28,900.00 10-05-16 14,900.00 6,876.86 5,976.86 8,023.14

Total 28,900.00 28,900.00 14,900.00 6,876.86 5,976.86 8,023.14____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 100.00% Description:Description: Repair Hays House Roof and Correct WaterRepair Hays House Roof and Correct Water

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-07-13 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-30-13 03-01-14 01-30-14 ( 30-)

Design Devel: 05-13-13 ( 0 ) Prime Re-Bid: 03-13-14 ( 0 )25%: ( 0 ) Subst Compl: 05-01-14 10-01-14 ( 0 )50%: ( 0 ) Final Accept: 06-01-14 12-01-14 ( 0 )75%: ( 0 ) A/E Cont End: 05-01-1505-01-15 12-31-2112-31-2195-100%: 11-15-13 10-04-13 ( 42-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Baysinger Architects, PLLC 13031410 ( 0 ) ( 0 ) 12-31-2112-31-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Baysinger Architects, PLLC 13031410 10 14,600.00 300.00 4 14,900.00 6,876.86 5 8,023.14 46***** Contract Totals ********** Contract Totals ***** 14,600.00 300.00 4 14,900.00 6,876.86 5 8,023.14 46

Page 13: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 13Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--060060--055055 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair GrandstandAgency: Department of Agriculture Analyst: Erin EoffLocation: DuQuoin State Fairgrounds - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-03-21 :: :

A/E Id: 1698 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: Jim Siefert : :A/E Telephone: (217)532-3959 : :Date Selected: 08-13-19 : :Contract Date: 10-16-19 ________________________________________________________________________________Est. Project Cost: 5,569,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,569,500.00 06-16-21 5,569,500.00 06-16-21 5,169,371.00 132,261.58 400,129.00 .00

Total 5,569,500.00 5,569,500.00 5,169,371.00 132,261.58 400,129.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Repair GrandstandRepair Grandstand

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-03-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-19-20 01-23-20 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-19-20 01-24-20 ( 5 ) Prime Bid: 01-07-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-21 ( 0 )50%: 06-22-20 06-26-20 ( 4 ) Final Accept: 02-28-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-2295-100%: 09-25-20 12-08-20 ( 74 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 20011610 ( 0 ) ( 0 ) 12-01-2212-01-22Brown Electric, Inc. 22046985 09-14-21 10-27-21 07-01-22 ( 0 ) 07-31-22 ( 0 ) 07-31-2307-31-23J & L Robinson Development a 22047081 09-14-21 10-27-21 07-01-22 ( 0 ) 07-31-22 ( 0 ) 07-31-2307-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 20011610 10 250,450.00 956.00 1 251,406.00 132,261.58 13 119,144.42 53Brown Electric, Inc. 22046985 85 354,965.00 .00 0 354,965.00 .00 0 354,965.00 0J & L Robinson Development a 22047081 81 4,563,000.00 .00 0 4,563,000.00 .00 0 4,563,000.00 0***** Contract Totals ********** Contract Totals ***** 5,168,415.00 956.00 1 5,169,371.00 132,261.58 13 5,037,109.42 3

Page 14: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 14Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--060060--056056 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate the Administration BuildingAgency: Department of Agriculture Analyst: Erin EoffLocation: DuQuoin State Fairgrounds - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-03-21 :: :

A/E Id: 4424 : :A/E Name: White & Borgognoni Architects, : :A/E Contact: : :A/E Telephone: (618)529-3691 : :Date Selected: 03-10-20 : :Contract Date: 09-11-20 ________________________________________________________________________________Est. Project Cost: 2,071,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,623,200.00 02-22-21 1,623,200.00 02-22-21 225,864.00 37,144.00 1,397,336.00 .00

Total 1,623,200.00 1,623,200.00 225,864.00 37,144.00 1,397,336.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 26.00% Description:Description: Renovate the Administration BuildingRenovate the Administration Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-15-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-18-20 11-18-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-18-20 11-19-20 ( 1 ) Prime Bid: 07-15-22 ( 0 )

Design Devel: 11-19-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-15-23 ( 0 )50%: 01-28-22 ( 0 ) Final Accept: 02-23-24 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2310-31-23 08-31-2408-31-2495-100%: 04-22-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

White & Borgognoni Architect 20042410 ( 0 ) ( 0 ) 08-31-2408-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

White & Borgognoni Architect 20042410 10 30,210.00 195,654.00 3 225,864.00 37,144.00 1 188,720.00 17***** Contract Totals ********** Contract Totals ***** 30,210.00 195,654.00 3 225,864.00 37,144.00 1 188,720.00 17

Page 15: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 15Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--060060--057057 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Repair Leaks Near Bay WindowAgency: Department of Agriculture Analyst: Erin EoffLocation: DuQuoin State Fairgrounds - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-03-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 5,319.02

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,319.02 06-16-21 5,319.02 06-16-21 5,319.02 5,319.02 .00 .00

Total 5,319.02 5,319.02 5,319.02 5,319.02 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 100.00% Description:Description: Repair Leaks Near Bay WindowRepair Leaks Near Bay Window

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 16: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 16Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--060060--058058 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: NDescription: Emergency Fire Alarm System ReplacementAgency: Department of Agriculture Analyst: Erin EoffLocation: DuQuoin State Fairgrounds - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-03-21 :: :

A/E Id: 4424 : :A/E Name: White & Borgognoni Architects, : :A/E Contact: : :A/E Telephone: (618)529-3691 : :Date Selected: 08-10-21 : :Contract Date: 07-28-21 ________________________________________________________________________________Est. Project Cost: 140,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 140,200.00 09-21-21 140,200.00 09-21-21 140,200.00 39,317.77 .00 .00

Total 140,200.00 140,200.00 140,200.00 39,317.77 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Emergency Fire Alarm System ReplacementEmergency Fire Alarm System Replacement

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-01-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-01-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-22 ( 0 )50%: ( 0 ) Final Accept: 11-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-27-2109-27-21 06-30-2206-30-2295-100%: 09-01-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

White & Borgognoni Architect 22010110 ( 0 ) ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

White & Borgognoni Architect 22010110 10 127,600.00 12,600.00 1 140,200.00 39,317.77 1 100,882.23 28***** Contract Totals ********** Contract Totals ***** 127,600.00 12,600.00 1 140,200.00 39,317.77 1 100,882.23 28

Page 17: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 17Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--060060--059059 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Repair Hayes HouseAgency: Department of Agriculture Analyst: Erin EoffLocation: DuQuoin State Fairgrounds - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-03-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 10,637.41

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 10,637.41 09-13-21 10,637.41 09-13-21 10,637.41 10,637.41 .00 .00

Total 10,637.41 10,637.41 10,637.41 10,637.41 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 100.00% Description:Description: Repair Hayes HouseRepair Hayes House

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 18: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 18Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--060060--060060 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair DrainAgency: Department of Agriculture Analyst: Erin EoffLocation: DuQuoin State Fairgrounds - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-03-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 7,484.98

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 7,484.98 09-13-21 7,484.98 09-13-21 7,484.98 7,484.98 .00 .00

Total 7,484.98 7,484.98 7,484.98 7,484.98 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 100.00% Description:Description: Repair DrainRepair Drain

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 19: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 19Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--177177 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair Parapet Wall - Junior LivestockAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 1472 : :A/E Name: Sarti Architectural Group, Inc : :A/E Contact: Dan Ernst : :A/E Telephone: (217)585-9111 : :Date Selected: 12-13-16 : :Contract Date: 03-01-17 ________________________________________________________________________________Est. Project Cost: 851,118.25

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 851,118.25 12-17-19 851,118.25 12-17-19 851,118.25 834,646.79 .00 .00

Total 851,118.25 851,118.25 851,118.25 834,646.79 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 99.00% Description:Description: Repair Parapet Wall - Junior LivestockRepair Parapet Wall - Junior Livestock

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-24-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-02-17 09-07-17 ( 36 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-25-17 12-31-19 ( 0 )50%: ( 0 ) Final Accept: 12-09-17 03-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-1812-01-18 03-31-2103-31-2195-100%: 06-21-17 05-11-17 ( 41-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Sarti Architectural Group, I 17010610 ( 0 ) ( 0 ) 03-31-2103-31-21R. L. Vollintine Constructio 18042781 09-25-17 10-04-17 02-01-18 02-01-20 04-16-19 (439 ) 05-01-20 01-30-20 ( 92-) 05-01-2105-01-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sarti Architectural Group, I 17010610 10 51,500.00 85,730.00 6 137,230.00 120,758.54 8 16,471.46 88R. L. Vollintine Constructio 18042781 81 167,000.00 546,888.25 9 713,888.25 713,888.25 7 .00 100***** Contract Totals ********** Contract Totals ***** 218,500.00 632,618.25 15 851,118.25 834,646.79 15 16,471.46 98

Page 20: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 20Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--177177 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair Parapet Wall - Junior LivestockAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 1472 : :A/E Name: Sarti Architectural Group, Inc : :A/E Contact: : :A/E Telephone: (217)585-9111 : :Date Selected: : :Contract Date: 03-01-17 ________________________________________________________________________________Est. Project Cost: 851,118.25

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 851,118.25 12-17-19 851,118.25 12-17-19 851,118.25 834,646.79 .00 .00

Total 851,118.25 851,118.25 851,118.25 834,646.79 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 1.00% Description:Description: Demo Repair/ Parapet WallDemo Repair/ Parapet Wall

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 21: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 21Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--184184 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate/Repair ColiseumAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Todd Higginbotham : :A/E Telephone: (217)363-3375 : :Date Selected: 02-13-18 : :Contract Date: 03-08-18 ________________________________________________________________________________Est. Project Cost: 30,276,857.52

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 30,276,857.52 03-05-19 30,276,857.52 09-03-19 14,817,475.93 13,281,331.39 15,459,381.59 .00

Total 30,276,857.52 30,276,857.52 14,817,475.93 13,281,331.39 15,459,381.59 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 99.00% Description:Description: PH-1 / Replace Roof and Structural RepaiPH-1 / Replace Roof and Structural Repai

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-22-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 06-01-18 05-31-18 ( 1-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 30,796.07 Schem Design: 06-01-18 06-04-18 ( 3 ) Prime Bid: 12-13-18 11-20-18 ( 23-)

Design Devel: ( 0 ) Prime Re-Bid: 12-20-18 ( 0 )25%: ( 0 ) Subst Compl: 04-15-20 ( 0 )50%: 08-10-18 08-17-18 ( 7 ) Final Accept: 06-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 10-19-18 10-08-18 ( 11-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 18001210 ( 0 ) ( 0 ) 12-31-2212-31-22R.D. Lawrence Construction C 19045381 01-04-19 01-11-19 07-20-19 08-02-19 ( 13 ) 08-19-19 ( 0 ) 12-31-2112-31-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 18001210 10 927,100.00 1,639,809.00 5 2,566,909.00 1,967,999.52 21 598,909.48 77C D B/Art In Architecture ART 49 80,000.00 77,500.00- 0 2,500.00 .00 0 2,500.00 0Adduci John 20049489 49 1,500.00 .00 0 1,500.00 1,500.00 1 .00 100Seagraves David 20049689 49 1,500.00 .00 0 1,500.00 1,500.00 1 .00 100Ted Sitting Crow Garner 20049589 49 1,500.00 .00 0 1,500.00 1,500.00 1 .00 100Seagraves David 20050189 49 73,000.00 .00 0 73,000.00 65,700.00 3 7,300.00 90Next Day Sign Company 6816 70 7,500.00 .00 0 7,500.00 7,500.00 3 .00 100

Page 22: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 22Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

C D B - Fiscal RESERVE 80 639,991.00 .00 0 639,991.00 .00 0 639,991.00 0R.D. Lawrence Construction C 19045381 81 10,219,000.00 749,502.51 24 10,968,502.51 10,681,058.45 11 287,444.06 97***** Contract Totals ********** Contract Totals ***** 11,951,091.00 2,311,811.51 29 14,262,902.51 12,726,757.97 41 1,536,144.54 89

Page 23: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 23Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--184184 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate/Repair ColiseumAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Todd Higginbotham : :A/E Telephone: (217)363-3375 : :Date Selected: 02-13-18 : :Contract Date: 03-08-18 ________________________________________________________________________________Est. Project Cost: 30,276,857.52

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 30,276,857.52 03-05-19 30,276,857.52 09-03-19 14,817,475.93 13,281,331.39 15,459,381.59 .00

Total 30,276,857.52 30,276,857.52 14,817,475.93 13,281,331.39 15,459,381.59 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 90.00% Description:Description: PH-2 / Plan & Begin Coliseum RenovationPH-2 / Plan & Begin Coliseum Renovation

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-22-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-05-19 11-12-19 ( 7 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 30,796.07 Schem Design: 11-05-19 11-12-19 ( 7 ) Prime Bid: 06-25-20 10-28-20 (125 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-01-22 ( 0 )50%: 03-04-20 03-13-20 ( 9 ) Final Accept: 10-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 06-30-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 24: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 24Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--184184 PM NAME: Ed James 033Ed James 033Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate/Repair ColiseumAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 10-01-19 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Karla Smalley : :A/E Telephone: (217)363-3375 : :Date Selected: : :Contract Date: 03-08-18 ________________________________________________________________________________Est. Project Cost: 30,276,857.52

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 30,276,857.52 03-05-19 30,276,857.52 09-03-19 14,817,475.93 13,281,331.39 15,459,381.59 .00

Total 30,276,857.52 30,276,857.52 14,817,475.93 13,281,331.39 15,459,381.59 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 33 (XP) 100.00% Description:Description: PH-3 / Emergency Structural Repair - ColPH-3 / Emergency Structural Repair - Col

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 30,796.07 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Litteken Construction Compan 19EM0481 07-03-18 07-03-18 08-07-18 08-03-18 ( 4-) 09-06-18 08-03-18 ( 34-) 09-06-1909-06-19

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Litteken Construction Compan 19EM0481 81 127,410.00 .00 0 127,410.00 127,410.00 2 .00 100***** Contract Totals ********** Contract Totals ***** 127,410.00 .00 0 127,410.00 127,410.00 2 .00 100

Page 25: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 25Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--184184 PM NAME: Ed James 033Ed James 033Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate/Repair ColiseumAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-06-19 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Karla Smalley : :A/E Telephone: (217)363-3375 : :Date Selected: : :Contract Date: 03-08-18 ________________________________________________________________________________Est. Project Cost: 30,276,857.52

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 30,276,857.52 03-05-19 30,276,857.52 09-03-19 14,817,475.93 13,281,331.39 15,459,381.59 .00

Total 30,276,857.52 30,276,857.52 14,817,475.93 13,281,331.39 15,459,381.59 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 44 (X ) 100.00% Description:Description: PH-4 / Structural Column Repair - ColisePH-4 / Structural Column Repair - Colise

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 30,796.07 Schem Design: ( 0 ) Prime Bid: 10-11-18 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 08-23-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Halverson Construction Co., 19044881 11-15-18 11-29-18 03-29-19 03-27-19 ( 2-) 04-28-19 09-23-19 (148 ) 04-27-2004-27-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Halverson Construction Co., 19044881 81 399,026.00 28,137.42 2 427,163.42 427,163.42 5 .00 100***** Contract Totals ********** Contract Totals ***** 399,026.00 28,137.42 2 427,163.42 427,163.42 5 .00 100

Page 26: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 26Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--188188 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 1472 : :A/E Name: Sarti Architectural Group, Inc : :A/E Contact: Darrin Moore : :A/E Telephone: (217)585-9111 : :Date Selected: 01-15-19 : :Contract Date: 05-28-19 ________________________________________________________________________________Est. Project Cost: 1,870,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,870,700.00 01-17-19 1,870,700.00 01-17-19 39,194.00 39,094.00 1,831,506.00 .00

Total 1,870,700.00 1,870,700.00 39,194.00 39,094.00 1,831,506.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 08-23-19 10-18-19 ( 56 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-23-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-23-21 ( 0 )50%: ( 0 ) Final Accept: 08-23-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2108-31-21 08-31-2308-31-2395-100%: 08-23-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Sarti Architectural Group, I 19030710 ( 0 ) ( 0 ) 08-31-2308-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sarti Architectural Group, I 19030710 10 39,194.00 .00 1 39,194.00 39,094.00 1 100.00 100***** Contract Totals ********** Contract Totals ***** 39,194.00 .00 1 39,194.00 39,094.00 1 100.00 100

Page 27: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 27Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--189189 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Multipurpose Arena GrandstandAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 32353 : :A/E Name: Kuhn & Trello Consulting Engin : :A/E Contact: Matt Williams : :A/E Telephone: (217)679-0044 : :Date Selected: 03-12-19 : :Contract Date: 05-03-19 ________________________________________________________________________________Est. Project Cost: 8,649,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,649,300.00 02-21-20 8,649,300.00 02-21-20 630,025.00 415,012.02 8,019,275.00 .00

Total 8,649,300.00 8,649,300.00 630,025.00 415,012.02 8,019,275.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 90.00% Description:Description: Repair Multipurpose Arena GrandstandRepair Multipurpose Arena Grandstand

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-04-19 04-04-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 07-29-19 08-07-19 ( 9 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-30-20 09-30-20 (184 )

Design Devel: 11-01-19 11-19-19 ( 18 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-20 12-01-22 ( 0 )50%: ( 0 ) Final Accept: 01-04-21 01-04-23 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 06-30-2306-30-2395-100%: 01-31-20 07-07-20 (158 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kuhn & Trello Consulting Eng 19002610 ( 0 ) ( 0 ) 06-30-2306-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kuhn & Trello Consulting Eng 19002610 10 52,642.00 577,383.00 3 630,025.00 415,012.02 9 215,012.98 66***** Contract Totals ********** Contract Totals ***** 52,642.00 577,383.00 3 630,025.00 415,012.02 9 215,012.98 66

Page 28: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 28Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--190190 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace HVAC - Emmerson BuildingAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: Todd Hannah : :A/E Telephone: (217)522-3355 : :Date Selected: 08-13-19 : :Contract Date: 09-23-19 ________________________________________________________________________________Est. Project Cost: 1,752,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,752,500.00 11-24-20 1,752,500.00 11-24-20 1,675,499.77 1,550,622.96 77,000.23 .00

Total 1,752,500.00 1,752,500.00 1,675,499.77 1,550,622.96 77,000.23 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 97.00% Description:Description: Replace HVAC - Emmerson BuildingReplace HVAC - Emmerson Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-26-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-24-19 10-24-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-24-19 11-27-19 ( 34 ) Prime Bid: 04-02-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-20 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 11-30-20 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-15-2204-15-2295-100%: 01-24-20 04-15-20 ( 82 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 20030810 ( 0 ) ( 0 ) 04-15-2204-15-22Henson Robinson Company 21046381 01-12-21 02-23-21 11-20-21 ( 0 ) 01-19-22 ( 0 ) 01-19-2301-19-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 20030810 10 50,320.00 84,106.00 2 134,426.00 125,775.38 7 8,650.62 94Henson Robinson Company 21046381 81 1,488,852.00 52,221.77 4 1,541,073.77 1,424,847.58 7 116,226.19 93***** Contract Totals ********** Contract Totals ***** 1,539,172.00 136,327.77 6 1,675,499.77 1,550,622.96 14 124,876.81 93

Page 29: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 29Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--191191 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair/Resurface Roadways and SidewalksAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 32353 : :A/E Name: Kuhn & Trello Consulting Engin : :A/E Contact: Matt Williams : :A/E Telephone: (217)679-0044 : :Date Selected: 09-10-19 : :Contract Date: 10-24-19 ________________________________________________________________________________Est. Project Cost: 4,102,522.36

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,102,522.36 08-18-21 4,102,522.36 08-18-21 250,149.00 130,368.79 3,852,373.36 .00

Total 4,102,522.36 4,102,522.36 250,149.00 130,368.79 3,852,373.36 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Repair/Resurface Roadways and SidewalksRepair/Resurface Roadways and Sidewalks

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-08-19 10-08-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-17-20 03-25-20 ( 37 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-26-20 01-06-21 02-17-21 ( 42 )

Design Devel: ( 0 ) Prime Re-Bid: 08-04-21 ( 0 )25%: ( 0 ) Subst Compl: 05-01-21 06-01-22 ( 0 )50%: ( 0 ) Final Accept: 06-01-21 07-02-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2107-31-21 06-01-2306-01-2395-100%: 10-01-20 10-14-20 ( 13 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kuhn & Trello Consulting Eng 2000710 ( 0 ) ( 0 ) 06-01-2306-01-23Kinney Contractors, Inc. 22049681 10-20-21 11-02-21 07-01-22 ( 0 ) 07-31-22 ( 0 ) 07-31-2307-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kuhn & Trello Consulting Eng 2000710 10 37,006.00 213,143.00 3 250,149.00 130,368.79 6 119,780.21 52Kinney Contractors, Inc. 22049681 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 37,006.00 213,143.00 3 250,149.00 130,368.79 6 119,780.21 52

Page 30: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 30Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--192192 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Update HVAC ControlsAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 27810 : :A/E Name: Horner & Shifrin, Inc. : :A/E Contact: : :A/E Telephone: (618)622-3040 : :Date Selected: 10-08-19 : :Contract Date: 12-26-19 ________________________________________________________________________________Est. Project Cost: 1,453,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,453,600.00 10-09-19 1,453,600.00 10-09-19 157,330.00 102,775.47 1,296,270.00 .00

Total 1,453,600.00 1,453,600.00 157,330.00 102,775.47 1,296,270.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Update HVAC ControlsUpdate HVAC Controls

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-20-19 11-20-19 ( 0 ) Assgn Bid: 04-14-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 07-21-21 ( 0 )CORC Assessment Amt: .00 Schem Design: 02-10-20 02-18-20 ( 8 ) Prime Bid: 02-08-21 04-14-21 ( 65 )

Design Devel: 09-25-20 10-16-20 ( 21 ) Prime Re-Bid: 10-13-21 ( 0 )25%: ( 0 ) Subst Compl: 07-31-21 ( 0 )50%: ( 0 ) Final Accept: 08-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2111-30-21 07-30-2207-30-2295-100%: 11-20-20 12-26-20 ( 36 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Horner & Shifrin, Inc. 2001310 ( 0 ) ( 0 ) 07-30-2207-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Horner & Shifrin, Inc. 2001310 10 24,760.00 132,570.00 2 157,330.00 102,775.47 7 54,554.53 65***** Contract Totals ********** Contract Totals ***** 24,760.00 132,570.00 2 157,330.00 102,775.47 7 54,554.53 65

Page 31: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 31Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--195195 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair/Resurface Roadways and SidewalksAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 33686 : :A/E Name: Civil Design, Inc. : :A/E Contact: : :A/E Telephone: (314)863-5570 : :Date Selected: 12-15-20 : :Contract Date: 03-22-21 ________________________________________________________________________________Est. Project Cost: 8,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,600,000.00 12-15-20 6,600,000.00 12-15-20 366,600.00 120,748.00 6,233,400.00 .00

Total 6,600,000.00 6,600,000.00 366,600.00 120,748.00 6,233,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 36.00% Description:Description: Repair/Resurface Roadways and SidewalksRepair/Resurface Roadways and Sidewalks

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-19-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-18-22 ( 0 )

Design Devel: 07-12-21 07-26-21 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-15-23 ( 0 )50%: 10-04-21 ( 0 ) Final Accept: 02-15-23 ( 0 )75%: ( 0 ) A/E Cont End: 01-30-2401-30-2495-100%: 01-24-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Civil Design, Inc. 21001810 ( 0 ) ( 0 ) 01-30-2401-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Civil Design, Inc. 21001810 10 366,600.00 .00 0 366,600.00 120,748.00 4 245,852.00 33***** Contract Totals ********** Contract Totals ***** 366,600.00 .00 0 366,600.00 120,748.00 4 245,852.00 33

Page 32: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 32Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--197197 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace HVAC and Controls - Multiple BuiAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)359-1514 : :Date Selected: 07-13-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 11,899,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 11,899,500.00 07-13-21 11,899,500.00 07-13-21 .00 .00 11,899,500.00 .00

Total 11,899,500.00 11,899,500.00 .00 .00 11,899,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace HVAC and Controls - Multiple BuiReplace HVAC and Controls - Multiple Bui

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. 22010210 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. 22010210 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 33: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 33Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 039039--150150--199199 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Rehabilitate Building - State Fire MuseuAgency: Department of Agriculture Analyst: Erin EoffLocation: Illinois State Fairgrounds - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,312,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

47 2,312,200.00 10-04-21 2,312,200.00 10-04-21 .00 .00 2,312,200.00 .00

Total 2,312,200.00 2,312,200.00 .00 .00 2,312,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Rehabilitate Building - State Fire MuseuRehabilitate Building - State Fire Museu

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 34: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 34Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--000000--002002 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Install SprinklersAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: Paul Boland : :A/E Telephone: (217)359-1514 : :Date Selected: 06-12-12 : :Contract Date: 09-07-12 ________________________________________________________________________________Est. Project Cost: 2,309,588.85

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,661,805.29 08-23-18 2,661,805.29 08-23-18 2,029,843.48 2,013,395.08 279,745.37 352,216.44

Total 2,661,805.29 2,661,805.29 2,029,843.48 2,013,395.08 279,745.37 352,216.44____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XX) 75.00% Description:Description: PH-1 / Install Sprinklers @ Quincy VeterPH-1 / Install Sprinklers @ Quincy Veter

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-27-12 ( 0 ) Assgn Bid: 05-01-14 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-15-12 12-05-12 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 6,325.39 Schem Design: 11-15-12 12-05-12 ( 20 ) Prime Bid: 07-15-13 05-08-14 (297 )

Design Devel: 11-15-12 12-05-12 ( 20 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-15-13 07-01-17 ( 0 )50%: ( 0 ) Final Accept: 01-15-14 09-01-17 ( 0 )75%: ( 0 ) A/E Cont End: 12-15-1412-15-14 07-31-2007-31-2095-100%: 03-15-13 10-04-13 (203 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. 12047610 ( 0 ) ( 0 ) 07-31-2007-31-20Prairie State Plumbing & Hea 15043185A ( 0 ) ( 0 )Automatic Fire Sprinkler, LL 15043082 08-11-14 09-09-14 05-07-15 ( 0 ) 06-06-17 ( 0 ) 02-01-2002-01-20Prairie State Plumbing & Hea 15043185 08-11-14 09-09-14 05-07-15 06-30-15 ( 54 ) 06-06-15 06-30-15 ( 24 ) 06-05-1806-05-18

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. 12047610 10 111,600.00 .00 4 111,600.00 95,151.60 7 16,448.40 85Prairie State Plumbing & Hea 15043185A 11 15,817.35 .00 0 15,817.35 15,817.35 1 .00 100Prairie State Plumbing & Hea INT6718 00 .00 4,494.18 0 4,494.18 4,494.18 1 .00 100Automatic Fire Sprinkler, LL 15043082 82 1,587,300.00 174,254.85- 7 1,413,045.15 1,413,045.15 10 .00 100Prairie State Plumbing & Hea 15043185 85 111,200.00 14,670.60- 1 96,529.40 96,529.40 4 .00 100

Page 35: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 35Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 1,825,917.35 184,431.27- 12 1,641,486.08 1,625,037.68 23 16,448.40 99

Page 36: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 36Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--000000--002002 PM NAME: Ken Mesle 333Ken Mesle 333Project Status: AP Active Project Region:Project Type: ST Standard PLA: YDescription: Install SprinklersAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 06-15-20 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: Paul Boland : :A/E Telephone: (217)359-1514 : :Date Selected: : :Contract Date: 09-07-12 ________________________________________________________________________________Est. Project Cost: 2,309,588.85

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,661,805.29 08-23-18 2,661,805.29 08-23-18 2,029,843.48 2,013,395.08 279,745.37 352,216.44

Total 2,661,805.29 2,661,805.29 2,029,843.48 2,013,395.08 279,745.37 352,216.44____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 100.00% Description:Description: PH-2 / Install Sprinklers @ LaSalle VetePH-2 / Install Sprinklers @ LaSalle Vete

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 6,325.39 Schem Design: ( 0 ) Prime Bid: 08-21-13 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 01-15-14 ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2007-31-2095-100%: 03-18-13 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Automatic Fire Systems, Inc. 14049482 10-18-13 12-02-13 03-02-14 01-15-14 ( 46-) 04-01-14 01-15-14 ( 76-) 04-01-1504-01-15

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Automatic Fire Systems, Inc. 14049482 82 3,730.00 .00 0 3,730.00 3,730.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 3,730.00 .00 0 3,730.00 3,730.00 1 .00 100

Page 37: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 37Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--000000--002002 PM NAME: Ken Mesle 333Ken Mesle 333Project Status: AP Active Project Region:Project Type: ST Standard PLA: YDescription: Install SprinklersAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 06-15-20 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: Paul Boland : :A/E Telephone: (217)359-1514 : :Date Selected: : :Contract Date: 09-07-12 ________________________________________________________________________________Est. Project Cost: 2,309,588.85

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,661,805.29 08-23-18 2,661,805.29 08-23-18 2,029,843.48 2,013,395.08 279,745.37 352,216.44

Total 2,661,805.29 2,661,805.29 2,029,843.48 2,013,395.08 279,745.37 352,216.44____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 33 (XP) 100.00% Description:Description: PH-3 / /Install Sprinklers @ Anna VeteraPH-3 / /Install Sprinklers @ Anna Vetera

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 6,325.39 Schem Design: ( 0 ) Prime Bid: 08-27-13 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2007-31-2095-100%: 03-18-13 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Automatic Fire Sprinkler, LL 14049582 10-18-13 12-10-13 03-10-14 03-06-14 ( 4-) 04-09-14 09-09-14 (153 ) 04-09-1504-09-15

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Automatic Fire Sprinkler, LL 14049582 82 21,788.00 .00 0 21,788.00 21,788.00 2 .00 100***** Contract Totals ********** Contract Totals ***** 21,788.00 .00 0 21,788.00 21,788.00 2 .00 100

Page 38: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 38Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--000000--002002 PM NAME: Ken Mesle 333Ken Mesle 333Project Status: AP Active Project Region:Project Type: ST Standard PLA: YDescription: Install SprinklersAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 06-15-20 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: Paul Boland : :A/E Telephone: (217)359-1514 : :Date Selected: : :Contract Date: 09-07-12 ________________________________________________________________________________Est. Project Cost: 2,309,588.85

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,661,805.29 08-23-18 2,661,805.29 08-23-18 2,029,843.48 2,013,395.08 279,745.37 352,216.44

Total 2,661,805.29 2,661,805.29 2,029,843.48 2,013,395.08 279,745.37 352,216.44____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 44 (XP) 100.00% Description:Description: PH-4 / Install Sprinklers @ Manteno VetePH-4 / Install Sprinklers @ Manteno Vete

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 6,325.39 Schem Design: ( 0 ) Prime Bid: 08-29-13 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2007-31-2095-100%: 03-18-13 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Automatic Fire Sprinkler, LL 14049682 10-18-13 12-11-13 03-11-14 06-27-14 (108 ) 04-10-14 03-10-15 (334 ) 04-10-1504-10-15

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Automatic Fire Sprinkler, LL 14049682 82 308,740.00 54,099.40 2 362,839.40 362,839.40 5 .00 100***** Contract Totals ********** Contract Totals ***** 308,740.00 54,099.40 2 362,839.40 362,839.40 5 .00 100

Page 39: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 39Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--114114 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct Domestic Water LoopAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 11837 : :A/E Name: Poepping, Stone, Bach & Associ : :A/E Contact: Doug Seeber : :A/E Telephone: (217)223-4605 : :Date Selected: 08-14-18 : :Contract Date: 10-11-18 ________________________________________________________________________________Est. Project Cost: 3,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,000,000.00 02-20-20 3,000,000.00 02-20-20 439,837.00 180,550.28 2,560,163.00 .00

Total 3,000,000.00 3,000,000.00 439,837.00 180,550.28 2,560,163.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 70.00% Description:Description: Construct Domestic Water LoopConstruct Domestic Water Loop

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-06-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-04-19 06-09-20 (522 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-21-21 07-22-21 ( 31 ) Prime Bid: 07-22-22 ( 0 )

Design Devel: 06-21-21 08-19-21 ( 59 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-20-23 ( 0 )50%: ( 0 ) Final Accept: 12-19-23 ( 0 )75%: 11-16-21 ( 0 ) A/E Cont End: 12-01-2112-01-21 12-01-2412-01-2495-100%: 05-13-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Poepping, Stone, Bach & Asso 19010210 ( 0 ) ( 0 ) 12-01-2412-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Poepping, Stone, Bach & Asso 19010210 10 30,448.00 409,389.00 1 439,837.00 180,550.28 19 259,286.72 41***** Contract Totals ********** Contract Totals ***** 30,448.00 409,389.00 1 439,837.00 180,550.28 19 259,286.72 41

Page 40: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 40Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--115115 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: DB Design Build PLA: YDescription: Construct New Nursing Home and DomiciliaAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 30418 : :A/E Name: Perkins Eastman Architects, D. : :A/E Contact: Ramu Ramachandran : :A/E Telephone: (312)755-1200 : :Date Selected: 09-11-18 : :Contract Date: 12-22-18 ________________________________________________________________________________Est. Project Cost: 230,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 240,773,981.13 05-03-21 240,773,981.13 05-03-21 235,786,950.00 18,651,496.09 4,987,031.13 .00

Total 240,773,981.13 240,773,981.13 235,786,950.00 18,651,496.09 4,987,031.13 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 11.00% Description:Description: Construct New Nursing Home and DomiciliaConstruct New Nursing Home and Domicilia

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-14-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-30-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-20-19 09-16-21 (758 ) Prime Bid: 01-14-20 06-23-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-01-26 ( 0 )50%: ( 0 ) Final Accept: 02-01-26 ( 0 )75%: ( 0 ) A/E Cont End: 07-08-2607-08-2695-100%: 12-01-19 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Perkins Eastman Architects, 19011110 ( 0 ) ( 0 ) 07-08-2607-08-26C D B - Fiscal FF&E ( 0 ) ( 0 )C D B - Fiscal TELECOM ( 0 ) ( 0 )Veterans United Constructors 21DB0141 03-01-21 09-07-24 ( 0 ) 12-06-24 ( 0 ) 12-06-2512-06-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Perkins Eastman Architects, 19011110 10 5,383,627.00 337,971.00 5 5,721,598.00 3,861,031.59 19 1,860,566.41 68C D B - Fiscal FF&E 11 15,000,000.0015,000,000.00- 0 .00 .00 0 .00 100C D B - Fiscal TELECOM 11 5,000,000.00 2,000,000.00- 0 3,000,000.00 .00 0 3,000,000.00 0C D B/Art In Architecture ART 49 1,150,000.00 136,852.00 0 1,286,852.00 .00 0 1,286,852.00 0Veterans United Constructors 21DB0141 41 225,700,000.00 .00 0 225,700,000.00 14,711,964.50 13 210,988,035.50 7

Page 41: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 41Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 252,233,627.0016,525,177.00- 5 235,708,450.00 18,572,996.09 32 217,135,453.91 8

Page 42: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 42Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--115C115C PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct New Nursing Home and DomiciliaAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,480,447.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,480,447.00 06-20-19 2,480,447.00 06-20-19 2,480,447.00 176,609.94 .00 .00

Total 2,480,447.00 2,480,447.00 2,480,447.00 176,609.94 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Construct New Nursing Home and DomiciliaConstruct New Nursing Home and Domicilia

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 43: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 43Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--116116 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: IG Intergovernmental Agreement PLA: NDescription: Evaluate Water SystemAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 594,040.39

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 594,040.39 09-10-20 594,040.39 09-10-20 580,940.39 580,940.39 13,100.00 .00

Total 594,040.39 594,040.39 580,940.39 580,940.39 13,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XX) .00% Description:Description: Evaluate Water SystemEvaluate Water System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 44: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 44Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--120120 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Restore and Expand CemeteryAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 28747 : :A/E Name: Browning Day Mullins Dierdorf : :A/E Contact: Brett Schlachter : :A/E Telephone: (317)635-5030 : :Date Selected: 05-12-20 : :Contract Date: 04-20-20 ________________________________________________________________________________Est. Project Cost: 1,386,025.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,386,025.00 07-09-21 1,386,025.00 07-09-21 1,274,197.00 124,102.00 111,828.00 .00

Total 1,386,025.00 1,386,025.00 1,274,197.00 124,102.00 111,828.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 15.00% Description:Description: Expand CemeteryExpand Cemetery

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-12-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-25-20 05-19-20 ( 6-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-25-20 05-19-20 ( 6-) Prime Bid: 07-30-20 06-09-21 (314 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-12-21 01-15-22 ( 0 )50%: ( 0 ) Final Accept: 05-11-21 03-15-22 ( 0 )75%: 06-15-20 06-09-20 ( 6-) A/E Cont End: 08-20-2308-20-2395-100%: 06-29-20 03-18-21 (262 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Browning Day Mullins Dierdor 20013910 ( 0 ) ( 0 ) 08-20-2308-20-23Waterkotte Construction, Inc 22041381 07-30-21 08-18-21 04-30-22 ( 0 ) 05-30-22 ( 0 ) 05-30-2305-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Browning Day Mullins Dierdor 20013910 10 113,200.00 42,719.00 2 155,919.00 81,619.00 1 74,300.00 52Waterkotte Construction, Inc 22041381 81 1,118,278.00 .00 0 1,118,278.00 42,483.00 1 1,075,795.00 4***** Contract Totals ********** Contract Totals ***** 1,231,478.00 42,719.00 2 1,274,197.00 124,102.00 2 1,150,095.00 10

Page 45: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 45Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--120120 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Restore and Expand CemeteryAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 28747 : :A/E Name: Browning Day Mullins Dierdorf : :A/E Contact: Brett Schlachter : :A/E Telephone: (317)635-5030 : :Date Selected: : :Contract Date: 04-20-20 ________________________________________________________________________________Est. Project Cost: 1,386,025.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,386,025.00 07-09-21 1,386,025.00 07-09-21 1,274,197.00 124,102.00 111,828.00 .00

Total 1,386,025.00 1,386,025.00 1,274,197.00 124,102.00 111,828.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 100.00% Description:Description: Restore CemetaryRestore Cemetary

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-12-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 02-15-21 02-02-21 ( 13-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 46: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 46Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--122122 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 2519 : :A/E Name: Architechnics, Inc. : :A/E Contact: Paul Westerhoff : :A/E Telephone: (217)222-0554 : :Date Selected: 11-17-20 : :Contract Date: 01-27-21 ________________________________________________________________________________Est. Project Cost: 406,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 406,700.00 11-19-20 406,700.00 11-19-20 304,869.00 135,473.00 101,831.00 .00

Total 406,700.00 406,700.00 304,869.00 135,473.00 101,831.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-26-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-16-21 08-04-21 ( 12-)

Design Devel: 02-15-21 02-23-21 ( 8 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-15-21 ( 0 )50%: 03-29-21 03-24-21 ( 5-) Final Accept: 12-06-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2211-30-2295-100%: 05-24-21 04-26-21 ( 28-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechnics, Inc. 21001510 ( 0 ) ( 0 ) 11-30-2211-30-22Designed Roofing Systems, In 22045181 08-25-21 09-16-21 01-14-22 ( 0 ) 03-15-22 ( 0 ) 03-15-2303-15-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechnics, Inc. 21001510 10 41,500.00 .00 0 41,500.00 26,630.00 5 14,870.00 64Designed Roofing Systems, In 22045181 81 263,369.00 .00 0 263,369.00 108,843.00 1 154,526.00 41***** Contract Totals ********** Contract Totals ***** 304,869.00 .00 0 304,869.00 135,473.00 6 169,396.00 45

Page 47: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 47Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--123123 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Air Conditioning UnitsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 200,000.00 05-03-21 200,000.00 05-03-21 200,000.00 .00 .00 .00

Total 200,000.00 200,000.00 200,000.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 96.00% Description:Description: Replace Air Conditioning UnitsReplace Air Conditioning Units

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

River City Construction, L.L 21053081 06-16-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

River City Construction, L.L 21053081 81 200,000.00 .00 0 200,000.00 .00 0 200,000.00 0***** Contract Totals ********** Contract Totals ***** 200,000.00 .00 0 200,000.00 .00 0 200,000.00 0

Page 48: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 48Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--124124 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Storm Sewer RepairAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 29894 : :A/E Name: GSG Consultants, Inc. : :A/E Contact: : :A/E Telephone: (312)733-6262 : :Date Selected: 09-14-21 : :Contract Date: 10-13-21 ________________________________________________________________________________Est. Project Cost: 750,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 111,744.00 10-07-21 111,744.00 10-07-21 111,744.00 .00 .00 .00

Total 111,744.00 111,744.00 111,744.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Emergency Storm Sewer RepairEmergency Storm Sewer Repair

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-05-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-14-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-22 ( 0 )50%: ( 0 ) Final Accept: 08-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 01-31-2301-31-2395-100%: 11-29-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

GSG Consultants, Inc. 22041310 ( 0 ) ( 0 ) 01-31-2301-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

GSG Consultants, Inc. 22041310 10 111,744.00 .00 0 111,744.00 .00 0 111,744.00 0***** Contract Totals ********** Contract Totals ***** 111,744.00 .00 0 111,744.00 .00 0 111,744.00 0

Page 49: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 49Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--125125 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Electrical System - HeadquartersAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 980,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 980,800.00 10-18-21 980,800.00 10-18-21 .00 .00 980,800.00 .00

Total 980,800.00 980,800.00 .00 .00 980,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Upgrade Electrical System - HeadquartersUpgrade Electrical System - Headquarters

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 50: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 50Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--010010--126126 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Install Fire Suppression SystemAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Quincy - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,156,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,156,500.00 10-18-21 1,156,500.00 10-18-21 .00 .00 1,156,500.00 .00

Total 1,156,500.00 1,156,500.00 .00 .00 1,156,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Install Fire Suppression SystemInstall Fire Suppression System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 51: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 51Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--064064 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: NDescription: Emergency Water UpgradesAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-14-21 :: :

A/E Id: 29590 : :A/E Name: Nest Builders, Inc. : :A/E Contact: Benjamin Rubach : :A/E Telephone: (312)915-0557 : :Date Selected: 03-12-19 : :Contract Date: 04-17-19 ________________________________________________________________________________Est. Project Cost: 9,934,118.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 9,934,118.00 12-19-19 9,934,118.00 07-01-21 8,743,107.59 8,142,237.05 1,191,010.41 .00

Total 9,934,118.00 9,934,118.00 8,743,107.59 8,142,237.05 1,191,010.41 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 85.00% Description:Description: Emergency Water UpgradesEmergency Water Upgrades

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-31-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-28-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-20 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 10-30-20 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-04-1905-04-19 12-31-2112-31-2195-100%: 12-31-19 03-13-20 ( 73 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Nest Builders, Inc. 19002410 ( 0 ) ( 0 ) 12-31-2112-31-21Chas F. Bruckner & Son, Inc. 19EM1282 02-11-19 02-11-19 03-04-19 12-15-20 ( 0 ) 01-20-21 ( 0 ) 12-31-2112-31-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Nest Builders, Inc. 19002410 10 55,700.00 787,259.00 7 842,959.00 604,021.24 22 238,937.76 72Chas F. Bruckner & Son, Inc. INT7155 00 148.59 .00 0 148.59 148.59 1 .00 100Chas F. Bruckner & Son, Inc. 19EM1282 82 100,000.00 7,800,000.00 6 7,900,000.00 7,538,067.22 42 361,932.78 96***** Contract Totals ********** Contract Totals ***** 155,848.59 8,587,259.00 13 8,743,107.59 8,142,237.05 65 600,870.54 93

Page 52: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 52Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--065065 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Air HandlersAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-14-21 :: :

A/E Id: 30812 : :A/E Name: Webb Engineering Services, Inc : :A/E Contact: : :A/E Telephone: (314)588-0600 : :Date Selected: 03-12-19 : :Contract Date: 06-11-19 ________________________________________________________________________________Est. Project Cost: 5,669,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,669,100.00 02-27-20 2,669,100.00 02-27-20 262,413.00 105,546.35 2,406,687.00 .00

Total 2,669,100.00 2,669,100.00 262,413.00 105,546.35 2,406,687.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 49.99% Description:Description: Replace Air HandlersReplace Air Handlers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-07-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-09-20 01-09-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-04-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-21 ( 0 )50%: 07-27-20 12-09-20 (135 ) Final Accept: 10-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-29-2207-29-2295-100%: 11-09-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Webb Engineering Services, I 19003510 ( 0 ) ( 0 ) 07-29-2207-29-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Webb Engineering Services, I 19003510 10 165,700.00 96,713.00 1 262,413.00 105,546.35 3 156,866.65 40***** Contract Totals ********** Contract Totals ***** 165,700.00 96,713.00 1 262,413.00 105,546.35 3 156,866.65 40

Page 53: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 53Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--066066 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-14-21 :: :

A/E Id: 26348 : :A/E Name: SMT Architects P.C. : :A/E Contact: Michelle Thorsell : :A/E Telephone: (630)705-0707 : :Date Selected: 03-12-19 : :Contract Date: 04-22-19 ________________________________________________________________________________Est. Project Cost: 2,032,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,032,300.00 06-22-20 2,032,300.00 06-22-20 1,995,602.50 1,702,008.32 36,697.50 .00

Total 2,032,300.00 2,032,300.00 1,995,602.50 1,702,008.32 36,697.50 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-03-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-24-19 06-24-19 ( 0 ) Prime Bid: 12-12-19 02-27-20 ( 77 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-20 ( 0 )50%: ( 0 ) Final Accept: 11-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2109-30-21 09-30-2209-30-2295-100%: 09-16-19 10-08-19 ( 22 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SMT Architects P.C. 19023810 ( 0 ) ( 0 ) 09-30-2209-30-22Seal Tight Exteriors Inc. 21040881 07-29-20 12-01-20 07-29-21 07-09-21 ( 20-) 08-28-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SMT Architects P.C. 19023810 10 95,800.00 3,400.00 2 99,200.00 75,792.22 6 23,407.78 77Seal Tight Exteriors Inc. INT7198 00 1,192.50 .00 0 1,192.50 1,192.50 1 .00 100Seal Tight Exteriors Inc. 21040881 81 1,895,210.00 .00 0 1,895,210.00 1,625,023.60 6 270,186.40 86***** Contract Totals ********** Contract Totals ***** 1,992,202.50 3,400.00 2 1,995,602.50 1,702,008.32 13 293,594.18 85

Page 54: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 54Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--067067 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Water MainsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-15-21 :: :

A/E Id: 29102 : :A/E Name: Milhouse Engineering and Const : :A/E Contact: : :A/E Telephone: (312)987-0061 : :Date Selected: 08-13-19 : :Contract Date: 10-02-19 ________________________________________________________________________________Est. Project Cost: 3,625,004.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,038,000.00 08-15-19 2,038,000.00 08-15-19 127,400.00 18,655.00 1,910,600.00 .00

Total 2,038,000.00 2,038,000.00 127,400.00 18,655.00 1,910,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 30.00% Description:Description: Replace Water MainsReplace Water Mains

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-04-19 09-04-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-25-19 01-28-21 (430 ) Prime Bid: ( 0 )

Design Devel: 11-15-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2109-30-21 09-09-2409-09-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Milhouse Engineering and Con 20020410 ( 0 ) ( 0 ) 09-09-2409-09-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Milhouse Engineering and Con 20020410 10 83,700.00 43,700.00 1 127,400.00 18,655.00 2 108,745.00 15***** Contract Totals ********** Contract Totals ***** 83,700.00 43,700.00 1 127,400.00 18,655.00 2 108,745.00 15

Page 55: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 55Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--068068 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate Central KitchenAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 11-09-21 :: :

A/E Id: 28132 : :A/E Name: Bauhs Dring Main Ltd. : :A/E Contact: : :A/E Telephone: (312)649-9484 : :Date Selected: 11-13-19 : :Contract Date: 03-04-20 ________________________________________________________________________________Est. Project Cost: 950,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 750,700.00 11-18-19 750,700.00 11-18-19 89,100.00 15,520.00 661,600.00 .00

Total 750,700.00 750,700.00 89,100.00 15,520.00 661,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 35.00% Description:Description: Renovate Central KitchenRenovate Central Kitchen

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-17-20 01-17-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-11-20 12-01-20 ( 20 ) Prime Bid: 02-21-22 ( 0 )

Design Devel: 08-30-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-22 ( 0 )50%: 10-25-21 ( 0 ) Final Accept: 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-15-2012-15-20 09-01-2309-01-2395-100%: 12-20-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauhs Dring Main Ltd. 2002710 ( 0 ) ( 0 ) 09-01-2309-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauhs Dring Main Ltd. 2002710 10 14,920.00 74,180.00 3 89,100.00 15,520.00 1 73,580.00 18***** Contract Totals ********** Contract Totals ***** 14,920.00 74,180.00 3 89,100.00 15,520.00 1 73,580.00 18

Page 56: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 56Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--069069 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: PLA: NDescription: Renovate RestroomsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-15-21 :: :

A/E Id: 30317 : :A/E Name: Middough Inc. : :A/E Contact: : :A/E Telephone: (630)756-7000 : :Date Selected: 11-13-19 : :Contract Date: 03-12-20 ________________________________________________________________________________Est. Project Cost: 3,187,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,187,300.00 11-18-19 3,187,300.00 11-18-19 296,300.00 54,690.00 2,891,000.00 .00

Total 3,187,300.00 3,187,300.00 296,300.00 54,690.00 2,891,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Renovate RestroomsRenovate Restrooms

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-23-20 01-23-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-20-20 08-20-20 (122 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-03-20 ( 0 ) Prime Bid: 04-12-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-15-22 ( 0 )50%: ( 0 ) Final Accept: 08-01-22 ( 0 )75%: 12-28-20 ( 0 ) A/E Cont End: 06-30-2306-30-2395-100%: 02-22-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Middough Inc. 2002610 ( 0 ) ( 0 ) 06-30-2306-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Middough Inc. 2002610 10 296,300.00 .00 0 296,300.00 54,690.00 1 241,610.00 19***** Contract Totals ********** Contract Totals ***** 296,300.00 .00 0 296,300.00 54,690.00 1 241,610.00 19

Page 57: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 57Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--071071 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Shingled Roofing SystemsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-15-21 :: :

A/E Id: 26348 : :A/E Name: SMT Architects P.C. : :A/E Contact: : :A/E Telephone: (630)705-0707 : :Date Selected: 03-10-20 : :Contract Date: 05-28-20 ________________________________________________________________________________Est. Project Cost: 3,651,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,651,200.00 03-10-20 3,651,200.00 03-10-20 260,400.00 156,388.00 3,390,800.00 .00

Total 3,651,200.00 3,651,200.00 260,400.00 156,388.00 3,390,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.50% Description:Description: Replace Shingled Roofing SystemsReplace Shingled Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-19-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-12-21 03-31-21 ( 47 )

Design Devel: 07-27-20 07-20-20 ( 7-) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-10-21 ( 0 )50%: ( 0 ) Final Accept: 01-07-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-10-2212-10-2295-100%: 10-12-20 01-05-21 ( 85 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SMT Architects P.C. 20024710 ( 0 ) ( 0 ) 12-10-2212-10-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SMT Architects P.C. 20024710 10 260,400.00 .00 0 260,400.00 156,388.00 5 104,012.00 60***** Contract Totals ********** Contract Totals ***** 260,400.00 .00 0 260,400.00 156,388.00 5 104,012.00 60

Page 58: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 58Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--072072 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: NDescription: Emergency Renovation for Isolation RoomsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 11-09-21 :: :

A/E Id: 3473 : :A/E Name: Rubinos and Mesia Engineers, I : :A/E Contact: Ted White : :A/E Telephone: (312)870-6600 : :Date Selected: 05-12-20 : :Contract Date: 04-22-20 ________________________________________________________________________________Est. Project Cost: 7,705,883.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 7,705,883.00 07-28-21 7,705,883.00 07-28-21 7,705,882.52 7,327,391.16 .48 .00

Total 7,705,883.00 7,705,883.00 7,705,882.52 7,327,391.16 .48 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Emergency Renovation for Isolation RoomsEmergency Renovation for Isolation Rooms

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-30-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-12-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-29-20 ( 0 )50%: ( 0 ) Final Accept: 06-26-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-26-2006-26-20 11-30-2011-30-2095-100%: 05-12-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Rubinos and Mesia Engineers, 20003710 ( 0 ) ( 0 ) 11-30-2011-30-20Ujamaa Construction, Inc. 20EM1981 03-31-20 03-31-20 04-30-20 07-17-20 ( 78 ) 06-28-20 ( 0 ) 12-01-2012-01-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Rubinos and Mesia Engineers, 20003710 10 193,711.00 246,743.00 3 440,454.00 437,435.71 4 3,018.29 99Ujamaa Construction, Inc. 20EM1981 81 2,055,675.00 5,208,279.52 4 7,263,954.52 6,888,481.45 6 375,473.07 95***** Contract Totals ********** Contract Totals ***** 2,249,386.00 5,455,022.52 7 7,704,408.52 7,325,917.16 10 378,491.36 95

Page 59: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 59Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--073073 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Air HandlersAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 11-09-21 :: :

A/E Id: 6012 : :A/E Name: Melvin Cohen and Associates, I : :A/E Contact: : :A/E Telephone: (312)663-3700 : :Date Selected: 09-15-20 : :Contract Date: 12-07-20 ________________________________________________________________________________Est. Project Cost: 3,700,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,700,000.00 09-28-20 3,700,000.00 09-28-20 292,500.00 145,100.00 3,407,500.00 .00

Total 3,700,000.00 3,700,000.00 292,500.00 145,100.00 3,407,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Replace Air HandlersReplace Air Handlers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-28-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-01-21 05-05-21 ( 93 ) Prime Bid: 09-13-21 ( 0 )

Design Devel: 04-26-21 08-02-21 ( 98 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-22 ( 0 )50%: ( 0 ) Final Accept: 10-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2309-30-2395-100%: 07-05-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Melvin Cohen and Associates, 21001110 ( 0 ) ( 0 ) 09-30-2309-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Melvin Cohen and Associates, 21001110 10 292,500.00 .00 0 292,500.00 145,100.00 2 147,400.00 50***** Contract Totals ********** Contract Totals ***** 292,500.00 .00 0 292,500.00 145,100.00 2 147,400.00 50

Page 60: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 60Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--074074 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: NDescription: Emergency Renovation for Isolation RoomsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 11-09-21 :: :

A/E Id: 3473 : :A/E Name: Rubinos and Mesia Engineers, I : :A/E Contact: Andrew Wynn : :A/E Telephone: (312)870-6600 : :Date Selected: 05-11-21 : :Contract Date: 04-21-21 ________________________________________________________________________________Est. Project Cost: 518,238.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 518,238.00 04-26-21 518,238.00 04-26-21 518,238.00 201,691.86 .00 .00

Total 518,238.00 518,238.00 518,238.00 201,691.86 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 80.00% Description:Description: Emergency Renovation for Isolation RoomsEmergency Renovation for Isolation Rooms

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-05-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-08-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-05-21 ( 0 )50%: ( 0 ) Final Accept: 08-19-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-29-2106-29-21 11-30-2111-30-2195-100%: 05-20-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Rubinos and Mesia Engineers, 21002210 ( 0 ) ( 0 ) 11-30-2111-30-21Ujamaa Construction, Inc. 21EM0681 04-01-21 ( 0 ) ( 0 ) 11-30-2111-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Rubinos and Mesia Engineers, 21002210 10 33,238.00 .00 1 33,238.00 31,140.10 4 2,097.90 94Ujamaa Construction, Inc. 21EM0681 81 485,000.00 .00 1 485,000.00 170,551.76 1 314,448.24 35***** Contract Totals ********** Contract Totals ***** 518,238.00 .00 2 518,238.00 201,691.86 5 316,546.14 39

Page 61: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 61Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--020020--075075 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade HVAC/Replace AHU'sAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Manteno - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-15-21 :: :

A/E Id: 20003 : :A/E Name: A. Epstein and Sons Internatio : :A/E Contact: : :A/E Telephone: (312)454-9100 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 4,313,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,313,900.00 09-20-21 4,313,900.00 09-20-21 .00 .00 4,313,900.00 .00

Total 4,313,900.00 4,313,900.00 .00 .00 4,313,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .01% Description:Description: Upgrade HVAC/Replace AHU'sUpgrade HVAC/Replace AHU's

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

A. Epstein and Sons Internat 22001110 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

A. Epstein and Sons Internat 22001110 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 62: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 62Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--050050--023023 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Wander Guard and Fire Alarm SystAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at LaSalle - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 10-29-21 :: :

A/E Id: 11837 : :A/E Name: Poepping, Stone, Bach & Associ : :A/E Contact: Todd Clevenger : :A/E Telephone: (217)223-4605 : :Date Selected: 03-12-19 : :Contract Date: 05-24-19 ________________________________________________________________________________Est. Project Cost: 583,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 583,100.00 03-15-19 583,100.00 03-15-19 557,900.00 124,120.99 25,200.00 .00

Total 583,100.00 583,100.00 557,900.00 124,120.99 25,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 20.00% Description:Description: Replace Wander Guard and Fire Alarm SystReplace Wander Guard and Fire Alarm Syst

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-23-19 04-23-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-06-20 10-14-20 (251 )

Design Devel: 08-19-19 09-17-19 ( 29 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-08-20 01-15-22 ( 0 )50%: ( 0 ) Final Accept: 07-08-20 03-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-08-2106-08-21 01-30-2301-30-2395-100%: 11-11-19 06-18-20 (220 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Poepping, Stone, Bach & Asso 19003410 ( 0 ) ( 0 ) 01-30-2301-30-23Block Electric Co., Inc. 22042885 08-05-21 08-17-21 02-13-22 ( 0 ) 04-14-22 ( 0 ) 04-14-2304-14-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Poepping, Stone, Bach & Asso 19003410 10 58,000.00 .00 1 58,000.00 37,808.48 14 20,191.52 65Block Electric Co., Inc. 22042885 85 499,900.00 .00 0 499,900.00 86,312.51 1 413,587.49 17***** Contract Totals ********** Contract Totals ***** 557,900.00 .00 1 557,900.00 124,120.99 15 433,779.01 22

Page 63: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 63Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--050050--024024 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Original Generator, Chiller andAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at LaSalle - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 10-29-21 :: :

A/E Id: 34382 : :A/E Name: Webb Engineering Services, Inc : :A/E Contact: Wayne Robinson : :A/E Telephone: (217)355-9064 : :Date Selected: 05-14-19 : :Contract Date: 09-03-19 ________________________________________________________________________________Est. Project Cost: 2,603,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,603,600.00 08-19-21 2,603,600.00 08-19-21 2,042,201.35 908,881.68 561,398.65 .00

Total 2,603,600.00 2,603,600.00 2,042,201.35 908,881.68 561,398.65 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 35.00% Description:Description: Replace Original Generator, Chiller andReplace Original Generator, Chiller and

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-13-19 08-13-19 ( 0 ) Assgn Bid: 01-06-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-04-20 01-06-21 (216 )

Design Devel: 11-04-19 12-23-19 ( 49 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-21 ( 0 )50%: ( 0 ) Final Accept: 07-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: 04-06-20 09-16-20 (163 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Webb Engineering Services, I 19004610 ( 0 ) ( 0 ) 06-30-2206-30-22Loescher Heating & Air Condi 20EM0383 11-07-19 11-07-19 01-06-20 12-20-19 ( 17-) 02-05-20 12-20-19 ( 47-) 02-04-2002-04-20CAD Construction Inc. 21049281 03-29-21 07-07-21 03-04-22 ( 0 ) 05-03-22 ( 0 ) 05-03-2305-03-23JB Contracting Corp. 21049385 03-29-21 07-07-21 03-04-22 ( 0 ) 05-03-22 ( 0 ) 05-03-2305-03-23JB Contracting Corp. 21049483 03-29-21 07-07-21 03-04-22 ( 0 ) 05-03-22 ( 0 ) 05-03-2305-03-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Webb Engineering Services, I 19004610 10 203,200.00 23,482.00 3 226,682.00 162,208.85 8 64,473.15 72Loescher Heating & Air Condi 20EM0383 83 100,156.81 26,364.81- 0 73,792.00 73,792.00 1 .00 100CAD Construction Inc. 21049281 81 198,550.00 3,947.86 2 202,497.86 73,884.52 2 128,613.34 37JB Contracting Corp. 21049385 85 649,000.00 64,615.39 1 713,615.39 280,004.46 2 433,610.93 39

Page 64: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 64Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

JB Contracting Corp. 21049483 83 801,463.00 24,151.10 1 825,614.10 318,991.85 2 506,622.25 39***** Contract Totals ********** Contract Totals ***** 1,952,369.81 89,831.54 7 2,042,201.35 908,881.68 15 1,133,319.67 45

Page 65: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 65Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--050050--030030 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace DoorsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at LaSalle - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 10-27-21 :: :

A/E Id: 30811 : :A/E Name: Kluber, Inc. : :A/E Contact: Charli Johnsos : :A/E Telephone: (630)406-1213 : :Date Selected: 07-13-21 : :Contract Date: 06-25-21 ________________________________________________________________________________Est. Project Cost: 300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 300,000.00 11-03-21 300,000.00 11-03-21 26,900.00 4,460.00 273,100.00 .00

Total 300,000.00 300,000.00 26,900.00 4,460.00 273,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Replace DoorsReplace Doors

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-18-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-02-21 08-02-21 ( 0 ) Prime Bid: 02-21-22 ( 0 )

Design Devel: 09-20-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-22 ( 0 )50%: ( 0 ) Final Accept: 07-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2306-01-2395-100%: 11-08-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kluber, Inc. 21002810 ( 0 ) ( 0 ) 06-01-2306-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kluber, Inc. 21002810 10 26,900.00 .00 0 26,900.00 4,460.00 1 22,440.00 17***** Contract Totals ********** Contract Totals ***** 26,900.00 .00 0 26,900.00 4,460.00 1 22,440.00 17

Page 66: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 66Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--050050--031031 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate Veterans HomeAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at LaSalle - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 10-27-21 :: :

A/E Id: 33853 : :A/E Name: Virtual Energy Solutions, Inc. : :A/E Contact: : :A/E Telephone: (312)583-7023 : :Date Selected: 10-12-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 4,194,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,194,400.00 10-18-21 4,194,400.00 10-18-21 .00 .00 4,194,400.00 .00

Total 4,194,400.00 4,194,400.00 .00 .00 4,194,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 2.00% Description:Description: Renovate Veterans HomeRenovate Veterans Home

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Virtual Energy Solutions, In 22002010 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Virtual Energy Solutions, In 22002010 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 67: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 67Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--060060--018018 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Nurse Call SystemAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Anna, Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-03-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: Wynter Farmer : :A/E Telephone: (618)659-8709 : :Date Selected: 03-12-19 : :Contract Date: 06-11-19 ________________________________________________________________________________Est. Project Cost: 193,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 193,700.00 03-19-19 193,700.00 03-19-19 189,437.82 162,580.53 4,262.18 .00

Total 193,700.00 193,700.00 189,437.82 162,580.53 4,262.18 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace Nurse Call SystemReplace Nurse Call System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-18-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 07-09-19 08-01-19 ( 23 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 6,173.37 Schem Design: 07-09-19 08-06-19 ( 28 ) Prime Bid: 11-07-19 12-12-19 ( 35 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-07-20 03-15-22 ( 0 )50%: ( 0 ) Final Accept: 06-23-20 06-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 03-15-2103-15-21 09-15-2309-15-2395-100%: 09-03-19 09-24-19 ( 21 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 19012910 ( 0 ) ( 0 ) 09-15-2309-15-23Brown Electric, Inc. 20047285 01-16-20 01-29-20 07-27-20 ( 0 ) 08-26-20 05-27-21 (274 ) 12-03-2112-03-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 19012910 10 32,500.00 .00 1 32,500.00 25,674.00 5 6,826.00 79Brown Electric, Inc. 20047285 85 138,945.00 17,992.82 3 156,937.82 136,906.53 2 20,031.29 87***** Contract Totals ********** Contract Totals ***** 171,445.00 17,992.82 4 189,437.82 162,580.53 7 26,857.29 86

Page 68: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 68Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--060060--019019 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: PLA: NDescription: General Building Repairs & ImprovementsAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Anna, Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-03-21 :: :

A/E Id: 26859 : :A/E Name: Eggemeyer Associates Architect : :A/E Contact: : :A/E Telephone: (618)988-2380 : :Date Selected: 11-13-19 : :Contract Date: 03-02-20 ________________________________________________________________________________Est. Project Cost: 2,166,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,166,700.00 11-18-19 2,166,700.00 11-18-19 211,250.00 .00 1,955,450.00 .00

Total 2,166,700.00 2,166,700.00 211,250.00 .00 1,955,450.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: General Building Repairs & ImprovementsGeneral Building Repairs & Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-15-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-25-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-11-21 ( 0 )

Design Devel: 05-25-20 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-07-22 ( 0 )50%: ( 0 ) Final Accept: 03-08-22 ( 0 )75%: 09-14-20 ( 0 ) A/E Cont End: 02-15-2402-15-2495-100%: 11-27-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Eggemeyer Associates Archite 20013310 ( 0 ) ( 0 ) 02-15-2402-15-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Eggemeyer Associates Archite 20013310 10 211,250.00 .00 0 211,250.00 .00 0 211,250.00 0***** Contract Totals ********** Contract Totals ***** 211,250.00 .00 0 211,250.00 .00 0 211,250.00 0

Page 69: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 69Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--080080--001001 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: YDescription: Construct 200 Bed Veteran's Home FacilitAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Chicago, Cook CountyCounty: 31 - Cook Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 19 - Lindsey LaPointe

Senate:10 - Robert Martwick : CURRENT STATUS 09-23-19 :: :

A/E Id: 29865 : :A/E Name: Harley Ellis Devereaux Corpora : :A/E Contact: Alli Mallory : :A/E Telephone: (312)324-7410 : :Date Selected: 02-23-10 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 120,523,968.01

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 175,150,000.00 05-07-20 175,150,000.00 05-07-20 118,033,289.61 109,307,491.45 2,395,790.74 54,720,919.65170 94,887.66 01-17-17 94,887.66 01-17-17 94,887.66 94,887.66 .00 .00

Total 175,244,887.66 175,244,887.66 118,128,177.27 109,402,379.11 2,395,790.74 54,720,919.65____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: PH. 1- Site Work for 200 Bed Veteran'sPH. 1- Site Work for 200 Bed Veteran's

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 29,522,298.05 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-30-20 ( 0 )50%: ( 0 ) Final Accept: 08-04-20 ( 0 )75%: ( 0 ) A/E Cont End: 01-20-2301-20-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Harley Ellis Devereaux Corpo 10005110 ( 0 ) ( 0 ) 05-25-2005-25-20Turner Construction Company 10005210 ( 0 ) ( 0 ) 06-13-2006-13-20Harley Ellis Devereaux Corpo 20025210 ( 0 ) ( 0 ) 01-20-2301-20-23Turner Construction Company 20025310 ( 0 ) ( 0 ) 06-13-2106-13-21Illinois Office of the State 7051 ( 0 ) ( 0 )PirTano Construction Company 13047541 11-14-12 12-12-12 06-10-13 06-06-13 ( 4-) 08-09-13 06-26-13 ( 44-) 08-09-1408-09-14Latimer Associates Inc 22SM0141 09-08-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Harley Ellis Devereaux Corpo 10005110 10 229,428.00 4,685,369.00 14 4,914,797.00 4,553,202.82 56 361,594.18 93

Page 70: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 70Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Turner Construction Company 10005210 10 45,133.00 9,130,212.05 10 9,175,345.05 9,175,345.05 55 .00 100Harley Ellis Devereaux Corpo 20025210 10 .00 .00 0 .00 .00 0 .00 100Turner Construction Company 20025310 10 650,948.00 51,097.31- 4 599,850.69 599,850.69 7 .00 100Illinois Office of the State 7051 11 90.00 .00 0 90.00 90.00 1 .00 100C D B/Art In Architecture ART 49 327,500.00 290,000.00- 0 37,500.00 .00 0 37,500.00 0Messinger Jason 19046049 49 3,000.00 .00 0 3,000.00 3,000.00 1 .00 100Watts Studio LLC 19046149 49 3,000.00 .00 0 3,000.00 3,000.00 1 .00 100Johnson Indira 19045949 49 3,000.00 .00 0 3,000.00 3,000.00 1 .00 100Johnson Indira 19048349 49 281,000.00 .00 0 281,000.00 281,000.00 6 .00 100Commonwealth Edison Co 5902 50 11,801.00 .00 0 11,801.00 11,801.00 1 .00 100Chicago City Of 6003 50 49,200.00 49,200.00 0 98,400.00 98,400.00 2 .00 100Commonwealth Edison Co 6049 50 11,876.63 3,871.29 0 15,747.92 15,747.92 2 .00 100Capital Development Board Ho TELECOM 50 5,000,000.00 .00 0 5,000,000.00 .00 0 5,000,000.00 0Capital Development Board Ho FF&E 70 4,000,000.00 2,742,508.35- 0 1,257,491.65 .00 0 1,257,491.65 0W W Grainger 7052 70 41,641.50 .00 0 41,641.50 .00 0 41,641.50 0W W Grainger 7124 70 977.74 .00 0 977.74 977.74 1 .00 100W W Grainger 7125 70 1,035.90 .00 0 1,035.90 1,035.90 2 .00 100W W Grainger 7126 70 2,356.63 .00 0 2,356.63 2,356.63 2 .00 100Diamedical USA Equipment, In 7129 70 497,250.00 11,750.00 1 509,000.00 509,000.00 5 .00 100Resource One Of Illinois 7131 70 91,955.25 .00 0 91,955.25 91,955.25 1 .00 100National Office Furniture, I 7142 70 14,083.20 .00 0 14,083.20 14,083.20 1 .00 100Diamedical USA Equipment, In 7148 70 872,275.85 .00 0 872,275.85 865,353.85 15 6,922.00 99Assa Group, Inc. dba Enwork 7149 70 4,905.10 .00 0 4,905.10 4,905.10 1 .00 100OFS 7150 70 54,536.27 .00 0 54,536.27 54,536.27 1 .00 100W W Grainger 7179 70 30,520.47 .00 0 30,520.47 29,000.00 1 1,520.47 95W W Grainger 7180 70 339,743.57 .00 0 339,743.57 162,610.83 3 177,132.74 48W W Grainger 7181 70 16,712.62 .00 0 16,712.62 2,053.45 1 14,659.17 12W W Grainger 7182 70 11,881.79 .00 0 11,881.79 256.14 1 11,625.65 2W W Grainger 7183 70 16,403.76 .00 0 16,403.76 .00 0 16,403.76 0W W Grainger 7184 70 16,421.07 .00 0 16,421.07 .00 0 16,421.07 0W W Grainger 7185 70 12,562.82 .00 0 12,562.82 726.75 1 11,836.07 6W W Grainger 7186 70 16,957.70 .00 0 16,957.70 857.30 1 16,100.40 5W W Grainger 7187 70 9,559.34 .00 0 9,559.34 594.75 1 8,964.59 6W W Grainger 7188 70 11,461.53 .00 0 11,461.53 340.35 1 11,121.18 3W W Grainger 7189 70 12,474.82 .00 0 12,474.82 688.68 2 11,786.14 6W W Grainger 7190 70 11,463.11 .00 0 11,463.11 .00 0 11,463.11 0W W Grainger 7191 70 19,166.89 .00 0 19,166.89 7,075.18 1 12,091.71 37W W Grainger 7192 70 17,423.55 .00 0 17,423.55 1,460.70 1 15,962.85 8W W Grainger 7193 70 9,896.56 .00 0 9,896.56 3,495.51 1 6,401.05 35Interior Design by A. Valent 7211 70 1,992.20 .00 0 1,992.20 1,992.20 1 .00 100Turner Construction Company 7212 70 4,953.55 .00 0 4,953.55 4,953.55 1 .00 100OFS 7150A 70 1,548,861.63 .00 0 1,548,861.63 1,548,861.63 6 .00 100W W Grainger 7214 70 19,981.86 .00 0 19,981.86 19,981.86 10 .00 100Interior Design by A. Valent 7216 70 47,540.00 .00 0 47,540.00 .00 0 47,540.00 0W W Grainger 7217 70 11,704.36 6,739.70 0 18,444.06 18,444.06 10 .00 100ThermoPatch Corporation 7218 70 3,419.70 .00 0 3,419.70 3,419.70 2 .00 100W W Grainger 7220 70 19,827.64 2,333.10- 0 17,494.54 17,494.54 11 .00 100W W Grainger 7226 70 28,914.83 .00 0 28,914.83 23,619.70 1 5,295.13 82National Office Furniture, I 7227 70 14,083.20 .00 0 14,083.20 14,083.20 4 .00 100W W Grainger 7229 70 10,572.79 1,570.41 0 12,143.20 12,143.20 10 .00 100Herman Miller, Inc 7231 70 438,723.35 .00 0 438,723.35 437,554.81 1 1,168.54 100Interior Design by A. Valent 7241 70 99,901.51 .00 0 99,901.51 .00 0 99,901.51 0U.S. Foods, Inc. 7242 70 192,787.33 .00 0 192,787.33 .00 0 192,787.33 0W W Grainger 7245 70 1,343.85 .00 0 1,343.85 1,343.85 1 .00 100Almacen Inc. 7247 70 260.00 .00 0 260.00 260.00 1 .00 100Assa Group, Inc. dba Enwork 7249 70 4,905.18 .00 0 4,905.18 4,905.18 1 .00 100Logsdon Stationers dba Logsd 7246 70 356.40 .00 0 356.40 356.40 1 .00 100

Page 71: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 71Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Interior Investments, LLC 7251 70 44,370.00 .00 0 44,370.00 44,370.00 1 .00 100Globe Medical Surgical Suppl 7257 70 3,309.30 .00 0 3,309.30 3,309.30 1 .00 100W W Grainger 7258 70 4,658.32 874.48 0 5,532.80 5,532.80 7 .00 100Ameican 3B Scientific LP 7259 70 3,445.90 .00 0 3,445.90 3,445.90 2 .00 100Sunrise Hitek Group, LLC 7113 80 4,620.00 .00 0 4,620.00 4,620.00 1 .00 100Twin Oaks Landscaping, Inc. 7233 80 8,633.00 .00 0 8,633.00 8,633.00 1 .00 100Automatic Fire Systems, Inc. 7255 80 3,845.72 .00 0 3,845.72 3,845.72 1 .00 100C. R. Leonard Plumbing & Hea INT7156 00 78.32 .00 0 78.32 78.32 1 .00 100PirTano Construction Company 13047541 41 928,307.00 2,362.36 1 930,669.36 930,669.36 6 .00 100Latimer Associates Inc 22SM0141 41 54,504.00 .00 0 54,504.00 .00 0 54,504.00 0***** Contract Totals ********** Contract Totals ***** 16,255,544.6110,806,010.53 30 27,061,555.14 19,611,719.34 259 7,449,835.80 73

Page 72: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 72Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 040040--080080--001001 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: YDescription: Construct 200 Bed Veteran's Home FacilitAgency: Department of Veterans' Affairs Analyst: Amber EvansLocation: Illinois Veterans' Home at Chicago, Cook CountyCounty: 31 - Cook Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 19 - Lindsey LaPointe

Senate:10 - Robert Martwick : CURRENT STATUS 11-02-21 :: :

A/E Id: 29865 : :A/E Name: Harley Ellis Devereaux Corpora : :A/E Contact: Alan Treuthart : :A/E Telephone: (312)324-7410 : :Date Selected: : :Contract Date: 05-26-10 ________________________________________________________________________________Est. Project Cost: 120,523,968.01

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 175,150,000.00 05-07-20 175,150,000.00 05-07-20 118,033,289.61 109,307,491.45 2,395,790.74 54,720,919.65170 94,887.66 01-17-17 94,887.66 01-17-17 94,887.66 94,887.66 .00 .00

Total 175,244,887.66 175,244,887.66 118,128,177.27 109,402,379.11 2,395,790.74 54,720,919.65____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 100.00% Description:Description: PH. 2 - Construct 200 Bed Veteran's HomePH. 2 - Construct 200 Bed Veteran's Home

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: 10-01-13 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 29,522,298.05 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 05-25-2005-25-2095-100%: 04-16-13 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IHC Construction Companies, 15044341 08-29-14 09-18-14 07-17-16 04-01-20 04-24-20 (377 ) 07-01-20 ( 0 ) 07-01-2207-01-22C. R. Leonard Plumbing & Hea 15044442 08-29-14 09-18-14 07-17-16 04-01-20 04-24-20 (377 ) 07-01-20 ( 0 ) 07-01-2207-01-22Great Lakes Plumbing & Heati 15044543 08-29-14 09-18-14 07-17-16 04-01-20 07-14-20 (458 ) 07-01-20 ( 0 ) 07-01-2207-01-22Amber Mechanical Contractors 15044644 08-29-14 09-18-14 07-17-16 04-01-20 04-24-20 (377 ) 07-01-20 ( 0 ) 07-01-2207-01-22Elite Electric Company 15044745 08-29-14 09-18-14 07-17-16 04-01-20 04-24-20 (377 ) 07-01-20 ( 0 ) 07-01-2207-01-22Automatic Fire Systems, Inc. 150459442 09-16-14 10-01-14 07-30-16 04-01-20 04-24-20 (364 ) 07-01-20 ( 0 ) 07-01-2207-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IHC Construction Companies, 15044341 41 33,542,689.0029,305,350.88 122 62,848,039.88 62,771,128.12 55 76,911.76 100C. R. Leonard Plumbing & Hea 15044442 42 4,155,011.00 1,306,831.17 32 5,461,842.17 5,335,314.66 26 126,527.51 98

Page 73: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 73Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Great Lakes Plumbing & Heati 15044543 43 5,657,835.00 1,400,839.40 29 7,058,674.40 6,964,339.24 36 94,335.16 99Amber Mechanical Contractors 15044644 44 3,100,000.00 710,188.29 20 3,810,188.29 3,583,279.90 22 226,908.39 94Elite Electric Company 15044745 45 7,941,800.00 2,895,419.57 48 10,837,219.57 10,202,710.23 34 634,509.34 94Automatic Fire Systems, Inc. 150459442 42 790,522.00 229,083.82 13 1,019,605.82 922,635.62 24 96,970.20 91***** Contract Totals ********** Contract Totals ***** 55,187,857.0035,847,713.13 264 91,035,570.13 89,779,407.77 197 1,256,162.36 99

Page 74: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 74Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--000000--063063 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: LS Lump Sum PLA: NDescription: Statewide FY'19 Deferred Maintenance LumAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 12,510,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 .00 11-18-19 .00 11-18-19 .00 .00 .00 .00

Total .00 .00 .00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Statewide FY'19 Deferred Maintenance LumStatewide FY'19 Deferred Maintenance Lum

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 75: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 75Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--000000--065065 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-19-21 :: :

A/E Id: 34808 : :A/E Name: GSG Material Testing, Inc. dba : :A/E Contact: : :A/E Telephone: (312)424-3613 : :Date Selected: 03-10-20 : :Contract Date: 06-12-20 ________________________________________________________________________________Est. Project Cost: 723,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 723,100.00 03-11-20 723,100.00 03-11-20 95,680.00 19,717.00 627,420.00 .00

Total 723,100.00 723,100.00 95,680.00 19,717.00 627,420.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 72.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-19-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-26-21 ( 0 )

Design Devel: 07-27-20 08-31-20 ( 35 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-18-21 ( 0 )50%: 09-21-20 11-06-20 ( 46 ) Final Accept: 07-16-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-18-2206-18-2295-100%: 12-14-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

GSG Material Testing, Inc. d 20024810 ( 0 ) ( 0 ) 06-18-2206-18-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

GSG Material Testing, Inc. d 20024810 10 95,680.00 .00 0 95,680.00 19,717.00 1 75,963.00 21***** Contract Totals ********** Contract Totals ***** 95,680.00 .00 0 95,680.00 19,717.00 1 75,963.00 21

Page 76: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 76Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--000000--656656 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: BI Budget Impasse Hold PLA: NDescription: UST- Carlyle,Beaver Dam,Pere Marquette,HAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide Site MonitoringSite Monitoring________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-02-21 :: :

A/E Id: 21755 : :A/E Name: Atlas Soils, Inc. : :A/E Contact: David Kimmle : :A/E Telephone: (618)398-0890 : :Date Selected: 08-09-11 : :Contract Date: 09-12-11 ________________________________________________________________________________Est. Project Cost: 689,642.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 789,355.69 10-09-19 719,355.69 08-16-13 718,625.75 689,639.14 28,986.61- 29,716.55

Total 789,355.69 719,355.69 718,625.75 689,639.14 28,986.61 29,716.55____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 91.00% Description:Description: UST - Various State ParksUST - Various State Parks

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-27-11 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1312-31-13 12-30-1912-30-1995-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Atlas Soils, Inc. 96008610 ( 0 ) ( 0 ) 12-30-1212-30-12Atlas Soils, Inc. 12000510 ( 0 ) ( 0 ) 12-30-1912-30-19Hoener R L Co 97084581 03-20-97 04-10-97 08-16-97 04-07-98 (234 ) 09-16-97 11-15-99 (790 )U S Tech Group Inc 97084685 03-20-97 05-01-97 08-16-97 05-13-98 (270 ) 09-16-97 05-21-98 (247 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Atlas Soils, Inc. 96008610 10 48,425.00 137,472.48 19 185,897.48 173,278.86 54 12,618.62 93Atlas Soils, Inc. 12000510 10 8,824.00 20,600.00 2 29,424.00 13,056.01 8 16,367.99 44Southwestern Electric Coop 8835 80 658.00 .00 0 658.00 658.00 1 .00 100Hoener R L Co 6364 80 2,400.00 .00 0 2,400.00 2,400.00 1 .00 100Atlas Soils, Inc. INT8630 00 78.01 .00 0 78.01 78.01 1 .00 100

Page 77: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 77Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hoener R L Co 97084581 81 351,004.00 71,818.09 12 422,822.09 422,822.09 13 .00 100U S Tech Group Inc 97084685 85 69,865.00 7,481.17 4 77,346.17 77,346.17 8 .00 100***** Contract Totals ********** Contract Totals ***** 481,254.01 237,371.74 37 718,625.75 689,639.14 86 28,986.61 96

Page 78: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 78Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--111111--025025 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Repair Dams and DredgingAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Lake Le-Aqua-Na State Park - Stephenson CountyCounty: 177 - Stephenson ________________________________________________________________________________Leg. Districts: House: 89 - Andrew Chesney

Senate:45 - Brian Stewart : CURRENT STATUS 11-02-21 :: :

A/E Id: 19605 : :A/E Name: Engineering Resource Associate : :A/E Contact: John Mayer : :A/E Telephone: (630)393-3060 : :Date Selected: 03-12-19 : :Contract Date: 07-10-19 ________________________________________________________________________________Est. Project Cost: 3,450,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

199 50,000.00 12-19-19 50,000.00 12-19-19 5,788.38 .00 44,211.62 .00962 3,400,000.00 07-30-20 3,400,000.00 07-30-20 3,298,142.00 2,597,080.84 101,858.00 .00

Total 3,450,000.00 3,450,000.00 3,303,930.38 2,597,080.84 146,069.62 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Repair Dams and DredgingRepair Dams and Dredging

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-02-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-11-19 10-16-19 ( 5 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-09-20 05-21-20 ( 0 )

Design Devel: 10-11-19 10-17-19 ( 6 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-15-20 06-30-21 ( 0 )50%: ( 0 ) Final Accept: 12-11-20 08-21-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-15-2110-15-21 08-29-2208-29-2295-100%: 03-19-20 03-26-20 ( 7 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Engineering Resource Associa 19031610 ( 0 ) ( 0 ) 08-29-2208-29-22Fischer Excavating, Inc. 21043681 11-18-20 01-14-21 06-30-21 07-21-21 ( 21 ) 08-29-21 ( 0 ) 08-29-2208-29-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Engineering Resource Associa 19031610 10 334,220.00 62,430.00 3 396,650.00 381,528.80 21 15,121.20 96Fischer Excavating, Inc. 21043681 81 2,906,101.00 1,179.38 1 2,907,280.38 2,215,552.04 4 691,728.34 76***** Contract Totals ********** Contract Totals ***** 3,240,321.00 63,609.38 4 3,303,930.38 2,597,080.84 25 706,849.54 79

Page 79: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 79Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--117117--036036 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Rehabilitate Sewage System & Replace RooAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Mississippi Palisades State Park - Carroll CountyCounty: 15 - Carroll ________________________________________________________________________________Leg. Districts: House: 71 - Tony McCombie

Senate:36 - Neil Anderson : CURRENT STATUS 11-01-21 :: :

A/E Id: 34311 : :A/E Name: IMEG Corp. : :A/E Contact: Corey Stout : :A/E Telephone: (815)965-6400 : :Date Selected: 07-14-20 : :Contract Date: 09-02-20 ________________________________________________________________________________Est. Project Cost: 504,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

884 377,000.00 05-03-21 377,000.00 05-03-21 29,936.95 29,936.95 347,063.05 .00962 127,700.00 08-17-18 127,700.00 08-17-18 89,629.05 41,266.00 38,070.95 .00

Total 504,700.00 504,700.00 119,566.00 71,202.95 385,134.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.90% Description:Description: Rehabilitate Sewage System & Replace RooRehabilitate Sewage System & Replace Roo

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-23-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-11-20 03-17-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: 11-10-21 ( 0 )25%: ( 0 ) Subst Compl: 05-31-21 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 06-30-21 10-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-31-2205-31-22 09-30-2209-30-2295-100%: 01-15-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Missman, Inc. 14040110 ( 0 ) ( 0 ) 12-12-1912-12-19IMEG Corp. 20025810 ( 0 ) ( 0 ) 09-30-2209-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Missman, Inc. 14040110 10 51,400.00 22,845.00 6 74,245.00 50,075.45 7 24,169.55 68IMEG Corp. 20025810 10 38,926.00 6,395.00 1 45,321.00 21,127.50 2 24,193.50 47***** Contract Totals ********** Contract Totals ***** 90,326.00 29,240.00 7 119,566.00 71,202.95 9 48,363.05 60

Page 80: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 80Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--126126--024024 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Construct BuildingsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Shabbona Lake State Park - DeKalb CountyCounty: 37 - DeKalb ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-02-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,051,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,051,200.00 10-07-21 1,051,200.00 10-07-21 .00 .00 1,051,200.00 .00

Total 1,051,200.00 1,051,200.00 .00 .00 1,051,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 1.00% Description:Description: Construct BuildingsConstruct Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 81: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 81Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--220220--050050 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Plan and Begin Repair of Lock 33Agency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Hennepin Canal Parkway State Park - Bureau CountyCounty: 11 - Bureau ________________________________________________________________________________Leg. Districts: House: 74 - Daniel Swanson

Senate:37 - Win Stoller : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 725,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 725,000.00 10-07-21 725,000.00 10-07-21 .00 .00 725,000.00 .00

Total 725,000.00 725,000.00 .00 .00 725,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Plan and Begin Repair of Lock 33Plan and Begin Repair of Lock 33

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 82: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 82Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--220220--051051 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing System - Locktender's HoAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Hennepin Canal Parkway State Park - Bureau CountyCounty: 11 - Bureau ________________________________________________________________________________Leg. Districts: House: 74 - Daniel Swanson

Senate:37 - Win Stoller : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 117,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 117,600.00 10-07-21 117,600.00 10-07-21 .00 .00 117,600.00 .00

Total 117,600.00 117,600.00 .00 .00 117,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Roofing System - Locktender's HoReplace Roofing System - Locktender's Ho

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 83: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 83Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--221221--023023 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct Building and Addition, ConvertAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illini State Park - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 11-01-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: : :A/E Telephone: (217)363-3375 : :Date Selected: 03-10-20 : :Contract Date: 07-13-20 ________________________________________________________________________________Est. Project Cost: 2,019,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,019,000.00 08-19-21 2,019,000.00 08-19-21 1,933,350.00 100,728.15 85,650.00 .00

Total 2,019,000.00 2,019,000.00 1,933,350.00 100,728.15 85,650.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 4.00% Description:Description: Construct Building and Addition, ConvertConstruct Building and Addition, Convert

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-12-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-24-20 12-16-20 (114 ) Prime Bid: 03-01-21 04-14-21 06-23-21 ( 70 )

Design Devel: 11-02-20 02-10-21 (100 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-01-22 03-29-22 ( 0 )50%: ( 0 ) Final Accept: 04-15-22 05-13-22 ( 0 )75%: ( 0 ) A/E Cont End: 03-01-2303-01-23 03-29-2303-29-2395-100%: 02-01-21 04-01-21 ( 59 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 20003310 ( 0 ) ( 0 ) 03-29-2303-29-23CAD Construction Inc. 22047181 09-15-21 10-06-21 09-21-22 ( 0 ) 11-05-22 ( 0 ) 11-05-2311-05-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 20003310 10 165,000.00 .00 1 165,000.00 100,728.15 7 64,271.85 61CAD Construction Inc. 22047181 81 1,768,350.00 .00 0 1,768,350.00 .00 0 1,768,350.00 0***** Contract Totals ********** Contract Totals ***** 1,933,350.00 .00 1 1,933,350.00 100,728.15 7 1,832,621.85 5

Page 84: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 84Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--222222--024024 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Johnson-Sauk Trail State Park - Henry CountyCounty: 73 - Henry ________________________________________________________________________________Leg. Districts: House: 74 - Daniel Swanson

Senate:37 - Win Stoller : CURRENT STATUS 10-29-21 :: :

A/E Id: 32074 : :A/E Name: Carlile Architects LLC : :A/E Contact: Jacob Carlile : :A/E Telephone: (815)401-0526 : :Date Selected: 05-14-19 : :Contract Date: 08-12-19 ________________________________________________________________________________Est. Project Cost: 372,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 372,200.00 05-22-19 372,200.00 05-22-19 324,200.00 282,726.55 48,000.00 .00

Total 372,200.00 372,200.00 324,200.00 282,726.55 48,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 95.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-29-19 07-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 09-03-19 09-03-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-21-20 04-29-20 ( 68 )

Design Devel: 10-14-19 10-15-19 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-15-20 ( 0 )50%: ( 0 ) Final Accept: 08-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 06-30-2206-30-2295-100%: 12-09-19 12-19-19 ( 10 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Carlile Architects LLC 19004110 ( 0 ) ( 0 ) 06-30-2206-30-22CAD Construction Inc. 21043981 12-10-20 01-31-21 05-01-21 07-21-21 ( 81 ) 06-30-21 ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Carlile Architects LLC 19004110 10 48,600.00 .00 1 48,600.00 42,974.00 9 5,626.00 89CAD Construction Inc. 21043981 81 275,600.00 .00 1 275,600.00 239,752.55 5 35,847.45 87***** Contract Totals ********** Contract Totals ***** 324,200.00 .00 2 324,200.00 282,726.55 14 41,473.45 87

Page 85: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 85Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--275275--001001 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Construct BuildingsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Sahara Woods State Fish and Wildlife Area, Saline CountyCounty: 165 - Saline ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-01-21 :: :

A/E Id: 25661 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: : :A/E Telephone: (618)998-0075 : :Date Selected: 05-12-20 : :Contract Date: 09-18-20 ________________________________________________________________________________Est. Project Cost: 1,300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

40 150,000.00 09-04-20 150,000.00 09-04-20 105,700.00 49,251.50 44,300.00 .00962 600,000.00 09-04-20 600,000.00 09-04-20 .00 .00 600,000.00 .00

Total 750,000.00 750,000.00 105,700.00 49,251.50 644,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Construct BuildingsConstruct Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-02-20 11-17-20 ( 15 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-20-21 ( 0 )

Design Devel: 11-02-20 12-02-20 ( 30 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-15-22 ( 0 )50%: 01-14-21 02-22-21 ( 39 ) Final Accept: 06-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-15-2309-15-2395-100%: 01-14-21 09-17-21 (246 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 21011110 ( 0 ) ( 0 ) 09-15-2309-15-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 21011110 10 105,700.00 .00 0 105,700.00 49,251.50 4 56,448.50 47***** Contract Totals ********** Contract Totals ***** 105,700.00 .00 0 105,700.00 49,251.50 4 56,448.50 47

Page 86: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 86Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--302302--049049 PM NAME: Mark Jones 475Mark Jones 475Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade Campground Electric ServiceAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Chain O'Lakes CA and SP - McHenry CountyCounty: 111 - McHenry ________________________________________________________________________________Leg. Districts: House: 64 - Tom Weber

Senate:32 - Craig Wilcox : CURRENT STATUS 11-08-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,311,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,311,200.00 10-07-21 1,311,200.00 10-07-21 .00 .00 1,311,200.00 .00

Total 1,311,200.00 1,311,200.00 .00 .00 1,311,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Upgrade Campground Electric ServiceUpgrade Campground Electric Service

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 87: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 87Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--304304--035035 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Repair Storm Damage/Replace Flight PensAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: DesPlaines Game Farm - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 10-12-21 :: :

A/E Id: 32074 : :A/E Name: Carlile Architects LLC : :A/E Contact: : :A/E Telephone: (815)401-0526 : :Date Selected: 05-14-19 : :Contract Date: 06-18-19 ________________________________________________________________________________Est. Project Cost: 950,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 820,000.00 07-18-19 820,000.00 07-18-19 123,922.00 68,835.00 696,078.00 .00962 130,000.00 01-30-20 130,000.00 01-30-20 .00 .00 130,000.00 .00

Total 950,000.00 950,000.00 123,922.00 68,835.00 826,078.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Repair Storm Damage/Replace Flight PensRepair Storm Damage/Replace Flight Pens

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-13-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-03-19 09-18-19 ( 15 ) Prime Bid: 10-30-20 04-14-21 (166 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-16-21 ( 0 )50%: 05-29-20 05-29-20 ( 0 ) Final Accept: 09-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2112-01-21 09-17-2209-17-2295-100%: 07-24-20 10-22-20 ( 90 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Carlile Architects LLC 19025110 ( 0 ) ( 0 ) 09-17-2209-17-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Carlile Architects LLC 19025110 10 46,370.00 77,552.00 2 123,922.00 68,835.00 6 55,087.00 56***** Contract Totals ********** Contract Totals ***** 46,370.00 77,552.00 2 123,922.00 68,835.00 6 55,087.00 56

Page 88: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 88Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--308308--029029 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate Visitor Center and Cragg CabinAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Goose Lake Prairie Natural Area - Grundy CountyCounty: 63 - Grundy ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,041,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,041,800.00 10-07-21 2,041,800.00 10-07-21 .00 .00 2,041,800.00 .00

Total 2,041,800.00 2,041,800.00 .00 .00 2,041,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Renovate Visitor Center and Cragg CabinRenovate Visitor Center and Cragg Cabin

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 89: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 89Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--311311--096096 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Beach ConcessionAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illinois Beach State Park - Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House: 61 - Joyce Mason

Senate:31 - Melinda Bush : CURRENT STATUS 11-02-21 :: :

A/E Id: 19410 : :A/E Name: Hanno Weber & Associates Archi : :A/E Contact: Hanno Weber : :A/E Telephone: (312)922-5589 : :Date Selected: 05-13-14 : :Contract Date: 06-11-14 ________________________________________________________________________________Est. Project Cost: 4,200,087.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,566,445.04 04-07-21 3,566,445.04 04-07-21 2,678,110.36 2,222,589.45 9,576.77 878,757.91962 2,793,015.00 07-10-18 2,793,015.00 07-10-18 963,159.91 522,276.54 549,239.84 1,280,615.25

Total 6,359,460.04 6,359,460.04 3,641,270.27 2,744,865.99 558,816.61 2,159,373.16____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 89.00% Description:Description: Replace Beach ConcessionReplace Beach Concession

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-01-14 ( 0 ) Assgn Bid: 06-19-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 08-15-19 ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-15-15 05-16-19 ( 0 )

Design Devel: 08-08-14 08-13-14 ( 5 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-15-16 09-06-21 ( 0 )50%: ( 0 ) Final Accept: 06-24-16 11-05-21 ( 0 )75%: 10-31-14 10-16-14 ( 15-) A/E Cont End: 05-15-1705-15-17 09-30-2209-30-2295-100%: 02-28-19 04-12-19 ( 43 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hanno Weber & Associates Arc 14042110 ( 0 ) ( 0 ) 09-30-2209-30-22C. W. Burns Co., Inc. 20046442 01-30-20 07-09-20 07-07-21 ( 0 ) 09-05-21 ( 0 ) 09-05-2209-05-22BP Construction and Remodele 20046545 01-30-20 07-09-20 07-07-21 ( 0 ) 09-05-21 ( 0 ) 09-05-2209-05-22MG Mechanical Contracting, I 20046644 01-30-20 07-09-20 07-07-21 ( 0 ) 09-05-21 ( 0 ) 09-05-2209-05-22Amber Mechanical Contractors 20046743 01-30-20 07-09-20 07-07-21 ( 0 ) 09-05-21 ( 0 ) 09-05-2209-05-22Stuckey Construction Company 20046841 01-30-20 07-09-20 07-07-21 ( 0 ) 09-05-21 ( 0 ) 09-05-2209-05-22Broadway Electric, Inc. 21057785 07-08-21 08-11-21 08-11-22 ( 0 ) 10-10-22 ( 0 ) 10-10-2310-10-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hanno Weber & Associates Arc 14042110 10 185,200.00 67,111.00 5 252,311.00 212,767.90 26 39,543.10 84

Page 90: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 90Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

North Shore Gas Co. 7147 50 17,340.00 .00 0 17,340.00 17,340.00 1 .00 100BP Construction and Remodele INT7157 00 230.80 .00 0 230.80 230.80 1 .00 100C. W. Burns Co., Inc. INT7158 00 85.00 .00 0 85.00 85.00 1 .00 100C. W. Burns Co., Inc. 20046442 42 414,000.00 12,530.24 2 426,530.24 344,134.02 18 82,396.22 81BP Construction and Remodele 20046545 45 367,290.00 .00 0 367,290.00 164,003.75 6 203,286.25 45MG Mechanical Contracting, I 20046644 44 106,400.00 .00 0 106,400.00 88,742.20 5 17,657.80 84Amber Mechanical Contractors 20046743 43 98,000.00 .00 0 98,000.00 .00 0 98,000.00 0Stuckey Construction Company 20046841 41 2,108,000.00 1,916.77- 2 2,106,083.23 1,787,783.02 10 318,300.21 85Broadway Electric, Inc. 21057785 85 267,000.00 .00 0 267,000.00 129,779.30 2 137,220.70 49***** Contract Totals ********** Contract Totals ***** 3,563,545.80 77,724.47 9 3,641,270.27 2,744,865.99 70 896,404.28 75

Page 91: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 91Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--311311--097097 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Utility RelocationAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illinois Beach State Park - Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House: 61 - Joyce Mason

Senate:31 - Melinda Bush : CURRENT STATUS 11-02-21 :: :

A/E Id: 1579 : :A/E Name: Crawford, Murphy & Tilly, Inc. : :A/E Contact: Chris Dagiantis : :A/E Telephone: (217)787-8050 : :Date Selected: 10-16-18 : :Contract Date: 06-07-19 ________________________________________________________________________________Est. Project Cost: 2,150,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

884 194,470.00 09-11-20 194,470.00 09-11-20 95,470.00 45,470.00 99,000.00 .00962 1,955,530.00 02-25-20 1,955,530.00 02-25-20 1,955,530.00 298,977.60 .00 .00

Total 2,150,000.00 2,150,000.00 2,051,000.00 344,447.60 99,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 26.00% Description:Description: Utility RelocationUtility Relocation

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-01-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-05-19 09-17-19 ( 12 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-01-20 06-21-21 ( 0 )50%: ( 0 ) Final Accept: 08-01-20 07-21-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2107-01-21 06-30-2306-30-2395-100%: 06-24-19 08-13-19 ( 50 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Crawford, Murphy & Tilly, In 19021010 ( 0 ) ( 0 ) 06-30-2306-30-23Broadway Electric, Inc. 21046081 01-12-21 03-23-21 06-21-21 08-20-21 ( 0 ) 09-19-21 ( 0 ) 09-19-2209-19-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Crawford, Murphy & Tilly, In 19021010 10 74,000.00 .00 1 74,000.00 24,000.00 2 50,000.00 33Broadway Electric, Inc. 21046081 81 1,977,000.00 .00 1 1,977,000.00 320,447.60 3 1,656,552.40 16***** Contract Totals ********** Contract Totals ***** 2,051,000.00 .00 2 2,051,000.00 344,447.60 5 1,706,552.40 17

Page 92: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 92Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--311311--098098 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing System and Repair InteriAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illinois Beach State Park - Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House: 61 - Joyce Mason

Senate:31 - Melinda Bush : CURRENT STATUS 11-02-21 :: :

A/E Id: 30474 : :A/E Name: Soos and Associates, Inc. : :A/E Contact: Melanie Soos : :A/E Telephone: (847)821-7667 : :Date Selected: 06-11-19 : :Contract Date: 08-12-19 ________________________________________________________________________________Est. Project Cost: 186,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 171,100.00 06-02-20 171,100.00 06-02-20 20,100.00 11,121.00 151,000.00 .00962 15,000.00 01-16-20 15,000.00 01-16-20 .00 .00 15,000.00 .00

Total 186,100.00 186,100.00 20,100.00 11,121.00 166,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Roofing System and Repair InteriReplace Roofing System and Repair Interi

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-30-19 09-05-19 ( 6 ) Prime Bid: 02-06-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-20 ( 0 )50%: 10-11-19 10-18-19 ( 7 ) Final Accept: 07-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 10-31-2110-31-2195-100%: 12-06-19 12-24-19 ( 18 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Soos and Associates, Inc. 19026110 ( 0 ) ( 0 ) 10-31-2110-31-21Premier Contractors,Inc. 22044581 08-20-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Soos and Associates, Inc. 19026110 10 20,100.00 .00 1 20,100.00 11,121.00 2 8,979.00 55Premier Contractors,Inc. 22044581 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 20,100.00 .00 1 20,100.00 11,121.00 2 8,979.00 55

Page 93: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 93Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--311311--099099 PM NAME: Mark Jones 475Mark Jones 475Project Status: AP Active Project Region: 11Project Type: DB Design Build PLA: YDescription: Stabilize ShorelineAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illinois Beach State Park - Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House: 61 - Joyce Mason

Senate:31 - Melinda Bush : CURRENT STATUS 11-08-21 :: :

A/E Id: 32114 : :A/E Name: SmithGroup, Inc. : :A/E Contact: Robert Wright : :A/E Telephone: (312)641-0770 : :Date Selected: 02-11-20 : :Contract Date: 03-31-20 ________________________________________________________________________________Est. Project Cost: 46,050,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 45,000,000.00 07-01-19 4,500,000.00 11-06-19 2,651,045.00 1,713,850.28 1,848,955.00 .00

Total 45,000,000.00 4,500,000.00 2,651,045.00 1,713,850.28 1,848,955.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Comprehensive Shoreline ProtectionComprehensive Shoreline Protection

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-13-20 02-13-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-24-20 05-22-20 ( 28 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 04-11-2504-11-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SmithGroup, Inc. 20024110 ( 0 ) ( 0 ) 04-11-2504-11-25SmithGroup, Inc. 7068 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SmithGroup, Inc. 20024110 10 2,637,445.00 3,700.00 1 2,641,145.00 1,703,950.28 16 937,194.72 65SmithGroup, Inc. 7068 11 9,900.00 .00 0 9,900.00 9,900.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 2,647,345.00 3,700.00 1 2,651,045.00 1,713,850.28 17 937,194.72 65

Page 94: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 94Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--312312--051051 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Improve Higbee Run DrainageAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illinois-Michigan Canal State Park - Grundy CountyCounty: 63 - Grundy ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 10-15-21 :: :

A/E Id: 29543 : :A/E Name: V3 Companies, Ltd. : :A/E Contact: Greg Wolterstorff : :A/E Telephone: (630)724-9200 : :Date Selected: 10-14-14 : :Contract Date: 04-29-15 ________________________________________________________________________________Est. Project Cost: 601,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

962 951,700.00 09-04-20 951,700.00 09-04-20 418,315.00 72,369.63 183,385.00 350,000.00

Total 951,700.00 951,700.00 418,315.00 72,369.63 183,385.00 350,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Improve Higbee Run DrainageImprove Higbee Run Drainage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-03-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 07-01-15 02-07-19 (317 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-01-15 02-07-19 (317 ) Prime Bid: 08-01-16 10-28-20 (549 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-17 08-30-21 ( 0 )50%: ( 0 ) Final Accept: 07-01-17 10-15-21 ( 0 )75%: 10-01-15 09-27-19 (457 ) A/E Cont End: 06-01-1806-01-18 08-30-2208-30-2295-100%: 05-01-16 06-26-20 (517 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

V3 Companies, Ltd. 15010610 ( 0 ) ( 0 ) 08-30-2208-30-22D Construction Inc 21048581 03-24-21 04-28-21 07-27-21 ( 0 ) 10-25-21 ( 0 ) 10-25-2210-25-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

V3 Companies, Ltd. 15010610 10 69,000.00 19,315.00 3 88,315.00 72,369.63 4 15,945.37 82D Construction Inc 21048581 81 330,000.00 .00 0 330,000.00 .00 0 330,000.00 0***** Contract Totals ********** Contract Totals ***** 399,000.00 19,315.00 3 418,315.00 72,369.63 4 345,945.37 17

Page 95: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 95Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--312312--053053 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Nettle Creek AqueductAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illinois-Michigan Canal State Park - Grundy CountyCounty: 63 - Grundy ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 10-29-21 :: :

A/E Id: 32109 : :A/E Name: Exp U.S. Services Inc. : :A/E Contact: Brian Umbright : :A/E Telephone: (312)616-0000 : :Date Selected: 03-12-19 : :Contract Date: 08-01-19 ________________________________________________________________________________Est. Project Cost: 6,850,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,600,000.00 03-23-21 5,600,000.00 03-23-21 .00 .00 5,600,000.00 .00962 1,250,000.00 12-13-19 1,250,000.00 12-13-19 1,094,971.00 654,542.02 155,029.00 .00

Total 6,850,000.00 6,850,000.00 1,094,971.00 654,542.02 5,755,029.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Replace Nettle Creek AqueductReplace Nettle Creek Aqueduct

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-14-20 03-09-20 ( 24 ) Prime Bid: 02-18-22 ( 0 )

Design Devel: 12-11-20 12-29-20 ( 18 ) Prime Re-Bid: ( 0 )25%: 03-12-21 03-30-21 ( 18 ) Subst Compl: 07-14-23 ( 0 )50%: ( 0 ) Final Accept: 08-25-23 ( 0 )75%: 08-13-21 08-30-21 ( 17 ) A/E Cont End: 04-24-2104-24-21 08-25-2408-25-2495-100%: 12-03-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Exp U.S. Services Inc. 19023910 ( 0 ) ( 0 ) 08-25-2408-25-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Exp U.S. Services Inc. 19023910 10 288,140.00 806,831.00 2 1,094,971.00 654,542.02 7 440,428.98 60***** Contract Totals ********** Contract Totals ***** 288,140.00 806,831.00 2 1,094,971.00 654,542.02 7 440,428.98 60

Page 96: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 96Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--312312--054054 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Illinois-Michigan Canal State Park - Grundy CountyCounty: 63 - Grundy ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 10-07-21 :: :

A/E Id: 26474 : :A/E Name: BCA Architects, Ltd. : :A/E Contact: Kurt Rimmele : :A/E Telephone: (815)434-0108 : :Date Selected: 05-14-19 : :Contract Date: 07-23-19 ________________________________________________________________________________Est. Project Cost: 160,954.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 160,954.00 12-10-19 160,954.00 12-10-19 21,700.00 14,928.70 139,254.00 .00

Total 160,954.00 160,954.00 21,700.00 14,928.70 139,254.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 3.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-08-19 05-08-19 ( 0 ) Assgn Bid: 09-02-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-13-20 ( 0 )

Design Devel: 03-20-20 03-31-20 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-01-20 06-01-21 ( 0 )50%: ( 0 ) Final Accept: 11-01-20 07-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-15-2007-15-20 06-01-2206-01-2295-100%: 05-22-20 07-17-20 ( 56 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BCA Architects, Ltd. 19004010 ( 0 ) ( 0 ) 06-01-2206-01-22Premier Contractors,Inc. 22044481 08-27-21 10-25-21 12-01-21 ( 0 ) 12-31-21 ( 0 ) 12-31-2212-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BCA Architects, Ltd. 19004010 10 3,600.00 18,100.00 2 21,700.00 14,928.70 4 6,771.30 69Premier Contractors,Inc. 22044481 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 3,600.00 18,100.00 2 21,700.00 14,928.70 4 6,771.30 69

Page 97: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 97Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--313313--048048 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade Water Supply SystemAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Kankakee River Conservation Area and State ParkCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 11-09-21 :: :

A/E Id: 28414 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Rob Lamberson : :A/E Telephone: (309)663-8435 : :Date Selected: 01-14-20 : :Contract Date: 03-20-20 ________________________________________________________________________________Est. Project Cost: 541,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

884 156,000.00 10-09-20 156,000.00 10-09-20 156,000.00 90,252.80 .00 .00962 385,000.00 01-22-20 385,000.00 01-22-20 369,197.83 161,492.49 15,802.17 .00

Total 541,000.00 541,000.00 525,197.83 251,745.29 15,802.17 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 90.00% Description:Description: Upgrade Water Supply SystemUpgrade Water Supply System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-31-20 01-31-20 ( 0 ) Assgn Bid: 08-19-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-08-20 09-02-20 ( 86 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-30-20 02-28-22 ( 0 )50%: ( 0 ) Final Accept: 09-30-20 03-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-30-2108-30-21 08-30-2308-30-2395-100%: 04-06-20 05-05-20 ( 29 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 2003010 ( 0 ) ( 0 ) 08-30-2308-30-23Ruben E. Smith Const. and R 21052181 05-05-21 07-01-21 12-28-21 ( 0 ) 01-27-22 ( 0 ) 01-27-2301-27-23Ruder Electric, Inc. 21052285 05-05-21 07-01-21 12-28-21 ( 0 ) 01-27-22 ( 0 ) 01-27-2301-27-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 2003010 10 29,918.00 .00 1 29,918.00 .00 0 29,918.00 0Ruben E. Smith Const. and R 21052181 81 313,668.00 8,681.83 1 322,349.83 161,492.49 2 160,857.34 50Ruder Electric, Inc. 21052285 85 172,930.00 .00 0 172,930.00 90,252.80 1 82,677.20 52***** Contract Totals ********** Contract Totals ***** 516,516.00 8,681.83 2 525,197.83 251,745.29 3 273,452.54 48

Page 98: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 98Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--327327--025025 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Boat Ramps and Improve ParkingAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: William W. Powers Fish & Wildlife Area - Cook Co.County: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 33 - Marcus Evans,

Senate:17 - Elgie Sims, : CURRENT STATUS 11-09-21 :: :

A/E Id: 33216 : :A/E Name: Rogina Engineers & Surveyors, : :A/E Contact: Mike Rogina : :A/E Telephone: (815)729-0777 : :Date Selected: 03-11-14 : :Contract Date: 07-10-14 ________________________________________________________________________________Est. Project Cost: 1,103,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

39 1,669,990.00 07-30-20 1,669,990.00 07-30-20 1,004,695.00 280,416.70 98,905.00 566,390.00

Total 1,669,990.00 1,669,990.00 1,004,695.00 280,416.70 98,905.00 566,390.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 95.00% Description:Description: Replace Boat Ramps and Improve ParkingReplace Boat Ramps and Improve Parking

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-10-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-03-14 10-03-14 ( 0 ) Prime Bid: 03-20-15 05-13-20 (881 )

Design Devel: ( 0 ) Prime Re-Bid: 02-20-20 ( 0 )25%: ( 0 ) Subst Compl: 07-15-16 07-15-21 ( 0 )50%: 10-17-14 ( 0 ) Final Accept: 09-09-16 09-09-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-15-1707-15-17 07-15-2207-15-2295-100%: 12-26-14 01-10-19 (476 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Rogina Engineers & Surveyors 14041910 ( 0 ) ( 0 ) 07-15-2207-15-22Paul Borg Construction Compa 21044081 12-10-20 03-03-21 07-01-21 ( 0 ) 08-15-21 ( 0 ) 08-15-2208-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Rogina Engineers & Surveyors 14041910 10 83,500.00 2,195.00 5 85,695.00 52,984.75 4 32,710.25 62Paul Borg Construction Compa 21044081 81 919,000.00 .00 0 919,000.00 227,431.95 1 691,568.05 25***** Contract Totals ********** Contract Totals ***** 1,002,500.00 2,195.00 5 1,004,695.00 280,416.70 5 724,278.30 28

Page 99: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 99Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--332332--002002 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Improve DuPage River SpillwayAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: I & M Canal - ChannahonCounty: 63 - Grundy ________________________________________________________________________________Leg. Districts: House: 85 - Dagmara Avelar

Senate:43 - John Connor : CURRENT STATUS 10-15-21 :: :

A/E Id: 29142 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Michael Bryant : :A/E Telephone: (217)352-7408 : :Date Selected: 01-09-18 : :Contract Date: 11-26-14 ________________________________________________________________________________Est. Project Cost: 5,772,150.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,518,640.00 09-14-21 5,518,640.00 09-14-21 4,130,188.82 2,475,860.42 168,076.49 1,220,374.69884 900,000.00 05-13-13 900,000.00 05-13-13 .00 .00 .00 900,000.00962 1,792,320.00 09-14-21 1,792,320.00 09-14-21 .00 .00 1,792,320.00 .00

Total 8,210,960.00 8,210,960.00 4,130,188.82 2,475,860.42 1,960,396.49 2,120,374.69____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 45.00% Description:Description: Improve DuPage River SpillwayImprove DuPage River Spillway

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-08-09 01-15-15 01-20-21 (197 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-28-10 06-01-16 ( 0 )50%: ( 0 ) Final Accept: 11-30-10 09-16-16 ( 0 )75%: ( 0 ) A/E Cont End: 01-14-0901-14-09 12-31-2012-31-2095-100%: 10-31-14 07-17-20 ( 86 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Maurer Stutz Inc 54012110 ( 0 ) ( 0 )Foth Infrastructure & Enviro 58020810 ( 0 ) ( 0 ) 06-17-1706-17-17Farnsworth Group, Inc. 58020810A1 ( 0 ) ( 0 ) 12-31-2012-31-20Farnsworth Group, Inc. 18000810 ( 0 ) ( 0 ) 12-23-2212-23-22D Construction Inc 21053181 05-11-21 06-07-21 12-04-21 ( 0 ) 02-02-22 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Maurer Stutz Inc 54012110 10 22,650.00 11,215.00 3 33,865.00 33,865.00 6 .00 100Foth Infrastructure & Enviro 58020810 10 8,500.00 141,274.99 7 149,774.99 149,774.99 10 .00 100

Page 100: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 100Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 58020810A110 206,370.82 105,140.82- 0 101,230.00 101,230.00 3 .00 100Farnsworth Group, Inc. 18000810 10 286,469.01 6,553.00 3 293,022.01 74,667.10 3 218,354.91 26Foth Infrastructure & Enviro INT9144 00 305.32 .00 0 305.32 305.32 1 .00 100Farnsworth Group, Inc. INT6730 00 .00 1,991.50 0 1,991.50 1,991.50 1 .00 100D Construction Inc 21053181 81 3,550,000.00 .00 4 3,550,000.00 2,114,026.51 6 1,435,973.49 60***** Contract Totals ********** Contract Totals ***** 4,074,295.15 55,893.67 17 4,130,188.82 2,475,860.42 30 1,654,328.40 60

Page 101: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 101Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--340340--018018 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Water Control StructuresAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Moraine Hills State Park - McHenry CountyCounty: 111 - McHenry ________________________________________________________________________________Leg. Districts: House: 64 - Tom Weber

Senate:32 - Craig Wilcox : CURRENT STATUS 11-02-21 :: :

A/E Id: 19605 : :A/E Name: Engineering Resource Associate : :A/E Contact: John Mayer : :A/E Telephone: (630)393-3060 : :Date Selected: 06-13-17 : :Contract Date: 08-30-17 ________________________________________________________________________________Est. Project Cost: 400,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 365,174.92 04-25-17 365,174.92 04-25-17 122,325.00 58,188.48 242,849.92 .00

Total 365,174.92 365,174.92 122,325.00 58,188.48 242,849.92 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 30.00% Description:Description: Replace Water Control StructuresReplace Water Control Structures

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-14-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-14-18 ( 0 )

Design Devel: 06-20-19 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-12-19 ( 0 )50%: 07-06-18 ( 0 ) Final Accept: 08-12-19 ( 0 )75%: ( 0 ) A/E Cont End: 07-12-2007-12-20 11-12-2211-12-2295-100%: 09-21-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Engineering Resource Associa 17022010 ( 0 ) ( 0 ) 11-12-2211-12-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Engineering Resource Associa 17022010 10 79,400.00 42,925.00 2 122,325.00 58,188.48 5 64,136.52 48***** Contract Totals ********** Contract Totals ***** 79,400.00 42,925.00 2 122,325.00 58,188.48 5 64,136.52 48

Page 102: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 102Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--340340--019019 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Moraine Hills State Park - McHenry CountyCounty: 111 - McHenry ________________________________________________________________________________Leg. Districts: House: 64 - Tom Weber

Senate:32 - Craig Wilcox : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 643,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 643,100.00 10-07-21 643,100.00 10-07-21 .00 .00 643,100.00 .00

Total 643,100.00 643,100.00 .00 .00 643,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 103: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 103Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--341341--006006 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Various ImprovementsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Mazonia-Braidwood State Fish & Wildlife Area, Grundy Co.County: 63 - Grundy ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 10-07-21 :: :

A/E Id: 26816 : :A/E Name: Infrastructure Engineering, In : :A/E Contact: Adrian Fernanadez : :A/E Telephone: (312)425-9560 : :Date Selected: 11-13-18 : :Contract Date: 02-15-19 ________________________________________________________________________________Est. Project Cost: 1,427,519.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

39 1,427,519.00 07-01-22 1,427,519.00 07-01-22 146,600.00 89,068.40 1,280,919.00 .00

Total 1,427,519.00 1,427,519.00 146,600.00 89,068.40 1,280,919.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 97.00% Description:Description: Various ImprovementsVarious Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-08-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-22-19 04-29-19 ( 7 ) Prime Bid: 01-30-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-01-20 ( 0 )50%: ( 0 ) Final Accept: 09-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 08-01-2108-01-2195-100%: 09-16-19 02-14-20 (151 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Infrastructure Engineering, 19021310 ( 0 ) ( 0 ) 08-01-2108-01-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Infrastructure Engineering, 19021310 10 146,600.00 .00 0 146,600.00 89,068.40 4 57,531.60 61***** Contract Totals ********** Contract Totals ***** 146,600.00 .00 0 146,600.00 89,068.40 4 57,531.60 61

Page 104: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 104Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--342342--011011 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Boat DocksAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Des Plaines State F&WA - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 11-09-21 :: :

A/E Id: 33216 : :A/E Name: Rogina Engineers & Surveyors, : :A/E Contact: Mike Rogina : :A/E Telephone: (815)729-0777 : :Date Selected: : :Contract Date: 05-23-14 ________________________________________________________________________________Est. Project Cost: 130,069.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

39 80,612.50 02-13-15 80,612.50 02-13-15 7,451.86 7,451.86 .00 73,160.6441 105,900.00 05-24-18 105,900.00 05-24-18 105,900.00 55,993.36 .00 .00962 16,716.21 03-10-20 16,716.21 03-10-20 16,716.21 .00 .00 .00

Total 203,228.71 203,228.71 130,068.07 63,445.22 .00 73,160.64____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Replace Boat DocksReplace Boat Docks

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 102,934.78 Schem Design: 12-20-13 ( 0 ) Prime Bid: 06-13-14 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-31-15 07-31-21 ( 0 )50%: ( 0 ) Final Accept: 07-31-15 09-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-31-1605-31-16 07-31-2207-31-2295-100%: 02-14-14 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Rogina & Associates, Ltd. 14040510 ( 0 ) ( 0 ) 05-31-1605-31-16Rogina Engineers & Surveyors 14040510A ( 0 ) ( 0 ) 07-31-2207-31-22Tobey's Construction & Carta 15056381 03-19-15 04-16-15 08-14-15 ( 0 ) 09-28-15 ( 0 ) 09-27-2209-27-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Rogina & Associates, Ltd. 14040510 10 11,500.00 11,500.00- 0 .00 .00 0 .00 100Rogina Engineers & Surveyors 14040510A 11 11,500.00 1,000.00 5 12,500.00 3,963.00 2 8,537.00 32Tobey's Construction & Carta 15056381 81 60,523.00 57,045.07 9 117,568.07 59,482.22 2 58,085.85 51***** Contract Totals ********** Contract Totals ***** 83,523.00 46,545.07 14 130,068.07 63,445.22 4 66,622.85 49

Page 105: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 105Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Page 106: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 106Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--342342--012012 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Des Plaines State F&WA - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 11-09-21 :: :

A/E Id: 34388 : :A/E Name: Weese Langley Weese Architects : :A/E Contact: Dan Weese : :A/E Telephone: (312)642-1820 : :Date Selected: 09-10-19 : :Contract Date: 10-25-19 ________________________________________________________________________________Est. Project Cost: 613,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 240,000.00 09-11-19 240,000.00 09-11-19 73,034.00 22,870.50 166,966.00 .00

Total 240,000.00 240,000.00 73,034.00 22,870.50 166,966.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 65.00% Description:Description: Various ImprovementsVarious Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-17-19 10-17-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-23-19 12-24-19 ( 1 ) Prime Bid: 07-20-20 07-15-21 ( 0 )

Design Devel: 03-25-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-21 03-31-22 ( 0 )50%: 03-15-21 11-10-21 (240 ) Final Accept: 04-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 03-31-2203-31-22 03-31-2303-31-2395-100%: 05-15-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Weese Langley Weese Architec 2000810 ( 0 ) ( 0 ) 03-31-2303-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Weese Langley Weese Architec 2000810 10 37,200.00 35,834.00 1 73,034.00 22,870.50 3 50,163.50 31***** Contract Totals ********** Contract Totals ***** 37,200.00 35,834.00 1 73,034.00 22,870.50 3 50,163.50 31

Page 107: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 107Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--401401--018018 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair/Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Beaver Dam State Park - Macoupin CountyCounty: 117 - Macoupin ________________________________________________________________________________Leg. Districts: House: 95 - Avery Bourne

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 29581 : :A/E Name: Formation Architects Inc. : :A/E Contact: Rick Neuhaus : :A/E Telephone: (618)651-0820 : :Date Selected: 11-13-19 : :Contract Date: 01-10-20 ________________________________________________________________________________Est. Project Cost: 158,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 158,000.00 06-29-20 158,000.00 06-29-20 21,650.00 14,477.30 136,350.00 .00

Total 158,000.00 158,000.00 21,650.00 14,477.30 136,350.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Repair/Replace Roofing SystemsRepair/Replace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-04-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-28-20 02-19-20 ( 9-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-25-20 12-09-20 (167 )

Design Devel: 02-28-20 02-20-20 ( 8-) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-25-20 ( 0 )50%: ( 0 ) Final Accept: 01-25-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-25-2111-25-21 03-31-2303-31-2395-100%: 04-27-20 05-26-20 ( 29 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Formation Architects Inc. 20041210 ( 0 ) ( 0 ) 03-31-2303-31-23Premier Contractors,Inc. 21053381 06-24-21 10-25-21 12-24-21 ( 0 ) 02-22-22 ( 0 ) 02-22-2302-22-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Formation Architects Inc. 20041210 10 21,650.00 .00 1 21,650.00 14,477.30 5 7,172.70 67Premier Contractors,Inc. 21053381 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 21,650.00 .00 1 21,650.00 14,477.30 5 7,172.70 67

Page 108: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 108Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--412412--019019 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Rehabilitate Batchtown Boat Access SiteAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Mississippi State Fish & Wildlife AreaCounty: 83 - Jersey ________________________________________________________________________________Leg. Districts: House: 97 - Mark Batinick

Senate:49 - Meg Cappel : CURRENT STATUS 11-02-21 :: :

A/E Id: 2082 : :A/E Name: Vasconcelles Engineering Corpo : :A/E Contact: Robert Dalton : :A/E Telephone: (217)698-3114 : :Date Selected: 01-14-14 : :Contract Date: 04-07-14 ________________________________________________________________________________Est. Project Cost: 606,538.82

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

39 395,171.58 10-25-21 395,171.58 10-25-21 69,184.16 69,184.16 .00 325,987.42962 627,599.66 10-25-21 627,599.66 10-25-21 137,060.84 .00 490,538.82 .00

Total 1,022,771.24 1,022,771.24 206,245.00 69,184.16 490,538.82 325,987.42____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 98.00% Description:Description: Rehabilitate Batchtown Boat Access SiteRehabilitate Batchtown Boat Access Site

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-18-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-08-14 04-25-19 08-04-21 (832 )

Design Devel: 06-04-14 06-06-14 ( 2 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-14 10-04-19 ( 0 )50%: ( 0 ) Final Accept: 01-31-15 12-13-19 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1612-31-16 01-14-2201-14-2295-100%: 02-25-19 03-12-20 (381 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Vasconcelles Engineering Cor 14001110 ( 0 ) ( 0 ) 01-14-2201-14-22Veenstra & Kimm, Inc. 14001110A ( 0 ) ( 0 )Stutz Excavating, Inc. 22049581 10-13-21 10-26-21 01-24-22 ( 0 ) 02-08-22 ( 0 ) 02-08-2302-08-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Vasconcelles Engineering Cor 14001110 10 63,000.00 4,473.76 6 67,473.76 67,473.76 8 .00 100Veenstra & Kimm, Inc. 14001110A 10 22,771.24 .00 0 22,771.24 1,710.40 1 21,060.84 8Stutz Excavating, Inc. 22049581 81 116,000.00 .00 0 116,000.00 .00 0 116,000.00 0***** Contract Totals ********** Contract Totals ***** 201,771.24 4,473.76 6 206,245.00 69,184.16 9 137,060.84 34

Page 109: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 109Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--416416--021021 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Repair Roofing Systems - Stevenson SheltAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Nauvoo State Park - Hancock CountyCounty: 67 - Hancock ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 132,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 132,700.00 10-07-21 132,700.00 10-07-21 .00 .00 132,700.00 .00

Total 132,700.00 132,700.00 .00 .00 132,700.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Repair Roofing Systems - Stevenson SheltRepair Roofing Systems - Stevenson Shelt

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 110: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 110Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--419419--077077 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade Lodge Attic Ventilation & ExhausAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Pere Marquette State Park, Jersey CountyCounty: 83 - Jersey ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 28732 : :A/E Name: BRiC Partnership, LLC : :A/E Contact: Andy Rein : :A/E Telephone: (618)277-5200 : :Date Selected: 06-11-13 : :Contract Date: 09-06-13 ________________________________________________________________________________Est. Project Cost: 690,930.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 758,249.90 07-01-18 758,249.90 08-08-18 363,694.70 277,245.15 152,235.19 242,320.01962 350,000.00 07-10-18 350,000.00 07-10-18 23,110.00 21,487.62 151,890.00 175,000.00

Total 1,108,249.90 1,108,249.90 386,804.70 298,732.77 304,125.19 417,320.01____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 90.00% Description:Description: Upgrade Lodge Attic Ventilation & ExhausUpgrade Lodge Attic Ventilation & Exhaus

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-18-13 ( 0 ) Assgn Bid: 02-13-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-06-13 11-19-13 ( 13 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-06-13 11-19-13 ( 13 ) Prime Bid: 05-16-19 05-16-19 02-20-20 (280 )

Design Devel: 06-03-14 06-12-14 ( 9 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-05-16 02-07-20 ( 0 )50%: ( 0 ) Final Accept: 05-08-16 05-08-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1612-31-16 07-22-2207-22-2295-100%: 03-15-19 03-29-19 ( 14 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BRiC Partnership, LLC 13003310 ( 0 ) ( 0 ) 07-22-2207-22-22G.R.P. Mechanical Company, I 20050284 06-16-20 08-13-20 12-11-20 ( 0 ) 02-09-21 ( 0 ) 02-09-2202-09-22Jun Construction Co. 20050381 06-16-20 08-13-20 12-11-20 ( 0 ) 02-09-21 ( 0 ) 02-09-2202-09-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BRiC Partnership, LLC 13003310 10 17,724.00 77,740.00 4 95,464.00 87,192.94 19 8,271.06 91G.R.P. Mechanical Company, I 20050284 84 119,456.00 .00 0 119,456.00 55,999.20 1 63,456.80 47Jun Construction Co. 20050381 81 162,000.00 9,884.70 3 171,884.70 155,540.63 5 16,344.07 91***** Contract Totals ********** Contract Totals ***** 299,180.00 87,624.70 7 386,804.70 298,732.77 25 88,071.93 77

Page 111: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 111Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--419419--078078 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Rehabilitate Campground ElectricalAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Pere Marquette State Park, Jersey CountyCounty: 83 - Jersey ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 13931 : :A/E Name: McClure Engineering Associates : :A/E Contact: Eric Moe : :A/E Telephone: (309)833-4594 : :Date Selected: 06-10-14 : :Contract Date: 10-09-14 ________________________________________________________________________________Est. Project Cost: 2,599,520.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 600,472.16 06-14-21 600,472.16 06-14-21 600,472.12 600,472.12 .04 .00962 3,221,839.00 01-29-20 3,221,839.00 01-29-20 1,392,680.04 1,305,221.98 606,367.70 1,222,791.26

Total 3,822,311.16 3,822,311.16 1,993,152.16 1,905,694.10 606,367.74 1,222,791.26____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 90.00% Description:Description: Rehabilitate Campground ElectricalRehabilitate Campground Electrical

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-29-14 ( 0 ) Assgn Bid: 12-05-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-15-14 01-16-15 ( 32 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-22-15 10-01-19 12-12-19 ( 72 )

Design Devel: 12-15-14 01-16-15 ( 32 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-16 06-30-20 ( 0 )50%: 04-07-15 06-15-15 ( 69 ) Final Accept: 09-30-16 09-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-1709-30-17 08-01-2208-01-2295-100%: 07-01-19 11-01-19 (123 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

McClure Engineering Associat 14021910 ( 0 ) ( 0 ) 08-01-2208-01-22Camp Electric & Heating Co., 20048085 02-14-20 05-28-20 10-30-20 11-17-20 ( 18 ) 01-28-21 04-14-21 ( 76 ) 01-28-2201-28-22Stutz Excavating, Inc. 20048181 02-14-20 05-28-20 10-30-20 11-17-20 ( 18 ) 01-28-21 ( 0 ) 01-28-2201-28-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

McClure Engineering Associat 14021910 10 179,900.00 63,925.00 7 243,825.00 230,312.73 15 13,512.27 95Stutz Excavating, Inc. INT7159 00 65.83 .00 0 65.83 65.83 1 .00 100Camp Electric & Heating Co., INT7160 00 5,697.33 .00 0 5,697.33 5,697.33 1 .00 100Stutz Excavating, Inc. INT7200 00 6,553.96 .00 0 6,553.96 6,553.96 1 .00 100Camp Electric & Heating Co., 20048085 85 332,699.00 9,122.82 3 341,821.82 341,821.82 10 .00 100

Page 112: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 112Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Stutz Excavating, Inc. 20048181 81 1,343,564.20 51,624.02 8 1,395,188.22 1,321,242.43 11 73,945.79 95***** Contract Totals ********** Contract Totals ***** 1,868,480.32 124,671.84 18 1,993,152.16 1,905,694.10 39 87,458.06 96

Page 113: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 113Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--419419--079079 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Rehabilitate Group Camp AreasAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Pere Marquette State Park, Jersey CountyCounty: 83 - Jersey ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 32193 : :A/E Name: Domokur Architects Incorporate : :A/E Contact: Matthew Ebersole : :A/E Telephone: (312)833-8015 : :Date Selected: 06-10-14 : :Contract Date: 03-11-15 ________________________________________________________________________________Est. Project Cost: 8,795,798.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

962 9,023,500.00 07-10-18 9,023,500.00 07-10-18 775,137.00 750,808.38 7,953,815.13 294,547.87

Total 9,023,500.00 9,023,500.00 775,137.00 750,808.38 7,953,815.13 294,547.87____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Rehabilitate Group Camp AreasRehabilitate Group Camp Areas

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-29-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1612-31-16 06-30-2206-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Domokur Architects Incorpora 14022010 ( 0 ) ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Domokur Architects Incorpora 14022010 10 587,447.00 187,690.00 3 775,137.00 750,808.38 14 24,328.62 97***** Contract Totals ********** Contract Totals ***** 587,447.00 187,690.00 3 775,137.00 750,808.38 14 24,328.62 97

Page 114: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 114Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--419419--080080 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Pere Marquette State Park, Jersey CountyCounty: 83 - Jersey ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 21754 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: David Pool : :A/E Telephone: (618)398-0890 : :Date Selected: 05-14-19 : :Contract Date: 08-09-19 ________________________________________________________________________________Est. Project Cost: 1,438,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,092,400.00 05-22-19 1,092,400.00 05-22-19 139,460.00 45,042.80 952,940.00 .00

Total 1,092,400.00 1,092,400.00 139,460.00 45,042.80 952,940.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 65.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-23-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-04-19 10-10-19 ( 6 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-03-20 02-03-20 ( 31 ) Prime Bid: 08-20-20 10-20-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-27-21 07-29-22 ( 0 )50%: 05-28-21 08-02-21 ( 66 ) Final Accept: 10-29-21 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2208-31-22 09-29-2309-29-2395-100%: 08-06-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 19033110 ( 0 ) ( 0 ) 09-29-2309-29-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 19033110 10 121,200.00 18,260.00 1 139,460.00 45,042.80 9 94,417.20 32***** Contract Totals ********** Contract Totals ***** 121,200.00 18,260.00 1 139,460.00 45,042.80 9 94,417.20 32

Page 115: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 115Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--432432--026026 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Fish Hatchery Power & Control SyAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Jake Wolf Memorial Hatchery - Mason CountyCounty: 125 - Mason ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 10-28-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: Paul Boland : :A/E Telephone: (217)359-1514 : :Date Selected: 03-12-19 : :Contract Date: 06-07-19 ________________________________________________________________________________Est. Project Cost: 2,100,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 650,000.00 02-20-20 650,000.00 02-20-20 417,427.00 417,427.00 232,573.00 .00199 1,150,000.00 07-01-21 1,150,000.00 07-01-21 650,000.00 9,393.65 .00 500,000.00962 1,744,118.00 07-01-21 1,744,118.00 07-01-21 944,118.00 144,118.00 .00 800,000.00

Total 3,544,118.00 3,544,118.00 2,011,545.00 570,938.65 232,573.00 1,300,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 18.00% Description:Description: Replace Fish Hatchery Power & Control SyReplace Fish Hatchery Power & Control Sy

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-18-19 04-18-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 08-05-19 08-26-19 ( 21 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-24-20 08-27-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-30-21 ( 0 )50%: 01-24-20 03-04-20 ( 40 ) Final Accept: 02-28-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 01-30-2201-30-2295-100%: 07-15-20 09-18-20 ( 65 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

HDR Engineering, Inc. 14032710 ( 0 ) ( 0 )Henneman Engineering Inc. 19003310 ( 0 ) ( 0 ) 01-30-2201-30-22Quick Electrical Contractors 21053985 05-19-21 07-09-21 07-09-22 ( 0 ) 10-07-22 ( 0 ) 10-07-2310-07-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

HDR Engineering, Inc. 14032710 10 .00 .00 0 .00 .00 0 .00 100Henneman Engineering Inc. 19003310 10 15,388.00 187,157.00 2 202,545.00 144,118.00 9 58,427.00 71Quick Electrical Contractors 21053985 85 1,809,000.00 .00 0 1,809,000.00 426,820.65 3 1,382,179.35 24***** Contract Totals ********** Contract Totals ***** 1,824,388.00 187,157.00 2 2,011,545.00 570,938.65 12 1,440,606.35 28

Page 116: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 116Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Page 117: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 117Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--506506--651651 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: US Underground Storage Tanks PLA: NDescription: UST Site InvestigationAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Hidden Springs State Forest - Shelby CountyCounty: 173 - Shelby ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS 11-08-21 :: :

A/E Id: 1498 : :A/E Name: Atlas Soils, Inc. : :A/E Contact: Michael Emken : :A/E Telephone: (217)532-3959 : :Date Selected: : :Contract Date: 03-03-98 ________________________________________________________________________________Est. Project Cost: 37,564.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 37,564.00 03-13-13 37,564.00 03-13-13 34,916.41 34,816.41 100.00- 2,747.59

Total 37,564.00 37,564.00 34,916.41 34,816.41 100.00 2,747.59____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (S ) 99.99% Description:Description: UST Site InvestigationUST Site Investigation

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Atlas Soils, Inc. 98026210 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Atlas Soils, Inc. 98026210 10 9,422.00 18,242.00 3 27,664.00 27,564.00 12 100.00 100***** Contract Totals ********** Contract Totals ***** 9,422.00 18,242.00 3 27,664.00 27,564.00 12 100.00 100

Page 118: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 118Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--508508--045045 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct Connecting Trails, Parking LotAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Kickapoo State Park - Vermilion CountyCounty: 183 - Vermilion ________________________________________________________________________________Leg. Districts: House:104 - Michael Marron

Senate:52 - Scott Bennett : CURRENT STATUS 10-28-21 :: :

A/E Id: 28276 : :A/E Name: The Upchurch Group, Inc. : :A/E Contact: Stan Fearday : :A/E Telephone: (217)235-3177 : :Date Selected: 03-10-15 : :Contract Date: 03-20-19 ________________________________________________________________________________Est. Project Cost: 510,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

962 910,600.00 10-11-19 910,600.00 10-11-19 489,422.48 407,124.99 21,177.52 400,000.00

Total 910,600.00 910,600.00 489,422.48 407,124.99 21,177.52 400,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Construct Connecting Trails, Parking LotConstruct Connecting Trails, Parking Lot

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-17-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-30-20 06-24-20 ( 55 )

Design Devel: 08-15-19 08-26-19 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-20 ( 0 )50%: ( 0 ) Final Accept: 01-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 01-15-2201-15-2295-100%: 01-31-20 11-14-19 ( 78-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

The Upchurch Group, Inc. 14032510 ( 0 ) ( 0 )The Upchurch Group, Inc. 19002310 ( 0 ) ( 0 ) 01-15-2201-15-22Grunloh Construction, Inc. 21044281 12-10-20 03-03-21 07-31-21 ( 0 ) 08-30-21 ( 0 ) 08-30-2208-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

The Upchurch Group, Inc. 14032510 10 .00 .00 0 .00 .00 0 .00 100The Upchurch Group, Inc. 19002310 10 71,900.00 6,518.00 1 78,418.00 66,392.31 6 12,025.69 85Grunloh Construction, Inc. 21044281 81 364,000.00 47,004.48 3 411,004.48 340,732.68 4 70,271.80 83***** Contract Totals ********** Contract Totals ***** 435,900.00 53,522.48 4 489,422.48 407,124.99 10 82,297.49 83

Page 119: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 119Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--508508--046046 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Kickapoo State Park - Vermilion CountyCounty: 183 - Vermilion ________________________________________________________________________________Leg. Districts: House:104 - Michael Marron

Senate:52 - Scott Bennett : CURRENT STATUS 11-01-21 :: :

A/E Id: 20616 : :A/E Name: Reifsteck Reid & Company Archi : :A/E Contact: Charles Reifsteck : :A/E Telephone: (217)351-4100 : :Date Selected: 06-11-19 : :Contract Date: 08-01-19 ________________________________________________________________________________Est. Project Cost: 302,975.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 302,975.00 07-24-20 302,975.00 07-24-20 295,930.73 270,765.03 7,044.27 .00

Total 302,975.00 302,975.00 295,930.73 270,765.03 7,044.27 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-24-19 07-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 24.76 Schem Design: 09-02-19 09-12-19 ( 10 ) Prime Bid: 03-09-20 06-03-20 ( 86 )

Design Devel: 10-28-19 11-06-19 ( 9 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-30-20 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 06-30-20 10-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-30-2105-30-21 09-30-2209-30-2295-100%: 01-06-20 03-09-20 ( 63 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Reifsteck Reid & Company Arc 19005310 ( 0 ) ( 0 ) 09-30-2209-30-22Grunloh Construction, Inc. 21044181 12-10-20 02-01-21 06-01-21 09-30-21 ( 0 ) 10-31-21 ( 0 ) 10-31-2210-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Reifsteck Reid & Company Arc 19005310 10 34,175.00 .00 2 34,175.00 24,503.31 7 9,671.69 72Grunloh Construction, Inc. 21044181 81 256,000.00 5,755.73 3 261,755.73 246,261.72 5 15,494.01 94***** Contract Totals ********** Contract Totals ***** 290,175.00 5,755.73 5 295,930.73 270,765.03 12 25,165.70 92

Page 120: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 120Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--519519--013013 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Sewer LinesAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Eagle Creek State Park - Shelby CountyCounty: 173 - Shelby ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS 11-08-21 :: :

A/E Id: 28276 : :A/E Name: The Upchurch Group, Inc. : :A/E Contact: Mark Dwiggins : :A/E Telephone: (217)235-3177 : :Date Selected: 05-13-14 : :Contract Date: 08-25-14 ________________________________________________________________________________Est. Project Cost: 2,674,498.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 67,198.80 04-07-21 67,198.80 04-07-21 67,198.80 67,198.80 .00 .00962 3,647,564.00 09-03-21 3,647,564.00 09-03-21 2,451,989.54 385,217.92 155,310.17 1,040,264.29

Total 3,714,762.80 3,714,762.80 2,519,188.34 452,416.72 155,310.17 1,040,264.29____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 14.00% Description:Description: Replace Sewer LinesReplace Sewer Lines

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-11-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-30-15 02-28-19 02-14-19 ( 14-)

Design Devel: 11-28-14 12-16-14 ( 18 ) Prime Re-Bid: 09-15-19 ( 0 )25%: ( 0 ) Subst Compl: 06-30-16 06-15-21 ( 0 )50%: 03-31-15 03-31-15 ( 0 ) Final Accept: 07-29-16 07-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-1706-30-17 12-31-2112-31-2195-100%: 06-30-15 11-29-18 (248 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

The Upchurch Group, Inc. 14031210 ( 0 ) ( 0 ) 12-31-2112-31-21Grunloh Construction, Inc. 20045681 11-22-19 12-19-19 09-19-20 09-19-22 ( 0 ) 10-19-22 ( 0 ) 10-19-2310-19-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

The Upchurch Group, Inc. 14031210 10 145,800.00 88,029.00 8 233,829.00 128,368.51 9 105,460.49 55Grunloh Construction, Inc. INT7161 00 352.95 .00 0 352.95 352.95 1 .00 100Grunloh Construction, Inc. 20045681 81 1,964,000.00 321,006.39 6 2,285,006.39 323,695.26 5 1,961,311.13 14***** Contract Totals ********** Contract Totals ***** 2,110,152.95 409,035.39 14 2,519,188.34 452,416.72 15 2,066,771.62 18

Page 121: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 121Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--520520--010010 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Rehabilitate Shower BuildingsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Wolf Creek State Park, Shelby CountyCounty: 173 - Shelby ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS 11-08-21 :: :

A/E Id: 20616 : :A/E Name: Reifsteck Reid & Company Archi : :A/E Contact: : :A/E Telephone: (217)351-4100 : :Date Selected: 10-08-19 : :Contract Date: 12-02-19 ________________________________________________________________________________Est. Project Cost: 1,374,016.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 938,900.00 10-15-19 938,900.00 10-15-19 145,552.00 91,074.66 793,348.00 .00

Total 938,900.00 938,900.00 145,552.00 91,074.66 793,348.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Rehabilitate Shower BuildingsRehabilitate Shower Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-02-20 04-07-20 ( 36 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-02-20 04-08-20 ( 37 ) Prime Bid: 12-17-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-20-22 ( 0 )50%: 07-09-21 07-13-21 ( 4 ) Final Accept: 02-27-23 ( 0 )75%: ( 0 ) A/E Cont End: 06-20-2306-20-2395-100%: 09-17-21 09-17-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Reifsteck Reid & Company Arc 20040610 ( 0 ) ( 0 ) 06-20-2306-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Reifsteck Reid & Company Arc 20040610 10 23,360.00 122,192.00 1 145,552.00 91,074.66 4 54,477.34 63***** Contract Totals ********** Contract Totals ***** 23,360.00 122,192.00 1 145,552.00 91,074.66 4 54,477.34 63

Page 122: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 122Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--523523--011011 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Walnut Point State Park - Douglas CountyCounty: 41 - Douglas ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS 11-08-21 :: :

A/E Id: 20616 : :A/E Name: Reifsteck Reid & Company Archi : :A/E Contact: Charles Reifsteck : :A/E Telephone: (217)351-4100 : :Date Selected: 04-09-19 : :Contract Date: 08-09-19 ________________________________________________________________________________Est. Project Cost: 126,707.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 126,707.00 06-01-20 126,707.00 06-01-20 119,510.00 87,980.50 7,197.00 .00

Total 126,707.00 126,707.00 119,510.00 87,980.50 7,197.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-11-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 09-27-19 10-08-19 ( 11 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-06-20 ( 0 )

Design Devel: 09-27-19 10-08-19 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-15-20 ( 0 )50%: ( 0 ) Final Accept: 10-09-20 ( 0 )75%: ( 0 ) A/E Cont End: 08-15-2108-15-21 07-15-2207-15-2295-100%: 12-06-19 12-19-19 ( 13 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Reifsteck Reid & Company Arc 19032510 ( 0 ) ( 0 ) 07-15-2207-15-22CAD Construction Inc. 21047481 02-17-21 03-16-21 07-14-21 07-12-21 ( 2-) 08-13-21 ( 0 ) 08-13-2208-13-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Reifsteck Reid & Company Arc 19032510 10 20,010.00 .00 1 20,010.00 12,926.00 6 7,084.00 65CAD Construction Inc. 21047481 81 99,500.00 .00 0 99,500.00 75,054.50 1 24,445.50 76***** Contract Totals ********** Contract Totals ***** 119,510.00 .00 1 119,510.00 87,980.50 7 31,529.50 74

Page 123: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 123Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--523523--012012 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Connect to Water SupplyAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Walnut Point State Park - Douglas CountyCounty: 41 - Douglas ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 467,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 467,100.00 10-07-21 467,100.00 10-07-21 .00 .00 467,100.00 .00

Total 467,100.00 467,100.00 .00 .00 467,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Connect to Water SupplyConnect to Water Supply

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 124: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 124Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--615615--016016 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Sewage Treatment PlantAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Washington County Conservation AreaCounty: 189 - Washington ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 10-15-21 :: :

A/E Id: 26744 : :A/E Name: Heneghan and Associates, P.C. : :A/E Contact: Lindsey Bowlin : :A/E Telephone: (618)533-6525 : :Date Selected: 07-08-14 : :Contract Date: 04-30-19 ________________________________________________________________________________Est. Project Cost: 765,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

962 2,546,400.00 07-10-18 2,546,400.00 07-10-18 647,402.00 91,214.25 1,298,998.00 600,000.00

Total 2,546,400.00 2,546,400.00 647,402.00 91,214.25 1,298,998.00 600,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 2.00% Description:Description: Replace Sewage Treatment PlantReplace Sewage Treatment Plant

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 03-16-20 03-17-20 ( 1 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-25-21 07-14-21 (111 )

Design Devel: 03-16-20 03-17-20 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-01-22 ( 0 )50%: 08-13-20 08-20-20 ( 7 ) Final Accept: 05-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 05-15-2205-15-22 06-15-2306-15-2395-100%: 01-15-21 04-21-21 ( 96 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Heneghan and Associates, P.C 15020210 ( 0 ) ( 0 ) 06-15-2306-15-23Heneghan and Associates, P.C 15020210 04-30-19 ( 0 ) ( 0 )Haier Plumbing and Heating, 22044081 08-17-21 10-19-21 03-31-22 ( 0 ) 04-30-22 ( 0 ) 04-30-2304-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Heneghan and Associates, P.C 15020210 10 40,802.00 108,600.00 1 149,402.00 91,214.25 5 58,187.75 61Heneghan and Associates, P.C 15020210 10 40,802.00 108,600.00 1 149,402.00 91,214.25 5 58,187.75 61Haier Plumbing and Heating, 22044081 81 498,000.00 .00 0 498,000.00 .00 0 498,000.00 0***** Contract Totals ********** Contract Totals ***** 579,604.00 217,200.00 2 796,804.00 182,428.50 10 614,375.50 23

Page 125: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 125Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--704704--050050 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Cox BridgeAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Carlyle Lake State Fish & Wildlife Area - Fayette Co.County: 51 - Fayette ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 10-27-21 :: :

A/E Id: 20405 : :A/E Name: Oates Associates, Inc. : :A/E Contact: Bruce Schopp : :A/E Telephone: (618)345-2200 : :Date Selected: 03-10-15 : :Contract Date: 01-29-19 ________________________________________________________________________________Est. Project Cost: 1,846,964.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,758,764.00 09-16-21 1,758,764.00 09-16-21 1,208,764.00 136,792.00 .00 550,000.00962 1,138,200.00 07-10-18 1,138,200.00 07-10-18 349,850.00 .00 288,350.00 500,000.00

Total 2,896,964.00 2,896,964.00 1,558,614.00 136,792.00 288,350.00 1,050,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 15.00% Description:Description: Replace Cox BridgeReplace Cox Bridge

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-15-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-01-19 04-03-19 ( 2 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-01-19 04-04-19 ( 3 ) Prime Bid: 09-25-19 05-27-20 (245 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-20 11-30-22 ( 0 )50%: ( 0 ) Final Accept: 11-15-20 01-30-23 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2109-30-21 06-15-2406-15-2495-100%: 07-20-19 11-20-19 (123 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Oates Associates, Inc. 1521410 ( 0 ) ( 0 ) 06-15-2406-15-24Keller Construction Inc. 21051381 05-13-21 08-20-21 06-16-22 ( 0 ) 07-16-22 ( 0 ) 07-16-2307-16-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Oates Associates, Inc. 1521410 10 427,600.00 198,986.00- 3 228,614.00 136,792.00 11 91,822.00 60Keller Construction Inc. 21051381 81 1,330,000.00 .00 0 1,330,000.00 .00 0 1,330,000.00 0***** Contract Totals ********** Contract Totals ***** 1,757,600.00 198,986.00- 3 1,558,614.00 136,792.00 11 1,421,822.00 9

Page 126: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 126Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--713713--004004 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Connect to Local Water DistrictAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Crawford County Fish and Wildlife AreaCounty: 33 - Crawford ________________________________________________________________________________Leg. Districts: House:110 - Chris Miller

Senate:55 - Darren Bailey : CURRENT STATUS 11-02-21 :: :

A/E Id: 33686 : :A/E Name: Civil Design, Inc. : :A/E Contact: Wes Kistler : :A/E Telephone: (314)863-5570 : :Date Selected: 11-13-19 : :Contract Date: 02-24-20 ________________________________________________________________________________Est. Project Cost: 430,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 430,600.00 11-19-19 430,600.00 11-19-19 260,250.00 222,425.00 170,350.00 .00

Total 430,600.00 430,600.00 260,250.00 222,425.00 170,350.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 99.00% Description:Description: Connect to Local Water DistrictConnect to Local Water District

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-16-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-10-20 04-14-20 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-29-20 12-09-20 ( 41 )

Design Devel: 04-10-20 04-15-20 ( 5 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-21 ( 0 )50%: 06-12-20 06-19-20 ( 7 ) Final Accept: 07-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: 08-14-20 08-20-20 ( 6 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Civil Design, Inc. 20041310 ( 0 ) ( 0 ) 06-30-2206-30-22Shores Builders, Inc. 21048681 03-10-21 07-20-21 09-15-21 09-15-21 10-01-21 ( 16 ) 10-15-21 ( 0 ) 10-15-2210-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Civil Design, Inc. 20041310 10 59,650.00 .00 0 59,650.00 41,191.00 7 18,459.00 69Eaton Water District 7105 50 31,100.00 .00 0 31,100.00 31,100.00 1 .00 100Shores Builders, Inc. 21048681 81 169,500.00 .00 1 169,500.00 150,134.00 1 19,366.00 89***** Contract Totals ********** Contract Totals ***** 260,250.00 .00 1 260,250.00 222,425.00 9 37,825.00 86

Page 127: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 127Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--720720--027027 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Pump StationAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Rend Lake Fish and Wildlife Area - Jefferson CountyCounty: 81 - Jefferson ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-08-21 :: :

A/E Id: 31395 : :A/E Name: Bacon Farmer Workman Engineeri : :A/E Contact: : :A/E Telephone: (618)997-9190 : :Date Selected: 05-12-20 : :Contract Date: 01-26-21 ________________________________________________________________________________Est. Project Cost: 1,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

953 1,000,000.00 01-23-20 1,000,000.00 01-23-20 41,260.00 25,448.50 958,740.00 .00

Total 1,000,000.00 1,000,000.00 41,260.00 25,448.50 958,740.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Renovate Pump StationRenovate Pump Station

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-19-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-20-21 05-18-21 ( 28 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-20-21 05-18-21 ( 28 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-11-2310-11-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bacon Farmer Workman Enginee 20014510 ( 0 ) ( 0 ) 10-11-2310-11-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bacon Farmer Workman Enginee 20014510 10 41,260.00 .00 0 41,260.00 25,448.50 1 15,811.50 62***** Contract Totals ********** Contract Totals ***** 41,260.00 .00 0 41,260.00 25,448.50 1 15,811.50 62

Page 128: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 128Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--728728--024024 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair & Rehabilitate FortAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Fort Massac State Park, Massac CountyCounty: 127 - Massac ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 10-15-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: Kirk Sippel : :A/E Telephone: (312)567-1000 : :Date Selected: 02-14-13 : :Contract Date: 06-24-13 ________________________________________________________________________________Est. Project Cost: 1,465,015.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

884 1,716,284.48 11-08-19 1,716,284.48 11-08-19 283,689.00 113,715.52 466,311.00 966,284.48962 3,086,300.00 01-14-21 3,130,967.80 01-14-21 11,727.80- 14,644.85 2,142,695.60 1,000,000.00991 330,000.00 03-01-17 330,000.00 03-01-17 44,667.80 44,667.80 285,332.20 .00

Total 5,132,584.48 5,177,252.28 316,629.00 173,028.17 2,894,338.80 1,966,284.48____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Repair & Rehabilitate FortRepair & Rehabilitate Fort

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-01-13 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 09-24-13 10-01-13 ( 7 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-24-13 10-01-13 ( 7 ) Prime Bid: 01-09-15 04-18-19 01-09-20 (266 )

Design Devel: 05-16-14 05-23-14 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-12-15 11-30-19 ( 0 )50%: ( 0 ) Final Accept: 02-28-16 12-30-19 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2306-01-2395-100%: 02-15-19 02-20-19 ( 5 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauer Latoza Studio Ltd. 13002910 ( 0 ) ( 0 ) 06-01-2306-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 13002910 10 26,124.00 290,505.00 3 316,629.00 173,028.17 14 143,600.83 55***** Contract Totals ********** Contract Totals ***** 26,124.00 290,505.00 3 316,629.00 173,028.17 14 143,600.83 55

Page 129: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 129Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--728728--025025 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Rehabilitate Shower BuildingAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Fort Massac State Park, Massac CountyCounty: 127 - Massac ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 10-15-21 :: :

A/E Id: 29471 : :A/E Name: BHDG Architects, Inc. : :A/E Contact: Hayley Grimes : :A/E Telephone: (618)998-8015 : :Date Selected: 07-09-13 : :Contract Date: 10-02-13 ________________________________________________________________________________Est. Project Cost: 1,055,655.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 9,794.42 02-17-21 9,794.42 02-17-21 9,794.42 9,794.42 .00 .00884 390,000.00 07-26-13 390,000.00 08-27-19 323,770.75 295,250.01 66,229.25 .00962 907,437.60 10-01-19 907,437.60 10-01-19 599,643.18 599,643.18 9,794.42 298,000.00

Total 1,307,232.02 1,307,232.02 933,208.35 904,687.61 76,023.67 298,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 90.00% Description:Description: Rehabilitate Shower BuildingRehabilitate Shower Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-15-13 ( 0 ) Assgn Bid: 03-26-15 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 06-26-19 ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-26-14 04-02-15 (127 )

Design Devel: 04-28-14 04-29-14 ( 1 ) Prime Re-Bid: 03-21-19 ( 0 )25%: ( 0 ) Subst Compl: 05-29-15 05-01-21 ( 0 )50%: ( 0 ) Final Accept: 07-29-15 07-01-21 ( 0 )75%: 06-30-14 07-17-14 ( 17 ) A/E Cont End: 12-31-1512-31-15 07-01-2207-01-2295-100%: 01-11-19 01-29-19 ( 18 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BHDG Architects, Inc. 14000110 ( 0 ) ( 0 ) 07-01-2207-01-22H & N Construction, Inc. 20043541 09-12-19 10-17-19 04-14-20 12-15-20 05-26-21 (407 ) 01-15-21 09-07-21 (235 ) 01-15-2201-15-22Litton Enterprises, Inc. 20043642 09-12-19 10-17-19 04-14-20 12-15-20 05-26-21 (407 ) 01-15-21 09-02-21 (230 ) 01-15-2201-15-22W. J. Burke Electric Company 20043745 09-12-19 10-17-19 04-14-20 12-15-20 05-26-21 (407 ) 01-15-21 07-15-21 (181 ) 01-15-2201-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BHDG Architects, Inc. 14000110 10 6,815.00 89,528.00 6 96,343.00 67,822.26 16 28,520.74 70H & N Construction, Inc. 20043541 41 619,000.00 17,214.48 2 636,214.48 636,214.48 18 .00 100Litton Enterprises, Inc. 20043642 42 144,561.00 .00 1 144,561.00 144,561.00 7 .00 100

Page 130: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 130Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

W. J. Burke Electric Company 20043745 45 54,000.00 2,089.87 2 56,089.87 56,089.87 7 .00 100***** Contract Totals ********** Contract Totals ***** 824,376.00 108,832.35 11 933,208.35 904,687.61 48 28,520.74 97

Page 131: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 131Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--737737--011011 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Sewage Treatment SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Lake Murphysboro State Park - Jackson CountyCounty: 77 - Jackson ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-01-21 :: :

A/E Id: 31395 : :A/E Name: Bacon Farmer Workman Engineeri : :A/E Contact: : :A/E Telephone: (618)997-9190 : :Date Selected: 11-13-19 : :Contract Date: 11-02-20 ________________________________________________________________________________Est. Project Cost: 1,831,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 831,600.00 11-18-19 831,600.00 11-18-19 142,200.00 56,920.30 689,400.00 .00

Total 831,600.00 831,600.00 142,200.00 56,920.30 689,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 65.00% Description:Description: Replace Sewage Treatment SystemsReplace Sewage Treatment Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-26-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-02-21 04-06-21 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-02-21 04-08-21 ( 6 ) Prime Bid: 02-12-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-07-23 ( 0 )50%: 07-16-21 08-18-21 ( 33 ) Final Accept: 04-07-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2507-31-2595-100%: 11-23-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bacon Farmer Workman Enginee 20013210 ( 0 ) ( 0 ) 07-31-2507-31-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bacon Farmer Workman Enginee 20013210 10 142,200.00 .00 1 142,200.00 56,920.30 4 85,279.70 40***** Contract Totals ********** Contract Totals ***** 142,200.00 .00 1 142,200.00 56,920.30 4 85,279.70 40

Page 132: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 132Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--749749--023023 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Campground Sewage TreatmentAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Red Hills State Park - Lawrence CountyCounty: 101 - Lawrence ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 11-02-21 :: :

A/E Id: 16848 : :A/E Name: Clark Dietz, Inc. : :A/E Contact: Andrea Bretl : :A/E Telephone: (217)373-8900 : :Date Selected: 11-13-19 : :Contract Date: 04-23-20 ________________________________________________________________________________Est. Project Cost: 4,593,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,645,700.00 11-18-19 2,645,700.00 11-18-19 326,359.00 219,720.76 2,319,341.00 .00

Total 2,645,700.00 2,645,700.00 326,359.00 219,720.76 2,319,341.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 96.00% Description:Description: Replace Campground Sewage TreatmentReplace Campground Sewage Treatment

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-16-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 08-17-20 09-14-20 ( 28 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-17-20 09-18-20 ( 32 ) Prime Bid: 09-03-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-12-22 ( 0 )50%: 03-26-21 04-01-21 ( 6 ) Final Accept: 10-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-01-2408-01-2495-100%: 06-21-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Clark Dietz, Inc. 20041410 ( 0 ) ( 0 ) 08-01-2408-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Clark Dietz, Inc. 20041410 10 120,384.00 205,975.00 1 326,359.00 219,720.76 12 106,638.24 67***** Contract Totals ********** Contract Totals ***** 120,384.00 205,975.00 1 326,359.00 219,720.76 12 106,638.24 67

Page 133: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 133Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--759759--023023 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Stephen A. Forbes State Park - Marion CountyCounty: 121 - Marion ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 11-04-21 :: :

A/E Id: 31398 : :A/E Name: Baysinger Architects, PLLC : :A/E Contact: Ryan Dodd : :A/E Telephone: (618)993-8250 : :Date Selected: 06-11-19 : :Contract Date: 10-28-19 ________________________________________________________________________________Est. Project Cost: 222,750.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 222,750.00 06-17-21 222,750.00 06-17-21 34,850.00 14,496.00 187,900.00 .00

Total 222,750.00 222,750.00 34,850.00 14,496.00 187,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 4.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-22-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-10-20 11-13-19 ( 58-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-18-20 08-05-20 ( 48 )

Design Devel: 01-10-20 11-13-19 ( 58-) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-01-20 02-28-22 ( 0 )50%: ( 0 ) Final Accept: 02-01-21 04-08-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-01-2110-01-21 02-28-2302-28-2395-100%: 04-03-20 04-07-20 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Baysinger Architects, PLLC 20030510 ( 0 ) ( 0 ) 02-28-2302-28-23Premier Contractors,Inc. 22043681 08-12-21 10-25-21 01-23-22 ( 0 ) 03-24-22 ( 0 ) 03-24-2303-24-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Baysinger Architects, PLLC 20030510 10 34,850.00 .00 1 34,850.00 14,496.00 4 20,354.00 42Premier Contractors,Inc. 22043681 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 34,850.00 .00 1 34,850.00 14,496.00 4 20,354.00 42

Page 134: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 134Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--766766--008008 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing System - Wetlands CenteAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Cache River State Natural Area - Johnson CountyCounty: 87 - Johnson ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 739,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 739,000.00 10-07-21 739,000.00 10-07-21 .00 .00 739,000.00 .00

Total 739,000.00 739,000.00 .00 .00 739,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Roofing System - Wetlands CenteReplace Roofing System - Wetlands Cente

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 135: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 135Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--777777--018018 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair & Replace Roofing SystemsAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Wayne Fitzgerrell State Park - Franklin CountyCounty: 55 - Franklin ________________________________________________________________________________Leg. Districts: House:117 - Dave Severin

Senate:59 - Dale Fowler : CURRENT STATUS 11-08-21 :: :

A/E Id: 26859 : :A/E Name: Eggemeyer Associates Architect : :A/E Contact: Ed Kirchner : :A/E Telephone: (618)988-2380 : :Date Selected: 08-13-13 : :Contract Date: 11-07-13 ________________________________________________________________________________Est. Project Cost: 225,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

884 225,000.00 08-27-13 225,000.00 08-27-13 140,585.34 128,079.30 84,414.66 .00

Total 225,000.00 225,000.00 140,585.34 128,079.30 84,414.66 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 98.00% Description:Description: Repair & Replace Roofing SystemsRepair & Replace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-01-13 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-13-13 12-13-13 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-13-13 12-18-13 ( 5 ) Prime Bid: 05-20-14 07-09-14 ( 50 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-14 ( 0 )50%: ( 0 ) Final Accept: 12-30-14 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-1511-30-15 12-31-2112-31-2195-100%: 02-21-14 03-18-14 ( 25 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Eggemeyer Associates Archite 14000310 ( 0 ) ( 0 ) 12-31-2112-31-21D.E. Martin Roofing Co., Inc 15043381 08-19-14 09-12-14 12-11-14 01-15-15 ( 35 ) 01-10-15 ( 0 ) 12-31-2012-31-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Eggemeyer Associates Archite 14000310 10 31,221.00 .00 3 31,221.00 24,008.10 4 7,212.90 77D.E. Martin Roofing Co., Inc 15043381 81 63,023.00 46,341.34 5 109,364.34 104,071.20 3 5,293.14 95***** Contract Totals ********** Contract Totals ***** 94,244.00 46,341.34 8 140,585.34 128,079.30 7 12,506.04 91

Page 136: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 136Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--777777--019019 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Rehabilitate Parking and Access RoadAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Wayne Fitzgerrell State Park - Franklin CountyCounty: 55 - Franklin ________________________________________________________________________________Leg. Districts: House:117 - Dave Severin

Senate:59 - Dale Fowler : CURRENT STATUS 11-08-21 :: :

A/E Id: 29934 : :A/E Name: Kaskaskia Engineering Group, L : :A/E Contact: Michael Velloff : :A/E Telephone: (618)233-5877 : :Date Selected: 03-11-14 : :Contract Date: 05-30-14 ________________________________________________________________________________Est. Project Cost: 680,542.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

39 1,205,458.00 08-21-20 1,205,458.00 08-21-20 505,430.78 39,772.50 150,069.22 549,958.00

Total 1,205,458.00 1,205,458.00 505,430.78 39,772.50 150,069.22 549,958.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 12.00% Description:Description: Rehabilitate Parking and Access RoadRehabilitate Parking and Access Road

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-22-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 08-01-14 08-14-14 ( 13 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-01-14 08-14-14 ( 13 ) Prime Bid: 06-14-19 07-25-19 09-30-20 (433 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-16 12-31-19 ( 0 )50%: ( 0 ) Final Accept: 01-01-16 02-15-20 ( 0 )75%: ( 0 ) A/E Cont End: 08-01-1508-01-15 12-01-2112-01-2195-100%: 05-15-19 06-05-19 ( 21 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kaskaskia Engineering Group, 14011310 ( 0 ) ( 0 ) 12-01-2112-01-21E. T. Simonds Construction C 21053281 05-13-21 07-30-21 05-01-22 ( 0 ) 05-31-22 ( 0 ) 05-31-2305-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kaskaskia Engineering Group, 14011310 10 15,800.00 38,580.00 4 54,380.00 39,772.50 7 14,607.50 73E. T. Simonds Construction C 21053281 81 444,962.00 6,088.78 1 451,050.78 .00 0 451,050.78 0***** Contract Totals ********** Contract Totals ***** 460,762.00 44,668.78 5 505,430.78 39,772.50 7 465,658.28 8

Page 137: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 137Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--777777--020020 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Rend Lake Resort FacilitiesAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Wayne Fitzgerrell State Park - Franklin CountyCounty: 55 - Franklin ________________________________________________________________________________Leg. Districts: House:117 - Dave Severin

Senate:59 - Dale Fowler : CURRENT STATUS 11-08-21 :: :

A/E Id: 31754 : :A/E Name: Trivers Associates, Inc. : :A/E Contact: : :A/E Telephone: (618)451-2900 : :Date Selected: 11-17-20 : :Contract Date: 09-16-21 ________________________________________________________________________________Est. Project Cost: 6,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,501,300.00 01-23-20 4,501,300.00 01-23-20 96,870.00 17,737.00 4,404,430.00 .00962 1,500,000.00 01-23-20 1,500,000.00 01-23-20 .00 .00 1,500,000.00 .00

Total 6,001,300.00 6,001,300.00 96,870.00 17,737.00 5,904,430.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 8.00% Description:Description: Renovate Rend Lake Resort FacilitiesRenovate Rend Lake Resort Facilities

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-20-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-01-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-24-2510-24-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Trivers Associates, Inc. 21011810 ( 0 ) ( 0 ) 10-24-2510-24-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Trivers Associates, Inc. 21011810 10 96,870.00 .00 0 96,870.00 17,737.00 1 79,133.00 18***** Contract Totals ********** Contract Totals ***** 96,870.00 .00 0 96,870.00 17,737.00 1 79,133.00 18

Page 138: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 138Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--779779--018018 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Rehabilitate State Park Sewage TreatmentAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Eldon Hazlet State Park - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 06-30-21 :: :

A/E Id: 4274 : :A/E Name: Benton & Associates, Inc. : :A/E Contact: Greg Hillis : :A/E Telephone: (217)245-4146 : :Date Selected: 12-10-19 : :Contract Date: 04-22-20 ________________________________________________________________________________Est. Project Cost: 2,805,739.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,713,139.00 12-17-19 1,713,139.00 12-17-19 903,137.54 773,099.28 810,001.46 .00

Total 1,713,139.00 1,713,139.00 903,137.54 773,099.28 810,001.46 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Rehabilitate State Park Sewage TreatmentRehabilitate State Park Sewage Treatment

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-21-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 08-17-20 08-19-20 ( 2 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-17-20 09-08-20 ( 22 ) Prime Bid: 01-28-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-26-22 ( 0 )50%: ( 0 ) Final Accept: 12-18-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2407-31-2495-100%: 10-29-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Benton & Associates, Inc. 20041910 ( 0 ) ( 0 ) 07-31-2407-31-24Lake Contracting, Inc. 21EM0281 01-04-21 01-04-21 03-05-21 04-21-21 ( 47 ) 04-04-21 06-09-21 ( 66 ) 06-30-2106-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Benton & Associates, Inc. 20041910 10 64,043.00 193,700.00 1 257,743.00 127,704.74 2 130,038.26 50Lake Contracting, Inc. 21EM0281 81 800,000.00 154,605.46- 1 645,394.54 645,394.54 3 .00 100***** Contract Totals ********** Contract Totals ***** 864,043.00 39,094.54 2 903,137.54 773,099.28 5 130,038.26 86

Page 139: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 139Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--779779--018018 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Rehabilitate State Park Sewage TreatmentAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Eldon Hazlet State Park - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 10-27-21 :: :

A/E Id: 4274 : :A/E Name: Benton & Associates, Inc. : :A/E Contact: : :A/E Telephone: (217)245-4146 : :Date Selected: : :Contract Date: 04-22-20 ________________________________________________________________________________Est. Project Cost: 2,805,739.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,713,139.00 12-17-19 1,713,139.00 12-17-19 903,137.54 773,099.28 810,001.46 .00

Total 1,713,139.00 1,713,139.00 903,137.54 773,099.28 810,001.46 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 85.00% Description:Description: Rehabilitate State Park Sewage TreatmentRehabilitate State Park Sewage Treatment

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 140: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 140Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 102102--779779--019019 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing Systems/Siding and RehabAgency: Department of Natural Resources Analyst: Michelette ThompsonLocation: Eldon Hazlet State Park - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 11-02-21 :: :

A/E Id: 30361 : :A/E Name: Woolpert Architecture, LLC : :A/E Contact: : :A/E Telephone: (618)632-7004 : :Date Selected: 03-10-20 : :Contract Date: 09-17-20 ________________________________________________________________________________Est. Project Cost: 2,563,893.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,764,700.00 03-11-20 1,764,700.00 03-11-20 255,807.00 65,373.57 1,508,893.00 .00

Total 1,764,700.00 1,764,700.00 255,807.00 65,373.57 1,508,893.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 68.00% Description:Description: Replace Roofing Systems/Siding and RehabReplace Roofing Systems/Siding and Rehab

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-17-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-04-21 02-01-21 ( 28 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-04-21 02-01-21 ( 28 ) Prime Bid: 04-15-22 ( 0 )

Design Devel: 01-04-21 02-08-21 ( 35 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-24-24 ( 0 )50%: 10-18-21 ( 0 ) Final Accept: 07-24-24 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2311-30-23 12-31-2412-31-2495-100%: 01-21-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert Architecture, LLC 20042510 ( 0 ) ( 0 ) 12-31-2412-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert Architecture, LLC 20042510 10 66,697.00 189,110.00 1 255,807.00 65,373.57 2 190,433.43 26***** Contract Totals ********** Contract Totals ***** 66,697.00 189,110.00 1 255,807.00 65,373.57 2 190,433.43 26

Page 141: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 141Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--000000--010010 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace/Repair Roofing Systems at MultipAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 30497 : :A/E Name: Bloom Companies, LLC : :A/E Contact: Sander Kaplan : :A/E Telephone: (312)876-9500 : :Date Selected: 03-10-20 : :Contract Date: 10-08-20 ________________________________________________________________________________Est. Project Cost: 257,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 257,600.00 03-11-20 257,600.00 03-11-20 38,400.00 12,031.93 219,200.00 .00

Total 257,600.00 257,600.00 38,400.00 12,031.93 219,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Replace/Repair Roofing Systems at MultipReplace/Repair Roofing Systems at Multip

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-21-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 12-04-20 01-26-21 ( 53 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-26-21 11-10-21 (168 )

Design Devel: 12-04-20 01-28-21 ( 55 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-30-21 ( 0 )50%: ( 0 ) Final Accept: 01-07-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2210-31-2295-100%: 09-19-21 06-04-21 (107-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bloom Companies, LLC 20033510 ( 0 ) ( 0 ) 10-31-2210-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bloom Companies, LLC 20033510 10 38,400.00 .00 0 38,400.00 12,031.93 2 26,368.07 31***** Contract Totals ********** Contract Totals ***** 38,400.00 .00 0 38,400.00 12,031.93 2 26,368.07 31

Page 142: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 142Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--015015--013013 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair LodgeAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Blackhawk Historical Area, Rock Island CountyCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 72 - Michael Halpin

Senate:36 - Neil Anderson : CURRENT STATUS 10-29-21 :: :

A/E Id: 28417 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: : :A/E Telephone: (309)689-9888 : :Date Selected: 10-08-19 : :Contract Date: 03-10-20 ________________________________________________________________________________Est. Project Cost: 3,139,585.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,139,585.00 07-16-21 3,139,585.00 07-16-21 2,871,985.00 112,705.00 267,600.00 .00

Total 3,139,585.00 3,139,585.00 2,871,985.00 112,705.00 267,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 8.00% Description:Description: Repair LodgeRepair Lodge

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-11-19 ( 0 ) Assgn Bid: 05-12-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-24-20 05-14-20 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-10-20 03-17-21 05-12-21 ( 56 )

Design Devel: 10-23-20 10-27-20 ( 4 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-01-21 02-04-22 ( 0 )50%: ( 0 ) Final Accept: 01-07-22 04-04-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-01-2211-01-2295-100%: 01-15-21 02-11-21 ( 27 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 20031810 ( 0 ) ( 0 ) 11-01-2211-01-22CAD Construction Inc. 22045781 09-08-21 10-21-21 04-19-22 ( 0 ) 06-18-22 ( 0 ) 06-18-2306-18-23Commercial Mechanical, Inc. 22045883 09-10-21 10-21-21 04-19-22 ( 0 ) 06-18-22 ( 0 ) 06-18-2306-18-23Midwest Asbestos Abatement C 22045988 09-10-21 10-21-21 04-19-22 ( 0 ) 06-18-22 ( 0 ) 06-18-2306-18-23Loescher Heating & Air Condi 22046084 09-10-21 10-21-21 04-19-22 ( 0 ) 06-18-22 ( 0 ) 06-18-2306-18-23Tri-City Electric Company Of 22046185 09-10-21 10-21-21 04-19-21 ( 0 ) 06-19-22 ( 0 ) 06-18-2206-18-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 20031810 10 175,300.00 20,676.00 2 195,976.00 112,705.00 4 83,271.00 58CAD Construction Inc. 22045781 81 979,450.00 .00 0 979,450.00 .00 0 979,450.00 0Commercial Mechanical, Inc. 22045883 83 1,048,000.00 .00 0 1,048,000.00 .00 0 1,048,000.00 0

Page 143: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 143Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Midwest Asbestos Abatement C 22045988 88 102,555.00 .00 0 102,555.00 .00 0 102,555.00 0Loescher Heating & Air Condi 22046084 84 280,900.00 .00 0 280,900.00 .00 0 280,900.00 0Tri-City Electric Company Of 22046185 85 265,104.00 .00 0 265,104.00 .00 0 265,104.00 0***** Contract Totals ********** Contract Totals ***** 2,851,309.00 20,676.00 2 2,871,985.00 112,705.00 4 2,759,280.00 4

Page 144: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 144Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--021021--020020 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Investigate Power Quality IssuesAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Cahokia Mounds Historic Site - St. Clair CountyCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:113 - Jay Hoffman

Senate:57 - Christopher Belt : CURRENT STATUS 11-02-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: : :A/E Telephone: (618)344-3774 : :Date Selected: 09-10-19 : :Contract Date: 01-21-20 ________________________________________________________________________________Est. Project Cost: 25,165.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 25,165.00 01-16-20 25,165.00 01-16-20 25,165.00 17,178.50 .00 .00

Total 25,165.00 25,165.00 25,165.00 17,178.50 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 92.00% Description:Description: Investigate Power Quality IssuesInvestigate Power Quality Issues

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-25-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-20 10-31-21 ( 0 )50%: ( 0 ) Final Accept: 10-31-20 12-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2108-31-21 02-28-2202-28-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 20032910 ( 0 ) ( 0 ) 02-28-2202-28-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 20032910 10 25,165.00 .00 2 25,165.00 17,178.50 4 7,986.50 68***** Contract Totals ********** Contract Totals ***** 25,165.00 .00 2 25,165.00 17,178.50 4 7,986.50 68

Page 145: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 145Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--021021--021021 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Mechanical and Electrical SystemAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Cahokia Mounds Historic Site - St. Clair CountyCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:113 - Jay Hoffman

Senate:57 - Christopher Belt : CURRENT STATUS 11-02-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: : :A/E Telephone: (618)344-3774 : :Date Selected: 11-13-19 : :Contract Date: 04-03-20 ________________________________________________________________________________Est. Project Cost: 4,739,425.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,215,870.00 08-12-20 3,215,870.00 08-12-20 314,875.00 199,560.00 2,900,995.00 .00

Total 3,215,870.00 3,215,870.00 314,875.00 199,560.00 2,900,995.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Replace Mechanical and Electrical SystemReplace Mechanical and Electrical System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-28-20 ( 0 ) Assgn Bid: 09-01-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 06-12-20 06-19-20 ( 7 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-25-21 09-15-21 (202 )

Design Devel: 06-12-20 06-19-20 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-25-22 ( 0 )50%: 09-18-20 10-16-20 ( 28 ) Final Accept: 06-25-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-23-2410-23-2495-100%: 12-15-20 05-18-21 (154 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 20013510 ( 0 ) ( 0 ) 10-23-2410-23-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 20013510 10 294,100.00 .00 0 294,100.00 178,785.00 3 115,315.00 61***** Contract Totals ********** Contract Totals ***** 294,100.00 .00 0 294,100.00 178,785.00 3 115,315.00 61

Page 146: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 146Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--021021--021021 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Mechanical and Electrical SystemAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Cahokia Mounds Historic Site - St. Clair CountyCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:113 - Jay Hoffman

Senate:57 - Christopher Belt : CURRENT STATUS 03-03-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: Ted Bergen : :A/E Telephone: (618)344-3774 : :Date Selected: : :Contract Date: 04-03-20 ________________________________________________________________________________Est. Project Cost: 4,739,425.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,215,870.00 08-12-20 3,215,870.00 08-12-20 314,875.00 199,560.00 2,900,995.00 .00

Total 3,215,870.00 3,215,870.00 314,875.00 199,560.00 2,900,995.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 50.00% Description:Description: Replacement of compressor and associatedReplacement of compressor and associated

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kane Mechanical Group LLC 21SM0284 10-28-20 11-27-20 ( 0 ) 11-27-20 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kane Mechanical Group LLC 21SM0284 84 20,775.00 .00 0 20,775.00 20,775.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 20,775.00 .00 0 20,775.00 20,775.00 1 .00 100

Page 147: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 147Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--021021--022022 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Cahokia Mounds Historic Site - St. Clair CountyCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:113 - Jay Hoffman

Senate:57 - Christopher Belt : CURRENT STATUS 11-02-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: Todd Hannah : :A/E Telephone: (217)522-3355 : :Date Selected: 05-12-20 : :Contract Date: 09-29-20 ________________________________________________________________________________Est. Project Cost: 1,531,059.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,531,059.00 09-02-21 1,531,059.00 09-02-21 1,405,662.00 46,433.00 125,397.00 .00

Total 1,531,059.00 1,531,059.00 1,405,662.00 46,433.00 125,397.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 16.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-07-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-16-20 12-09-20 ( 23 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-10-21 08-04-21 ( 55 )

Design Devel: 11-16-20 12-09-20 ( 23 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-17-22 ( 0 )50%: 01-29-21 02-17-21 ( 19 ) Final Accept: 09-19-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2311-30-2395-100%: 03-26-21 04-08-21 ( 13 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 20043110 ( 0 ) ( 0 ) 11-30-2311-30-23Kehrer Brother's West Roofin 22048881 10-01-21 09-14-21 07-11-22 ( 0 ) 09-09-22 ( 0 ) 09-09-2309-09-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 20043110 10 151,700.00 .00 0 151,700.00 46,433.00 1 105,267.00 31Kehrer Brother's West Roofin 22048881 81 1,253,962.00 .00 0 1,253,962.00 .00 0 1,253,962.00 0***** Contract Totals ********** Contract Totals ***** 1,405,662.00 .00 0 1,405,662.00 46,433.00 1 1,359,229.00 3

Page 148: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 148Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--030030--013013 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade HVAC System/Fountain RepairsAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Dana-Thomas House State Historic Site - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 29433 : :A/E Name: AltusWorks, Inc. : :A/E Contact: Scott Utter : :A/E Telephone: (773)545-1870 : :Date Selected: 06-11-13 : :Contract Date: 12-12-13 ________________________________________________________________________________Est. Project Cost: 1,089,958.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,600,823.00 09-22-21 1,600,823.00 09-22-21 1,003,402.00 96,160.34 86,556.34 510,864.66

Total 1,600,823.00 1,600,823.00 1,003,402.00 96,160.34 86,556.34 510,864.66____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Upgrade HVAC System/Fountain RepairsUpgrade HVAC System/Fountain Repairs

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-17-13 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-12-14 05-15-20 04-28-21 (348 )

Design Devel: 04-11-14 11-20-19 ( 49 ) Prime Re-Bid: 09-15-21 ( 0 )25%: ( 0 ) Subst Compl: 04-10-15 12-31-21 ( 0 )50%: ( 0 ) Final Accept: 05-08-15 01-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 04-11-1604-11-16 01-23-2301-23-2395-100%: 02-24-20 05-12-20 ( 78 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

AltusWorks, Inc. 13031910 ( 0 ) ( 0 ) 01-23-2301-23-23CAD Construction Inc. 22049281 10-06-21 10-20-21 04-18-22 ( 0 ) 06-17-22 ( 0 ) 06-17-2306-17-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

AltusWorks, Inc. 13031910 10 76,800.00 61,047.00 6 137,847.00 96,160.34 10 41,686.66 70CAD Construction Inc. 22049281 81 865,555.00 .00 0 865,555.00 .00 0 865,555.00 0***** Contract Totals ********** Contract Totals ***** 942,355.00 61,047.00 6 1,003,402.00 96,160.34 10 907,241.66 10

Page 149: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 149Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--031031--008008 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ID Indef Delivery Indef Quanity PLA: YDescription: Replace Roofing SystemsAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: David Davis Mansion State Historical Site - BloomingtonCounty: 113 - McLean ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: kara Johnston : :A/E Telephone: (217)363-3375 : :Date Selected: 07-09-19 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 388,745.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 348,327.00 06-03-21 348,327.00 06-03-21 312,000.00 110,118.89 36,327.00 .00

Total 348,327.00 348,327.00 312,000.00 110,118.89 36,327.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 70.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-06-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-16-20 04-28-21 (163 )

Design Devel: 07-30-20 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-13-21 ( 0 )50%: 08-14-20 11-10-20 ( 88 ) Final Accept: 09-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: 10-09-20 01-04-21 ( 87 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. QE20000110 ( 0 ) ( 0 ) 06-30-2206-30-22CAD Construction Inc. 21057281 06-24-21 07-12-21 11-09-21 02-17-22 ( 0 ) 03-17-22 ( 0 ) 01-08-2301-08-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. QE2000011010 .00 .00 0 .00 .00 0 .00 100CAD Construction Inc. 21057281 81 312,000.00 .00 0 312,000.00 110,118.89 2 201,881.11 35***** Contract Totals ********** Contract Totals ***** 312,000.00 .00 0 312,000.00 110,118.89 2 201,881.11 35

Page 150: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 150Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--140140--003003 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Visitor Center/Building SystemsAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Lewis & Clark State Historic Site - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-08-21 :: :

A/E Id: 16668 : :A/E Name: Evan Lloyd Associates, Inc. : :A/E Contact: : :A/E Telephone: (217)789-7011 : :Date Selected: 11-13-19 : :Contract Date: 04-28-20 ________________________________________________________________________________Est. Project Cost: 1,261,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 801,000.00 11-18-19 801,000.00 11-18-19 30,540.00 30,540.00 770,460.00 .00

Total 801,000.00 801,000.00 30,540.00 30,540.00 770,460.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Renovate Visitor Center/Building SystemsRenovate Visitor Center/Building Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-15-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 07-27-20 08-06-20 ( 10 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-27-20 08-12-20 ( 16 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Evan Lloyd Associates, Inc. 20041510 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Evan Lloyd Associates, Inc. 20041510 10 30,540.00 .00 0 30,540.00 30,540.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 30,540.00 .00 0 30,540.00 30,540.00 1 .00 100

Page 151: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 151Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--141141--013013 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing Systems on the Visitor'sAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Lincoln Log Cabin Historic Site - Coles CountyCounty: 29 - Coles ________________________________________________________________________________Leg. Districts: House:110 - Chris Miller

Senate:55 - Darren Bailey : CURRENT STATUS 11-02-21 :: :

A/E Id: 28276 : :A/E Name: The Upchurch Group, Inc. : :A/E Contact: Andrew Ewing : :A/E Telephone: (217)235-3177 : :Date Selected: 03-10-20 : :Contract Date: 05-22-20 ________________________________________________________________________________Est. Project Cost: 473,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 473,500.00 06-07-21 473,500.00 06-07-21 434,400.00 235,673.07 39,100.00 .00

Total 473,500.00 473,500.00 434,400.00 235,673.07 39,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 60.00% Description:Description: Replace Roofing Systems on the Visitor'sReplace Roofing Systems on the Visitor's

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-13-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-16-20 03-31-21 (135 )

Design Devel: 07-06-20 08-07-20 ( 32 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-05-21 ( 0 )50%: ( 0 ) Final Accept: 03-05-21 ( 0 )75%: ( 0 ) A/E Cont End: 02-28-2202-28-2295-100%: 09-28-20 11-24-20 ( 57 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

The Upchurch Group, Inc. 20003410 ( 0 ) ( 0 ) 02-28-2202-28-22CAD Construction Inc. 21057481 06-24-21 08-25-21 11-17-21 ( 0 ) 12-17-21 ( 0 ) 12-17-2212-17-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

The Upchurch Group, Inc. 20003410 10 43,400.00 .00 0 43,400.00 31,305.02 4 12,094.98 72CAD Construction Inc. 21057481 81 391,000.00 .00 0 391,000.00 204,368.05 2 186,631.95 52***** Contract Totals ********** Contract Totals ***** 434,400.00 .00 0 434,400.00 235,673.07 6 198,726.93 54

Page 152: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 152Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--144144--038038 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Lincoln's New Salem Historic Site - Menard CountyCounty: 129 - Menard ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-03-21 :: :

A/E Id: 27519 : :A/E Name: John Shafer & Associates, Inc. : :A/E Contact: John Shafer : :A/E Telephone: (217)744-9036 : :Date Selected: 05-12-20 : :Contract Date: 09-11-20 ________________________________________________________________________________Est. Project Cost: 548,220.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 548,220.00 09-22-21 548,220.00 09-22-21 56,520.00 36,321.78 491,700.00 .00

Total 548,220.00 548,220.00 56,520.00 36,321.78 491,700.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.50% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-25-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-28-20 11-04-20 ( 7 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-03-21 07-21-21 ( 48 )

Design Devel: 10-28-20 11-04-20 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-28-22 ( 0 )50%: 01-15-21 01-04-21 ( 11-) Final Accept: 05-02-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-16-2311-16-2395-100%: 03-29-21 04-15-21 ( 17 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

John Shafer & Associates, In 20043210 ( 0 ) ( 0 ) 11-16-2311-16-23Premier Contractors,Inc. 22050581 11-02-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

John Shafer & Associates, In 20043210 10 56,520.00 .00 0 56,520.00 36,321.78 3 20,198.22 64Premier Contractors,Inc. 22050581 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 56,520.00 .00 0 56,520.00 36,321.78 3 20,198.22 64

Page 153: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 153Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--144144--039039 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Demolish and Construct BuildingAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Lincoln's New Salem Historic Site - Menard CountyCounty: 129 - Menard ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-03-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: : :A/E Telephone: (217)363-3375 : :Date Selected: 03-09-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

884 300,000.00 10-03-21 300,000.00 10-03-21 .00 .00 300,000.00 .00

Total 300,000.00 300,000.00 .00 .00 300,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 4.00% Description:Description: Demolish and Construct BuildingDemolish and Construct Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-13-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 22030410 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 22030410 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 154: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 154Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--145145--021021 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Masonry, Roofing and Site RepairAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Lincoln's Tomb Historic Site - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: : :A/E Telephone: (217)363-3375 : :Date Selected: 10-08-19 : :Contract Date: 01-27-20 ________________________________________________________________________________Est. Project Cost: 715,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 450,000.00 10-15-19 450,000.00 10-15-19 83,740.00 55,814.75 366,260.00 .00

Total 450,000.00 450,000.00 83,740.00 55,814.75 366,260.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Replace Masonry, Roofing and Site RepairReplace Masonry, Roofing and Site Repair

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-19-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-09-20 08-03-20 (147 ) Prime Bid: 08-24-20 05-05-21 ( 0 )

Design Devel: 05-11-20 06-04-21 (389 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-28-21 11-05-21 ( 0 )50%: ( 0 ) Final Accept: 03-30-21 12-06-21 ( 0 )75%: ( 0 ) A/E Cont End: 02-28-2202-28-22 11-05-2211-05-2295-100%: 03-01-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 2001510 ( 0 ) ( 0 ) 11-05-2211-05-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 2001510 10 70,598.00 13,142.00 1 83,740.00 55,814.75 4 27,925.25 67***** Contract Totals ********** Contract Totals ***** 70,598.00 13,142.00 1 83,740.00 55,814.75 4 27,925.25 67

Page 155: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 155Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--148148--008008 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate the Tinsley ShopAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Lincoln-Herndon Law Office - SpringfieldCounty: 167 - Sangamon Executive Director Project TrackingExecutive Director Project Tracking________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 30379 : :A/E Name: Melotte Morse Leonatti Parker : :A/E Contact: David Leonatti : :A/E Telephone: (217)789-9515 : :Date Selected: 01-08-13 : :Contract Date: 05-14-13 ________________________________________________________________________________Est. Project Cost: 5,459,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,115,377.00 06-08-21 1,065,377.00 06-08-21 149,650.00 84,273.00 .00 915,727.00990 .00 07-01-18 .00 .00 .00 .00 .00

Total 2,115,377.00 1,065,377.00 149,650.00 84,273.00 .00 915,727.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 10.00% Description:Description: Renovate the Tinsley ShopRenovate the Tinsley Shop

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-27-13 ( 0 ) Assgn Bid: 11-06-14 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 07-09-13 07-15-13 ( 6 ) Assgn Re-Bid: 11-06-14 ( 0 )CORC Assessment Amt: .00 Schem Design: 07-09-13 07-15-13 ( 6 ) Prime Bid: 06-17-14 08-21-14 ( 0 )

Design Devel: 10-01-13 10-10-13 ( 9 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-09-15 ( 0 )50%: 01-03-14 01-21-13 (347-) Final Accept: 11-04-15 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-1712-01-17 03-01-2303-01-2395-100%: 06-17-14 09-23-14 ( 98 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Melotte Morse Leonatti Parke 13022010 ( 0 ) ( 0 ) 03-01-2303-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Melotte Morse Leonatti Parke 13022010 10 137,350.00 12,300.00 4 149,650.00 84,273.00 6 65,377.00 56***** Contract Totals ********** Contract Totals ***** 137,350.00 12,300.00 4 149,650.00 84,273.00 6 65,377.00 56

Page 156: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 156Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--210210--006006 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Restore Roof AssemblyAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Pierre Menard Home Historic Site - Ellis GroveCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-01-21 :: :

A/E Id: 21616 : :A/E Name: Charles Joseph Pell Architects : :A/E Contact: Charles Pell : :A/E Telephone: (217)544-5444 : :Date Selected: 06-11-19 : :Contract Date: 10-03-19 ________________________________________________________________________________Est. Project Cost: 587,058.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 587,058.00 05-26-21 587,058.00 05-26-21 538,757.00 34,209.94 48,301.00 .00

Total 587,058.00 587,058.00 538,757.00 34,209.94 48,301.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Restore Roof AssemblyRestore Roof Assembly

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-28-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-06-20 03-05-20 ( 59 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-06-20 03-05-20 ( 59 ) Prime Bid: 07-09-20 04-14-21 (279 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-21 ( 0 )50%: 03-20-20 05-22-20 ( 63 ) Final Accept: 08-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2206-01-2295-100%: 05-29-20 01-04-21 (220 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Charles Joseph Pell Architec 20030610 ( 0 ) ( 0 ) 06-01-2206-01-22R & W Builders, Inc. 21057881 07-09-21 08-03-21 12-01-21 ( 0 ) 12-31-21 ( 0 ) 12-31-2212-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Charles Joseph Pell Architec 20030610 10 61,250.00 .00 0 61,250.00 34,209.94 5 27,040.06 56R & W Builders, Inc. 21057881 81 477,507.00 .00 0 477,507.00 .00 0 477,507.00 0***** Contract Totals ********** Contract Totals ***** 538,757.00 .00 0 538,757.00 34,209.94 5 504,547.06 6

Page 157: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 157Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--212212--011011 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Final Stabilization & Begin Restoration-Agency: Department of Natural Resources/HPA Analyst: Amber EvansLocation: Pullman Factory Historic Site - ChicagoCounty: 31 - Cook DedicationDedication________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 06-28-19 :: :

A/E Id: 28352 : :A/E Name: McGuire Igleski & Associates, : :A/E Contact: Amy Gauen : :A/E Telephone: (847)328-5679 : :Date Selected: 10-13-05 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 995,270.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 80,422.15 08-10-11 80,422.15 08-10-11 80,422.15 80,422.15 .00 .00141 1,092,432.86 05-11-15 1,092,432.86 05-11-15 865,165.57 865,165.57 .00 227,267.29170 .00 02-24-12 .00 08-31-11 .00 .00 .00 .00971 1,407,559.45 10-22-18 1,407,559.45 10-22-18 780,889.40 737,285.39 26,670.05 600,000.00990 1,985,071.22 05-29-14 1,985,071.22 08-29-14 1,985,071.22 1,985,071.22 .00 .00

Total 4,565,485.68 4,565,485.68 3,711,548.34 3,667,944.33 26,670.05 827,267.29____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 99.00% Description:Description: Final Stabilization & Begin RestorationFinal Stabilization & Begin Restoration

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-07-05 ( 0 ) Assgn Bid: 06-01-11 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-18-07 10-01-07 (136 ) Assgn Re-Bid: 06-22-11 ( 0 )CORC Assessment Amt: 738.12 Schem Design: 05-18-07 10-01-07 (136 ) Prime Bid: 08-25-09 07-29-10 06-29-11 (335 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-16-10 04-30-13 ( 0 )50%: ( 0 ) Final Accept: 10-14-10 04-30-14 ( 0 )75%: 05-01-09 05-04-09 ( 3 ) A/E Cont End: 06-30-1106-30-11 12-31-1512-31-1595-100%: 05-14-10 01-05-11 (236 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

McGuire Igleski & Associates 56002210 ( 0 ) ( 0 ) 12-31-1512-31-15McGuire Igleski & Associates 17021110 ( 0 ) ( 0 )Path Construction Company, I 12040981 09-27-11 11-03-11 06-30-12 08-31-13 04-07-14 (646 ) 09-30-13 07-09-14 (282 ) 09-30-1409-30-14Calumet City Plumbing and He 12041082 09-27-11 11-03-11 06-30-12 08-31-13 12-05-13 (523 ) 09-30-13 02-06-14 (129 ) 09-30-1409-30-14Ideal Heating Company 12041183 09-27-11 11-03-11 06-30-12 08-31-13 12-05-13 (523 ) 09-30-13 02-06-14 (129 ) 09-30-1409-30-14Amber Mechanical Contractors 12041284 09-27-11 11-03-11 06-30-12 08-31-13 12-05-13 (523 ) 09-30-13 02-06-14 (129 ) 09-30-1409-30-14Airport Electric Co. 12041385 09-27-11 11-03-11 06-30-12 08-31-13 02-06-14 (586 ) 09-30-13 02-06-14 (129 ) 09-30-1409-30-14Nelson Fire Protection Co. 12041482 09-27-11 11-03-11 06-30-12 08-31-13 12-05-13 (523 ) 09-30-13 02-06-14 (129 ) 09-30-1409-30-14

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

McGuire Igleski & Associates 56002210 10 133,162.00 393,242.29 10 526,404.29 526,404.29 37 .00 100

Page 158: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 158Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

McGuire Igleski & Associates 17021110 10 52,868.00 22,191.00 7 75,059.00 31,454.99 5 43,604.01 42Capital Development Board Ho CHER 40 600,000.00 600,000.00- 0 .00 .00 0 .00 100Telecommunications Revolving TELECOM 50 176.00 4,258.82 0 4,434.82 4,434.82 25 .00 100Authorization DUMMY 80 600,000.00 600,000.00- 0 .00 .00 0 .00 100McGuire Igleski & Associates INT8740 00 58.04 .00 0 58.04 58.04 1 .00 100McGuire Igleski & Associates INT3866 00 40.53 .00 0 40.53 40.53 1 .00 100Calumet City Plumbing and He INT4046 00 .00 .00 0 .00 .00 0 .00 100Path Construction Company, I INT4050 00 43.76 .00 0 43.76 43.76 1 .00 100Chicago Heights Construction INT7162 00 2,729.26 .00 0 2,729.26 2,729.26 1 .00 100Path Construction Company, I 12040981 81 1,756,300.00 208,212.33 15 1,964,512.33 1,964,512.33 31 .00 100Calumet City Plumbing and He 12041082 82 146,390.00 17,678.30 6 164,068.30 164,068.30 18 .00 100Ideal Heating Company 12041183 83 132,888.00 2,185.28 4 135,073.28 135,073.28 13 .00 100Amber Mechanical Contractors 12041284 84 174,888.00 .00 3 174,888.00 174,888.00 12 .00 100Airport Electric Co. 12041385 85 273,890.00 35,491.62 9 309,381.62 309,381.62 20 .00 100Nelson Fire Protection Co. 12041482 82 84,583.00 19,733.42 8 104,316.42 104,316.42 13 .00 100***** Contract Totals ********** Contract Totals ***** 3,958,016.59 497,006.94- 62 3,461,009.65 3,417,405.64 178 43,604.01 99

Page 159: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 159Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--212212--011011 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Final Stabilization & Begin Restoration-Agency: Department of Natural Resources/HPA Analyst: Amber EvansLocation: Pullman Factory Historic Site - ChicagoCounty: 31 - Cook DedicationDedication________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 06-30-20 :: :

A/E Id: 28352 : :A/E Name: McGuire Igleski & Associates, : :A/E Contact: Amy Gauen : :A/E Telephone: (847)328-5679 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 995,270.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 80,422.15 08-10-11 80,422.15 08-10-11 80,422.15 80,422.15 .00 .00141 1,092,432.86 05-11-15 1,092,432.86 05-11-15 865,165.57 865,165.57 .00 227,267.29170 .00 02-24-12 .00 08-31-11 .00 .00 .00 .00971 1,407,559.45 10-22-18 1,407,559.45 10-22-18 780,889.40 737,285.39 26,670.05 600,000.00990 1,985,071.22 05-29-14 1,985,071.22 08-29-14 1,985,071.22 1,985,071.22 .00 .00

Total 4,565,485.68 4,565,485.68 3,711,548.34 3,667,944.33 26,670.05 827,267.29____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (X ) 100.00% Description:Description: Finalize Stabilization & Begin RestoratiFinalize Stabilization & Begin Restorati

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 738.12 Schem Design: ( 0 ) Prime Bid: 11-13-14 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: 03-27-14 ( 0 ) A/E Cont End:95-100%: 10-06-14 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Chicago Heights Construction 15053481 01-06-15 02-06-15 04-17-15 05-30-18 03-12-19 (425 ) 06-15-18 03-10-20 (634 ) 05-30-2005-30-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Chicago Heights Construction 15053481 81 204,000.00 46,538.69 11 250,538.69 250,538.69 7 .00 100***** Contract Totals ********** Contract Totals ***** 204,000.00 46,538.69 11 250,538.69 250,538.69 7 .00 100

Page 160: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 160Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--212212--011011 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Final Stabilization & Begin Restoration-Agency: Department of Natural Resources/HPA Analyst: Amber EvansLocation: Pullman Factory Historic Site - ChicagoCounty: 31 - Cook DedicationDedication________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 09-30-21 :: :

A/E Id: 28352 : :A/E Name: McGuire Igleski & Associates, : :A/E Contact: : :A/E Telephone: (847)328-5679 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 995,270.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 80,422.15 08-10-11 80,422.15 08-10-11 80,422.15 80,422.15 .00 .00141 1,092,432.86 05-11-15 1,092,432.86 05-11-15 865,165.57 865,165.57 .00 227,267.29170 .00 02-24-12 .00 08-31-11 .00 .00 .00 .00971 1,407,559.45 10-22-18 1,407,559.45 10-22-18 780,889.40 737,285.39 26,670.05 600,000.00990 1,985,071.22 05-29-14 1,985,071.22 08-29-14 1,985,071.22 1,985,071.22 .00 .00

Total 4,565,485.68 4,565,485.68 3,711,548.34 3,667,944.33 26,670.05 827,267.29____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 33 (D ) 95.00% Description:Description: BlankBlank

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 738.12 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: 04-05-19 ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 161: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 161Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--212212--017017 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Renovate North Factory BuildingAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Pullman Factory Historic Site - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 10-07-21 :: :

A/E Id: 22186 : :A/E Name: Johnson Lasky Kindelin Archite : :A/E Contact: Meg Kindelin : :A/E Telephone: (312)357-1221 : :Date Selected: 01-15-19 : :Contract Date: 05-02-19 ________________________________________________________________________________Est. Project Cost: 1,600,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

962 700,000.00 06-18-19 700,000.00 06-18-19 .00 .00 700,000.00 .00971 900,000.00 10-22-18 900,000.00 10-22-18 164,330.00 86,330.00 735,670.00 .00

Total 1,600,000.00 1,600,000.00 164,330.00 86,330.00 1,435,670.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 96.00% Description:Description: Renovate North Factory BuildingRenovate North Factory Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-22-19 08-23-19 ( 32 ) Prime Bid: 04-06-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-15-21 ( 0 )50%: ( 0 ) Final Accept: 12-01-21 ( 0 )75%: 10-27-20 11-10-20 ( 14 ) A/E Cont End: 12-21-2112-21-2195-100%: 01-12-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Johnson Lasky Kindelin Archi 19022110 ( 0 ) ( 0 ) 12-21-2112-21-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Johnson Lasky Kindelin Archi 19022110 10 39,140.00 125,190.00 1 164,330.00 86,330.00 2 78,000.00 53***** Contract Totals ********** Contract Totals ***** 39,140.00 125,190.00 1 164,330.00 86,330.00 2 78,000.00 53

Page 162: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 162Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--600600--017017 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Exterior Repairs/Restore DrumAgency: Department of Natural Resources/HPA Analyst: Amber EvansLocation: Old State Capitol - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 29212 : :A/E Name: Ferry & Associates Architects, : :A/E Contact: Bruce Ferry : :A/E Telephone: (217)522-4100 : :Date Selected: 10-26-12 : :Contract Date: 02-14-13 ________________________________________________________________________________Est. Project Cost: 2,206,755.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,476,200.00 03-23-21 2,476,200.00 03-23-21 1,740,902.74 941,083.23 172,751.80 562,545.46

Total 2,476,200.00 2,476,200.00 1,740,902.74 941,083.23 172,751.80 562,545.46____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Exterior Repairs/Restore DrumExterior Repairs/Restore Drum

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-04-12 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 06-07-13 07-01-13 ( 24 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-07-13 07-01-13 ( 24 ) Prime Bid: 04-24-14 06-26-14 ( 63 )

Design Devel: 11-01-13 11-06-13 ( 5 ) Prime Re-Bid: 06-26-14 ( 0 )25%: ( 0 ) Subst Compl: 01-12-15 07-17-21 ( 0 )50%: 12-13-13 12-16-13 ( 3 ) Final Accept: 02-12-15 08-17-21 ( 0 )75%: ( 0 ) A/E Cont End: 01-12-1601-12-16 01-31-2201-31-2295-100%: 02-07-14 06-05-19 (944 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ferry & Associates Architect 13030910 ( 0 ) ( 0 ) 01-31-2201-31-22R.D. Lawrence Construction C 20050181 06-10-20 07-22-20 07-17-21 12-15-21 ( 0 ) 02-15-22 ( 0 ) 09-15-2209-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ferry & Associates Architect 13030910 10 18,900.00 175,218.00 10 194,118.00 169,944.39 14 24,173.61 88R.D. Lawrence Construction C 20050181 81 1,449,177.00 97,607.74 5 1,546,784.74 771,138.84 6 775,645.90 50***** Contract Totals ********** Contract Totals ***** 1,468,077.00 272,825.74 15 1,740,902.74 941,083.23 20 799,819.51 54

Page 163: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 163Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 104104--600600--018018 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Restore Interior and Exterior and UpgradAgency: Department of Natural Resources/HPA Analyst: Michelette ThompsonLocation: Old State Capitol - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 31754 : :A/E Name: Trivers Associates, Inc. : :A/E Contact: : :A/E Telephone: (618)451-2900 : :Date Selected: 05-14-19 : :Contract Date: 11-19-19 ________________________________________________________________________________Est. Project Cost: 15,187,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 15,187,200.00 03-23-21 15,187,200.00 03-23-21 1,031,696.00 581,947.30 14,155,504.00 .00

Total 15,187,200.00 15,187,200.00 1,031,696.00 581,947.30 14,155,504.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 90.00% Description:Description: Restore Interior and Exterior and UpgradRestore Interior and Exterior and Upgrad

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-26-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 02-06-20 02-07-20 ( 1 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-02-20 10-06-20 ( 4 ) Prime Bid: 03-04-21 10-30-21 ( 0 )

Design Devel: 10-02-20 10-07-20 ( 5 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-03-22 08-24-22 ( 0 )50%: 05-12-21 05-09-21 ( 3-) Final Accept: 07-02-22 10-26-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2307-01-23 10-27-2310-27-2395-100%: 08-12-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Trivers Associates, Inc. 20010510 ( 0 ) ( 0 ) 10-27-2310-27-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Trivers Associates, Inc. 20010510 10 804,936.00 226,760.00 4 1,031,696.00 581,947.30 9 449,748.70 57***** Contract Totals ********** Contract Totals ***** 804,936.00 226,760.00 4 1,031,696.00 581,947.30 9 449,748.70 57

Page 164: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 164Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--059059 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Design and Construct Residential TreatmeAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 17350 : :A/E Name: Primera Engineers, Ltd. : :A/E Contact: Lourdes Gonzalez : :A/E Telephone: (312)606-0910 : :Date Selected: 10-14-14 : :Contract Date: 12-18-14 ________________________________________________________________________________Est. Project Cost: 6,715,207.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,715,207.00 12-06-18 6,715,207.00 12-06-18 6,598,082.82 6,509,230.06 117,124.18 .00

Total 6,715,207.00 6,715,207.00 6,598,082.82 6,509,230.06 117,124.18 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.99% Description:Description: Design and Construct Residential TreatmeDesign and Construct Residential Treatme

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-20-14 ( 0 ) Assgn Bid: 08-19-15 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-30-15 02-04-15 ( 5 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-30-15 02-04-15 ( 5 ) Prime Bid: 05-12-15 08-26-15 04-13-17 (596 )

Design Devel: ( 0 ) Prime Re-Bid: 06-15-17 ( 0 )25%: ( 0 ) Subst Compl: 10-12-15 10-01-18 ( 0 )50%: ( 0 ) Final Accept: 11-12-15 11-01-18 ( 0 )75%: ( 0 ) A/E Cont End: 10-12-1610-12-16 04-12-2204-12-2295-100%: 03-13-15 01-23-17 (682 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Primera Engineers, Ltd. 15010410 ( 0 ) ( 0 ) 04-12-2204-12-22Vissering Construction Compa 18041081 08-11-17 09-12-17 03-11-18 01-11-19 ( 0 ) 11-01-19 ( 0 ) 01-11-2201-11-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Primera Engineers, Ltd. 15010410 10 355,300.00 261,550.00 12 616,850.00 585,688.21 9 31,161.79 95Vissering Construction Compa 18041081 81 5,450,000.00 531,232.82 29 5,981,232.82 5,923,541.85 23 57,690.97 99***** Contract Totals ********** Contract Totals ***** 5,805,300.00 792,782.82 41 6,598,082.82 6,509,230.06 32 88,852.76 99

Page 165: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 165Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--062062 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: DB Design Build PLA: NDescription: Construct New In-Patient Treatment CenteAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 29405 : :A/E Name: Hellmuth, Obata & Kassabaum, I : :A/E Contact: Jeff Goodale : :A/E Telephone: (312)782-1000 : :Date Selected: 08-16-17 : :Contract Date: 11-30-17 ________________________________________________________________________________Est. Project Cost: 174,436,847.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 174,436,847.00 03-09-21 174,436,847.00 03-09-21 174,215,012.81 162,957,849.15 221,834.19 .00

Total 174,436,847.00 174,436,847.00 174,215,012.81 162,957,849.15 221,834.19 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 99.00% Description:Description: Construct New In-Patient Treatment CenteConstruct New In-Patient Treatment Cente

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-19-17 10-19-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-19-18 05-04-18 (105 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-23-18 05-04-18 ( 42 ) Prime Bid: ( 0 )

Design Devel: 06-08-18 06-18-18 ( 10 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 07-16-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hellmuth, Obata & Kassabaum, 18020710 ( 0 ) ( 0 ) 12-31-2212-31-22Sebesta, Inc. 18021110 ( 0 ) ( 0 ) 12-31-2212-31-22Hellmuth, Obata & Kassabaum, 6705 ( 0 ) ( 0 )River City Construction, L.L 19DB0141 12-27-18 01-24-19 07-27-21 09-09-21 ( 44 ) 10-25-21 ( 0 ) 10-25-2210-25-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hellmuth, Obata & Kassabaum, 18020710 10 2,890,560.00 145,310.00 3 3,035,870.00 2,892,318.82 14 143,551.18 95Sebesta, Inc. 18021110 10 983,679.00 .00 0 983,679.00 541,395.20 3 442,283.80 55Hellmuth, Obata & Kassabaum, 6705 11 9,340.00 .00 0 9,340.00 9,340.00 1 .00 100BNP Media II LLC 6822 40 2,250.00 .00 0 2,250.00 2,250.00 1 .00 100Commonwealth Edison Co 6550 50 2,857.75 .00 0 2,857.75 2,857.75 1 .00 100

Page 166: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 166Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Commonwealth Edison Co 6550A 50 329,999.76 .00 0 329,999.76 329,999.76 1 .00 100C D B - Fiscal FF&E DUMMY70 9,000,000.00 71,249.59- 0 8,928,750.41 .00 0 8,928,750.41 0W W Grainger 7234 70 7,949.70 .00 0 7,949.70 7,949.70 2 .00 100Fitness For All, Inc. 7253 70 10,340.00 .00 0 10,340.00 10,340.00 1 .00 100W W Grainger 7256 70 52,959.89 .00 0 52,959.89 .00 2 52,959.89 0River City Construction, L.L 19DB0141 41 159,233,000.00 1,617,166.30 19 160,850,166.30 159,160,547.92 60 1,689,618.38 99***** Contract Totals ********** Contract Totals ***** 172,522,936.10 1,691,226.71 22 174,214,162.81 162,956,999.15 86 11,257,163.66 94

Page 167: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 167Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--065065 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: LS Lump Sum PLA: NDescription: Statewide for Fiber InstallationAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 25,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 25,000,000.00 07-01-19 16,707,000.00 10-13-21 1,893,067.34 1,893,066.88 14,813,932.66 .00

Total 25,000,000.00 16,707,000.00 1,893,067.34 1,893,066.88 14,813,932.66 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Statewide for Fiber InstallationStatewide for Fiber Installation

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 168: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 168Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--067067 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Provide Medical Office Space at VariousAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-10-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 06-09-20 : :Contract Date: 08-07-20 ________________________________________________________________________________Est. Project Cost: 3,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,000,000.00 06-15-20 3,000,000.00 06-15-20 562,431.00 195,784.26 2,437,569.00 .00

Total 3,000,000.00 3,000,000.00 562,431.00 195,784.26 2,437,569.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Provide Medical Office Space at VariousProvide Medical Office Space at Various

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-07-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 08-24-20 09-08-20 ( 15 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-24-20 09-10-20 ( 17 ) Prime Bid: 10-16-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-15-21 ( 0 )50%: ( 0 ) Final Accept: 08-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2508-31-2595-100%: 09-14-20 10-01-20 ( 17 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 21010110 ( 0 ) ( 0 ) 08-31-2508-31-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 21010110 10 562,431.00 .00 0 562,431.00 195,784.26 1 366,646.74 35***** Contract Totals ********** Contract Totals ***** 562,431.00 .00 0 562,431.00 195,784.26 1 366,646.74 35

Page 169: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 169Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--067067 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Provide Medical Office Space at VariousAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: : :Contract Date: 08-07-20 ________________________________________________________________________________Est. Project Cost: 3,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,000,000.00 06-15-20 3,000,000.00 06-15-20 562,431.00 195,784.26 2,437,569.00 .00

Total 3,000,000.00 3,000,000.00 562,431.00 195,784.26 2,437,569.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (B ) .00% Description:Description: Provide Permanent Medical Office Space aProvide Permanent Medical Office Space a

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-02-20 03-04-21 (122 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-02-20 03-04-21 (122 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 170: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 170Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--068068 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Provide Medical Office Space at VariousAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-08-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 06-09-20 : :Contract Date: 08-07-20 ________________________________________________________________________________Est. Project Cost: 4,195,355.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,195,355.00 11-10-21 4,195,355.00 11-10-21 563,815.00 303,681.54 3,631,540.00 .00

Total 4,195,355.00 4,195,355.00 563,815.00 303,681.54 3,631,540.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Provide Medical Office Space at VariousProvide Medical Office Space at Various

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-07-20 ( 0 ) Assgn Bid: 09-29-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 08-24-20 09-03-20 ( 10 ) Assgn Re-Bid: 08-04-21 ( 0 )CORC Assessment Amt: .00 Schem Design: 08-24-20 09-08-20 ( 15 ) Prime Bid: 10-16-20 12-09-20 ( 54 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-15-21 ( 0 )50%: ( 0 ) Final Accept: 08-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2508-31-2595-100%: 09-14-20 09-22-20 ( 8 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 21010210 ( 0 ) ( 0 ) 08-31-2508-31-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 21010210 10 563,815.00 .00 0 563,815.00 303,681.54 3 260,133.46 54***** Contract Totals ********** Contract Totals ***** 563,815.00 .00 0 563,815.00 303,681.54 3 260,133.46 54

Page 171: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 171Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--068068 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Provide Medical Office Space at VariousAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-20-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: : :Contract Date: 08-07-20 ________________________________________________________________________________Est. Project Cost: 4,195,355.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,195,355.00 11-10-21 4,195,355.00 11-10-21 563,815.00 303,681.54 3,631,540.00 .00

Total 4,195,355.00 4,195,355.00 563,815.00 303,681.54 3,631,540.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 20.00% Description:Description: Provide Permanent Medical Office space aProvide Permanent Medical Office space a

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-22-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 172: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 172Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--069069 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Provide Dental Care Room Upgrades and CrAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-08-21 :: :

A/E Id: 30193 : :A/E Name: Marcum Engineering, LLC : :A/E Contact: : :A/E Telephone: (618)997-9190 : :Date Selected: 09-15-20 : :Contract Date: 01-12-21 ________________________________________________________________________________Est. Project Cost: 34,050.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 34,050.00 01-11-21 34,050.00 01-11-21 34,050.00 33,000.00 .00 .00

Total 34,050.00 34,050.00 34,050.00 33,000.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Provide Dental Care Room Upgrades and CrProvide Dental Care Room Upgrades and Cr

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-14-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 07-30-2207-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Marcum Engineering, LLC 21041010 ( 0 ) ( 0 ) 07-30-2207-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Marcum Engineering, LLC 21041010 10 34,050.00 .00 0 34,050.00 33,000.00 1 1,050.00 97***** Contract Totals ********** Contract Totals ***** 34,050.00 .00 0 34,050.00 33,000.00 1 1,050.00 97

Page 173: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 173Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--070070 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Provide Dental Care Room Upgrades and CrAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 16848 : :A/E Name: Clark Dietz, Inc. : :A/E Contact: Nirav Patel : :A/E Telephone: (217)373-8900 : :Date Selected: 09-15-20 : :Contract Date: 11-16-20 ________________________________________________________________________________Est. Project Cost: 23,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 23,200.00 10-15-20 23,200.00 10-15-20 23,200.00 22,900.00 .00 .00

Total 23,200.00 23,200.00 23,200.00 22,900.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Provide Dental Care Room Upgrades and CrProvide Dental Care Room Upgrades and Cr

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-29-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Clark Dietz, Inc. 21011310 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Clark Dietz, Inc. 21011310 10 23,200.00 .00 0 23,200.00 22,900.00 3 300.00 99***** Contract Totals ********** Contract Totals ***** 23,200.00 .00 0 23,200.00 22,900.00 3 300.00 99

Page 174: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 174Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--071071 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Provide Dental Care Room Upgrades and CrAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-29-21 :: :

A/E Id: 29102 : :A/E Name: Milhouse Engineering and Const : :A/E Contact: : :A/E Telephone: (312)987-0061 : :Date Selected: 09-15-20 : :Contract Date: 11-10-20 ________________________________________________________________________________Est. Project Cost: 48,233.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 48,233.00 11-04-20 48,233.00 11-04-20 48,233.00 .00 .00 .00

Total 48,233.00 48,233.00 48,233.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Provide Dental Care Room Upgrades and CrProvide Dental Care Room Upgrades and Cr

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-01-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 12-30-20 07-07-21 (189 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2312-01-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Milhouse Engineering and Con 21020510 ( 0 ) ( 0 ) 12-01-2312-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Milhouse Engineering and Con 21020510 10 48,233.00 .00 0 48,233.00 .00 0 48,233.00 0***** Contract Totals ********** Contract Totals ***** 48,233.00 .00 0 48,233.00 .00 0 48,233.00 0

Page 175: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 175Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--000000--072072 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Provide Dental Care Room Upgrades and CrAgency: Department of Corrections Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-04-21 :: :

A/E Id: 29455 : :A/E Name: Berners-Schober Associates Inc : :A/E Contact: : :A/E Telephone: (920)432-4865 : :Date Selected: 09-15-20 : :Contract Date: 03-25-21 ________________________________________________________________________________Est. Project Cost: 16,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 16,000.00 02-17-21 16,000.00 02-17-21 16,000.00 11,590.80 .00 .00

Total 16,000.00 16,000.00 16,000.00 11,590.80 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Provide Dental Care Room Upgrades and CrProvide Dental Care Room Upgrades and Cr

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-10-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-04-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 07-29-2207-29-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Berners-Schober Associates I 21030810 ( 0 ) ( 0 ) 07-29-2207-29-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Berners-Schober Associates I 21030810 10 16,000.00 .00 0 16,000.00 11,590.80 1 4,409.20 73***** Contract Totals ********** Contract Totals ***** 16,000.00 .00 0 16,000.00 11,590.80 1 4,409.20 73

Page 176: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 176Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--007007--016016 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Dietary EquipmentAgency: Department of Corrections Analyst: Amber EvansLocation: Western Illinois Correctional Center - Mount Sterling, BrownCounty: 9 - Brown ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 1472 : :A/E Name: Sarti Architectural Group, Inc : :A/E Contact: Dan Ernst : :A/E Telephone: (217)585-9111 : :Date Selected: 03-12-19 : :Contract Date: 11-25-19 ________________________________________________________________________________Est. Project Cost: 1,220,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 635,000.00 03-19-19 635,000.00 03-19-19 75,200.00 41,532.40 559,800.00 .00

Total 635,000.00 635,000.00 75,200.00 41,532.40 559,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 70.00% Description:Description: Upgrade Dietary EquipmentUpgrade Dietary Equipment

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-07-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-20-20 04-17-20 ( 28 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-27-20 ( 0 )

Design Devel: 03-20-20 04-23-20 ( 34 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-05-21 ( 0 )50%: ( 0 ) Final Accept: 05-07-21 ( 0 )75%: ( 0 ) A/E Cont End: 03-04-2203-04-2295-100%: 06-12-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Sarti Architectural Group, I 19031710 ( 0 ) ( 0 ) 03-04-2203-04-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sarti Architectural Group, I 19031710 10 75,200.00 .00 0 75,200.00 41,532.40 2 33,667.60 55***** Contract Totals ********** Contract Totals ***** 75,200.00 .00 0 75,200.00 41,532.40 2 33,667.60 55

Page 177: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 177Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--007007--017017 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Fire Alarm and Lock ControlsAgency: Department of Corrections Analyst: Amber EvansLocation: Western Illinois Correctional Center - Mount Sterling, BrownCounty: 9 - Brown ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 10-26-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 05-14-19 : :Contract Date: 12-12-19 ________________________________________________________________________________Est. Project Cost: 4,661,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,661,600.00 05-16-19 4,661,600.00 05-16-19 353,400.00 250,440.00 4,308,200.00 .00

Total 4,661,600.00 4,661,600.00 353,400.00 250,440.00 4,308,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Replace Fire Alarm and Lock ControlsReplace Fire Alarm and Lock Controls

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-11-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-20-20 04-09-20 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-20-20 04-15-20 ( 26 ) Prime Bid: 11-19-20 05-12-21 (174 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-22 ( 0 )50%: 07-10-20 07-15-20 ( 5 ) Final Accept: 05-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 03-31-2303-31-2395-100%: 10-02-20 02-04-21 (125 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 20030210 ( 0 ) ( 0 ) 03-31-2303-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 20030210 10 353,400.00 .00 0 353,400.00 250,440.00 4 102,960.00 71***** Contract Totals ********** Contract Totals ***** 353,400.00 .00 0 353,400.00 250,440.00 4 102,960.00 71

Page 178: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 178Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--007007--018018 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: PLA: YDescription: Replace Cooling Tower & Refrigeration EqAgency: Department of Corrections Analyst: Amber EvansLocation: Western Illinois Correctional Center - Mount Sterling, BrownCounty: 9 - Brown ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 10-26-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 09-10-19 : :Contract Date: 02-26-20 ________________________________________________________________________________Est. Project Cost: 1,983,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,983,100.00 09-11-19 1,983,100.00 09-11-19 184,900.00 126,790.00 1,798,200.00 .00

Total 1,983,100.00 1,983,100.00 184,900.00 126,790.00 1,798,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace Cooling Tower & Refrigeration EqReplace Cooling Tower & Refrigeration Eq

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-23-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-22-20 07-16-20 ( 55 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-15-20 08-04-21 (293 )

Design Devel: 05-22-20 07-16-20 ( 55 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-21 ( 0 )50%: ( 0 ) Final Accept: 02-28-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 09-04-20 02-15-21 (164 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 20031310 ( 0 ) ( 0 ) 12-31-2212-31-22Henson Robinson Company 22049883 10-19-21 11-08-21 07-06-22 ( 0 ) 08-20-22 ( 0 ) 08-20-2308-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 20031310 10 184,900.00 .00 0 184,900.00 126,790.00 11 58,110.00 69Henson Robinson Company 22049883 83 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 184,900.00 .00 0 184,900.00 126,790.00 11 58,110.00 69

Page 179: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 179Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--008008--017017 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Electronic Locking and Control SAgency: Department of Corrections Analyst: Amber EvansLocation: Illinois River (Canton) Correctional Center - Fulton CountyCounty: 57 - Fulton ________________________________________________________________________________Leg. Districts: House: 91 - Mark Luft

Senate:46 - David Koehler : CURRENT STATUS 10-27-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: Paul Carmen : :A/E Telephone: (314)918-8383 : :Date Selected: 03-12-19 : :Contract Date: 09-05-19 ________________________________________________________________________________Est. Project Cost: 1,707,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,707,900.00 03-19-19 1,707,900.00 03-19-19 1,588,566.82 863,905.05 119,333.18 .00

Total 1,707,900.00 1,707,900.00 1,588,566.82 863,905.05 119,333.18 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 85.00% Description:Description: Replace Electronic Locking and Control SReplace Electronic Locking and Control S

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-06-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-18-19 11-06-19 ( 19 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-30-20 07-08-20 ( 69 )

Design Devel: 01-10-20 02-04-20 ( 25 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-15-21 ( 0 )50%: ( 0 ) Final Accept: 04-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 02-15-2202-15-2295-100%: 03-20-20 04-08-20 ( 19 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 19031910 ( 0 ) ( 0 ) 02-15-2202-15-22Block Electric Co., Inc. 21043785 12-08-20 01-12-21 09-09-21 ( 0 ) 10-24-21 ( 0 ) 10-24-2210-24-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 19031910 10 155,800.00 .00 0 155,800.00 140,216.10 7 15,583.90 90Block Electric Co., Inc. 21043785 85 1,443,300.00 10,533.18- 2 1,432,766.82 723,688.95 6 709,077.87 51***** Contract Totals ********** Contract Totals ***** 1,599,100.00 10,533.18- 2 1,588,566.82 863,905.05 13 724,661.77 54

Page 180: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 180Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--021021--014014 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Restrooms, Showers and HeatingAgency: Department of Corrections Analyst: Amber EvansLocation: Southwestern Correctional Center - East St. Louis, St. ClairCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:113 - Jay Hoffman

Senate:57 - Christopher Belt : CURRENT STATUS 11-09-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: : :A/E Telephone: (618)659-8709 : :Date Selected: 09-10-19 : :Contract Date: 01-10-20 ________________________________________________________________________________Est. Project Cost: 4,710,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,710,900.00 09-11-19 4,710,900.00 09-11-19 79,900.00 77,823.75 4,631,000.00 .00

Total 4,710,900.00 4,710,900.00 79,900.00 77,823.75 4,631,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Renovate Restrooms, Showers and ReplaceRenovate Restrooms, Showers and Replace

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-15-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-09-20 12-08-20 (243 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-09-20 12-29-20 (264 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2310-31-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 20031210 ( 0 ) ( 0 ) 10-31-2310-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 20031210 10 79,900.00 .00 0 79,900.00 77,823.75 2 2,076.25 98***** Contract Totals ********** Contract Totals ***** 79,900.00 .00 0 79,900.00 77,823.75 2 2,076.25 98

Page 181: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 181Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--021021--015015 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade Fire Alarm and CCTV SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Southwestern Correctional Center - East St. Louis, St. ClairCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:113 - Jay Hoffman

Senate:57 - Christopher Belt : CURRENT STATUS 11-02-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: : :A/E Telephone: (618)659-8709 : :Date Selected: 08-10-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,860,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,860,900.00 08-16-21 1,860,900.00 08-16-21 .00 .00 1,860,900.00 .00

Total 1,860,900.00 1,860,900.00 .00 .00 1,860,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 6.00% Description:Description: Upgrade Fire Alarm and CCTV SystemsUpgrade Fire Alarm and CCTV Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 22010610 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 22010610 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 182: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 182Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--040040--025025 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Rehabilitate Hot Water Distribution SystAgency: Department of Corrections Analyst: Amber EvansLocation: Danville Correctional Center - Vermilion CountyCounty: 183 - Vermilion ________________________________________________________________________________Leg. Districts: House:104 - Michael Marron

Senate:52 - Scott Bennett : CURRENT STATUS 10-27-21 :: :

A/E Id: 26673 : :A/E Name: G.H.R. Engineers & Associates, : :A/E Contact: John Aquino : :A/E Telephone: (217)356-0536 : :Date Selected: 04-14-15 : :Contract Date: 02-20-19 ________________________________________________________________________________Est. Project Cost: 3,544,880.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,544,880.00 03-24-21 3,544,880.00 03-24-21 3,247,197.00 210,627.80 297,683.00 .00

Total 3,544,880.00 3,544,880.00 3,247,197.00 210,627.80 297,683.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 9.00% Description:Description: Rehabilitate Hot Water Distribution SystRehabilitate Hot Water Distribution Syst

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-06-18 ( 0 ) Assgn Bid: 01-06-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-19-19 04-30-19 ( 11 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-19-19 04-30-19 ( 11 ) Prime Bid: 04-02-20 01-20-21 (293 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-05-21 02-04-22 ( 0 )50%: 11-04-19 11-12-19 ( 8 ) Final Accept: 04-02-21 04-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 05-31-2105-31-21 05-31-2305-31-2395-100%: 01-10-20 05-21-20 (132 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

G.H.R. Engineers & Associate 15021510 ( 0 ) ( 0 ) 05-31-2305-31-23Schomburg & Schomburg Constr 22043781 09-22-21 11-04-21 09-02-22 ( 0 ) 10-03-22 ( 0 ) 10-03-2310-03-23Mechanical, Inc. 22043883 09-22-21 11-04-21 09-02-22 ( 0 ) 10-03-22 ( 0 ) 10-03-2310-03-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

G.H.R. Engineers & Associate 15021510 10 50,420.00 244,460.00 2 294,880.00 210,627.80 7 84,252.20 72Schomburg & Schomburg Constr 22043781 81 1,024,797.00 .00 0 1,024,797.00 .00 0 1,024,797.00 0Mechanical, Inc. 22043883 83 1,927,520.00 .00 0 1,927,520.00 .00 0 1,927,520.00 0***** Contract Totals ********** Contract Totals ***** 3,002,737.00 244,460.00 2 3,247,197.00 210,627.80 7 3,036,569.20 7

Page 183: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 183Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--040040--026026 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Chiller Replacement - Admin BlAgency: Department of Corrections Analyst: Amber EvansLocation: Danville Correctional Center - Vermilion CountyCounty: 183 - Vermilion ________________________________________________________________________________Leg. Districts: House:104 - Michael Marron

Senate:52 - Scott Bennett : CURRENT STATUS 10-25-21 :: :

A/E Id: 26673 : :A/E Name: G.H.R. Engineers & Associates, : :A/E Contact: Lucas McGill : :A/E Telephone: (217)356-0536 : :Date Selected: 08-09-16 : :Contract Date: 08-12-16 ________________________________________________________________________________Est. Project Cost: 412,398.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 408,798.61 08-27-18 408,798.61 08-27-18 316,713.56 316,713.56 92,085.05 .00

Total 408,798.61 408,798.61 316,713.56 316,713.56 92,085.05 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Emergency Chiller Replacement - Admin BlEmergency Chiller Replacement - Admin Bl

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 49,625.90 Schem Design: ( 0 ) Prime Bid: 10-20-16 10-20-16 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-12-17 ( 0 )50%: ( 0 ) Final Accept: 01-26-17 ( 0 )75%: ( 0 ) A/E Cont End: 10-18-1610-18-16 03-31-2003-31-2095-100%: 08-22-16 08-26-16 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

G.H.R. Engineers & Associate 17000110 ( 0 ) ( 0 ) 03-31-2003-31-20Mechanical, Inc. 17042483 11-10-16 11-21-16 03-21-17 05-30-19 07-19-19 (850 ) 07-30-19 12-05-19 (128 ) 11-30-2011-30-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

G.H.R. Engineers & Associate 17000110 10 25,100.00 500.00- 7 24,600.00 24,600.00 7 .00 100Carrier Corporation 6457 80 7,000.00 .00 0 7,000.00 7,000.00 1 .00 100Mechanical, Inc. 17042483 83 137,153.00 125,160.56 8 262,313.56 262,313.56 3 .00 100***** Contract Totals ********** Contract Totals ***** 169,253.00 124,660.56 15 293,913.56 293,913.56 11 .00 100

Page 184: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 184Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--050050--054054 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Assess for New ChillerAgency: Department of Corrections Analyst: Amber EvansLocation: East Moline Correctional Center - Rock Island CountyCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 72 - Michael Halpin

Senate:36 - Neil Anderson : CURRENT STATUS 11-01-21 :: :

A/E Id: 34310 : :A/E Name: IMEG Corp. : :A/E Contact: : :A/E Telephone: (309)788-0673 : :Date Selected: 06-11-19 : :Contract Date: 01-16-20 ________________________________________________________________________________Est. Project Cost: 24,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 24,200.00 01-21-20 24,200.00 01-21-20 24,200.00 24,200.00 .00 .00

Total 24,200.00 24,200.00 24,200.00 24,200.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Assess for New ChillerAssess for New Chiller

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-25-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-20 ( 0 )50%: ( 0 ) Final Accept: 01-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2111-30-2195-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IMEG Corp. 19032610 ( 0 ) ( 0 ) 11-30-2111-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IMEG Corp. 19032610 10 24,200.00 .00 0 24,200.00 24,200.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 24,200.00 .00 0 24,200.00 24,200.00 1 .00 100

Page 185: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 185Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--050050--055055 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: PLA: YDescription: Replace Dietary EquipmentAgency: Department of Corrections Analyst: Amber EvansLocation: East Moline Correctional Center - Rock Island CountyCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 72 - Michael Halpin

Senate:36 - Neil Anderson : CURRENT STATUS 11-01-21 :: :

A/E Id: 30317 : :A/E Name: Middough Inc. : :A/E Contact: Sean Carney : :A/E Telephone: (630)756-7000 : :Date Selected: 11-13-19 : :Contract Date: 08-03-20 ________________________________________________________________________________Est. Project Cost: 1,929,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,929,300.00 11-18-19 1,929,300.00 11-18-19 222,590.00 88,000.00 1,706,710.00 .00

Total 1,929,300.00 1,929,300.00 222,590.00 88,000.00 1,706,710.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Replace Dietary EquipmentReplace Dietary Equipment

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-09-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-09-20 10-21-20 ( 12 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-13-21 01-19-22 ( 0 )

Design Devel: 12-18-20 05-25-21 (158 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-03-22 06-03-23 ( 0 )50%: ( 0 ) Final Accept: 08-31-22 08-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2307-31-23 07-31-2407-31-2495-100%: 11-05-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Middough Inc. 20032510 ( 0 ) ( 0 ) 07-31-2407-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Middough Inc. 20032510 10 194,300.00 28,290.00 1 222,590.00 88,000.00 3 134,590.00 40***** Contract Totals ********** Contract Totals ***** 194,300.00 28,290.00 1 222,590.00 88,000.00 3 134,590.00 40

Page 186: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 186Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--050050--056056 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Bridge - Dietary BuildingAgency: Department of Corrections Analyst: Amber EvansLocation: East Moline Correctional Center - Rock Island CountyCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 72 - Michael Halpin

Senate:36 - Neil Anderson : CURRENT STATUS 11-01-21 :: :

A/E Id: 23019 : :A/E Name: Shive-Hattery, Inc. : :A/E Contact: Larry Sandhaas : :A/E Telephone: (800)798-7650 : :Date Selected: 09-15-20 : :Contract Date: 02-01-21 ________________________________________________________________________________Est. Project Cost: 200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 200,000.00 08-26-20 200,000.00 08-26-20 43,800.00 6,274.00 156,200.00 .00

Total 200,000.00 200,000.00 43,800.00 6,274.00 156,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Replace Bridge - Dietary BuildingReplace Bridge - Dietary Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-14-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-14-21 07-22-21 ( 69 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-06-21 01-12-22 ( 0 )

Design Devel: 05-14-21 07-26-21 ( 73 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-31-22 07-31-23 ( 0 )50%: ( 0 ) Final Accept: 09-30-22 09-30-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2307-31-23 07-31-2407-31-2495-100%: 11-16-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Shive-Hattery, Inc. 21030910 ( 0 ) ( 0 ) 07-31-2407-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Shive-Hattery, Inc. 21030910 10 34,600.00 9,200.00 2 43,800.00 6,274.00 1 37,526.00 14***** Contract Totals ********** Contract Totals ***** 34,600.00 9,200.00 2 43,800.00 6,274.00 1 37,526.00 14

Page 187: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 187Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--050050--058058 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Fire Alarm SystemAgency: Department of Corrections Analyst: Amber EvansLocation: East Moline Correctional Center - Rock Island CountyCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 72 - Michael Halpin

Senate:36 - Neil Anderson : CURRENT STATUS 11-03-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 4,282,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,282,700.00 09-16-21 4,282,700.00 09-16-21 .00 .00 4,282,700.00 .00

Total 4,282,700.00 4,282,700.00 .00 .00 4,282,700.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 1.00% Description:Description: Upgrade Fire Alarm SystemUpgrade Fire Alarm System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 188: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 188Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--062062 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Repair/Replace Water HeatersAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 18333 : :A/E Name: McClure Engineering Associates : :A/E Contact: Brad Colson : :A/E Telephone: (815)433-2080 : :Date Selected: 01-10-17 : :Contract Date: 01-10-17 ________________________________________________________________________________Est. Project Cost: 1,137,776.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,137,776.00 08-20-19 1,137,776.00 08-20-19 1,093,289.76 1,019,800.81 44,486.24 .00

Total 1,137,776.00 1,137,776.00 1,093,289.76 1,019,800.81 44,486.24 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Repair/Replace Water HeatersRepair/Replace Water Heaters

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-19-16 ( 0 ) Assgn Bid: 04-18-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-03-17 06-30-17 (147 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-05-17 07-12-18 04-04-19 (266 )

Design Devel: 06-05-17 06-30-17 ( 25 ) Prime Re-Bid: 08-08-19 ( 0 )25%: ( 0 ) Subst Compl: 08-10-18 03-14-19 ( 0 )50%: 08-04-17 06-29-18 (329 ) Final Accept: 09-07-18 04-15-19 ( 0 )75%: ( 0 ) A/E Cont End: 02-03-1802-03-18 06-30-2206-30-2295-100%: 04-16-18 06-29-18 ( 74 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

McClure Engineering Associat 17021610 ( 0 ) ( 0 ) 06-30-2206-30-22Commercial Mechanical, Inc. 20042182 08-22-19 10-11-19 03-19-20 05-31-20 02-10-21 (328 ) 06-30-22 ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

McClure Engineering Associat 17021610 10 17,240.00 91,376.00 5 108,616.00 81,626.44 9 26,989.56 75Commercial Mechanical, Inc. 20042182 82 935,600.00 49,073.76 9 984,673.76 938,174.37 10 46,499.39 95***** Contract Totals ********** Contract Totals ***** 952,840.00 140,449.76 14 1,093,289.76 1,019,800.81 19 73,488.95 93

Page 189: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 189Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--065065 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Replacement of HVAC GrillsAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 20233 : :A/E Name: O & N Engineering-Development, : :A/E Contact: Jose Orozco : :A/E Telephone: (312)432-0386 : :Date Selected: 10-16-18 : :Contract Date: 01-10-19 ________________________________________________________________________________Est. Project Cost: 271,157.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 271,157.00 05-08-19 271,157.00 05-08-19 270,656.91 270,656.91 500.09 .00

Total 271,157.00 271,157.00 270,656.91 270,656.91 500.09 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Emergency Replacement of HVAC GrillsEmergency Replacement of HVAC Grills

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-27-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-24-19 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-08-19 ( 0 )50%: ( 0 ) Final Accept: 08-08-19 08-20-19 ( 12 )75%: ( 0 ) A/E Cont End: 08-31-1908-31-1995-100%: 12-20-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

O & N Engineering-Developmen 19021210 ( 0 ) ( 0 ) 08-31-1908-31-19Loescher Heating & Air Condi 19EM0884 01-24-19 03-25-19 07-10-19 (107 ) 04-24-19 07-18-19 ( 85 ) 08-31-1908-31-19

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

O & N Engineering-Developmen 19021210 10 11,800.00 500.00- 0 11,300.00 11,300.00 2 .00 100Loescher Heating & Air Condi 19EM0884 84 234,000.00 25,356.91 1 259,356.91 259,356.91 4 .00 100***** Contract Totals ********** Contract Totals ***** 245,800.00 24,856.91 1 270,656.91 270,656.91 6 .00 100

Page 190: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 190Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--066066 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: PLA: NDescription: Replace Roofing SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 27785 : :A/E Name: Kenyon & Associates Architects : :A/E Contact: Larry Wachtveitl : :A/E Telephone: (309)674-7121 : :Date Selected: 03-12-19 : :Contract Date: 07-15-19 ________________________________________________________________________________Est. Project Cost: 1,922,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,922,800.00 03-15-19 1,922,800.00 03-15-19 1,433,400.00 95,991.95 489,400.00 .00

Total 1,922,800.00 1,922,800.00 1,433,400.00 95,991.95 489,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 3.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-23-19 05-23-19 ( 0 ) Assgn Bid: 05-06-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 09-13-19 09-24-19 ( 11 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-19-20 ( 0 )

Design Devel: 09-13-19 09-24-19 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-15-20 01-08-22 ( 0 )50%: ( 0 ) Final Accept: 12-10-20 03-09-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-15-2110-15-21 01-08-2401-08-2495-100%: 12-20-19 12-24-19 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kenyon & Associates Architec 19032010 ( 0 ) ( 0 ) 01-08-2401-08-241 Source Mechanical 21056584 06-15-21 08-11-21 01-08-22 ( 0 ) 03-09-22 ( 0 ) 03-09-2303-09-23Sterling Commercial Roofing, 21056681 06-15-21 08-11-21 01-08-22 ( 0 ) 03-09-22 ( 0 ) 03-09-2303-09-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kenyon & Associates Architec 19032010 10 163,400.00 .00 1 163,400.00 95,991.95 4 67,408.05 591 Source Mechanical 21056584 84 42,500.00 .00 0 42,500.00 .00 0 42,500.00 0Sterling Commercial Roofing, 21056681 81 1,227,500.00 .00 0 1,227,500.00 .00 0 1,227,500.00 0***** Contract Totals ********** Contract Totals ***** 1,433,400.00 .00 1 1,433,400.00 95,991.95 4 1,337,408.05 7

Page 191: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 191Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--067067 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: PLA: YDescription: Install New Steam Absorber and Cooling TAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 1892 : :A/E Name: Stanley Consultants, Inc. : :A/E Contact: Mark Wagner : :A/E Telephone: (773)693-9624 : :Date Selected: 09-10-19 : :Contract Date: 02-03-20 ________________________________________________________________________________Est. Project Cost: 2,551,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,551,100.00 09-12-19 2,551,100.00 09-12-19 920,345.00 329,203.18 1,630,755.00 .00

Total 2,551,100.00 2,551,100.00 920,345.00 329,203.18 1,630,755.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Install New Steam Absorber and Cooling TInstall New Steam Absorber and Cooling T

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-18-19 ( 0 ) Assgn Bid: 10-14-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-03-20 04-17-20 ( 14 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-08-20 10-28-20 ( 20 )

Design Devel: 04-03-20 04-17-20 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-15-21 ( 0 )50%: ( 0 ) Final Accept: 11-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-15-2209-15-2295-100%: 07-30-20 08-04-20 ( 5 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Stanley Consultants, Inc. 20031610 ( 0 ) ( 0 ) 09-15-2209-15-22Ficek Electric & Communicati 21053745 05-17-21 07-02-21 03-09-22 ( 0 ) 05-08-22 ( 0 ) 05-08-2305-08-23Commercial Mechanical, Inc. 21053843 05-17-21 07-02-21 03-09-22 ( 0 ) 05-08-22 ( 0 ) 05-08-2305-08-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Stanley Consultants, Inc. 20031610 10 229,100.00 .00 0 229,100.00 158,612.15 9 70,487.85 69Ficek Electric & Communicati 21053745 45 69,175.00 .00 0 69,175.00 15,629.00 2 53,546.00 23Commercial Mechanical, Inc. 21053843 43 622,645.00 575.00- 1 622,070.00 154,962.03 2 467,107.97 25***** Contract Totals ********** Contract Totals ***** 920,920.00 575.00- 1 920,345.00 329,203.18 13 591,141.82 36

Page 192: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 192Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--068068 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Modify Sewer SystemAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 20233 : :A/E Name: O & N Engineering-Development, : :A/E Contact: Jose Orozco : :A/E Telephone: (312)432-0386 : :Date Selected: 10-08-19 : :Contract Date: 08-13-20 ________________________________________________________________________________Est. Project Cost: 468,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 468,000.00 10-10-19 468,000.00 10-10-19 58,000.00 17,198.00 410,000.00 .00

Total 468,000.00 468,000.00 58,000.00 17,198.00 410,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Modify Sewer SystemModify Sewer System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-14-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-09-20 11-02-20 ( 24 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-24-21 11-10-21 (231 )

Design Devel: 10-09-20 11-09-20 ( 31 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-21 ( 0 )50%: ( 0 ) Final Accept: 01-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2211-30-2295-100%: 01-15-21 04-30-21 (105 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

O & N Engineering-Developmen 20032110 ( 0 ) ( 0 ) 11-30-2211-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

O & N Engineering-Developmen 20032110 10 58,000.00 .00 0 58,000.00 17,198.00 1 40,802.00 30***** Contract Totals ********** Contract Totals ***** 58,000.00 .00 0 58,000.00 17,198.00 1 40,802.00 30

Page 193: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 193Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--069069 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 27679 : :A/E Name: Saavedra Group Architects, Inc : :A/E Contact: Daniel Saavedra : :A/E Telephone: (815)963-9392 : :Date Selected: 05-12-20 : :Contract Date: 08-20-20 ________________________________________________________________________________Est. Project Cost: 1,108,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,108,500.00 05-19-20 1,108,500.00 05-19-20 149,490.00 60,714.50 959,010.00 .00

Total 1,108,500.00 1,108,500.00 149,490.00 60,714.50 959,010.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-28-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 12-09-20 12-09-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-14-21 11-17-21 ( 0 )

Design Devel: 06-24-21 06-29-21 ( 5 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-29-21 07-31-22 ( 0 )50%: ( 0 ) Final Accept: 01-07-22 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2210-31-22 07-31-2307-31-2395-100%: 08-05-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Saavedra Group Architects, I 20033810 ( 0 ) ( 0 ) 07-31-2307-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Saavedra Group Architects, I 20033810 10 110,450.00 39,040.00 2 149,490.00 60,714.50 3 88,775.50 41***** Contract Totals ********** Contract Totals ***** 110,450.00 39,040.00 2 149,490.00 60,714.50 3 88,775.50 41

Page 194: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 194Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--071071 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Elevator ReplacementAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 34315 : :A/E Name: IMEG Corp. : :A/E Contact: : :A/E Telephone: (815)433-2080 : :Date Selected: 07-13-21 : :Contract Date: 09-16-21 ________________________________________________________________________________Est. Project Cost: 2,258,970.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,258,970.00 09-29-21 2,258,970.00 09-29-21 258,970.00 .00 2,000,000.00 .00

Total 2,258,970.00 2,258,970.00 258,970.00 .00 2,000,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Emergency Elevator ReplacementEmergency Elevator Replacement

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-14-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-04-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-01-22 ( 0 )50%: ( 0 ) Final Accept: 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-01-2211-01-2295-100%: 10-07-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IMEG Corp. 21032310 ( 0 ) ( 0 ) 11-01-2211-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IMEG Corp. 21032310 10 258,970.00 .00 0 258,970.00 .00 0 258,970.00 0***** Contract Totals ********** Contract Totals ***** 258,970.00 .00 0 258,970.00 .00 0 258,970.00 0

Page 195: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 195Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--075075--072072 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Electrical Repairs and TransfoAgency: Department of Corrections Analyst: Amber EvansLocation: Dixon Correctional Center - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 1892 : :A/E Name: Stanley Consultants, Inc. : :A/E Contact: : :A/E Telephone: (773)693-9624 : :Date Selected: 10-12-21 : :Contract Date: 11-12-21 ________________________________________________________________________________Est. Project Cost: 220,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 220,300.00 11-09-21 220,300.00 11-09-21 100,000.00 .00 120,300.00 .00

Total 220,300.00 220,300.00 100,000.00 .00 120,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Emergency Electrical Repairs and TransfoEmergency Electrical Repairs and Transfo

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 11-28-2111-28-2195-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Stanley Consultants, Inc. 22021210 ( 0 ) ( 0 ) 11-28-2111-28-21Block Electric Co., Inc. 22EM0283 09-02-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Stanley Consultants, Inc. 22021210 10 .00 .00 0 .00 .00 0 .00 100Block Electric Co., Inc. 22EM0283 83 100,000.00 .00 0 100,000.00 .00 0 100,000.00 0***** Contract Totals ********** Contract Totals ***** 100,000.00 .00 0 100,000.00 .00 0 100,000.00 0

Page 196: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 196Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--095095--019019 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Upgrade Touchscreens and Speakers in HouAgency: Department of Corrections Analyst: Amber EvansLocation: Hill Correctional Center - GalesburgCounty: 95 - Knox ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 11-03-21 :: :

A/E Id: 34127 : :A/E Name: Dewberry Engineers Inc. : :A/E Contact: Craig Clary : :A/E Telephone: (309)282-8000 : :Date Selected: 05-14-19 : :Contract Date: 08-28-19 ________________________________________________________________________________Est. Project Cost: 4,005,616.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,005,616.00 08-24-21 4,005,616.00 08-24-21 3,656,306.00 111,342.00 349,310.00 .00

Total 4,005,616.00 4,005,616.00 3,656,306.00 111,342.00 349,310.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Upgrade Touchscreens and Speakers in HouUpgrade Touchscreens and Speakers in Hou

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-06-19 08-06-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-21-19 11-21-19 ( 31 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-24-20 12-09-20 (107 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-30-22 ( 0 )50%: 04-20-20 04-24-20 ( 4 ) Final Accept: 09-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 07-30-2307-30-2395-100%: 06-15-20 09-03-20 ( 80 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Engineers Inc. 19005110 ( 0 ) ( 0 ) 07-30-2307-30-23Capitol Construction Group, 22047885 09-21-21 11-04-21 11-04-22 ( 0 ) 01-03-23 ( 0 ) 01-03-2401-03-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Engineers Inc. 19005110 10 17,517.00 145,683.00 1 163,200.00 111,342.00 8 51,858.00 68Capitol Construction Group, 22047885 85 3,493,106.00 .00 0 3,493,106.00 .00 0 3,493,106.00 0***** Contract Totals ********** Contract Totals ***** 3,510,623.00 145,683.00 1 3,656,306.00 111,342.00 8 3,544,964.00 3

Page 197: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 197Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--125125--018018 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Resurface Parking Lots and RoadsAgency: Department of Corrections Analyst: Amber EvansLocation: Jacksonville Correctional Center - Morgan CountyCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 28386 : :A/E Name: Hutchison Engineering, Inc. : :A/E Contact: : :A/E Telephone: (217)245-7164 : :Date Selected: 05-14-19 : :Contract Date: 12-18-19 ________________________________________________________________________________Est. Project Cost: 1,250,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,000,000.00 04-08-19 1,000,000.00 04-08-19 8,598.55 8,598.55 991,401.45 .00

Total 1,000,000.00 1,000,000.00 8,598.55 8,598.55 991,401.45 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 76.00% Description:Description: Resurface Parking Lots and RoadsResurface Parking Lots and Roads

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-15-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-20-20 04-15-20 ( 26 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2211-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hutchison Engineering, Inc. 20030310 ( 0 ) ( 0 ) 11-30-2211-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hutchison Engineering, Inc. 20030310 10 8,502.00 .00 0 8,502.00 8,502.00 2 .00 100Hutchison Engineering, Inc. INT7164 00 96.55 .00 0 96.55 96.55 1 .00 100***** Contract Totals ********** Contract Totals ***** 8,598.55 .00 0 8,598.55 8,598.55 3 .00 100

Page 198: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 198Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--125125--019019 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Locking SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Jacksonville Correctional Center - Morgan CountyCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,650,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,650,500.00 09-20-21 1,650,500.00 09-20-21 .00 .00 1,650,500.00 .00

Total 1,650,500.00 1,650,500.00 .00 .00 1,650,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Locking SystemsReplace Locking Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 199: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 199Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--125125--020020 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Sallyport GatesAgency: Department of Corrections Analyst: Amber EvansLocation: Jacksonville Correctional Center - Morgan CountyCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 486,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 486,000.00 10-19-21 486,000.00 10-19-21 .00 .00 486,000.00 .00

Total 486,000.00 486,000.00 .00 .00 486,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Sallyport GatesReplace Sallyport Gates

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 200: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 200Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--063063 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace WindowsAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 10-28-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: Todd Hannah : :A/E Telephone: (217)522-3355 : :Date Selected: 01-13-15 : :Contract Date: 06-04-15 ________________________________________________________________________________Est. Project Cost: 4,700,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,108,323.79 07-01-18 8,108,323.79 08-08-18 2,965,049.80 2,377,076.75 1,734,950.20 3,408,323.79

Total 8,108,323.79 8,108,323.79 2,965,049.80 2,377,076.75 1,734,950.20 3,408,323.79____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 80.00% Description:Description: Replace WindowsReplace Windows

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-06-15 ( 0 ) Assgn Bid: 07-25-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-11-19 01-11-19 ( 0 ) Prime Bid: 07-11-19 07-25-19 ( 14 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-20 07-01-22 ( 0 )50%: ( 0 ) Final Accept: 04-30-20 09-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1812-31-18 09-01-2309-01-2395-100%: 05-03-19 05-07-19 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 14032410 ( 0 ) ( 0 ) 09-01-2309-01-23R.D. Lawrence Construction C 20042281 08-29-19 09-30-19 09-29-20 04-01-22 ( 0 ) 06-01-22 ( 0 ) 11-28-2211-28-22General Waste Services, Inc. 20042388 08-29-19 09-30-19 09-29-20 04-01-22 ( 0 ) 06-01-22 ( 0 ) 11-28-2211-28-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 14032410 10 113,360.00 251,321.00 4 364,681.00 259,905.93 9 104,775.07 71R.D. Lawrence Construction C 20042281 81 2,314,000.00 103,020.69 7 2,417,020.69 2,019,892.78 14 397,127.91 84General Waste Services, Inc. 20042388 88 181,615.00 1,733.11 2 183,348.11 97,278.04 6 86,070.07 53***** Contract Totals ********** Contract Totals ***** 2,608,975.00 356,074.80 13 2,965,049.80 2,377,076.75 29 587,973.05 80

Page 201: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 201Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--066066 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Upgrade Laundry FacilityAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-03-21 :: :

A/E Id: 1698 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: Jim Siefert : :A/E Telephone: (217)532-3959 : :Date Selected: 07-11-17 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 184,328.78

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 162,536.00 02-05-21 162,536.00 02-05-21 153,155.87 82,635.70 9,380.13 .00

Total 162,536.00 162,536.00 153,155.87 82,635.70 9,380.13 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 90.00% Description:Description: Upgrade Laundry FacilityUpgrade Laundry Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 09-16-20 ( 0 )CORC Assessment Amt: .00 Schem Design: 06-07-19 06-07-19 ( 0 ) Prime Bid: 09-16-20 09-16-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 07-02-21 07-02-20 (365-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. QA18000210 ( 0 ) ( 0 )Hurst-Rosche, Inc. 21002510 ( 0 ) ( 0 )Warner Mechanical. LLC 21048982 03-25-21 04-21-21 09-18-21 ( 0 ) 10-18-21 ( 0 ) 10-18-2210-18-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. QA1800021010 .00 .00 0 .00 .00 0 .00 100Hurst-Rosche, Inc. 21002510 10 .00 .00 0 .00 .00 0 .00 100Warner Mechanical. LLC 21048982 82 147,760.00 5,395.87 1 153,155.87 82,635.70 1 70,520.17 54***** Contract Totals ********** Contract Totals ***** 147,760.00 5,395.87 1 153,155.87 82,635.70 1 70,520.17 54

Page 202: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 202Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--069069 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Renovate Shower RoomsAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-03-21 :: :

A/E Id: 20616 : :A/E Name: Reifsteck Reid & Company Archi : :A/E Contact: Chris Bieser : :A/E Telephone: (217)351-4100 : :Date Selected: 05-14-19 : :Contract Date: 09-06-19 ________________________________________________________________________________Est. Project Cost: 2,370,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,370,500.00 05-16-19 2,370,500.00 05-16-19 351,430.00 193,957.02 2,019,070.00 .00

Total 2,370,500.00 2,370,500.00 351,430.00 193,957.02 2,019,070.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Renovate Shower RoomsRenovate Shower Rooms

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-27-19 08-27-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-04-19 11-20-19 ( 16 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-19-20 11-23-20 06-09-21 (198 )

Design Devel: 05-13-20 05-20-20 ( 7 ) Prime Re-Bid: 10-13-21 ( 0 )25%: ( 0 ) Subst Compl: 07-31-21 08-31-21 ( 0 )50%: 06-22-20 08-12-20 ( 51 ) Final Accept: 08-31-21 09-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2012-31-20 07-31-2207-31-2295-100%: 11-15-20 02-23-21 (100 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Reifsteck Reid & Company Arc 19004710 ( 0 ) ( 0 ) 07-31-2207-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Reifsteck Reid & Company Arc 19004710 10 36,710.00 314,720.00 4 351,430.00 193,957.02 9 157,472.98 55***** Contract Totals ********** Contract Totals ***** 36,710.00 314,720.00 4 351,430.00 193,957.02 9 157,472.98 55

Page 203: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 203Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--070070 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Ash Handling SystemAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-04-21 :: :

A/E Id: 30317 : :A/E Name: Middough Inc. : :A/E Contact: : :A/E Telephone: (630)756-7000 : :Date Selected: 08-13-19 : :Contract Date: 09-26-19 ________________________________________________________________________________Est. Project Cost: 1,862,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,672,500.00 08-15-19 1,672,500.00 08-15-19 235,630.00 162,118.60 1,436,870.00 .00

Total 1,672,500.00 1,672,500.00 235,630.00 162,118.60 1,436,870.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Upgrade Ash Handling SystemUpgrade Ash Handling System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-29-19 08-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-11-19 02-07-20 ( 88 ) Prime Bid: 05-04-20 03-17-21 ( 0 )

Design Devel: 01-13-20 03-26-20 ( 73 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-01-20 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 11-01-20 10-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2110-31-21 09-30-2209-30-2295-100%: 03-16-20 06-30-20 (106 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Middough Inc. 2000310 ( 0 ) ( 0 ) 09-30-2209-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Middough Inc. 2000310 10 183,100.00 52,530.00 2 235,630.00 162,118.60 3 73,511.40 69***** Contract Totals ********** Contract Totals ***** 183,100.00 52,530.00 2 235,630.00 162,118.60 3 73,511.40 69

Page 204: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 204Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--071071 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Lock Controls - X-HouseAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 34127 : :A/E Name: Dewberry Engineers Inc. : :A/E Contact: : :A/E Telephone: (309)282-8000 : :Date Selected: 09-10-19 : :Contract Date: 11-05-19 ________________________________________________________________________________Est. Project Cost: 347,316.66

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 347,316.66 07-13-21 347,316.66 07-13-21 317,391.66 41,478.51 29,925.00 .00

Total 347,316.66 347,316.66 317,391.66 41,478.51 29,925.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Replace Lock Controls - X-HouseReplace Lock Controls - X-House

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-24-19 08-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-23-19 12-18-19 ( 5-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-18-20 03-17-21 (303 )

Design Devel: 02-10-20 12-19-19 ( 53-) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-04-21 01-04-22 ( 0 )50%: ( 0 ) Final Accept: 02-04-21 02-04-22 ( 0 )75%: ( 0 ) A/E Cont End: 01-04-2201-04-22 12-14-2212-14-2295-100%: 03-30-20 09-03-20 (157 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Engineers Inc. 20000210 ( 0 ) ( 0 ) 12-14-2212-14-22Capitol Construction Group, 22042785 08-04-21 10-07-21 04-05-22 ( 0 ) 05-20-22 ( 0 ) 05-20-2305-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Engineers Inc. 20000210 10 58,000.00 .00 1 58,000.00 41,336.85 9 16,663.15 71Dewberry Engineers Inc. INT7201 00 141.66 .00 0 141.66 141.66 1 .00 100Capitol Construction Group, 22042785 85 259,250.00 .00 0 259,250.00 .00 0 259,250.00 0***** Contract Totals ********** Contract Totals ***** 317,391.66 .00 1 317,391.66 41,478.51 10 275,913.15 13

Page 205: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 205Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--072072 PM NAME: Chris MacGibbon 334Chris MacGibbon 334Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Exterior Security Doors and FramAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 10-28-21 :: :

A/E Id: 16668 : :A/E Name: Evan Lloyd Associates, Inc. : :A/E Contact: Larry DuPont : :A/E Telephone: (217)789-7011 : :Date Selected: 10-08-19 : :Contract Date: 12-20-19 ________________________________________________________________________________Est. Project Cost: 1,616,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,616,600.00 05-19-21 1,616,600.00 05-19-21 1,447,400.00 147,013.00 169,200.00 .00

Total 1,616,600.00 1,616,600.00 1,447,400.00 147,013.00 169,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 15.00% Description:Description: Replace Exterior Security Doors and FramReplace Exterior Security Doors and Fram

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-13-19 11-13-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-29-20 06-30-21 02-17-21 (133-)

Design Devel: 03-31-20 04-08-20 ( 8 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-21 06-30-22 ( 0 )50%: ( 0 ) Final Accept: 07-31-21 07-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-22 07-01-2307-01-2395-100%: 11-18-21 12-01-20 (352-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Evan Lloyd Associates, Inc. 2001610 ( 0 ) ( 0 ) 07-01-2307-01-23Schwartz Construction Group, 21056881 06-22-21 08-02-21 02-28-22 ( 0 ) 04-14-22 ( 0 ) 04-14-2304-14-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Evan Lloyd Associates, Inc. 2001610 10 144,900.00 .00 1 144,900.00 78,831.00 3 66,069.00 55Schwartz Construction Group, 21056881 81 1,302,500.00 .00 0 1,302,500.00 68,182.00 1 1,234,318.00 5***** Contract Totals ********** Contract Totals ***** 1,447,400.00 .00 1 1,447,400.00 147,013.00 4 1,300,387.00 10

Page 206: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 206Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--073073 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct Walk-In Freezer and Install NeAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 29612 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)398-6280 : :Date Selected: 05-12-20 : :Contract Date: 07-15-20 ________________________________________________________________________________Est. Project Cost: 2,870,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,870,000.00 05-19-20 2,870,000.00 05-19-20 220,700.00 138,646.81 2,649,300.00 .00

Total 2,870,000.00 2,870,000.00 220,700.00 138,646.81 2,649,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Construct Walk-In Freezer and Install NeConstruct Walk-In Freezer and Install Ne

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-11-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-08-21 04-14-21 12-08-21 (238 )

Design Devel: 09-14-20 09-30-20 ( 16 ) Prime Re-Bid: 12-08-21 ( 0 )25%: ( 0 ) Subst Compl: 09-17-21 09-17-22 ( 0 )50%: ( 0 ) Final Accept: 10-15-21 10-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-17-2209-17-22 09-17-2309-17-2395-100%: 12-07-20 09-24-21 (291 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. 20004010 ( 0 ) ( 0 ) 09-17-2309-17-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. 20004010 10 216,400.00 4,300.00 2 220,700.00 138,646.81 7 82,053.19 63***** Contract Totals ********** Contract Totals ***** 216,400.00 4,300.00 2 220,700.00 138,646.81 7 82,053.19 63

Page 207: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 207Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--074074 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Assessment & Repair of ElectriAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 10-26-21 :: :

A/E Id: 34127 : :A/E Name: Dewberry Engineers Inc. : :A/E Contact: Craig Clary : :A/E Telephone: (309)282-8000 : :Date Selected: 05-12-20 : :Contract Date: 07-01-20 ________________________________________________________________________________Est. Project Cost: 860,792.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 960,792.00 03-30-21 960,792.00 03-30-21 935,515.98 844,566.21 25,276.02 .00

Total 960,792.00 960,792.00 935,515.98 844,566.21 25,276.02 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Emergency Assessment & Repair of ElectriEmergency Assessment & Repair of Electri

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-08-20 07-22-20 ( 14 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-30-21 ( 0 )50%: ( 0 ) Final Accept: 07-14-20 06-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-14-2007-14-20 04-30-2204-30-2295-100%: 06-12-20 06-25-20 ( 13 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Engineers Inc. 20042910 ( 0 ) ( 0 ) 04-30-2204-30-22EEI Holding Corporation 7078 ( 0 ) ( 0 )Capitol Construction Group, 20EM2481 04-16-20 04-16-20 06-14-20 ( 0 ) 07-14-20 ( 0 )Capitol Construction Group, 21042185 09-16-20 10-09-20 04-07-21 ( 0 ) 05-22-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Engineers Inc. 20042910 10 98,060.00 .00 3 98,060.00 95,294.60 6 2,765.40 97EEI Holding Corporation 7078 11 4,904.89 .00 0 4,904.89 4,904.89 1 .00 100Sunbelt Rentals, Inc. 7720004 70 100,000.00 .00 0 100,000.00 90,157.98 7 9,842.02 90Sunbelt Rentals, Inc. 7071 70 6,366.20 .00 0 6,366.20 6,366.20 2 .00 100Sunbelt Rentals, Inc. 7072 70 5,791.20 .00 0 5,791.20 5,791.20 1 .00 100

Page 208: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 208Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sunbelt Rentals, Inc. 7073 70 15,916.56 .00 0 15,916.56 15,916.56 4 .00 100Sunbelt Rentals, Inc. 7074 70 6,636.40 .00 0 6,636.40 6,636.40 3 .00 100Sunbelt Rentals, Inc. 7075 70 150.00 .00 0 150.00 150.00 1 .00 100Sunbelt Rentals, Inc. 7076 70 19,917.96 .00 0 19,917.96 19,917.96 2 .00 100Sunbelt Rentals, Inc. 7090 70 1,550.00 .00 0 1,550.00 1,550.00 1 .00 100Sunbelt Rentals, Inc. 7091 70 1,150.00 .00 0 1,150.00 1,150.00 1 .00 100Sunbelt Rentals, Inc. 7093 70 5,486.40 .00 0 5,486.40 5,486.40 1 .00 100Sunbelt Rentals, Inc. 7094 70 14,431.56 .00 0 14,431.56 14,431.56 1 .00 100Sunbelt Rentals, Inc. 7106 70 5,791.20 .00 0 5,791.20 5,791.20 1 .00 100Sunbelt Rentals, Inc. 7107 70 575.00 .00 0 575.00 575.00 1 .00 100Capitol Construction Group, 7130 70 9,650.00 .00 0 9,650.00 9,650.00 1 .00 100Sunbelt Rentals, Inc. 7132 70 1,145.00 .00 0 1,145.00 1,145.00 2 .00 100Sunbelt Rentals, Inc. 7133 70 575.00 .00 0 575.00 575.00 1 .00 100Sunbelt Rentals, Inc. 7134 70 5,992.21 .00 0 5,992.21 5,992.21 1 .00 100Sunbelt Rentals, Inc. 7153 70 5,791.20 .00 0 5,791.20 5,791.20 1 .00 100Capitol Construction Group, 20EM2481 81 500,000.00 495,000.00- 0 5,000.00 .00 0 5,000.00 0Capitol Construction Group, 21042185 85 613,626.00 7,009.20 1 620,635.20 547,292.85 4 73,342.35 88***** Contract Totals ********** Contract Totals ***** 1,423,506.78 487,990.80- 4 935,515.98 844,566.21 43 90,949.77 90

Page 209: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 209Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--076076 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair RoofsAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 10-26-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: : :A/E Telephone: (217)363-3375 : :Date Selected: 12-15-20 : :Contract Date: 01-07-21 ________________________________________________________________________________Est. Project Cost: 269,591.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 294,121.00 09-08-21 294,121.00 09-08-21 276,911.00 24,770.00 17,210.00 .00

Total 294,121.00 294,121.00 276,911.00 24,770.00 17,210.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Repair RoofsRepair Roofs

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-16-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-26-21 08-04-21 ( 9 )

Design Devel: 02-22-21 02-22-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-17-21 ( 0 )50%: ( 0 ) Final Accept: 10-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2209-30-2295-100%: 04-19-21 04-20-21 ( 1 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 21002010 ( 0 ) ( 0 ) 09-30-2209-30-22Designed Roofing Systems, In 22049781 10-19-21 11-04-21 01-03-22 ( 0 ) 02-02-22 ( 0 ) 02-02-2302-02-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 21002010 10 24,300.00 .00 0 24,300.00 17,450.00 2 6,850.00 72Henson Robinson Company 7250 80 7,320.00 .00 0 7,320.00 7,320.00 1 .00 100Designed Roofing Systems, In 22049781 81 245,291.00 .00 0 245,291.00 .00 0 245,291.00 0***** Contract Totals ********** Contract Totals ***** 276,911.00 .00 0 276,911.00 24,770.00 3 252,141.00 9

Page 210: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 210Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--135135--078078 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Electrical LoopAgency: Department of Corrections Analyst: Amber EvansLocation: Logan Correctional Center - LincolnCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 10-26-21 :: :

A/E Id: 34127 : :A/E Name: Dewberry Engineers Inc. : :A/E Contact: : :A/E Telephone: (309)282-8000 : :Date Selected: 06-08-21 : :Contract Date: 07-19-21 ________________________________________________________________________________Est. Project Cost: 5,782,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,782,300.00 07-12-21 5,782,300.00 07-12-21 560,700.00 .00 5,221,600.00 .00

Total 5,782,300.00 5,782,300.00 560,700.00 .00 5,221,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Replace Electrical LoopReplace Electrical Loop

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-17-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-23-22 ( 0 )

Design Devel: 11-18-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-23 ( 0 )50%: 12-27-21 ( 0 ) Final Accept: 07-01-23 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2406-01-2495-100%: 03-07-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Engineers Inc. 21002710 ( 0 ) ( 0 ) 06-01-2406-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Engineers Inc. 21002710 10 560,700.00 .00 0 560,700.00 .00 0 560,700.00 0***** Contract Totals ********** Contract Totals ***** 560,700.00 .00 0 560,700.00 .00 0 560,700.00 0

Page 211: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 211Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--140140--017017 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct Bus PadAgency: Department of Corrections Analyst: Amber EvansLocation: Lincoln Correctional Center - Logan CountyCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 30091 : :A/E Name: Fehr-Graham & Associates LLC : :A/E Contact: John Sawyer : :A/E Telephone: (217)544-8477 : :Date Selected: 03-12-19 : :Contract Date: 08-16-19 ________________________________________________________________________________Est. Project Cost: 3,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,500,000.00 06-01-21 3,500,000.00 06-01-21 801,075.13 321,950.63 2,698,924.87 .00

Total 3,500,000.00 3,500,000.00 801,075.13 321,950.63 2,698,924.87 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 95.00% Description:Description: Reconstruction of Access RoadReconstruction of Access Road

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-31-19 05-31-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-01-19 12-03-19 ( 63 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-02-20 02-03-21 (124 )

Design Devel: 06-08-20 07-19-20 ( 41 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-01-21 ( 0 )50%: ( 0 ) Final Accept: 04-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 12-31-2212-31-2295-100%: 07-13-20 08-18-20 ( 36 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Fehr-Graham & Associates LLC 19003810 ( 0 ) ( 0 ) 12-31-2212-31-22United Contractors Midwest, 21056181 06-16-21 07-26-21 10-24-21 ( 0 ) 12-23-21 ( 0 ) 12-23-2212-23-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Fehr-Graham & Associates LLC 19003810 10 43,586.00 312,742.00 3 356,328.00 197,953.72 11 158,374.28 56United Contractors Midwest, 21056181 81 449,446.51 4,699.38- 1 444,747.13 123,996.91 1 320,750.22 28***** Contract Totals ********** Contract Totals ***** 493,032.51 308,042.62 4 801,075.13 321,950.63 12 479,124.50 40

Page 212: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 212Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--140140--017017 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct Bus PadAgency: Department of Corrections Analyst: Amber EvansLocation: Lincoln Correctional Center - Logan CountyCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 30091 : :A/E Name: Fehr-Graham & Associates LLC : :A/E Contact: : :A/E Telephone: (217)544-8477 : :Date Selected: : :Contract Date: 08-16-19 ________________________________________________________________________________Est. Project Cost: 3,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,500,000.00 06-01-21 3,500,000.00 06-01-21 801,075.13 321,950.63 2,698,924.87 .00

Total 3,500,000.00 3,500,000.00 801,075.13 321,950.63 2,698,924.87 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 100.00% Description:Description: Construct Bus PadConstruct Bus Pad

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-25-21 11-10-21 (258 )

Design Devel: 08-07-20 11-09-20 ( 94 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-05-21 ( 0 )50%: 10-09-20 03-04-21 (146 ) Final Accept: 12-05-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-22 12-31-2212-31-2295-100%: 12-18-20 06-03-21 (167 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 213: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 213Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--140140--019019 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace GeneratorsAgency: Department of Corrections Analyst: Amber EvansLocation: Lincoln Correctional Center - Logan CountyCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 28483 : :A/E Name: Hanson Professional Services I : :A/E Contact: Gary Clack : :A/E Telephone: (217)788-2450 : :Date Selected: 11-13-19 : :Contract Date: 03-12-20 ________________________________________________________________________________Est. Project Cost: 3,600,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,600,900.00 07-14-21 3,600,900.00 07-14-21 203,000.00 140,892.18 3,397,900.00 .00

Total 3,600,900.00 3,600,900.00 203,000.00 140,892.18 3,397,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) .00% Description:Description: Replace GeneratorsReplace Generators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-14-20 01-14-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-02-20 03-03-21 (121 )

Design Devel: 05-11-20 05-14-20 ( 3 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-01-21 ( 0 )50%: ( 0 ) Final Accept: 08-02-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2207-01-2295-100%: 09-07-20 09-10-20 ( 3 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hanson Professional Services 2002510 ( 0 ) ( 0 ) 07-01-2207-01-22Anderson Electric Inc. 22040885 07-23-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hanson Professional Services 2002510 10 203,000.00 .00 0 203,000.00 140,892.18 8 62,107.82 70Anderson Electric Inc. 22040885 85 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 203,000.00 .00 0 203,000.00 140,892.18 8 62,107.82 70

Page 214: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 214Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--140140--020020 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Roofing System and Ventilators -Agency: Department of Corrections Analyst: Amber EvansLocation: Lincoln Correctional Center - Logan CountyCounty: 107 - Logan ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 27785 : :A/E Name: Kenyon & Associates Architects : :A/E Contact: : :A/E Telephone: (309)674-7121 : :Date Selected: 07-13-21 : :Contract Date: 09-10-21 ________________________________________________________________________________Est. Project Cost: 995,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 995,000.00 07-14-21 995,000.00 07-14-21 88,700.00 .00 906,300.00 .00

Total 995,000.00 995,000.00 88,700.00 .00 906,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Replace Roofing System and Ventilators -Replace Roofing System and Ventilators -

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-25-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-11-22 ( 0 )

Design Devel: 11-22-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-18-22 ( 0 )50%: 01-31-22 ( 0 ) Final Accept: 12-16-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-17-2311-17-2395-100%: 04-11-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kenyon & Associates Architec 22000510 ( 0 ) ( 0 ) 11-17-2311-17-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kenyon & Associates Architec 22000510 10 88,700.00 .00 0 88,700.00 .00 0 88,700.00 0***** Contract Totals ********** Contract Totals ***** 88,700.00 .00 0 88,700.00 .00 0 88,700.00 0

Page 215: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 215Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--130130 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Demolish BuildingsAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 31777 : :A/E Name: Quadrant Design, Inc. : :A/E Contact: Jennifer Eckart : :A/E Telephone: (618)443-4012 : :Date Selected: 09-10-13 : :Contract Date: 02-10-14 ________________________________________________________________________________Est. Project Cost: 4,606,278.23

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,059,192.31 01-22-20 4,059,192.31 01-22-20 590,968.07 590,968.07 740,310.16 2,727,914.08971 3,275,000.00 07-01-17 3,275,000.00 08-03-17 3,194,189.06 3,006,842.22 80,810.94 .00

Total 7,334,192.31 7,334,192.31 3,785,157.13 3,597,810.29 821,121.10 2,727,914.08____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XX) 100.00% Description:Description: PH-1/Demolish Buildings - Bids & Award RPH-1/Demolish Buildings - Bids & Award R

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-19-13 ( 0 ) Assgn Bid: 10-23-14 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 02-05-15 ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-28-14 10-30-14 ( 63 )

Design Devel: 04-10-14 04-10-14 ( 0 ) Prime Re-Bid: 02-05-15 ( 0 )25%: ( 0 ) Subst Compl: 05-15-15 ( 0 )50%: ( 0 ) Final Accept: 07-15-15 ( 0 )75%: ( 0 ) A/E Cont End: 05-16-1605-16-16 08-21-2108-21-2195-100%: 07-08-14 07-17-14 ( 9 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Quadrant Design, Inc. 14000410 ( 0 ) ( 0 ) 08-21-2108-21-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Quadrant Design, Inc. 14000410 10 257,626.00 160,456.00 7 418,082.00 230,735.16 7 187,346.84 55***** Contract Totals ********** Contract Totals ***** 257,626.00 160,456.00 7 418,082.00 230,735.16 7 187,346.84 55

Page 216: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 216Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--130130 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Demolish BuildingsAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 31777 : :A/E Name: Quadrant Design, Inc. : :A/E Contact: Michael Schneider : :A/E Telephone: (618)443-4012 : :Date Selected: : :Contract Date: 02-10-14 ________________________________________________________________________________Est. Project Cost: 4,606,278.23

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,059,192.31 01-22-20 4,059,192.31 01-22-20 590,968.07 590,968.07 740,310.16 2,727,914.08971 3,275,000.00 07-01-17 3,275,000.00 08-03-17 3,194,189.06 3,006,842.22 80,810.94 .00

Total 7,334,192.31 7,334,192.31 3,785,157.13 3,597,810.29 821,121.10 2,727,914.08____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 100.00% Description:Description: PH-2 / Demolish BuildingsPH-2 / Demolish Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: 03-09-17 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-16-17 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 08-21-2108-21-2195-100%: 01-08-17 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

General Waste Services, Inc. 17044388 04-17-17 05-08-17 05-05-18 01-02-18 (123-) 07-04-18 01-02-18 (183-) 07-04-1907-04-19Fager-McGee Commercial Const 17044481 04-17-17 05-08-17 05-05-18 10-19-18 01-14-20 (619 ) 12-21-18 09-16-20 (635 ) 01-15-2101-15-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

General Waste Services, Inc. 17044388 88 417,716.00 49,272.61 1 466,988.61 466,988.61 7 .00 100Fager-McGee Commercial Const 17044481 81 1,907,000.00 993,086.52 21 2,900,086.52 2,900,086.52 34 .00 100***** Contract Totals ********** Contract Totals ***** 2,324,716.00 1,042,359.13 22 3,367,075.13 3,367,075.13 41 .00 100

Page 217: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 217Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--133133 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Plumbing - South Cell HouseAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 28732 : :A/E Name: BRiC Partnership, LLC : :A/E Contact: Andy Rein : :A/E Telephone: (618)277-5200 : :Date Selected: 11-18-14 : :Contract Date: 04-28-15 ________________________________________________________________________________Est. Project Cost: 6,470,416.84

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,470,416.84 09-10-18 6,470,416.84 09-10-18 6,014,458.58 1,790,823.02 455,958.26 .00

Total 6,470,416.84 6,470,416.84 6,014,458.58 1,790,823.02 455,958.26 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: PH - 1 - Replace Plumbing - South Cell HPH - 1 - Replace Plumbing - South Cell H

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-27-15 ( 0 ) Assgn Bid: 07-12-18 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-26-18 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-31-18 06-28-18 07-18-18 ( 20 )

Design Devel: 05-26-15 06-12-15 ( 17 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-18 ( 0 )50%: 05-27-19 ( 0 ) Final Accept: 12-31-18 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1912-31-19 12-31-2312-31-2395-100%: 05-10-18 05-16-18 ( 6 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BRiC Partnership, LLC 15001010 ( 0 ) ( 0 ) 12-31-2312-31-23Litton Enterprises, Inc. 19041083 08-01-18 08-14-18 10-31-18 02-27-19 (119 ) 11-30-18 ( 0 ) 06-28-2006-28-20General Waste Services, Inc. 19041188 08-01-18 08-14-18 09-28-18 09-27-18 ( 1-) 10-28-18 03-06-19 (129 ) 10-28-1910-28-19

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BRiC Partnership, LLC 15001010 10 96,850.00 418,907.00 4 515,757.00 383,755.60 23 132,001.40 75Litton Enterprises, Inc. 19041083 83 543,920.00 31,484.68 4 575,404.68 575,404.68 7 .00 100General Waste Services, Inc. 19041188 88 65,620.00 7,323.10- 1 58,296.90 58,296.90 3 .00 100***** Contract Totals ********** Contract Totals ***** 706,390.00 443,068.58 9 1,149,458.58 1,017,457.18 33 132,001.40 89

Page 218: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 218Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--133133 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Plumbing - South Cell HouseAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 28732 : :A/E Name: BRiC Partnership, LLC : :A/E Contact: Andy Rein : :A/E Telephone: (618)277-5200 : :Date Selected: : :Contract Date: 04-28-15 ________________________________________________________________________________Est. Project Cost: 6,470,416.84

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,470,416.84 09-10-18 6,470,416.84 09-10-18 6,014,458.58 1,790,823.02 455,958.26 .00

Total 6,470,416.84 6,470,416.84 6,014,458.58 1,790,823.02 455,958.26 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 15.00% Description:Description: PH - 2 / Replace Plumbing - South Cell HPH - 2 / Replace Plumbing - South Cell H

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-18-19 03-31-21 (560 )

Design Devel: ( 0 ) Prime Re-Bid: 03-03-21 ( 0 )25%: ( 0 ) Subst Compl: 05-08-20 ( 0 )50%: 05-27-19 05-31-19 ( 4 ) Final Accept: 07-08-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-21 12-31-2312-31-2395-100%: 07-22-19 09-23-19 ( 63 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Southern Illinois Piping Con 21055482 06-04-21 07-19-21 05-15-22 ( 0 ) 08-13-22 ( 0 ) 08-13-2308-13-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Southern Illinois Piping Con 21055482 82 4,865,000.00 .00 0 4,865,000.00 773,365.84 2 4,091,634.16 16***** Contract Totals ********** Contract Totals ***** 4,865,000.00 .00 0 4,865,000.00 773,365.84 2 4,091,634.16 16

Page 219: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 219Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--140140 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace MSU Locking Control SystemAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: Paul Carmen : :A/E Telephone: (314)918-8383 : :Date Selected: 05-14-19 : :Contract Date: 09-05-19 ________________________________________________________________________________Est. Project Cost: 4,162,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,162,100.00 04-19-21 4,162,100.00 04-19-21 1,841,088.48 237,408.15 2,321,011.52 .00

Total 4,162,100.00 4,162,100.00 1,841,088.48 237,408.15 2,321,011.52 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Replace MSU Locking Control SystemReplace MSU Locking Control System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-22-19 ( 0 ) Assgn Bid: 06-09-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-01-19 11-12-19 ( 11 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-01-20 06-23-21 (265 )

Design Devel: 11-01-19 11-13-19 ( 12 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-02-21 ( 0 )50%: ( 0 ) Final Accept: 08-02-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2110-31-21 08-01-2308-01-2395-100%: 07-24-20 08-07-20 ( 14 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 20011010 ( 0 ) ( 0 ) 08-01-2308-01-23Korte & Luitjohan Contractor 22045581 09-02-21 10-20-21 06-17-22 ( 0 ) 08-01-22 ( 0 ) 08-01-2308-01-23Brown Electric, Inc. 22045685 09-02-21 10-20-21 06-17-22 ( 0 ) 08-01-22 ( 0 ) 08-01-2308-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 20011010 10 103,845.00 223,305.00 2 327,150.00 237,408.15 4 89,741.85 73Korte & Luitjohan Contractor 22045581 81 993,258.00 36,214.48 1 1,029,472.48 .00 0 1,029,472.48 0Brown Electric, Inc. 22045685 85 484,466.00 .00 0 484,466.00 .00 0 484,466.00 0***** Contract Totals ********** Contract Totals ***** 1,581,569.00 259,519.48 3 1,841,088.48 237,408.15 4 1,603,680.33 13

Page 220: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 220Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--141141 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Heating and Ventilation EquipmenAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 10-08-19 : :Contract Date: 01-27-20 ________________________________________________________________________________Est. Project Cost: 1,494,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,494,500.00 10-10-19 1,494,500.00 10-10-19 34,340.00 32,940.00 1,460,160.00 .00

Total 1,494,500.00 1,494,500.00 34,340.00 32,940.00 1,460,160.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 30.00% Description:Description: Replace Heating and Ventilation EquipmenReplace Heating and Ventilation Equipmen

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-15-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-23-20 05-11-20 ( 49 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-23-20 05-12-20 ( 50 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 03-15-2303-15-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 20012410 ( 0 ) ( 0 ) 03-15-2303-15-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 20012410 10 34,340.00 .00 0 34,340.00 32,940.00 2 1,400.00 96***** Contract Totals ********** Contract Totals ***** 34,340.00 .00 0 34,340.00 32,940.00 2 1,400.00 96

Page 221: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 221Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--143143 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace the General Store and the KitcheAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 34076 : :A/E Name: Shive-Hattery, Inc. : :A/E Contact: : :A/E Telephone: (312)324-5500 : :Date Selected: 07-14-20 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 24,682,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 24,682,000.00 07-20-20 24,682,000.00 07-20-20 .00 .00 24,682,000.00 .00

Total 24,682,000.00 24,682,000.00 .00 .00 24,682,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace the General Store and the KitcheReplace the General Store and the Kitche

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Shive-Hattery, Inc. 21010710 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Shive-Hattery, Inc. 21010710 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 222: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 222Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--175175--145145 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: NDescription: Emergency Roof Repairs/ReplacementAgency: Department of Corrections Analyst: Amber EvansLocation: Menard Correctional Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 400,000.00 10-28-21 400,000.00 10-28-21 .00 .00 400,000.00 .00

Total 400,000.00 400,000.00 .00 .00 400,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 25.00% Description:Description: Emergency Roof Repairs/ReplacementEmergency Roof Repairs/Replacement

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Joiner Sheet Metal & Roofing 22EM0681 10-25-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Joiner Sheet Metal & Roofing 22EM0681 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 223: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 223Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--178178--010010 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Install New Locking ControlsAgency: Department of Corrections Analyst: Amber EvansLocation: Big Muddy Correctional Center - Jefferson CountyCounty: 81 - Jefferson ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 10-15-21 :: :

A/E Id: 30361 : :A/E Name: Woolpert Architecture, LLC : :A/E Contact: Andy Kerkemeyer : :A/E Telephone: (618)632-7004 : :Date Selected: 05-14-19 : :Contract Date: 10-24-19 ________________________________________________________________________________Est. Project Cost: 3,749,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,749,800.00 05-16-19 3,749,800.00 05-16-19 371,720.00 215,295.20 3,378,080.00 .00

Total 3,749,800.00 3,749,800.00 371,720.00 215,295.20 3,378,080.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.50% Description:Description: Install New Locking ControlsInstall New Locking Controls

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-18-19 02-05-20 ( 49 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-18-19 02-11-20 ( 55 ) Prime Bid: 07-07-21 09-15-21 ( 70 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-12-22 ( 0 )50%: 01-25-21 02-17-21 ( 23 ) Final Accept: 07-11-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-25-2211-25-2295-100%: 05-03-21 05-14-21 ( 11 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert Architecture, LLC 20010810 ( 0 ) ( 0 ) 11-25-2211-25-22Broadway Electric, Inc. 22050085 10-25-21 11-08-21 06-06-22 ( 0 ) 07-06-22 ( 0 ) 07-06-2307-06-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert Architecture, LLC 20010810 10 101,260.00 270,460.00 1 371,720.00 215,295.20 5 156,424.80 58Broadway Electric, Inc. 22050085 85 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 101,260.00 270,460.00 1 371,720.00 215,295.20 5 156,424.80 58

Page 224: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 224Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--178178--012012 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Underground Wiring in R-4 & AsseAgency: Department of Corrections Analyst: Amber EvansLocation: Big Muddy Correctional Center - Jefferson CountyCounty: 81 - Jefferson ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-01-21 :: :

A/E Id: 3713 : :A/E Name: McCoy and Howard Consulting En : :A/E Contact: : :A/E Telephone: (618)242-0473 : :Date Selected: 07-09-19 : :Contract Date: 11-01-19 ________________________________________________________________________________Est. Project Cost: 750,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 103,795.00 08-08-19 103,795.00 08-08-19 18,845.00 18,845.00 84,950.00 .00

Total 103,795.00 103,795.00 18,845.00 18,845.00 84,950.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Replace Underground Wiring in R-4 & AsseReplace Underground Wiring in R-4 & Asse

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-07-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 08-01-2008-01-20 12-01-2112-01-2195-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

McCoy and Howard Consulting 19014010 ( 0 ) ( 0 ) 12-01-2112-01-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

McCoy and Howard Consulting 19014010 10 18,845.00 .00 1 18,845.00 18,845.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 18,845.00 .00 1 18,845.00 18,845.00 1 .00 100

Page 225: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 225Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--200200--120120 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate Inmate Kitchen and Cold StorageAgency: Department of Corrections Analyst: Amber EvansLocation: Pontiac Correctional Center - Livingston CountyCounty: 105 - Livingston ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 11-01-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: Paul Boland : :A/E Telephone: (217)359-1514 : :Date Selected: 12-09-14 : :Contract Date: 04-13-15 ________________________________________________________________________________Est. Project Cost: 11,846,808.75

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 11,846,808.75 07-01-18 11,846,808.75 08-08-18 9,642,544.11 9,434,873.89 2,204,264.64 .00

Total 11,846,808.75 11,846,808.75 9,642,544.11 9,434,873.89 2,204,264.64 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Renovate Inmate Kitchen and Cold StorageRenovate Inmate Kitchen and Cold Storage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-05-15 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 10,486.07 Schem Design: ( 0 ) Prime Bid: 05-15-16 04-26-18 05-24-18 ( 28 )

Design Devel: 06-09-17 06-13-17 ( 4 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-15-16 07-01-19 ( 0 )50%: 10-13-17 10-16-17 ( 3 ) Final Accept: 10-15-17 09-02-19 ( 0 )75%: ( 0 ) A/E Cont End: 08-15-1808-15-18 02-28-2202-28-2295-100%: 01-05-18 03-13-18 ( 67 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. 15010910 ( 0 ) ( 0 ) 02-28-2202-28-22Vissering Construction Compa 18050681 06-19-18 07-10-18 11-07-18 07-21-19 ( 0 ) 08-19-19 ( 0 ) 12-31-2012-31-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. 15010910 10 672,400.00 181,670.00 7 854,070.00 763,423.46 28 90,646.54 89Capital Development Board Ho EQUIPMENT 70 90,000.00 76,693.45- 0 13,306.55 .00 0 13,306.55 0W W Grainger 6558 70 66,579.45 .00 0 66,579.45 66,579.45 8 .00 100MBB of Springfield, Inc. 6757 70 10,114.00 .00 0 10,114.00 10,114.00 3 .00 100Seico, Inc. 6758 70 8,324.78 .00 0 8,324.78 8,324.78 1 .00 100Correctional Industries 6560 70 25,824.00 .00 0 25,824.00 25,824.00 1 .00 100W W Grainger 6767 70 5,121.00 .00 0 5,121.00 5,121.00 1 .00 100

Page 226: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 226Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Cooks Direct Inc 6572 70 32,887.00 .00 0 32,887.00 16,443.50 1 16,443.50 50Henneman Engineering Inc. INT6688 00 3,250.67 .00 0 3,250.67 3,250.67 1 .00 100Henneman Engineering Inc. INT6689 00 4,728.30 .00 0 4,728.30 4,728.30 1 .00 100Vissering Construction Compa 18050681 81 7,881,000.00 737,338.36 46 8,618,338.36 8,531,064.73 27 87,273.63 99***** Contract Totals ********** Contract Totals ***** 8,800,229.20 842,314.91 53 9,642,544.11 9,434,873.89 72 207,670.22 98

Page 227: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 227Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--200200--122122 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roof, Repair Masonry & TuckpointAgency: Department of Corrections Analyst: Amber EvansLocation: Pontiac Correctional Center - Livingston CountyCounty: 105 - Livingston ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 11-01-21 :: :

A/E Id: 27785 : :A/E Name: Kenyon & Associates Architects : :A/E Contact: Larry Wachtveitl : :A/E Telephone: (309)674-7121 : :Date Selected: 10-16-18 : :Contract Date: 12-21-18 ________________________________________________________________________________Est. Project Cost: 5,850,901.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,850,901.00 03-01-21 5,850,901.00 03-01-21 5,362,997.00 2,446,772.55 487,904.00 .00

Total 5,850,901.00 5,850,901.00 5,362,997.00 2,446,772.55 487,904.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 50.00% Description:Description: Replace Roof, Repair Masonry & TuckpointReplace Roof, Repair Masonry & Tuckpoint

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-15-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 03-01-19 09-24-19 (207 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-10-20 09-10-20 10-14-20 ( 34 )

Design Devel: 02-17-20 02-19-20 ( 2 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-21 ( 0 )50%: ( 0 ) Final Accept: 12-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2012-31-20 10-31-2210-31-2295-100%: 07-01-20 07-02-20 ( 1 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kenyon & Associates Architec 19001010 ( 0 ) ( 0 ) 10-31-2210-31-22Madison Construction Company 21050181 04-09-21 07-07-21 09-10-22 ( 0 ) 11-09-22 ( 0 ) 11-09-2311-09-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kenyon & Associates Architec 19001010 10 65,456.00 418,504.00 2 483,960.00 366,025.01 15 117,934.99 76Madison Construction Company 21050181 81 4,879,037.00 .00 0 4,879,037.00 2,080,747.54 3 2,798,289.46 43***** Contract Totals ********** Contract Totals ***** 4,944,493.00 418,504.00 2 5,362,997.00 2,446,772.55 18 2,916,224.45 46

Page 228: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 228Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--200200--124124 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair Roof - East and West CellhouseAgency: Department of Corrections Analyst: Amber EvansLocation: Pontiac Correctional Center - Livingston CountyCounty: 105 - Livingston ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 10-29-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: : :A/E Telephone: (312)567-1000 : :Date Selected: 11-13-19 : :Contract Date: 11-20-19 ________________________________________________________________________________Est. Project Cost: 463,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 463,600.00 06-09-21 463,600.00 06-09-21 48,005.00 19,387.70 415,595.00 .00

Total 463,600.00 463,600.00 48,005.00 19,387.70 415,595.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 95.00% Description:Description: Repair Roof - East and West CellhouseRepair Roof - East and West Cellhouse

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-30-19 10-30-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-23-20 09-16-20 (177 )

Design Devel: 12-16-19 01-24-20 ( 39 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-20 ( 0 )50%: ( 0 ) Final Accept: 07-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 06-30-2206-30-2295-100%: 01-27-20 06-16-20 (141 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauer Latoza Studio Ltd. 2001910 ( 0 ) ( 0 ) 06-30-2206-30-22Premier Contractors,Inc. 22044681 08-20-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 2001910 10 39,410.00 1,305.00 2 40,715.00 12,097.70 2 28,617.30 30Union Roofing Co., Inc. 7123 80 1,440.00 5,850.00 0 7,290.00 7,290.00 2 .00 100Premier Contractors,Inc. 22044681 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 40,850.00 7,155.00 2 48,005.00 19,387.70 4 28,617.30 40

Page 229: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 229Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--200200--125125 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Provide Temporary Heat - North Cell HousAgency: Department of Corrections Analyst: Amber EvansLocation: Pontiac Correctional Center - Livingston CountyCounty: 105 - Livingston ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 11-01-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Kevin Schnebly : :A/E Telephone: (217)363-3375 : :Date Selected: 07-19-19 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 273,823.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 273,823.00 05-20-20 273,823.00 05-20-20 273,822.11 273,822.11 .89 .00

Total 273,823.00 273,823.00 273,822.11 273,822.11 .89 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Provide Temporary Heat - North Cell HousProvide Temporary Heat - North Cell Hous

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. QB20000110 ( 0 ) ( 0 ) 06-30-2206-30-22A & R Mechanical Contractors 20EM0683 03-03-20 ( 0 ) 03-03-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. QB2000011010 .00 .00 0 .00 .00 0 .00 100A & R Mechanical Contractors 20EM0683 83 273,822.11 .00 0 273,822.11 273,822.11 3 .00 100***** Contract Totals ********** Contract Totals ***** 273,822.11 .00 0 273,822.11 273,822.11 3 .00 100

Page 230: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 230Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--200200--127127 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Assess BoilersAgency: Department of Corrections Analyst: Amber EvansLocation: Pontiac Correctional Center - Livingston CountyCounty: 105 - Livingston ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 300,000.00 10-26-21 300,000.00 10-26-21 300,000.00 .00 .00 .00

Total 300,000.00 300,000.00 300,000.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 2.00% Description:Description: Assess BoilersAssess Boilers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Mid-Illinois Mechanical Inc 22EM0583 09-29-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Mid-Illinois Mechanical Inc 22EM0583 83 300,000.00 .00 0 300,000.00 .00 0 300,000.00 0***** Contract Totals ********** Contract Totals ***** 300,000.00 .00 0 300,000.00 .00 0 300,000.00 0

Page 231: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 231Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--201201--005005 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Locking and Control SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Pinckneyville Correctional Center - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-08-21 :: :

A/E Id: 30361 : :A/E Name: Woolpert Architecture, LLC : :A/E Contact: Andy Kerkemeyer : :A/E Telephone: (618)632-7004 : :Date Selected: 05-14-19 : :Contract Date: 09-23-19 ________________________________________________________________________________Est. Project Cost: 3,936,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,936,400.00 05-16-19 3,936,400.00 05-16-19 2,560,790.72 998,734.73 1,375,609.28 .00

Total 3,936,400.00 3,936,400.00 2,560,790.72 998,734.73 1,375,609.28 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 20.00% Description:Description: Replace Locking and Control SystemsReplace Locking and Control Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-19-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-04-19 12-04-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-09-20 ( 0 )

Design Devel: 12-04-19 01-15-20 ( 42 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-09-21 ( 0 )50%: 03-18-20 03-17-20 ( 1-) Final Accept: 09-09-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-09-2209-09-2295-100%: 07-01-20 07-24-20 ( 23 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert Architecture, LLC 20010610 ( 0 ) ( 0 ) 09-09-2209-09-22F. W. Electric, Inc. 21054085 06-16-21 07-07-21 02-02-22 ( 0 ) 03-04-22 ( 0 ) 03-04-2303-04-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert Architecture, LLC 20010610 10 339,300.00 .00 1 339,300.00 214,287.00 4 125,013.00 63F. W. Electric, Inc. 21054085 85 2,205,000.00 16,490.72 1 2,221,490.72 784,447.73 2 1,437,042.99 35***** Contract Totals ********** Contract Totals ***** 2,544,300.00 16,490.72 2 2,560,790.72 998,734.73 6 1,562,055.99 39

Page 232: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 232Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--201201--006006 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Dietary Floors and DoorsAgency: Department of Corrections Analyst: Amber EvansLocation: Pinckneyville Correctional Center - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-08-21 :: :

A/E Id: 31398 : :A/E Name: Baysinger Architects, PLLC : :A/E Contact: : :A/E Telephone: (618)993-8250 : :Date Selected: 09-10-19 : :Contract Date: 01-13-20 ________________________________________________________________________________Est. Project Cost: 2,158,038.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,158,038.00 07-07-21 2,158,038.00 07-07-21 190,600.00 132,603.00 1,967,438.00 .00

Total 2,158,038.00 2,158,038.00 190,600.00 132,603.00 1,967,438.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Dietary Floors and DoorsReplace Dietary Floors and Doors

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-31-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 03-31-20 04-02-20 ( 2 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-31-20 04-17-20 ( 17 ) Prime Bid: 01-08-21 01-29-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-23-21 08-23-21 ( 0 )50%: 07-27-20 07-30-20 ( 3 ) Final Accept: 07-22-21 10-23-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-01-2209-01-2295-100%: 11-20-20 12-01-20 ( 11 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Baysinger Architects, PLLC 20012010 ( 0 ) ( 0 ) 09-01-2209-01-22Korte & Luitjohan Contractor 22043081 08-10-21 11-03-21 ( 0 ) ( 0 ) 11-03-2211-03-22Litton Enterprises, Inc. 22043182 08-10-21 11-03-21 ( 0 ) ( 0 ) 11-03-2211-03-22F. W. Electric, Inc. 22043285 08-10-21 11-03-21 ( 0 ) ( 0 ) 11-03-2211-03-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Baysinger Architects, PLLC 20012010 10 147,200.00 43,400.00 1 190,600.00 132,603.00 6 57,997.00 70Korte & Luitjohan Contractor 22043081 81 .00 .00 0 .00 .00 0 .00 100Litton Enterprises, Inc. 22043182 82 .00 .00 0 .00 .00 0 .00 100F. W. Electric, Inc. 22043285 85 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 147,200.00 43,400.00 1 190,600.00 132,603.00 6 57,997.00 70

Page 233: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 233Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Page 234: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 234Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--201201--007007 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: NDescription: Emergency Replacement of the Bar ScreenAgency: Department of Corrections Analyst: Amber EvansLocation: Pinckneyville Correctional Center - Perry CountyCounty: 145 - Perry ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-08-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 340,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 340,000.00 11-03-21 340,000.00 11-03-21 .00 .00 340,000.00 .00

Total 340,000.00 340,000.00 .00 .00 340,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 4.00% Description:Description: Emergency Replacement of the Bar ScreenEmergency Replacement of the Bar Screen

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 235: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 235Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--215215--068068 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace GeneratorAgency: Department of Corrections Analyst: Amber EvansLocation: Sheridan Correctional Center - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 11-01-21 :: :

A/E Id: 30317 : :A/E Name: Middough Inc. : :A/E Contact: : :A/E Telephone: (630)756-7000 : :Date Selected: 09-14-21 : :Contract Date: 11-12-21 ________________________________________________________________________________Est. Project Cost: 2,320,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,320,200.00 09-20-21 2,320,200.00 09-20-21 .00 .00 2,320,200.00 .00

Total 2,320,200.00 2,320,200.00 .00 .00 2,320,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace GeneratorReplace Generator

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-19-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-18-22 ( 0 )

Design Devel: 12-20-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-23 ( 0 )50%: 02-28-22 ( 0 ) Final Accept: 01-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2411-30-2495-100%: 05-09-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Middough Inc. 22001510 ( 0 ) ( 0 ) 11-30-2411-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Middough Inc. 22001510 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 236: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 236Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--225225--010010 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade Building Automation System and FAgency: Department of Corrections Analyst: Amber EvansLocation: Taylorville Correctional Center - Christian CountyCounty: 21 - Christian ________________________________________________________________________________Leg. Districts: House: 95 - Avery Bourne

Senate:48 - Doris Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 27810 : :A/E Name: Horner & Shifrin, Inc. : :A/E Contact: : :A/E Telephone: (618)622-3040 : :Date Selected: 07-13-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 3,456,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,456,700.00 07-14-21 3,456,700.00 07-14-21 .00 .00 3,456,700.00 .00

Total 3,456,700.00 3,456,700.00 .00 .00 3,456,700.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 15.00% Description:Description: Upgrade Building Automation System and FUpgrade Building Automation System and F

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Horner & Shifrin, Inc. 22010310 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Horner & Shifrin, Inc. 22010310 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 237: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 237Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--230230--133133 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace HVAC - Health Care UnitAgency: Department of Corrections Analyst: Amber EvansLocation: Stateville Correctional Center - Joliet, Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 86 - Lawrence Walsh,

Senate:43 - John Connor : CURRENT STATUS 11-01-21 :: :

A/E Id: 33433 : :A/E Name: Sebesta, Inc. : :A/E Contact: Jason Newhuis : :A/E Telephone: (312)241-1010 : :Date Selected: 07-09-19 : :Contract Date: 08-07-19 ________________________________________________________________________________Est. Project Cost: 3,923,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,923,500.00 07-23-20 3,923,500.00 07-23-20 3,681,888.79 2,984,755.44 241,611.21 .00

Total 3,923,500.00 3,923,500.00 3,681,888.79 2,984,755.44 241,611.21 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 95.00% Description:Description: Replace HVAC - Health Care UnitReplace HVAC - Health Care Unit

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-01-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-27-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-26-21 ( 0 )50%: 10-18-19 10-22-19 ( 4 ) Final Accept: 05-21-21 ( 0 )75%: ( 0 ) A/E Cont End: 03-26-2203-26-2295-100%: 12-20-19 01-24-20 ( 35 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Sebesta, Inc. 19026410 ( 0 ) ( 0 ) 03-26-2203-26-22Ideal Heating Company 21044483 12-10-20 01-26-21 11-22-21 ( 0 ) 02-20-22 ( 0 ) 02-20-2302-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sebesta, Inc. 19026410 10 623,500.00 .00 0 623,500.00 287,611.00 2 335,889.00 46Ideal Heating Company 21044483 83 2,975,555.00 82,833.79 11 3,058,388.79 2,697,144.44 7 361,244.35 88***** Contract Totals ********** Contract Totals ***** 3,599,055.00 82,833.79 11 3,681,888.79 2,984,755.44 9 697,133.35 81

Page 238: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 238Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--230230--136136 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Domestic Hot Water Heater ReplAgency: Department of Corrections Analyst: Amber EvansLocation: Stateville Correctional Center - Joliet, Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 86 - Lawrence Walsh,

Senate:43 - John Connor : CURRENT STATUS 11-01-21 :: :

A/E Id: 33433 : :A/E Name: Sebesta, Inc. : :A/E Contact: Jason Newhuis : :A/E Telephone: (312)241-1010 : :Date Selected: 12-15-20 : :Contract Date: 03-22-21 ________________________________________________________________________________Est. Project Cost: 5,257,447.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,257,447.00 08-20-21 5,257,447.00 08-20-21 5,107,447.00 3,501,107.55 150,000.00 .00

Total 5,257,447.00 5,257,447.00 5,107,447.00 3,501,107.55 150,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Emergency Domestic Hot Water Heater ReplEmergency Domestic Hot Water Heater Repl

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-12-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2110-31-21 06-30-2206-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Sebesta, Inc. 21021110 ( 0 ) ( 0 ) 06-30-2206-30-22Dodson Plumbing, Heating and 20EM3883 11-10-21 01-31-22 ( 0 ) 03-31-22 ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sebesta, Inc. 21021110 10 657,447.00 .00 1 657,447.00 242,794.17 1 414,652.83 37Dodson Plumbing, Heating and 20EM3883 83 4,200,000.00 250,000.00 3 4,450,000.00 3,258,313.38 13 1,191,686.62 73***** Contract Totals ********** Contract Totals ***** 4,857,447.00 250,000.00 4 5,107,447.00 3,501,107.55 14 1,606,339.45 69

Page 239: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 239Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--230230--137137 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Assess Masonry PiersAgency: Department of Corrections Analyst: Amber EvansLocation: Stateville Correctional Center - Joliet, Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 86 - Lawrence Walsh,

Senate:43 - John Connor : CURRENT STATUS 11-01-21 :: :

A/E Id: 35154 : :A/E Name: Helen Torres & Associates, PLL : :A/E Contact: : :A/E Telephone: (312)859-5246 : :Date Selected: : :Contract Date: 05-12-21 ________________________________________________________________________________Est. Project Cost: 85,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 85,100.00 10-12-21 85,100.00 10-12-21 85,100.00 1,800.00 .00 .00

Total 85,100.00 85,100.00 85,100.00 1,800.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 2.00% Description:Description: Assess Masonry PiersAssess Masonry Piers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-01-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-31-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-17-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-14-21 ( 0 )50%: ( 0 ) Final Accept: 02-12-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 11-01-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Helen Torres & Associates, P 21042410 ( 0 ) ( 0 ) 12-31-2212-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Helen Torres & Associates, P 21042410 10 25,850.00 59,250.00 1 85,100.00 1,800.00 1 83,300.00 2***** Contract Totals ********** Contract Totals ***** 25,850.00 59,250.00 1 85,100.00 1,800.00 1 83,300.00 2

Page 240: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 240Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--230230--138138 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing System - RotundaAgency: Department of Corrections Analyst: Amber EvansLocation: Stateville Correctional Center - Joliet, Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 86 - Lawrence Walsh,

Senate:43 - John Connor : CURRENT STATUS 11-09-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: : :A/E Telephone: (312)567-1000 : :Date Selected: 07-13-21 : :Contract Date: 10-05-21 ________________________________________________________________________________Est. Project Cost: 3,007,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,007,400.00 07-14-21 3,007,400.00 07-14-21 300,745.00 .00 2,706,655.00 .00

Total 3,007,400.00 3,007,400.00 300,745.00 .00 2,706,655.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Replace Roofing System - RotundaReplace Roofing System - Rotunda

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-08-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-03-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-03-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: 03-02-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2410-31-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauer Latoza Studio Ltd. 22030310 ( 0 ) ( 0 ) 10-31-2410-31-24Seal Tight Exteriors Inc. 22EM0381 09-08-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 22030310 10 115,745.00 .00 0 115,745.00 .00 0 115,745.00 0Seal Tight Exteriors Inc. 22EM0381 81 185,000.00 .00 0 185,000.00 .00 0 185,000.00 0***** Contract Totals ********** Contract Totals ***** 300,745.00 .00 0 300,745.00 .00 0 300,745.00 0

Page 241: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 241Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--241241--004004 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Air ConditioningAgency: Department of Corrections Analyst: Amber EvansLocation: Vandalia Work Camp - Fayette CountyCounty: 51 - Fayette ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 11-09-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: Wynter Farmer : :A/E Telephone: (618)659-8709 : :Date Selected: 09-10-19 : :Contract Date: 10-17-19 ________________________________________________________________________________Est. Project Cost: 426,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 426,100.00 09-12-19 426,100.00 09-12-19 421,535.03 310,652.80 4,564.97 .00

Total 426,100.00 426,100.00 421,535.03 310,652.80 4,564.97 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 85.00% Description:Description: Replace Air ConditioningReplace Air Conditioning

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-03-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-13-19 12-23-19 ( 10 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-04-20 08-19-20 ( 76 )

Design Devel: 12-13-19 12-24-19 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-16-20 ( 0 )50%: ( 0 ) Final Accept: 02-21-21 ( 0 )75%: ( 0 ) A/E Cont End: 02-21-2202-21-2295-100%: 03-13-20 04-07-20 ( 25 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 20040210 ( 0 ) ( 0 ) 02-21-2202-21-22Henson Robinson Company 21043283 10-21-20 01-26-21 01-26-22 06-24-21 (216-) 03-27-22 ( 0 ) 03-27-2303-27-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 20040210 10 47,800.00 .00 0 47,800.00 39,603.30 4 8,196.70 83Henson Robinson Company 21043283 83 299,847.00 73,888.03 1 373,735.03 271,049.50 4 102,685.53 73***** Contract Totals ********** Contract Totals ***** 347,647.00 73,888.03 1 421,535.03 310,652.80 8 110,882.23 74

Page 242: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 242Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--245245--075075 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade Sewer Treatment FacilityAgency: Department of Corrections Analyst: Amber EvansLocation: Vienna Correctional Center - Johnson CountyCounty: 87 - Johnson ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-08-21 :: :

A/E Id: 25661 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: : :A/E Telephone: (618)998-0075 : :Date Selected: 10-08-19 : :Contract Date: 01-17-20 ________________________________________________________________________________Est. Project Cost: 1,364,650.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,041,000.00 10-10-19 1,041,000.00 10-10-19 128,200.00 72,759.00 912,800.00 .00

Total 1,041,000.00 1,041,000.00 128,200.00 72,759.00 912,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Upgrade Sewer Treatment FacilityUpgrade Sewer Treatment Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-11-19 ( 0 ) Assgn Bid: 10-13-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-29-20 07-02-20 ( 34 ) Assgn Re-Bid: 10-27-21 ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-25-21 10-27-21 (244 )

Design Devel: 05-29-20 07-02-20 ( 34 ) Prime Re-Bid: 10-27-21 ( 0 )25%: ( 0 ) Subst Compl: 01-06-22 ( 0 )50%: 08-25-20 12-09-20 (106 ) Final Accept: 03-07-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2306-01-2395-100%: 12-21-20 08-10-21 (232 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 20012510 ( 0 ) ( 0 ) 06-01-2306-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 20012510 10 128,200.00 .00 0 128,200.00 72,759.00 13 55,441.00 57***** Contract Totals ********** Contract Totals ***** 128,200.00 .00 0 128,200.00 72,759.00 13 55,441.00 57

Page 243: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 243Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--245245--077077 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing Systems and Other ImprovAgency: Department of Corrections Analyst: Amber EvansLocation: Vienna Correctional Center - Johnson CountyCounty: 87 - Johnson ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 10-15-21 :: :

A/E Id: 29471 : :A/E Name: BHDG Architects, Inc. : :A/E Contact: : :A/E Telephone: (618)998-8015 : :Date Selected: 03-10-20 : :Contract Date: 03-12-21 ________________________________________________________________________________Est. Project Cost: 1,298,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,292,800.00 03-11-20 1,292,800.00 03-11-20 51,476.00 33,776.00 1,241,324.00 .00

Total 1,292,800.00 1,292,800.00 51,476.00 33,776.00 1,241,324.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 45.00% Description:Description: Replace Roofing Systems and Other ImprovReplace Roofing Systems and Other Improv

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-10-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-02-21 05-06-21 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-04-21 ( 0 )

Design Devel: 05-02-21 05-14-21 ( 12 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-01-22 ( 0 )50%: 06-29-21 ( 0 ) Final Accept: 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-23-2308-23-2395-100%: 08-26-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BHDG Architects, Inc. 21011210 ( 0 ) ( 0 ) 08-23-2308-23-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BHDG Architects, Inc. 21011210 10 51,476.00 .00 0 51,476.00 33,776.00 2 17,700.00 66***** Contract Totals ********** Contract Totals ***** 51,476.00 .00 0 51,476.00 33,776.00 2 17,700.00 66

Page 244: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 244Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--245245--078078 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair Baghouse and Replace BoilerAgency: Department of Corrections Analyst: Amber EvansLocation: Vienna Correctional Center - Johnson CountyCounty: 87 - Johnson ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-08-21 :: :

A/E Id: 29102 : :A/E Name: Milhouse Engineering and Const : :A/E Contact: : :A/E Telephone: (312)987-0061 : :Date Selected: 12-15-20 : :Contract Date: 04-27-21 ________________________________________________________________________________Est. Project Cost: 4,080,490.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 80,490.00 03-09-21 80,490.00 03-09-21 80,490.00 .00 .00 .00

Total 80,490.00 80,490.00 80,490.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Repair Baghouse and Replace BoilerRepair Baghouse and Replace Boiler

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-09-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 07-23-21 09-01-21 ( 40 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-23-21 09-01-21 ( 40 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2309-30-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Milhouse Engineering and Con 21041310 ( 0 ) ( 0 ) 09-30-2309-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Milhouse Engineering and Con 21041310 10 80,490.00 .00 0 80,490.00 .00 0 80,490.00 0***** Contract Totals ********** Contract Totals ***** 80,490.00 .00 0 80,490.00 .00 0 80,490.00 0

Page 245: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 245Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--255255--025025 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Shawnee Correctional Center - Johnson CountyCounty: 87 - Johnson ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-12-21 :: :

A/E Id: 31398 : :A/E Name: Baysinger Architects, PLLC : :A/E Contact: Michael Baysinger : :A/E Telephone: (618)993-8250 : :Date Selected: 11-18-14 : :Contract Date: 03-26-15 ________________________________________________________________________________Est. Project Cost: 3,484,941.05

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,484,941.05 06-26-18 3,484,941.05 06-26-18 3,150,989.19 2,362,318.21 333,951.86 .00

Total 3,484,941.05 3,484,941.05 3,150,989.19 2,362,318.21 333,951.86 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 70.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-23-15 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-17-15 10-05-17 11-02-17 ( 28 )

Design Devel: 05-12-15 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-14-16 08-01-20 ( 0 )50%: 05-15-17 05-15-17 ( 0 ) Final Accept: 12-14-16 10-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 11-14-1711-14-17 10-01-2110-01-2195-100%: 07-24-17 08-11-17 ( 18 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Baysinger Architects, PLLC 15001110 ( 0 ) ( 0 ) 10-01-2110-01-21Hutchinson Design Group, Ltd 7053 ( 0 ) ( 0 )Hutchinson Design Group, Ltd 7056 ( 0 ) ( 0 )Hutchinson Design Group, Ltd 7194 ( 0 ) ( 0 )Hutchinson Design Group, Ltd 7225 ( 0 ) ( 0 )Evrard-Strang Construction I 18044181 12-04-17 01-05-18 09-02-18 06-30-19 ( 0 ) 08-31-19 ( 0 ) 06-30-2006-30-20D.E. Martin Roofing Co., Inc 20EM3781 10-20-20 01-05-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Baysinger Architects, PLLC 15001110 10 237,940.00 100,910.80 3 338,850.80 293,642.52 14 45,208.28 87Hutchinson Design Group, Ltd 7053 11 722.80 .00 0 722.80 722.80 1 .00 100

Page 246: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 246Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hutchinson Design Group, Ltd 7056 11 9,015.38 783.33 0 9,798.71 9,798.71 2 .00 100Hutchinson Design Group, Ltd 7194 11 2,687.50 1,406.35 0 4,093.85 4,093.85 2 .00 100Hutchinson Design Group, Ltd 7225 11 15,000.00 .00 0 15,000.00 .00 0 15,000.00 0Evrard-Strang Construction I 18044181 81 2,494,648.00 247,060.75 6 2,741,708.75 2,013,246.05 14 728,462.70 74D.E. Martin Roofing Co., Inc 20EM3781 81 40,000.00 1,335.72- 0 38,664.28 38,664.28 1 .00 100***** Contract Totals ********** Contract Totals ***** 2,800,013.68 348,825.51 9 3,148,839.19 2,360,168.21 34 788,670.98 75

Page 247: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 247Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--255255--026026 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Coolers and FreezersAgency: Department of Corrections Analyst: Amber EvansLocation: Shawnee Correctional Center - Johnson CountyCounty: 87 - Johnson ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-12-21 :: :

A/E Id: 1698 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: Dave Pool : :A/E Telephone: (217)532-3959 : :Date Selected: 03-10-15 : :Contract Date: 03-01-19 ________________________________________________________________________________Est. Project Cost: 970,386.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,015,252.95 05-15-20 1,015,252.95 05-15-20 874,881.10 833,246.25 95,504.90 44,866.95

Total 1,015,252.95 1,015,252.95 874,881.10 833,246.25 95,504.90 44,866.95____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 94.00% Description:Description: Replace Coolers and FreezersReplace Coolers and Freezers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-28-15 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-01-19 05-01-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 60.15 Schem Design: 05-01-19 05-07-19 ( 6 ) Prime Bid: 12-19-19 03-05-20 ( 77 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-19-20 ( 0 )50%: ( 0 ) Final Accept: 10-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 11-15-2111-15-2195-100%: 10-09-19 11-20-19 ( 42 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 15001510 ( 0 ) ( 0 ) 11-15-2111-15-21Southern Illinois Piping Con 20050281 06-10-20 07-22-20 04-18-21 01-28-21 ( 80-) 06-17-21 07-27-21 ( 40 ) 06-17-2206-17-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 15001510 10 13,160.00 77,140.00 2 90,300.00 48,665.15 16 41,634.85 54Southern Illinois Piping Con 20050281 81 753,600.00 30,981.10 8 784,581.10 784,581.10 6 .00 100***** Contract Totals ********** Contract Totals ***** 766,760.00 108,121.10 10 874,881.10 833,246.25 22 41,634.85 95

Page 248: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 248Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--255255--027027 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: YDescription: Emergency Chiller ReplacementAgency: Department of Corrections Analyst: Amber EvansLocation: Shawnee Correctional Center - Johnson CountyCounty: 87 - Johnson ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-12-21 :: :

A/E Id: 1238 : :A/E Name: Asaturian, Eaton and Associate : :A/E Contact: : :A/E Telephone: (618)529-3414 : :Date Selected: 08-11-20 : :Contract Date: 07-14-20 ________________________________________________________________________________Est. Project Cost: 356,546.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 461,057.00 04-08-21 461,057.00 04-08-21 459,702.00 213,405.84 1,355.00 .00

Total 461,057.00 461,057.00 459,702.00 213,405.84 1,355.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 10.00% Description:Description: Emergency Chiller ReplacementEmergency Chiller Replacement

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-14-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-20-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-11-2010-11-20 12-31-2112-31-2195-100%: 10-09-20 11-06-20 ( 28 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Asaturian, Eaton and Associa 21010810 ( 0 ) ( 0 ) 12-31-2112-31-21A & W Plumbing & Heating, In 21049083 03-26-21 04-21-21 10-03-21 ( 0 ) 11-02-21 ( 0 ) 11-02-2211-02-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Asaturian, Eaton and Associa 21010810 10 162,657.00 90,045.00 3 252,702.00 213,405.84 10 39,296.16 85A & W Plumbing & Heating, In 21049083 83 207,000.00 .00 0 207,000.00 .00 0 207,000.00 0***** Contract Totals ********** Contract Totals ***** 369,657.00 90,045.00 3 459,702.00 213,405.84 10 246,296.16 47

Page 249: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 249Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--260260--036036 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair/Replace Dietary Electrical ServicAgency: Department of Corrections Analyst: Amber EvansLocation: Centralia Correctional Center - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:108 - Charles Meier

Senate:54 - Jason Plummer : CURRENT STATUS 11-09-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: Wynter Farmer : :A/E Telephone: (618)659-8709 : :Date Selected: 07-14-20 : :Contract Date: 08-19-20 ________________________________________________________________________________Est. Project Cost: 473,595.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 473,595.00 07-12-21 473,595.00 07-12-21 438,274.20 59,222.75 35,320.80 .00

Total 473,595.00 473,595.00 438,274.20 59,222.75 35,320.80 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Repair/Replace Dietary Electrical ServicRepair/Replace Dietary Electrical Servic

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-28-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 09-21-20 10-01-20 ( 10 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-21-20 10-05-20 ( 14 ) Prime Bid: 03-26-21 05-26-21 ( 61 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-28-22 ( 0 )50%: ( 0 ) Final Accept: 04-14-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2307-31-2395-100%: 01-08-21 02-18-21 ( 41 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 21040410 ( 0 ) ( 0 ) 07-31-2307-31-23Keith Martin, Inc. 22042985 08-05-21 02-20-22 ( 0 ) 05-21-22 ( 0 ) 05-21-2305-21-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 21040410 10 8,700.80 72,224.40 1 80,925.20 55,073.75 2 25,851.45 68J. F. Electric, Incorporated 7111 80 4,149.00 .00 0 4,149.00 4,149.00 1 .00 100Keith Martin, Inc. 22042985 85 353,200.00 .00 0 353,200.00 .00 0 353,200.00 0***** Contract Totals ********** Contract Totals ***** 366,049.80 72,224.40 1 438,274.20 59,222.75 3 379,051.45 14

Page 250: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 250Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--260260--038038 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Replace Boiler - Dietary BuildingAgency: Department of Corrections Analyst: Amber EvansLocation: Centralia Correctional Center - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:108 - Charles Meier

Senate:54 - Jason Plummer : CURRENT STATUS 11-08-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 110,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 110,000.00 04-12-21 110,000.00 04-12-21 110,000.00 .00 .00 .00

Total 110,000.00 110,000.00 110,000.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Boiler - Dietary BuildingReplace Boiler - Dietary Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Premium Mechanical and Autom 21EM0781 04-09-21 04-09-21 06-07-21 ( 0 ) 07-07-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Premium Mechanical and Autom 21EM0781 81 110,000.00 .00 0 110,000.00 .00 0 110,000.00 0***** Contract Totals ********** Contract Totals ***** 110,000.00 .00 0 110,000.00 .00 0 110,000.00 0

Page 251: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 251Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--260260--039039 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade Fire Alarm SystemAgency: Department of Corrections Analyst: Amber EvansLocation: Centralia Correctional Center - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:108 - Charles Meier

Senate:54 - Jason Plummer : CURRENT STATUS 11-08-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 3,215,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,215,000.00 10-19-21 3,215,000.00 10-19-21 .00 .00 3,215,000.00 .00

Total 3,215,000.00 3,215,000.00 .00 .00 3,215,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 1.00% Description:Description: Upgrade Fire Alarm SystemUpgrade Fire Alarm System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 252: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 252Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--270270--041041 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Lock ControlsAgency: Department of Corrections Analyst: Amber EvansLocation: Graham Correctional Center - Montgomery CountyCounty: 135 - Montgomery ________________________________________________________________________________Leg. Districts: House: 95 - Avery Bourne

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 34127 : :A/E Name: Dewberry Engineers Inc. : :A/E Contact: Craig Clary : :A/E Telephone: (309)282-8000 : :Date Selected: 03-12-19 : :Contract Date: 07-16-19 ________________________________________________________________________________Est. Project Cost: 401,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 401,900.00 03-14-19 401,900.00 03-14-19 47,750.00 30,442.06 354,150.00 .00

Total 401,900.00 401,900.00 47,750.00 30,442.06 354,150.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Replace Lock ControlsReplace Lock Controls

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-16-19 12-02-19 ( 47 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-04-20 10-27-21 (510 )

Design Devel: 10-16-19 12-02-19 ( 47 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-04-21 ( 0 )50%: 12-20-19 01-24-20 ( 35 ) Final Accept: 03-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-05-2112-05-21 03-31-2303-31-2395-100%: 03-24-20 09-08-20 (168 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Engineers Inc. 19012310 ( 0 ) ( 0 ) 03-31-2303-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Engineers Inc. 19012310 10 47,750.00 .00 1 47,750.00 30,442.06 8 17,307.94 64***** Contract Totals ********** Contract Totals ***** 47,750.00 .00 1 47,750.00 30,442.06 8 17,307.94 64

Page 253: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 253Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--270270--042042 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Graham Correctional Center - Montgomery CountyCounty: 135 - Montgomery ________________________________________________________________________________Leg. Districts: House: 95 - Avery Bourne

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 1698 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: Timothy Downen : :A/E Telephone: (217)532-3959 : :Date Selected: 03-12-19 : :Contract Date: 07-10-19 ________________________________________________________________________________Est. Project Cost: 2,119,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,119,500.00 03-19-19 2,119,500.00 03-19-19 1,820,037.00 109,483.20 299,463.00 .00

Total 2,119,500.00 2,119,500.00 1,820,037.00 109,483.20 299,463.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 20.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 08-23-19 08-23-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-16-20 04-14-21 (454 )

Design Devel: 08-23-19 08-27-19 ( 4 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-07-20 ( 0 )50%: ( 0 ) Final Accept: 09-18-20 ( 0 )75%: ( 0 ) A/E Cont End: 11-04-2111-04-21 05-31-2305-31-2395-100%: 11-01-19 02-05-20 ( 96 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 19012110 ( 0 ) ( 0 ) 05-31-2305-31-23Joiner Sheet Metal & Roofing 21056481 06-21-21 07-22-21 12-09-21 ( 0 ) 01-23-22 ( 0 ) 01-23-2301-23-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 19012110 10 190,300.00 .00 1 190,300.00 109,483.20 8 80,816.80 58Joiner Sheet Metal & Roofing 21056481 81 1,629,737.00 .00 0 1,629,737.00 .00 0 1,629,737.00 0***** Contract Totals ********** Contract Totals ***** 1,820,037.00 .00 1 1,820,037.00 109,483.20 8 1,710,553.80 6

Page 254: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 254Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--290290--007007 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Boiler BurnersAgency: Department of Corrections Analyst: Amber EvansLocation: Decatur Correctional Center - Macon CountyCounty: 115 - Macon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: Wynter Farmer : :A/E Telephone: (618)659-8709 : :Date Selected: 10-08-19 : :Contract Date: 12-13-19 ________________________________________________________________________________Est. Project Cost: 2,436,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,436,800.00 10-15-19 2,436,800.00 10-15-19 1,498,058.53 350,556.74 938,741.47 .00

Total 2,436,800.00 2,436,800.00 1,498,058.53 350,556.74 938,741.47 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 27.00% Description:Description: Replace Boiler BurnersReplace Boiler Burners

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-13-19 11-13-19 ( 0 ) Assgn Bid: 08-19-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-15-20 09-02-20 ( 79 )

Design Devel: 01-27-20 02-07-20 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-30-21 ( 0 )50%: ( 0 ) Final Accept: 05-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-30-2204-30-2295-100%: 04-20-20 05-06-20 ( 16 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 2001810 ( 0 ) ( 0 ) 04-30-2204-30-22Midwest Asbestos Abatement C 21051588 05-20-21 07-27-21 07-22-22 ( 0 ) 10-20-22 ( 0 ) 10-20-2310-20-23Mid-Illinois Mechanical Inc 21051683 05-20-21 07-27-21 07-22-22 ( 0 ) 10-20-22 ( 0 ) 10-20-2310-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 2001810 10 233,700.00 .00 0 233,700.00 133,981.00 3 99,719.00 57Midwest Asbestos Abatement C 21051588 88 271,880.00 .00 0 271,880.00 .00 0 271,880.00 0Mid-Illinois Mechanical Inc 21051683 83 924,500.00 67,978.53 1 992,478.53 216,575.74 2 775,902.79 22***** Contract Totals ********** Contract Totals ***** 1,430,080.00 67,978.53 1 1,498,058.53 350,556.74 5 1,147,501.79 24

Page 255: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 255Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--295295--012012 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Locking and Control Systems andAgency: Department of Corrections Analyst: Amber EvansLocation: Lawrence Correctional Center - Lawrence CountyCounty: 101 - Lawrence ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 10-15-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: Paul Carmen : :A/E Telephone: (314)918-8383 : :Date Selected: 05-14-19 : :Contract Date: 09-10-19 ________________________________________________________________________________Est. Project Cost: 3,939,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,939,200.00 05-16-19 3,939,200.00 05-16-19 2,348,500.00 227,102.50 1,590,700.00 .00

Total 3,939,200.00 3,939,200.00 2,348,500.00 227,102.50 1,590,700.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Replace Locking and Control Systems andReplace Locking and Control Systems and

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-06-19 ( 0 ) Assgn Bid: 01-06-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-25-19 01-14-20 ( 81 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-18-20 01-20-21 (216 )

Design Devel: 02-14-20 03-10-20 ( 25 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-18-21 ( 0 )50%: ( 0 ) Final Accept: 02-25-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 05-01-20 07-20-20 ( 80 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 19033210 ( 0 ) ( 0 ) 12-31-2212-31-22Poettker Construction Compan 21049681 04-27-21 05-21-21 11-22-22 ( 0 ) 01-06-23 ( 0 ) 01-06-2401-06-24Seico, Inc. 21052385 04-27-21 05-21-21 11-22-22 ( 0 ) 01-06-23 ( 0 ) 01-06-2401-06-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 19033210 10 321,500.00 .00 0 321,500.00 227,102.50 5 94,397.50 71Poettker Construction Compan 21049681 81 372,000.00 .00 0 372,000.00 .00 0 372,000.00 0Seico, Inc. 21052385 85 1,655,000.00 .00 0 1,655,000.00 .00 0 1,655,000.00 0***** Contract Totals ********** Contract Totals ***** 2,348,500.00 .00 0 2,348,500.00 227,102.50 5 2,121,397.50 10

Page 256: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 256Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--295295--017017 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade Bar Screen SystemAgency: Department of Corrections Analyst: Amber EvansLocation: Lawrence Correctional Center - Lawrence CountyCounty: 101 - Lawrence ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 10-15-21 :: :

A/E Id: 27810 : :A/E Name: Horner & Shifrin, Inc. : :A/E Contact: : :A/E Telephone: (618)622-3040 : :Date Selected: 10-12-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 584,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 584,600.00 10-18-21 584,600.00 10-18-21 .00 .00 584,600.00 .00

Total 584,600.00 584,600.00 .00 .00 584,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Upgrade Bar Screen SystemUpgrade Bar Screen System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Horner & Shifrin, Inc. 22042010 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Horner & Shifrin, Inc. 22042010 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 257: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 257Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--295295--020020 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: NDescription: Emergency Replacement of Underground PipAgency: Department of Corrections Analyst: Amber EvansLocation: Lawrence Correctional Center - Lawrence CountyCounty: 101 - Lawrence ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 100,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 100,000.00 11-08-21 100,000.00 11-08-21 .00 .00 100,000.00 .00

Total 100,000.00 100,000.00 .00 .00 100,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Emergency Replacement of Underground PipEmergency Replacement of Underground Pip

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 258: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 258Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 120120--300300--008008 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Corrections Analyst: Amber EvansLocation: Kewanee Life Skills Re-Entry Center - Henry CountyCounty: 73 - Henry ________________________________________________________________________________Leg. Districts: House: 74 - Daniel Swanson

Senate:37 - Win Stoller : CURRENT STATUS 11-01-21 :: :

A/E Id: 35486 : :A/E Name: Design Mavens Architecture PLL : :A/E Contact: : :A/E Telephone: (309)304-3048 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 5,178,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,178,600.00 09-22-21 5,178,600.00 09-22-21 .00 .00 5,178,600.00 .00

Total 5,178,600.00 5,178,600.00 .00 .00 5,178,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Design Mavens Architecture P 22001410 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Design Mavens Architecture P 22001410 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 259: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 259Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--000000--005005 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct and Renovate Facilities - LincAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 28573 : :A/E Name: Cordogan, Clark & Assoc., Inc. : :A/E Contact: Tim Weber : :A/E Telephone: (630)896-4678 : :Date Selected: 11-17-20 : :Contract Date: 02-02-21 ________________________________________________________________________________Est. Project Cost: 21,184,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,500,000.00 11-18-20 2,500,000.00 11-18-20 1,653,140.00 377,509.60 846,860.00 .00

Total 2,500,000.00 2,500,000.00 1,653,140.00 377,509.60 846,860.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 49.00% Description:Description: Construct and Renovate Facilities - LincConstruct and Renovate Facilities - Linc

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-19-21 01-19-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-22-21 04-08-21 ( 17 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-14-21 06-22-21 ( 8 ) Prime Bid: 04-25-22 06-30-22 ( 0 )

Design Devel: 11-22-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-23 09-30-23 ( 0 )50%: ( 0 ) Final Accept: 08-30-23 11-30-23 ( 0 )75%: 02-14-22 ( 0 ) A/E Cont End: 06-30-2406-30-24 09-30-2409-30-2495-100%: 03-21-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Cordogan, Clark & Assoc., In 21001210 ( 0 ) ( 0 ) 09-30-2409-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Cordogan, Clark & Assoc., In 21001210 10 1,609,800.00 43,340.00 1 1,653,140.00 377,509.60 6 1,275,630.40 23***** Contract Totals ********** Contract Totals ***** 1,609,800.00 43,340.00 1 1,653,140.00 377,509.60 6 1,275,630.40 23

Page 260: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 260Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--003003--004004 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - HarrisburgCounty: 165 - Saline ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-12-21 :: :

A/E Id: 22834 : :A/E Name: hmb Architects LLC : :A/E Contact: Harlan Bohnsack : :A/E Telephone: (618)457-5709 : :Date Selected: 10-14-14 : :Contract Date: 02-10-15 ________________________________________________________________________________Est. Project Cost: 2,800,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,856,164.00 07-01-18 2,856,164.00 08-08-18 2,216,385.08 2,048,923.85 639,778.92 .00

Total 2,856,164.00 2,856,164.00 2,216,385.08 2,048,923.85 639,778.92 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 99.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-09-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-27-15 04-30-15 ( 3 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-27-15 04-30-15 ( 3 ) Prime Bid: 11-16-15 08-15-19 08-29-19 ( 14 )

Design Devel: 06-25-15 06-24-15 ( 1-) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-02-17 10-15-20 ( 0 )50%: ( 0 ) Final Accept: 03-02-17 12-15-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1812-31-18 12-31-2112-31-2195-100%: 06-21-19 06-27-19 ( 6 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

hmb Architects LLC 15000410 ( 0 ) ( 0 ) 12-31-2112-31-21D7 Roofing, LLC 20044381 06-23-20 07-16-20 05-12-21 06-08-21 ( 27 ) 07-11-21 ( 0 ) 07-11-2207-11-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

hmb Architects LLC 15000410 10 191,444.00 14,787.00 2 206,231.00 171,615.94 5 34,615.06 83D7 Roofing, LLC 20044381 81 1,971,904.00 38,250.08 1 2,010,154.08 1,877,307.91 8 132,846.17 93***** Contract Totals ********** Contract Totals ***** 2,163,348.00 53,037.08 3 2,216,385.08 2,048,923.85 13 167,461.23 93

Page 261: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 261Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--003003--005005 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace ChillersAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - HarrisburgCounty: 165 - Saline ________________________________________________________________________________Leg. Districts: House:118 - Patrick Windhorst

Senate:59 - Dale Fowler : CURRENT STATUS 11-12-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: Stephen Duda : :A/E Telephone: (314)918-8383 : :Date Selected: 10-14-14 : :Contract Date: 04-20-15 ________________________________________________________________________________Est. Project Cost: 810,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 832,485.73 07-01-18 832,485.73 08-08-18 713,369.44 691,803.38 119,116.29 .00

Total 832,485.73 832,485.73 713,369.44 691,803.38 119,116.29 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 92.00% Description:Description: Replace ChillersReplace Chillers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-20-15 ( 0 ) Assgn Bid: 05-23-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 8,416.52 Schem Design: ( 0 ) Prime Bid: 10-28-15 04-18-19 05-30-19 ( 42 )

Design Devel: 06-05-15 06-10-15 ( 5 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-16 12-06-19 ( 0 )50%: ( 0 ) Final Accept: 08-31-16 01-10-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-1706-30-17 12-31-2112-31-2195-100%: 02-22-19 02-22-19 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 15000710 ( 0 ) ( 0 ) 12-31-2112-31-21Brown Electric, Inc. 20040585 07-19-19 08-27-19 02-26-20 07-30-20 (155 ) 04-11-20 12-03-20 (236 ) 04-11-2104-11-21A & W Plumbing & Heating, In 20040683 07-19-19 08-27-19 02-26-20 07-30-20 (155 ) 04-11-20 12-03-20 (236 ) 04-11-2104-11-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 15000710 10 83,781.00 2,253.62- 4 81,527.38 59,961.32 6 21,566.06 74Brown Electric, Inc. 20040585 85 59,665.00 10,788.61 1 70,453.61 70,453.61 6 .00 100A & W Plumbing & Heating, In 20040683 83 510,800.00 50,588.45 5 561,388.45 561,388.45 7 .00 100***** Contract Totals ********** Contract Totals ***** 654,246.00 59,123.44 10 713,369.44 691,803.38 19 21,566.06 97

Page 262: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 262Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--080080--004004 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Security Locks, Doors, Windows,Agency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - Warrenville, DuPage CountyCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 41 - Janet Rohr

Senate:21 - Laura Ellman : CURRENT STATUS 08-30-21 :: :

A/E Id: 3473 : :A/E Name: Rubinos and Mesia Engineers, I : :A/E Contact: Ted White : :A/E Telephone: (312)870-6600 : :Date Selected: 08-13-19 : :Contract Date: 10-03-19 ________________________________________________________________________________Est. Project Cost: 3,409,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,409,600.00 08-19-19 3,409,600.00 08-19-19 325,400.00 235,030.70 3,084,200.00 .00

Total 3,409,600.00 3,409,600.00 325,400.00 235,030.70 3,084,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Replace Security Locks, Doors, Windows,Replace Security Locks, Doors, Windows,

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-13-19 09-13-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-12-20 07-14-21 (244 )

Design Devel: 02-24-20 03-09-20 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-05-21 ( 0 )50%: ( 0 ) Final Accept: 12-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-05-2211-05-2295-100%: 08-24-20 02-08-21 (168 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Rubinos and Mesia Engineers, 20020510 ( 0 ) ( 0 ) 11-05-2211-05-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Rubinos and Mesia Engineers, 20020510 10 325,400.00 .00 0 325,400.00 235,030.70 6 90,369.30 72***** Contract Totals ********** Contract Totals ***** 325,400.00 .00 0 325,400.00 235,030.70 6 90,369.30 72

Page 263: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 263Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--080080--005005 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Repair/Resurface RoadwaysAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - Warrenville, DuPage CountyCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 41 - Janet Rohr

Senate:21 - Laura Ellman : CURRENT STATUS 08-30-21 :: :

A/E Id: 19605 : :A/E Name: Engineering Resource Associate : :A/E Contact: John Mayer : :A/E Telephone: (630)393-3060 : :Date Selected: 09-10-19 : :Contract Date: 10-21-19 ________________________________________________________________________________Est. Project Cost: 647,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 647,200.00 09-12-19 647,200.00 09-12-19 99,750.00 62,637.08 547,450.00 .00

Total 647,200.00 647,200.00 99,750.00 62,637.08 547,450.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Repair/Resurface RoadwaysRepair/Resurface Roadways

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-27-19 09-27-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-19-21 06-09-21 (110 )

Design Devel: 12-27-19 01-03-20 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-01-21 ( 0 )50%: ( 0 ) Final Accept: 10-01-21 ( 0 )75%: 09-14-20 12-02-20 ( 79 ) A/E Cont End: 08-01-2208-01-2295-100%: 11-09-20 02-09-21 ( 92 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Engineering Resource Associa 20021110 ( 0 ) ( 0 ) 08-01-2208-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Engineering Resource Associa 20021110 10 68,234.00 31,516.00 1 99,750.00 62,637.08 8 37,112.92 63***** Contract Totals ********** Contract Totals ***** 68,234.00 31,516.00 1 99,750.00 62,637.08 8 37,112.92 63

Page 264: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 264Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--110110--008008 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Renovate Intake BuildingAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - St. CharlesCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 50 - Keith Wheeler

Senate:25 - Karina Villa : CURRENT STATUS 11-05-21 :: :

A/E Id: 20003 : :A/E Name: A. Epstein and Sons Internatio : :A/E Contact: Edward Curley : :A/E Telephone: (312)454-9100 : :Date Selected: 06-12-12 : :Contract Date: 09-27-12 ________________________________________________________________________________Est. Project Cost: 7,209,464.38

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 7,265,324.35 04-11-18 7,265,324.35 04-11-18 4,307,200.56 4,293,458.76 2,902,263.82 55,859.97

Total 7,265,324.35 7,265,324.35 4,307,200.56 4,293,458.76 2,902,263.82 55,859.97____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Renovate Intake BuildingRenovate Intake Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-28-12 ( 0 ) Assgn Bid: 12-05-13 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-03-12 12-04-12 ( 1 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-05-13 12-12-13 ( 98 )

Design Devel: 05-08-13 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-06-14 11-28-18 ( 0 )50%: 03-04-13 03-11-13 ( 7 ) Final Accept: 11-06-14 12-28-18 ( 0 )75%: ( 0 ) A/E Cont End: 10-05-1510-05-15 09-20-2209-20-2295-100%: 07-05-13 10-08-13 ( 95 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

A. Epstein and Sons Internat 12048110 ( 0 ) ( 0 ) 09-20-2209-20-22Automatic Fire Systems, Inc. 14060882 03-13-14 04-16-14 08-29-18 04-26-19 04-03-20 (583 ) 05-28-19 10-13-20 (504 ) 01-29-2101-29-21Colfax Corporation 14060988 03-13-14 04-16-14 04-16-15 12-04-14 (133-) 05-16-15 12-04-14 (163-) 05-15-1605-15-16Associated Electrical Contra 14061085 03-13-14 04-16-14 08-29-18 04-26-19 04-03-20 (583 ) 05-28-19 10-13-20 (504 ) 01-29-2101-29-21Amber Mechanical Contractors 14061184 03-13-14 04-16-14 08-29-18 04-26-19 04-03-20 (583 ) 05-28-19 10-13-20 (504 ) 01-29-2101-29-21Premier Mechanical, Incorpor 14061283 03-13-14 04-16-14 08-29-18 04-26-19 04-03-20 (583 ) 05-28-19 10-13-20 (504 ) 01-29-2101-29-21JB Contracting Corp. 14061382 03-13-14 04-16-14 08-29-18 04-26-19 04-03-20 (583 ) 05-28-19 10-13-20 (504 ) 01-29-2101-29-21Path Construction Company, I 14061481 03-13-14 04-16-14 08-29-18 04-26-19 04-03-20 (583 ) 05-28-19 10-07-20 (498 ) 01-29-2101-29-21Premier Mechanical, Incorpor 21SM0684 03-31-21 03-23-21 05-30-21 06-14-21 ( 15 ) 06-29-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

A. Epstein and Sons Internat 12048110 10 369,000.00 99,691.00 11 468,691.00 454,949.20 17 13,741.80 97

Page 265: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 265Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Technology Management Rev. F 6691 50 72,802.68 .00 0 72,802.68 72,802.68 1 .00 100Automatic Fire Systems, Inc. 14060882 82 103,800.00 8,856.14 7 112,656.14 112,656.14 4 .00 100Colfax Corporation 14060988 88 49,890.00 7,694.74 1 57,584.74 57,584.74 2 .00 100Associated Electrical Contra 14061085 85 469,942.00 26,670.07 11 496,612.07 496,612.07 12 .00 100Amber Mechanical Contractors 14061184 84 107,300.00 5,526.01 7 112,826.01 112,826.01 9 .00 100Premier Mechanical, Incorpor 14061283 83 576,000.00 12,503.54 7 588,503.54 588,503.54 11 .00 100JB Contracting Corp. 14061382 82 128,699.00 2,882.58 7 131,581.58 131,581.58 9 .00 100Path Construction Company, I 14061481 81 1,856,600.00 329,355.37 22 2,185,955.37 2,185,955.37 15 .00 100Premier Mechanical, Incorpor 21SM0684 84 79,987.43 .00 0 79,987.43 79,987.43 1 .00 100***** Contract Totals ********** Contract Totals ***** 3,814,021.11 493,179.45 73 4,307,200.56 4,293,458.76 81 13,741.80 100

Page 266: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 266Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--110110--011011 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Water Distribution SystemAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - St. CharlesCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 50 - Keith Wheeler

Senate:25 - Karina Villa : CURRENT STATUS 08-30-21 :: :

A/E Id: 29914 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Gary Davis : :A/E Telephone: (815)744-6940 : :Date Selected: 01-08-13 : :Contract Date: 05-15-13 ________________________________________________________________________________Est. Project Cost: 1,295,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,457,705.75 07-01-16 2,457,705.75 10-05-16 385,638.00 187,866.10 909,962.00 1,162,105.75

Total 2,457,705.75 2,457,705.75 385,638.00 187,866.10 909,962.00 1,162,105.75____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Replace Water Distribution SystemReplace Water Distribution System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-27-13 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-01-13 10-22-13 ( 21 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-16-15 12-19-18 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-16-15 11-30-21 ( 0 )50%: 06-16-14 ( 0 ) Final Accept: 02-16-16 02-28-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-01-1410-01-14 11-30-2211-30-2295-100%: 06-30-18 07-27-18 ( 27 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 13040510 ( 0 ) ( 0 ) 11-30-2211-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 13040510 10 22,900.00 362,738.00 4 385,638.00 187,866.10 5 197,771.90 49***** Contract Totals ********** Contract Totals ***** 22,900.00 362,738.00 4 385,638.00 187,866.10 5 197,771.90 49

Page 267: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 267Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--110110--012012 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Construct Recreational Area & FencingAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - St. CharlesCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 50 - Keith Wheeler

Senate:25 - Karina Villa : CURRENT STATUS 08-30-21 :: :

A/E Id: 26736 : :A/E Name: DLR Group inc. : :A/E Contact: Jake Davis : :A/E Telephone: (312)382-9980 : :Date Selected: 01-09-13 : :Contract Date: 04-02-13 ________________________________________________________________________________Est. Project Cost: 899,025.50

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 602,285.32 08-22-18 602,285.32 08-22-18 83,091.00 56,308.75 270,934.50 248,259.82

Total 602,285.32 602,285.32 83,091.00 56,308.75 270,934.50 248,259.82____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Construct Recreational Area & FencingConstruct Recreational Area & Fencing

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-03-12 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 06-03-13 02-14-14 (256 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-03-13 02-14-14 (256 ) Prime Bid: 11-03-13 02-11-15 (465 )

Design Devel: 06-03-13 02-14-14 (256 ) Prime Re-Bid: 05-30-19 ( 0 )25%: ( 0 ) Subst Compl: 07-03-14 01-13-22 ( 0 )50%: ( 0 ) Final Accept: 09-03-14 02-17-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-03-1507-03-15 01-13-2301-13-2395-100%: 09-03-13 10-09-14 (401 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DLR Group inc. 13012510 ( 0 ) ( 0 ) 01-13-2301-13-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DLR Group inc. 13012510 10 78,236.00 4,855.00 3 83,091.00 56,308.75 5 26,782.25 68***** Contract Totals ********** Contract Totals ***** 78,236.00 4,855.00 3 83,091.00 56,308.75 5 26,782.25 68

Page 268: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 268Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--110110--015015 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade Perimeter Security Fencing & InsAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - St. CharlesCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 50 - Keith Wheeler

Senate:25 - Karina Villa : CURRENT STATUS 11-05-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: Phil Peterson : :A/E Telephone: (312)922-6400 : :Date Selected: 10-14-14 : :Contract Date: 12-22-14 ________________________________________________________________________________Est. Project Cost: 5,800,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,947,587.34 08-22-18 5,947,587.34 08-22-18 3,431,093.06 1,564,968.04 2,516,494.28 .00

Total 5,947,587.34 5,947,587.34 3,431,093.06 1,564,968.04 2,516,494.28 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Upgrade Perimeter Security Fencing & InsUpgrade Perimeter Security Fencing & Ins

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-30-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-22-15 06-27-19 ( 0 )

Design Devel: 04-20-15 05-13-15 ( 23 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-16 06-24-22 ( 0 )50%: ( 0 ) Final Accept: 02-24-17 09-23-22 ( 0 )75%: 01-25-19 03-13-19 ( 47 ) A/E Cont End: 12-31-1712-31-17 06-21-2406-21-2495-100%: 03-22-19 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 15041010 ( 0 ) ( 0 ) 06-21-2406-21-24Ringland-Johnson, Inc. 21047681 03-01-21 04-27-21 04-27-22 ( 0 ) 08-05-22 ( 0 ) 08-05-2308-05-23Utility Dynamics Corporation 21047785 03-01-21 04-27-21 04-27-22 ( 0 ) 08-05-22 ( 0 ) 08-05-2308-05-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 15041010 10 435,400.00 30,823.00 2 466,223.00 283,244.83 7 182,978.17 61Ringland-Johnson, Inc. 21047681 81 1,198,700.00 .00 0 1,198,700.00 911,478.15 4 287,221.85 76Utility Dynamics Corporation 21047785 85 1,766,170.06 .00 0 1,766,170.06 370,245.06 2 1,395,925.00 21***** Contract Totals ********** Contract Totals ***** 3,400,270.06 30,823.00 2 3,431,093.06 1,564,968.04 13 1,866,125.02 46

Page 269: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 269Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--110110--019019 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: PLA: YDescription: Demolish BuildingsAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - St. CharlesCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 50 - Keith Wheeler

Senate:25 - Karina Villa : CURRENT STATUS 11-02-21 :: :

A/E Id: 3473 : :A/E Name: Rubinos and Mesia Engineers, I : :A/E Contact: Atanu Mazunder : :A/E Telephone: (312)870-6600 : :Date Selected: 05-14-19 : :Contract Date: 07-11-19 ________________________________________________________________________________Est. Project Cost: 6,559,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,559,800.00 05-17-19 6,559,800.00 05-17-19 1,895,674.43 966,821.05 4,664,125.57 .00

Total 6,559,800.00 6,559,800.00 1,895,674.43 966,821.05 4,664,125.57 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Demolish BuildingsDemolish Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-04-20 09-30-20 (118 )

Design Devel: ( 0 ) Prime Re-Bid: 09-30-20 ( 0 )25%: ( 0 ) Subst Compl: 12-04-20 ( 0 )50%: 12-16-19 12-20-19 ( 4 ) Final Accept: 12-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-04-2112-04-21 04-01-2504-01-2595-100%: 03-09-20 03-17-20 ( 8 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Rubinos and Mesia Engineers, 19024410 ( 0 ) ( 0 ) 04-01-2504-01-25Tropical Environmental, Inc. 7057 ( 0 ) ( 0 )Valor Technologies, Inc. 7058 ( 0 ) ( 0 )Mc Donagh Demolition Inc. 21048781 03-16-21 04-16-21 09-13-21 ( 0 ) 10-13-21 ( 0 ) 10-13-2210-13-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Rubinos and Mesia Engineers, 19024410 10 427,900.00 22,136.00 1 450,036.00 295,917.80 5 154,118.20 66Tropical Environmental, Inc. 7057 11 3,850.00 .00 0 3,850.00 3,850.00 1 .00 100Valor Technologies, Inc. 7058 11 3,980.00 .00 0 3,980.00 3,980.00 1 .00 100Tropical Environmental, Inc. 7110 80 1,500.00 .00 0 1,500.00 1,500.00 1 .00 100Mc Donagh Demolition Inc. 21048781 81 1,424,900.00 11,408.43 1 1,436,308.43 661,573.25 3 774,735.18 46

Page 270: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 270Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 1,862,130.00 33,544.43 2 1,895,674.43 966,821.05 11 928,853.38 51

Page 271: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 271Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--110110--019019 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: PLA: YDescription: Demolish BuildingsAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - St. CharlesCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 50 - Keith Wheeler

Senate:25 - Karina Villa : CURRENT STATUS :: :

A/E Id: 3473 : :A/E Name: Rubinos and Mesia Engineers, I : :A/E Contact: : :A/E Telephone: (312)870-6600 : :Date Selected: : :Contract Date: 07-11-19 ________________________________________________________________________________Est. Project Cost: 6,559,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,559,800.00 05-17-19 6,559,800.00 05-17-19 1,895,674.43 966,821.05 4,664,125.57 .00

Total 6,559,800.00 6,559,800.00 1,895,674.43 966,821.05 4,664,125.57 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) .00% Description:Description: Second Demolition PackageSecond Demolition Package

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-04-22 ( 0 )

Design Devel: 10-25-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-03-23 ( 0 )50%: ( 0 ) Final Accept: 03-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 12-04-2112-04-21 04-01-2504-01-2595-100%: 01-10-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 272: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 272Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--110110--020020 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - St. CharlesCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 50 - Keith Wheeler

Senate:25 - Karina Villa : CURRENT STATUS 10-07-21 :: :

A/E Id: 21303 : :A/E Name: Doyle & Associates Architects : :A/E Contact: James Cooper : :A/E Telephone: (312)922-5520 : :Date Selected: 05-14-19 : :Contract Date: 06-18-19 ________________________________________________________________________________Est. Project Cost: 1,046,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,046,800.00 05-20-19 1,046,800.00 05-20-19 126,200.00 57,708.00 920,600.00 .00

Total 1,046,800.00 1,046,800.00 126,200.00 57,708.00 920,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-23-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-16-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-20 05-30-22 ( 0 )50%: 08-19-19 08-28-19 ( 9 ) Final Accept: 11-01-20 06-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-01-2109-01-21 05-30-2405-30-2495-100%: 10-15-19 10-21-19 ( 6 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Doyle & Associates Architect 19025310 ( 0 ) ( 0 ) 05-30-2405-30-24Premier Contractors,Inc. 22050481 11-02-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Doyle & Associates Architect 19025310 10 126,200.00 .00 1 126,200.00 57,708.00 1 68,492.00 46Premier Contractors,Inc. 22050481 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 126,200.00 .00 1 126,200.00 57,708.00 1 68,492.00 46

Page 273: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 273Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--195195--003003 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: YDescription: Replace HVAC Systems and Boiler ComponenAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - Pere MarquetteCounty: 83 - Jersey ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-09-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: Ted Bergen : :A/E Telephone: (618)344-3774 : :Date Selected: 03-12-19 : :Contract Date: 09-03-19 ________________________________________________________________________________Est. Project Cost: 1,200,950.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,194,100.00 08-18-21 1,194,100.00 08-18-21 1,096,951.33 91,553.33 97,148.67 .00

Total 1,194,100.00 1,194,100.00 1,096,951.33 91,553.33 97,148.67 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace HVAC Systems and Boiler ComponenReplace HVAC Systems and Boiler Componen

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-18-19 10-22-19 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-18-19 10-22-19 ( 4 ) Prime Bid: 05-28-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-30-21 ( 0 )50%: 12-20-19 12-31-19 ( 11 ) Final Accept: 06-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-29-2204-29-2295-100%: 03-06-20 07-30-20 (146 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 19031810 ( 0 ) ( 0 ) 04-29-2204-29-22Kane Mechanical, Inc. 20EM2181 02-20-20 02-20-20 03-20-20 03-18-20 ( 2-) 05-19-20 06-02-20 ( 14 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 19031810 10 98,850.00 .00 0 98,850.00 62,061.00 5 36,789.00 63Kane Mechanical, Inc. INT7168 00 116.33 .00 0 116.33 116.33 1 .00 100Kane Mechanical, Inc. 20EM2181 81 29,376.00 .00 0 29,376.00 29,376.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 128,342.33 .00 0 128,342.33 91,553.33 7 36,789.00 71

Page 274: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 274Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 125125--195195--003003 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: YDescription: Replace HVAC Systems and Boiler ComponenAgency: Department of Juvenile Justice Analyst: Amber EvansLocation: Illinois Youth Center - Pere MarquetteCounty: 83 - Jersey ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-09-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: : :A/E Telephone: (618)344-3774 : :Date Selected: : :Contract Date: 09-03-19 ________________________________________________________________________________Est. Project Cost: 1,200,950.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,194,100.00 08-18-21 1,194,100.00 08-18-21 1,096,951.33 91,553.33 97,148.67 .00

Total 1,194,100.00 1,194,100.00 1,096,951.33 91,553.33 97,148.67 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 5.00% Description:Description: Replace HVAC Systems and Boiler ComponenReplace HVAC Systems and Boiler Componen

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: 05-26-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-18-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-18-19 ( 0 ) Prime Bid: 05-28-20 06-09-21 (377 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-30-21 ( 0 )50%: 12-20-19 ( 0 ) Final Accept: 06-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-29-2204-29-2295-100%: 03-06-20 03-23-21 (382 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

General Waste Services, Inc. 22046488 09-13-21 10-22-21 08-23-22 ( 0 ) 10-23-22 ( 0 ) 10-23-2310-23-23Camp Electric & Heating Co., 22046585 09-13-21 10-22-21 08-23-22 ( 0 ) 10-23-22 ( 0 ) 10-23-2310-23-23Limbaugh Construction Co. In 22046681 09-13-21 10-22-21 08-23-22 ( 0 ) 10-23-22 ( 0 ) 10-23-2310-23-23JEN Mechanical, Inc. 22046784 09-03-21 10-22-21 08-23-22 ( 0 ) 10-23-22 ( 0 ) 10-23-2310-23-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

General Waste Services, Inc. 22046488 88 115,839.00 .00 0 115,839.00 .00 0 115,839.00 0Camp Electric & Heating Co., 22046585 85 87,420.00 .00 0 87,420.00 .00 0 87,420.00 0Limbaugh Construction Co. In 22046681 81 317,030.00 .00 0 317,030.00 .00 0 317,030.00 0JEN Mechanical, Inc. 22046784 84 448,320.00 .00 0 448,320.00 .00 0 448,320.00 0***** Contract Totals ********** Contract Totals ***** 968,609.00 .00 0 968,609.00 .00 0 968,609.00 0

Page 275: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 275Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Page 276: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 276Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--000000--020020 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: DB Design Build PLA: NDescription: Construct Central Computing FacilityAgency: Department of Central Management Services Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 09-02-21 :: :

A/E Id: 34177 : :A/E Name: IMEG Corp. : :A/E Contact: : :A/E Telephone: (312)294-0501 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 80,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 80,500,000.00 07-01-19 8,050,000.00 11-06-19 150,800.00 150,800.00 7,899,200.00 .00

Total 80,500,000.00 8,050,000.00 150,800.00 150,800.00 7,899,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 11.00% Description:Description: Construct Central Computing FacilityConstruct Central Computing Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Exp U.S. Services Inc. 21010910 ( 0 ) ( 0 ) 09-15-2609-15-26IMEG Corp. 21012510 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Exp U.S. Services Inc. 21010910 10 150,800.00 .00 0 150,800.00 150,800.00 3 .00 100IMEG Corp. 21012510 11 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 150,800.00 .00 0 150,800.00 150,800.00 3 .00 100

Page 277: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 277Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--000000--022022 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 09-02-21 :: :

A/E Id: 31293 : :A/E Name: Moreno Architects Ltd. : :A/E Contact: Carolina Condeco : :A/E Telephone: (312)895-4438 : :Date Selected: 07-14-20 : :Contract Date: 10-07-20 ________________________________________________________________________________Est. Project Cost: 64,245,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 64,245,000.00 03-29-21 64,245,000.00 03-29-21 8,394,071.00 6,240,765.93 55,850,929.00 .00

Total 64,245,000.00 64,245,000.00 8,394,071.00 6,240,765.93 55,850,929.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Renovate Building-Demolition packageRenovate Building-Demolition package

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-06-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-23-20 01-15-21 ( 23 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-23-20 02-02-21 ( 41 ) Prime Bid: 09-02-21 09-29-21 ( 27 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-22 ( 0 )50%: 06-04-21 06-11-21 ( 7 ) Final Accept: 02-28-23 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2412-31-2495-100%: 07-16-21 08-27-21 ( 42 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Moreno Architects Ltd. 21030110 ( 0 ) ( 0 ) 12-31-2412-31-24R.D. Lawrence Construction C 22050281 10-28-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Moreno Architects Ltd. 21030110 10 782,060.00 3,763,511.00 2 4,545,571.00 2,695,765.93 10 1,849,805.07 59Central Management Services WABASH BLD80 3,545,000.00 .00 0 3,545,000.00 3,545,000.00 1 .00 100C D B/Art In Architecture ART 89 303,500.00 .00 0 303,500.00 .00 0 303,500.00 0R.D. Lawrence Construction C 22050281 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 4,630,560.00 3,763,511.00 2 8,394,071.00 6,240,765.93 11 2,153,305.07 74

Page 278: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 278Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--000000--022022 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 09-02-21 :: :

A/E Id: 31293 : :A/E Name: Moreno Architects Ltd. : :A/E Contact: : :A/E Telephone: (312)895-4438 : :Date Selected: : :Contract Date: 10-07-20 ________________________________________________________________________________Est. Project Cost: 64,245,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 64,245,000.00 03-29-21 64,245,000.00 03-29-21 8,394,071.00 6,240,765.93 55,850,929.00 .00

Total 64,245,000.00 64,245,000.00 8,394,071.00 6,240,765.93 55,850,929.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 95.00% Description:Description: Renovate BuildingRenovate Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-06-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-23-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-23-20 ( 0 ) Prime Bid: 10-28-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-22 ( 0 )50%: 06-04-21 06-16-21 ( 12 ) Final Accept: 02-28-23 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2412-31-2495-100%: 09-10-21 10-29-21 ( 49 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 279: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 279Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--000000--023023 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 27519 : :A/E Name: John Shafer & Associates, Inc. : :A/E Contact: John Shafer : :A/E Telephone: (217)744-9036 : :Date Selected: 07-14-20 : :Contract Date: 08-19-20 ________________________________________________________________________________Est. Project Cost: 7,753,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 7,753,500.00 09-08-21 7,753,500.00 09-08-21 6,943,436.36 3,517,909.49 810,063.64 .00

Total 7,753,500.00 7,753,500.00 6,943,436.36 3,517,909.49 810,063.64 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 2.00% Description:Description: Renovate BuildingRenovate Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-15-20 10-16-20 ( 1 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-15-20 11-20-20 ( 36 ) Prime Bid: 05-19-21 08-18-21 ( 91 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-22 ( 0 )50%: 02-18-21 03-16-21 ( 26 ) Final Accept: 08-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 05-31-2305-31-2395-100%: 03-31-21 06-09-21 ( 70 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

John Shafer & Associates, In 21040210 ( 0 ) ( 0 ) 05-31-2305-31-23Johnco Construction, Inc. 22047681 09-17-21 10-04-21 08-01-22 ( 0 ) 08-31-22 ( 0 ) 08-31-2308-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

John Shafer & Associates, In 21040210 10 69,880.00 431,786.00 3 501,666.00 342,224.41 4 159,441.59 68C D B/Art In Architecture AIA DUMMY 49 31,770.36 .00 0 31,770.36 .00 0 31,770.36 0Central Management Services JEFF TERR 80 2,975,000.00 .00 0 2,975,000.00 2,975,000.00 1 .00 100Johnco Construction, Inc. 22047681 81 3,435,000.00 .00 0 3,435,000.00 200,685.08 1 3,234,314.92 6***** Contract Totals ********** Contract Totals ***** 6,511,650.36 431,786.00 3 6,943,436.36 3,517,909.49 6 3,425,526.87 51

Page 280: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 280Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--000000--025025 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: AcquisitionAgency: Department of Central Management Services Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 77,200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 77,200,000.00 10-18-21 77,200,000.00 10-18-21 77,200,000.00 77,200,000.00 .00 .00

Total 77,200,000.00 77,200,000.00 77,200,000.00 77,200,000.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: AcquisitionAcquisition

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 281: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 281Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--020020--041041 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Repair Exterior FacadeAgency: Department of Central Management Services Analyst: Amber EvansLocation: Michael A. Bilandic BuildingCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 6 - Sonya Harper

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-02-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: Ed Torrez : :A/E Telephone: (312)567-1000 : :Date Selected: 01-15-19 : :Contract Date: 03-14-19 ________________________________________________________________________________Est. Project Cost: 8,295,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 7,625,000.00 08-04-21 7,625,000.00 08-04-21 7,229,928.50 4,086,457.14 395,071.50 .00

Total 7,625,000.00 7,625,000.00 7,229,928.50 4,086,457.14 395,071.50 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Repair Exterior FacadeRepair Exterior Facade

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-13-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-31-19 07-30-19 ( 60 ) Prime Bid: 03-05-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-20 12-08-21 ( 0 )50%: 10-28-19 11-14-19 ( 17 ) Final Accept: 12-29-20 01-24-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2112-01-21 01-30-2401-30-2495-100%: 01-06-20 01-16-20 ( 10 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauer Latoza Studio Ltd. 19022210 ( 0 ) ( 0 ) 01-30-2401-30-24The Bowa Group, Inc. 21040781 08-06-20 10-20-20 08-16-21 ( 0 ) 09-13-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 19022210 10 219,190.00 326,610.00 3 545,800.00 436,007.21 11 109,792.79 80The Bowa Group, Inc. 21040781 81 6,333,000.00 351,128.50 7 6,684,128.50 3,650,449.93 7 3,033,678.57 55***** Contract Totals ********** Contract Totals ***** 6,552,190.00 677,738.50 10 7,229,928.50 4,086,457.14 18 3,143,471.36 57

Page 282: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 282Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--020020--043043 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade ElevatorsAgency: Department of Central Management Services Analyst: Amber EvansLocation: Michael A. Bilandic BuildingCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 6 - Sonya Harper

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-02-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: Hynek Dvorak : :A/E Telephone: (312)922-6400 : :Date Selected: 03-12-19 : :Contract Date: 05-06-19 ________________________________________________________________________________Est. Project Cost: 6,243,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,243,000.00 07-07-21 6,243,000.00 07-07-21 5,189,053.00 308,932.26 1,053,947.00 .00

Total 6,243,000.00 6,243,000.00 5,189,053.00 308,932.26 1,053,947.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Upgrade ElevatorsUpgrade Elevators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 07-05-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-19-19 09-26-19 ( 38 ) Prime Bid: 03-26-20 02-19-21 03-31-21 ( 40 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-24-21 05-20-22 ( 0 )50%: 10-21-19 12-31-19 ( 71 ) Final Accept: 05-24-21 06-17-22 ( 0 )75%: ( 0 ) A/E Cont End: 04-24-2204-24-22 05-20-2305-20-2395-100%: 12-08-20 12-29-20 ( 21 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 19023110 ( 0 ) ( 0 ) 05-20-2305-20-23CCC Holdings, Inc 22045081 08-25-21 10-27-21 04-19-24 ( 0 ) 06-18-24 ( 0 ) 06-18-2506-18-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 19023110 10 362,800.00 81,253.00 1 444,053.00 308,932.26 7 135,120.74 70CCC Holdings, Inc 22045081 81 4,745,000.00 .00 0 4,745,000.00 .00 0 4,745,000.00 0***** Contract Totals ********** Contract Totals ***** 5,107,800.00 81,253.00 1 5,189,053.00 308,932.26 7 4,880,120.74 6

Page 283: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 283Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--020020--044044 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Renovate the Bilandic BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: Michael A. Bilandic BuildingCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 6 - Sonya Harper

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-02-21 :: :

A/E Id: 11856 : :A/E Name: B + A Engineers, Ltd. dba CCJM : :A/E Contact: Paul Ghassan : :A/E Telephone: (312)669-0609 : :Date Selected: 08-13-19 : :Contract Date: 10-03-19 ________________________________________________________________________________Est. Project Cost: 27,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 27,000,000.00 11-06-19 27,000,000.00 11-06-19 2,296,440.00 1,228,769.92 24,703,560.00 .00

Total 27,000,000.00 27,000,000.00 2,296,440.00 1,228,769.92 24,703,560.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Renovate the Bilandic BuildingRenovate the Bilandic Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-11-19 09-11-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-01-21 10-01-21 09-15-21 ( 16-)

Design Devel: 03-06-20 03-08-21 (367 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-01-22 04-01-22 ( 0 )50%: 05-21-21 06-08-21 ( 18 ) Final Accept: 05-01-22 05-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2412-01-24 12-01-2412-01-2495-100%: 07-09-21 08-03-21 ( 25 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

B + A Engineers, Ltd. dba CC 20020610 ( 0 ) ( 0 ) 12-01-2412-01-24CCC Holdings, Inc 22050881 11-08-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

B + A Engineers, Ltd. dba CC 20020610 10 605,594.00 1,690,846.00 3 2,296,440.00 1,228,769.92 6 1,067,670.08 54CCC Holdings, Inc 22050881 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 605,594.00 1,690,846.00 3 2,296,440.00 1,228,769.92 6 1,067,670.08 54

Page 284: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 284Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--025025--031031 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Emergency Glass Curtain Wall RepairsAgency: Department of Central Management Services Analyst: Amber EvansLocation: James R. Thompson Center - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 6 - Sonya Harper

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-04-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 50,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,160.00 07-28-20 3,160.00 07-28-20 3,160.00 3,160.00 .00 .00

Total 3,160.00 3,160.00 3,160.00 3,160.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 92.00% Description:Description: Emergency Glass Curtain Wall RepairsEmergency Glass Curtain Wall Repairs

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 285: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 285Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--025025--032032 PM NAME: Ebone White 390Ebone White 390Project Status: AP Active Project Region: 11Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Assess and Repair Exterior Metal CladdinAgency: Department of Central Management Services Analyst: Amber EvansLocation: James R. Thompson Center - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 6 - Sonya Harper

Senate: 3 - Mattie Hunter : CURRENT STATUS 09-03-21 :: :

A/E Id: 22186 : :A/E Name: Johnson Lasky Kindelin Archite : :A/E Contact: : :A/E Telephone: (312)357-1221 : :Date Selected: 07-09-19 : :Contract Date: 10-26-20 ________________________________________________________________________________Est. Project Cost: 62,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 62,000.00 06-01-20 62,000.00 06-01-20 62,000.00 33,099.88 .00 .00

Total 62,000.00 62,000.00 62,000.00 33,099.88 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Assess and Repair Exterior Metal CladdinAssess and Repair Exterior Metal Claddin

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-30-20 ( 0 )50%: ( 0 ) Final Accept: 11-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Johnson Lasky Kindelin Archi QC20020110 ( 0 ) ( 0 ) 06-30-2206-30-22Berglund Construction Compan 20EM2581 05-21-20 05-21-20 08-18-20 ( 0 ) 08-18-20 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Johnson Lasky Kindelin Archi QC2002011010 .00 .00 0 .00 .00 0 .00 100Berglund Construction Compan 20EM2581 81 62,000.00 .00 0 62,000.00 33,099.88 1 28,900.12 53***** Contract Totals ********** Contract Totals ***** 62,000.00 .00 0 62,000.00 33,099.88 1 28,900.12 53

Page 286: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 286Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--030030--018018 PM NAME: Ashlie Shaffer 595Ashlie Shaffer 595Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade Walkway Walls/Replace Parking LoAgency: Department of Central Management Services Analyst: Amber EvansLocation: Kenneth Hall Regional Office Building - East St. LouisCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:114 - LaToya Greenwood

Senate:57 - Christopher Belt : CURRENT STATUS 11-05-21 :: :

A/E Id: 31395 : :A/E Name: Bacon Farmer Workman Engineeri : :A/E Contact: Kenny McDaniel : :A/E Telephone: (618)997-9190 : :Date Selected: 03-12-19 : :Contract Date: 07-15-19 ________________________________________________________________________________Est. Project Cost: 936,620.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 936,620.00 10-18-21 936,620.00 10-18-21 67,400.00 42,211.68 869,220.00 .00

Total 936,620.00 936,620.00 67,400.00 42,211.68 869,220.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Upgrade Walkway Walls/Replace Parking LoUpgrade Walkway Walls/Replace Parking Lo

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-16-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-15-19 12-19-19 ( 65 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-11-20 06-09-21 (363 )

Design Devel: 10-15-19 12-19-19 ( 65 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-11-20 ( 0 )50%: 01-06-20 04-23-20 (108 ) Final Accept: 02-11-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-20-2110-20-21 10-20-2310-20-2395-100%: 04-09-20 01-06-21 (272 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bacon Farmer Workman Enginee 19012510 ( 0 ) ( 0 ) 10-20-2310-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bacon Farmer Workman Enginee 19012510 10 67,400.00 .00 1 67,400.00 42,211.68 4 25,188.32 63***** Contract Totals ********** Contract Totals ***** 67,400.00 .00 1 67,400.00 42,211.68 4 25,188.32 63

Page 287: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 287Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--041041--012012 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade HVAC System and LightingAgency: Department of Central Management Services Analyst: Amber EvansLocation: Springfield Regional Office Building - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 99 - Mike Murphy

Senate:50 - Steve McClure : CURRENT STATUS 11-02-21 :: :

A/E Id: 31186 : :A/E Name: Delta Engineering Group, LLC : :A/E Contact: : :A/E Telephone: (312)377-7700 : :Date Selected: 08-13-19 : :Contract Date: 10-18-19 ________________________________________________________________________________Est. Project Cost: 3,437,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,437,500.00 08-19-19 3,437,500.00 08-19-19 333,177.00 193,055.71 3,104,323.00 .00

Total 3,437,500.00 3,437,500.00 333,177.00 193,055.71 3,104,323.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Upgrade HVAC System and LightingUpgrade HVAC System and Lighting

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-19-19 09-19-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-18-19 11-20-19 ( 2 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-10-21 ( 0 )

Design Devel: 09-22-20 09-30-20 ( 8 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-22 ( 0 )50%: 12-10-20 01-08-21 ( 29 ) Final Accept: 11-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-21 10-31-2310-31-2395-100%: 03-10-21 06-10-21 ( 92 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Delta Engineering Group, LLC 2000610 ( 0 ) ( 0 ) 10-31-2310-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Delta Engineering Group, LLC 2000610 10 39,095.00 294,082.00 1 333,177.00 193,055.71 7 140,121.29 58***** Contract Totals ********** Contract Totals ***** 39,095.00 294,082.00 1 333,177.00 193,055.71 7 140,121.29 58

Page 288: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 288Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--042042--006006 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate the State Armory BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: State Armory Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 27706 : :A/E Name: Tilton, Kelly + Bell, L.L.C. : :A/E Contact: : :A/E Telephone: (312)447-3100 : :Date Selected: 02-11-20 : :Contract Date: 11-20-20 ________________________________________________________________________________Est. Project Cost: 122,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 122,000,000.00 07-01-19 12,200,000.00 11-06-19 8,607,510.00 937,835.65 3,592,490.00 .00

Total 122,000,000.00 12,200,000.00 8,607,510.00 937,835.65 3,592,490.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 15.00% Description:Description: Renovate the State Armory - StabilizatioRenovate the State Armory - Stabilizatio

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-30-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-05-21 05-15-21 ( 40 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-19-21 ( 0 ) Prime Bid: 06-17-22 ( 0 )

Design Devel: 11-19-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 02-04-22 ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 05-31-2805-31-2895-100%: 04-11-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Tilton, Kelly + Bell, L.L.C. 20042310 ( 0 ) ( 0 ) 05-31-2805-31-28

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Tilton, Kelly + Bell, L.L.C. 20042310 10 728,063.00 7,269,447.00 1 7,997,510.00 937,835.65 6 7,059,674.35 12***** Contract Totals ********** Contract Totals ***** 728,063.00 7,269,447.00 1 7,997,510.00 937,835.65 6 7,059,674.35 12

Page 289: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 289Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--042042--006006 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate the State Armory BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: State Armory Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 27706 : :A/E Name: Tilton, Kelly + Bell, L.L.C. : :A/E Contact: : :A/E Telephone: (312)447-3100 : :Date Selected: : :Contract Date: 11-20-20 ________________________________________________________________________________Est. Project Cost: 122,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 122,000,000.00 07-01-19 12,200,000.00 11-06-19 8,607,510.00 937,835.65 3,592,490.00 .00

Total 122,000,000.00 12,200,000.00 8,607,510.00 937,835.65 3,592,490.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 15.00% Description:Description: Renovate the State Armory - RenovationRenovate the State Armory - Renovation

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-25-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 290: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 290Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--043043--009009 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Chillers and Cooling TowerAgency: Department of Central Management Services Analyst: Amber EvansLocation: Rockford Regional Office Building - Winnebago CountyCounty: 201 - Winnebago ________________________________________________________________________________Leg. Districts: House: 67 - Maurice West,

Senate:34 - Steve Stadelman : CURRENT STATUS 11-02-21 :: :

A/E Id: 16618 : :A/E Name: Dynacept Engineering, Ltd. : :A/E Contact: : :A/E Telephone: (847)299-4848 : :Date Selected: 05-14-19 : :Contract Date: 07-23-19 ________________________________________________________________________________Est. Project Cost: 1,087,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,087,900.00 07-28-20 1,087,900.00 07-28-20 894,720.00 277,508.27 193,180.00 .00

Total 1,087,900.00 1,087,900.00 894,720.00 277,508.27 193,180.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 65.00% Description:Description: Replace Chillers and Cooling TowerReplace Chillers and Cooling Tower

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-06-19 ( 0 ) Assgn Bid: 09-30-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-19-20 09-30-20 10-14-20 ( 14 )

Design Devel: 09-16-19 09-27-19 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-16-20 08-06-21 ( 0 )50%: ( 0 ) Final Accept: 11-13-20 10-05-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-16-2110-16-21 10-05-2210-05-2295-100%: 01-06-20 05-29-20 (144 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dynacept Engineering, Ltd. 19025410 ( 0 ) ( 0 ) 10-05-2210-05-22Commercial Mechanical, Inc. 21047283 02-11-21 04-08-21 08-06-21 ( 0 ) 10-05-21 ( 0 ) 10-05-2210-05-22Morse Electric Incorporated 21047385 02-11-21 04-08-21 08-06-21 ( 0 ) 10-05-21 ( 0 ) 10-05-2210-05-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dynacept Engineering, Ltd. 19025410 10 111,600.00 6,960.00 2 118,560.00 45,550.00 3 73,010.00 39Commercial Mechanical, Inc. 21047283 83 697,000.00 .00 0 697,000.00 208,545.70 3 488,454.30 30Morse Electric Incorporated 21047385 85 79,160.00 .00 0 79,160.00 23,412.57 1 55,747.43 30***** Contract Totals ********** Contract Totals ***** 887,760.00 6,960.00 2 894,720.00 277,508.27 7 617,211.73 31

Page 291: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 291Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--100100--008008 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade HVAC SystemAgency: Department of Central Management Services Analyst: Amber EvansLocation: State Police Central Headquarters - Springfield, Sangamon CoCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 28140 : :A/E Name: Fuhrmann Engineering, Inc. : :A/E Contact: Gina Fuhrmann : :A/E Telephone: (217)529-5577 : :Date Selected: 05-14-19 : :Contract Date: 08-28-19 ________________________________________________________________________________Est. Project Cost: 4,821,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,821,600.00 01-10-20 4,821,600.00 01-10-20 1,615,030.00 152,785.13 3,206,570.00 .00

Total 4,821,600.00 4,821,600.00 1,615,030.00 152,785.13 3,206,570.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Upgrade HVAC SystemUpgrade HVAC System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-30-19 07-30-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-01-19 10-09-19 ( 8 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-12-20 10-14-20 ( 29-)

Design Devel: 01-27-20 01-30-20 ( 3 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-26-21 05-25-22 ( 0 )50%: 03-15-20 05-12-20 ( 58 ) Final Accept: 04-23-21 07-25-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-21 03-01-2303-01-2395-100%: 07-13-20 07-23-20 ( 10 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Fuhrmann Engineering, Inc. 19004810 ( 0 ) ( 0 ) 03-01-2303-01-23Henson Robinson Company 22046883 09-10-21 03-28-22 ( 0 ) 05-25-22 ( 0 ) 05-25-2305-25-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Fuhrmann Engineering, Inc. 19004810 10 39,602.00 212,928.00 2 252,530.00 152,785.13 4 99,744.87 61Henson Robinson Company 22046883 83 1,362,500.00 .00 0 1,362,500.00 .00 0 1,362,500.00 0***** Contract Totals ********** Contract Totals ***** 1,402,102.00 212,928.00 2 1,615,030.00 152,785.13 4 1,462,244.87 10

Page 292: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 292Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--100100--010010 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Exterior - South BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: State Police Central Headquarters - Springfield, Sangamon CoCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 3592 : :A/E Name: Steckel-Parker Architects, Inc : :A/E Contact: David Steckel : :A/E Telephone: (217)793-6444 : :Date Selected: 08-13-19 : :Contract Date: 10-18-19 ________________________________________________________________________________Est. Project Cost: 2,858,758.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,858,758.00 05-27-21 2,858,758.00 05-27-21 2,463,407.99 620,584.32 395,350.01 .00

Total 2,858,758.00 2,858,758.00 2,463,407.99 620,584.32 395,350.01 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Repair Exterior - South BuildingRepair Exterior - South Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-24-19 09-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-02-20 02-17-21 (107 )

Design Devel: 12-16-19 01-23-20 ( 38 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 10-29-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-21 09-30-2209-30-2295-100%: 09-08-20 10-26-20 ( 48 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Steckel-Parker Architects, I 2000510 ( 0 ) ( 0 ) 09-30-2209-30-22Otto Baum Company, Inc. 20EM2381 04-07-20 04-07-20 05-07-20 06-29-20 ( 53 ) 07-05-20 07-02-20 ( 3-)CAD Construction Inc. 21055981 06-10-21 07-19-21 03-16-22 ( 0 ) 05-15-22 ( 0 ) 05-15-2305-15-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Steckel-Parker Architects, I 2000510 10 27,893.00 148,907.00 1 176,800.00 95,919.35 3 80,880.65 54Otto Baum Company, Inc. INT7169 00 1,107.99 .00 0 1,107.99 1,107.99 1 .00 100Otto Baum Company, Inc. 20EM2381 81 100,000.00 .00 0 100,000.00 74,612.21 1 25,387.79 75CAD Construction Inc. 21055981 81 2,185,500.00 .00 0 2,185,500.00 448,944.77 2 1,736,555.23 21***** Contract Totals ********** Contract Totals ***** 2,314,500.99 148,907.00 1 2,463,407.99 620,584.32 7 1,842,823.67 25

Page 293: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 293Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--100100--010010 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Exterior - South BuildingAgency: Department of Central Management Services Analyst: Amber EvansLocation: State Police Central Headquarters - Springfield, Sangamon CoCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 03-01-21 :: :

A/E Id: 3592 : :A/E Name: Steckel-Parker Architects, Inc : :A/E Contact: David Steckel : :A/E Telephone: (217)793-6444 : :Date Selected: : :Contract Date: 10-18-19 ________________________________________________________________________________Est. Project Cost: 2,858,758.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,858,758.00 05-27-21 2,858,758.00 05-27-21 2,463,407.99 620,584.32 395,350.01 .00

Total 2,858,758.00 2,858,758.00 2,463,407.99 620,584.32 395,350.01 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 97.00% Description:Description: Emergency Facade RepairsEmergency Facade Repairs

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2209-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 294: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 294Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--160160--001001 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: YDescription: Emergency Roof Replacement and InteriorAgency: Department of Central Management Services Analyst: Amber EvansLocation: Springfield Executive Mansion - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 22528 : :A/E Name: Vinci/Hamp Architects, Inc. : :A/E Contact: Philip Hamp : :A/E Telephone: (312)733-7744 : :Date Selected: 02-09-21 : :Contract Date: 03-03-21 ________________________________________________________________________________Est. Project Cost: 790,920.34

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 790,920.34 06-21-21 790,920.34 06-21-21 730,161.34 280,769.11 60,759.00 .00

Total 790,920.34 790,920.34 730,161.34 280,769.11 60,759.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 50.00% Description:Description: Emergency Roof Replacement and InteriorEmergency Roof Replacement and Interior

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-15-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-17-21 02-25-21 ( 8 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-01-21 ( 0 )

Design Devel: 03-19-21 04-08-21 ( 20 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-15-21 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 08-31-21 11-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-06-2104-06-21 04-30-2204-30-2295-100%: 04-19-21 05-11-21 ( 22 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Vinci/Hamp Architects, Inc. 21002110 ( 0 ) ( 0 ) 04-30-2204-30-22Henson Robinson Company 21EM0981 06-21-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Vinci/Hamp Architects, Inc. 21002110 10 80,325.00 3,158.00 3 83,483.00 50,764.40 7 32,718.60 61Designed Roofing Systems, In 7143 80 7,509.34 .00 0 7,509.34 7,509.34 1 .00 100Henson Robinson Company 21EM0981 81 639,169.00 .00 1 639,169.00 222,495.37 1 416,673.63 35***** Contract Totals ********** Contract Totals ***** 727,003.34 3,158.00 4 730,161.34 280,769.11 9 449,392.23 39

Page 295: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 295Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--174174--012012 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair/Replace BoilersAgency: Department of Central Management Services Analyst: Amber EvansLocation: Champaign Regional Office BuildingCounty: 19 - Champaign ________________________________________________________________________________Leg. Districts: House:103 - Carol Ammons

Senate:52 - Scott Bennett : CURRENT STATUS 10-27-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: : :A/E Telephone: (217)363-3375 : :Date Selected: 11-17-20 : :Contract Date: 12-29-20 ________________________________________________________________________________Est. Project Cost: 930,923.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 930,923.00 11-09-21 930,923.00 11-09-21 416,323.00 250,978.49 514,600.00 .00

Total 930,923.00 930,923.00 416,323.00 250,978.49 514,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Repair BoilersRepair Boilers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-30-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-03-21 10-13-21 (163 )

Design Devel: 01-18-21 04-01-21 ( 73 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-21 06-30-22 ( 0 )50%: ( 0 ) Final Accept: 01-31-22 07-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-15-2212-15-22 06-30-2306-30-2395-100%: 03-08-21 06-11-21 ( 95 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 21000910 ( 0 ) ( 0 ) 06-30-2306-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 21000910 10 291,345.00 124,978.00 1 416,323.00 250,978.49 3 165,344.51 60***** Contract Totals ********** Contract Totals ***** 291,345.00 124,978.00 1 416,323.00 250,978.49 3 165,344.51 60

Page 296: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 296Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--174174--013013 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ID Indef Delivery Indef Quanity PLA: NDescription: Assess and Repair Chiller/Cooling TowerAgency: Department of Central Management Services Analyst: Amber EvansLocation: Champaign Regional Office BuildingCounty: 19 - Champaign ________________________________________________________________________________Leg. Districts: House:103 - Carol Ammons

Senate:52 - Scott Bennett : CURRENT STATUS 10-27-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: : :A/E Telephone: (217)363-3375 : :Date Selected: 07-19-19 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 8,472.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,472.00 06-02-21 8,472.00 06-02-21 8,472.00 8,472.00 .00 .00

Total 8,472.00 8,472.00 8,472.00 8,472.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Assess and Repair Chiller/Cooling TowerAssess and Repair Chiller/Cooling Tower

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. QJ20000110 ( 0 ) ( 0 )Schomburg & Schomburg Constr 21SM0881 06-03-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. QJ2000011010 .00 .00 0 .00 .00 0 .00 100Schomburg & Schomburg Constr 21SM0881 81 8,472.00 .00 0 8,472.00 8,472.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 8,472.00 .00 0 8,472.00 8,472.00 1 .00 100

Page 297: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 297Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--185185--004004 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: PLA: YDescription: Replace Windows, Doors and Roofing SysteAgency: Department of Central Management Services Analyst: Amber EvansLocation: Watseka Garage - Iroquois CountyCounty: 75 - Iroquois ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 11-03-21 :: :

A/E Id: 29944 : :A/E Name: Specialty Consulting, Inc. : :A/E Contact: Angel Benalcazar : :A/E Telephone: (847)331-5233 : :Date Selected: 05-12-20 : :Contract Date: 07-15-20 ________________________________________________________________________________Est. Project Cost: 815,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 815,100.00 05-19-20 815,100.00 05-19-20 152,758.00 72,946.67 662,342.00 .00

Total 815,100.00 815,100.00 152,758.00 72,946.67 662,342.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 96.00% Description:Description: Replace Windows, Doors and Roofing SysteReplace Windows, Doors and Roofing Syste

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-04-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-22-21 07-14-21 (142 )

Design Devel: 09-14-20 11-16-20 ( 63 ) Prime Re-Bid: 11-10-21 ( 0 )25%: ( 0 ) Subst Compl: 07-02-21 ( 0 )50%: 11-09-20 02-08-21 ( 91 ) Final Accept: 08-06-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2207-01-2295-100%: 01-04-21 04-08-21 ( 94 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Specialty Consulting, Inc. 20003910 ( 0 ) ( 0 ) 07-01-2207-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Specialty Consulting, Inc. 20003910 10 134,250.00 18,508.00 1 152,758.00 72,946.67 4 79,811.33 48***** Contract Totals ********** Contract Totals ***** 134,250.00 18,508.00 1 152,758.00 72,946.67 4 79,811.33 48

Page 298: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 298Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--189189--015015 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Emergency GeneratorAgency: Department of Central Management Services Analyst: Amber EvansLocation: Springfield Computer Facility - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 28732 : :A/E Name: BRiC Partnership, LLC : :A/E Contact: Matt Crook : :A/E Telephone: (618)277-5200 : :Date Selected: 06-12-12 : :Contract Date: 09-29-12 ________________________________________________________________________________Est. Project Cost: 15,120,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 15,620,000.00 07-01-18 15,620,000.00 08-30-18 11,178,193.42 9,991,228.46 4,044,798.63 397,007.95

Total 15,620,000.00 15,620,000.00 11,178,193.42 9,991,228.46 4,044,798.63 397,007.95____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 80.00% Description:Description: Replace Emergency GeneratorReplace Emergency Generator

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-31-12 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-25-13 02-14-13 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 263,811.95 Schem Design: 01-25-13 02-14-13 ( 20 ) Prime Bid: 09-05-19 12-19-19 12-12-19 ( 7-)

Design Devel: 01-25-13 02-14-13 ( 20 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-08-21 05-28-21 ( 0 )50%: ( 0 ) Final Accept: 03-05-21 07-28-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1512-31-15 05-31-2205-31-2295-100%: 06-21-19 10-22-19 (123 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BRiC Partnership, LLC 12005710 ( 0 ) ( 0 ) 05-31-2205-31-22B & B Electric, Inc. 20047485 01-28-20 05-04-20 06-08-21 ( 0 ) 08-07-21 ( 0 ) 08-07-2208-07-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BRiC Partnership, LLC 12005710 10 103,071.00 893,942.00 5 997,013.00 831,311.79 35 165,701.21 83B & B Electric, Inc. 20047485 85 8,746,430.00 1,434,750.42 20 10,181,180.42 9,159,916.67 19 1,021,263.75 90***** Contract Totals ********** Contract Totals ***** 8,849,501.00 2,328,692.42 25 11,178,193.42 9,991,228.46 54 1,186,964.96 89

Page 299: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 299Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--189189--018018 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace ChillersAgency: Department of Central Management Services Analyst: Amber EvansLocation: Springfield Computer Facility - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: Ted Bergen : :A/E Telephone: (618)344-3774 : :Date Selected: 08-13-19 : :Contract Date: 01-08-20 ________________________________________________________________________________Est. Project Cost: 3,163,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,163,300.00 08-19-19 3,163,300.00 08-19-19 288,500.00 185,000.00 2,874,800.00 .00

Total 3,163,300.00 3,163,300.00 288,500.00 185,000.00 2,874,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace ChillersReplace Chillers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-21-20 03-06-20 ( 14 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-21-20 03-09-20 ( 17 ) Prime Bid: 08-27-20 05-26-21 (272 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-21 ( 0 )50%: 04-17-20 05-28-20 ( 41 ) Final Accept: 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2209-30-2295-100%: 06-12-20 08-06-20 ( 55 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 20030910 ( 0 ) ( 0 ) 09-30-2209-30-22E.L. Pruitt Company 22049081 10-06-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 20030910 10 288,500.00 .00 0 288,500.00 185,000.00 5 103,500.00 64E.L. Pruitt Company 22049081 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 288,500.00 .00 0 288,500.00 185,000.00 5 103,500.00 64

Page 300: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 300Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--235235--001001 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: NDescription: Renovate for Office SpaceAgency: Department of Central Management Services Analyst: Amber EvansLocation: The Old State Journal-Register Building - Springfield, SangaCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: Todd Hannah : :A/E Telephone: (217)522-3355 : :Date Selected: 02-09-21 : :Contract Date: 02-02-21 ________________________________________________________________________________Est. Project Cost: 2,097,085.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,097,085.00 04-08-21 2,097,085.00 04-08-21 2,097,082.00 488,428.47 3.00 .00

Total 2,097,085.00 2,097,085.00 2,097,082.00 488,428.47 3.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 95.00% Description:Description: Renovate for Office SpaceRenovate for Office Space

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-29-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-01-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-21 ( 0 )50%: ( 0 ) Final Accept: 04-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 04-02-21 05-13-21 ( 41 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 21042010 ( 0 ) ( 0 ) 12-31-2212-31-22P.J. Hoerr, Inc. 21EM0381 02-11-21 02-11-21 12-01-21 ( 0 ) 02-01-22 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 21042010 10 241,400.00 15,682.00 2 257,082.00 181,052.24 5 76,029.76 71P.J. Hoerr, Inc. 21EM0381 81 1,840,000.00 .00 1 1,840,000.00 307,376.23 2 1,532,623.77 17***** Contract Totals ********** Contract Totals ***** 2,081,400.00 15,682.00 3 2,097,082.00 488,428.47 7 1,608,653.53 23

Page 301: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 301Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--503503--009009 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate for Code Compliance/Replace WinAgency: Department of Central Management Services Analyst: Amber EvansLocation: Center for Rehabilitation and Education - Chicago (Wood StreCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 10-07-21 :: :

A/E Id: 28572 : :A/E Name: Cordogan, Clark & Assoc., Inc. : :A/E Contact: Nathan Melotte : :A/E Telephone: (312)943-7300 : :Date Selected: 09-10-19 : :Contract Date: 10-25-19 ________________________________________________________________________________Est. Project Cost: 2,991,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,289,400.00 09-12-19 2,289,400.00 09-12-19 73,311.00 65,412.00 2,216,089.00 .00

Total 2,289,400.00 2,289,400.00 73,311.00 65,412.00 2,216,089.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 40.00% Description:Description: Renovate for Code Compliance/Replace WinRenovate for Code Compliance/Replace Win

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-26-19 09-26-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-23-19 02-03-20 (103 ) Prime Bid: ( 0 )

Design Devel: 01-08-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Cordogan, Clark & Assoc., In 20021210 ( 0 ) ( 0 ) 12-01-2212-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Cordogan, Clark & Assoc., In 20021210 10 73,311.00 .00 0 73,311.00 65,412.00 7 7,899.00 89***** Contract Totals ********** Contract Totals ***** 73,311.00 .00 0 73,311.00 65,412.00 7 7,899.00 89

Page 302: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 302Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--510510--018018 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Secure Electrical VaultsAgency: Department of Central Management Services Analyst: Amber EvansLocation: Chicago Medical Center Office and Laboratory Building - CookCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 08-31-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: Jasen Ginalski : :A/E Telephone: (312)922-6400 : :Date Selected: 03-12-19 : :Contract Date: 06-26-19 ________________________________________________________________________________Est. Project Cost: 1,553,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,553,900.00 03-21-19 1,553,900.00 03-21-19 174,300.00 43,431.00 1,379,600.00 .00

Total 1,553,900.00 1,553,900.00 174,300.00 43,431.00 1,379,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Secure Electrical VaultsSecure Electrical Vaults

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-25-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-21-19 09-04-19 ( 14 ) Prime Bid: 05-13-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-09-20 ( 0 )50%: ( 0 ) Final Accept: 01-20-21 ( 0 )75%: 12-11-19 02-12-20 ( 63 ) A/E Cont End: 12-09-2112-09-2195-100%: 03-04-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 19023210 ( 0 ) ( 0 ) 12-09-2112-09-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 19023210 10 174,300.00 .00 0 174,300.00 43,431.00 3 130,869.00 25***** Contract Totals ********** Contract Totals ***** 174,300.00 .00 0 174,300.00 43,431.00 3 130,869.00 25

Page 303: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 303Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--510510--019019 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: NDescription: Emergency Boiler ReplacementAgency: Department of Central Management Services Analyst: Amber EvansLocation: Chicago Medical Center Office and Laboratory Building - CookCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 10-14-21 :: :

A/E Id: 29590 : :A/E Name: Nest Builders, Inc. : :A/E Contact: Benjamin Rubach : :A/E Telephone: (312)915-0557 : :Date Selected: 11-17-20 : :Contract Date: 01-25-21 ________________________________________________________________________________Est. Project Cost: 1,763,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,763,800.00 04-27-21 1,763,800.00 04-27-21 1,127,719.64 298,931.19 636,080.36 .00

Total 1,763,800.00 1,763,800.00 1,127,719.64 298,931.19 636,080.36 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Emergency Boiler ReplacementEmergency Boiler Replacement

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-16-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-04-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-15-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-01-21 ( 0 )50%: 01-29-21 02-04-21 ( 6 ) Final Accept: 10-25-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2110-31-21 01-31-2201-31-2295-100%: 03-12-21 03-16-21 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Nest Builders, Inc. 21020910 ( 0 ) ( 0 ) 01-31-2201-31-22Voris Mechanical, Inc. 21EM0183 11-16-20 11-16-20 01-12-21 ( 0 ) 05-31-21 09-23-21 (115 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Nest Builders, Inc. 21020910 10 161,076.00 .00 1 161,076.00 130,290.80 8 30,785.20 81Voris Mechanical, Inc. 21EM0183 83 100,000.00 88,356.36- 2 11,643.64 11,643.64 2 .00 100***** Contract Totals ********** Contract Totals ***** 261,076.00 88,356.36- 3 172,719.64 141,934.44 10 30,785.20 82

Page 304: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 304Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--510510--019019 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: NDescription: Emergency Boiler ReplacementAgency: Department of Central Management Services Analyst: Amber EvansLocation: Chicago Medical Center Office and Laboratory Building - CookCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 11-10-21 :: :

A/E Id: 29590 : :A/E Name: Nest Builders, Inc. : :A/E Contact: Benjamin Rubach : :A/E Telephone: (312)915-0557 : :Date Selected: : :Contract Date: 01-25-21 ________________________________________________________________________________Est. Project Cost: 1,763,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,763,800.00 04-27-21 1,763,800.00 04-27-21 1,127,719.64 298,931.19 636,080.36 .00

Total 1,763,800.00 1,763,800.00 1,127,719.64 298,931.19 636,080.36 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 97.00% Description:Description: Boiler ReplacementBoiler Replacement

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 01-31-2201-31-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

The Stone Group Inc. 21EM0583 04-14-21 04-14-21 10-01-21 ( 0 ) 11-01-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

The Stone Group Inc. 21EM0583 83 955,000.00 .00 1 955,000.00 156,996.75 1 798,003.25 17***** Contract Totals ********** Contract Totals ***** 955,000.00 .00 1 955,000.00 156,996.75 1 798,003.25 17

Page 305: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 305Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--510510--021021 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: NDescription: Upgrade ElevatorsAgency: Department of Central Management Services Analyst: Amber EvansLocation: Chicago Medical Center Office and Laboratory Building - CookCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 11-10-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: Terry Shanklin : :A/E Telephone: (312)922-6400 : :Date Selected: 02-09-21 : :Contract Date: 03-15-21 ________________________________________________________________________________Est. Project Cost: 2,621,801.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,621,801.00 05-24-21 2,621,801.00 05-24-21 2,621,801.00 353,363.92 .00 .00

Total 2,621,801.00 2,621,801.00 2,621,801.00 353,363.92 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Upgrade ElevatorsUpgrade Elevators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-11-21 02-11-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-30-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-22 ( 0 )50%: 04-09-21 04-15-21 ( 6 ) Final Accept: 10-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2412-01-2495-100%: 06-04-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 21021710 ( 0 ) ( 0 ) 12-01-2412-01-24Parkway Elevators, Inc. 21EM0881 05-03-21 05-03-21 08-06-22 ( 0 ) 10-05-22 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 21021710 10 271,001.00 253,800.00 1 524,801.00 215,453.59 7 309,347.41 41Parkway Elevators, Inc. 21EM0881 81 2,097,000.00 .00 0 2,097,000.00 137,910.33 3 1,959,089.67 7***** Contract Totals ********** Contract Totals ***** 2,368,001.00 253,800.00 1 2,621,801.00 353,363.92 10 2,268,437.08 14

Page 306: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 306Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--510510--022022 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: PLA: NDescription: Replace and Upgrade HVAC SystemsAgency: Department of Central Management Services Analyst: Amber EvansLocation: Chicago Medical Center Office and Laboratory Building - CookCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 11-10-21 :: :

A/E Id: 11856 : :A/E Name: B + A Engineers, Ltd. dba CCJM : :A/E Contact: Jin Lee : :A/E Telephone: (312)669-0609 : :Date Selected: 07-13-21 : :Contract Date: 10-20-21 ________________________________________________________________________________Est. Project Cost: 9,152,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 9,152,300.00 07-14-21 9,152,300.00 07-14-21 237,754.00 .00 8,914,546.00 .00

Total 9,152,300.00 9,152,300.00 237,754.00 .00 8,914,546.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 2.00% Description:Description: Replace and Upgrade HVAC SystemsReplace and Upgrade HVAC Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-03-21 08-03-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-14-22 ( 0 ) Prime Bid: ( 0 )

Design Devel: 05-23-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2612-01-2695-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

B + A Engineers, Ltd. dba CC 22020110 ( 0 ) ( 0 ) 12-01-2612-01-26

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

B + A Engineers, Ltd. dba CC 22020110 10 237,754.00 .00 0 237,754.00 .00 0 237,754.00 0***** Contract Totals ********** Contract Totals ***** 237,754.00 .00 0 237,754.00 .00 0 237,754.00 0

Page 307: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 307Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 250250--546546--002002 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Remediate Site and Demolish BuildingsAgency: Department of Central Management Services Analyst: Amber EvansLocation: Sangamo Building, SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 34906 : :A/E Name: Poepping, Stone, Bach & Associ : :A/E Contact: : :A/E Telephone: (630)799-8070 : :Date Selected: 06-09-20 : :Contract Date: 08-17-20 ________________________________________________________________________________Est. Project Cost: 3,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,000,000.00 06-15-20 3,000,000.00 06-15-20 567,100.00 269,194.75 2,432,900.00 .00

Total 3,000,000.00 3,000,000.00 567,100.00 269,194.75 2,432,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 30.00% Description:Description: Remediate Site and Demolish BuildingsRemediate Site and Demolish Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-17-20 07-17-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-03-21 ( 0 )

Design Devel: 12-21-20 01-04-21 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-22-21 ( 0 )50%: ( 0 ) Final Accept: 12-20-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2211-30-2295-100%: 04-16-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Poepping, Stone, Bach & Asso 20004210 ( 0 ) ( 0 ) 11-30-2211-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Poepping, Stone, Bach & Asso 20004210 10 567,100.00 .00 0 567,100.00 269,194.75 4 297,905.25 48***** Contract Totals ********** Contract Totals ***** 567,100.00 .00 0 567,100.00 269,194.75 4 297,905.25 48

Page 308: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 308Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--000000--016016 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Construct State Police FacilityAgency: Illinois State Police Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 55,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 55,000,000.00 07-01-19 5,500,000.00 11-06-19 .00 .00 5,500,000.00 .00

Total 55,000,000.00 5,500,000.00 .00 .00 5,500,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Construct State Police FacilityConstruct State Police Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 309: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 309Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--000000--018018 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Construct a New Crime LabAgency: Illinois State Police Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 21853 : :A/E Name: RADA Architects, Ltd. : :A/E Contact: : :A/E Telephone: (312)856-1970 : :Date Selected: 11-17-20 : :Contract Date: 03-03-21 ________________________________________________________________________________Est. Project Cost: 65,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 65,500,000.00 07-01-19 6,550,000.00 05-19-20 2,534,812.00 1,097,029.16 4,015,188.00 .00

Total 65,500,000.00 6,550,000.00 2,534,812.00 1,097,029.16 4,015,188.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Construct a New Crime LabConstruct a New Crime Lab

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-19-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-05-21 10-22-21 (109 ) Prime Bid: ( 0 )

Design Devel: 10-25-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2612-01-2695-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

RADA Architects, Ltd. 21021210 ( 0 ) ( 0 ) 12-01-2612-01-26Nest Builders, Inc. 21022010 ( 0 ) ( 0 ) 12-01-2612-01-26Gilbane Building Company 21022410 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

RADA Architects, Ltd. 21021210 10 2,198,812.00 .00 0 2,198,812.00 1,097,029.16 6 1,101,782.84 50Nest Builders, Inc. 21022010 10 336,000.00 .00 0 336,000.00 .00 0 336,000.00 0Gilbane Building Company 21022410 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 2,534,812.00 .00 0 2,534,812.00 1,097,029.16 6 1,437,782.84 43

Page 310: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 310Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--048048--005005 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: NDescription: Emergency Boiler RepairAgency: Illinois State Police Analyst: Amber EvansLocation: Chicago Forensic Laboratory - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 11-02-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 330,880.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 330,880.00 06-16-21 330,880.00 06-16-21 330,880.00 127,326.00 .00 .00

Total 330,880.00 330,880.00 330,880.00 127,326.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 85.00% Description:Description: Emergency Boiler RepairEmergency Boiler Repair

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ideal Heating Company 21EM1083 06-18-21 ( 0 ) ( 0 ) 12-31-2112-31-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ideal Heating Company 21EM1083 83 330,880.00 .00 1 330,880.00 127,326.00 1 203,554.00 39***** Contract Totals ********** Contract Totals ***** 330,880.00 .00 1 330,880.00 127,326.00 1 203,554.00 39

Page 311: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 311Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--085085--001001 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Radio Tower and Upgrade HVAC atAgency: Illinois State Police Analyst: Amber EvansLocation: Communication Building/Tower - FairfieldCounty: 191 - Wayne ________________________________________________________________________________Leg. Districts: House:108 - Charles Meier

Senate:54 - Jason Plummer : CURRENT STATUS 10-15-21 :: :

A/E Id: 29490 : :A/E Name: Woolpert, Inc. : :A/E Contact: Andrew Kerkemeyer : :A/E Telephone: (618)632-7004 : :Date Selected: 07-09-19 : :Contract Date: 09-20-19 ________________________________________________________________________________Est. Project Cost: 537,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 537,200.00 05-28-19 537,200.00 05-28-19 457,398.00 74,199.00 79,802.00 .00

Total 537,200.00 537,200.00 457,398.00 74,199.00 79,802.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 4.00% Description:Description: Replace Radio Tower and Upgrade HVAC atReplace Radio Tower and Upgrade HVAC at

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-12-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-09-20 12-09-20 (244 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-20 ( 0 )50%: 11-15-19 11-21-19 ( 6 ) Final Accept: 10-15-20 ( 0 )75%: ( 0 ) A/E Cont End: 10-15-2110-15-21 02-15-2302-15-2395-100%: 02-06-20 07-28-20 (173 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert, Inc. 20010210 ( 0 ) ( 0 ) 02-15-2302-15-23Korte & Luitjohan Contractor 22040781 06-23-21 08-17-21 01-14-22 ( 0 ) 02-13-22 ( 0 ) 02-13-2302-13-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert, Inc. 20010210 10 77,700.00 .00 1 77,700.00 41,114.00 3 36,586.00 53Korte & Luitjohan Contractor 22040781 81 379,698.00 .00 0 379,698.00 33,085.00 1 346,613.00 9***** Contract Totals ********** Contract Totals ***** 457,398.00 .00 1 457,398.00 74,199.00 4 383,199.00 16

Page 312: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 312Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--101101--012012 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Renovate Joliet Crime LaboratoryAgency: Illinois State Police Analyst: Amber EvansLocation: Joliet Crime Laboratory - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 86 - Lawrence Walsh,

Senate:43 - John Connor : CURRENT STATUS 11-02-21 :: :

A/E Id: 34402 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Brian Craft : :A/E Telephone: (815)744-6940 : :Date Selected: 03-12-19 : :Contract Date: 07-23-19 ________________________________________________________________________________Est. Project Cost: 6,936,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,936,300.00 03-14-19 6,936,300.00 03-14-19 722,700.00 475,435.24 6,213,600.00 .00

Total 6,936,300.00 6,936,300.00 722,700.00 475,435.24 6,213,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Renovate Joliet Crime LaboratoryRenovate Joliet Crime Laboratory

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-21-19 05-21-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-16-19 10-18-19 ( 32 ) Prime Bid: 08-24-20 04-20-21 ( 0 )

Design Devel: 01-20-20 07-21-20 (183 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-28-21 07-20-22 ( 0 )50%: ( 0 ) Final Accept: 04-30-21 09-20-22 ( 0 )75%: 11-02-20 12-09-20 ( 37 ) A/E Cont End: 02-28-2202-28-22 10-20-2310-20-2395-100%: 02-02-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 19003610 ( 0 ) ( 0 ) 10-20-2310-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 19003610 10 641,800.00 80,900.00 3 722,700.00 475,435.24 7 247,264.76 66***** Contract Totals ********** Contract Totals ***** 641,800.00 80,900.00 3 722,700.00 475,435.24 7 247,264.76 66

Page 313: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 313Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--160160--006006 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: EM Emergency PLA: NDescription: Emergency Roof Replacement - District 20Agency: Illinois State Police Analyst: Amber EvansLocation: Pittsfield District 20 - Pike CountyCounty: 149 - Pike ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Kevin Schnebly : :A/E Telephone: (217)363-3375 : :Date Selected: 03-09-21 : :Contract Date: 05-18-21 ________________________________________________________________________________Est. Project Cost: 556,372.50

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 556,372.50 10-21-21 556,372.50 10-21-21 550,487.23 325,732.57 5,885.27 .00

Total 556,372.50 556,372.50 550,487.23 325,732.57 5,885.27 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Emergency Roof Replacement - District 20Emergency Roof Replacement - District 20

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-18-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-29-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: 04-29-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-23-21 ( 0 )50%: ( 0 ) Final Accept: 09-23-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2110-31-2195-100%: 05-25-21 06-15-21 ( 21 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 21031810 ( 0 ) ( 0 ) 10-31-2110-31-21Laverdiere Construction, Inc 21EM0481 02-16-21 02-16-21 04-17-21 09-30-21 09-16-21 (152 ) 10-31-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 21031810 10 156,000.00 .00 0 156,000.00 28,650.03 1 127,349.97 18Laverdiere Construction, Inc 21EM0481 81 300,000.00 94,487.23 6 394,487.23 297,082.54 5 97,404.69 75***** Contract Totals ********** Contract Totals ***** 456,000.00 94,487.23 6 550,487.23 325,732.57 6 224,754.66 59

Page 314: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 314Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--221221--018018 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade HVAC System & Install GeneratorAgency: Illinois State Police Analyst: Amber EvansLocation: State Police Training Academy - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 99 - Mike Murphy

Senate:50 - Steve McClure : CURRENT STATUS 10-27-21 :: :

A/E Id: 30361 : :A/E Name: Woolpert Architecture, LLC : :A/E Contact: Andy Kerkemeyer : :A/E Telephone: (618)632-7004 : :Date Selected: 03-12-19 : :Contract Date: 07-12-19 ________________________________________________________________________________Est. Project Cost: 9,471,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 9,471,100.00 03-25-19 9,471,100.00 03-25-19 1,038,722.00 542,894.55 8,432,378.00 .00

Total 9,471,100.00 9,471,100.00 1,038,722.00 542,894.55 8,432,378.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Upgrade HVAC System & Install GeneratorUpgrade HVAC System & Install Generator

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-16-19 05-16-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-03-20 08-24-20 09-30-20 ( 37 )

Design Devel: 10-07-19 10-16-19 ( 9 ) Prime Re-Bid: 09-01-21 ( 0 )25%: ( 0 ) Subst Compl: 06-30-21 12-04-22 ( 0 )50%: 01-27-20 01-29-20 ( 2 ) Final Accept: 08-16-21 01-04-23 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-22 01-04-2401-04-2495-100%: 06-22-20 07-21-20 ( 29 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert Architecture, LLC 19003910 ( 0 ) ( 0 ) 01-04-2401-04-24R.D. Lawrence Construction C 22050381 11-03-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert Architecture, LLC 19003910 10 798,200.00 240,522.00 2 1,038,722.00 542,894.55 5 495,827.45 52R.D. Lawrence Construction C 22050381 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 798,200.00 240,522.00 2 1,038,722.00 542,894.55 5 495,827.45 52

Page 315: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 315Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--221221--019019 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade Parking Lots, Pavements and ResuAgency: Illinois State Police Analyst: Amber EvansLocation: State Police Training Academy - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 99 - Mike Murphy

Senate:50 - Steve McClure : CURRENT STATUS 11-03-21 :: :

A/E Id: 2017 : :A/E Name: Russell W. Martin Engineering, : :A/E Contact: Adam Pallai : :A/E Telephone: (217)698-8900 : :Date Selected: 09-10-19 : :Contract Date: 11-12-19 ________________________________________________________________________________Est. Project Cost: 817,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 817,900.00 09-17-19 817,900.00 09-17-19 736,149.61 689,785.34 81,750.39 .00

Total 817,900.00 817,900.00 736,149.61 689,785.34 81,750.39 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Upgrade Parking Lots, Pavements and ResuUpgrade Parking Lots, Pavements and Resu

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-29-20 01-31-20 ( 2 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 975.20 Schem Design: ( 0 ) Prime Bid: 05-21-20 06-10-20 ( 20 )

Design Devel: 01-29-20 01-31-20 ( 2 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-21-20 10-15-21 ( 0 )50%: ( 0 ) Final Accept: 11-21-20 11-21-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-21-2110-21-21 10-21-2210-21-2295-100%: 04-01-20 04-02-20 ( 1 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Russell W. Martin Engineerin 20040410 ( 0 ) ( 0 ) 10-21-2210-21-22Truman L. Flatt & Sons Co., 21045181 12-22-20 02-17-21 08-16-21 08-16-21 ( 0 ) 09-15-21 10-27-21 ( 42 ) 09-15-2209-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Russell W. Martin Engineerin 20040410 10 114,200.00 4,946.89 3 119,146.89 72,782.62 7 46,364.27 61Truman L. Flatt & Sons Co., 21045181 81 535,248.00 81,754.72 7 617,002.72 617,002.72 4 .00 100***** Contract Totals ********** Contract Totals ***** 649,448.00 86,701.61 10 736,149.61 689,785.34 11 46,364.27 94

Page 316: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 316Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--240240--011011 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Roofing SystemAgency: Illinois State Police Analyst: Amber EvansLocation: Sterling District 1 - Whiteside CountyCounty: 195 - Whiteside ________________________________________________________________________________Leg. Districts: House: 71 - Tony McCombie

Senate:36 - Neil Anderson : CURRENT STATUS 11-03-21 :: :

A/E Id: 35563 : :A/E Name: Ryan Keutzer dba Studio Archit : :A/E Contact: Ryan Keutzer : :A/E Telephone: (000)000-0000 : :Date Selected: 02-09-21 : :Contract Date: 04-26-21 ________________________________________________________________________________Est. Project Cost: 420,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 420,600.00 08-19-19 420,600.00 08-19-19 284,099.00 196,393.00 136,501.00 .00

Total 420,600.00 420,600.00 284,099.00 196,393.00 136,501.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Replace Roofing SystemReplace Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-05-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-29-21 ( 0 )50%: ( 0 ) Final Accept: 01-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2210-31-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kelly & Associates-Architect 20031010 ( 0 ) ( 0 ) 11-30-2111-30-21Ryan Keutzer dba Studio Arch 21031710 ( 0 ) ( 0 ) 10-31-2210-31-22Sterling Commercial Roofing, 21045981 12-29-20 01-21-21 05-21-21 ( 0 ) 07-20-21 ( 0 ) 07-20-2207-20-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kelly & Associates-Architect 20031010 10 44,700.00 .00 0 44,700.00 27,421.00 4 17,279.00 61Ryan Keutzer dba Studio Arch 21031710 10 17,799.00 .00 0 17,799.00 .00 0 17,799.00 0Sterling Commercial Roofing, 21045981 81 221,600.00 .00 0 221,600.00 168,972.00 1 52,628.00 76***** Contract Totals ********** Contract Totals ***** 284,099.00 .00 0 284,099.00 196,393.00 5 87,706.00 69

Page 317: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 317Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 291291--275275--006006 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade Parking Lot/Site LightingAgency: Illinois State Police Analyst: Amber EvansLocation: Illinois State Police Central Headquarters - Springfield, SaCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 2017 : :A/E Name: Russell W. Martin Engineering, : :A/E Contact: Phil Martin : :A/E Telephone: (217)698-8900 : :Date Selected: 11-13-19 : :Contract Date: 04-21-20 ________________________________________________________________________________Est. Project Cost: 958,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 958,100.00 11-18-19 958,100.00 11-18-19 796,745.00 56,671.27 161,355.00 .00

Total 958,100.00 958,100.00 796,745.00 56,671.27 161,355.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 2.00% Description:Description: Upgrade Parking Lot/Site LightingUpgrade Parking Lot/Site Lighting

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-15-20 ( 0 ) Assgn Bid: 09-01-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 08-14-20 08-20-20 ( 6 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-25-21 ( 0 )

Design Devel: 10-23-20 11-19-20 ( 27 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-21 ( 0 )50%: ( 0 ) Final Accept: 10-29-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2208-31-2295-100%: 12-18-20 06-21-21 (185 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Russell W. Martin Engineerin 20032710 ( 0 ) ( 0 ) 08-31-2208-31-22B & B Electric, Inc. 22048085 10-01-21 10-19-21 10-19-22 ( 0 ) 11-18-22 ( 0 ) 11-18-2311-18-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Russell W. Martin Engineerin 20032710 10 112,200.00 .00 0 112,200.00 56,671.27 6 55,528.73 51B & B Electric, Inc. 22048085 85 684,545.00 .00 0 684,545.00 .00 0 684,545.00 0***** Contract Totals ********** Contract Totals ***** 796,745.00 .00 0 796,745.00 56,671.27 6 740,073.73 7

Page 318: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 318Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--000000--095095 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: 19 COVID-19 PLA: NDescription: Emergency Renovation for Isolation RoomsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-15-21 :: :

A/E Id: 29338 : :A/E Name: Knight E/A, Inc. : :A/E Contact: Jeffrey Ninette : :A/E Telephone: (312)577-3300 : :Date Selected: 05-12-20 : :Contract Date: 05-22-20 ________________________________________________________________________________Est. Project Cost: 12,527,728.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 12,528,887.20 03-03-21 12,528,887.20 03-03-21 11,328,887.20 8,754,440.28 1,200,000.00 .00

Total 12,528,887.20 12,528,887.20 11,328,887.20 8,754,440.28 1,200,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Emergency Renovation for Isolation RoomsEmergency Renovation for Isolation Rooms

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-30-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-01-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-16-20 ( 0 )50%: ( 0 ) Final Accept: 05-15-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-21-2006-21-20 11-30-2111-30-2195-100%: 04-01-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Knight E/A, Inc. 20003610 ( 0 ) ( 0 ) 11-30-2111-30-21Livewire Electrical Systems, 20EM1281 03-27-20 03-27-20 04-27-20 05-14-20 ( 0 ) 06-21-20 ( 0 ) 08-30-2108-30-21The Bowa Group, Inc. 20EM1381 03-27-20 03-27-20 04-27-20 05-11-20 ( 0 ) 08-30-20 ( 0 ) 08-30-2108-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Knight E/A, Inc. 20003610 10 627,728.00 .00 6 627,728.00 422,902.25 1 204,825.75 67Therm Flo Inc. 7146 80 1,159.20 .00 0 1,159.20 1,159.20 1 .00 100Livewire Electrical Systems, 20EM1281 81 2,019,098.00 2,480,902.00 8 4,500,000.00 3,638,098.93 9 861,901.07 81The Bowa Group, Inc. 20EM1381 81 3,484,946.00 2,715,054.00 7 6,200,000.00 4,692,279.90 3 1,507,720.10 76***** Contract Totals ********** Contract Totals ***** 6,132,931.20 5,195,956.00 21 11,328,887.20 8,754,440.28 14 2,574,446.92 77

Page 319: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 319Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--100100 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roof - Dietary BuildingAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 21754 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: David Pool : :A/E Telephone: (618)398-0890 : :Date Selected: 11-13-18 : :Contract Date: 02-08-19 ________________________________________________________________________________Est. Project Cost: 559,146.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 559,146.00 02-25-20 559,146.00 02-25-20 516,660.00 462,475.20 42,486.00 .00

Total 559,146.00 559,146.00 516,660.00 462,475.20 42,486.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 85.00% Description:Description: Replace Roof - Dietary BuildingReplace Roof - Dietary Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-27-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 03-29-19 05-07-19 ( 39 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-29-19 05-08-19 ( 40 ) Prime Bid: 08-15-19 01-30-20 (168 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-14-20 ( 0 )50%: ( 0 ) Final Accept: 03-03-20 ( 0 )75%: ( 0 ) A/E Cont End: 02-12-2102-12-21 02-12-2202-12-2295-100%: 06-14-19 09-05-19 ( 83 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 19030110 ( 0 ) ( 0 ) 02-12-2202-12-22Geissler Roofing Co., Inc. 20048881 06-13-20 08-05-20 02-01-21 12-02-20 ( 61-) 05-02-21 ( 0 ) 05-02-2205-02-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 19030110 10 91,800.00 .00 1 91,800.00 78,323.00 16 13,477.00 85Geissler Roofing Co., Inc. 20048881 81 424,860.00 .00 0 424,860.00 384,152.20 2 40,707.80 91***** Contract Totals ********** Contract Totals ***** 516,660.00 .00 1 516,660.00 462,475.20 18 54,184.80 90

Page 320: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 320Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--101101 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: PLA: YDescription: Replace Roofing SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 26859 : :A/E Name: Eggemeyer Associates Architect : :A/E Contact: Ed Kirchner : :A/E Telephone: (618)988-2380 : :Date Selected: 03-12-19 : :Contract Date: 07-10-19 ________________________________________________________________________________Est. Project Cost: 1,932,370.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,932,370.00 06-21-21 1,932,370.00 06-21-21 118,470.00 78,063.87 1,813,900.00 .00

Total 1,932,370.00 1,932,370.00 118,470.00 78,063.87 1,813,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Replace Roofing SystemReplace Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 08-15-19 08-26-19 ( 11 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-20-20 06-24-20 (125 )

Design Devel: 08-15-19 08-26-19 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-20-20 ( 0 )50%: ( 0 ) Final Accept: 10-20-20 ( 0 )75%: 10-18-19 11-20-19 ( 33 ) A/E Cont End: 11-08-2111-08-21 08-01-2308-01-2395-100%: 12-15-19 02-07-20 ( 54 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Eggemeyer Associates Archite 19013110 ( 0 ) ( 0 ) 08-01-2308-01-23Premier Contractors,Inc. 22041281 07-29-21 11-04-21 04-03-22 ( 0 ) 05-03-22 ( 0 ) 05-03-2305-03-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Eggemeyer Associates Archite 19013110 10 113,870.00 4,600.00 2 118,470.00 78,063.87 4 40,406.13 66Premier Contractors,Inc. 22041281 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 113,870.00 4,600.00 2 118,470.00 78,063.87 4 40,406.13 66

Page 321: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 321Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--102102 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: PLA: NDescription: Renovate Washrooms/Showers - Forensic/LoAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 34404 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: : :A/E Telephone: (618)236-2000 : :Date Selected: 05-14-19 : :Contract Date: 11-27-19 ________________________________________________________________________________Est. Project Cost: 1,524,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,524,200.00 05-23-19 1,524,200.00 05-23-19 27,320.00 27,320.00 1,496,880.00 .00

Total 1,524,200.00 1,524,200.00 27,320.00 27,320.00 1,496,880.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Renovate Washrooms/Showers - Forensic/LoRenovate Washrooms/Showers - Forensic/Lo

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-10-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 02-28-20 07-20-20 (143 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-28-20 07-20-20 (143 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 20030410 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 20030410 10 27,320.00 .00 0 27,320.00 27,320.00 2 .00 100***** Contract Totals ********** Contract Totals ***** 27,320.00 .00 0 27,320.00 27,320.00 2 .00 100

Page 322: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 322Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--103103 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade/Replace Fire Alarm SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 10-08-19 : :Contract Date: 01-07-20 ________________________________________________________________________________Est. Project Cost: 2,433,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,008,800.00 10-15-19 2,008,800.00 10-15-19 60,803.00 60,803.00 1,947,997.00 .00

Total 2,008,800.00 2,008,800.00 60,803.00 60,803.00 1,947,997.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Upgrade/Replace Fire Alarm SystemUpgrade/Replace Fire Alarm System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-13-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-19-20 03-23-20 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: 03-19-20 03-26-20 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 08-16-2408-16-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 20040710 ( 0 ) ( 0 ) 08-16-2408-16-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 20040710 10 60,803.00 .00 0 60,803.00 60,803.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 60,803.00 .00 0 60,803.00 60,803.00 1 .00 100

Page 323: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 323Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--104104 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Holly BuildingAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 34404 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Jared Heller : :A/E Telephone: (618)236-2000 : :Date Selected: 11-13-19 : :Contract Date: 12-13-19 ________________________________________________________________________________Est. Project Cost: 3,176,304.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,176,800.00 06-11-20 3,176,800.00 06-11-20 2,689,351.66 2,580,537.01 487,448.34 .00

Total 3,176,800.00 3,176,800.00 2,689,351.66 2,580,537.01 487,448.34 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Renovate Holly BuildingRenovate Holly Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-28-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 07-13-20 07-20-20 ( 7 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-21-19 01-15-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-28-20 11-30-21 ( 0 )50%: 09-21-20 11-10-20 ( 50 ) Final Accept: 01-28-20 01-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 01-28-2001-28-20 12-01-2212-01-2295-100%: 11-30-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 20013410 ( 0 ) ( 0 ) 12-01-2212-01-22Limbaugh Construction Co. In 20EM0281 10-24-19 10-24-19 04-01-20 10-26-20 (208 ) 06-30-20 04-12-21 (286 ) 12-31-2012-31-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 20013410 10 141,100.00 210,600.00 3 351,700.00 242,885.35 2 108,814.65 69Limbaugh Construction Co. In 20EM0281 81 100,000.00 2,237,651.66 3 2,337,651.66 2,337,651.66 10 .00 100***** Contract Totals ********** Contract Totals ***** 241,100.00 2,448,251.66 6 2,689,351.66 2,580,537.01 12 108,814.65 96

Page 324: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 324Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--104104 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Holly BuildingAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 34404 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: : :A/E Telephone: (618)236-2000 : :Date Selected: : :Contract Date: 12-13-19 ________________________________________________________________________________Est. Project Cost: 3,176,304.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,176,800.00 06-11-20 3,176,800.00 06-11-20 2,689,351.66 2,580,537.01 487,448.34 .00

Total 3,176,800.00 3,176,800.00 2,689,351.66 2,580,537.01 487,448.34 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 75.00% Description:Description: Renovate Maple BuildingRenovate Maple Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 05-18-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 325: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 325Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--105105 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Dental Rooms for Airborne IsolaAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: : :A/E Telephone: (618)344-3774 : :Date Selected: 08-11-20 : :Contract Date: 10-16-20 ________________________________________________________________________________Est. Project Cost: 90,844.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 10,844.00 12-24-20 10,844.00 12-24-20 10,844.00 1,034.00 .00 .00

Total 10,844.00 10,844.00 10,844.00 1,034.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Renovate Dental Rooms for Airborne IsolaRenovate Dental Rooms for Airborne Isola

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-31-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 11-15-2111-15-2195-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 21010410 ( 0 ) ( 0 ) 11-15-2111-15-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 21010410 10 9,810.00 .00 0 9,810.00 .00 0 9,810.00 0ProAlliance Corporation 7119 80 1,034.00 .00 0 1,034.00 1,034.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 10,844.00 .00 0 10,844.00 1,034.00 1 9,810.00 10

Page 326: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 326Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--107107 PM NAME: Ashlie Shaffer 595Ashlie Shaffer 595Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Employee Duress SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 10-26-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: : :A/E Telephone: (618)659-8709 : :Date Selected: 08-10-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 339,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 339,800.00 07-13-21 339,800.00 07-13-21 .00 .00 339,800.00 .00

Total 339,800.00 339,800.00 .00 .00 339,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace Employee Duress SystemReplace Employee Duress System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 22010710 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 22010710 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 327: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 327Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--010010--108108 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: NDescription: Emergency Replacement of Emergency GenerAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Alton Mental Health Center - Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-09-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 121,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 121,000.00 10-21-21 121,000.00 10-21-21 .00 .00 121,000.00 .00

Total 121,000.00 121,000.00 .00 .00 121,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Emergency Replacement of Emergency GenerEmergency Replacement of Emergency Gener

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-01-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-12-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 11-28-2111-28-2195-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 22030910 ( 0 ) ( 0 ) 11-28-2111-28-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 22030910 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 328: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 328Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--095095 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Interior and Exterior of Water ToAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 26744 : :A/E Name: Heneghan and Associates, P.C. : :A/E Contact: Ronald Paul : :A/E Telephone: (618)533-6525 : :Date Selected: 03-12-19 : :Contract Date: 07-31-19 ________________________________________________________________________________Est. Project Cost: 3,425,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,425,000.00 07-09-21 3,425,000.00 07-09-21 158,580.00 99,662.25 3,266,420.00 .00

Total 3,425,000.00 3,425,000.00 158,580.00 99,662.25 3,266,420.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Repair Interior and Exterior of Water ToRepair Interior and Exterior of Water To

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-30-19 01-05-20 ( 36 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-30-19 01-06-20 ( 37 ) Prime Bid: 12-08-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: 11-10-21 ( 0 )25%: ( 0 ) Subst Compl: 09-30-21 ( 0 )50%: 07-03-20 07-20-20 ( 17 ) Final Accept: 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-23-2110-23-21 10-23-2210-23-2295-100%: 10-27-20 10-13-21 (351 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Heneghan and Associates, P.C 19013210 ( 0 ) ( 0 ) 10-23-2210-23-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Heneghan and Associates, P.C 19013210 10 32,860.00 125,720.00 1 158,580.00 99,662.25 5 58,917.75 63***** Contract Totals ********** Contract Totals ***** 32,860.00 125,720.00 1 158,580.00 99,662.25 5 58,917.75 63

Page 329: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 329Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--096096 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 29471 : :A/E Name: BHDG Architects, Inc. : :A/E Contact: Sheila Baysinger : :A/E Telephone: (618)998-8015 : :Date Selected: 05-14-19 : :Contract Date: 08-26-19 ________________________________________________________________________________Est. Project Cost: 2,006,528.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,006,528.00 10-21-21 2,006,528.00 10-21-21 2,006,527.81 106,767.94 .19 .00

Total 2,006,528.00 2,006,528.00 2,006,527.81 106,767.94 .19 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 10.00% Description:Description: Replace Roofing SystemReplace Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-13-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-25-19 11-25-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-30-20 ( 0 )

Design Devel: 11-25-19 12-02-19 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-30-21 ( 0 )50%: 03-05-20 03-05-20 ( 0 ) Final Accept: 07-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: 05-21-20 05-21-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BHDG Architects, Inc. 20010310 ( 0 ) ( 0 ) 06-30-2206-30-22Joiner Sheet Metal & Roofing 21054181 05-24-21 07-22-21 01-18-22 ( 0 ) 03-19-22 ( 0 ) 03-19-2303-19-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BHDG Architects, Inc. 20010310 10 166,200.00 .00 0 166,200.00 106,767.94 7 59,432.06 64Joiner Sheet Metal & Roofing 21054181 81 1,409,746.00 430,581.81 2 1,840,327.81 .00 0 1,840,327.81 0***** Contract Totals ********** Contract Totals ***** 1,575,946.00 430,581.81 2 2,006,527.81 106,767.94 7 1,899,759.87 5

Page 330: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 330Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--097097 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade Facility Energy Management SysteAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 34304 : :A/E Name: Prairie Engineers, P.C. : :A/E Contact: : :A/E Telephone: (217)605-0403 : :Date Selected: 08-13-19 : :Contract Date: 11-01-19 ________________________________________________________________________________Est. Project Cost: 2,316,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,316,300.00 08-13-19 2,316,300.00 08-13-19 221,100.00 140,686.47 2,095,200.00 .00

Total 2,316,300.00 2,316,300.00 221,100.00 140,686.47 2,095,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Upgrade Facility Energy Management SysteUpgrade Facility Energy Management Syste

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-26-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-15-20 01-27-20 ( 12 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-06-21 09-01-21 ( 87 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-30-22 ( 0 )50%: 12-23-20 02-02-21 ( 41 ) Final Accept: 06-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2211-30-2295-100%: 04-01-21 04-21-21 ( 20 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Prairie Engineers, P.C. 20011710 ( 0 ) ( 0 ) 11-30-2211-30-22Brown Electric, Inc. 220493483 10-07-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Prairie Engineers, P.C. 20011710 10 47,445.00 173,655.00 1 221,100.00 140,686.47 8 80,413.53 64Brown Electric, Inc. 220493483 83 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 47,445.00 173,655.00 1 221,100.00 140,686.47 8 80,413.53 64

Page 331: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 331Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--098098 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Construct New Building and Upgrade ElectAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 29490 : :A/E Name: Woolpert, Inc. : :A/E Contact: : :A/E Telephone: (618)632-7004 : :Date Selected: 09-10-19 : :Contract Date: 12-04-19 ________________________________________________________________________________Est. Project Cost: 8,917,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,917,900.00 02-20-20 8,917,900.00 02-20-20 838,460.00 447,525.77 8,079,440.00 .00

Total 8,917,900.00 8,917,900.00 838,460.00 447,525.77 8,079,440.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Replace Boilers and Upgrade Electrical SReplace Boilers and Upgrade Electrical S

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-10-20 04-09-20 ( 1-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-10-20 04-10-20 ( 0 ) Prime Bid: 07-28-21 11-24-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-01-22 ( 0 )50%: 02-05-21 02-17-21 ( 12 ) Final Accept: 10-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2406-01-2495-100%: 09-10-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert, Inc. 20012110 ( 0 ) ( 0 ) 06-01-2406-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert, Inc. 20012110 10 106,600.00 731,860.00 4 838,460.00 447,525.77 8 390,934.23 53***** Contract Totals ********** Contract Totals ***** 106,600.00 731,860.00 4 838,460.00 447,525.77 8 390,934.23 53

Page 332: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 332Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--099099 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Oak HallAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 21841 : :A/E Name: Architechniques, Ltd. : :A/E Contact: Curt Orso : :A/E Telephone: (618)942-6918 : :Date Selected: 09-10-19 : :Contract Date: 10-02-19 ________________________________________________________________________________Est. Project Cost: 2,343,775.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,060,375.00 09-28-20 3,060,375.00 09-28-20 2,208,610.54 2,149,619.70 851,764.46 .00

Total 3,060,375.00 3,060,375.00 2,208,610.54 2,149,619.70 851,764.46 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Renovate Oak HallRenovate Oak Hall

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-12-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-01-19 12-30-19 ( 59 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-01-19 ( 0 ) Prime Bid: 05-08-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-07-20 ( 0 )50%: 01-08-20 ( 0 ) Final Accept: 12-03-20 ( 0 )75%: ( 0 ) A/E Cont End: 02-05-2202-05-2295-100%: 03-06-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechniques, Ltd. 20011810 ( 0 ) ( 0 ) 02-05-2202-05-22H & N Construction, Inc. 20EM0181 10-09-19 10-09-19 12-31-19 ( 0 ) 02-14-20 05-18-21 (459 ) 04-30-2104-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechniques, Ltd. 20011810 10 224,370.00 51,805.00 3 276,175.00 217,184.16 3 58,990.84 79H & N Construction, Inc. 20EM0181 81 1,351,000.00 581,435.54 6 1,932,435.54 1,932,435.54 12 .00 100***** Contract Totals ********** Contract Totals ***** 1,575,370.00 633,240.54 9 2,208,610.54 2,149,619.70 15 58,990.84 97

Page 333: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 333Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--099099 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Oak HallAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 21841 : :A/E Name: Architechniques, Ltd. : :A/E Contact: : :A/E Telephone: (618)942-6918 : :Date Selected: : :Contract Date: 10-02-19 ________________________________________________________________________________Est. Project Cost: 2,343,775.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,060,375.00 09-28-20 3,060,375.00 09-28-20 2,208,610.54 2,149,619.70 851,764.46 .00

Total 3,060,375.00 3,060,375.00 2,208,610.54 2,149,619.70 851,764.46 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 41.00% Description:Description: Renovate Oak HallRenovate Oak Hall

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: 12-30-19 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 334: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 334Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--100100 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing Systems on Several BuildAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 21841 : :A/E Name: Architechniques, Ltd. : :A/E Contact: : :A/E Telephone: (618)942-6918 : :Date Selected: 03-10-20 : :Contract Date: 03-25-21 ________________________________________________________________________________Est. Project Cost: 1,566,860.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,546,860.00 04-06-21 1,546,860.00 04-06-21 136,659.49 41,968.49 1,410,200.51 .00

Total 1,546,860.00 1,546,860.00 136,659.49 41,968.49 1,410,200.51 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 49.00% Description:Description: Replace Roofing Systems on Several BuildReplace Roofing Systems on Several Build

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 06-23-21 07-27-21 ( 34 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-23-21 07-27-21 ( 34 ) Prime Bid: 01-05-22 ( 0 )

Design Devel: 06-23-21 08-10-21 ( 48 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-06-22 ( 0 )50%: 09-01-21 ( 0 ) Final Accept: 02-04-23 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2411-30-2495-100%: 10-27-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechniques, Ltd. 21012010 ( 0 ) ( 0 ) 11-30-2411-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechniques, Ltd. 21012010 10 126,850.00 8,550.00 1 135,400.00 40,709.00 1 94,691.00 30Joiner Sheet Metal & Roofing 7178 80 .00 1,259.49 0 1,259.49 1,259.49 1 .00 100***** Contract Totals ********** Contract Totals ***** 126,850.00 9,809.49 1 136,659.49 41,968.49 2 94,691.00 31

Page 335: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 335Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--102102 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate Lence HallAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 21841 : :A/E Name: Architechniques, Ltd. : :A/E Contact: : :A/E Telephone: (618)942-6918 : :Date Selected: 11-17-20 : :Contract Date: 02-25-21 ________________________________________________________________________________Est. Project Cost: 5,807,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 521,520.00 10-21-21 521,520.00 10-21-21 21,520.00 .00 500,000.00 .00

Total 521,520.00 521,520.00 21,520.00 .00 500,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 19.00% Description:Description: Renovate Lence HallRenovate Lence Hall

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechniques, Ltd. 21011510 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechniques, Ltd. 21011510 10 21,520.00 .00 0 21,520.00 .00 0 21,520.00 0***** Contract Totals ********** Contract Totals ***** 21,520.00 .00 0 21,520.00 .00 0 21,520.00 0

Page 336: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 336Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--015015--721721 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: AS Asbestos PLA: NDescription: Abate Asbestos for Life Safety UpgradesAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Choate Mental Health and Developmental Center - Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-12-21 :: :

A/E Id: 21841 : :A/E Name: Architechniques, Ltd. : :A/E Contact: Curt Orso : :A/E Telephone: (618)942-6918 : :Date Selected: 06-08-10 : :Contract Date: 07-12-12 ________________________________________________________________________________Est. Project Cost: 1,267,598.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,613,624.42 07-24-19 2,613,624.42 07-24-19 1,892,249.81 1,865,354.74 .03 721,374.58

Total 2,613,624.42 2,613,624.42 1,892,249.81 1,865,354.74 .03 721,374.58____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 99.00% Description:Description: Abate Asbestos for Life Safety UpgradesAbate Asbestos for Life Safety Upgrades

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 2,845.43 Schem Design: ( 0 ) Prime Bid: 05-15-13 01-15-14 07-09-14 (175 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-22-16 08-01-16 ( 0 )50%: 10-15-12 11-20-12 ( 36 ) Final Accept: 03-22-16 10-15-16 ( 0 )75%: ( 0 ) A/E Cont End: 03-22-1803-22-18 12-31-2112-31-2195-100%: 10-01-13 10-04-13 ( 3 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechniques, Ltd. 12003610 ( 0 ) ( 0 ) 12-31-2112-31-21General Waste Services, Inc. 15050788 10-28-14 11-25-14 01-23-17 12-09-19 06-28-19 (886 ) 02-03-20 09-01-19 (155-) 02-03-2102-03-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechniques, Ltd. 12003610 10 270,737.00 29,803.00 4 300,540.00 273,644.93 20 26,895.07 91General Waste Services, Inc. INT6720 00 .00 938.85 0 938.85 938.85 1 .00 100General Waste Services, Inc. 15050788 88 1,445,000.00 145,770.96 9 1,590,770.96 1,590,770.96 21 .00 100***** Contract Totals ********** Contract Totals ***** 1,715,737.00 176,512.81 13 1,892,249.81 1,865,354.74 42 26,895.07 99

Page 337: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 337Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--030030--153153 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade Fire Alarm System and Replace HVAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Chicago-Read Mental Health Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 19 - Lindsey LaPointe

Senate:10 - Robert Martwick : CURRENT STATUS 11-02-21 :: :

A/E Id: 17350 : :A/E Name: Primera Engineers, Ltd. : :A/E Contact: Jill Deichmann : :A/E Telephone: (312)606-0910 : :Date Selected: 05-14-19 : :Contract Date: 07-24-19 ________________________________________________________________________________Est. Project Cost: 30,099,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 30,099,300.00 03-23-21 30,099,300.00 03-23-21 1,848,738.00 920,482.32 28,250,562.00 .00

Total 30,099,300.00 30,099,300.00 1,848,738.00 920,482.32 28,250,562.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Upgrade Fire Alarm System and Replace HVUpgrade Fire Alarm System and Replace HV

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-14-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-26-20 ( 0 ) Prime Bid: 06-25-20 09-14-21 12-08-21 ( 85 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-25-22 02-23-26 ( 0 )50%: 12-15-20 01-14-21 ( 30 ) Final Accept: 04-22-22 03-30-26 ( 0 )75%: ( 0 ) A/E Cont End: 03-25-2303-25-23 02-23-2702-23-2795-100%: 05-04-21 08-31-21 (119 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Primera Engineers, Ltd. 19025510 ( 0 ) ( 0 ) 02-23-2702-23-27

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Primera Engineers, Ltd. 19025510 10 621,300.00 1,227,438.00 2 1,848,738.00 920,482.32 11 928,255.68 50***** Contract Totals ********** Contract Totals ***** 621,300.00 1,227,438.00 2 1,848,738.00 920,482.32 11 928,255.68 50

Page 338: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 338Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--035035--064064 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replacement Of Walk-In FreezerAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Mabley Developmental Center - Dixon, Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 28752 : :A/E Name: McClellan Blakemore Architects : :A/E Contact: Brian Blakemore : :A/E Telephone: (815)227-0023 : :Date Selected: 03-12-19 : :Contract Date: 07-08-19 ________________________________________________________________________________Est. Project Cost: 729,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 729,200.00 03-28-19 729,200.00 03-28-19 88,400.00 48,163.00 640,800.00 .00

Total 729,200.00 729,200.00 88,400.00 48,163.00 640,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Replacement Of Walk-In FreezerReplacement Of Walk-In Freezer

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-25-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 08-09-19 09-03-19 ( 25 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-12-19 02-27-20 ( 77 )

Design Devel: 08-09-19 09-03-19 ( 25 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-30-20 11-30-23 ( 0 )50%: ( 0 ) Final Accept: 12-11-20 02-11-24 ( 0 )75%: ( 0 ) A/E Cont End: 10-29-2110-29-21 10-29-2510-29-2595-100%: 10-04-19 10-11-19 ( 7 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

McClellan Blakemore Architec 19031410 ( 0 ) ( 0 ) 10-29-2510-29-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

McClellan Blakemore Architec 19031410 10 88,400.00 .00 1 88,400.00 48,163.00 2 40,237.00 55***** Contract Totals ********** Contract Totals ***** 88,400.00 .00 1 88,400.00 48,163.00 2 40,237.00 55

Page 339: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 339Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--055055--134134 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Elgin Mental Health Center - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 10-13-21 :: :

A/E Id: 30897 : :A/E Name: Batir Architecture, Ltd. : :A/E Contact: Paula Price : :A/E Telephone: (630)513-5109 : :Date Selected: 03-12-19 : :Contract Date: 04-30-19 ________________________________________________________________________________Est. Project Cost: 2,833,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,833,900.00 02-20-20 2,833,900.00 02-20-20 1,256,980.00 149,041.50 1,576,920.00 .00

Total 2,833,900.00 2,833,900.00 1,256,980.00 149,041.50 1,576,920.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 10.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-08-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-19-20 08-19-20 (153 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-20 ( 0 )50%: 11-08-19 12-03-19 ( 25 ) Final Accept: 10-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2108-31-21 09-21-2209-21-2295-100%: 01-10-20 06-19-20 (161 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Batir Architecture, Ltd. 19024110 ( 0 ) ( 0 ) 09-21-2209-21-22AGAE Contractors, Inc. 21048881 04-06-21 05-10-21 09-22-21 ( 0 ) 10-22-21 ( 0 ) 10-22-2210-22-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Batir Architecture, Ltd. 19024110 10 35,530.00 168,770.00 2 204,300.00 149,041.50 4 55,258.50 73AGAE Contractors, Inc. 21048881 81 1,052,680.00 .00 0 1,052,680.00 .00 0 1,052,680.00 0***** Contract Totals ********** Contract Totals ***** 1,088,210.00 168,770.00 2 1,256,980.00 149,041.50 4 1,107,938.50 12

Page 340: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 340Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--055055--135135 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace BoilersAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Elgin Mental Health Center - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 10-19-21 :: :

A/E Id: 30811 : :A/E Name: Kluber, Inc. : :A/E Contact: Don Ware : :A/E Telephone: (630)406-1213 : :Date Selected: 05-14-19 : :Contract Date: 06-18-19 ________________________________________________________________________________Est. Project Cost: 2,668,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,665,000.00 02-20-20 2,665,000.00 02-20-20 1,532,593.00 217,053.00 1,132,407.00 .00

Total 2,665,000.00 2,665,000.00 1,532,593.00 217,053.00 1,132,407.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Replace BoilersReplace Boilers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-21-19 ( 0 ) Assgn Bid: 10-14-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-07-19 10-22-19 ( 15 ) Prime Bid: 07-14-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-30-21 07-30-22 ( 0 )50%: 02-24-20 03-05-20 ( 10 ) Final Accept: 08-30-21 08-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-22 07-30-2407-30-2495-100%: 04-24-20 07-20-20 ( 87 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kluber, Inc. 19024510 ( 0 ) ( 0 ) 07-30-2407-30-24Ideal Heating Company 21052643 05-11-21 06-01-21 03-28-22 ( 0 ) 04-27-22 ( 0 ) 04-27-2304-27-23Industria, Inc. 21052741 05-11-21 06-01-21 03-28-22 ( 0 ) 04-27-22 ( 0 ) 04-27-2304-27-23Fitzgerald's Electrical Cont 21052845 05-11-21 06-01-21 03-28-22 ( 0 ) 04-27-22 ( 0 ) 04-27-2304-27-23NES, Inc. 21052988 05-11-21 06-01-21 03-28-22 ( 0 ) 04-27-22 ( 0 ) 04-27-2304-27-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kluber, Inc. 19024510 10 67,019.00 183,431.00 2 250,450.00 143,753.00 7 106,697.00 57Assa Group, Inc. dba Enwork 7249 70 .00 .00 0 .00 .00 0 .00 100Colfax Corporation 7248 80 3,500.00 .00 0 3,500.00 3,500.00 1 .00 100Ideal Heating Company 21052643 43 877,777.00 .00 0 877,777.00 69,800.00 1 807,977.00 8

Page 341: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 341Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Industria, Inc. 21052741 41 154,066.00 .00 0 154,066.00 .00 0 154,066.00 0Fitzgerald's Electrical Cont 21052845 45 178,900.00 .00 0 178,900.00 .00 0 178,900.00 0NES, Inc. 21052988 88 67,900.00 .00 0 67,900.00 .00 0 67,900.00 0***** Contract Totals ********** Contract Totals ***** 1,349,162.00 183,431.00 2 1,532,593.00 217,053.00 9 1,315,540.00 14

Page 342: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 342Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--055055--136136 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Renovate DietaryAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Elgin Mental Health Center - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 10-01-21 :: :

A/E Id: 30811 : :A/E Name: Kluber, Inc. : :A/E Contact: Don Ware : :A/E Telephone: (630)406-1213 : :Date Selected: 05-14-19 : :Contract Date: 07-11-19 ________________________________________________________________________________Est. Project Cost: 6,769,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,769,900.00 12-04-19 6,769,900.00 12-04-19 484,597.00 323,120.00 6,285,303.00 .00

Total 6,769,900.00 6,769,900.00 484,597.00 323,120.00 6,285,303.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Renovate DietaryRenovate Dietary

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-21-19 ( 0 ) Assgn Bid: 04-28-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 04-14-21 ( 0 )CORC Assessment Amt: .00 Schem Design: 11-04-19 11-06-19 ( 2 ) Prime Bid: 08-06-20 01-22-21 03-17-21 ( 54 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-04-21 06-24-22 ( 0 )50%: 02-24-20 03-05-20 ( 10 ) Final Accept: 10-29-21 07-24-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-04-2209-04-22 06-24-2306-24-2395-100%: 10-05-20 10-16-20 ( 11 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kluber, Inc. 19025610 ( 0 ) ( 0 ) 06-24-2306-24-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kluber, Inc. 19025610 10 451,000.00 33,597.00 1 484,597.00 323,120.00 15 161,477.00 67***** Contract Totals ********** Contract Totals ***** 451,000.00 33,597.00 1 484,597.00 323,120.00 15 161,477.00 67

Page 343: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 343Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--055055--137137 PM NAME: Mark Jones 475Mark Jones 475Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Sections of Electrical Main LoopAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Elgin Mental Health Center - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 11-08-21 :: :

A/E Id: 6012 : :A/E Name: Melvin Cohen and Associates, I : :A/E Contact: Ronald Cohen : :A/E Telephone: (312)663-3700 : :Date Selected: 10-08-19 : :Contract Date: 11-14-19 ________________________________________________________________________________Est. Project Cost: 2,352,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,510,400.00 10-15-19 1,510,400.00 10-15-19 131,200.00 79,880.00 1,379,200.00 .00

Total 1,510,400.00 1,510,400.00 131,200.00 79,880.00 1,379,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Replace Sections of Electrical Main LoopReplace Sections of Electrical Main Loop

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-24-19 10-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-09-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-03-21 ( 0 )50%: ( 0 ) Final Accept: 10-29-21 ( 0 )75%: 03-16-20 04-08-20 ( 23 ) A/E Cont End: 09-03-2209-03-2295-100%: 05-11-20 05-14-20 ( 3 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Melvin Cohen and Associates, 20022010 ( 0 ) ( 0 ) 09-03-2209-03-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Melvin Cohen and Associates, 20022010 10 131,200.00 .00 0 131,200.00 79,880.00 3 51,320.00 61***** Contract Totals ********** Contract Totals ***** 131,200.00 .00 0 131,200.00 79,880.00 3 51,320.00 61

Page 344: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 344Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--055055--138138 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: DB Design Build PLA: YDescription: Replace Power PlantAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Elgin Mental Health Center - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 10-31-21 :: :

A/E Id: 1892 : :A/E Name: Stanley Consultants, Inc. : :A/E Contact: : :A/E Telephone: (773)693-9624 : :Date Selected: 02-11-20 : :Contract Date: 06-15-20 ________________________________________________________________________________Est. Project Cost: 22,700,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 22,700,000.00 07-01-19 2,270,000.00 11-06-19 906,200.00 510,889.75 1,363,800.00 .00

Total 22,700,000.00 2,270,000.00 906,200.00 510,889.75 1,363,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 85.00% Description:Description: Replace Power PlantReplace Power Plant

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-16-20 06-03-20 ( 79 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-12-20 10-16-20 ( 4 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2312-01-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Stanley Consultants, Inc. 20024410 ( 0 ) ( 0 ) 12-01-2312-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Stanley Consultants, Inc. 20024410 10 906,200.00 .00 0 906,200.00 510,889.75 7 395,310.25 56***** Contract Totals ********** Contract Totals ***** 906,200.00 .00 0 906,200.00 510,889.75 7 395,310.25 56

Page 345: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 345Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--055055--140140 PM NAME: Mark Jones 475Mark Jones 475Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Chiller in the Forensic TreatmenAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Elgin Mental Health Center - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 11-08-21 :: :

A/E Id: 30811 : :A/E Name: Kluber, Inc. : :A/E Contact: Don Ware : :A/E Telephone: (630)406-1213 : :Date Selected: 11-17-20 : :Contract Date: 12-07-20 ________________________________________________________________________________Est. Project Cost: 1,917,355.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 295,512.00 07-21-21 295,512.00 07-21-21 295,512.00 218,775.00 .00 .00

Total 295,512.00 295,512.00 295,512.00 218,775.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 90.00% Description:Description: Replace Chiller in the Forensic TreatmenReplace Chiller in the Forensic Treatmen

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-03-20 ( 0 ) Assgn Bid: 11-10-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-15-21 12-08-21 (146 )

Design Devel: 02-01-21 02-11-21 ( 10 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-15-22 ( 0 )50%: ( 0 ) Final Accept: 06-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 05-15-2305-15-2395-100%: 05-01-21 05-26-21 ( 25 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kluber, Inc. 21021310 ( 0 ) ( 0 ) 05-15-2305-15-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kluber, Inc. 21021310 10 135,000.00 .00 0 135,000.00 66,350.00 3 68,650.00 49The Stone Group Inc. IA7206 70 160,512.00 .00 0 160,512.00 152,425.00 5 8,087.00 95***** Contract Totals ********** Contract Totals ***** 295,512.00 .00 0 295,512.00 218,775.00 8 76,737.00 74

Page 346: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 346Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--055055--141141 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Apply Membrane and Replace Sealant - GolAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Elgin Mental Health Center - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 10-26-21 :: :

A/E Id: 31779 : :A/E Name: DBH & Associates Architects In : :A/E Contact: : :A/E Telephone: (847)269-9368 : :Date Selected: 06-08-21 : :Contract Date: 08-11-21 ________________________________________________________________________________Est. Project Cost: 213,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 213,000.00 07-13-21 213,000.00 07-13-21 20,340.00 .00 192,660.00 .00

Total 213,000.00 213,000.00 20,340.00 .00 192,660.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 16.00% Description:Description: Apply Membrane and Replace Sealant - GolApply Membrane and Replace Sealant - Gol

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-10-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-12-21 10-22-21 ( 10 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2412-01-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DBH & Associates Architects 21022310 ( 0 ) ( 0 ) 12-01-2412-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DBH & Associates Architects 21022310 10 20,340.00 .00 0 20,340.00 .00 0 20,340.00 0***** Contract Totals ********** Contract Totals ***** 20,340.00 .00 0 20,340.00 .00 0 20,340.00 0

Page 347: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 347Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--060060--049049 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair Exterior Structures/Replace WindoAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Fox Developmental Center - Livingston CountyCounty: 105 - Livingston ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 10-27-21 :: :

A/E Id: 19019 : :A/E Name: Construction Technology Labora : :A/E Contact: : :A/E Telephone: (847)965-7500 : :Date Selected: 03-12-19 : :Contract Date: 08-07-19 ________________________________________________________________________________Est. Project Cost: 2,463,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,463,800.00 04-01-19 2,463,800.00 04-01-19 218,000.00 137,134.76 2,245,800.00 .00

Total 2,463,800.00 2,463,800.00 218,000.00 137,134.76 2,245,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.60% Description:Description: Repair Exterior Structures/Replace WindoRepair Exterior Structures/Replace Windo

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-30-19 05-30-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-21-19 10-29-19 ( 8 ) Prime Bid: 05-18-20 ( 0 )

Design Devel: 12-30-19 01-07-20 ( 8 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-20 ( 0 )50%: ( 0 ) Final Accept: 09-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2108-31-21 08-31-2208-31-2295-100%: 03-23-20 02-05-21 (319 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Construction Technology Labo 19003710 ( 0 ) ( 0 ) 08-31-2208-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Construction Technology Labo 19003710 10 211,100.00 6,900.00 3 218,000.00 137,134.76 5 80,865.24 63***** Contract Totals ********** Contract Totals ***** 211,100.00 6,900.00 3 218,000.00 137,134.76 5 80,865.24 63

Page 348: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 348Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--060060--050050 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Walk-in Coolers and FreezersAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Fox Developmental Center - Livingston CountyCounty: 105 - Livingston ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 11-01-21 :: :

A/E Id: 20233 : :A/E Name: O & N Engineering-Development, : :A/E Contact: Jose Orozco : :A/E Telephone: (312)432-0386 : :Date Selected: 09-10-19 : :Contract Date: 11-04-19 ________________________________________________________________________________Est. Project Cost: 485,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 485,100.00 09-11-19 485,100.00 09-11-19 429,351.97 35,694.00 55,748.03 .00

Total 485,100.00 485,100.00 429,351.97 35,694.00 55,748.03 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 2.00% Description:Description: Replace Walk-in Coolers and FreezersReplace Walk-in Coolers and Freezers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-22-19 10-22-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-08-20 10-14-20 (128 )

Design Devel: 12-16-19 12-31-19 ( 15 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-20 ( 0 )50%: ( 0 ) Final Accept: 11-01-20 ( 0 )75%: 02-24-20 03-05-20 ( 10 ) A/E Cont End: 09-30-2109-30-21 09-30-2209-30-2295-100%: 04-20-20 05-12-20 ( 22 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

O & N Engineering-Developmen 2000910 ( 0 ) ( 0 ) 09-30-2209-30-22CORE Construction Services o 22043983 08-16-21 10-04-21 03-13-22 ( 0 ) 05-12-22 ( 0 ) 05-12-2305-12-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

O & N Engineering-Developmen 2000910 10 56,200.00 .00 1 56,200.00 35,694.00 3 20,506.00 64CORE Construction Services o 22043983 83 334,433.00 38,718.97 1 373,151.97 .00 0 373,151.97 0***** Contract Totals ********** Contract Totals ***** 390,633.00 38,718.97 2 429,351.97 35,694.00 3 393,657.97 8

Page 349: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 349Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--087087--047047 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Smoke and Heat DetectorsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Chester Mental Health Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: Wynter Farmer : :A/E Telephone: (618)659-8709 : :Date Selected: 05-14-19 : :Contract Date: 08-08-19 ________________________________________________________________________________Est. Project Cost: 2,126,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,126,800.00 05-22-19 2,126,800.00 05-22-19 610,995.00 128,649.00 1,515,805.00 .00

Total 2,126,800.00 2,126,800.00 610,995.00 128,649.00 1,515,805.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Replace Smoke and Heat DetectorsReplace Smoke and Heat Detectors

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-31-19 11-13-19 ( 13 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-18-20 08-18-21 (426 )

Design Devel: 10-31-19 11-14-19 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-07-21 ( 0 )50%: 01-16-20 07-30-20 (196 ) Final Accept: 10-06-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-13-2209-13-2295-100%: 04-02-20 10-16-20 (197 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 20010410 ( 0 ) ( 0 ) 09-13-2209-13-22Brown Electric, Inc. 22049185 10-05-21 10-19-21 10-14-22 ( 0 ) 01-12-23 ( 0 ) 01-12-2401-12-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 20010410 10 211,000.00 .00 0 211,000.00 128,649.00 4 82,351.00 61Brown Electric, Inc. 22049185 85 399,995.00 .00 0 399,995.00 .00 0 399,995.00 0***** Contract Totals ********** Contract Totals ***** 610,995.00 .00 0 610,995.00 128,649.00 4 482,346.00 21

Page 350: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 350Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--087087--048048 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade HVAC SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Chester Mental Health Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 29590 : :A/E Name: Nest Builders, Inc. : :A/E Contact: : :A/E Telephone: (312)915-0557 : :Date Selected: 11-13-19 : :Contract Date: 02-06-20 ________________________________________________________________________________Est. Project Cost: 5,782,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,782,300.00 11-18-19 5,782,300.00 11-18-19 498,800.00 290,943.30 5,283,500.00 .00

Total 5,782,300.00 5,782,300.00 498,800.00 290,943.30 5,283,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 80.00% Description:Description: Upgrade HVAC SystemUpgrade HVAC System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-30-20 04-30-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-22-20 ( 0 )

Design Devel: 04-30-20 05-14-20 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-19-22 ( 0 )50%: ( 0 ) Final Accept: 08-18-22 ( 0 )75%: 07-23-20 07-30-20 ( 7 ) A/E Cont End: 10-01-2410-01-2495-100%: 09-17-20 07-26-21 (312 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Nest Builders, Inc. 20016010 ( 0 ) ( 0 ) 10-01-2410-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Nest Builders, Inc. 20016010 10 498,800.00 .00 0 498,800.00 290,943.30 11 207,856.70 58***** Contract Totals ********** Contract Totals ***** 498,800.00 .00 0 498,800.00 290,943.30 11 207,856.70 58

Page 351: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 351Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--087087--049049 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Slope FailureAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Chester Mental Health Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 5512 : :A/E Name: Holcomb Foundation Engineering : :A/E Contact: Timothy Holcomb : :A/E Telephone: (618)529-5262 : :Date Selected: 09-10-19 : :Contract Date: 06-01-20 ________________________________________________________________________________Est. Project Cost: 832,220.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 832,220.00 07-06-21 832,220.00 07-06-21 796,102.00 170,967.52 36,118.00 .00

Total 832,220.00 832,220.00 796,102.00 170,967.52 36,118.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Repair Slope FailureRepair Slope Failure

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-05-20 05-12-21 (188 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-05-21 ( 0 )50%: 07-06-20 07-17-20 ( 11 ) Final Accept: 07-05-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-15-2204-15-2295-100%: 09-07-20 01-19-21 (134 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Holcomb Foundation Engineeri 20040110 ( 0 ) ( 0 )Holcomb Foundation Engineeri 20043010 ( 0 ) ( 0 ) 04-15-2204-15-22Lake Contracting, Inc. 22040381 07-19-21 08-16-21 11-14-21 ( 0 ) 01-13-22 ( 0 ) 01-13-2301-13-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Holcomb Foundation Engineeri 20040110 10 16,220.00 .00 0 16,220.00 16,220.00 1 .00 100Holcomb Foundation Engineeri 20043010 10 59,900.00 .00 0 59,900.00 27,452.00 3 32,448.00 46Lake Contracting, Inc. 22040381 81 719,982.00 .00 0 719,982.00 127,295.52 1 592,686.48 18***** Contract Totals ********** Contract Totals ***** 796,102.00 .00 0 796,102.00 170,967.52 5 625,134.48 22

Page 352: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 352Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--087087--050050 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: EM Emergency PLA: NDescription: Emergency Repair and Replacement of theAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Chester Mental Health Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 31623 : :A/E Name: WRF Engineers LLC : :A/E Contact: Wynter Farmer : :A/E Telephone: (618)659-8709 : :Date Selected: 01-14-20 : :Contract Date: 12-23-19 ________________________________________________________________________________Est. Project Cost: 625,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 625,000.00 09-16-21 625,000.00 09-16-21 456,786.59 327,656.90 168,213.41 .00

Total 625,000.00 625,000.00 456,786.59 327,656.90 168,213.41 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Emergency Repair and Replacement of theEmergency Repair and Replacement of the

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-30-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 03-21-2003-21-20 04-30-2204-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WRF Engineers LLC 20013810 ( 0 ) ( 0 ) 04-30-2204-30-22Brown Electric, Inc. 20EM0685 01-09-20 ( 0 ) ( 0 ) 04-30-2204-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WRF Engineers LLC 20013810 10 51,500.00 .00 5 51,500.00 9,882.35 2 41,617.65 19Brown Electric, Inc. 20EM0685 85 100,000.00 305,286.59 6 405,286.59 317,774.55 6 87,512.04 79***** Contract Totals ********** Contract Totals ***** 151,500.00 305,286.59 11 456,786.59 327,656.90 8 129,129.69 72

Page 353: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 353Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--087087--052052 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade and Expand the CCTV System withAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Chester Mental Health Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 11-09-21 :: :

A/E Id: 33845 : :A/E Name: Faith Group, L.L.C. : :A/E Contact: : :A/E Telephone: (314)991-2228 : :Date Selected: 10-12-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,027,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,027,400.00 07-16-21 1,027,400.00 07-16-21 .00 .00 1,027,400.00 .00

Total 1,027,400.00 1,027,400.00 .00 .00 1,027,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Upgrade and Expand the CCTV System withUpgrade and Expand the CCTV System with

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Faith Group, L.L.C. 22042110 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Faith Group, L.L.C. 22042110 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 354: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 354Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--100100--125125 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: YDescription: Emergency Repair Administration BuildingAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Shapiro Developmental Center - Kankakee, Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 06-30-20 :: :

A/E Id: 32074 : :A/E Name: Carlile Architects LLC : :A/E Contact: Jacob Carlile : :A/E Telephone: (815)401-0526 : :Date Selected: 06-12-18 : :Contract Date: 07-12-18 ________________________________________________________________________________Est. Project Cost: 3,687,649.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,937,197.00 06-07-21 1,937,197.00 06-07-21 454,547.27 338,717.83 1,482,649.73 .00

Total 1,937,197.00 1,937,197.00 454,547.27 338,717.83 1,482,649.73 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Emergency Repair Administration BuildingEmergency Repair Administration Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-22-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-22-18 07-23-18 ( 31 ) Prime Bid: 04-14-21 ( 0 )

Design Devel: 09-17-18 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-17-22 ( 0 )50%: ( 0 ) Final Accept: 11-16-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-14-1808-14-18 02-28-2302-28-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Carlile Architects LLC 18021910 ( 0 ) ( 0 ) 02-28-2302-28-23Bulley & Andrews, L.L.C. 19EM0381 06-27-18 06-27-18 08-27-18 ( 0 ) 09-27-18 ( 0 ) 12-31-1812-31-18

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Carlile Architects LLC 18021910 10 230,427.00 112,100.00 6 342,527.00 226,697.56 16 115,829.44 66Bulley & Andrews, L.L.C. 6817 80 4,826.23 .00 0 4,826.23 4,826.23 1 .00 100Bulley & Andrews, L.L.C. INT7063 00 59.64 .00 0 59.64 59.64 3 .00 100Bulley & Andrews, L.L.C. INT7064 00 1,863.40 .00 0 1,863.40 1,863.40 3 .00 100Bulley & Andrews, L.L.C. 19EM0381 81 109,141.00 3,870.00- 0 105,271.00 105,271.00 2 .00 100***** Contract Totals ********** Contract Totals ***** 346,317.27 108,230.00 6 454,547.27 338,717.83 25 115,829.44 75

Page 355: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 355Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--100100--125125 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: EM Emergency PLA: YDescription: Emergency Repair Administration BuildingAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Shapiro Developmental Center - Kankakee, Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 10-15-21 :: :

A/E Id: 32074 : :A/E Name: Carlile Architects LLC : :A/E Contact: : :A/E Telephone: (815)401-0526 : :Date Selected: : :Contract Date: 07-12-18 ________________________________________________________________________________Est. Project Cost: 3,687,649.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,937,197.00 06-07-21 1,937,197.00 06-07-21 454,547.27 338,717.83 1,482,649.73 .00

Total 1,937,197.00 1,937,197.00 454,547.27 338,717.83 1,482,649.73 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 5.00% Description:Description: Emergency Repair Administration BuildingEmergency Repair Administration Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-14-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-17-22 ( 0 )50%: ( 0 ) Final Accept: 11-16-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2007-31-20 02-28-2302-28-2395-100%: 01-06-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

A.L.L. Masonry Construction 21057381 06-24-21 09-07-21 09-03-22 ( 0 ) 10-03-22 ( 0 ) 10-03-2310-03-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

A.L.L. Masonry Construction 21057381 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 356: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 356Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--100100--126126 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade Steam and Condensate LinesAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Shapiro Developmental Center - Kankakee, Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 10-15-21 :: :

A/E Id: 29612 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)398-6280 : :Date Selected: 03-12-19 : :Contract Date: 05-14-19 ________________________________________________________________________________Est. Project Cost: 25,209,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 25,209,400.00 03-23-21 25,209,400.00 03-23-21 12,398,284.66 2,283,053.24 12,811,115.34 .00

Total 25,209,400.00 25,209,400.00 12,398,284.66 2,283,053.24 12,811,115.34 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Upgrade Steam and Condensate LinesUpgrade Steam and Condensate Lines

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-10-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-14-20 01-23-20 ( 9 ) Prime Bid: 08-13-20 10-02-20 03-16-21 (165 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-22 09-01-22 ( 0 )50%: 03-29-20 04-29-20 ( 31 ) Final Accept: 08-01-22 11-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2306-01-2395-100%: 07-09-20 11-13-20 (127 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. 19024210 ( 0 ) ( 0 ) 06-01-2306-01-23Amber Mechanical Contractors 20EM1781 03-18-20 03-18-20 04-27-20 ( 0 ) 06-15-20 ( 0 )Amber Mechanical Contractors 20EM2881 06-18-20 ( 0 ) ( 0 )Amber Mechanical Contractors 20EM3381 09-17-20 ( 0 ) ( 0 )Mechanical, Inc. 21055883 06-11-21 09-08-21 04-03-23 ( 0 ) 07-05-23 ( 0 ) 07-04-2407-04-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. 19024210 10 1,183,200.00 276,272.00 1 1,459,472.00 844,605.01 9 614,866.99 58Amber Mechanical Contractors INT7171 00 165.00 .00 0 165.00 165.00 1 .00 100Amber Mechanical Contractors 20EM1781 81 100,000.00 .00 0 100,000.00 100,000.00 1 .00 100Amber Mechanical Contractors 20EM2881 81 719,647.66 .00 0 719,647.66 558,271.44 1 161,376.22 78

Page 357: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 357Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Amber Mechanical Contractors 20EM3381 81 895,000.00 .00 0 895,000.00 780,011.79 1 114,988.21 87Mechanical, Inc. 21055883 83 9,224,000.00 .00 0 9,224,000.00 .00 0 9,224,000.00 0***** Contract Totals ********** Contract Totals ***** 12,122,012.66 276,272.00 1 12,398,284.66 2,283,053.24 13 10,115,231.42 19

Page 358: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 358Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--100100--127127 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Shapiro Developmental Center - Kankakee, Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 10-15-21 :: :

A/E Id: 34388 : :A/E Name: Weese Langley Weese Architects : :A/E Contact: : :A/E Telephone: (312)642-1820 : :Date Selected: 03-12-19 : :Contract Date: 04-30-19 ________________________________________________________________________________Est. Project Cost: 3,312,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,312,400.00 04-28-21 3,312,400.00 04-28-21 217,117.00 49,040.00 3,095,283.00 .00

Total 3,312,400.00 3,312,400.00 217,117.00 49,040.00 3,095,283.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-10-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-16-19 06-09-20 (267 ) Prime Bid: 03-23-20 12-17-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-20-20 10-08-22 ( 0 )50%: ( 0 ) Final Accept: 12-01-20 11-10-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-20-2110-20-21 09-02-2309-02-2395-100%: 09-30-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Weese Langley Weese Architec 19024310 ( 0 ) ( 0 ) 09-02-2309-02-23Weese Langley Weese Architec 6897 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Weese Langley Weese Architec 19024310 10 180,300.00 30,817.00 1 211,117.00 43,040.00 3 168,077.00 20Weese Langley Weese Architec 6897 11 6,000.00 .00 0 6,000.00 6,000.00 1 .00 100Weese Langley Weese Architec 6898 80 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 186,300.00 30,817.00 1 217,117.00 49,040.00 4 168,077.00 23

Page 359: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 359Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--100100--130130 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofing SystemsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Shapiro Developmental Center - Kankakee, Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 09-30-21 :: :

A/E Id: 32074 : :A/E Name: Carlile Architects LLC : :A/E Contact: : :A/E Telephone: (815)401-0526 : :Date Selected: 08-10-21 : :Contract Date: 10-12-21 ________________________________________________________________________________Est. Project Cost: 5,322,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,322,600.00 07-13-21 5,322,600.00 07-13-21 405,000.00 .00 4,917,600.00 .00

Total 5,322,600.00 5,322,600.00 405,000.00 .00 4,917,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-31-21 08-31-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-06-21 ( 0 ) Prime Bid: 09-26-22 ( 0 )

Design Devel: 02-28-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-23 ( 0 )50%: 04-25-22 ( 0 ) Final Accept: 04-30-23 ( 0 )75%: ( 0 ) A/E Cont End: 03-31-2403-31-2495-100%: 07-18-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Carlile Architects LLC 22000810 ( 0 ) ( 0 ) 03-31-2403-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Carlile Architects LLC 22000810 10 405,000.00 .00 0 405,000.00 .00 0 405,000.00 0***** Contract Totals ********** Contract Totals ***** 405,000.00 .00 0 405,000.00 .00 0 405,000.00 0

Page 360: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 360Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--110110--066066 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Ludeman Developmental Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 80 - Anthony DeLuca

Senate:40 - Patrick Hutchinson : CURRENT STATUS 11-02-21 :: :

A/E Id: 29054 : :A/E Name: Muller & Muller, Ltd. : :A/E Contact: Eric Grygorcewicz : :A/E Telephone: (312)432-4180 : :Date Selected: 05-14-19 : :Contract Date: 07-11-19 ________________________________________________________________________________Est. Project Cost: 1,232,285.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,232,285.00 08-12-20 1,232,285.00 08-12-20 1,187,778.00 1,033,853.97 44,507.00 .00

Total 1,232,285.00 1,232,285.00 1,187,778.00 1,033,853.97 44,507.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 90.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-10-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-04-19 ( 0 ) Prime Bid: 02-13-20 07-08-20 (146 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-01-20 10-31-21 ( 0 )50%: 10-07-19 10-21-19 ( 14 ) Final Accept: 08-01-20 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2107-01-21 10-31-2310-31-2395-100%: 12-02-19 12-19-19 ( 17 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Muller & Muller, Ltd. 19024610 ( 0 ) ( 0 ) 10-31-2310-31-23J. L. Adler Roofing & Sheet 21043881 01-04-21 03-05-21 10-31-21 ( 0 ) 11-30-21 ( 0 ) 11-30-2211-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Muller & Muller, Ltd. 19024610 10 88,100.00 .00 1 88,100.00 69,878.77 11 18,221.23 79Adler J L Roofing Inc 6894 80 9,978.00 .00 0 9,978.00 9,978.00 1 .00 100J. L. Adler Roofing & Sheet 21043881 81 1,089,700.00 .00 0 1,089,700.00 953,997.20 4 135,702.80 88***** Contract Totals ********** Contract Totals ***** 1,187,778.00 .00 1 1,187,778.00 1,033,853.97 16 153,924.03 87

Page 361: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 361Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--110110--067067 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Rehabilitate Roads, Parking Lots, SidewaAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Ludeman Developmental Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 80 - Anthony DeLuca

Senate:40 - Patrick Hutchinson : CURRENT STATUS 11-02-21 :: :

A/E Id: 26816 : :A/E Name: Infrastructure Engineering, In : :A/E Contact: Mark Kozlowski : :A/E Telephone: (312)425-9560 : :Date Selected: 05-14-19 : :Contract Date: 07-25-19 ________________________________________________________________________________Est. Project Cost: 5,449,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,149,400.00 03-23-21 5,149,400.00 03-23-21 3,988,869.83 423,392.62 1,160,530.17 .00

Total 5,149,400.00 5,149,400.00 3,988,869.83 423,392.62 1,160,530.17 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Rehabilitate Roads, Parking Lots, SidewaRehabilitate Roads, Parking Lots, Sidewa

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-10-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-07-20 01-06-21 ( 91 )

Design Devel: 02-15-20 03-10-20 ( 24 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-21 ( 0 )50%: ( 0 ) Final Accept: 02-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-2295-100%: 07-15-20 11-23-20 (131 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Infrastructure Engineering, 19024710 ( 0 ) ( 0 ) 12-01-2212-01-22Pan-Oceanic Engineering Co., 21046681 01-28-21 03-05-21 ( 0 ) 02-01-22 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Infrastructure Engineering, 19024710 10 766,249.00 .00 0 766,249.00 423,392.62 8 342,856.38 55Pan-Oceanic Engineering Co., 21046681 81 3,072,640.00 149,980.83 1 3,222,620.83 .00 0 3,222,620.83 0***** Contract Totals ********** Contract Totals ***** 3,838,889.00 149,980.83 1 3,988,869.83 423,392.62 8 3,565,477.21 11

Page 362: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 362Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--110110--068068 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Water Main PipingAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Ludeman Developmental Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 80 - Anthony DeLuca

Senate:40 - Patrick Hutchinson : CURRENT STATUS 11-02-21 :: :

A/E Id: 29102 : :A/E Name: Milhouse Engineering and Const : :A/E Contact: Robert Bohnak : :A/E Telephone: (312)987-0061 : :Date Selected: 08-13-19 : :Contract Date: 10-16-19 ________________________________________________________________________________Est. Project Cost: 3,950,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,950,300.00 07-21-21 3,950,300.00 07-21-21 316,600.00 183,968.72 3,633,700.00 .00

Total 3,950,300.00 3,950,300.00 316,600.00 183,968.72 3,633,700.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Water Main PipingReplace Water Main Piping

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-28-19 08-28-19 ( 0 ) Assgn Bid: 04-28-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-17-20 07-17-20 (151 ) Prime Bid: 08-20-20 04-28-21 (251 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-21 ( 0 )50%: ( 0 ) Final Accept: 11-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-01-2209-01-2295-100%: 05-11-20 02-17-21 (282 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Milhouse Engineering and Con 20020710 ( 0 ) ( 0 ) 09-01-2209-01-22Calumet City Plumbing and He 22044882 08-27-21 ( 0 ) ( 0 )Calumet City Plumbing and He 22044981 08-27-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Milhouse Engineering and Con 20020710 10 316,600.00 .00 0 316,600.00 183,968.72 5 132,631.28 58Calumet City Plumbing and He 22044882 82 .00 .00 0 .00 .00 0 .00 100Calumet City Plumbing and He 22044981 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 316,600.00 .00 0 316,600.00 183,968.72 5 132,631.28 58

Page 363: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 363Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--110110--069069 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: PLA: YDescription: Renovate ResidencesAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Ludeman Developmental Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 80 - Anthony DeLuca

Senate:40 - Patrick Hutchinson : CURRENT STATUS 11-02-21 :: :

A/E Id: 28132 : :A/E Name: Bauhs Dring Main Ltd. : :A/E Contact: Todd Main : :A/E Telephone: (312)649-9484 : :Date Selected: 09-10-19 : :Contract Date: 10-16-19 ________________________________________________________________________________Est. Project Cost: 3,057,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,057,100.00 09-11-19 3,057,100.00 09-11-19 334,030.00 118,780.00 2,723,070.00 .00

Total 3,057,100.00 3,057,100.00 334,030.00 118,780.00 2,723,070.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Renovate ResidencesRenovate Residences

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-25-19 09-25-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-04-20 12-01-20 ( 0 )

Design Devel: 07-16-20 02-17-21 (216 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-31-22 12-31-22 ( 0 )50%: ( 0 ) Final Accept: 03-31-22 02-25-23 ( 0 )75%: ( 0 ) A/E Cont End: 01-31-2301-31-23 10-01-2310-01-2395-100%: 10-01-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauhs Dring Main Ltd. 20021310 ( 0 ) ( 0 ) 10-01-2310-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauhs Dring Main Ltd. 20021310 10 323,400.00 10,630.00 1 334,030.00 118,780.00 5 215,250.00 36***** Contract Totals ********** Contract Totals ***** 323,400.00 10,630.00 1 334,030.00 118,780.00 5 215,250.00 36

Page 364: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 364Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--110110--070070 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate Dental Rooms for Airborne IsolaAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Ludeman Developmental Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 80 - Anthony DeLuca

Senate:40 - Patrick Hutchinson : CURRENT STATUS 11-02-21 :: :

A/E Id: 29338 : :A/E Name: Knight E/A, Inc. : :A/E Contact: Jeff Bedwell : :A/E Telephone: (312)577-3300 : :Date Selected: 08-11-20 : :Contract Date: 10-26-20 ________________________________________________________________________________Est. Project Cost: 127,240.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 141,688.00 06-21-21 141,688.00 06-21-21 141,688.00 27,400.00 .00 .00

Total 141,688.00 141,688.00 141,688.00 27,400.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Renovate Dental Rooms for Airborne IsolaRenovate Dental Rooms for Airborne Isola

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-06-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-15-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-15-21 ( 0 )50%: ( 0 ) Final Accept: 02-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2207-31-2295-100%: 05-11-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Knight E/A, Inc. 21040510 ( 0 ) ( 0 ) 07-31-2207-31-22Paul Borg Construction Compa 21SM0781 06-30-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Knight E/A, Inc. 21040510 10 31,816.00 14,848.00 1 46,664.00 26,376.00 2 20,288.00 57ProAlliance Corporation 7117 80 1,024.00 .00 0 1,024.00 1,024.00 1 .00 100Paul Borg Construction Compa 21SM0781 81 94,000.00 .00 0 94,000.00 .00 0 94,000.00 0***** Contract Totals ********** Contract Totals ***** 126,840.00 14,848.00 1 141,688.00 27,400.00 3 114,288.00 19

Page 365: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 365Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--115115--070070 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Structural Repairs - PavilionsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Madden Mental Health Center - Hines, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 7 - Emanuel Welsh

Senate: 4 - Kimberly Lightford : CURRENT STATUS 11-09-21 :: :

A/E Id: 19019 : :A/E Name: Construction Technology Labora : :A/E Contact: John Vincent : :A/E Telephone: (847)965-7500 : :Date Selected: 05-14-19 : :Contract Date: 07-23-19 ________________________________________________________________________________Est. Project Cost: 1,479,925.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,009,500.00 05-22-19 1,009,500.00 05-22-19 505,625.00 503,120.88 503,875.00 .00

Total 1,009,500.00 1,009,500.00 505,625.00 503,120.88 503,875.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Structural Repairs - PavilionsStructural Repairs - Pavilions

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-12-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-21-19 12-03-19 ( 43 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Construction Technology Labo 19024810 ( 0 ) ( 0 ) 12-01-2212-01-22Drive Construction, Inc. 21SM0481 03-02-21 03-01-21 04-01-21 04-08-21 ( 7 ) 05-01-21 04-08-21 ( 23-)

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Construction Technology Labo 19024810 10 102,900.00 382,925.00 2 485,825.00 483,320.88 5 2,504.12 100Drive Construction, Inc. 21SM0481 81 19,800.00 .00 0 19,800.00 19,800.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 122,700.00 382,925.00 2 505,625.00 503,120.88 6 2,504.12 100

Page 366: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 366Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--115115--071071 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Absorber with an Air-Cooled ChilAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Madden Mental Health Center - Hines, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 7 - Emanuel Welsh

Senate: 4 - Kimberly Lightford : CURRENT STATUS 11-02-21 :: :

A/E Id: 34078 : :A/E Name: Interface Engineering, Inc. : :A/E Contact: Mark Blazis : :A/E Telephone: (503)382-2266 : :Date Selected: 08-13-19 : :Contract Date: 09-17-19 ________________________________________________________________________________Est. Project Cost: 1,750,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,750,600.00 08-14-19 1,750,600.00 08-14-19 1,361,700.00 105,189.20 388,900.00 .00

Total 1,750,600.00 1,750,600.00 1,361,700.00 105,189.20 388,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Absorber with an Air-Cooled ChilReplace Absorber with an Air-Cooled Chil

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-27-19 08-27-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-21-20 09-30-20 (132 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-21 ( 0 )50%: 01-06-20 01-09-20 ( 3 ) Final Accept: 05-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 03-31-2203-31-2295-100%: 03-16-20 07-02-20 (108 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Interface Engineering, Inc. 20020810 ( 0 ) ( 0 ) 03-31-2203-31-22Quality Controls, Inc. 21055683 06-14-21 09-10-21 05-25-22 ( 0 ) 06-24-22 ( 0 ) 06-24-2306-24-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Interface Engineering, Inc. 20020810 10 169,700.00 .00 0 169,700.00 105,189.20 7 64,510.80 62Quality Controls, Inc. 21055683 83 1,192,000.00 .00 0 1,192,000.00 .00 0 1,192,000.00 0***** Contract Totals ********** Contract Totals ***** 1,361,700.00 .00 0 1,361,700.00 105,189.20 7 1,256,510.80 8

Page 367: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 367Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--115115--073073 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade Patio FencingAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Madden Mental Health Center - Hines, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 7 - Emanuel Welsh

Senate: 4 - Kimberly Lightford : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,393,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,393,500.00 10-07-21 1,393,500.00 10-07-21 .00 .00 1,393,500.00 .00

Total 1,393,500.00 1,393,500.00 .00 .00 1,393,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Upgrade Patio FencingUpgrade Patio Fencing

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 368: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 368Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--135135--076076 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Murray Developmental Center - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:108 - Charles Meier

Senate:54 - Jason Plummer : CURRENT STATUS 11-08-21 :: :

A/E Id: 29858 : :A/E Name: Wright & Calvert Design Group, : :A/E Contact: Jason Wright : :A/E Telephone: (618)263-3254 : :Date Selected: 05-14-19 : :Contract Date: 10-16-19 ________________________________________________________________________________Est. Project Cost: 464,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 464,800.00 05-22-19 464,800.00 05-22-19 369,226.00 51,278.70 95,574.00 .00

Total 464,800.00 464,800.00 369,226.00 51,278.70 95,574.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-04-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-13-19 01-24-20 ( 42 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-23-20 05-12-21 05-12-21 ( 0 )

Design Devel: 12-13-19 01-29-20 ( 47 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-20 ( 0 )50%: ( 0 ) Final Accept: 01-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2211-30-2295-100%: 03-06-20 03-30-21 (389 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Wright & Calvert Design Grou 20030110 ( 0 ) ( 0 ) 11-30-2211-30-22Joiner Sheet Metal & Roofing 21056781 06-21-21 07-01-21 01-17-22 ( 0 ) 03-18-22 ( 0 ) 03-18-2303-18-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Wright & Calvert Design Grou 20030110 10 61,000.00 6,100.00 1 67,100.00 30,359.70 2 36,740.30 45Joiner Sheet Metal & Roofing 21056781 81 302,126.00 .00 0 302,126.00 20,919.00 1 281,207.00 7***** Contract Totals ********** Contract Totals ***** 363,126.00 6,100.00 1 369,226.00 51,278.70 3 317,947.30 14

Page 369: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 369Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--135135--077077 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Boiler House Emergency GeneratorAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Murray Developmental Center - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:108 - Charles Meier

Senate:54 - Jason Plummer : CURRENT STATUS 11-08-21 :: :

A/E Id: 3713 : :A/E Name: McCoy and Howard Consulting En : :A/E Contact: Chip Fox : :A/E Telephone: (618)242-0473 : :Date Selected: 05-14-19 : :Contract Date: 09-20-19 ________________________________________________________________________________Est. Project Cost: 675,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 675,700.00 05-23-19 675,700.00 05-23-19 454,400.00 47,559.00 221,300.00 .00

Total 675,700.00 675,700.00 454,400.00 47,559.00 221,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Replace Boiler House Emergency GeneratorReplace Boiler House Emergency Generator

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-20-19 02-07-20 (110 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-18-20 04-14-21 (361 )

Design Devel: 10-20-19 02-07-20 (110 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-15-20 ( 0 )50%: 11-19-19 02-07-20 ( 80 ) Final Accept: 02-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2112-01-2195-100%: 02-15-20 09-18-20 (216 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

McCoy and Howard Consulting 20010910 ( 0 ) ( 0 ) 12-01-2112-01-21G.R.P. Mechanical Company, I 21056285 06-29-21 07-29-21 01-25-22 ( 0 ) 03-26-22 ( 0 ) 03-26-2303-26-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

McCoy and Howard Consulting 20010910 10 74,800.00 .00 0 74,800.00 47,559.00 3 27,241.00 64G.R.P. Mechanical Company, I 21056285 85 379,600.00 .00 0 379,600.00 .00 0 379,600.00 0***** Contract Totals ********** Contract Totals ***** 454,400.00 .00 0 454,400.00 47,559.00 3 406,841.00 11

Page 370: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 370Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--135135--078078 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing System - Elm CottageAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Murray Developmental Center - Clinton CountyCounty: 27 - Clinton ________________________________________________________________________________Leg. Districts: House:108 - Charles Meier

Senate:54 - Jason Plummer : CURRENT STATUS 11-08-21 :: :

A/E Id: 1765 : :A/E Name: David A. Loyet and Associates, : :A/E Contact: Matthew Loyet : :A/E Telephone: (618)654-2328 : :Date Selected: 03-10-20 : :Contract Date: 11-05-20 ________________________________________________________________________________Est. Project Cost: 886,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 886,000.00 03-11-20 886,000.00 03-11-20 647,500.00 51,243.13 238,500.00 .00

Total 886,000.00 886,000.00 647,500.00 51,243.13 238,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Roofing System - Elm CottageReplace Roofing System - Elm Cottage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-30-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-21-20 01-19-21 ( 29 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-20-21 07-21-21 ( 62 )

Design Devel: 12-21-20 02-05-21 ( 46 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-21-22 ( 0 )50%: ( 0 ) Final Accept: 04-22-22 ( 0 )75%: ( 0 ) A/E Cont End: 03-20-2303-20-2395-100%: 03-08-21 04-16-21 ( 39 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

David A. Loyet and Associate 20042610 ( 0 ) ( 0 ) 03-20-2303-20-23Joiner Sheet Metal & Roofing 22044381 09-13-21 10-20-21 04-03-22 ( 0 ) 06-02-22 ( 0 ) 06-02-2306-02-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

David A. Loyet and Associate 20042610 10 82,500.00 .00 0 82,500.00 51,243.13 6 31,256.87 62Joiner Sheet Metal & Roofing 22044381 81 565,000.00 .00 0 565,000.00 .00 0 565,000.00 0***** Contract Totals ********** Contract Totals ***** 647,500.00 .00 0 647,500.00 51,243.13 6 596,256.87 8

Page 371: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 371Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--155155--015015 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Illinois School for the Visually Impaired - Jacksonville, MoCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 28475 : :A/E Name: SNDB Designs, Inc. : :A/E Contact: Simone Demirjian-Beazly : :A/E Telephone: (217)520-9617 : :Date Selected: 03-12-19 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,730,767.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,730,766.50 10-21-21 1,730,766.50 10-21-21 1,343,525.03 234,130.53 387,241.47 .00

Total 1,730,766.50 1,730,766.50 1,343,525.03 234,130.53 387,241.47 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 71.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-21-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 09-26-19 10-16-19 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-19-20 07-30-20 10-14-20 ( 76 )

Design Devel: 09-26-19 10-18-19 ( 22 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-19-20 02-07-22 ( 0 )50%: ( 0 ) Final Accept: 01-19-21 04-08-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-19-2111-19-21 02-07-2302-07-2395-100%: 05-15-20 07-02-20 ( 48 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SNDB Designs, Inc. 19032110 ( 0 ) ( 0 ) 02-07-2302-07-23Joiner Sheet Metal & Roofing 21048081 03-03-21 04-21-21 09-28-21 ( 0 ) 11-27-21 ( 0 ) 11-27-2211-27-22Henson Robinson Company 21048184 03-03-21 04-21-21 09-28-21 ( 0 ) 11-27-21 ( 0 ) 11-27-2211-27-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SNDB Designs, Inc. 19032110 10 115,000.00 25,700.00 3 140,700.00 89,126.67 3 51,573.33 63Designed Roofing Systems, In 7089 80 4,496.50 .00 0 4,496.50 4,496.50 1 .00 100Designed Roofing Systems, In 7092 80 3,226.00 .00 0 3,226.00 3,226.00 1 .00 100Joiner Sheet Metal & Roofing 21048081 81 996,800.00 107,152.53 3 1,103,952.53 66,217.26 2 1,037,735.27 6Henson Robinson Company 21048184 84 91,150.00 .00 0 91,150.00 71,064.10 3 20,085.90 78***** Contract Totals ********** Contract Totals ***** 1,210,672.50 132,852.53 6 1,343,525.03 234,130.53 10 1,109,394.50 18

Page 372: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 372Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Page 373: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 373Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--155155--016016 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate Classrooms/Administration BuildAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Illinois School for the Visually Impaired - Jacksonville, MoCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 16668 : :A/E Name: Evan Lloyd Associates, Inc. : :A/E Contact: Larry DuPont : :A/E Telephone: (217)789-7011 : :Date Selected: 03-12-19 : :Contract Date: 10-29-19 ________________________________________________________________________________Est. Project Cost: 4,396,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,396,900.00 08-05-20 4,396,900.00 08-05-20 29,836.00 26,836.00 4,367,064.00 .00

Total 4,396,900.00 4,396,900.00 29,836.00 26,836.00 4,367,064.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 35.00% Description:Description: Renovate Classrooms/Administration BuildRenovate Classrooms/Administration Build

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-21-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-31-20 03-10-20 ( 39 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Evan Lloyd Associates, Inc. 19032210 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Evan Lloyd Associates, Inc. 19032210 10 29,836.00 .00 0 29,836.00 26,836.00 1 3,000.00 90***** Contract Totals ********** Contract Totals ***** 29,836.00 .00 0 29,836.00 26,836.00 1 3,000.00 90

Page 374: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 374Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--155155--017017 PM NAME: Medeny Guy 511Medeny Guy 511Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Security Camera SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Illinois School for the Visually Impaired - Jacksonville, MoCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 770,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 770,400.00 07-13-21 770,400.00 07-13-21 .00 .00 770,400.00 .00

Total 770,400.00 770,400.00 .00 .00 770,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Upgrade Security Camera SystemUpgrade Security Camera System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 375: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 375Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--160160--025025 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Install Security SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Illinois School for the Deaf - Jacksonville, Morgan CountyCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 1698 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: Dale Dodd : :A/E Telephone: (217)532-3959 : :Date Selected: 05-14-19 : :Contract Date: 10-04-19 ________________________________________________________________________________Est. Project Cost: 6,576,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,576,600.00 05-22-19 6,576,600.00 05-22-19 546,080.00 358,527.60 6,030,520.00 .00

Total 6,576,600.00 6,576,600.00 546,080.00 358,527.60 6,030,520.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Install Security SystemInstall Security System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-05-19 09-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-16-19 01-08-20 ( 23 ) Prime Bid: 07-20-20 12-20-20 ( 0 )

Design Devel: 03-09-20 03-25-20 ( 16 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-30-21 04-30-22 ( 0 )50%: ( 0 ) Final Accept: 01-30-22 05-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-30-2212-30-2295-100%: 11-01-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 19004310 ( 0 ) ( 0 ) 12-30-2212-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 19004310 10 526,100.00 19,980.00 1 546,080.00 358,527.60 9 187,552.40 66***** Contract Totals ********** Contract Totals ***** 526,100.00 19,980.00 1 546,080.00 358,527.60 9 187,552.40 66

Page 376: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 376Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--160160--026026 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Install Sprinkler Systems - AdministratiAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Illinois School for the Deaf - Jacksonville, Morgan CountyCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 16848 : :A/E Name: Clark Dietz, Inc. : :A/E Contact: : :A/E Telephone: (217)373-8900 : :Date Selected: 11-13-19 : :Contract Date: 02-24-20 ________________________________________________________________________________Est. Project Cost: 1,755,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 847,200.00 11-18-19 847,200.00 11-18-19 9,703.00 9,703.00 837,497.00 .00

Total 847,200.00 847,200.00 9,703.00 9,703.00 837,497.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 35.01% Description:Description: Install Sprinkler Systems - AdministratiInstall Sprinkler Systems - Administrati

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-19-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-04-20 05-14-20 ( 10 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Clark Dietz, Inc. 20015010 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Clark Dietz, Inc. 20015010 10 9,703.00 .00 0 9,703.00 9,703.00 2 .00 100***** Contract Totals ********** Contract Totals ***** 9,703.00 .00 0 9,703.00 9,703.00 2 .00 100

Page 377: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 377Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--160160--027027 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Roofing Systems on High School,Agency: Department of Human Services Analyst: Michelette ThompsonLocation: Illinois School for the Deaf - Jacksonville, Morgan CountyCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,739,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,739,100.00 07-13-21 1,739,100.00 07-13-21 .00 .00 1,739,100.00 .00

Total 1,739,100.00 1,739,100.00 .00 .00 1,739,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Roofing Systems on High School,Replace Roofing Systems on High School,

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 378: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 378Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--160160--028028 PM NAME: Medeny Guy 511Medeny Guy 511Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Install New A/C Units and New Building AAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Illinois School for the Deaf - Jacksonville, Morgan CountyCounty: 137 - Morgan ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 6,498,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,498,900.00 07-13-21 6,498,900.00 07-13-21 .00 .00 6,498,900.00 .00

Total 6,498,900.00 6,498,900.00 .00 .00 6,498,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Install New A/C Units and New Building AInstall New A/C Units and New Building A

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 379: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 379Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--190190--050050 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Kiley Developmental Center - Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House: 60 - Rita Mayfield

Senate:30 - Adriane Johnson : CURRENT STATUS 10-27-21 :: :

A/E Id: 28730 : :A/E Name: DLZ Illinois, Inc. : :A/E Contact: Stephen Kromkowski : :A/E Telephone: (773)283-2600 : :Date Selected: 05-14-19 : :Contract Date: 07-30-19 ________________________________________________________________________________Est. Project Cost: 565,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 565,700.00 05-22-19 565,700.00 05-22-19 357,389.70 166,894.11 208,310.30 .00

Total 565,700.00 565,700.00 357,389.70 166,894.11 208,310.30 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 85.00% Description:Description: Replace Roofing SystemReplace Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-04-19 ( 0 ) Assgn Bid: 09-02-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-16-19 10-04-19 ( 18 ) Prime Bid: 04-09-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-06-20 ( 0 )50%: 12-09-19 12-19-19 ( 10 ) Final Accept: 12-04-20 ( 0 )75%: ( 0 ) A/E Cont End: 11-06-2111-06-2195-100%: 02-03-20 02-21-20 ( 18 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DLZ Illinois, Inc. 19024910 ( 0 ) ( 0 ) 11-06-2111-06-21DCG Roofing Solutions, Inc. 21049181 03-24-21 05-19-21 09-16-21 ( 0 ) 11-15-21 ( 0 ) 11-15-2211-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DLZ Illinois, Inc. 19024910 10 56,300.00 .00 0 56,300.00 33,864.87 6 22,435.13 60DCG Roofing Solutions, Inc. 21049181 81 295,800.00 5,289.70 1 301,089.70 133,029.24 1 168,060.46 44***** Contract Totals ********** Contract Totals ***** 352,100.00 5,289.70 1 357,389.70 166,894.11 7 190,495.59 47

Page 380: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 380Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--190190--051051 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Install Emergency Address SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Kiley Developmental Center - Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House: 60 - Rita Mayfield

Senate:30 - Adriane Johnson : CURRENT STATUS 10-26-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: Phil Peterson : :A/E Telephone: (312)922-6400 : :Date Selected: 05-14-19 : :Contract Date: 07-11-19 ________________________________________________________________________________Est. Project Cost: 3,611,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,611,600.00 06-20-19 3,611,600.00 06-20-19 1,587,880.00 179,524.66 2,023,720.00 .00

Total 3,611,600.00 3,611,600.00 1,587,880.00 179,524.66 2,023,720.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 10.00% Description:Description: Install Emergency Address SystemInstall Emergency Address System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-04-19 ( 0 ) Assgn Bid: 03-17-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 04-28-21 ( 0 )CORC Assessment Amt: .00 Schem Design: 09-03-19 09-19-19 ( 16 ) Prime Bid: 03-19-20 06-19-20 03-31-21 (285 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-17-20 01-18-21 ( 0 )50%: 11-12-19 12-24-19 ( 42 ) Final Accept: 11-13-20 03-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-17-2110-17-21 03-30-2203-30-2295-100%: 04-03-20 04-28-20 ( 25 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 19025710 ( 0 ) ( 0 ) 03-30-2203-30-22Krause Electrical Contractor 22043485 08-11-21 04-17-22 ( 0 ) 05-29-22 ( 0 ) 05-29-2305-29-23Krause Electrical Contractor 22043581 08-11-21 09-13-21 04-17-22 ( 0 ) 05-29-22 ( 0 ) 05-29-2305-29-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 19025710 10 267,900.00 8,980.00 1 276,880.00 179,524.66 5 97,355.34 65Krause Electrical Contractor 22043485 85 1,144,000.00 .00 0 1,144,000.00 .00 0 1,144,000.00 0Krause Electrical Contractor 22043581 81 167,000.00 .00 0 167,000.00 .00 0 167,000.00 0***** Contract Totals ********** Contract Totals ***** 1,578,900.00 8,980.00 1 1,587,880.00 179,524.66 5 1,408,355.34 11

Page 381: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 381Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--190190--053053 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate Dental Rooms for Airborne IsolaAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Kiley Developmental Center - Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House: 60 - Rita Mayfield

Senate:30 - Adriane Johnson : CURRENT STATUS 10-25-21 :: :

A/E Id: 34312 : :A/E Name: IMEG Corp. : :A/E Contact: Lewis Hamilton : :A/E Telephone: (847)336-7100 : :Date Selected: 08-11-20 : :Contract Date: 09-11-20 ________________________________________________________________________________Est. Project Cost: 6,868.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,868.00 12-14-20 6,868.00 12-14-20 6,868.00 5,555.50 .00 .00

Total 6,868.00 6,868.00 6,868.00 5,555.50 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Renovate Dental Rooms for Airborne IsolaRenovate Dental Rooms for Airborne Isola

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-29-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IMEG Corp. 21020310 ( 0 ) ( 0 ) 12-01-2212-01-22ProAlliance Corporation 7112 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IMEG Corp. 21020310 10 4,800.00 .00 0 4,800.00 3,487.50 2 1,312.50 73ProAlliance Corporation 7112 11 2,068.00 .00 0 2,068.00 2,068.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 6,868.00 .00 0 6,868.00 5,555.50 3 1,312.50 81

Page 382: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 382Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--210210--003003 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: DB Design Build PLA: NDescription: Construct an Addition to the Treatment aAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Rushville Treatment and Detention Facility - Schuyler CountyCounty: 169 - Schuyler ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 10-26-21 :: :

A/E Id: 31650 : :A/E Name: Dewberry Architects Inc. : :A/E Contact: : :A/E Telephone: (309)282-8000 : :Date Selected: 02-11-20 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 30,659,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 30,659,600.00 07-01-19 30,659,600.00 11-06-19 .00 .00 30,659,600.00 .00

Total 30,659,600.00 30,659,600.00 .00 .00 30,659,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Construct an Addition to the Treatment aConstruct an Addition to the Treatment a

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-12-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Architects Inc. 20033310 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Architects Inc. 20033310 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 383: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 383Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--210210--004004 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Refurbish Roofing SystemAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Rushville Treatment and Detention Facility - Schuyler CountyCounty: 169 - Schuyler ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 10-25-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: : :A/E Telephone: (217)522-3355 : :Date Selected: 03-10-20 : :Contract Date: 11-10-20 ________________________________________________________________________________Est. Project Cost: 2,126,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,004,900.00 03-11-20 2,004,900.00 03-11-20 180,080.00 99,945.45 1,824,820.00 .00

Total 2,004,900.00 2,004,900.00 180,080.00 99,945.45 1,824,820.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Refurbish Roofing SystemRefurbish Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-21-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-18-20 12-21-20 ( 3 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-18-20 12-21-20 ( 3 ) Prime Bid: 06-30-21 08-18-21 ( 49 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-22 ( 0 )50%: 04-01-21 04-08-21 ( 7 ) Final Accept: 08-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 03-31-2303-31-2395-100%: 05-01-21 05-17-21 ( 16 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 20033410 ( 0 ) ( 0 ) 03-31-2303-31-23Designed Roofing Systems, In 22049981 10-25-21 11-08-21 08-05-22 ( 0 ) 10-04-22 ( 0 ) 10-04-2310-04-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 20033410 10 28,500.00 151,580.00 1 180,080.00 99,945.45 3 80,134.55 56Designed Roofing Systems, In 22049981 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 28,500.00 151,580.00 1 180,080.00 99,945.45 3 80,134.55 56

Page 384: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 384Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--210210--005005 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Electronic Lock Controls, CCTV aAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Rushville Treatment and Detention Facility - Schuyler CountyCounty: 169 - Schuyler ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 10-26-21 :: :

A/E Id: 31650 : :A/E Name: Dewberry Architects Inc. : :A/E Contact: : :A/E Telephone: (309)282-8000 : :Date Selected: 08-11-20 : :Contract Date: 02-10-21 ________________________________________________________________________________Est. Project Cost: 4,274,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 274,100.00 01-21-21 274,100.00 01-21-21 274,100.00 140,581.00 .00 .00

Total 274,100.00 274,100.00 274,100.00 140,581.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Replace Electronic Lock Controls, CCTV aReplace Electronic Lock Controls, CCTV a

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-26-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-09-21 04-14-21 ( 5 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-20-21 ( 0 )

Design Devel: 04-09-21 04-16-21 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-23 ( 0 )50%: 06-16-21 07-07-21 ( 21 ) Final Accept: 05-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 03-29-2403-29-2495-100%: 08-11-21 08-31-21 ( 20 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Architects Inc. 21030710 ( 0 ) ( 0 ) 03-29-2403-29-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Architects Inc. 21030710 10 274,100.00 .00 0 274,100.00 140,581.00 5 133,519.00 51***** Contract Totals ********** Contract Totals ***** 274,100.00 .00 0 274,100.00 140,581.00 5 133,519.00 51

Page 385: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 385Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 321321--210210--007007 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct an Addition for Storage and ReAgency: Department of Human Services Analyst: Michelette ThompsonLocation: Rushville Treatment and Detention Facility - Schuyler CountyCounty: 169 - Schuyler ________________________________________________________________________________Leg. Districts: House: 93 - Norine Hammond

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,371,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,371,300.00 07-13-21 2,371,300.00 07-13-21 .00 .00 2,371,300.00 .00

Total 2,371,300.00 2,371,300.00 .00 .00 2,371,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Construct an Addition for Storage and ReConstruct an Addition for Storage and Re

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 386: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 386Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 506506--149149--003003 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Security Camera SystemAgency: Abraham Lincoln Presidential Library and Museum Agency Analyst: Amber EvansLocation: Abraham Lincoln Presidential Library and Museum Complex - SpCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 34127 : :A/E Name: Dewberry Engineers Inc. : :A/E Contact: Thomas Craft : :A/E Telephone: (309)282-8000 : :Date Selected: 05-14-19 : :Contract Date: 07-31-19 ________________________________________________________________________________Est. Project Cost: 778,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 778,500.00 05-17-19 778,500.00 05-17-19 639,767.91 531,353.02 138,732.09 .00

Total 778,500.00 778,500.00 639,767.91 531,353.02 138,732.09 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 98.00% Description:Description: Replace Security Camera SystemReplace Security Camera System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-28-19 06-28-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 09-02-19 09-24-19 ( 22 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-16-20 07-22-20 (128 )

Design Devel: 11-25-19 11-22-19 ( 3-) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-20 ( 0 )50%: ( 0 ) Final Accept: 07-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 12-31-2112-31-2195-100%: 01-20-20 03-17-20 ( 57 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Engineers Inc. 19004210 ( 0 ) ( 0 ) 12-31-2112-31-21Senergy Electric, Inc. 21043585 11-04-20 01-08-21 04-08-21 08-02-21 ( 0 ) 09-02-21 ( 0 ) 05-08-2205-08-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Engineers Inc. 19004210 10 86,950.00 .00 2 86,950.00 66,387.40 5 20,562.60 76Senergy Electric, Inc. 21043585 85 524,177.00 28,640.91 9 552,817.91 464,965.62 3 87,852.29 84***** Contract Totals ********** Contract Totals ***** 611,127.00 28,640.91 11 639,767.91 531,353.02 8 108,414.89 83

Page 387: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 387Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 506506--149149--005005 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Floor/Repair Roof and CeilingAgency: Abraham Lincoln Presidential Library and Museum Agency Analyst: Amber EvansLocation: Abraham Lincoln Presidential Library and Museum Complex - SpCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 34492 : :A/E Name: IDG Architects, Inc. : :A/E Contact: Aaron Gunn : :A/E Telephone: (832)448-2462 : :Date Selected: 08-13-19 : :Contract Date: 09-27-19 ________________________________________________________________________________Est. Project Cost: 1,458,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,458,300.00 08-20-19 1,458,300.00 08-20-19 1,301,770.07 281,493.03 156,529.93 .00

Total 1,458,300.00 1,458,300.00 1,301,770.07 281,493.03 156,529.93 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 20.00% Description:Description: Replace Floor/Repair Roof and CeilingReplace Floor/Repair Roof and Ceiling

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-12-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-22-19 12-19-19 ( 27 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-22-19 12-19-19 ( 27 ) Prime Bid: 09-03-20 08-13-20 02-03-21 (174 )

Design Devel: ( 0 ) Prime Re-Bid: 04-14-21 ( 0 )25%: ( 0 ) Subst Compl: 11-15-21 10-15-21 ( 0 )50%: ( 0 ) Final Accept: 01-15-22 12-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 01-31-2201-31-2295-100%: 06-05-20 11-11-20 (159 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IDG Architects, Inc. 20011510 ( 0 ) ( 0 ) 01-31-2201-31-22CAD Construction Inc. 21058181 07-09-21 07-27-21 11-24-21 ( 0 ) 12-24-21 ( 0 ) 12-24-2212-24-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IDG Architects, Inc. 20011510 10 26,860.00 95,540.00 1 122,400.00 79,789.01 4 42,610.99 65CAD Construction Inc. 21058181 81 1,096,500.00 82,870.07 2 1,179,370.07 201,704.02 2 977,666.05 17***** Contract Totals ********** Contract Totals ***** 1,123,360.00 178,410.07 3 1,301,770.07 281,493.03 6 1,020,277.04 22

Page 388: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 388Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--000000--012012 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Installation Energy and Water Plan (IEWPAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-02-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: Paul Carmen : :A/E Telephone: (314)918-8383 : :Date Selected: 12-15-20 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 350,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 350,000.00 07-28-21 .00 .00 .00 350,000.00 .00

Total 350,000.00 .00 .00 .00 350,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Installation Energy and Water Plan (IEWPInstallation Energy and Water Plan (IEWP

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-16-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 21031510 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 21031510 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 389: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 389Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--015015--023023 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: GL LEED Gold PLA: NDescription: Construct Vehicle Maintenance ShopAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Bloomington Readiness Center - McLean CountyCounty: 113 - McLean ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 31650 : :A/E Name: Dewberry Architects Inc. : :A/E Contact: Paul Reardon : :A/E Telephone: (309)282-8000 : :Date Selected: 09-10-19 : :Contract Date: 06-10-20 ________________________________________________________________________________Est. Project Cost: 13,808,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 761,315.00 06-04-20 358,393.42 09-21-21 761,315.00 358,393.42 .00 .00

Total 761,315.00 358,393.42 761,315.00 358,393.42 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Construct Vehicle Maintenance ShopConstruct Vehicle Maintenance Shop

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-06-19 11-06-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-24-20 09-23-20 ( 30 ) Prime Bid: 08-16-21 04-07-22 ( 0 )

Design Devel: 06-04-21 06-29-21 ( 25 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-22 07-15-23 ( 0 )50%: 08-27-21 09-30-21 ( 34 ) Final Accept: 10-15-22 09-01-23 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2308-31-23 07-15-2407-15-2495-100%: 01-17-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Architects Inc. 2001010 ( 0 ) ( 0 ) 07-15-2407-15-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Architects Inc. 2001010 10 761,315.00 .00 2 761,315.00 358,393.42 8 402,921.58 47***** Contract Totals ********** Contract Totals ***** 761,315.00 .00 2 761,315.00 358,393.42 8 402,921.58 47

Page 390: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 390Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--035035--007007 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Construct an Addition to the Readiness CAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Marion Readiness Center - Williamson CountyCounty: 199 - Williamson ________________________________________________________________________________Leg. Districts: House:117 - Dave Severin

Senate:59 - Dale Fowler : CURRENT STATUS 11-01-21 :: :

A/E Id: 32263 : :A/E Name: Knight E/A, Inc. : :A/E Contact: : :A/E Telephone: (217)546-7455 : :Date Selected: 07-14-20 : :Contract Date: 09-22-20 ________________________________________________________________________________Est. Project Cost: 6,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 171,100.00 04-19-21 171,100.00 04-19-21 171,100.00 165,920.00 .00 .00990 .00 04-19-21 .00 .00 .00 .00 .00

Total 171,100.00 171,100.00 171,100.00 165,920.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 35.00% Description:Description: Construct an Addition to the Readiness CConstruct an Addition to the Readiness C

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-01-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-01-20 05-25-21 (175 ) Prime Bid: ( 0 )

Design Devel: 02-01-21 05-26-21 (114 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2412-01-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Knight E/A, Inc. 21010510 ( 0 ) ( 0 ) 12-01-2412-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Knight E/A, Inc. 21010510 10 171,100.00 .00 0 171,100.00 165,920.00 2 5,180.00 97***** Contract Totals ********** Contract Totals ***** 171,100.00 .00 0 171,100.00 165,920.00 2 5,180.00 97

Page 391: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 391Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--070070--026026 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade Mechanical SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: General Jones Armory - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 26 - Kambium Buckner

Senate:13 - Robert Peters : CURRENT STATUS 11-09-21 :: :

A/E Id: 28730 : :A/E Name: DLZ Illinois, Inc. : :A/E Contact: Stephen Kromkowski : :A/E Telephone: (773)283-2600 : :Date Selected: 08-12-14 : :Contract Date: 01-08-15 ________________________________________________________________________________Est. Project Cost: 3,307,670.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,009,800.54 03-30-21 3,009,800.54 03-30-21 3,008,822.91 2,945,305.88 977.63 .00990 344,388.00 12-18-19 311,125.73 10-07-21 344,388.00 311,125.73 .00 .00

Total 3,354,188.54 3,320,926.27 3,353,210.91 3,256,431.61 977.63 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Upgrade Mechanical SystemUpgrade Mechanical System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-27-14 ( 0 ) Assgn Bid: 07-31-18 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-20-15 04-22-15 ( 33 ) Prime Bid: 01-07-16 07-19-18 08-07-18 ( 19 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-01-17 12-31-20 ( 0 )50%: 09-08-15 09-10-15 ( 2 ) Final Accept: 06-30-17 12-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-01-1805-01-18 12-01-2312-01-2395-100%: 05-17-18 06-05-18 ( 19 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DLZ Illinois, Inc. 15040210 ( 0 ) ( 0 ) 12-01-2312-01-23Amber Mechanical Contractors 19041883 09-24-18 10-12-18 10-12-19 04-01-21 (537 ) 12-11-19 ( 0 ) 12-10-2112-10-21Public Electric Construction 19041985 09-24-18 10-12-18 10-12-19 04-01-21 (537 ) 12-11-19 10-18-21 (677 ) 12-10-2112-10-21Universal Asbestos Removal, 19042088 09-24-18 10-12-18 10-12-19 03-01-20 (141 ) 12-11-19 ( 0 ) 12-10-2112-10-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DLZ Illinois, Inc. 15040210 10 65,777.00 278,611.00 6 344,388.00 311,125.73 19 33,262.27 90Amber Mechanical Contractors 19041883 83 2,583,000.00 49,617.46 5 2,632,617.46 2,570,028.48 20 62,588.98 98Public Electric Construction 19041985 85 72,990.00 53,435.02 8 126,425.02 126,425.02 9 .00 100Universal Asbestos Removal, 19042088 88 235,000.00 14,780.43 4 249,780.43 248,852.38 4 928.05 100

Page 392: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 392Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 2,956,767.00 396,443.91 23 3,353,210.91 3,256,431.61 52 96,779.30 97

Page 393: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 393Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--070070--027027 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Exterior and Interior RenovationsAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: General Jones Armory - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 26 - Kambium Buckner

Senate:13 - Robert Peters : CURRENT STATUS 11-09-21 :: :

A/E Id: 29054 : :A/E Name: Muller & Muller, Ltd. : :A/E Contact: Eric Grygorcewicz : :A/E Telephone: (312)432-4180 : :Date Selected: 08-12-14 : :Contract Date: 12-02-14 ________________________________________________________________________________Est. Project Cost: 3,415,962.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,754,901.09 10-04-21 1,754,901.09 10-04-21 1,731,477.05 942,864.76 23,424.04 .00990 1,332,586.00 06-03-21 182,572.28 05-20-21 246,461.00 182,572.28 1,086,125.00 .00

Total 3,087,487.09 1,937,473.37 1,977,938.05 1,125,437.04 1,109,549.04 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 60.00% Description:Description: Exterior and Interior RenovationsExterior and Interior Renovations

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-26-14 ( 0 ) Assgn Bid: 09-01-15 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 10-29-19 ( 0 )CORC Assessment Amt: .00 Schem Design: 02-27-15 03-23-15 ( 24 ) Prime Bid: 07-30-15 07-30-15 09-02-15 ( 34 )

Design Devel: ( 0 ) Prime Re-Bid: 11-05-19 ( 0 )25%: ( 0 ) Subst Compl: 09-30-16 08-30-22 ( 0 )50%: ( 0 ) Final Accept: 11-11-16 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-30-1710-30-17 08-30-2408-30-2495-100%: 05-29-15 08-12-19 (536 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Muller & Muller, Ltd. 15040310 ( 0 ) ( 0 ) 08-30-2408-30-24Airport Electric Co. 20047585 02-06-20 01-07-21 05-07-21 ( 0 ) 06-06-21 ( 0 ) 06-06-2206-06-22A & H Plumbing & Heating Co. 20047682 02-06-20 01-07-21 05-07-21 ( 0 ) 06-06-21 ( 0 ) 06-06-2206-06-22The Bowa Group, Inc. 21040381 07-13-20 01-07-21 05-07-21 ( 0 ) 06-06-21 ( 0 ) 06-06-2206-06-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Muller & Muller, Ltd. 15040310 10 57,620.00 188,841.00 6 246,461.00 182,572.28 12 63,888.72 74Airport Electric Co. 20047585 85 239,864.00 10,916.87 3 250,780.87 103,658.20 3 147,122.67 41A & H Plumbing & Heating Co. 20047682 82 123,000.00 34,696.18 5 157,696.18 115,445.18 4 42,251.00 73The Bowa Group, Inc. 21040381 81 1,323,000.00 .00 0 1,323,000.00 723,761.38 4 599,238.62 55

Page 394: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 394Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 1,743,484.00 234,454.05 14 1,977,938.05 1,125,437.04 23 852,501.01 57

Page 395: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 395Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--080080--010010 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade Electrical SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Northwest Readiness Center - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 4 - Delia Ramirez

Senate: 2 - Omar Aquino : CURRENT STATUS 08-20-18 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: : :A/E Telephone: (312)567-1000 : :Date Selected: : :Contract Date: 03-13-14 ________________________________________________________________________________Est. Project Cost: 6,960,236.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,766,822.03 08-03-20 6,766,822.03 08-03-20 4,517,207.22 2,038,069.70 .00 2,249,614.81990 2,542,208.84 10-24-12 2,475,508.78 09-05-13 2,542,208.84 2,475,508.78 .00 .00

Total 9,309,030.87 9,242,330.81 7,059,416.06 4,513,578.48 .00 2,249,614.81____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Resurface RoofResurface Roof

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-14-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-16-14 ( 0 ) Prime Bid: 12-19-14 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-11-15 ( 0 )50%: 07-25-14 ( 0 ) Final Accept: 02-12-15 ( 0 )75%: ( 0 ) A/E Cont End: 02-10-1602-10-16 02-10-1702-10-1795-100%: 09-26-14 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

A. Epstein and Sons Internat 54035610 ( 0 ) ( 0 )Henneman Engineering Inc. 59021110 ( 0 ) ( 0 ) 04-14-1104-14-11Henneman Engineering Inc. SS59021110 ( 0 ) ( 0 ) 12-01-1312-01-13Bauer Latoza Studio Ltd. 14041110 ( 0 ) ( 0 ) 02-10-1702-10-17Bennett & Brosseau Roofing, 10040181 07-21-09 08-25-09 11-23-09 04-15-10 05-06-10 (164 ) 05-14-10 06-10-10 ( 27 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

A. Epstein and Sons Internat 54035610 10 .00 .00 0 .00 .00 0 .00 100Henneman Engineering Inc. 59021110 10 56,660.00 295,968.70 3 352,628.70 352,628.70 17 .00 100Henneman Engineering Inc. SS5902111010 67,271.30 44,965.09- 2 22,306.21 22,306.21 2 .00 100

Page 396: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 396Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 14041110 10 239,800.00 61,005.00 5 300,805.00 180,743.00 4 120,062.00 60Bennett & Brosseau Roofing, 10040181 81 223,000.00 .00 2 223,000.00 223,000.00 3 .00 100***** Contract Totals ********** Contract Totals ***** 586,731.30 312,008.61 12 898,739.91 778,677.91 26 120,062.00 87

Page 397: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 397Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--080080--010010 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade Electrical SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Northwest Readiness Center - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 4 - Delia Ramirez

Senate: 2 - Omar Aquino : CURRENT STATUS 07-16-18 :: :

A/E Id: 29814 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: Jim Brody : :A/E Telephone: (312)583-1400 : :Date Selected: 04-08-08 : :Contract Date: 10-11-11 ________________________________________________________________________________Est. Project Cost: 6,960,236.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,766,822.03 08-03-20 6,766,822.03 08-03-20 4,517,207.22 2,038,069.70 .00 2,249,614.81990 2,542,208.84 10-24-12 2,475,508.78 09-05-13 2,542,208.84 2,475,508.78 .00 .00

Total 9,309,030.87 9,242,330.81 7,059,416.06 4,513,578.48 .00 2,249,614.81____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 100.00% Description:Description: Upgrade ElectricalUpgrade Electrical

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 06-30-1206-30-12 12-01-1312-01-1395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Broadway Electric, Inc. SS10040685 10-11-11 12-30-12 03-28-11 (643-) 08-07-13 05-30-13 ( 69-) 08-07-1308-07-13CMM Group, Inc. SS10040781 10-11-11 12-30-12 03-28-11 (643-) 08-07-13 02-06-13 (182-) 08-07-1308-07-13Broadway Electric, Inc. 10040685 08-07-09 09-23-09 04-11-10 06-11-11 03-28-11 (351 ) 06-30-11 10-11-11 (103 )CMM Group, Inc. 10040781 08-07-09 09-23-09 04-11-10 06-11-11 03-28-11 (351 ) 06-30-11 10-11-11 (103 )A & H Plumbing & Heating Co. 10040882 08-07-09 09-23-09 04-11-10 10-01-10 05-06-10 ( 25 ) 12-31-10 01-06-11 ( 6 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Broadway Electric, Inc. SS1004068585 80,120.69 20,547.00 2 100,667.69 100,667.69 5 .00 100CMM Group, Inc. SS1004078181 12,900.43 6,153.89 2 19,054.32 19,054.32 1 .00 100Broadway Electric, Inc. 10040685 85 1,503,400.00 34,830.80- 11 1,468,569.20 1,468,569.20 10 .00 100

Page 398: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 398Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

CMM Group, Inc. 10040781 81 368,500.00 21,982.83 5 390,482.83 390,482.83 6 .00 100A & H Plumbing & Heating Co. 10040882 82 263,000.00 11,491.11 5 274,491.11 274,491.11 6 .00 100***** Contract Totals ********** Contract Totals ***** 2,227,921.12 25,344.03 25 2,253,265.15 2,253,265.15 28 .00 100

Page 399: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 399Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--080080--010010 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade Electrical SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Northwest Readiness Center - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 4 - Delia Ramirez

Senate: 2 - Omar Aquino : CURRENT STATUS 11-02-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: Kirk Sippel : :A/E Telephone: (312)567-1000 : :Date Selected: 11-12-13 : :Contract Date: 03-13-14 ________________________________________________________________________________Est. Project Cost: 6,960,236.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,766,822.03 08-03-20 6,766,822.03 08-03-20 4,517,207.22 2,038,069.70 .00 2,249,614.81990 2,542,208.84 10-24-12 2,475,508.78 09-05-13 2,542,208.84 2,475,508.78 .00 .00

Total 9,309,030.87 9,242,330.81 7,059,416.06 4,513,578.48 .00 2,249,614.81____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 33 (C ) 75.00% Description:Description: Upgrade PlumbingUpgrade Plumbing

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-16-14 05-27-14 ( 11 ) Prime Bid: 12-19-14 06-27-19 03-04-20 (251 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-11-15 04-06-20 ( 0 )50%: 07-25-14 10-15-14 ( 82 ) Final Accept: 02-12-15 05-04-20 ( 0 )75%: ( 0 ) A/E Cont End: 02-10-1602-10-16 01-10-2301-10-2395-100%: 04-15-19 09-06-19 (144 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Midway Contracting Group, LL 21042488 09-17-20 12-01-20 12-01-21 ( 0 ) 01-30-22 ( 0 )The Stone Group Inc. 21042582 09-17-20 12-01-20 12-01-21 ( 0 ) 01-30-22 ( 0 )Industria, Inc. 21042681 09-17-20 12-01-20 12-01-21 ( 0 ) 01-30-22 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Midway Contracting Group, LL 21042488 88 226,000.00 .00 0 226,000.00 112,044.80 3 113,955.20 50The Stone Group Inc. 21042582 82 364,529.00 .00 0 364,529.00 49,343.98 1 315,185.02 14Industria, Inc. 21042681 81 3,316,882.00 .00 0 3,316,882.00 1,320,246.64 5 1,996,635.36 40***** Contract Totals ********** Contract Totals ***** 3,907,411.00 .00 0 3,907,411.00 1,481,635.42 9 2,425,775.58 38

Page 400: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 400Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--080080--015015 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace RoofAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Northwest Readiness Center - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 4 - Delia Ramirez

Senate: 2 - Omar Aquino : CURRENT STATUS 11-02-21 :: :

A/E Id: 29054 : :A/E Name: Muller & Muller, Ltd. : :A/E Contact: Eric Grygorcewicz : :A/E Telephone: (312)432-4180 : :Date Selected: 12-11-18 : :Contract Date: 02-25-19 ________________________________________________________________________________Est. Project Cost: 2,210,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,886,000.00 07-09-20 1,886,000.00 07-09-20 1,886,000.00 1,137,404.93 .00 .00990 156,200.00 08-07-20 128,799.50 10-18-21 156,200.00 121,577.26 .00 .00

Total 2,042,200.00 2,014,799.50 2,042,200.00 1,258,982.19 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 80.00% Description:Description: Replace RoofReplace Roof

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-23-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-13-19 05-30-19 ( 17 ) Prime Bid: 11-15-19 03-05-20 (111 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-31-21 09-09-22 ( 0 )50%: ( 0 ) Final Accept: 06-30-21 10-09-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2109-30-21 09-09-2409-09-2495-100%: 09-02-19 10-21-19 ( 49 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Muller & Muller, Ltd. 19021510 ( 0 ) ( 0 ) 09-09-2409-09-24L. Marshall, Inc. 21042281 09-16-20 01-12-21 09-09-21 ( 0 ) 10-09-21 ( 0 ) 10-09-2210-09-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Muller & Muller, Ltd. 19021510 10 110,735.00 45,465.00 2 156,200.00 121,577.26 10 34,622.74 78L. Marshall, Inc. 21042281 81 1,886,000.00 .00 0 1,886,000.00 1,137,404.93 3 748,595.07 60***** Contract Totals ********** Contract Totals ***** 1,996,735.00 45,465.00 2 2,042,200.00 1,258,982.19 13 783,217.81 62

Page 401: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 401Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--095095--016016 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Decatur Armory - Macon CountyCounty: 115 - Macon ________________________________________________________________________________Leg. Districts: House:101 - Dan Caulkins

Senate:51 - Chapin Rose : CURRENT STATUS 11-03-21 :: :

A/E Id: 28475 : :A/E Name: SNDB Designs, Inc. : :A/E Contact: Simone Demirjian-Beazly : :A/E Telephone: (217)520-9617 : :Date Selected: 06-09-20 : :Contract Date: 09-01-20 ________________________________________________________________________________Est. Project Cost: 1,086,220.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 992,420.00 08-20-21 992,420.00 08-20-21 992,420.00 .00 .00 .00990 93,800.00 09-08-21 41,993.99 09-21-21 93,800.00 41,993.99 .00 .00

Total 1,086,220.00 1,034,413.99 1,086,220.00 41,993.99 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 4.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-07-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-04-21 01-26-21 ( 22 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-29-21 08-04-21 ( 6 )

Design Devel: 01-04-21 01-28-21 ( 24 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-15-22 09-19-22 ( 0 )50%: ( 0 ) Final Accept: 08-15-22 11-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-15-2306-15-2395-100%: 05-24-21 06-28-21 ( 35 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SNDB Designs, Inc. 20043310 ( 0 ) ( 0 ) 06-15-2306-15-23Henson Robinson Company 22046281 09-03-21 09-28-21 06-25-22 ( 0 ) 08-24-22 ( 0 ) 08-24-2308-24-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SNDB Designs, Inc. 20043310 10 59,466.00 34,334.00 1 93,800.00 41,993.99 2 51,806.01 45Henson Robinson Company 22046281 81 992,420.00 .00 0 992,420.00 .00 0 992,420.00 0***** Contract Totals ********** Contract Totals ***** 1,051,886.00 34,334.00 1 1,086,220.00 41,993.99 2 1,044,226.01 4

Page 402: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 402Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--096096--010010 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair/Upgrade HVAC, Electrical and PlumAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Decatur Army and Aviation Support Facility - Macon Co.County: 115 - Macon ________________________________________________________________________________Leg. Districts: House:101 - Dan Caulkins

Senate:51 - Chapin Rose : CURRENT STATUS 11-01-21 :: :

A/E Id: 15170 : :A/E Name: Blank, Wesselink, Cook & Assoc : :A/E Contact: Scott Righter : :A/E Telephone: (217)428-0973 : :Date Selected: 05-14-19 : :Contract Date: 08-01-19 ________________________________________________________________________________Est. Project Cost: 1,700,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,339,093.00 07-12-21 1,339,093.00 07-12-21 1,339,093.00 .00 .00 .00990 202,032.00 10-26-21 111,477.00 09-03-21 202,032.00 111,477.00 .00 .00

Total 1,541,125.00 1,450,570.00 1,541,125.00 111,477.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 15.00% Description:Description: Repair/Upgrade HVAC, Electrical and PlumRepair/Upgrade HVAC, Electrical and Plum

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-09-19 07-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-02-19 09-17-19 ( 15 ) Prime Bid: 07-30-20 02-05-21 06-09-21 (124 )

Design Devel: 03-23-20 05-28-20 ( 66 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-30-21 03-31-22 ( 0 )50%: 09-24-20 10-16-20 ( 22 ) Final Accept: 09-15-21 04-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-30-2207-30-22 03-31-2303-31-2395-100%: 11-13-20 03-08-21 (115 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Blank, Wesselink, Cook & Ass 19004910 ( 0 ) ( 0 ) 03-31-2303-31-23A & R Mechanical Contractors 22042283 08-02-21 09-20-21 06-17-22 ( 0 ) 08-16-22 ( 0 ) 08-16-2308-16-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Blank, Wesselink, Cook & Ass 19004910 10 85,422.00 116,610.00 4 202,032.00 111,477.00 8 90,555.00 55A & R Mechanical Contractors 22042283 83 1,339,093.00 .00 0 1,339,093.00 .00 0 1,339,093.00 0***** Contract Totals ********** Contract Totals ***** 1,424,515.00 116,610.00 4 1,541,125.00 111,477.00 8 1,429,648.00 7

Page 403: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 403Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--110110--012012 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair Exterior and Interior of BuildingAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Dixon Armory - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 1747 : :A/E Name: Larson & Darby, Inc. : :A/E Contact: John Heimbach : :A/E Telephone: (815)484-0739 : :Date Selected: 05-14-19 : :Contract Date: 09-06-19 ________________________________________________________________________________Est. Project Cost: 874,389.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 .00 09-08-21 .00 09-08-21 .00 .00 .00 .00990 874,387.89 11-02-21 678,238.50 09-21-21 874,387.89 678,238.50 .00 .00

Total 874,387.89 678,238.50 874,387.89 678,238.50 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Repair Exterior and Interior of BuildingRepair Exterior and Interior of Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-16-19 07-16-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-02-19 02-26-20 ( 86 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-17-20 08-26-20 ( 9 )

Design Devel: 03-02-20 05-22-20 ( 81 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-18-20 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 02-01-21 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-21 09-30-2209-30-2295-100%: 06-18-20 07-16-20 ( 28 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Larson & Darby, Inc. 19004410 ( 0 ) ( 0 ) 09-30-2209-30-22CAD Construction Inc. 21042981 09-29-20 01-07-21 07-06-21 ( 0 ) 09-04-21 ( 0 ) 09-04-2209-04-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Larson & Darby, Inc. 19004410 10 93,254.00 28,966.00 1 122,220.00 32,471.90 1 89,748.10 27CAD Construction Inc. 21042981 81 678,200.00 73,967.89 2 752,167.89 645,766.60 8 106,401.29 86***** Contract Totals ********** Contract Totals ***** 771,454.00 102,933.89 3 874,387.89 678,238.50 9 196,149.39 78

Page 404: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 404Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--115115--035035 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roof, Provide Exterior Repairs aAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: East St. Louis Readiness Center, St. Clair CountyCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:114 - LaToya Greenwood

Senate:57 - Christopher Belt : CURRENT STATUS 11-09-21 :: :

A/E Id: 21111 : :A/E Name: Eilering Architecture : :A/E Contact: Debra Eilering : :A/E Telephone: (618)235-2000 : :Date Selected: 08-14-18 : :Contract Date: 09-28-18 ________________________________________________________________________________Est. Project Cost: 1,910,206.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,721,803.45 04-07-21 1,720,967.68 04-07-21 1,662,069.26 1,662,069.26 58,898.42 .00990 226,127.65 01-08-21 166,141.43 12-02-20 226,510.83 166,141.43 383.18- .00

Total 1,947,931.10 1,887,109.11 1,888,580.09 1,828,210.69 58,515.24 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 95.00% Description:Description: Replace Roof, Provide Exterior Repairs aReplace Roof, Provide Exterior Repairs a

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-16-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-14-18 12-18-18 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-01-19 08-15-19 ( 14 )

Design Devel: 12-14-18 12-18-18 ( 4 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-01-20 ( 0 )50%: ( 0 ) Final Accept: 12-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-2195-100%: 06-01-19 06-05-19 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Eilering Architecture 19010410 ( 0 ) ( 0 ) 12-31-2112-31-21Korte & Luitjohan Contractor 20042681 09-19-19 10-11-19 04-08-20 09-17-20 (162 ) 07-07-20 04-27-21 (294 ) 07-07-2107-07-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Eilering Architecture 19010410 10 118,541.00 104,015.00 1 222,556.00 162,186.60 9 60,369.40 73Korte & Luitjohan Contractor 20042681 81 1,608,400.00 57,624.09 14 1,666,024.09 1,666,024.09 15 .00 100***** Contract Totals ********** Contract Totals ***** 1,726,941.00 161,639.09 15 1,888,580.09 1,828,210.69 24 60,369.40 97

Page 405: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 405Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--115115--036036 PM NAME: Ashlie Shaffer 595Ashlie Shaffer 595Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Plumbing, Drainage, LightingAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: East St. Louis Readiness Center, St. Clair CountyCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:114 - LaToya Greenwood

Senate:57 - Christopher Belt : CURRENT STATUS 10-28-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: Ted Bergen : :A/E Telephone: (618)344-3774 : :Date Selected: 10-08-19 : :Contract Date: 01-23-20 ________________________________________________________________________________Est. Project Cost: 3,199,257.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,872,548.00 08-26-21 2,872,548.00 08-26-21 2,872,548.00 .00 .00 .00990 326,709.00 08-26-21 112,384.45 01-22-21 326,709.00 112,384.45 .00 .00

Total 3,199,257.00 2,984,932.45 3,199,257.00 112,384.45 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Repair Plumbing, Drainage, LightingRepair Plumbing, Drainage, Lighting

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-14-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-15-20 05-19-20 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-04-21 08-04-21 ( 0 )

Design Devel: 05-15-20 05-26-20 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-22 ( 0 )50%: 04-15-21 05-14-21 ( 29 ) Final Accept: 03-08-23 ( 0 )75%: ( 0 ) A/E Cont End: 10-15-2410-15-2495-100%: 06-10-21 07-05-21 ( 25 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 20040910 ( 0 ) ( 0 ) 10-15-2410-15-24Litteken Construction Compan 22048281 09-27-21 10-21-21 10-21-22 ( 0 ) 12-20-22 ( 0 ) 12-20-2312-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 20040910 10 113,724.00 648,833.00 3 762,557.00 112,384.45 3 650,172.55 15Litteken Construction Compan 22048281 81 2,436,700.00 .00 0 2,436,700.00 .00 0 2,436,700.00 0***** Contract Totals ********** Contract Totals ***** 2,550,424.00 648,833.00 3 3,199,257.00 112,384.45 3 3,086,872.55 4

Page 406: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 406Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--115115--037037 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Land AcquistionAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: East St. Louis Readiness Center, St. Clair CountyCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:114 - LaToya Greenwood

Senate:57 - Christopher Belt : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 15,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 15,000.00 05-24-19 15,000.00 05-24-19 .00 .00 15,000.00 .00

Total 15,000.00 15,000.00 .00 .00 15,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Land AcquistionLand Acquistion

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 407: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 407Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--170170--009009 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate HVAC SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Kankakee Armory - Kankakee CountyCounty: 91 - Kankakee ________________________________________________________________________________Leg. Districts: House: 79 - Jackie Haas

Senate:40 - Patrick Hutchinson : CURRENT STATUS 11-03-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)359-1514 : :Date Selected: 06-08-21 : :Contract Date: 09-22-21 ________________________________________________________________________________Est. Project Cost: 4,419,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 243,698.00 09-10-21 243,698.00 09-10-21 243,698.00 .00 .00 .00

Total 243,698.00 243,698.00 243,698.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Renovate HVAC SystemRenovate HVAC System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-14-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-27-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-27-21 ( 0 ) Prime Bid: 07-06-22 ( 0 )

Design Devel: 12-22-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 02-23-22 ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 04-30-2504-30-2595-100%: 04-20-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. 22030110 ( 0 ) ( 0 ) 04-30-2504-30-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. 22030110 10 243,698.00 .00 0 243,698.00 .00 0 243,698.00 0***** Contract Totals ********** Contract Totals ***** 243,698.00 .00 0 243,698.00 .00 0 243,698.00 0

Page 408: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 408Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--185185--014014 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing System/Tuckpointing & SeAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Lawrenceville Armory - Lawrence CountyCounty: 101 - Lawrence ________________________________________________________________________________Leg. Districts: House:110 - Chris Miller

Senate:55 - Darren Bailey : CURRENT STATUS 10-15-21 :: :

A/E Id: 29858 : :A/E Name: Wright & Calvert Design Group, : :A/E Contact: : :A/E Telephone: (618)263-3254 : :Date Selected: 06-08-21 : :Contract Date: 08-24-21 ________________________________________________________________________________Est. Project Cost: 850,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 70,540.00 08-20-21 .00 70,540.00 .00 .00 .00

Total 70,540.00 .00 70,540.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 8.00% Description:Description: Replace Roofing System/Tuckpointing & SeReplace Roofing System/Tuckpointing & Se

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-06-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-19-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-01-22 ( 0 )

Design Devel: 11-19-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 02-04-22 ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2411-30-2495-100%: 04-08-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Wright & Calvert Design Grou 21042810 ( 0 ) ( 0 ) 11-30-2411-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Wright & Calvert Design Grou 21042810 10 70,540.00 .00 0 70,540.00 .00 0 70,540.00 0***** Contract Totals ********** Contract Totals ***** 70,540.00 .00 0 70,540.00 .00 0 70,540.00 0

Page 409: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 409Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--190190--012012 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair/Replace Vehicle Parking LotsAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Litchfield Armory - Montgomery CountyCounty: 135 - Montgomery ________________________________________________________________________________Leg. Districts: House: 95 - Avery Bourne

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 34336 : :A/E Name: Veenstra & Kimm, Inc. : :A/E Contact: Robert Dalton : :A/E Telephone: (217)544-8033 : :Date Selected: 05-14-19 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,248,420.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,110,000.00 09-22-21 1,110,000.00 09-22-21 1,110,000.00 .00 .00 .00990 138,420.00 08-25-21 41,638.44 02-05-21 119,045.00 41,638.44 19,375.00 .00

Total 1,248,420.00 1,151,638.44 1,229,045.00 41,638.44 19,375.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Repair/Replace Vehicle Parking LotsRepair/Replace Vehicle Parking Lots

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-13-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-11-19 12-16-19 ( 66 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-11-19 12-16-19 ( 66 ) Prime Bid: 06-04-20 09-15-21 09-01-21 ( 14-)

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-01-21 05-31-22 ( 0 )50%: 01-10-20 05-14-20 (125 ) Final Accept: 04-30-21 07-29-22 ( 0 )75%: ( 0 ) A/E Cont End: 02-01-2202-01-22 02-01-2302-01-2395-100%: 07-20-21 08-02-21 ( 13 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Vasconcelles Engineering Cor 19032910 ( 0 ) ( 0 ) 02-01-2202-01-22Veenstra & Kimm, Inc. 19032910A ( 0 ) ( 0 ) 02-01-2302-01-23RCS Construction, Inc. 22048481 10-01-21 10-22-21 12-21-21 ( 0 ) 01-05-22 ( 0 ) 01-05-2301-05-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Vasconcelles Engineering Cor 19032910 10 62,262.00 28,329.05- 0 33,932.95 33,932.95 5 .00 100Veenstra & Kimm, Inc. 19032910A 10 .00 85,112.05 2 85,112.05 7,705.49 2 77,406.56 9RCS Construction, Inc. 22048481 81 1,110,000.00 .00 0 1,110,000.00 .00 0 1,110,000.00 0***** Contract Totals ********** Contract Totals ***** 1,172,262.00 56,783.00 2 1,229,045.00 41,638.44 7 1,187,406.56 3

Page 410: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 410Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--190190--013013 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing-HVAC System/Upgrade ElecAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Litchfield Armory - Montgomery CountyCounty: 135 - Montgomery ________________________________________________________________________________Leg. Districts: House: 95 - Avery Bourne

Senate:48 - Doris Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 34304 : :A/E Name: Prairie Engineers, P.C. : :A/E Contact: : :A/E Telephone: (217)605-0403 : :Date Selected: 06-08-21 : :Contract Date: 08-31-21 ________________________________________________________________________________Est. Project Cost: 3,618,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 214,685.00 08-26-21 214,685.00 08-26-21 214,685.00 .00 .00 .00

Total 214,685.00 214,685.00 214,685.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Replace Roofing-HVAC System/Upgrade ElecReplace Roofing-HVAC System/Upgrade Elec

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-21-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-23-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-09-22 ( 0 )

Design Devel: 11-23-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-30-23 ( 0 )50%: 04-09-22 ( 0 ) Final Accept: 12-29-23 ( 0 )75%: ( 0 ) A/E Cont End: 10-25-2510-25-2595-100%: 07-02-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Prairie Engineers, P.C. 21013010 ( 0 ) ( 0 ) 10-25-2510-25-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Prairie Engineers, P.C. 21013010 10 214,685.00 .00 0 214,685.00 .00 0 214,685.00 0***** Contract Totals ********** Contract Totals ***** 214,685.00 .00 0 214,685.00 .00 0 214,685.00 0

Page 411: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 411Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--235235--022022 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Construct Vehicle Maintenance ShopAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: North Riverside Armory - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 8 - LaShawn Ford

Senate: 4 - Kimberly Lightford : CURRENT STATUS 11-01-21 :: :

A/E Id: 29054 : :A/E Name: Muller & Muller, Ltd. : :A/E Contact: : :A/E Telephone: (312)432-4180 : :Date Selected: 06-09-20 : :Contract Date: 08-11-20 ________________________________________________________________________________Est. Project Cost: 17,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 75,000.00 08-10-20 75,000.00 06-10-21 75,000.00 75,000.00 .00 .00

Total 75,000.00 75,000.00 75,000.00 75,000.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Construct Vehicle Maintenance ShopConstruct Vehicle Maintenance Shop

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-22-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 12-07-20 04-16-21 (130 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2412-01-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Muller & Muller, Ltd. 20025510 ( 0 ) ( 0 ) 12-01-2412-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Muller & Muller, Ltd. 20025510 10 75,000.00 .00 0 75,000.00 75,000.00 6 .00 100***** Contract Totals ********** Contract Totals ***** 75,000.00 .00 0 75,000.00 75,000.00 6 .00 100

Page 412: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 412Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--235235--023023 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Construct Entry Control Point at North RAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: North Riverside Armory - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 8 - LaShawn Ford

Senate: 4 - Kimberly Lightford : CURRENT STATUS 11-01-21 :: :

A/E Id: 29054 : :A/E Name: Muller & Muller, Ltd. : :A/E Contact: : :A/E Telephone: (312)432-4180 : :Date Selected: 04-13-21 : :Contract Date: 05-10-21 ________________________________________________________________________________Est. Project Cost: 1,800,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 54,000.00 05-21-21 54,000.00 05-21-21 54,000.00 8,989.33 .00 .00990 .00 05-21-21 .00 .00 .00 .00 .00

Total 54,000.00 54,000.00 54,000.00 8,989.33 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 15.00% Description:Description: Construct Entry Control Point at North RConstruct Entry Control Point at North R

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-22-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 09-17-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Muller & Muller, Ltd. 21022110 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Muller & Muller, Ltd. 21022110 10 54,000.00 .00 2 54,000.00 8,989.33 2 45,010.67 17***** Contract Totals ********** Contract Totals ***** 54,000.00 .00 2 54,000.00 8,989.33 2 45,010.67 17

Page 413: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 413Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--250250--020020 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace HVAC System and Plumbing and IntAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Paris Armory - Edgar CountyCounty: 45 - Edgar ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS 10-27-21 :: :

A/E Id: 34304 : :A/E Name: Prairie Engineers, P.C. : :A/E Contact: G. Whitlow : :A/E Telephone: (217)605-0403 : :Date Selected: 05-14-19 : :Contract Date: 09-26-19 ________________________________________________________________________________Est. Project Cost: 3,128,177.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 61,579.53 08-26-21 61,579.53 08-26-21 .00 .00 61,579.53 .00990 3,068,051.70 11-09-21 698,989.47 10-14-21 3,068,051.70 698,988.97 .00 .00

Total 3,129,631.23 760,569.00 3,068,051.70 698,988.97 61,579.53 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Replace HVAC System and Plumbing and IntReplace HVAC System and Plumbing and Int

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-11-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-20-19 12-20-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-06-20 09-30-20 ( 55 )

Design Devel: 12-20-19 12-30-19 ( 10 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-21 ( 0 )50%: 03-27-20 04-02-20 ( 6 ) Final Accept: 11-20-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2209-30-2295-100%: 06-19-20 06-12-20 ( 7-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Prairie Engineers, P.C. 19032710 ( 0 ) ( 0 ) 09-30-2209-30-22Prairie Engineers, P.C. 19032710 09-26-19 ( 0 ) ( 0 )Grunloh Construction, Inc. 21049881 04-12-21 05-27-21 01-22-22 ( 0 ) 03-23-22 ( 0 ) 03-23-2303-23-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Prairie Engineers, P.C. 19032710 10 177,051.00 184,146.00 3 361,197.00 190,995.87 8 170,201.13 53Prairie Engineers, P.C. 19032710 10 177,051.00 184,146.00 3 361,197.00 190,995.87 8 170,201.13 53Grunloh Construction, Inc. 21049881 81 2,606,000.00 100,854.70 4 2,706,854.70 507,993.10 2 2,198,861.60 19***** Contract Totals ********** Contract Totals ***** 2,960,102.00 469,146.70 10 3,429,248.70 889,984.84 18 2,539,263.86 26

Page 414: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 414Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--260260--026026 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair Privately-Owned Vehicle Parking LAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Bartonville Readiness Center - Peoria CountyCounty: 143 - Peoria ________________________________________________________________________________Leg. Districts: House: 92 - Jehan Gordon-Booth

Senate:46 - David Koehler : CURRENT STATUS 10-27-21 :: :

A/E Id: 31434 : :A/E Name: Midwest Engineering Associates : :A/E Contact: : :A/E Telephone: (309)222-8600 : :Date Selected: 05-14-19 : :Contract Date: 09-06-19 ________________________________________________________________________________Est. Project Cost: 1,518,052.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,378,000.00 06-15-21 1,378,000.00 06-15-21 1,378,000.00 .00 .00 .00990 151,500.00 08-20-21 96,032.00 10-07-21 151,500.00 96,032.00 .00 .00

Total 1,529,500.00 1,474,032.00 1,529,500.00 96,032.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 15.00% Description:Description: Repair Privately-Owned Vehicle Parking LRepair Privately-Owned Vehicle Parking L

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-09-19 08-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-01-20 04-14-21 (195 )

Design Devel: 01-30-20 02-12-20 ( 13 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-21 09-30-22 ( 0 )50%: ( 0 ) Final Accept: 11-30-21 10-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2210-31-22 09-30-2309-30-2395-100%: 08-01-20 02-10-21 (193 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Midwest Engineering Associat 19005010 ( 0 ) ( 0 ) 09-30-2309-30-23Illinois Civil Contractors, 21057581 06-24-21 08-04-21 08-04-22 ( 0 ) 09-03-22 ( 0 ) 09-03-2309-03-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Midwest Engineering Associat 19005010 10 72,042.00 79,458.00 2 151,500.00 96,032.00 4 55,468.00 63Illinois Civil Contractors, 21057581 81 1,378,000.00 .00 0 1,378,000.00 .00 0 1,378,000.00 0***** Contract Totals ********** Contract Totals ***** 1,450,042.00 79,458.00 2 1,529,500.00 96,032.00 4 1,433,468.00 6

Page 415: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 415Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--260260--027027 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace HVAC SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Bartonville Readiness Center - Peoria CountyCounty: 143 - Peoria ________________________________________________________________________________Leg. Districts: House: 92 - Jehan Gordon-Booth

Senate:46 - David Koehler : CURRENT STATUS 10-27-21 :: :

A/E Id: 34304 : :A/E Name: Prairie Engineers, P.C. : :A/E Contact: : :A/E Telephone: (217)605-0403 : :Date Selected: 05-11-21 : :Contract Date: 08-31-21 ________________________________________________________________________________Est. Project Cost: 3,955,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 217,495.00 08-26-21 217,495.00 09-03-21 217,495.00 .00 .00 .00

Total 217,495.00 217,495.00 217,495.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 8.00% Description:Description: Replace HVAC SystemReplace HVAC System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-03-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-23-21 11-04-21 ( 19-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-03-22 ( 0 )

Design Devel: 11-23-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-01-23 ( 0 )50%: 03-02-22 ( 0 ) Final Accept: 12-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 04-29-2504-29-2595-100%: 05-25-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Prairie Engineers, P.C. 21012610 ( 0 ) ( 0 ) 04-29-2504-29-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Prairie Engineers, P.C. 21012610 10 217,495.00 .00 0 217,495.00 .00 0 217,495.00 0***** Contract Totals ********** Contract Totals ***** 217,495.00 .00 0 217,495.00 .00 0 217,495.00 0

Page 416: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 416Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--261261--005005 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct National Guard Readiness CenteAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Peoria Army Aviation Support Facility - Peoria CountyCounty: 143 - Peoria ________________________________________________________________________________Leg. Districts: House: 92 - Jehan Gordon-Booth

Senate:46 - David Koehler : CURRENT STATUS 10-29-21 :: :

A/E Id: 31650 : :A/E Name: Dewberry Architects Inc. : :A/E Contact: Chad DeWeese : :A/E Telephone: (309)282-8000 : :Date Selected: 05-16-17 : :Contract Date: 07-05-17 ________________________________________________________________________________Est. Project Cost: 30,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 130,800.00 09-23-21 75,000.00 01-11-19 130,800.00 75,000.00 .00 .00

Total 130,800.00 75,000.00 130,800.00 75,000.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Construct National Guard Readiness CenteConstruct National Guard Readiness Cente

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-25-17 06-08-17 ( 14 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2209-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dewberry Architects Inc. 17021910 ( 0 ) ( 0 ) 09-30-2209-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dewberry Architects Inc. 17021910 10 75,000.00 55,800.00 1 130,800.00 75,000.00 2 55,800.00 57***** Contract Totals ********** Contract Totals ***** 75,000.00 55,800.00 1 130,800.00 75,000.00 2 55,800.00 57

Page 417: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 417Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--261261--007007 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Refueler Parking AreaAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Peoria Army Aviation Support Facility - Peoria CountyCounty: 143 - Peoria ________________________________________________________________________________Leg. Districts: House: 92 - Jehan Gordon-Booth

Senate:46 - David Koehler : CURRENT STATUS 10-29-21 :: :

A/E Id: 30881 : :A/E Name: WHKS & Co. : :A/E Contact: : :A/E Telephone: (217)483-9457 : :Date Selected: 12-11-18 : :Contract Date: 09-06-19 ________________________________________________________________________________Est. Project Cost: 1,010,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 840,500.00 06-14-21 840,500.00 06-14-21 840,500.00 230,047.61 .00 .00990 169,900.00 08-20-21 68,359.39 10-26-21 169,900.00 68,359.39 .00 .00

Total 1,010,400.00 908,859.39 1,010,400.00 298,407.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 31.00% Description:Description: Replace Refueler Parking AreaReplace Refueler Parking Area

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-08-19 08-08-19 ( 0 ) Assgn Bid: 05-26-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-16-19 03-12-20 ( 87 ) Prime Bid: 07-27-20 02-19-21 06-09-21 (110 )

Design Devel: 04-06-20 07-23-20 (108 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-01-21 10-31-22 ( 0 )50%: ( 0 ) Final Accept: 03-01-21 11-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 02-01-2202-01-22 10-31-2310-31-2395-100%: 11-27-20 02-02-21 ( 67 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

WHKS & Co. 19001510 ( 0 ) ( 0 ) 10-31-2310-31-23Stark Excavating, Inc. 22042481 08-02-21 09-14-21 03-13-22 ( 0 ) 05-12-22 ( 0 ) 05-12-2305-12-23Quick Electrical Contractors 22042585 08-02-21 09-14-21 03-13-22 ( 0 ) 05-12-22 ( 0 ) 05-12-2305-12-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

WHKS & Co. 19001510 10 87,787.00 82,113.00 2 169,900.00 68,359.39 2 101,540.61 40Stark Excavating, Inc. 22042481 81 731,000.00 .00 0 731,000.00 207,097.81 1 523,902.19 28Quick Electrical Contractors 22042585 85 109,500.00 .00 0 109,500.00 22,949.80 1 86,550.20 21***** Contract Totals ********** Contract Totals ***** 928,287.00 82,113.00 2 1,010,400.00 298,407.00 4 711,993.00 30

Page 418: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 418Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--261261--008008 PM NAME: Medeny Guy 511Medeny Guy 511Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Peoria Army Aviation Support Facility - Peoria CountyCounty: 143 - Peoria ________________________________________________________________________________Leg. Districts: House: 92 - Jehan Gordon-Booth

Senate:46 - David Koehler : CURRENT STATUS 11-01-21 :: :

A/E Id: 27785 : :A/E Name: Kenyon & Associates Architects : :A/E Contact: Larry Wachtveitl : :A/E Telephone: (309)674-7121 : :Date Selected: 06-09-20 : :Contract Date: 07-28-20 ________________________________________________________________________________Est. Project Cost: 1,191,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 672,000.00 06-24-21 672,000.00 06-24-21 672,000.00 .00 .00 .00990 108,750.00 07-20-21 71,118.35 06-22-21 108,750.00 71,118.35 .00 .00

Total 780,750.00 743,118.35 780,750.00 71,118.35 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-14-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-01-21 04-28-21 ( 58 )

Design Devel: 09-07-20 09-08-20 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-21 09-22-22 ( 0 )50%: ( 0 ) Final Accept: 07-01-21 10-29-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2206-01-22 10-29-2310-29-2395-100%: 11-30-20 01-06-21 ( 37 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kenyon & Associates Architec 20004310 ( 0 ) ( 0 ) 10-29-2310-29-23P.J. Hoerr, Inc. 21058081 07-02-21 07-21-21 11-18-21 09-22-22 ( 0 ) 10-29-22 ( 0 ) 10-29-2310-29-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kenyon & Associates Architec 20004310 10 72,417.00 36,333.00 1 108,750.00 71,118.35 4 37,631.65 65P.J. Hoerr, Inc. 21058081 81 672,000.00 .00 0 672,000.00 .00 0 672,000.00 0***** Contract Totals ********** Contract Totals ***** 744,417.00 36,333.00 1 780,750.00 71,118.35 4 709,631.65 9

Page 419: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 419Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--280280--013013 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Repair HVAC System, Interior Renovation,Agency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Quincy Readiness Center - Adams CountyCounty: 1 - Adams ________________________________________________________________________________Leg. Districts: House: 94 - Randy Frese

Senate:47 - Jil Tracy : CURRENT STATUS 11-01-21 :: :

A/E Id: 2519 : :A/E Name: Architechnics, Inc. : :A/E Contact: Isaac Miller : :A/E Telephone: (217)222-0554 : :Date Selected: 05-14-19 : :Contract Date: 08-29-19 ________________________________________________________________________________Est. Project Cost: 1,020,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 751,380.56 05-25-21 751,380.56 05-25-21 739,799.71 739,799.71 11,580.85 .00990 129,500.00 09-29-20 107,321.41 09-03-21 129,500.00 107,321.41 .00 .00

Total 880,880.56 858,701.97 869,299.71 847,121.12 11,580.85 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 90.00% Description:Description: Repair HVAC System, Interior Renovation,Repair HVAC System, Interior Renovation,

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-08-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-25-19 11-06-19 ( 12 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-25-19 ( 0 ) Prime Bid: 05-28-20 07-22-20 ( 55 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-21 08-31-21 ( 0 )50%: 01-10-20 01-24-20 ( 14 ) Final Accept: 08-31-21 09-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-22 09-30-2209-30-2295-100%: 03-20-20 04-28-20 ( 39 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechnics, Inc. 19032810 ( 0 ) ( 0 ) 09-30-2209-30-22Laverdiere Construction, Inc 21042881 09-24-20 01-08-21 05-08-21 08-31-21 08-19-21 (103 ) 07-07-21 09-28-21 ( 83 ) 07-07-2207-07-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechnics, Inc. 19032810 10 89,889.00 39,611.00 2 129,500.00 107,321.41 6 22,178.59 83Laverdiere Construction, Inc 21042881 81 720,916.00 18,883.71 9 739,799.71 739,799.71 8 .00 100***** Contract Totals ********** Contract Totals ***** 810,805.00 58,494.71 11 869,299.71 847,121.12 14 22,178.59 98

Page 420: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 420Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--282282--003003 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: SL LEED Silver PLA: YDescription: Capital Improvements - Lincoln's ChalleNAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Rantoul Military Affairs, Champaign CountyCounty: 19 - Champaign Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House:104 - Michael Marron

Senate:52 - Scott Bennett : CURRENT STATUS 11-01-21 :: :

A/E Id: 35437 : :A/E Name: RATIO States, LLC : :A/E Contact: : :A/E Telephone: (217)352-7696 : :Date Selected: 05-11-21 : :Contract Date: 07-19-21 ________________________________________________________________________________Est. Project Cost: 57,355,435.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 68,028,607.00 07-01-16 68,028,607.00 07-19-16 41,136,975.36 41,069,915.13 7,003,026.98 19,888,604.66170 608,525.13 01-17-17 608,525.13 01-17-17 608,525.13 608,525.13 .00 .00990 250,000.00 07-29-15 249,980.07 06-24-16 249,980.07 249,980.07 19.93 .00

Total 68,887,132.13 68,887,112.20 41,995,480.56 41,928,420.33 7,003,046.91 19,888,604.66____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: PH. 1 Capital Improvements - Lincoln's CPH. 1 Capital Improvements - Lincoln's C

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-01-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 3,875.05 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 07-02-2607-02-2695-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

RATIO Architects, Inc. 11003110 ( 0 ) ( 0 ) 05-04-2105-04-21RATIO States, LLC 21012710 ( 0 ) ( 0 ) 07-02-2607-02-26River City Construction, L.L 14064681 04-04-14 04-22-14 07-30-16 11-05-18 11-05-18 (828 ) 08-31-20 09-30-20 ( 30 ) 12-30-2012-30-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

RATIO Architects, Inc. 11003110 10 546,407.00 3,118,598.70 18 3,665,005.70 3,665,005.70 50 .00 100RATIO States, LLC 21012710 10 66,460.00 .00 0 66,460.00 .00 0 66,460.00 0JLA Limited 6649 49 1,500.00 .00 0 1,500.00 1,500.00 1 .00 100Krivanek & Breaux-Art & Desi 6651 49 2,000.00 .00 0 2,000.00 2,000.00 1 .00 100

Page 421: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 421Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

KOH-Varilla Guild Inc. 6652 49 1,500.00 .00 0 1,500.00 1,500.00 1 .00 100KOH-Varilla Guild Inc. 6653 49 2,000.00 .00 0 2,000.00 2,000.00 1 .00 100Seagraves David 6655 49 1,500.00 .00 0 1,500.00 1,500.00 1 .00 100Michael D. Young 6659 49 2,000.00 .00 0 2,000.00 2,000.00 1 .00 100Seagraves David 18045349 49 58,000.00 .00 0 58,000.00 58,000.00 5 .00 100Krivanek & Breaux-Art & Desi 18045249 49 120,000.00 1,599.77 0 121,599.77 121,599.77 5 .00 100Rantoul Village of 6150 50 184,495.31 .00 0 184,495.31 184,495.31 1 .00 100Frontier Communications Corp 6515 50 9,085.26 .00 0 9,085.26 9,085.26 1 .00 100Holzberg Communications Inc. 6519 60 8,491.35 .00 0 8,491.35 8,491.35 1 .00 100W W Grainger 6475 70 2,000.00 14,976.26 0 16,976.26 16,976.26 4 .00 100Resource One Of Illinois 6479 70 12,965.17 .00 0 12,965.17 12,965.17 2 .00 100Steelsentry Inc 6483 70 6,011.30 .00 0 6,011.30 6,011.30 1 .00 100Resource One Of Illinois 6484 70 175,257.72 .00 0 175,257.72 175,257.72 2 .00 100Resource One Of Illinois 6602 70 350,736.73 6,827.13 1 357,563.86 357,563.86 4 .00 100Steelsentry Inc 6605 70 6,011.30 6,011.30- 0 .00 .00 2 .00 100Tarter Construction, LLC 17104439 70 772,400.00 49,072.00- 2 723,328.00 723,328.00 2 .00 100Resource One Of Illinois 6514 70 2,325.11 .00 0 2,325.11 2,325.11 1 .00 100Moreno & Sons Inc. 6613 70 9,100.00 .00 0 9,100.00 9,100.00 1 .00 100W W Grainger 6642 70 5,933.40 .00 0 5,933.40 5,933.40 1 .00 100Ecologic Industries LLC 6524 70 88,000.00 .00 0 88,000.00 88,000.00 2 .00 100Creative Concrete & Design 6654 70 8,188.94 .00 0 8,188.94 8,188.94 1 .00 100Gold Edge Supply Inc 6664 70 5,040.00 .00 0 5,040.00 5,040.00 1 .00 100Rogards Inc 6694 70 979.95 .00 0 979.95 979.95 1 .00 100C D W Computer Centers Inc. 6695 70 8,108.94 .00 0 8,108.94 8,108.94 1 .00 100National Tek Services Inc 6665 70 41,775.00 .00 0 41,775.00 41,775.00 1 .00 100W W Grainger 6666 70 69,147.04 21,312.92- 0 47,834.12 47,834.12 7 .00 100C D W Computer Centers Inc. 6667 70 1,880.61 .00 0 1,880.61 1,880.61 1 .00 100W W Grainger 6668 70 21,831.60 23,538.00 0 45,369.60 45,369.60 3 .00 100Correctional Industries 6711 70 21,411.00 .00 0 21,411.00 21,411.00 1 .00 100Rogards Inc 6791 70 5,650.00 .00 0 5,650.00 5,650.00 1 .00 100Rogards Inc 6796 70 3,481.00 .00 0 3,481.00 3,481.00 1 .00 100W W Grainger 6798 70 996.12 .00 0 996.12 996.12 1 .00 100Chemical Maint Inc 6797 70 20,395.75 .00 0 20,395.75 20,395.75 3 .00 100Resource One Of Illinois 6802 70 3,597.25 .00 0 3,597.25 3,597.25 1 .00 100Illini Supply Co Inc 6811 70 12,027.45 .00 0 12,027.45 12,027.45 1 .00 100W W Grainger 6810 70 6,788.43 1,251.61 0 8,040.04 8,040.04 2 .00 100National Tek Services Inc 6806 70 9,655.00 .00 0 9,655.00 9,655.00 1 .00 100C D W Computer Centers Inc. 6814 70 4,800.00 .00 0 4,800.00 4,800.00 1 .00 100C D W Computer Centers Inc. 6815 70 1,717.31 .00 0 1,717.31 1,717.31 1 .00 100C D W Computer Centers Inc. 6823 70 59,056.20 .00 0 59,056.20 59,056.20 1 .00 100C D W Computer Centers Inc. 6824 70 4,620.00 .00 0 4,620.00 4,620.00 1 .00 100C D B/Art In Architecture ART 89 190,700.00 190,099.77- 0 600.23 .00 0 600.23 0Moreno & Sons Inc. INT6737 00 .00 105.11 0 105.11 105.11 1 .00 100W W Grainger INT6738 00 .00 50.82 0 50.82 50.82 1 .00 100Ecologic Industries LLC INT6739 00 .00 1,335.84 0 1,335.84 1,335.84 1 .00 100C D W Computer Centers Inc. INT6751 00 2,689.42 .00 0 2,689.42 2,689.42 1 .00 100Chemical Maint Inc INT6754 00 148.07 .00 0 148.07 148.07 1 .00 100River City Construction, L.L 14064681 81 32,025,000.00 4,129,828.58 135 36,154,828.58 36,154,828.58 86 .00 100***** Contract Totals ********** Contract Totals ***** 34,963,864.73 7,031,615.83 156 41,995,480.56 41,928,420.33 214 67,060.23 100

Page 422: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 422Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--282282--003003 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: SL LEED Silver PLA: YDescription: Capital Improvements - Lincoln's ChalleNAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Rantoul Military Affairs, Champaign CountyCounty: 19 - Champaign Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House:104 - Michael Marron

Senate:52 - Scott Bennett : CURRENT STATUS 11-01-21 :: :

A/E Id: 29508 : :A/E Name: RATIO Architects, Inc. : :A/E Contact: John Petersen : :A/E Telephone: (217)352-7696 : :Date Selected: : :Contract Date: 06-20-11 ________________________________________________________________________________Est. Project Cost: 57,355,435.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 68,028,607.00 07-01-16 68,028,607.00 07-19-16 41,136,975.36 41,069,915.13 7,003,026.98 19,888,604.66170 608,525.13 01-17-17 608,525.13 01-17-17 608,525.13 608,525.13 .00 .00990 250,000.00 07-29-15 249,980.07 06-24-16 249,980.07 249,980.07 19.93 .00

Total 68,887,132.13 68,887,112.20 41,995,480.56 41,928,420.33 7,003,046.91 19,888,604.66____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 100.00% Description:Description: PH.2 Install Emergency GeneratorsPH.2 Install Emergency Generators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 09-03-19 09-03-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 3,875.05 Schem Design: ( 0 ) Prime Bid: 01-30-20 05-12-20 06-10-20 ( 29 )

Design Devel: 09-03-19 09-04-19 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-27-20 12-08-20 ( 0 )50%: ( 0 ) Final Accept: 09-28-20 01-08-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-19-2106-19-21 06-19-2106-19-2195-100%: 03-06-20 03-12-20 ( 6 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Capitol Construction Group, 22050645 11-02-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Capitol Construction Group, 22050645 45 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 423: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 423Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--303303--007007 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: LA Land Acquisition PLA: NDescription: Land AcquisitionAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Machesney Park Armory - Winnebago CountyCounty: 201 - Winnebago ________________________________________________________________________________Leg. Districts: House: 68 - Dave Vella

Senate:34 - Steve Stadelman : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,106,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 926,000.00 05-30-19 926,000.00 05-30-19 5,000.00 5,000.00 921,000.00 .00

Total 926,000.00 926,000.00 5,000.00 5,000.00 921,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Land AcquisitionLand Acquisition

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 424: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 424Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--303303--008008 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing System and Renovate ExteAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Machesney Park Armory - Winnebago CountyCounty: 201 - Winnebago ________________________________________________________________________________Leg. Districts: House: 68 - Dave Vella

Senate:34 - Steve Stadelman : CURRENT STATUS 11-02-21 :: :

A/E Id: 27679 : :A/E Name: Saavedra Group Architects, Inc : :A/E Contact: Guy Gehlhausen : :A/E Telephone: (815)963-9392 : :Date Selected: 06-09-20 : :Contract Date: 08-20-20 ________________________________________________________________________________Est. Project Cost: 2,336,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,518,867.00 09-03-21 1,518,867.00 09-03-21 1,518,867.00 .00 .00 .00990 187,950.00 08-26-21 89,656.04 04-13-21 187,950.00 89,656.04 .00 .00

Total 1,706,817.00 1,608,523.04 1,706,817.00 89,656.04 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) .00% Description:Description: Replace Roofing System and Renovate ExteReplace Roofing System and Renovate Exte

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-10-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-02-20 10-01-20 ( 1-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-02-20 10-07-20 ( 5 ) Prime Bid: 05-05-21 05-12-21 ( 7 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-15-21 08-31-22 ( 0 )50%: ( 0 ) Final Accept: 01-28-22 10-31-22 ( 0 )75%: 12-18-20 12-29-20 ( 11 ) A/E Cont End: 11-15-2211-15-22 11-15-2311-15-2395-100%: 02-24-21 03-04-21 ( 8 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Saavedra Group Architects, I 20033910 ( 0 ) ( 0 ) 11-15-2311-15-23Master Design Build, LLC 22047381 09-14-21 10-21-21 02-18-22 ( 0 ) 03-20-22 ( 0 ) 03-20-2303-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Saavedra Group Architects, I 20033910 10 128,859.00 59,091.00 1 187,950.00 89,656.04 3 98,293.96 48Master Design Build, LLC 22047381 81 1,518,867.00 .00 0 1,518,867.00 .00 0 1,518,867.00 0***** Contract Totals ********** Contract Totals ***** 1,647,726.00 59,091.00 1 1,706,817.00 89,656.04 3 1,617,160.96 5

Page 425: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 425Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--305305--016016 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Vehicle Exhaust/Replace Roofs, HAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Milan Readiness Center - Rock Island CountyCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 72 - Michael Halpin

Senate:36 - Neil Anderson : CURRENT STATUS 11-01-21 :: :

A/E Id: 27785 : :A/E Name: Kenyon & Associates Architects : :A/E Contact: : :A/E Telephone: (309)674-7121 : :Date Selected: 06-08-21 : :Contract Date: 09-13-21 ________________________________________________________________________________Est. Project Cost: 1,200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 14,859.00 09-09-21 14,859.00 09-09-21 14,859.00 .00 .00 .00

Total 14,859.00 14,859.00 14,859.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Upgrade Vehicle Exhaust/Replace Roofs, HUpgrade Vehicle Exhaust/Replace Roofs, H

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-04-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-30-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 03-30-2403-30-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kenyon & Associates Architec 21042910 ( 0 ) ( 0 ) 03-30-2403-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kenyon & Associates Architec 21042910 10 14,859.00 .00 0 14,859.00 .00 0 14,859.00 0***** Contract Totals ********** Contract Totals ***** 14,859.00 .00 0 14,859.00 .00 0 14,859.00 0

Page 426: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 426Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--310310--008008 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade Mechanical System/Renovate InterAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Crestwood Readiness Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 28 - Robert Rita

Senate:14 - Emil Jones, : CURRENT STATUS 10-27-21 :: :

A/E Id: 29102 : :A/E Name: Milhouse Engineering and Const : :A/E Contact: Joe Zurad : :A/E Telephone: (312)987-0061 : :Date Selected: 11-13-18 : :Contract Date: 11-15-18 ________________________________________________________________________________Est. Project Cost: 3,105,697.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,791,190.99 10-26-21 2,791,190.99 10-26-21 2,014,628.58 1,900,021.82 776,562.41 .00990 650,666.18 07-27-21 173,975.69 02-20-20 303,373.00 173,975.69 347,293.18 .00

Total 3,441,857.17 2,965,166.68 2,318,001.58 2,073,997.51 1,123,855.59 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Upgrade Mechanical System/Renovate InterUpgrade Mechanical System/Renovate Inter

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-07-18 11-07-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-02-19 08-20-21 ( 0 )50%: ( 0 ) Final Accept: 07-31-19 11-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-02-2005-02-20 06-02-2206-02-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Frega Associates, Ltd. 15040410 ( 0 ) ( 0 ) 12-15-1712-15-17Geo. Bancroft Engineering, L 18020910 ( 0 ) ( 0 ) 10-01-2010-01-20Milhouse Engineering and Con 19021110 ( 0 ) ( 0 ) 06-02-2206-02-22Amber Mechanical Contractors 19042884 09-20-18 10-04-18 05-02-19 11-15-20 ( 0 ) 12-30-20 ( 0 ) 10-28-2210-28-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Frega Associates, Ltd. 15040410 10 42,600.00 10,000.00- 0 32,600.00 32,600.00 2 .00 100Geo. Bancroft Engineering, L 18020910 10 140,867.00 .00 0 140,867.00 65,503.16 2 75,363.84 47Milhouse Engineering and Con 19021110 10 80,033.00 49,873.00 4 129,906.00 75,872.53 2 54,033.47 59Amber Mechanical Contractors 19042884 84 1,717,000.00 297,628.58 7 2,014,628.58 1,900,021.82 17 114,606.76 94

Page 427: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 427Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 1,980,500.00 337,501.58 11 2,318,001.58 2,073,997.51 23 244,004.07 90

Page 428: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 428Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--310310--009009 PM NAME: Leonard McGee 331Leonard McGee 331Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade Electrical and Lighting SystemsAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Crestwood Readiness Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 28 - Robert Rita

Senate:14 - Emil Jones, : CURRENT STATUS 10-27-21 :: :

A/E Id: 1892 : :A/E Name: Stanley Consultants, Inc. : :A/E Contact: Majid Zargar : :A/E Telephone: (773)693-9624 : :Date Selected: 02-10-15 : :Contract Date: 04-03-15 ________________________________________________________________________________Est. Project Cost: 1,665,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,201,137.66 11-12-21 1,179,591.03 11-12-21 1,173,134.94 1,003,521.71 6,456.09 .00990 244,077.00 09-08-21 177,809.86 09-03-21 244,077.00 177,809.86 .00 .00

Total 1,445,214.66 1,357,400.89 1,417,211.94 1,181,331.57 6,456.09 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Upgrade Electrical and Lighting SystemsUpgrade Electrical and Lighting Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-05-15 03-05-15 ( 0 ) Assgn Bid: 08-27-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-08-15 05-13-15 ( 5 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-30-16 08-07-19 08-27-19 ( 20 )

Design Devel: 07-31-15 08-18-15 ( 18 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-01-20 ( 0 )50%: ( 0 ) Final Accept: 09-16-20 ( 0 )75%: 12-22-15 01-20-16 ( 29 ) A/E Cont End: 08-13-1808-13-18 02-28-2202-28-2295-100%: 03-31-16 07-23-19 (209 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Stanley Consultants, Inc. 15042010 ( 0 ) ( 0 ) 02-28-2202-28-22Airport Electric Co. 20043085 09-12-19 09-26-19 06-22-20 11-18-20 (149 ) 10-30-21 ( 0 ) 11-15-2111-15-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Stanley Consultants, Inc. 15042010 10 69,111.00 174,966.00 5 244,077.00 177,809.86 21 66,267.14 73Airport Electric Co. 20043085 85 1,094,890.00 78,244.94 9 1,173,134.94 1,003,521.71 12 169,613.23 86***** Contract Totals ********** Contract Totals ***** 1,164,001.00 253,210.94 14 1,417,211.94 1,181,331.57 33 235,880.37 83

Page 429: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 429Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--310310--010010 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing System and Renovate ExteAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Crestwood Readiness Center - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 28 - Robert Rita

Senate:14 - Emil Jones, : CURRENT STATUS 11-01-21 :: :

A/E Id: 20512 : :A/E Name: Bauer Latoza Studio Ltd. : :A/E Contact: : :A/E Telephone: (312)567-1000 : :Date Selected: 06-09-20 : :Contract Date: 07-31-20 ________________________________________________________________________________Est. Project Cost: 5,050,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,993,063.00 09-15-21 2,993,063.00 09-15-21 80,063.00 .00 2,913,000.00 .00990 247,337.00 12-01-20 239,408.36 10-18-21 247,337.00 239,408.36 .00 .00

Total 3,240,400.00 3,232,471.36 327,400.00 239,408.36 2,913,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) .00% Description:Description: Replace Roofing System and Renovate ExteReplace Roofing System and Renovate Exte

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-09-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-21-20 10-01-20 ( 10 ) Prime Bid: 04-30-21 06-08-21 08-18-21 ( 71 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-22 06-30-22 ( 0 )50%: 01-12-21 02-17-21 ( 36 ) Final Accept: 07-01-22 07-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2306-01-23 09-01-2409-01-2495-100%: 03-30-21 07-15-21 (107 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bauer Latoza Studio Ltd. 20025610 ( 0 ) ( 0 ) 09-01-2409-01-24Chicago Heights Construction 22048781 10-01-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bauer Latoza Studio Ltd. 20025610 10 127,738.00 199,662.00 3 327,400.00 239,408.36 4 87,991.64 73Chicago Heights Construction 22048781 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 127,738.00 199,662.00 3 327,400.00 239,408.36 4 87,991.64 73

Page 430: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 430Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--318318--014014 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Rehabilitate Interior/Exterior/ConstructAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Sparta Readiness Center - Randolph CountyCounty: 157 - Randolph ________________________________________________________________________________Leg. Districts: House:116 - David Friess

Senate:58 - Terri Bryant : CURRENT STATUS 10-15-21 :: :

A/E Id: 26859 : :A/E Name: Eggemeyer Associates Architect : :A/E Contact: : :A/E Telephone: (618)988-2380 : :Date Selected: 04-13-21 : :Contract Date: 08-02-21 ________________________________________________________________________________Est. Project Cost: 2,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 76,493.00 07-28-21 76,493.00 07-28-21 76,493.00 32,709.30 .00 .00

Total 76,493.00 76,493.00 76,493.00 32,709.30 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 19.00% Description:Description: Rehabilitate Interior/Exterior/ConstructRehabilitate Interior/Exterior/Construct

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-12-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: 02-25-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 09-22-2509-22-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Eggemeyer Associates Archite 21012810 ( 0 ) ( 0 ) 09-22-2509-22-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Eggemeyer Associates Archite 21012810 10 76,493.00 .00 0 76,493.00 32,709.30 1 43,783.70 43***** Contract Totals ********** Contract Totals ***** 76,493.00 .00 0 76,493.00 32,709.30 1 43,783.70 43

Page 431: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 431Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--077077 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Land AquisitionAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 429,957.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 438,806.24 05-28-21 438,806.24 05-28-21 257,502.00 257,502.00 181,304.24 .00

Total 438,806.24 438,806.24 257,502.00 257,502.00 181,304.24 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Land AquisitionLand Aquisition

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 432: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 432Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--079079 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate Building 2 for Soldier SupportAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 29103 : :A/E Name: SPAAN Tech, Inc. : :A/E Contact: Frank Bressendorf : :A/E Telephone: (312)277-8800 : :Date Selected: 05-14-19 : :Contract Date: 08-28-19 ________________________________________________________________________________Est. Project Cost: 444,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 392,590.29 11-12-21 86,725.57 10-14-21 364,434.23 86,725.57 28,156.06 .00

Total 392,590.29 86,725.57 364,434.23 86,725.57 28,156.06 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 70.00% Description:Description: Renovate Building 2 for Soldier SupportRenovate Building 2 for Soldier Support

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-09-19 ( 0 ) Assgn Bid: 10-14-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-08-19 11-19-19 ( 11 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 181.32 Schem Design: ( 0 ) Prime Bid: 04-30-20 10-28-20 (181 )

Design Devel: 11-08-19 01-07-20 ( 60 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-21 11-30-21 ( 0 )50%: ( 0 ) Final Accept: 05-31-21 01-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 03-31-2203-31-22 11-30-2211-30-2295-100%: 02-14-20 07-20-20 (157 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SPAAN Tech, Inc. 19033010 ( 0 ) ( 0 ) 11-30-2211-30-22Limbaugh Construction Co. In 21046981 02-18-21 04-22-21 07-20-21 11-15-21 ( 0 ) 12-15-21 ( 0 ) 08-20-2208-20-22Henson Robinson Company 21047084 02-18-21 04-22-21 ( 0 ) ( 0 )Capitol Construction Group, 21047185 02-18-21 04-22-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SPAAN Tech, Inc. 19033010 10 37,092.00 38,108.00 1 75,200.00 24,715.99 4 50,484.01 33Limbaugh Construction Co. In 21046981 81 149,300.00 9,333.52 3 158,633.52 47,308.50 1 111,325.02 30Henson Robinson Company 21047084 84 59,490.00 .00 0 59,490.00 7,921.40 1 51,568.60 13Capitol Construction Group, 21047185 85 68,650.00 2,460.71 2 71,110.71 6,779.68 1 64,331.03 10***** Contract Totals ********** Contract Totals ***** 314,532.00 49,902.23 6 364,434.23 86,725.57 7 277,708.66 24

Page 433: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 433Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Page 434: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 434Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--080080 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate AGO BuildingAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: Todd Hannah : :A/E Telephone: (217)522-3355 : :Date Selected: 06-11-19 : :Contract Date: 07-31-19 ________________________________________________________________________________Est. Project Cost: 1,284,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 353,571.91 10-26-21 353,571.91 10-26-21 353,571.91 91,149.90 .00 .00990 857,830.73 10-14-21 816,318.19 10-26-21 857,830.73 816,318.19 .00 .00

Total 1,211,402.64 1,169,890.10 1,211,402.64 907,468.09 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 71.00% Description:Description: Renovate AGO BuildingRenovate AGO Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-22-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-15-19 11-18-19 ( 3 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-25-20 08-19-20 ( 55 )

Design Devel: 11-15-19 11-19-19 ( 4 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-21 ( 0 )50%: 02-07-20 02-21-20 ( 14 ) Final Accept: 11-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2207-01-2295-100%: 04-16-20 06-12-20 ( 57 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 19013910 ( 0 ) ( 0 ) 07-01-2207-01-22Johnco Construction, Inc. 21042381 09-17-20 12-23-20 09-19-21 ( 0 ) 11-18-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 19013910 10 82,358.00 74,267.00 2 156,625.00 115,112.46 5 41,512.54 74Johnco Construction, Inc. 21042381 81 1,058,000.00 3,222.36- 2 1,054,777.64 792,355.63 13 262,422.01 75***** Contract Totals ********** Contract Totals ***** 1,140,358.00 71,044.64 4 1,211,402.64 907,468.09 18 303,934.55 75

Page 435: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 435Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--083083 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair or Replace HVAC SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 28140 : :A/E Name: Fuhrmann Engineering, Inc. : :A/E Contact: Gina Fuhrmann : :A/E Telephone: (217)529-5577 : :Date Selected: 06-09-20 : :Contract Date: 09-10-20 ________________________________________________________________________________Est. Project Cost: 617,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 266,400.00 08-04-21 266,400.00 08-04-21 266,400.00 .00 .00 .00990 69,900.00 08-20-21 42,283.00 10-18-21 69,900.00 42,283.00 .00 .00

Total 336,300.00 308,683.00 336,300.00 42,283.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Repair or Replace HVAC SystemRepair or Replace HVAC System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-23-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-06-20 11-06-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-07-21 07-21-21 ( 14 )

Design Devel: 11-06-20 11-16-20 ( 10 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-31-22 04-29-22 ( 0 )50%: 02-05-21 02-25-21 ( 20 ) Final Accept: 03-31-22 06-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 01-31-2301-31-2395-100%: 04-23-21 04-30-21 ( 7 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Fuhrmann Engineering, Inc. 20034010 ( 0 ) ( 0 ) 01-31-2301-31-23Henson Robinson Company 22044283 08-20-21 09-16-21 03-15-22 ( 0 ) 05-14-22 ( 0 ) 05-14-2305-14-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Fuhrmann Engineering, Inc. 20034010 10 45,383.00 24,517.00 1 69,900.00 42,283.00 2 27,617.00 61Henson Robinson Company 22044283 83 266,400.00 .00 0 266,400.00 .00 0 266,400.00 0***** Contract Totals ********** Contract Totals ***** 311,783.00 24,517.00 1 336,300.00 42,283.00 2 294,017.00 13

Page 436: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 436Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--084084 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-01-21 :: :

A/E Id: 3592 : :A/E Name: Steckel-Parker Architects, Inc : :A/E Contact: : :A/E Telephone: (217)793-6444 : :Date Selected: 07-14-20 : :Contract Date: 09-02-20 ________________________________________________________________________________Est. Project Cost: 1,311,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 753,940.00 06-22-21 753,940.00 06-22-21 753,940.00 .00 .00 .00990 108,200.00 07-16-21 68,819.00 08-20-21 108,200.00 68,819.00 .00 .00

Total 862,140.00 822,759.00 862,140.00 68,819.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 3.00% Description:Description: Replace Roofing SystemReplace Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 11-09-20 11-11-20 ( 2 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-13-21 05-26-21 ( 13 )

Design Devel: 11-09-20 11-23-20 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-17-22 ( 0 )50%: ( 0 ) Final Accept: 04-21-22 ( 0 )75%: ( 0 ) A/E Cont End: 02-17-2302-17-2395-100%: 03-01-21 03-18-21 ( 17 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Steckel-Parker Architects, I 21040310 ( 0 ) ( 0 ) 02-17-2302-17-23Henson Robinson Company 21057981 07-02-21 08-12-21 01-09-22 ( 0 ) 03-10-22 ( 0 ) 03-10-2303-10-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Steckel-Parker Architects, I 21040310 10 70,643.00 37,557.00 1 108,200.00 68,819.00 3 39,381.00 64Henson Robinson Company 21057981 81 753,940.00 .00 0 753,940.00 .00 0 753,940.00 0***** Contract Totals ********** Contract Totals ***** 824,583.00 37,557.00 1 862,140.00 68,819.00 3 793,321.00 8

Page 437: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 437Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--085085 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Mechanical Upgrade - Building #10Agency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 34304 : :A/E Name: Prairie Engineers, P.C. : :A/E Contact: : :A/E Telephone: (217)605-0403 : :Date Selected: 09-15-20 : :Contract Date: 02-10-21 ________________________________________________________________________________Est. Project Cost: 4,259,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 276,145.00 02-08-21 205,113.00 09-03-21 276,145.00 205,113.00 .00 .00

Total 276,145.00 205,113.00 276,145.00 205,113.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 60.00% Description:Description: Mechanical Upgrade - Building #10Mechanical Upgrade - Building #10

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-10-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-07-21 05-13-21 ( 6 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-07-21 05-14-21 ( 7 ) Prime Bid: 02-02-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 08-27-21 08-10-21 ( 17-) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-22-2510-22-2595-100%: 11-19-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Prairie Engineers, P.C. 21041110 ( 0 ) ( 0 ) 10-22-2510-22-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Prairie Engineers, P.C. 21041110 10 276,145.00 .00 0 276,145.00 205,113.00 4 71,032.00 74***** Contract Totals ********** Contract Totals ***** 276,145.00 .00 0 276,145.00 205,113.00 4 71,032.00 74

Page 438: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 438Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--086086 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Resurface POV Parking Lot Around BuildinAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 32353 : :A/E Name: Kuhn & Trello Consulting Engin : :A/E Contact: : :A/E Telephone: (217)679-0044 : :Date Selected: 02-09-21 : :Contract Date: 03-18-21 ________________________________________________________________________________Est. Project Cost: 1,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 94,421.00 07-20-22 48,638.13 09-21-21 94,421.00 48,638.13 .00 .00

Total 94,421.00 48,638.13 94,421.00 48,638.13 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Resurface POV Parking Lot Around BuildinResurface POV Parking Lot Around Buildin

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-03-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-17-21 05-26-21 ( 9 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-28-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-22-2410-22-2495-100%: 11-15-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kuhn & Trello Consulting Eng 21042110 ( 0 ) ( 0 ) 10-22-2410-22-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kuhn & Trello Consulting Eng 21042110 10 22,461.00 71,960.00 1 94,421.00 48,638.13 3 45,782.87 52***** Contract Totals ********** Contract Totals ***** 22,461.00 71,960.00 1 94,421.00 48,638.13 3 45,782.87 52

Page 439: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 439Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--087087 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Paint Stripping System in AlliedAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 29611 : :A/E Name: Henneman Engineering Inc. : :A/E Contact: : :A/E Telephone: (217)359-1514 : :Date Selected: 04-13-21 : :Contract Date: 08-10-21 ________________________________________________________________________________Est. Project Cost: 750,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 54,984.00 08-06-21 .00 54,984.00 .00 .00 .00

Total 54,984.00 .00 54,984.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 24.00% Description:Description: Replace Paint Stripping System in AlliedReplace Paint Stripping System in Allied

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-04-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-05-21 11-05-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-15-22 ( 0 )

Design Devel: 11-05-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 02-11-22 ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 05-31-2405-31-2495-100%: 05-06-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Henneman Engineering Inc. 21042510 ( 0 ) ( 0 ) 05-31-2405-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Henneman Engineering Inc. 21042510 10 54,984.00 .00 0 54,984.00 .00 0 54,984.00 0***** Contract Totals ********** Contract Totals ***** 54,984.00 .00 0 54,984.00 .00 0 54,984.00 0

Page 440: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 440Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--089089 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Construct Storage BuildingAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-08-21 :: :

A/E Id: 3592 : :A/E Name: Steckel-Parker Architects, Inc : :A/E Contact: : :A/E Telephone: (217)793-6444 : :Date Selected: 06-08-21 : :Contract Date: 08-11-21 ________________________________________________________________________________Est. Project Cost: 1,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 62,326.00 08-10-21 .00 62,326.00 .00 .00 .00

Total 62,326.00 .00 62,326.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Construct Storage BuildingConstruct Storage Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-08-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-27-21 11-12-21 ( 16 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-01-22 ( 0 )

Design Devel: 10-27-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-31-23 ( 0 )50%: 01-12-22 ( 0 ) Final Accept: 09-29-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2407-31-2495-100%: 03-23-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Steckel-Parker Architects, I 22030210 ( 0 ) ( 0 ) 07-31-2407-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Steckel-Parker Architects, I 22030210 10 62,326.00 .00 0 62,326.00 .00 0 62,326.00 0***** Contract Totals ********** Contract Totals ***** 62,326.00 .00 0 62,326.00 .00 0 62,326.00 0

Page 441: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 441Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--325325--090090 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace HVAC Systems - Adjutant GeneralAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Camp Lincoln, Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 33160 : :A/E Name: BRiC Partnership, LLC : :A/E Contact: : :A/E Telephone: (217)679-0827 : :Date Selected: 07-13-21 : :Contract Date: 09-16-21 ________________________________________________________________________________Est. Project Cost: 9,278,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 263,880.00 09-17-21 131,940.00 09-17-21 131,940.00 .00 .00 .00

Total 263,880.00 131,940.00 131,940.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 13.00% Description:Description: Replace HVAC Systems - Adjutant GeneralReplace HVAC Systems - Adjutant General

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-16-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-01-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-28-22 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 03-30-2603-30-2695-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BRiC Partnership, LLC 22040110 ( 0 ) ( 0 ) 03-30-2603-30-26

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BRiC Partnership, LLC 22040110 10 131,940.00 .00 0 131,940.00 .00 0 131,940.00 0***** Contract Totals ********** Contract Totals ***** 131,940.00 .00 0 131,940.00 .00 0 131,940.00 0

Page 442: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 442Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--345345--014014 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade Plumbing System and Renovate KitAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Sullivan Armory - Moultrie CountyCounty: 139 - Moultrie ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS 11-01-21 :: :

A/E Id: 34304 : :A/E Name: Prairie Engineers, P.C. : :A/E Contact: G. Whitlow : :A/E Telephone: (217)605-0403 : :Date Selected: 12-11-18 : :Contract Date: 04-11-19 ________________________________________________________________________________Est. Project Cost: 2,633,777.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,141,560.34 10-26-21 2,141,560.34 10-26-21 2,139,094.01 2,041,372.75 2,466.33 .00990 288,440.15 03-30-21 184,064.51 05-25-21 216,769.00 184,064.21 71,671.15 .00

Total 2,430,000.49 2,325,624.85 2,355,863.01 2,225,436.96 74,137.48 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Upgrade Plumbing System and Renovate KitUpgrade Plumbing System and Renovate Kit

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-23-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 06-20-19 06-20-19 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-07-19 12-12-19 ( 35 )

Design Devel: 06-20-19 06-20-19 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-20 ( 0 )50%: ( 0 ) Final Accept: 01-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2111-30-2195-100%: 09-12-19 09-17-19 ( 5 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Prairie Engineers, P.C. 19030510 ( 0 ) ( 0 ) 11-30-2111-30-21Johnco Construction, Inc. 20047381 01-27-20 02-18-20 08-16-20 04-01-21 (228 ) 10-15-20 ( 0 ) 04-15-2104-15-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Prairie Engineers, P.C. 19030510 10 106,317.00 110,452.00 2 216,769.00 184,064.21 15 32,704.79 85Johnco Construction, Inc. 20047381 81 3,965,600.00 1,826,505.99- 18 2,139,094.01 2,041,372.75 15 97,721.26 96***** Contract Totals ********** Contract Totals ***** 4,071,917.00 1,716,053.99- 20 2,355,863.01 2,225,436.96 30 130,426.05 95

Page 443: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 443Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--350350--010010 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Sycamore Armory - DeKalb CountyCounty: 37 - DeKalb ________________________________________________________________________________Leg. Districts: House: 70 - Jeff Keicher

Senate:35 - Dave Syverson : CURRENT STATUS 11-02-21 :: :

A/E Id: 29890 : :A/E Name: Mode Architects, P.C. : :A/E Contact: Michael McAtee : :A/E Telephone: (312)475-9918 : :Date Selected: 06-09-20 : :Contract Date: 08-11-20 ________________________________________________________________________________Est. Project Cost: 36,289.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 498,000.00 06-08-21 498,000.00 06-08-21 498,000.00 .00 .00 .00990 74,400.00 07-27-21 36,061.00 05-25-21 74,400.00 36,061.00 .00 .00

Total 572,400.00 534,061.00 572,400.00 36,061.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Replace Roofing SystemReplace Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-14-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-14-20 09-15-20 ( 1 ) Prime Bid: 03-12-21 04-14-21 ( 33 )

Design Devel: 11-02-20 11-03-20 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-21 12-29-21 ( 0 )50%: ( 0 ) Final Accept: 10-28-21 02-28-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2209-30-22 02-28-2402-28-2495-100%: 12-28-20 01-06-21 ( 9 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Mode Architects, P.C. 20025710 ( 0 ) ( 0 ) 02-28-2402-28-24Premier Contractors,Inc. 21057081 06-21-21 11-04-21 03-04-22 ( 0 ) 05-03-22 ( 0 ) 05-03-2305-03-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Mode Architects, P.C. 20025710 10 38,111.00 36,289.00 1 74,400.00 36,061.00 2 38,339.00 49Premier Contractors,Inc. 21057081 81 498,000.00 .00 0 498,000.00 .00 0 498,000.00 0***** Contract Totals ********** Contract Totals ***** 536,111.00 36,289.00 1 572,400.00 36,061.00 2 536,339.00 6

Page 444: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 444Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--355355--021021 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct Parking LotAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Urbana Readiness Center, Champaign CountyCounty: 19 - Champaign ________________________________________________________________________________Leg. Districts: House:103 - Carol Ammons

Senate:52 - Scott Bennett : CURRENT STATUS 10-27-21 :: :

A/E Id: 3473 : :A/E Name: Rubinos and Mesia Engineers, I : :A/E Contact: Andrew Wynn : :A/E Telephone: (312)870-6600 : :Date Selected: 03-12-19 : :Contract Date: 07-23-19 ________________________________________________________________________________Est. Project Cost: 820,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 561,088.00 09-01-20 475,855.03 08-20-21 529,300.00 475,855.03 31,788.00 .00

Total 561,088.00 475,855.03 529,300.00 475,855.03 31,788.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Construct Parking LotConstruct Parking Lot

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-22-19 05-22-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-20-20 07-22-20 ( 93 )

Design Devel: 09-23-19 09-24-19 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-30-20 08-30-21 ( 0 )50%: 12-16-19 12-19-19 ( 3 ) Final Accept: 09-30-20 09-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-30-2108-30-21 08-30-2208-30-2295-100%: 02-24-20 02-27-20 ( 3 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Rubinos and Mesia Engineers, 19002810 ( 0 ) ( 0 ) 08-30-2208-30-22Grunloh Construction, Inc. 21042081 09-09-20 01-08-21 04-08-21 06-20-21 06-09-21 ( 62 ) 07-30-21 09-27-21 ( 59 ) 07-30-2207-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Rubinos and Mesia Engineers, 19002810 10 67,088.00 38,212.00 1 105,300.00 72,357.43 4 32,942.57 69Grunloh Construction, Inc. 21042081 81 424,000.00 .00 1 424,000.00 403,497.60 2 20,502.40 95***** Contract Totals ********** Contract Totals ***** 491,088.00 38,212.00 2 529,300.00 475,855.03 6 53,444.97 90

Page 445: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 445Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--355355--022022 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Renovate Basement to Support Unit StatioAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Urbana Readiness Center, Champaign CountyCounty: 19 - Champaign ________________________________________________________________________________Leg. Districts: House:103 - Carol Ammons

Senate:52 - Scott Bennett : CURRENT STATUS 10-27-21 :: :

A/E Id: 34765 : :A/E Name: JP Architects, Ltd. : :A/E Contact: : :A/E Telephone: (708)907-3651 : :Date Selected: 09-15-20 : :Contract Date: 11-24-20 ________________________________________________________________________________Est. Project Cost: 1,800,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 114,929.00 05-12-21 .00 114,929.00 .00 .00 .00

Total 114,929.00 .00 114,929.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Renovate Basement to Support Unit StatioRenovate Basement to Support Unit Statio

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-27-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-31-20 02-02-21 ( 33 ) Prime Bid: 01-03-22 ( 0 )

Design Devel: 06-18-21 07-07-21 ( 19 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: 08-06-21 10-13-21 ( 68 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-2295-100%: 09-24-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

JP Architects, Ltd. 21001010 ( 0 ) ( 0 ) 12-31-2212-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

JP Architects, Ltd. 21001010 10 38,480.00 76,449.00 1 114,929.00 .00 0 114,929.00 0***** Contract Totals ********** Contract Totals ***** 38,480.00 76,449.00 1 114,929.00 .00 0 114,929.00 0

Page 446: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 446Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--370370--014014 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Armory RoofAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: West Frankfort Armory - Franklin CountyCounty: 55 - Franklin ________________________________________________________________________________Leg. Districts: House:117 - Dave Severin

Senate:59 - Dale Fowler : CURRENT STATUS 11-01-21 :: :

A/E Id: 4424 : :A/E Name: White & Borgognoni Architects, : :A/E Contact: Bryan Cobin : :A/E Telephone: (618)529-3691 : :Date Selected: 05-14-19 : :Contract Date: 07-23-19 ________________________________________________________________________________Est. Project Cost: 1,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 215,975.00 06-01-20 215,975.00 06-01-20 215,975.00 195,250.80 .00 .00990 87,300.00 08-07-20 68,680.22 01-16-21 87,300.00 68,680.22 .00 .00

Total 303,275.00 284,655.22 303,275.00 263,931.02 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Replace Armory RoofReplace Armory Roof

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-01-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 08-21-19 09-17-19 ( 27 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-19-19 03-05-20 ( 77 )

Design Devel: 08-21-19 09-17-19 ( 27 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-30-20 ( 0 )50%: ( 0 ) Final Accept: 10-15-20 ( 0 )75%: ( 0 ) A/E Cont End: 07-17-2107-17-21 02-28-2202-28-2295-100%: 10-16-19 10-17-19 ( 1 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

White & Borgognoni Architect 19013710 ( 0 ) ( 0 ) 02-28-2202-28-22Geissler Roofing Co., Inc. 21040481 07-09-20 08-20-20 12-23-20 03-08-21 03-08-21 ( 75 ) 04-07-21 ( 0 ) 01-22-2201-22-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

White & Borgognoni Architect 19013710 10 56,226.00 31,074.00 2 87,300.00 68,680.22 4 18,619.78 79Geissler Roofing Co., Inc. 21040481 81 215,975.00 .00 1 215,975.00 195,250.80 3 20,724.20 91***** Contract Totals ********** Contract Totals ***** 272,201.00 31,074.00 3 303,275.00 263,931.02 7 39,343.98 87

Page 447: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 447Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--385385--037037 PM NAME: Tim Dietz 260Tim Dietz 260Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct Automated Record Fire RangeAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Marseilles Readiness Center - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 11-01-21 :: :

A/E Id: 28730 : :A/E Name: DLZ Illinois, Inc. : :A/E Contact: Stephen Kromkowski : :A/E Telephone: (773)283-2600 : :Date Selected: 05-08-18 : :Contract Date: 09-13-18 ________________________________________________________________________________Est. Project Cost: 5,033,788.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 5,035,730.68 10-18-21 4,525,894.34 10-26-21 5,001,780.17 4,525,894.34 33,950.51 .00

Total 5,035,730.68 4,525,894.34 5,001,780.17 4,525,894.34 33,950.51 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Construct Automated Record Fire RangeConstruct Automated Record Fire Range

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-30-18 05-30-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 6,629.55 Schem Design: ( 0 ) Prime Bid: 04-09-19 08-29-19 08-29-19 ( 0 )

Design Devel: 11-30-18 01-09-19 ( 40 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-23-20 10-31-20 ( 0 )50%: 04-26-19 05-07-19 ( 11 ) Final Accept: 08-18-20 12-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-23-2106-23-21 11-01-2211-01-2295-100%: 07-05-19 06-26-19 ( 9-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DLZ Illinois, Inc. 18021710 ( 0 ) ( 0 ) 11-01-2211-01-22Vissering Construction Compa 20043841 09-23-19 10-16-19 10-15-20 01-07-21 ( 84 ) 12-14-20 ( 0 ) 12-14-2112-14-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DLZ Illinois, Inc. 18021710 10 179,434.00 272,066.00 3 451,500.00 376,321.79 12 75,178.21 83Vissering Construction Compa 20043841 41 3,461,000.00 1,089,280.17 10 4,550,280.17 4,149,572.55 21 400,707.62 91***** Contract Totals ********** Contract Totals ***** 3,640,434.00 1,361,346.17 13 5,001,780.17 4,525,894.34 33 475,885.83 91

Page 448: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 448Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 546546--385385--058058 PM NAME: Medeny Guy 511Medeny Guy 511Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct Addition and Renovate FacilityAgency: Department of Military Affairs Analyst: Michelette ThompsonLocation: Marseilles Readiness Center - LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 11-01-21 :: :

A/E Id: 29890 : :A/E Name: Mode Architects, P.C. : :A/E Contact: James Mo : :A/E Telephone: (312)475-9918 : :Date Selected: 04-13-21 : :Contract Date: 05-13-21 ________________________________________________________________________________Est. Project Cost: 2,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 62,140.00 05-12-21 62,140.00 05-12-21 62,140.00 57,640.00 .00 .00

Total 62,140.00 62,140.00 62,140.00 57,640.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 15.00% Description:Description: Construct Addition and Renovate FacilityConstruct Addition and Renovate Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-27-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-09-21 08-19-21 ( 10 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2306-30-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Mode Architects, P.C. 21002310 ( 0 ) ( 0 ) 06-30-2306-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Mode Architects, P.C. 21002310 10 62,140.00 .00 1 62,140.00 57,640.00 1 4,500.00 93***** Contract Totals ********** Contract Totals ***** 62,140.00 .00 1 62,140.00 57,640.00 1 4,500.00 93

Page 449: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 449Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 573573--000000--001001 PM NAME: Michelette MISSING 0Michelette MISSING 0Project Status: AP Active Project Region:Project Type: GR Monetary Grants/Reimbursements PLA: NDescription: Community Health Center Grant Lump SumAgency: Department of Public Health Analyst: Stan GralnickLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 47,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 59,892,815.80 04-27-20 9,892,815.80 04-27-20 2,000,000.00 2,000,000.00 6,719.80 7,886,096.00

Total 59,892,815.80 9,892,815.80 2,000,000.00 2,000,000.00 6,719.80 7,886,096.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Community Health Center GrantsCommunity Health Center Grants

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 450: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 450Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--000000--004004 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Plan and Begin - Upgrade SecurityAgency: Department of Revenue Analyst: Amber EvansLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 08-10-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,000,000.00 08-16-21 2,000,000.00 08-16-21 .00 .00 2,000,000.00 .00

Total 2,000,000.00 2,000,000.00 .00 .00 2,000,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Plan and Begin - Upgrade SecurityPlan and Begin - Upgrade Security

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 22010810 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 22010810 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 451: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 451Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--031031 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair Parking RampAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 20897 : :A/E Name: DESMAN, Inc. : :A/E Contact: Bob Tober : :A/E Telephone: (312)263-8400 : :Date Selected: 05-11-10 : :Contract Date: 12-17-10 ________________________________________________________________________________Est. Project Cost: 2,544,124.65

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,544,124.65 03-11-15 2,544,124.65 03-11-15 2,544,124.65 2,544,124.65 .00 .00

Total 2,544,124.65 2,544,124.65 2,544,124.65 2,544,124.65 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Repair Parking RampRepair Parking Ramp

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-07-11 06-07-11 (151 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-12-11 06-20-12 (374 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-29-11 ( 0 )50%: 02-17-11 06-07-11 (110 ) Final Accept: 03-17-12 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-1312-01-1395-100%: 04-15-11 02-22-12 (313 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DESMAN, Inc. 11020210 ( 0 ) ( 0 ) 12-01-1312-01-13Western Waterproofing Compan 13043681 09-11-12 10-04-12 03-03-13 06-24-13 (113 ) 04-02-13 02-14-14 (318 ) 04-02-1404-02-14EEI Holding Corporation 13043785 09-11-12 10-04-12 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DESMAN, Inc. 11020210 10 227,400.00 31,786.35- 0 195,613.65 195,613.65 6 .00 100Western Waterproofing Compan 13043681 81 2,245,419.00 88,753.00 2 2,334,172.00 2,334,172.00 7 .00 100EEI Holding Corporation 13043785 85 21,200.00 11,794.00- 0 9,406.00 9,406.00 2 .00 100***** Contract Totals ********** Contract Totals ***** 2,494,019.00 45,172.65 2 2,539,191.65 2,539,191.65 15 .00 100

Page 452: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 452Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--035035 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: IG Intergovernmental Agreement PLA: NDescription: Upgrade WIB SecurityAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 3,195,998.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,615,971.71 04-04-19 6,615,971.71 04-04-19 3,605,590.47 3,423,287.51 897,010.48 2,113,370.76

Total 6,615,971.71 6,615,971.71 3,605,590.47 3,423,287.51 897,010.48 2,113,370.76____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 100.00% Description:Description: Upgrade WIB SecurityUpgrade WIB Security

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 453: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 453Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--036036 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade HVAC SystemsAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 28732 : :A/E Name: BRiC Partnership, LLC : :A/E Contact: Tom Buchheit : :A/E Telephone: (618)277-5200 : :Date Selected: 01-14-14 : :Contract Date: 03-31-14 ________________________________________________________________________________Est. Project Cost: 5,687,256.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,772,268.00 03-25-19 3,772,268.00 03-25-19 2,432,285.45 2,264,455.23 1,211,442.55 128,540.00

Total 3,772,268.00 3,772,268.00 2,432,285.45 2,264,455.23 1,211,442.55 128,540.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Upgrade HVAC SystemsUpgrade HVAC Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-20-14 ( 0 ) Assgn Bid: 06-06-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 7,474.50 Schem Design: 06-02-14 06-17-14 ( 15 ) Prime Bid: 05-02-15 01-24-19 06-13-19 (140 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-02-16 03-24-20 ( 0 )50%: 10-02-14 11-17-14 ( 46 ) Final Accept: 10-02-16 05-24-20 ( 0 )75%: ( 0 ) A/E Cont End: 08-02-1708-02-17 07-21-2207-21-2295-100%: 11-29-18 12-10-18 ( 11 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BRiC Partnership, LLC 14011010 ( 0 ) ( 0 ) 07-21-2207-21-22Henson Robinson Company 20040883 07-25-19 08-23-19 08-22-20 04-22-21 ( 0 ) 06-21-21 ( 0 ) 06-21-2206-21-22Henson Robinson Company 20040984 07-25-19 08-23-19 08-22-20 04-22-21 ( 0 ) 06-21-21 ( 0 ) 06-21-2206-21-22Anderson Electric Inc. 20041085 07-25-19 08-23-19 08-22-20 04-22-21 07-19-21 (331 ) 06-21-21 ( 0 ) 06-21-2206-21-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BRiC Partnership, LLC 14011010 10 254,000.00 39,728.00 2 293,728.00 237,237.94 34 56,490.06 81Henson Robinson Company INT7203 00 440.85 .00 0 440.85 440.85 1 .00 100Henson Robinson Company 20040883 83 782,000.00 283,624.96 12 1,065,624.96 1,002,542.99 17 63,081.97 94Henson Robinson Company 20040984 84 673,450.00 13,488.18 2 686,938.18 638,679.99 14 48,258.19 93Anderson Electric Inc. 20041085 85 379,800.00 5,753.46 4 385,553.46 385,553.46 11 .00 100

Page 454: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 454Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 2,089,690.85 342,594.60 20 2,432,285.45 2,264,455.23 77 167,830.22 93

Page 455: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 455Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--038038 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate Parking StructureAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 19019 : :A/E Name: Construction Technology Labora : :A/E Contact: John Vincent : :A/E Telephone: (847)965-7500 : :Date Selected: 06-09-15 : :Contract Date: 02-01-19 ________________________________________________________________________________Est. Project Cost: 6,674,544.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,921,419.35 09-27-21 6,921,419.35 09-27-21 6,575,343.50 2,761,553.97 99,200.50 246,875.35

Total 6,921,419.35 6,921,419.35 6,575,343.50 2,761,553.97 99,200.50 246,875.35____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 35.00% Description:Description: Renovate Parking StructureRenovate Parking Structure

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-10-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-26-20 10-28-20 (216 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-21 03-31-22 ( 0 )50%: 10-04-19 10-10-19 ( 6 ) Final Accept: 01-30-22 05-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2112-01-21 09-14-2409-14-2495-100%: 01-17-20 03-12-20 ( 55 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Construction Technology Labo 16000210 ( 0 ) ( 0 ) 09-14-2409-14-24Western Waterproofing Compan 21050581 04-26-21 05-13-21 03-09-22 ( 0 ) 04-08-22 ( 0 ) 04-08-2304-08-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Construction Technology Labo 16000210 10 119,150.00 575,600.00 3 694,750.00 512,388.11 8 182,361.89 74Western Waterproofing Compan 21050581 81 5,278,886.00 601,707.50 2 5,880,593.50 2,249,165.86 8 3,631,427.64 38***** Contract Totals ********** Contract Totals ***** 5,398,036.00 1,177,307.50 5 6,575,343.50 2,761,553.97 16 3,813,789.53 42

Page 456: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 456Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--039039 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Evaluate To Correct Water InfiltrationAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 29893 : :A/E Name: Goettsch Partners, Inc. : :A/E Contact: Patrick Loughran : :A/E Telephone: (312)356-0600 : :Date Selected: 02-13-18 : :Contract Date: 06-01-18 ________________________________________________________________________________Est. Project Cost: 43,772.75

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 43,772.75 04-04-19 43,772.75 04-04-19 43,772.75 43,772.75 .00 .00

Total 43,772.75 43,772.75 43,772.75 43,772.75 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Evaluate To Correct Water InfiltrationEvaluate To Correct Water Infiltration

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-08-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 05-31-1905-31-1995-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Goettsch Partners, Inc. 18001410 ( 0 ) ( 0 ) 05-31-1905-31-19

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Goettsch Partners, Inc. 18001410 10 24,999.00 749.00 1 25,748.00 25,748.00 2 .00 100Bacon & Van Buskirk Glass Co 6831 80 8,424.75 .00 0 8,424.75 8,424.75 1 .00 100UL LLC 6840 80 9,600.00 .00 0 9,600.00 9,600.00 1 .00 100***** Contract Totals ********** Contract Totals ***** 43,023.75 749.00 1 43,772.75 43,772.75 4 .00 100

Page 457: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 457Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--041041 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Fire Sprinkler SystemAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 34382 : :A/E Name: Webb Engineering Services, Inc : :A/E Contact: : :A/E Telephone: (217)355-9064 : :Date Selected: 09-10-19 : :Contract Date: 12-13-19 ________________________________________________________________________________Est. Project Cost: 8,792,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,792,600.00 09-17-19 8,792,600.00 09-17-19 71,867.00 69,361.00 8,720,733.00 .00

Total 8,792,600.00 8,792,600.00 71,867.00 69,361.00 8,720,733.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 30.00% Description:Description: Replace Fire Sprinkler SystemReplace Fire Sprinkler System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-16-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-01-20 03-31-21 (364 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-15-2312-15-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Webb Engineering Services, I 20012210 ( 0 ) ( 0 ) 12-15-2312-15-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Webb Engineering Services, I 20012210 10 67,467.00 4,400.00 1 71,867.00 69,361.00 4 2,506.00 97***** Contract Totals ********** Contract Totals ***** 67,467.00 4,400.00 1 71,867.00 69,361.00 4 2,506.00 97

Page 458: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 458Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--042042 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: PLA: NDescription: Repair/Waterproof Sub-Surface Loading DoAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 30091 : :A/E Name: Fehr-Graham & Associates LLC : :A/E Contact: : :A/E Telephone: (217)544-8477 : :Date Selected: 10-08-19 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 3,532,100.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,532,100.00 12-11-19 3,532,100.00 12-11-19 .00 .00 3,532,100.00 .00

Total 3,532,100.00 3,532,100.00 .00 .00 3,532,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 2.00% Description:Description: Repair/Waterproof Sub-Surface Loading DoRepair/Waterproof Sub-Surface Loading Do

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Fehr-Graham & Associates LLC 20012610 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Fehr-Graham & Associates LLC 20012610 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 459: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 459Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 624624--060060--043043 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Correct Water InfiltrationAgency: Department of Revenue Analyst: Amber EvansLocation: Revenue Building (Willard Ice Building) - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 29944 : :A/E Name: Specialty Consulting, Inc. : :A/E Contact: : :A/E Telephone: (847)331-5233 : :Date Selected: 05-12-20 : :Contract Date: 08-27-20 ________________________________________________________________________________Est. Project Cost: 2,085,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,085,500.00 09-09-19 2,085,500.00 09-09-19 361,088.00 206,565.24 1,724,412.00 .00

Total 2,085,500.00 2,085,500.00 361,088.00 206,565.24 1,724,412.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Correct Water InfiltrationCorrect Water Infiltration

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-16-20 06-16-20 ( 0 ) Assgn Bid: 11-10-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-22-20 02-05-21 ( 45 ) Prime Bid: 05-03-21 07-30-21 ( 0 )

Design Devel: 02-22-21 04-12-21 ( 49 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-01-21 01-31-22 ( 0 )50%: 04-12-21 04-13-21 ( 1 ) Final Accept: 11-30-21 02-28-22 ( 0 )75%: ( 0 ) A/E Cont End: 11-01-2211-01-22 01-31-2301-31-2395-100%: 05-24-21 08-02-21 ( 70 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Specialty Consulting, Inc. 20004110 ( 0 ) ( 0 ) 01-31-2301-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Specialty Consulting, Inc. 20004110 10 349,818.00 11,270.00 1 361,088.00 206,565.24 5 154,522.76 57***** Contract Totals ********** Contract Totals ***** 349,818.00 11,270.00 1 361,088.00 206,565.24 5 154,522.76 57

Page 460: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 460Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--176176 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Provide Power GeneratorsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 31076 : :A/E Name: #9 Design, LLC : :A/E Contact: John Cronin : :A/E Telephone: (630)279-9990 : :Date Selected: 09-11-12 : :Contract Date: 04-18-13 ________________________________________________________________________________Est. Project Cost: 1,330,795.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,330,794.60 06-10-20 1,330,794.60 06-10-20 1,303,537.62 1,184,530.10 27,256.98 .00

Total 1,330,794.60 1,330,794.60 1,303,537.62 1,184,530.10 27,256.98 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Provide Power GeneratorsProvide Power Generators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-11-13 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 07-01-13 07-08-13 ( 7 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-09-13 12-01-16 ( 88 )

Design Devel: 07-01-13 07-08-13 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-14 ( 0 )50%: ( 0 ) Final Accept: 11-03-14 ( 0 )75%: ( 0 ) A/E Cont End: 02-15-1602-15-16 04-30-2204-30-2295-100%: 09-23-13 07-08-16 ( 19 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

#9 Design, LLC 13021010 ( 0 ) ( 0 ) 04-30-2204-30-22Pals Electric, Inc. 17043585 02-09-17 03-08-17 12-03-17 02-27-20 (816 ) 01-02-18 ( 0 ) 03-31-2203-31-22Grunloh Construction, Inc. 17043681 02-09-17 03-08-17 12-03-17 10-30-17 ( 34-) 01-02-18 06-22-18 (171 ) 01-02-1901-02-19

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

#9 Design, LLC 13021010 10 139,736.00 33,142.00- 9 106,594.00 87,818.00 4 18,776.00 82Pals Electric, Inc. 17043585 85 792,807.38 56,009.20 7 848,816.58 748,585.06 6 100,231.52 88Grunloh Construction, Inc. 17043681 81 343,000.00 5,127.04 1 348,127.04 348,127.04 6 .00 100***** Contract Totals ********** Contract Totals ***** 1,275,543.38 27,994.24 17 1,303,537.62 1,184,530.10 16 119,007.52 91

Page 461: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 461Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--208208 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Various Improvements - District 8Agency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 22909 : :A/E Name: AAIC, inc. : :A/E Contact: Erin Morris : :A/E Telephone: (618)345-1270 : :Date Selected: 10-11-16 : :Contract Date: 03-07-17 ________________________________________________________________________________Est. Project Cost: 1,862,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,862,500.00 11-13-19 1,862,500.00 11-13-19 1,844,004.23 1,792,395.95 18,495.77 .00

Total 1,862,500.00 1,862,500.00 1,844,004.23 1,792,395.95 18,495.77 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Various Improvements - District 8Various Improvements - District 8

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-31-16 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-19-17 05-09-17 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-14-17 06-14-18 10-31-19 (504 )

Design Devel: 04-19-17 05-09-17 ( 20 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-01-18 07-28-19 ( 0 )50%: ( 0 ) Final Accept: 12-31-18 09-28-19 ( 0 )75%: ( 0 ) A/E Cont End: 12-18-1912-18-19 03-01-2303-01-2395-100%: 04-09-18 09-04-19 (513 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

AAIC, inc. 17010210 ( 0 ) ( 0 ) 03-01-2303-01-23R & W Builders, Inc. 20046081 11-22-19 01-06-20 12-31-20 ( 0 ) 03-01-21 ( 0 ) 03-01-2203-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

AAIC, inc. 17010210 10 150,669.00 29,214.00- 3 121,455.00 116,779.50 24 4,675.50 96R & W Builders, Inc. 20046081 81 1,657,748.00 64,801.23 16 1,722,549.23 1,675,616.45 15 46,932.78 97***** Contract Totals ********** Contract Totals ***** 1,808,417.00 35,587.23 19 1,844,004.23 1,792,395.95 39 51,608.28 97

Page 462: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 462Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--212212 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-21-19 :: :

A/E Id: 29338 : :A/E Name: Knight E/A, Inc. : :A/E Contact: Ninette Paradiso : :A/E Telephone: (312)577-3300 : :Date Selected: 11-15-16 : :Contract Date: 01-19-17 ________________________________________________________________________________Est. Project Cost: 4,652,222.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 4,652,220.49 06-09-21 4,652,220.49 06-09-21 4,652,220.49 4,609,819.19 .00 .00

Total 4,652,220.49 4,652,220.49 4,652,220.49 4,609,819.19 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 100.00% Description:Description: Joliet Bridge HousesJoliet Bridge Houses

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-28-16 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 12-12-18 ( 0 )CORC Assessment Amt: .00 Schem Design: 05-02-17 05-02-17 ( 0 ) Prime Bid: 02-27-18 02-01-18 05-03-18 ( 91 )

Design Devel: ( 0 ) Prime Re-Bid: 01-24-19 ( 0 )25%: ( 0 ) Subst Compl: 06-30-19 09-28-18 ( 0 )50%: 08-08-17 10-23-17 ( 76 ) Final Accept: 08-15-19 10-26-18 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2006-30-20 06-30-2206-30-2295-100%: 11-14-17 01-30-18 ( 77 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Knight E/A, Inc. 17020910 ( 0 ) ( 0 ) 06-30-2206-30-22Tri-State Enterprises, Inc. 19047381 02-27-19 03-25-19 09-21-19 09-26-19 ( 5 ) 11-20-19 10-16-19 ( 35-) 11-19-2011-19-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Knight E/A, Inc. 17020910 10 232,839.20 89,960.80 5 322,800.00 285,398.72 6 37,401.28 89Tri-State Enterprises, Inc. 19047381 81 1,151,922.00 92,136.00- 0 1,059,786.00 1,059,786.00 4 .00 100***** Contract Totals ********** Contract Totals ***** 1,384,761.20 2,175.20- 5 1,382,586.00 1,345,184.72 10 37,401.28 97

Page 463: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 463Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--212212 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 29338 : :A/E Name: Knight E/A, Inc. : :A/E Contact: Ninette Paradiso : :A/E Telephone: (312)577-3300 : :Date Selected: : :Contract Date: 01-19-17 ________________________________________________________________________________Est. Project Cost: 4,652,222.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 4,652,220.49 06-09-21 4,652,220.49 06-09-21 4,652,220.49 4,609,819.19 .00 .00

Total 4,652,220.49 4,652,220.49 4,652,220.49 4,609,819.19 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (X ) 100.00% Description:Description: Dan Ryan Field OfficeDan Ryan Field Office

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-02-17 05-02-17 ( 0 ) Prime Bid: 03-01-18 11-15-18 (259 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-02-19 ( 0 )50%: 10-23-17 01-17-18 ( 86 ) Final Accept: 09-13-19 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2006-30-20 06-30-2206-30-2295-100%: 12-14-17 07-23-18 (221 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

The George Sollitt Construct 19045841 01-04-19 01-28-19 09-25-19 01-29-20 (126 ) 11-24-19 ( 0 ) 10-31-2110-31-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

The George Sollitt Construct 19045841 41 3,006,855.37 262,779.12 16 3,269,634.49 3,264,634.47 11 5,000.02 100***** Contract Totals ********** Contract Totals ***** 3,006,855.37 262,779.12 16 3,269,634.49 3,264,634.47 11 5,000.02 100

Page 464: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 464Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--224224 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 30134 : :A/E Name: Baranski Hammer & Associates, : :A/E Contact: Doug Muller : :A/E Telephone: (312)337-1960 : :Date Selected: 07-11-17 : :Contract Date: 10-26-17 ________________________________________________________________________________Est. Project Cost: 1,366,815.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,366,814.48 06-23-21 1,366,814.48 06-23-21 1,366,814.48 1,034,122.10 .00 .00

Total 1,366,814.48 1,366,814.48 1,366,814.48 1,034,122.10 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Various ImprovementsVarious Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-10-17 08-10-17 ( 0 ) Assgn Bid: 05-08-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 9,218.76 Schem Design: 12-08-17 12-14-17 ( 6 ) Prime Bid: 11-30-18 05-15-19 (166 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-19 ( 0 )50%: 07-23-18 07-24-18 ( 1 ) Final Accept: 08-15-19 ( 0 )75%: ( 0 ) A/E Cont End: 01-31-2001-31-20 12-01-2212-01-2295-100%: 09-17-18 12-17-18 ( 91 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Baranski Hammer & Associates 18020110 ( 0 ) ( 0 ) 12-01-2212-01-22C. W. Burns Co., Inc. 19051482 06-20-19 08-05-19 05-01-20 12-02-21 ( 0 ) 12-31-21 ( 0 ) 12-31-2212-31-22Chicago Heights Construction 19051581 06-20-19 08-05-19 05-01-20 12-01-21 ( 0 ) 12-31-21 ( 0 ) 12-31-2212-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Baranski Hammer & Associates 18020110 10 105,648.84 35,951.16 2 141,600.00 86,717.96 5 54,882.04 61C. W. Burns Co., Inc. 19051482 82 565,000.00 58,911.05 5 623,911.05 564,669.95 6 59,241.10 91Chicago Heights Construction 19051581 81 515,915.00 85,388.43 4 601,303.43 382,734.19 3 218,569.24 64***** Contract Totals ********** Contract Totals ***** 1,186,563.84 180,250.64 11 1,366,814.48 1,034,122.10 14 332,692.38 76

Page 465: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 465Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--229229 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct Equipment Storage Building andAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 33686 : :A/E Name: Civil Design, Inc. : :A/E Contact: Adam Bohnhoff : :A/E Telephone: (314)863-5570 : :Date Selected: 08-16-17 : :Contract Date: 10-11-17 ________________________________________________________________________________Est. Project Cost: 1,036,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,036,000.00 07-01-19 1,036,000.00 07-01-19 1,018,610.50 1,018,610.50 17,389.50 .00

Total 1,036,000.00 1,036,000.00 1,018,610.50 1,018,610.50 17,389.50 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Construct Equipment Storage Building andConstruct Equipment Storage Building and

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-30-17 08-30-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 690.44 Schem Design: ( 0 ) Prime Bid: 05-03-18 05-10-18 ( 7 )

Design Devel: 12-15-17 12-22-17 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-06-18 ( 0 )50%: ( 0 ) Final Accept: 09-03-18 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-1908-31-19 08-31-2008-31-2095-100%: 02-09-18 03-28-18 ( 47 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Civil Design, Inc. 18000310 ( 0 ) ( 0 ) 08-31-2008-31-20CAD Construction Inc. 19040581 07-19-18 08-10-18 08-28-19 ( 0 ) 02-06-19 01-14-20 (342 ) 06-06-2006-06-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Civil Design, Inc. 18000310 10 72,900.00 .00 1 72,900.00 72,900.00 12 .00 100CAD Construction Inc. 19040581 81 1,319,550.92 373,840.42- 5 945,710.50 945,710.50 11 .00 100***** Contract Totals ********** Contract Totals ***** 1,392,450.92 373,840.42- 6 1,018,610.50 1,018,610.50 23 .00 100

Page 466: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 466Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--231231 PM NAME: Ashlie Shaffer 595Ashlie Shaffer 595Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Various Improvements - District 8Agency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 02-26-21 :: :

A/E Id: 18168 : :A/E Name: EWR Architects, Inc. : :A/E Contact: Jared Heller : :A/E Telephone: (618)236-2000 : :Date Selected: 08-16-17 : :Contract Date: 08-29-17 ________________________________________________________________________________Est. Project Cost: 1,525,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,525,000.00 07-01-19 1,525,000.00 07-01-19 371,080.62 295,611.62 1,153,919.38 .00

Total 1,525,000.00 1,525,000.00 371,080.62 295,611.62 1,153,919.38 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 99.00% Description:Description: PH-1/Sanitary Line & Lift Station - CarrPH-1/Sanitary Line & Lift Station - Carr

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-24-17 12-14-17 ( 51 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-05-18 ( 0 )50%: ( 0 ) Final Accept: 02-05-18 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1912-31-19 12-31-2112-31-2195-100%: 09-12-17 10-13-17 ( 31 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EWR Architects, Inc. 18010310 ( 0 ) ( 0 ) 12-31-2112-31-21Farnsworth Group, Inc. 18010310A ( 0 ) ( 0 )Haier Plumbing and Heating, 18045441 02-28-18 03-14-18 07-12-18 08-21-18 ( 40 ) 09-10-18 04-25-19 (227 ) 05-30-2105-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EWR Architects, Inc. 18010310 10 28,600.00 32,059.95 3 60,659.95 60,659.95 1 .00 100Farnsworth Group, Inc. 18010310A 10 220,849.02 79,310.97- 0 141,538.05 66,069.05 3 75,469.00 47Haier Plumbing and Heating, 18045441 41 264,869.62 95,987.00- 3 168,882.62 168,882.62 2 .00 100***** Contract Totals ********** Contract Totals ***** 514,318.64 143,238.02- 6 371,080.62 295,611.62 6 75,469.00 80

Page 467: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 467Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--231231 PM NAME: Ashlie Shaffer 595Ashlie Shaffer 595Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Various Improvements - District 8Agency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 28414 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: : :A/E Telephone: (309)663-8435 : :Date Selected: : :Contract Date: 08-22-18 ________________________________________________________________________________Est. Project Cost: 1,525,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,525,000.00 07-01-19 1,525,000.00 07-01-19 371,080.62 295,611.62 1,153,919.38 .00

Total 1,525,000.00 1,525,000.00 371,080.62 295,611.62 1,153,919.38 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 100.00% Description:Description: PH-2/Salt Storage, Generator& Sewer ConnPH-2/Salt Storage, Generator& Sewer Conn

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: 03-31-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-14-17 04-14-21 (217 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: 10-13-17 10-13-17 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 468: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 468Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--234234 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Repr/Rpac Overhead Door Headers, ReplceAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-25-21 :: :

A/E Id: 29338 : :A/E Name: Knight E/A, Inc. : :A/E Contact: Hugo Mascote : :A/E Telephone: (312)577-3300 : :Date Selected: 06-12-18 : :Contract Date: 09-11-18 ________________________________________________________________________________Est. Project Cost: 1,673,900.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,673,900.00 10-22-20 1,673,900.00 10-22-20 1,599,600.00 160,986.83 74,300.00 .00

Total 1,673,900.00 1,673,900.00 1,599,600.00 160,986.83 74,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 40.00% Description:Description: Repr/Rpac Overhead Door Headers, ReplceRepr/Rpac Overhead Door Headers, Replce

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-22-18 06-22-18 ( 0 ) Assgn Bid: 07-22-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-13-18 11-20-18 ( 7 ) Prime Bid: 10-24-19 08-05-20 (286 )

Design Devel: 02-13-19 02-22-19 ( 9 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-24-20 ( 0 )50%: ( 0 ) Final Accept: 09-04-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2112-01-2195-100%: 08-14-19 12-24-19 (132 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Knight E/A, Inc. 18022010 ( 0 ) ( 0 ) 12-01-2112-01-21Mechanical Concepts of Illin 21044984 12-21-20 03-18-21 09-14-21 ( 0 ) 11-13-21 ( 0 ) 11-13-2211-13-22Paul Borg Construction Compa 21045081 12-21-20 03-18-21 09-14-21 ( 0 ) 11-13-21 ( 0 ) 11-13-2211-13-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Knight E/A, Inc. 18022010 10 34,442.00 96,458.00 1 130,900.00 88,312.84 5 42,587.16 68Mechanical Concepts of Illin 21044984 84 120,900.00 .00 0 120,900.00 .00 0 120,900.00 0Paul Borg Construction Compa 21045081 81 1,347,800.00 .00 0 1,347,800.00 72,673.99 1 1,275,126.01 5***** Contract Totals ********** Contract Totals ***** 1,503,142.00 96,458.00 1 1,599,600.00 160,986.83 6 1,438,613.17 10

Page 469: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 469Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--235235 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Building Renovation, New Wash BayAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-03-21 :: :

A/E Id: 26973 : :A/E Name: Ament, Inc. : :A/E Contact: Al Varney : :A/E Telephone: (309)762-3617 : :Date Selected: 06-12-18 : :Contract Date: 08-03-18 ________________________________________________________________________________Est. Project Cost: 1,487,420.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,487,420.00 05-25-21 1,487,420.00 05-25-21 132,500.00 81,731.64 1,354,920.00 .00

Total 1,487,420.00 1,487,420.00 132,500.00 81,731.64 1,354,920.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Building Renovation, New Wash BayBuilding Renovation, New Wash Bay

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-27-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-29-19 06-05-20 06-03-20 ( 2-)

Design Devel: 10-26-18 10-26-18 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-28-19 03-31-21 ( 0 )50%: ( 0 ) Final Accept: 07-26-19 04-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-28-2006-28-20 06-28-2206-28-2295-100%: 01-04-19 01-03-20 (364 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ament, Inc. 18002110 ( 0 ) ( 0 ) 06-28-2206-28-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ament, Inc. 18002110 10 132,500.00 .00 1 132,500.00 81,731.64 6 50,768.36 62***** Contract Totals ********** Contract Totals ***** 132,500.00 .00 1 132,500.00 81,731.64 6 50,768.36 62

Page 470: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 470Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--238238 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Demolish and Construct Building, RemodelAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 33399 : :A/E Name: Stromsland, De Young, Prybys A : :A/E Contact: James Prybys : :A/E Telephone: (815)727-1311 : :Date Selected: 08-14-18 : :Contract Date: 08-07-19 ________________________________________________________________________________Est. Project Cost: 3,983,730.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 3,983,729.08 03-19-21 3,983,729.08 03-19-21 3,855,052.70 1,401,501.95 128,676.38 .00

Total 3,983,729.08 3,983,729.08 3,855,052.70 1,401,501.95 128,676.38 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: OttawaOttawa

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 05-30-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-30-20 12-17-20 01-06-21 ( 20 )

Design Devel: 06-12-20 06-19-20 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-29-21 11-01-21 ( 0 )50%: ( 0 ) Final Accept: 02-26-21 12-16-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-27-2208-27-22 02-21-2302-21-2395-100%: 10-02-20 10-16-20 ( 14 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

RKG Design Group, LLC 19020810 ( 0 ) ( 0 )Stromsland, De Young, Prybys 19025210 ( 0 ) ( 0 ) 02-21-2302-21-23CAD Construction Inc. 21049941 04-07-21 04-23-21 10-15-21 09-21-21 ( 24-) 11-14-21 ( 0 ) 11-14-2211-14-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

RKG Design Group, LLC 19020810 10 .00 502.08 0 502.08 502.08 1 .00 100Stromsland, De Young, Prybys 19025210 10 308,900.00 106,204.00 3 415,104.00 275,557.73 18 139,546.27 66CAD Construction Inc. 21049941 41 1,016,900.00 41,234.62 4 1,058,134.62 1,007,380.54 6 50,754.08 95***** Contract Totals ********** Contract Totals ***** 1,325,800.00 147,940.70 7 1,473,740.70 1,283,440.35 25 190,300.35 87

Page 471: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 471Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--238238 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Demolish and Construct Building, RemodelAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 33399 : :A/E Name: Stromsland, De Young, Prybys A : :A/E Contact: James Prybys : :A/E Telephone: (815)727-1311 : :Date Selected: : :Contract Date: 08-07-19 ________________________________________________________________________________Est. Project Cost: 3,983,730.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 3,983,729.08 03-19-21 3,983,729.08 03-19-21 3,855,052.70 1,401,501.95 128,676.38 .00

Total 3,983,729.08 3,983,729.08 3,855,052.70 1,401,501.95 128,676.38 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (C ) 6.00% Description:Description: KankakeeKankakee

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: 08-27-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-13-19 ( 0 ) Prime Bid: 10-08-21 01-21-21 02-03-21 ( 13 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-27-22 02-21-22 ( 0 )50%: 07-24-20 06-09-20 ( 45-) Final Accept: 03-29-22 ( 0 )75%: ( 0 ) A/E Cont End: 02-21-2302-21-2395-100%: 11-06-20 11-23-20 ( 17 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CCC Holdings, Inc 21050641 04-15-21 07-13-21 10-06-22 ( 0 ) 12-05-22 ( 0 ) 12-05-2312-05-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

CCC Holdings, Inc 21050641 41 2,381,312.00 .00 0 2,381,312.00 118,061.60 1 2,263,250.40 5***** Contract Totals ********** Contract Totals ***** 2,381,312.00 .00 0 2,381,312.00 118,061.60 1 2,263,250.40 5

Page 472: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 472Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--241241 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 21841 : :A/E Name: Architechniques, Ltd. : :A/E Contact: Curt Orso : :A/E Telephone: (618)942-6918 : :Date Selected: 08-14-18 : :Contract Date: 01-25-19 ________________________________________________________________________________Est. Project Cost: 1,450,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,274,772.00 09-30-21 1,274,772.00 09-30-21 1,274,348.06 1,091,574.58 423.94 .00

Total 1,274,772.00 1,274,772.00 1,274,348.06 1,091,574.58 423.94 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 90.00% Description:Description: Various ImprovementsVarious Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 03-29-19 04-03-19 ( 5 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-29-19 04-15-19 ( 17 ) Prime Bid: 02-27-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-20 ( 0 )50%: ( 0 ) Final Accept: 11-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 08-16-2208-16-2295-100%: 12-13-19 12-24-19 ( 11 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechniques, Ltd. 19010610 ( 0 ) ( 0 ) 08-16-2208-16-22J. F. Electric, Incorporated 21043385 10-21-20 01-12-21 07-11-21 ( 0 ) 08-10-21 ( 0 ) 08-10-2208-10-22H & N Construction, Inc. 21043481 10-21-20 01-12-21 07-11-21 ( 0 ) 08-10-21 ( 0 ) 08-10-2208-10-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechniques, Ltd. 19010610 10 39,510.00 114,780.00 1 154,290.00 118,012.60 6 36,277.40 77J. F. Electric, Incorporated 21043385 85 56,882.00 .00 0 56,882.00 48,633.80 8 8,248.20 86H & N Construction, Inc. 21043481 81 995,000.00 68,176.06 3 1,063,176.06 924,928.18 9 138,247.88 87***** Contract Totals ********** Contract Totals ***** 1,091,392.00 182,956.06 4 1,274,348.06 1,091,574.58 23 182,773.48 86

Page 473: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 473Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--242242 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct Vehicle and Equipment StorageAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 29944 : :A/E Name: Specialty Consulting, Inc. : :A/E Contact: Ramin Parsa : :A/E Telephone: (847)331-5233 : :Date Selected: 03-09-21 : :Contract Date: 06-15-21 ________________________________________________________________________________Est. Project Cost: 1,455,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,435,480.00 10-15-21 1,435,480.00 10-15-21 1,402,132.09 313,563.75 33,347.91 .00

Total 1,435,480.00 1,435,480.00 1,402,132.09 313,563.75 33,347.91 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 53.00% Description:Description: Construct Vehicle and Equipment StorageConstruct Vehicle and Equipment Storage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-09-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-22 ( 0 )50%: ( 0 ) Final Accept: 08-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2306-30-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kelly & Associates-Architect 20031410 ( 0 ) ( 0 ) 02-28-2202-28-22Specialty Consulting, Inc. 21032010 ( 0 ) ( 0 ) 06-30-2306-30-23CAD Construction Inc. 21050241 04-20-21 07-01-21 11-28-21 ( 0 ) 01-27-22 ( 0 ) 01-27-2301-27-23Loescher Heating & Air Condi 21050344 04-20-21 07-01-21 11-28-21 ( 0 ) 01-27-22 ( 0 ) 01-27-2301-27-23Loescher Heating & Air Condi 21050445 04-20-21 07-01-21 11-28-21 ( 0 ) 01-27-22 ( 0 ) 01-27-2301-27-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kelly & Associates-Architect 20031410 10 142,550.00 .00 0 142,550.00 87,822.95 6 54,727.05 62Specialty Consulting, Inc. 21032010 10 53,982.00 .00 0 53,982.00 9,588.45 1 44,393.55 18CAD Construction Inc. 21050241 41 867,800.00 154,244.10 4 1,022,044.10 216,152.35 2 805,891.75 21Loescher Heating & Air Condi 21050344 44 60,000.00 3,148.00 1 63,148.00 .00 0 63,148.00 0

Page 474: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 474Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Loescher Heating & Air Condi 21050445 45 114,550.00 5,857.99 1 120,407.99 .00 0 120,407.99 0***** Contract Totals ********** Contract Totals ***** 1,238,882.00 163,250.09 6 1,402,132.09 313,563.75 9 1,088,568.34 22

Page 475: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 475Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--243243 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-27-21 :: :

A/E Id: 28475 : :A/E Name: SNDB Designs, Inc. : :A/E Contact: Simone Demirjian-Beazly : :A/E Telephone: (217)520-9617 : :Date Selected: 09-10-19 : :Contract Date: 11-18-19 ________________________________________________________________________________Est. Project Cost: 925,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 769,000.00 12-21-20 769,000.00 12-21-20 108,200.00 63,726.08 660,800.00 .00

Total 769,000.00 769,000.00 108,200.00 63,726.08 660,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 2.00% Description:Description: Various ImprovementsVarious Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: 08-05-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-20-20 02-05-20 ( 16 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-25-20 08-19-20 ( 55 )

Design Devel: 01-20-20 02-12-20 ( 23 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-29-20 08-26-22 ( 0 )50%: ( 0 ) Final Accept: 03-02-21 10-26-22 ( 0 )75%: ( 0 ) A/E Cont End: 01-15-2101-15-21 08-26-2308-26-2395-100%: 04-13-20 05-15-20 ( 32 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SNDB Designs, Inc. 20040310 ( 0 ) ( 0 ) 08-26-2308-26-23A & R Mechanical Contractors 21053584 06-03-21 10-27-21 07-24-22 ( 0 ) 09-22-22 ( 0 ) 09-22-2309-22-23CAD Construction Inc. 21053681 06-03-21 10-27-21 07-24-22 ( 0 ) 09-22-22 ( 0 ) 09-22-2309-22-23E.L. Pruitt Company 22048982 10-01-21 10-27-21 07-24-22 ( 0 ) 09-22-22 ( 0 ) 09-22-2309-22-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SNDB Designs, Inc. 20040310 10 108,200.00 .00 1 108,200.00 63,726.08 2 44,473.92 59A & R Mechanical Contractors 21053584 84 .00 .00 0 .00 .00 0 .00 100CAD Construction Inc. 21053681 81 .00 .00 0 .00 .00 0 .00 100E.L. Pruitt Company 22048982 82 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 108,200.00 .00 1 108,200.00 63,726.08 2 44,473.92 59

Page 476: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 476Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Page 477: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 477Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--244244 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate and Expand Building/Construct CAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: Ted Bergen : :A/E Telephone: (618)344-3774 : :Date Selected: 09-10-19 : :Contract Date: 02-11-20 ________________________________________________________________________________Est. Project Cost: 1,918,285.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,918,285.00 09-28-21 1,918,285.00 09-28-21 236,897.26 180,718.51 1,681,387.74 .00

Total 1,918,285.00 1,918,285.00 236,897.26 180,718.51 1,681,387.74 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 85.00% Description:Description: Renovate and Expand Building/Construct CRenovate and Expand Building/Construct C

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-01-19 ( 0 ) Assgn Bid: 08-18-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-26-20 03-26-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-26-20 03-31-20 ( 5 ) Prime Bid: 09-10-20 09-01-21 (356 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-21 ( 0 )50%: ( 0 ) Final Accept: 10-29-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2208-31-2295-100%: 07-02-20 10-07-20 ( 97 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 20031510 ( 0 ) ( 0 ) 08-31-2208-31-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 20031510 10 134,900.00 12,300.00 1 147,200.00 91,021.25 3 56,178.75 62***** Contract Totals ********** Contract Totals ***** 134,900.00 12,300.00 1 147,200.00 91,021.25 3 56,178.75 62

Page 478: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 478Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--244244 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate and Expand Building/Construct CAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: Ted Bergen : :A/E Telephone: (618)344-3774 : :Date Selected: : :Contract Date: 02-11-20 ________________________________________________________________________________Est. Project Cost: 1,918,285.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,918,285.00 09-28-21 1,918,285.00 09-28-21 236,897.26 180,718.51 1,681,387.74 .00

Total 1,918,285.00 1,918,285.00 236,897.26 180,718.51 1,681,387.74 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 100.00% Description:Description: Structural Repairs to Woodriver Cold StoStructural Repairs to Woodriver Cold Sto

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Korte & Luitjohan Contractor 21SM0181 10-15-20 12-14-20 07-15-21 (213 ) 01-13-21 ( 0 ) 01-13-2201-13-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Korte & Luitjohan Contractor 21SM0181 81 78,678.00 11,019.26 2 89,697.26 89,697.26 1 .00 100***** Contract Totals ********** Contract Totals ***** 78,678.00 11,019.26 2 89,697.26 89,697.26 1 .00 100

Page 479: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 479Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--245245 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Construct Salt Storage Buildings/DemolisAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 29580 : :A/E Name: D. A. R. T. Design Incorporate : :A/E Contact: Stephen May : :A/E Telephone: (618)997-7223 : :Date Selected: 09-10-19 : :Contract Date: 12-13-19 ________________________________________________________________________________Est. Project Cost: 820,501.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 820,501.00 05-03-21 820,501.00 05-03-21 800,219.22 654,650.49 20,281.78 .00

Total 820,501.00 820,501.00 800,219.22 654,650.49 20,281.78 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 85.00% Description:Description: Construct Salt Storage Buildings/DemolisConstruct Salt Storage Buildings/Demolis

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 01-10-20 01-22-20 ( 12 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-19-20 09-16-20 ( 89 )

Design Devel: 01-10-20 01-22-20 ( 12 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-14-21 ( 0 )50%: ( 0 ) Final Accept: 03-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 03-01-2203-01-2295-100%: 04-17-20 04-15-20 ( 2-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

D. A. R. T. Design Incorpora 20012310 ( 0 ) ( 0 ) 03-01-2203-01-22H & N Construction, Inc. 21046481 01-18-21 03-03-21 08-30-21 12-03-21 ( 0 ) 01-03-22 ( 0 ) 09-29-2209-29-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

D. A. R. T. Design Incorpora 20012310 10 84,250.00 1,344.00 1 85,594.00 52,795.00 2 32,799.00 62H & N Construction, Inc. 21046481 81 659,900.00 54,725.22 5 714,625.22 601,855.49 4 112,769.73 84***** Contract Totals ********** Contract Totals ***** 744,150.00 56,069.22 6 800,219.22 654,650.49 6 145,568.73 82

Page 480: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 480Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--246246 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing System/Construct BuildinAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-08-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: Todd Hannah : :A/E Telephone: (217)522-3355 : :Date Selected: 10-08-19 : :Contract Date: 01-09-20 ________________________________________________________________________________Est. Project Cost: 368,850.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 368,850.00 09-01-21 368,850.00 09-01-21 368,807.83 334,381.60 42.17 .00

Total 368,850.00 368,850.00 368,807.83 334,381.60 42.17 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Replace Roofing System/Construct BuildinReplace Roofing System/Construct Buildin

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-18-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-04-20 02-18-20 ( 14 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-02-20 08-05-20 ( 34 )

Design Devel: 02-04-20 02-18-20 ( 14 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-01-21 ( 0 )50%: ( 0 ) Final Accept: 02-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 02-15-2202-15-2295-100%: 04-30-20 05-04-20 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 20012710 ( 0 ) ( 0 ) 02-15-2202-15-22CAD Construction Inc. 21045481 01-04-21 02-23-21 08-22-21 ( 0 ) 09-21-21 ( 0 ) 09-21-2209-21-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 20012710 10 45,850.00 .00 0 45,850.00 26,896.22 2 18,953.78 59CAD Construction Inc. 21045481 81 299,210.00 23,747.83 2 322,957.83 307,485.38 3 15,472.45 95***** Contract Totals ********** Contract Totals ***** 345,060.00 23,747.83 2 368,807.83 334,381.60 5 34,426.23 91

Page 481: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 481Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--247247 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Roofing SystemsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 29890 : :A/E Name: Mode Architects, P.C. : :A/E Contact: Michael McAtee : :A/E Telephone: (312)475-9918 : :Date Selected: 10-08-19 : :Contract Date: 11-19-19 ________________________________________________________________________________Est. Project Cost: 1,725,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,640,400.00 09-11-20 1,640,400.00 09-11-20 1,561,010.00 727,331.00 79,390.00 .00

Total 1,640,400.00 1,640,400.00 1,561,010.00 727,331.00 79,390.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 75.00% Description:Description: Replace Roofing SystemsReplace Roofing Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-22-19 10-22-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-09-20 08-19-20 ( 41 )

Design Devel: 02-24-20 03-04-20 ( 9 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-20 11-30-21 ( 0 )50%: ( 0 ) Final Accept: 12-30-20 12-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2111-30-21 11-30-2311-30-2395-100%: 05-04-20 05-12-20 ( 8 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Mode Architects, P.C. 20022110 ( 0 ) ( 0 ) 11-30-2311-30-23Elens and Maichin Roofing an 21044381 12-10-20 03-16-21 12-11-21 ( 0 ) 01-10-22 ( 0 ) 01-10-2301-10-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Mode Architects, P.C. 20022110 10 190,400.00 .00 1 190,400.00 94,396.00 5 96,004.00 50Elens and Maichin Roofing an 21044381 81 1,370,610.00 .00 0 1,370,610.00 632,935.00 2 737,675.00 46***** Contract Totals ********** Contract Totals ***** 1,561,010.00 .00 1 1,561,010.00 727,331.00 7 833,679.00 47

Page 482: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 482Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--248248 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Demolish Buildings/Construct BuildingsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 15170 : :A/E Name: Blank, Wesselink, Cook & Assoc : :A/E Contact: Scott Righter : :A/E Telephone: (217)428-0973 : :Date Selected: 10-08-19 : :Contract Date: 02-24-20 ________________________________________________________________________________Est. Project Cost: 3,421,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 3,421,500.00 07-09-21 3,421,500.00 07-09-21 3,267,765.00 106,323.55 153,735.00 .00

Total 3,421,500.00 3,421,500.00 3,267,765.00 106,323.55 153,735.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 15.00% Description:Description: Demolish Buildings/Construct BuildingsDemolish Buildings/Construct Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-12-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-22-20 07-09-20 ( 48 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-10-20 02-24-21 05-26-21 ( 91 )

Design Devel: 05-22-20 07-20-20 ( 59 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-29-21 01-24-22 ( 0 )50%: ( 0 ) Final Accept: 12-31-21 02-28-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2210-31-2295-100%: 12-03-20 04-01-21 (119 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Blank, Wesselink, Cook & Ass 20032010 ( 0 ) ( 0 ) 10-31-2210-31-22Laverdiere Construction, Inc 22042341 08-02-21 09-20-21 03-19-22 ( 0 ) 05-18-22 ( 0 ) 05-18-2305-18-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Blank, Wesselink, Cook & Ass 20032010 10 193,100.00 .00 1 193,100.00 106,323.55 4 86,776.45 55Laverdiere Construction, Inc 22042341 41 3,074,665.00 .00 0 3,074,665.00 .00 0 3,074,665.00 0***** Contract Totals ********** Contract Totals ***** 3,267,765.00 .00 1 3,267,765.00 106,323.55 4 3,161,441.45 3

Page 483: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 483Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--249249 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Remodel Restrooms/Remove Septic System aAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 11837 : :A/E Name: Poepping, Stone, Bach & Associ : :A/E Contact: Darin Prost : :A/E Telephone: (217)223-4605 : :Date Selected: 10-08-19 : :Contract Date: 12-31-19 ________________________________________________________________________________Est. Project Cost: 525,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 356,050.00 05-28-21 356,050.00 05-28-21 345,690.71 99,329.97 10,359.29 .00

Total 356,050.00 356,050.00 345,690.71 99,329.97 10,359.29 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Remodel Restrooms/Remove Septic System aRemodel Restrooms/Remove Septic System a

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-14-19 11-14-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-17-20 03-02-20 ( 14 ) Prime Bid: 08-31-20 03-17-21 (198 )

Design Devel: 04-27-20 06-12-20 ( 46 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-28-21 ( 0 )50%: ( 0 ) Final Accept: 07-12-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-28-2205-28-2295-100%: 07-06-20 12-29-20 (176 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Poepping, Stone, Bach & Asso 2001410 ( 0 ) ( 0 ) 05-28-2205-28-22Grunloh Construction, Inc. 21056381 06-17-21 07-30-21 04-26-22 ( 0 ) 06-25-22 ( 0 ) 06-25-2306-25-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Poepping, Stone, Bach & Asso 2001410 10 69,400.00 .00 0 69,400.00 49,272.65 11 20,127.35 71Grunloh Construction, Inc. 21056381 81 273,000.00 3,290.71 1 276,290.71 50,057.32 1 226,233.39 18***** Contract Totals ********** Contract Totals ***** 342,400.00 3,290.71 1 345,690.71 99,329.97 12 246,360.74 29

Page 484: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 484Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--251251 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Renovate BuildingAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 30361 : :A/E Name: Woolpert Architecture, LLC : :A/E Contact: : :A/E Telephone: (618)632-7004 : :Date Selected: 07-14-20 : :Contract Date: 01-15-21 ________________________________________________________________________________Est. Project Cost: 8,638,260.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 8,638,260.00 11-03-21 8,638,260.00 11-03-21 888,260.00 546,207.80 7,750,000.00 .00

Total 8,638,260.00 8,638,260.00 888,260.00 546,207.80 7,750,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Renovate BuildingRenovate Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-15-20 ( 0 ) Assgn Bid: 10-27-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-29-21 03-24-21 ( 5-) Prime Bid: 11-10-21 ( 0 )

Design Devel: 05-28-21 06-04-21 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-22 ( 0 )50%: ( 0 ) Final Accept: 10-17-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2306-30-23 08-31-2308-31-2395-100%: 09-03-21 09-20-21 ( 17 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert Architecture, LLC 21000110 ( 0 ) ( 0 ) 08-31-2308-31-23Johnco Construction, Inc. 22050981 11-09-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert Architecture, LLC 21000110 10 108,060.00 780,200.00 1 888,260.00 546,207.80 5 342,052.20 62Johnco Construction, Inc. 22050981 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 108,060.00 780,200.00 1 888,260.00 546,207.80 5 342,052.20 62

Page 485: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 485Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--252252 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: 08-11-20 : :Contract Date: 12-21-20 ________________________________________________________________________________Est. Project Cost: 550,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 21,500.00 12-09-20 21,500.00 12-09-20 21,490.00 .00 10.00 .00

Total 21,500.00 21,500.00 21,490.00 .00 10.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Replacement of HVAC at Fairview HeightsReplacement of HVAC at Fairview Heights

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-21-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-15-21 05-10-21 ( 56 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-15-21 05-21-21 ( 67 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 02-22-2402-22-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 21040810 ( 0 ) ( 0 ) 02-22-2402-22-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 21040810 10 21,490.00 .00 0 21,490.00 .00 0 21,490.00 0***** Contract Totals ********** Contract Totals ***** 21,490.00 .00 0 21,490.00 .00 0 21,490.00 0

Page 486: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 486Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--252252 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: : :A/E Telephone: (314)918-8383 : :Date Selected: : :Contract Date: 12-21-20 ________________________________________________________________________________Est. Project Cost: 550,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 21,500.00 12-09-20 21,500.00 12-09-20 21,490.00 .00 10.00 .00

Total 21,500.00 21,500.00 21,490.00 .00 10.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 25.00% Description:Description: Energy Grid Source at Scott I-64Energy Grid Source at Scott I-64

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-24-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 487: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 487Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--253253 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-15-21 :: :

A/E Id: 22834 : :A/E Name: hmb Architects LLC : :A/E Contact: : :A/E Telephone: (618)457-5709 : :Date Selected: 08-11-20 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 750,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 140,000.00 12-09-20 140,000.00 12-09-20 106,366.00 47,545.00 33,634.00 .00

Total 140,000.00 140,000.00 106,366.00 47,545.00 33,634.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Various ImprovementsVarious Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-16-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-22-21 05-28-21 ( 6 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-09-21 ( 0 )

Design Devel: 05-22-21 06-10-21 ( 19 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-07-23 ( 0 )50%: ( 0 ) Final Accept: 03-08-23 ( 0 )75%: ( 0 ) A/E Cont End: 09-15-2409-15-2495-100%: 07-31-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

hmb Architects LLC 21011010 ( 0 ) ( 0 ) 09-15-2409-15-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

hmb Architects LLC 21011010 10 106,366.00 .00 0 106,366.00 47,545.00 2 58,821.00 45***** Contract Totals ********** Contract Totals ***** 106,366.00 .00 0 106,366.00 47,545.00 2 58,821.00 45

Page 488: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 488Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--255255 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Construct New Material/Equipment StorageAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 33686 : :A/E Name: Civil Design, Inc. : :A/E Contact: Wes Kistler : :A/E Telephone: (314)863-5570 : :Date Selected: 09-15-20 : :Contract Date: 12-22-20 ________________________________________________________________________________Est. Project Cost: 1,700,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 369,000.00 12-09-20 369,000.00 12-09-20 170,985.00 104,656.00 198,015.00 .00

Total 369,000.00 369,000.00 170,985.00 104,656.00 198,015.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Construct New Material/Equipment StorageConstruct New Material/Equipment Storage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-28-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-01-21 03-01-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-24-21 12-08-21 ( 75 )

Design Devel: 03-01-21 03-08-21 ( 7 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-07-23 ( 0 )50%: 05-14-21 05-21-21 ( 7 ) Final Accept: 04-07-23 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2309-30-2395-100%: 07-12-21 07-26-21 ( 14 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Civil Design, Inc. 21041210 ( 0 ) ( 0 ) 09-30-2309-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Civil Design, Inc. 21041210 10 170,985.00 .00 0 170,985.00 104,656.00 7 66,329.00 61***** Contract Totals ********** Contract Totals ***** 170,985.00 .00 0 170,985.00 104,656.00 7 66,329.00 61

Page 489: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 489Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--256256 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Renovate Building and Construct StorageAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-31-21 :: :

A/E Id: 29890 : :A/E Name: Mode Architects, P.C. : :A/E Contact: : :A/E Telephone: (312)475-9918 : :Date Selected: 09-15-20 : :Contract Date: 12-15-20 ________________________________________________________________________________Est. Project Cost: 1,225,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 565,000.00 12-09-20 565,000.00 12-09-20 152,800.00 33,405.00 412,200.00 .00

Total 565,000.00 565,000.00 152,800.00 33,405.00 412,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 58.00% Description:Description: Renovate Building and Construct StorageRenovate Building and Construct Storage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-19-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-22-21 01-23-21 ( 1 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-22-21 02-05-21 ( 14 ) Prime Bid: 09-15-21 ( 0 )

Design Devel: 03-19-21 04-16-21 ( 28 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-22 ( 0 )50%: 05-14-21 06-29-21 ( 46 ) Final Accept: 11-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-30-2309-30-2395-100%: 07-09-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Mode Architects, P.C. 21031010 ( 0 ) ( 0 ) 09-30-2309-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Mode Architects, P.C. 21031010 10 152,800.00 .00 0 152,800.00 33,405.00 1 119,395.00 22***** Contract Totals ********** Contract Totals ***** 152,800.00 .00 0 152,800.00 33,405.00 1 119,395.00 22

Page 490: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 490Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--257257 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade HVAC and Electrical EquipmentAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-27-21 :: :

A/E Id: 34869 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: : :A/E Telephone: (217)528-3661 : :Date Selected: 11-17-20 : :Contract Date: 02-17-21 ________________________________________________________________________________Est. Project Cost: 600,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 210,000.00 12-18-20 210,000.00 12-18-20 65,150.00 35,936.80 144,850.00 .00

Total 210,000.00 210,000.00 65,150.00 35,936.80 144,850.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 98.00% Description:Description: Upgrade HVAC and Electrical EquipmentUpgrade HVAC and Electrical Equipment

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-15-20 ( 0 ) Assgn Bid: 10-27-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-22-21 04-13-21 ( 22 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-01-21 11-10-21 ( 70 )

Design Devel: 03-22-21 04-21-21 ( 30 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-31-22 ( 0 )50%: ( 0 ) Final Accept: 07-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-15-2408-15-2495-100%: 06-01-21 09-08-21 ( 99 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 21041810 ( 0 ) ( 0 ) 08-15-2408-15-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 21041810 10 65,150.00 .00 0 65,150.00 35,936.80 2 29,213.20 55***** Contract Totals ********** Contract Totals ***** 65,150.00 .00 0 65,150.00 35,936.80 2 29,213.20 55

Page 491: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 491Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--258258 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Demolish and Construct BuildingsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-27-21 :: :

A/E Id: 16668 : :A/E Name: Evan Lloyd Associates, Inc. : :A/E Contact: : :A/E Telephone: (217)789-7011 : :Date Selected: 11-17-20 : :Contract Date: 08-04-21 ________________________________________________________________________________Est. Project Cost: 2,650,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,030,000.00 01-22-21 1,030,000.00 01-22-21 222,600.00 .00 807,400.00 .00

Total 1,030,000.00 1,030,000.00 222,600.00 .00 807,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 12.00% Description:Description: Demolish and Construct BuildingsDemolish and Construct Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-22-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-13-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Evan Lloyd Associates, Inc. 21011910 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Evan Lloyd Associates, Inc. 21011910 10 222,600.00 .00 0 222,600.00 .00 0 222,600.00 0***** Contract Totals ********** Contract Totals ***** 222,600.00 .00 0 222,600.00 .00 0 222,600.00 0

Page 492: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 492Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--259259 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roofing Systems and ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-09-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: : :A/E Telephone: (618)344-3774 : :Date Selected: 11-17-20 : :Contract Date: 03-31-21 ________________________________________________________________________________Est. Project Cost: 525,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 90,899.00 07-14-21 90,899.00 07-14-21 90,890.00 14,900.00 9.00 .00

Total 90,899.00 90,899.00 90,890.00 14,900.00 9.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Replace Roofing Systems and ImprovementsReplace Roofing Systems and Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-03-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-19-21 04-30-21 ( 11 ) Prime Bid: 03-14-22 ( 0 )

Design Devel: 09-03-21 09-07-21 ( 4 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-30-22 ( 0 )50%: 11-12-21 ( 0 ) Final Accept: 01-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2307-01-23 12-31-2312-31-2395-100%: 01-21-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 21001310 ( 0 ) ( 0 ) 12-31-2312-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 21001310 10 14,900.00 75,990.00 1 90,890.00 14,900.00 1 75,990.00 16***** Contract Totals ********** Contract Totals ***** 14,900.00 75,990.00 1 90,890.00 14,900.00 1 75,990.00 16

Page 493: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 493Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--260260 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Demolish and Construct Buildings and AddAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-15-21 :: :

A/E Id: 26859 : :A/E Name: Eggemeyer Associates Architect : :A/E Contact: : :A/E Telephone: (618)988-2380 : :Date Selected: 11-17-20 : :Contract Date: 03-03-21 ________________________________________________________________________________Est. Project Cost: 1,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 140,080.00 02-26-21 140,080.00 02-26-21 140,080.00 89,614.50 .00 .00

Total 140,080.00 140,080.00 140,080.00 89,614.50 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 90.00% Description:Description: Demolish and Construct Buildings and AddDemolish and Construct Buildings and Add

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-28-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 04-30-21 04-30-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-01-21 ( 0 )

Design Devel: 04-30-21 05-05-21 ( 5 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-22 ( 0 )50%: ( 0 ) Final Accept: 01-31-23 ( 0 )75%: 07-21-21 08-04-21 ( 14 ) A/E Cont End: 01-15-2501-15-2595-100%: 09-22-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Eggemeyer Associates Archite 21031310 ( 0 ) ( 0 ) 01-15-2501-15-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Eggemeyer Associates Archite 21031310 10 140,080.00 .00 0 140,080.00 89,614.50 3 50,465.50 64***** Contract Totals ********** Contract Totals ***** 140,080.00 .00 0 140,080.00 89,614.50 3 50,465.50 64

Page 494: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 494Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--261261 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate RestroomsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-27-21 :: :

A/E Id: 34103 : :A/E Name: CSA Partners Ltd. : :A/E Contact: : :A/E Telephone: (312)578-0550 : :Date Selected: 11-17-20 : :Contract Date: 03-25-21 ________________________________________________________________________________Est. Project Cost: 1,250,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 475,000.00 01-22-21 475,000.00 01-22-21 138,240.00 32,160.00 336,760.00 .00

Total 475,000.00 475,000.00 138,240.00 32,160.00 336,760.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 22.00% Description:Description: Renovate RestroomsRenovate Restrooms

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-07-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-25-21 06-14-21 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-25-21 07-13-21 ( 49 ) Prime Bid: 08-05-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-23 ( 0 )50%: 02-11-22 ( 0 ) Final Accept: 10-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 04-30-2404-30-2495-100%: 05-20-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CSA Partners Ltd. 21041510 ( 0 ) ( 0 ) 04-30-2404-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

CSA Partners Ltd. 21041510 10 32,160.00 106,080.00 1 138,240.00 32,160.00 1 106,080.00 23***** Contract Totals ********** Contract Totals ***** 32,160.00 106,080.00 1 138,240.00 32,160.00 1 106,080.00 23

Page 495: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 495Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--262262 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Demolish and Construct Storage BuildingsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-29-21 :: :

A/E Id: 7753 : :A/E Name: Allied Design Consultants, Inc : :A/E Contact: : :A/E Telephone: (217)522-3355 : :Date Selected: 11-17-20 : :Contract Date: 05-14-21 ________________________________________________________________________________Est. Project Cost: 1,840,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 368,000.00 01-22-21 368,000.00 01-22-21 164,700.00 29,780.00 203,300.00 .00

Total 368,000.00 368,000.00 164,700.00 29,780.00 203,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 30.00% Description:Description: Demolish and Construct Storage BuildingsDemolish and Construct Storage Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-12-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 06-25-21 07-15-21 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-25-21 08-04-21 ( 40 ) Prime Bid: 01-07-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-04-22 ( 0 )50%: 09-03-21 11-12-21 ( 70 ) Final Accept: 01-02-23 ( 0 )75%: ( 0 ) A/E Cont End: 01-05-2401-05-2495-100%: 10-29-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Allied Design Consultants, I 21012110 ( 0 ) ( 0 ) 01-05-2401-05-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Allied Design Consultants, I 21012110 10 164,700.00 .00 0 164,700.00 29,780.00 1 134,920.00 18***** Contract Totals ********** Contract Totals ***** 164,700.00 .00 0 164,700.00 29,780.00 1 134,920.00 18

Page 496: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 496Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--263263 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Demolish, Construct New and Renovate BuiAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-02-21 :: :

A/E Id: 29054 : :A/E Name: Muller & Muller, Ltd. : :A/E Contact: : :A/E Telephone: (312)432-4180 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 6,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,650,000.00 08-10-21 1,650,000.00 08-10-21 .00 .00 1,650,000.00 .00

Total 1,650,000.00 1,650,000.00 .00 .00 1,650,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Demolish, Construct New and Renovate BuiDemolish, Construct New and Renovate Bui

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-02-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Muller & Muller, Ltd. 22021310 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Muller & Muller, Ltd. 22021310 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 497: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 497Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--264264 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Roofs and Structural RepairsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-02-21 :: :

A/E Id: 1747 : :A/E Name: Larson & Darby, Inc. : :A/E Contact: : :A/E Telephone: (815)484-0739 : :Date Selected: 08-10-21 : :Contract Date: 10-27-21 ________________________________________________________________________________Est. Project Cost: 375,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 75,000.00 08-10-21 75,000.00 08-10-21 .00 .00 75,000.00 .00

Total 75,000.00 75,000.00 .00 .00 75,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace Roofs and Structural RepairsReplace Roofs and Structural Repairs

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-08-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-29-22 ( 0 )

Design Devel: 12-06-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-28-22 ( 0 )50%: ( 0 ) Final Accept: 11-25-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-28-2410-28-2495-100%: 02-14-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Larson & Darby, Inc. 22020610 ( 0 ) ( 0 ) 10-28-2410-28-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Larson & Darby, Inc. 22020610 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 498: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 498Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--265265 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Construct Pole Building/Replace ConcreteAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-29-21 :: :

A/E Id: 33686 : :A/E Name: Civil Design, Inc. : :A/E Contact: : :A/E Telephone: (314)863-5570 : :Date Selected: 08-10-21 : :Contract Date: 11-10-21 ________________________________________________________________________________Est. Project Cost: 400,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 80,000.00 08-10-21 80,000.00 08-10-21 60,364.00 .00 19,636.00 .00

Total 80,000.00 80,000.00 60,364.00 .00 19,636.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Construct Pole Building/Replace ConcreteConstruct Pole Building/Replace Concrete

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-29-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-04-22 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-04-22 ( 0 ) Prime Bid: 07-14-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-28-23 ( 0 )50%: 03-04-22 ( 0 ) Final Accept: 06-30-23 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2406-01-2495-100%: 04-04-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Civil Design, Inc. 22040710 ( 0 ) ( 0 ) 06-01-2406-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Civil Design, Inc. 22040710 10 60,364.00 .00 0 60,364.00 .00 0 60,364.00 0***** Contract Totals ********** Contract Totals ***** 60,364.00 .00 0 60,364.00 .00 0 60,364.00 0

Page 499: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 499Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--266266 PM NAME: Ashlie Shaffer 595Ashlie Shaffer 595Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Construct Addition/Renovate Interior/ConAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 15170 : :A/E Name: Blank, Wesselink, Cook & Assoc : :A/E Contact: : :A/E Telephone: (217)428-0973 : :Date Selected: 08-10-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 3,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 700,000.00 08-10-21 700,000.00 08-10-21 .00 .00 700,000.00 .00

Total 700,000.00 700,000.00 .00 .00 700,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Construct Addition/Renovate Interior/ConConstruct Addition/Renovate Interior/Con

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Blank, Wesselink, Cook & Ass 22010910 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Blank, Wesselink, Cook & Ass 22010910 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 500: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 500Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--267267 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Remove and Install Septic Tank and LiftAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-02-21 :: :

A/E Id: 34008 : :A/E Name: Horner & Shifrin, Inc. : :A/E Contact: : :A/E Telephone: (312)332-4334 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,075,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 215,000.00 08-10-21 215,000.00 08-10-21 .00 .00 215,000.00 .00

Total 215,000.00 215,000.00 .00 .00 215,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Remove and Install Septic Tank and LiftRemove and Install Septic Tank and Lift

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Horner & Shifrin, Inc. 22001310 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Horner & Shifrin, Inc. 22001310 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 501: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 501Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--268268 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Pump StationsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-14-21 :: :

A/E Id: 34549 : :A/E Name: Bacon Farmer Workman Engineeri : :A/E Contact: : :A/E Telephone: (217)679-6254 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,025,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 205,000.00 08-10-21 205,000.00 08-10-21 .00 .00 205,000.00 .00

Total 205,000.00 205,000.00 .00 .00 205,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Upgrade Pump StationsUpgrade Pump Stations

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bacon Farmer Workman Enginee 22041410 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bacon Farmer Workman Enginee 22041410 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 502: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 502Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--269269 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Construct Maintenance Building and an ADAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 340,000.00 08-10-21 340,000.00 08-10-21 .00 .00 340,000.00 .00

Total 340,000.00 340,000.00 .00 .00 340,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Construct Maintenance Building and an ADConstruct Maintenance Building and an AD

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 503: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 503Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--270270 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Install Oil/Water Separators and ConstruAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,650,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 650,000.00 08-10-21 650,000.00 08-10-21 .00 .00 650,000.00 .00

Total 650,000.00 650,000.00 .00 .00 650,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Install Oil/Water Separators and ConstruInstall Oil/Water Separators and Constru

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 504: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 504Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--271271 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Demolish Building and Construct Heated PAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-29-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: : :A/E Telephone: (312)922-6400 : :Date Selected: 10-12-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 325,000.00 08-10-21 325,000.00 08-10-21 .00 .00 325,000.00 .00

Total 325,000.00 325,000.00 .00 .00 325,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Demolish Building and Construct Heated PDemolish Building and Construct Heated P

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 22001810 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 22001810 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 505: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 505Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--000000--272272 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair and Replace Roofing and Replace LAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Statewide ProgramCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-02-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 750,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 130,000.00 08-10-21 130,000.00 08-10-21 .00 .00 130,000.00 .00

Total 130,000.00 130,000.00 .00 .00 130,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 2.00% Description:Description: Repair and Replace Roofing and Replace LRepair and Replace Roofing and Replace L

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 506: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 506Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--012012--004004 PM NAME: Dan Bielski 143Dan Bielski 143Project Status: AP Active Project Region: 11Project Type: DB Design Build PLA: YDescription: Construct Salt Storage BuildingAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Grayslake Team Section Headquarters - Dist. 1, Lake CountyCounty: 97 - Lake ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-02-21 :: :

A/E Id: 29890 : :A/E Name: Mode Architects, P.C. : :A/E Contact: James Mo : :A/E Telephone: (312)475-9918 : :Date Selected: 12-11-18 : :Contract Date: 03-26-19 ________________________________________________________________________________Est. Project Cost: 2,509,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 2,509,500.00 06-23-21 2,509,500.00 06-23-21 2,509,500.00 1,999,123.79 .00 .00

Total 2,509,500.00 2,509,500.00 2,509,500.00 1,999,123.79 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 85.00% Description:Description: Construct Salt Storage BuildingConstruct Salt Storage Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-21-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-29-19 05-07-19 ( 8 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2112-01-21 01-10-2301-10-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Mode Architects, P.C. 19021610 ( 0 ) ( 0 ) 01-10-2301-10-23Tri-State Enterprises, Inc. 21DB0241 03-15-21 02-22-21 12-11-21 ( 0 ) 01-10-22 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Mode Architects, P.C. 19021610 10 153,500.00 .00 2 153,500.00 70,923.54 4 82,576.46 46Tri-State Enterprises, Inc. 21DB0241 41 2,352,000.00 .00 0 2,352,000.00 1,924,200.25 4 427,799.75 82***** Contract Totals ********** Contract Totals ***** 2,505,500.00 .00 2 2,505,500.00 1,995,123.79 8 510,376.21 80

Page 507: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 507Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--032032--007007 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Various Improvements - District 1Agency: Department of Transportation Analyst: Michelette ThompsonLocation: Naperville Maintenance YardCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 41 - Janet Rohr

Senate:21 - Laura Ellman : CURRENT STATUS 11-02-21 :: :

A/E Id: 28730 : :A/E Name: DLZ Illinois, Inc. : :A/E Contact: Stephen Kromkowski : :A/E Telephone: (773)283-2600 : :Date Selected: 10-11-16 : :Contract Date: 03-02-17 ________________________________________________________________________________Est. Project Cost: 2,897,850.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 2,897,850.00 07-01-19 2,897,850.00 07-01-19 2,799,203.74 2,608,882.70 98,646.26 .00

Total 2,897,850.00 2,897,850.00 2,799,203.74 2,608,882.70 98,646.26 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Various Improvements - District 1Various Improvements - District 1

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-29-16 ( 0 ) Assgn Bid: 05-15-19 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: 05-15-19 ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-13-18 12-07-18 05-22-19 (166 )

Design Devel: 09-01-17 02-21-19 (538 ) Prime Re-Bid: 05-22-19 ( 0 )25%: ( 0 ) Subst Compl: 08-09-19 07-30-21 ( 0 )50%: 08-20-18 10-16-18 ( 57 ) Final Accept: 09-20-19 09-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-09-2008-09-20 07-30-2307-30-2395-100%: 10-29-18 01-07-19 ( 70 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DLZ Illinois, Inc. 17020710 ( 0 ) ( 0 ) 07-30-2307-30-23C. W. Burns Co., Inc. 19051042 06-14-19 07-15-19 07-14-20 03-30-21 ( 0 ) 05-30-21 ( 0 ) 05-30-2205-30-22Linear Electric, Inc. 19051145 06-14-19 07-15-19 07-14-20 03-30-21 ( 0 ) 05-30-21 ( 0 ) 05-30-2205-30-22Ideal Heating Company 19051243 06-14-19 07-15-19 07-14-20 03-30-21 ( 0 ) 05-30-21 ( 0 ) 05-30-2205-30-22Tri-State Enterprises, Inc. 19051341 06-14-19 07-15-19 07-14-20 ( 0 ) 09-12-20 ( 0 ) 05-30-2205-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DLZ Illinois, Inc. 17020710 10 248,933.73 26,997.73- 3 221,936.00 202,696.74 15 19,239.26 91C. W. Burns Co., Inc. 19051042 42 293,500.00 16,394.62 5 309,894.62 295,239.88 8 14,654.74 95Linear Electric, Inc. 19051145 45 229,969.00 46,400.02 6 276,369.02 238,936.17 10 37,432.85 87Ideal Heating Company 19051243 43 192,222.00 11,226.77 4 203,448.77 172,844.84 4 30,603.93 85

Page 508: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 508Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Tri-State Enterprises, Inc. 19051341 41 1,832,786.00 45,230.67- 7 1,787,555.33 1,699,165.07 15 88,390.26 95***** Contract Totals ********** Contract Totals ***** 2,797,410.73 1,793.01 25 2,799,203.74 2,608,882.70 52 190,321.04 93

Page 509: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 509Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--036036--008008 PM NAME: Abdulgaffar ShedbalkAbdulgaffar ShedbalkProject Status: AP Active Project Region: 11Project Type: DB Design Build PLA: NDescription: Construct Salt Storage BuildingAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 1: New Lenox Maintenance Yard - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 37 - Tim Ozinga

Senate:19 - Michael Hastings : CURRENT STATUS 09-16-21 :: :

A/E Id: 33485 : :A/E Name: RKG Design Group, LLC : :A/E Contact: Michael McAtee : :A/E Telephone: (708)403-1812 : :Date Selected: 05-16-17 : :Contract Date: 07-26-17 ________________________________________________________________________________Est. Project Cost: 2,159,008.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 2,159,007.04 08-18-21 2,159,007.04 08-18-21 2,154,401.17 1,872,658.71 4,605.87 .00

Total 2,159,007.04 2,159,007.04 2,154,401.17 1,872,658.71 4,605.87 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Construct Salt Storage BuildingConstruct Salt Storage Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-13-17 06-13-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 55,481.03 Schem Design: 09-25-17 01-25-18 (122 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2012-01-2095-100%: 01-25-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

RKG Design Group, LLC 17021810 ( 0 ) ( 0 ) 12-01-2012-01-20F.H Paschen, S.N. Nielsen & 18DB0141 05-11-18 06-22-18 12-19-18 10-15-20 (666 ) 10-01-21 ( 0 ) 10-01-2210-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

RKG Design Group, LLC 17021810 10 174,530.93 87,275.46- 0 87,255.47 87,255.47 16 .00 100F.H Paschen, S.N. Nielsen & 18DB0141 41 3,857,420.00 1,790,274.30- 5 2,067,145.70 1,785,403.24 10 281,742.46 86***** Contract Totals ********** Contract Totals ***** 4,031,950.93 1,877,549.76- 5 2,154,401.17 1,872,658.71 26 281,742.46 87

Page 510: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 510Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--036036--009009 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Construct Cold Storage Building, SecondaAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 1: New Lenox Maintenance Yard - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 37 - Tim Ozinga

Senate:19 - Michael Hastings : CURRENT STATUS 11-01-21 :: :

A/E Id: 29890 : :A/E Name: Mode Architects, P.C. : :A/E Contact: : :A/E Telephone: (312)475-9918 : :Date Selected: 08-10-21 : :Contract Date: 11-12-21 ________________________________________________________________________________Est. Project Cost: 3,050,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,250,000.00 08-10-21 1,250,000.00 08-10-21 .00 .00 1,250,000.00 .00

Total 1,250,000.00 1,250,000.00 .00 .00 1,250,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Construct Cold Storage Building, SecondaConstruct Cold Storage Building, Seconda

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-09-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-10-22 ( 0 ) Prime Bid: 11-28-22 ( 0 )

Design Devel: 04-04-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-31-23 ( 0 )50%: 06-27-22 ( 0 ) Final Accept: 02-15-24 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2412-31-2495-100%: 09-19-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Mode Architects, P.C. 22000610 ( 0 ) ( 0 ) 12-31-2412-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Mode Architects, P.C. 22000610 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 511: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 511Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--040040--006006 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Install Trench Drains/Replace Roofing/DeAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 1: Oak Brook Team Section Headquarters - Villa ParCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 46 - Deb Conroy

Senate:23 - Thomas Cullerton : CURRENT STATUS 11-10-21 :: :

A/E Id: 20003 : :A/E Name: A. Epstein and Sons Internatio : :A/E Contact: : :A/E Telephone: (312)454-9100 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 750,000.00 08-10-21 750,000.00 08-10-21 .00 .00 750,000.00 .00

Total 750,000.00 750,000.00 .00 .00 750,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Install Trench Drains/Replace Roofing/DeInstall Trench Drains/Replace Roofing/De

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-25-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

A. Epstein and Sons Internat 22021410 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

A. Epstein and Sons Internat 22021410 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 512: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 512Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--045045--002002 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Demolish Building and Construct Salt StoAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Roscoe Maintenance Storage Facility - Winnebago CountyCounty: 201 - Winnebago ________________________________________________________________________________Leg. Districts: House: 69 - Joe Sosnowski

Senate:35 - Dave Syverson : CURRENT STATUS 10-31-21 :: :

A/E Id: 18146 : :A/E Name: Architrave, Ltd. : :A/E Contact: : :A/E Telephone: (312)642-2600 : :Date Selected: 11-17-20 : :Contract Date: 03-23-21 ________________________________________________________________________________Est. Project Cost: 750,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 150,000.00 03-19-21 150,000.00 03-19-21 96,700.00 .00 53,300.00 .00

Total 150,000.00 150,000.00 96,700.00 .00 53,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 44.00% Description:Description: Demolish Building and Construct Salt StoDemolish Building and Construct Salt Sto

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-05-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-10-21 09-03-21 (116 ) Prime Bid: 01-03-22 ( 0 )

Design Devel: 07-05-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-03-22 ( 0 )50%: 08-23-21 ( 0 ) Final Accept: 11-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-02-2310-02-2395-100%: 10-18-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architrave, Ltd. 21001410 ( 0 ) ( 0 ) 10-02-2310-02-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architrave, Ltd. 21001410 10 96,700.00 .00 0 96,700.00 .00 0 96,700.00 0***** Contract Totals ********** Contract Totals ***** 96,700.00 .00 0 96,700.00 .00 0 96,700.00 0

Page 513: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 513Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--076076--004004 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Bishop Ford Maintenance Yard - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 29 - Thaddeus Jones

Senate:15 - Napoleon Harris, : CURRENT STATUS 10-01-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: : :A/E Telephone: (312)922-6400 : :Date Selected: 08-11-20 : :Contract Date: 10-08-20 ________________________________________________________________________________Est. Project Cost: 3,600,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 544,700.00 11-04-21 544,700.00 11-04-21 77,986.00 52,586.00 466,714.00 .00

Total 544,700.00 544,700.00 77,986.00 52,586.00 466,714.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 44.00% Description:Description: Various ImprovementsVarious Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-09-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-22-21 03-25-21 ( 3 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2312-01-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 21020410 ( 0 ) ( 0 ) 12-01-2312-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 21020410 10 77,986.00 .00 0 77,986.00 52,586.00 2 25,400.00 68***** Contract Totals ********** Contract Totals ***** 77,986.00 .00 0 77,986.00 52,586.00 2 25,400.00 68

Page 514: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 514Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--094094--002002 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Demolish and Construct Weigh StationAgency: Department of Transportation Analyst: Michelette ThompsonLocation: East Chicago Heights Weigh Station - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 33 - Marcus Evans,

Senate:17 - Elgie Sims, : CURRENT STATUS 11-03-21 :: :

A/E Id: 18146 : :A/E Name: Architrave, Ltd. : :A/E Contact: : :A/E Telephone: (312)642-2600 : :Date Selected: 03-09-21 : :Contract Date: 10-20-21 ________________________________________________________________________________Est. Project Cost: 475,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 38,030.00 10-19-21 38,030.00 10-19-21 38,030.00 .00 .00 .00

Total 38,030.00 38,030.00 38,030.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Demolish and Construct Weigh StationDemolish and Construct Weigh Station

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-29-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 12-17-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-17-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2410-31-2495-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architrave, Ltd. 21032110 ( 0 ) ( 0 ) 10-31-2410-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architrave, Ltd. 21032110 10 38,030.00 .00 0 38,030.00 .00 0 38,030.00 0***** Contract Totals ********** Contract Totals ***** 38,030.00 .00 0 38,030.00 .00 0 38,030.00 0

Page 515: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 515Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--096096--005005 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Dan Ryan Maintenance Facility - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 6 - Sonya Harper

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-09-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: : :A/E Telephone: (312)922-6400 : :Date Selected: 09-10-19 : :Contract Date: 11-07-19 ________________________________________________________________________________Est. Project Cost: 1,200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 609,700.00 10-30-19 609,700.00 10-30-19 609,700.00 242,171.76 .00 .00

Total 609,700.00 609,700.00 609,700.00 242,171.76 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Salt Storage Dome & Vehicle Storage BuilSalt Storage Dome & Vehicle Storage Buil

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-30-19 09-30-19 ( 0 ) Assgn Bid: 07-21-21 ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-06-20 08-04-21 (363 )

Design Devel: 02-10-20 05-14-20 ( 94 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-02-21 ( 0 )50%: ( 0 ) Final Accept: 05-28-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-13-2305-13-2395-100%: 06-01-20 04-16-21 (319 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 20021410 ( 0 ) ( 0 ) 05-13-2305-13-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 20021410 10 609,700.00 .00 0 609,700.00 242,171.76 8 367,528.24 40***** Contract Totals ********** Contract Totals ***** 609,700.00 .00 0 609,700.00 242,171.76 8 367,528.24 40

Page 516: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 516Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--096096--005005 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Dan Ryan Maintenance Facility - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 6 - Sonya Harper

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-09-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: : :A/E Telephone: (312)922-6400 : :Date Selected: : :Contract Date: 11-07-19 ________________________________________________________________________________Est. Project Cost: 1,200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 609,700.00 10-30-19 609,700.00 10-30-19 609,700.00 242,171.76 .00 .00

Total 609,700.00 609,700.00 609,700.00 242,171.76 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) 75.00% Description:Description: Maintenance Storage BuildingMaintenance Storage Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-30-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-17-20 ( 0 )

Design Devel: 03-16-20 01-04-21 (294 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-13-22 ( 0 )50%: 06-22-20 05-14-21 (326 ) Final Accept: 07-08-22 ( 0 )75%: ( 0 ) A/E Cont End: 05-13-2305-13-2395-100%: 09-28-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 517: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 517Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--128128--005005 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: DB Design Build PLA: YDescription: Construct Maintenance FacilityAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 1: Stevenson Team Section Headquarters - McCook, CCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 23 - Michael Zalewski

Senate:12 - Steven Landek : CURRENT STATUS 10-08-21 :: :

A/E Id: 29054 : :A/E Name: Muller & Muller, Ltd. : :A/E Contact: Susan Thayer : :A/E Telephone: (312)432-4180 : :Date Selected: 06-12-18 : :Contract Date: 09-12-18 ________________________________________________________________________________Est. Project Cost: 14,696,803.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 14,696,803.00 04-26-21 14,696,803.00 04-26-21 14,145,310.67 349,717.79 551,492.33 .00

Total 14,696,803.00 14,696,803.00 14,145,310.67 349,717.79 551,492.33 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 10.00% Description:Description: Construct Maintenance FacilityConstruct Maintenance Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-05-18 07-05-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-05-19 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Muller & Muller, Ltd. 18022110 ( 0 ) ( 0 ) 12-01-2212-01-22CORE Construction 21DB0341 06-04-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Muller & Muller, Ltd. 18022110 10 394,600.00 52,920.00 1 447,520.00 349,717.79 19 97,802.21 78CORE Construction 21DB0341 41 13,697,790.67 .00 0 13,697,790.67 .00 0 13,697,790.67 0***** Contract Totals ********** Contract Totals ***** 14,092,390.67 52,920.00 1 14,145,310.67 349,717.79 19 13,795,592.88 3

Page 518: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 518Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--128128--006006 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Construct Salt Storage BuildingAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 1: Stevenson Team Section Headquarters - McCook, CCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 23 - Michael Zalewski

Senate:12 - Steven Landek : CURRENT STATUS :: :

A/E Id: 18146 : :A/E Name: Architrave, Ltd. : :A/E Contact: : :A/E Telephone: (312)642-2600 : :Date Selected: 10-12-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,600,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 900,000.00 08-18-21 900,000.00 08-18-21 .00 .00 900,000.00 .00

Total 900,000.00 900,000.00 .00 .00 900,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Construct Salt Storage BuildingConstruct Salt Storage Building

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architrave, Ltd. 22022010 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architrave, Ltd. 22022010 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 519: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 519Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--137137--004004 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Sewer System and Renovate EquipmAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Creston Sub-Headquarters, Ogle CountyCounty: 141 - Ogle ________________________________________________________________________________Leg. Districts: House: 69 - Joe Sosnowski

Senate:35 - Dave Syverson : CURRENT STATUS 11-03-21 :: :

A/E Id: 34311 : :A/E Name: IMEG Corp. : :A/E Contact: Corey Stout : :A/E Telephone: (815)965-6400 : :Date Selected: 09-15-20 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 950,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 375,000.00 12-09-20 375,000.00 12-09-20 .00 .00 375,000.00 .00

Total 375,000.00 375,000.00 .00 .00 375,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Upgrade Sewer System and Renovate EquipmUpgrade Sewer System and Renovate Equipm

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IMEG Corp. 21031110 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IMEG Corp. 21031110 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 520: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 520Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--140140--031031 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace BoilerAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 2 Headquarters, Dixon - Lee CountyCounty: 103 - Lee ________________________________________________________________________________Leg. Districts: House: 90 - Tom Demmer

Senate:45 - Brian Stewart : CURRENT STATUS 11-03-21 :: :

A/E Id: 31186 : :A/E Name: Delta Engineering Group, LLC : :A/E Contact: Mourad Djendi : :A/E Telephone: (312)377-7700 : :Date Selected: 05-11-21 : :Contract Date: 07-06-21 ________________________________________________________________________________Est. Project Cost: 600,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 64,400.00 07-07-21 64,400.00 07-07-21 64,400.00 7,214.30 .00 .00

Total 64,400.00 64,400.00 64,400.00 7,214.30 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Replace BoilerReplace Boiler

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-03-21 06-03-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-25-22 ( 0 )

Design Devel: 10-04-21 10-05-21 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-02-22 ( 0 )50%: 12-13-21 ( 0 ) Final Accept: 10-07-22 ( 0 )75%: ( 0 ) A/E Cont End: 09-02-2309-02-2395-100%: 02-07-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Delta Engineering Group, LLC 21002610 ( 0 ) ( 0 ) 09-02-2309-02-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Delta Engineering Group, LLC 21002610 10 64,400.00 .00 0 64,400.00 7,214.30 1 57,185.70 11***** Contract Totals ********** Contract Totals ***** 64,400.00 .00 0 64,400.00 7,214.30 1 57,185.70 11

Page 521: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 521Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--252252--003003 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Demolish Buildings and Construct BuildinAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Morris Maintenance Storage Facility, Grundy CountyCounty: 63 - Grundy ________________________________________________________________________________Leg. Districts: House: 75 - David Welter

Senate:38 - Sue Rezin : CURRENT STATUS 08-30-21 :: :

A/E Id: 29102 : :A/E Name: Milhouse Engineering and Const : :A/E Contact: Fred Owens : :A/E Telephone: (312)987-0061 : :Date Selected: 10-08-19 : :Contract Date: 01-28-20 ________________________________________________________________________________Est. Project Cost: 14,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 908,000.00 12-17-19 908,000.00 12-17-19 908,000.00 271,114.00 .00 .00

Total 908,000.00 908,000.00 908,000.00 271,114.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 99.00% Description:Description: Demolish Buildings and Construct BuildinDemolish Buildings and Construct Buildin

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-21-19 11-21-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 04-13-20 05-21-20 ( 38 ) Prime Bid: 04-12-21 ( 0 )

Design Devel: 07-06-20 09-01-20 ( 57 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-01-23 ( 0 )50%: 09-07-20 11-18-20 ( 72 ) Final Accept: 10-15-23 ( 0 )75%: ( 0 ) A/E Cont End: 09-01-2409-01-2495-100%: 02-22-21 07-15-21 (143 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Milhouse Engineering and Con 2001210 ( 0 ) ( 0 ) 09-01-2409-01-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Milhouse Engineering and Con 2001210 10 908,000.00 .00 0 908,000.00 271,114.00 3 636,886.00 30***** Contract Totals ********** Contract Totals ***** 908,000.00 .00 0 908,000.00 271,114.00 3 636,886.00 30

Page 522: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 522Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--256256--029029 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate RestroomsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 3: Ottawa District Headquarters - Ottawa, LaSalleCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 11-01-21 :: :

A/E Id: 30497 : :A/E Name: Bloom Companies, LLC : :A/E Contact: : :A/E Telephone: (312)876-9500 : :Date Selected: 10-12-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 135,000.00 08-10-21 135,000.00 08-10-21 .00 .00 135,000.00 .00

Total 135,000.00 135,000.00 .00 .00 135,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Renovate RestroomsRenovate Restrooms

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bloom Companies, LLC 22001610 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bloom Companies, LLC 22001610 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 523: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 523Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--308308--007007 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate and Construct a New Wash AreaAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 4: Morton Team Section Headquarters - Morton, TazeCounty: 179 - Tazewell ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 11-03-21 :: :

A/E Id: 16668 : :A/E Name: Evan Lloyd Associates, Inc. : :A/E Contact: : :A/E Telephone: (217)789-7011 : :Date Selected: 10-12-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,625,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 300,000.00 08-10-21 300,000.00 08-10-21 .00 .00 300,000.00 .00

Total 300,000.00 300,000.00 .00 .00 300,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 3.00% Description:Description: Renovate and Construct a New Wash AreaRenovate and Construct a New Wash Area

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Evan Lloyd Associates, Inc. 22001710 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Evan Lloyd Associates, Inc. 22001710 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 524: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 524Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--341341--005005 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate Rest AreasAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Pride of the Prairie Rest Areas - Macon CountyCounty: 115 - Macon ________________________________________________________________________________Leg. Districts: House:101 - Dan Caulkins

Senate:51 - Chapin Rose : CURRENT STATUS 11-01-21 :: :

A/E Id: 29212 : :A/E Name: Ferry & Associates Architects, : :A/E Contact: Bruce Ferry : :A/E Telephone: (217)522-4100 : :Date Selected: 02-14-17 : :Contract Date: 04-07-17 ________________________________________________________________________________Est. Project Cost: 1,238,304.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,117,380.00 07-01-19 1,117,380.00 07-01-19 1,043,333.55 943,049.68 74,046.45 .00902 120,924.00 09-18-18 120,924.00 09-18-18 120,924.00 107,719.28 .00 .00

Total 1,238,304.00 1,238,304.00 1,164,257.55 1,050,768.96 74,046.45 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 90.00% Description:Description: Renovate Rest AreasRenovate Rest Areas

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-07-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-12-17 05-17-17 ( 5 ) Prime Bid: 04-12-18 04-05-18 ( 7-)

Design Devel: 10-05-17 10-11-17 ( 6 ) Prime Re-Bid: 04-05-18 ( 0 )25%: ( 0 ) Subst Compl: 01-07-19 09-27-19 ( 0 )50%: ( 0 ) Final Accept: 03-01-19 10-31-19 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2012-31-20 12-31-2112-31-2195-100%: 01-08-18 02-06-18 ( 29 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ferry & Associates Architect 17001710 ( 0 ) ( 0 ) 12-31-2112-31-21Energy Edge Builders, Inc. 19044781 11-14-18 01-04-19 08-02-19 10-24-19 ( 83 ) 10-01-19 ( 0 ) 12-31-2112-31-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ferry & Associates Architect 17001710 10 33,089.00 134,022.00 4 167,111.00 153,906.28 14 13,204.72 92Energy Edge Builders, Inc. 19044781 81 1,409,435.68 412,289.13- 5 997,146.55 896,862.68 13 100,283.87 90***** Contract Totals ********** Contract Totals ***** 1,442,524.68 278,267.13- 9 1,164,257.55 1,050,768.96 27 113,488.59 90

Page 525: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 525Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--368368--039039 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Roof SystemAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 5: Headquarters - Paris, Edgar CountyCounty: 45 - Edgar ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 475,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 90,000.00 08-10-21 90,000.00 08-10-21 .00 .00 90,000.00 .00

Total 90,000.00 90,000.00 .00 .00 90,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Roof SystemReplace Roof System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 526: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 526Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--381381--001001 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Demolish and Construct BuildingsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Tuscola Team Section, Douglas CountyCounty: 41 - Douglas ________________________________________________________________________________Leg. Districts: House:102 - Brad Halbrook

Senate:51 - Chapin Rose : CURRENT STATUS 11-08-21 :: :

A/E Id: 3592 : :A/E Name: Steckel-Parker Architects, Inc : :A/E Contact: : :A/E Telephone: (217)793-6444 : :Date Selected: 09-15-20 : :Contract Date: 03-02-21 ________________________________________________________________________________Est. Project Cost: 1,325,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 265,000.00 12-09-20 265,000.00 12-09-20 139,150.00 38,064.95 125,850.00 .00

Total 265,000.00 265,000.00 139,150.00 38,064.95 125,850.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Demolish and Construct BuildingsDemolish and Construct Buildings

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-04-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 06-10-21 06-25-21 ( 15 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-12-22 ( 0 )

Design Devel: 06-10-21 06-29-21 ( 19 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-13-22 ( 0 )50%: 09-06-21 10-07-21 ( 31 ) Final Accept: 02-11-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-25-2407-25-2495-100%: 11-03-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Steckel-Parker Architects, I 21011610 ( 0 ) ( 0 ) 07-25-2407-25-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Steckel-Parker Architects, I 21011610 10 139,150.00 .00 0 139,150.00 38,064.95 2 101,085.05 27***** Contract Totals ********** Contract Totals ***** 139,150.00 .00 0 139,150.00 38,064.95 2 101,085.05 27

Page 527: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 527Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--397397--004004 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade Sanitary Sewer SystemAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 6: Coalfield Rest Areas (NB & SB) - Montgomery CouCounty: 135 - Montgomery ________________________________________________________________________________Leg. Districts: House: 95 - Avery Bourne

Senate:48 - Doris Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 26105 : :A/E Name: Juneau Associates, Inc., P.C. : :A/E Contact: Charles Juneau : :A/E Telephone: (618)659-0900 : :Date Selected: 03-13-18 : :Contract Date: 06-01-18 ________________________________________________________________________________Est. Project Cost: 2,031,465.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 2,031,465.00 08-09-21 2,031,465.00 08-09-21 1,946,415.00 134,641.16 85,050.00 .00

Total 2,031,465.00 2,031,465.00 1,946,415.00 134,641.16 85,050.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 25.00% Description:Description: Upgrade Sanitary Sewer SystemUpgrade Sanitary Sewer System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-19-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 10-23-19 10-28-19 ( 5 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-11-20 06-09-21 07-14-21 ( 35 )

Design Devel: 10-23-19 10-19-19 ( 4-) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-10-21 03-31-22 ( 0 )50%: 01-08-20 04-21-20 (104 ) Final Accept: 04-10-21 04-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-01-2108-01-21 12-30-2312-30-2395-100%: 03-25-20 03-18-21 (358 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Juneau Associates, Inc., P.C 18011810 ( 0 ) ( 0 ) 12-30-2312-30-23Haier Plumbing and Heating, 22044781 08-26-21 10-15-21 06-12-22 ( 0 ) 07-12-22 ( 0 ) 07-12-2307-12-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Juneau Associates, Inc., P.C 18011810 10 37,650.00 208,615.00 2 246,265.00 134,641.16 12 111,623.84 55Haier Plumbing and Heating, 22044781 81 1,700,150.00 .00 0 1,700,150.00 .00 0 1,700,150.00 0***** Contract Totals ********** Contract Totals ***** 1,737,800.00 208,615.00 2 1,946,415.00 134,641.16 12 1,811,773.84 7

Page 528: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 528Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--400400--005005 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Construct Salt Storage and Cold StorageAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 6: Litchfield Team Section Headquarters - MontgomeCounty: 135 - Montgomery ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: : :A/E Telephone: (618)344-3774 : :Date Selected: 09-14-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,715,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 425,000.00 08-10-21 425,000.00 08-10-21 .00 .00 425,000.00 .00

Total 425,000.00 425,000.00 .00 .00 425,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Construct Salt Storage and Cold StorageConstruct Salt Storage and Cold Storage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 22041510 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 22041510 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 529: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 529Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--428428--003003 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Demolish and Construct Rest Areas and VeAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Railsplitter Rest Area - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 29212 : :A/E Name: Ferry & Associates Architects, : :A/E Contact: : :A/E Telephone: (217)522-4100 : :Date Selected: 10-08-19 : :Contract Date: 02-04-20 ________________________________________________________________________________Est. Project Cost: 7,800,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 305,373.00 10-19-20 305,373.00 10-19-20 305,373.00 258,127.04 .00 .00

Total 305,373.00 305,373.00 305,373.00 258,127.04 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 17.00% Description:Description: Demolish and Construct Rest Areas and VeDemolish and Construct Rest Areas and Ve

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-01-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-29-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-29-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2508-31-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ferry & Associates Architect 20031910 ( 0 ) ( 0 ) 08-31-2508-31-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ferry & Associates Architect 20031910 10 230,473.00 74,900.00 1 305,373.00 258,127.04 7 47,245.96 85***** Contract Totals ********** Contract Totals ***** 230,473.00 74,900.00 1 305,373.00 258,127.04 7 47,245.96 85

Page 530: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 530Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--429429--002002 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Demolish and Construct Weigh StationAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Williamsville Weigh StationCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 87 - Tim Butler

Senate:44 - Sally Turner : CURRENT STATUS 11-02-21 :: :

A/E Id: 21841 : :A/E Name: Architechniques, Ltd. : :A/E Contact: Curt Orso : :A/E Telephone: (618)942-6918 : :Date Selected: 06-11-19 : :Contract Date: 09-20-19 ________________________________________________________________________________Est. Project Cost: 575,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 558,514.10 02-04-21 558,514.10 02-04-21 539,399.35 399,331.46 19,114.75 .00

Total 558,514.10 558,514.10 539,399.35 399,331.46 19,114.75 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 90.00% Description:Description: Demolish and Construct Weigh StationDemolish and Construct Weigh Station

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-15-19 08-15-19 ( 0 ) Assgn Bid: 01-06-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-11-20 01-20-21 (254 )

Design Devel: 11-18-19 12-03-19 ( 15 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-01-20 10-01-21 ( 0 )50%: ( 0 ) Final Accept: 11-06-20 12-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2110-31-21 12-01-2212-01-2295-100%: 03-09-20 05-29-20 ( 81 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Architechniques, Ltd. 19005410 ( 0 ) ( 0 ) 12-01-2212-01-22Capitol Construction Group, 21048345 03-05-21 04-22-21 08-20-21 12-31-21 ( 0 ) 01-31-22 ( 0 ) 01-31-2301-31-23Laverdiere Construction, Inc 21048441 03-05-21 04-22-21 08-20-21 12-31-21 ( 0 ) 01-31-22 ( 0 ) 01-31-2301-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Architechniques, Ltd. 19005410 10 70,997.00 .00 1 70,997.00 45,843.00 3 25,154.00 65Capitol Construction Group, 21048345 45 52,650.00 450.00 2 53,100.00 16,730.63 2 36,369.37 32Laverdiere Construction, Inc 21048441 41 411,652.00 3,650.35 2 415,302.35 336,757.83 4 78,544.52 81***** Contract Totals ********** Contract Totals ***** 535,299.00 4,100.35 5 539,399.35 399,331.46 9 140,067.89 74

Page 531: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 531Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--435435--001001 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Construct New D6 Bridge Crew MaintenanceAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 6: Bridge Crew Yard - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 99 - Mike Murphy

Senate:50 - Steve McClure : CURRENT STATUS 11-02-21 :: :

A/E Id: 1698 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: : :A/E Telephone: (217)532-3959 : :Date Selected: 05-11-21 : :Contract Date: 07-26-21 ________________________________________________________________________________Est. Project Cost: 4,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 81,670.00 07-15-21 81,670.00 07-15-21 81,670.00 40,321.00 .00 .00

Total 81,670.00 81,670.00 81,670.00 40,321.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Construct New D6 Bridge Crew MaintenanceConstruct New D6 Bridge Crew Maintenance

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-08-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-01-21 11-03-21 ( 2 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-01-21 11-05-21 ( 4 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2510-31-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 21042610 ( 0 ) ( 0 ) 10-31-2510-31-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 21042610 10 81,670.00 .00 0 81,670.00 40,321.00 2 41,349.00 49***** Contract Totals ********** Contract Totals ***** 81,670.00 .00 0 81,670.00 40,321.00 2 41,349.00 49

Page 532: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 532Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--442442--053053 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: District 6: Various ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Administration/Hanley Building - Springfield, Sangamon CountCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Karla Smalley : :A/E Telephone: (217)363-3375 : :Date Selected: 12-13-16 : :Contract Date: 03-03-17 ________________________________________________________________________________Est. Project Cost: 11,090,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 11,090,000.00 07-01-19 11,090,000.00 07-01-19 10,499,034.83 9,573,483.06 590,965.17 .00

Total 11,090,000.00 11,090,000.00 10,499,034.83 9,573,483.06 590,965.17 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 94.00% Description:Description: District 6: Various ImprovementsDistrict 6: Various Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-24-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-02-17 05-02-17 ( 0 ) Prime Bid: 08-23-18 08-23-18 ( 0 )

Design Devel: 12-05-17 12-08-17 ( 3 ) Prime Re-Bid: 11-01-18 ( 0 )25%: ( 0 ) Subst Compl: 10-04-20 ( 0 )50%: 03-15-18 03-20-18 ( 5 ) Final Accept: 12-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2012-31-20 10-31-2210-31-2295-100%: 06-21-18 06-25-18 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 17001310 ( 0 ) ( 0 ) 10-31-2210-31-22Johnco Construction, Inc. 19045281 12-11-18 12-27-18 12-26-20 12-26-21 ( 0 ) 02-24-22 ( 0 ) 02-24-2302-24-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 17001310 10 232,213.86 517,484.89 7 749,698.75 685,677.06 26 64,021.69 92Johnco Construction, Inc. 19045281 81 9,925,091.59 175,755.51- 21 9,749,336.08 8,887,806.00 29 861,530.08 91***** Contract Totals ********** Contract Totals ***** 10,157,305.45 341,729.38 28 10,499,034.83 9,573,483.06 55 925,551.77 91

Page 533: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 533Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--442442--055055 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Chilled Water System, Remove andAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Administration/Hanley Building - Springfield, Sangamon CountCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 30812 : :A/E Name: Webb Engineering Services, Inc : :A/E Contact: Wayne Robinson : :A/E Telephone: (314)588-0600 : :Date Selected: 06-12-18 : :Contract Date: 08-03-18 ________________________________________________________________________________Est. Project Cost: 2,387,426.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 2,387,426.00 01-14-20 2,387,426.00 01-14-20 2,307,236.25 2,090,556.12 80,189.75 .00

Total 2,387,426.00 2,387,426.00 2,307,236.25 2,090,556.12 80,189.75 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Replace Chilled Water System, Remove andReplace Chilled Water System, Remove and

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-03-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 617.12 Schem Design: ( 0 ) Prime Bid: 07-01-19 07-12-19 11-21-19 (132 )

Design Devel: 11-15-18 11-26-18 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-01-20 ( 0 )50%: ( 0 ) Final Accept: 03-01-20 ( 0 )75%: ( 0 ) A/E Cont End: 02-01-2102-01-21 04-04-2204-04-2295-100%: 05-31-19 09-17-19 (109 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Webb Engineering Services, I 18002210 ( 0 ) ( 0 ) 04-04-2204-04-22Johnco Construction, Inc. 20047981 02-06-20 04-29-20 03-21-21 07-03-21 ( 0 ) 02-04-21 ( 0 ) 09-04-2209-04-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Webb Engineering Services, I 18002210 10 165,450.00 36,926.00 3 202,376.00 181,618.38 14 20,757.62 90Johnco Construction, Inc. 20047981 81 2,081,000.00 23,860.25 6 2,104,860.25 1,908,937.74 9 195,922.51 91***** Contract Totals ********** Contract Totals ***** 2,246,450.00 60,786.25 9 2,307,236.25 2,090,556.12 23 216,680.13 91

Page 534: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 534Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--500500--004004 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Demolish and Construct Buildings and RepAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Vandalia Maintenance Facility, Fayette CountyCounty: 51 - Fayette ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 11-08-21 :: :

A/E Id: 27810 : :A/E Name: Horner & Shifrin, Inc. : :A/E Contact: Casey Wilson : :A/E Telephone: (618)622-3040 : :Date Selected: 09-15-20 : :Contract Date: 04-02-21 ________________________________________________________________________________Est. Project Cost: 4,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,000,000.00 12-09-20 1,000,000.00 12-09-20 76,800.00 70,084.24 923,200.00 .00

Total 1,000,000.00 1,000,000.00 76,800.00 70,084.24 923,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 15.00% Description:Description: Demolish and Construct Buildings and RepDemolish and Construct Buildings and Rep

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-19-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 07-01-21 07-01-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-01-21 07-02-21 ( 1 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 09-15-2509-15-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Horner & Shifrin, Inc. 21011710 ( 0 ) ( 0 ) 09-15-2509-15-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Horner & Shifrin, Inc. 21011710 10 76,800.00 .00 0 76,800.00 70,084.24 2 6,715.76 91***** Contract Totals ********** Contract Totals ***** 76,800.00 .00 0 76,800.00 70,084.24 2 6,715.76 91

Page 535: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 535Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--514514--009009 PM NAME: Daniel Johnson 498Daniel Johnson 498Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Repair Exterior and Site ImprovementsAgency: Department of Transportation Analyst: Michelette ThompsonLocation: District 8: Headquarters - Collinsville, Madison CountyCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:112 - Katie Stuart

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-02-21 :: :

A/E Id: 27800 : :A/E Name: EDM Incorporated : :A/E Contact: : :A/E Telephone: (618)344-3774 : :Date Selected: 08-10-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 750,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 150,000.00 08-10-21 150,000.00 08-10-21 .00 .00 150,000.00 .00

Total 150,000.00 150,000.00 .00 .00 150,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 15.00% Description:Description: Repair Exterior and Site ImprovementsRepair Exterior and Site Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

EDM Incorporated 22040810 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

EDM Incorporated 22040810 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 536: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 536Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--565565--005005 PM NAME: Marci Boudet 020Marci Boudet 020Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Demolish and Construct Rest Areas and StAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Trail of Tears Rest Area, Union CountyCounty: 181 - Union ________________________________________________________________________________Leg. Districts: House:115 - Paul Jacobs

Senate:58 - Terri Bryant : CURRENT STATUS 11-01-21 :: :

A/E Id: 31398 : :A/E Name: Baysinger Architects, PLLC : :A/E Contact: : :A/E Telephone: (618)993-8250 : :Date Selected: 10-08-19 : :Contract Date: 12-20-19 ________________________________________________________________________________Est. Project Cost: 6,700,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 1,109,740.00 03-11-21 1,109,740.00 03-11-21 1,109,740.00 472,973.53 .00 .00

Total 1,109,740.00 1,109,740.00 1,109,740.00 472,973.53 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Demolish and Construct Rest Areas and StDemolish and Construct Rest Areas and St

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-06-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 05-11-20 05-11-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-11-20 05-14-20 ( 3 ) Prime Bid: 11-08-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-31-23 ( 0 )50%: 05-24-21 06-09-21 ( 16 ) Final Accept: 09-29-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2407-31-2495-100%: 08-30-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Baysinger Architects, PLLC 20012810 ( 0 ) ( 0 ) 07-31-2407-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Baysinger Architects, PLLC 20012810 10 113,680.00 996,060.00 1 1,109,740.00 472,973.53 8 636,766.47 43***** Contract Totals ********** Contract Totals ***** 113,680.00 996,060.00 1 1,109,740.00 472,973.53 8 636,766.47 43

Page 537: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 537Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--636636--002002 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Assess and Repair Water DamageAgency: Department of Transportation Analyst: Michelette ThompsonLocation: National Trail Rest Area, I-70 Effingham CountyCounty: 49 - Effingham ________________________________________________________________________________Leg. Districts: House:107 - Blaine Wilhour

Senate:54 - Jason Plummer : CURRENT STATUS 11-09-21 :: :

A/E Id: 29858 : :A/E Name: Wright & Calvert Design Group, : :A/E Contact: Jason Wright : :A/E Telephone: (618)263-3254 : :Date Selected: 03-12-19 : :Contract Date: 03-20-19 ________________________________________________________________________________Est. Project Cost: 72,180.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 72,180.00 10-09-19 72,180.00 10-09-19 72,180.00 9,180.00 .00 .00

Total 72,180.00 72,180.00 72,180.00 9,180.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 25.00% Description:Description: Assess and Repair Water DamageAssess and Repair Water Damage

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-01-20 ( 0 )

Design Devel: 01-06-20 05-26-20 (141 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-20 ( 0 )50%: ( 0 ) Final Accept: 12-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-1912-31-19 11-30-2111-30-2195-100%: 04-01-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Wright & Calvert Design Grou 19002210 ( 0 ) ( 0 ) 11-30-2111-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Wright & Calvert Design Grou 19002210 10 18,360.00 53,820.00 1 72,180.00 9,180.00 1 63,000.00 13***** Contract Totals ********** Contract Totals ***** 18,360.00 53,820.00 1 72,180.00 9,180.00 1 63,000.00 13

Page 538: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 538Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--637637--003003 PM NAME: Darnell Barnes 332Darnell Barnes 332Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Repair and Replace Water Supply SystemAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Prairie View Rest Area, I-57 Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 29 - Thaddeus Jones

Senate:15 - Napoleon Harris, : CURRENT STATUS 11-09-21 :: :

A/E Id: 18866 : :A/E Name: Robinson Engineering, Ltd. : :A/E Contact: : :A/E Telephone: (708)331-6700 : :Date Selected: 07-13-21 : :Contract Date: 10-19-21 ________________________________________________________________________________Est. Project Cost: 1,200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 56,300.00 10-18-21 56,300.00 10-18-21 56,300.00 .00 .00 .00

Total 56,300.00 56,300.00 56,300.00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Repair and Replace Water Supply SystemRepair and Replace Water Supply System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-10-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-19-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-14-22 ( 0 )50%: ( 0 ) Final Accept: 04-28-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2512-01-2595-100%: 12-07-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Robinson Engineering, Ltd. 21022710 ( 0 ) ( 0 ) 12-01-2512-01-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Robinson Engineering, Ltd. 21022710 10 56,300.00 .00 0 56,300.00 .00 0 56,300.00 0***** Contract Totals ********** Contract Totals ***** 56,300.00 .00 0 56,300.00 .00 0 56,300.00 0

Page 539: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 539Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 630630--638638--001001 PM NAME: Josh Hansel 467Josh Hansel 467Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Demo. Weigh Station/Construct Weigh StatAgency: Department of Transportation Analyst: Michelette ThompsonLocation: Litchfield Weigh Station, I-55 Montgomery CountyCounty: 135 - Montgomery ________________________________________________________________________________Leg. Districts: House:106 - Thomas Bennett

Senate:53 - Jason Barickman : CURRENT STATUS 11-08-21 :: :

A/E Id: 1472 : :A/E Name: Sarti Architectural Group, Inc : :A/E Contact: Dan Ernst : :A/E Telephone: (217)585-9111 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 3,664,356.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 3,768,862.70 01-15-20 3,768,862.70 01-15-20 3,696,296.78 3,662,810.49 72,565.92 .00

Total 3,768,862.70 3,768,862.70 3,696,296.78 3,662,810.49 72,565.92 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (XP) 99.00% Description:Description: Demo. Weigh Station/Construct Weigh StatDemo. Weigh Station/Construct Weigh Stat

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-08-18 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 24,713.54 Schem Design: ( 0 ) Prime Bid: 08-09-18 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-20 ( 0 )50%: ( 0 ) Final Accept: 08-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 12-31-2112-31-2195-100%: 04-19-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

AndersonBloom + Associates, 16010310 ( 0 ) ( 0 ) 05-08-2105-08-21Sarti Architectural Group, I 19000910 ( 0 ) ( 0 ) 12-31-2112-31-21Plocher Construction Company 19044341 10-24-18 11-15-18 04-02-20 05-17-21 01-07-21 (280 ) 07-16-21 07-15-21 ( 1-) 07-16-2207-16-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

AndersonBloom + Associates, 16010310 10 179,755.00 16,388.88- 2 163,366.12 163,366.12 10 .00 100Sarti Architectural Group, I 19000910 10 309,335.25 104,709.25- 4 204,626.00 171,139.71 7 33,486.29 84Plocher Construction Company 19044341 41 5,804,400.00 2,476,095.34- 17 3,328,304.66 3,328,304.66 12 .00 100***** Contract Totals ********** Contract Totals ***** 6,293,490.25 2,597,193.47- 23 3,696,296.78 3,662,810.49 29 33,486.29 99

Page 540: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 540Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--000000--025025 PM NAME: Michelette MISSING 0Michelette MISSING 0Project Status: AP Active Project Region:Project Type: ES Environmental Studies PLA: NDescription: SNG Plant Cost EstimateAgency: Capital Development Board Analyst: MISSINGLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 .00 10-23-12 .00 10-23-12 .00 .00 .00 .00991 352,000.00 09-20-11 352,000.00 10-18-11 352,000.00 352,000.00 .00 .00

Total 352,000.00 352,000.00 352,000.00 352,000.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: SNG Plant Cost EstimateSNG Plant Cost Estimate

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 541: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 541Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--000000--026026 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: GR Monetary Grants/Reimbursements PLA: NDescription: Performance Contracting Grant with DCEOAgency: Capital Development Board Analyst: MISSINGLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 10,000,000.00 06-19-12 10,000,000.00 06-19-12 10,000,000.00 10,000,000.00 .00 .00

Total 10,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Performance Contracting Grant with DCEOPerformance Contracting Grant with DCEO

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 542: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 542Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--000000--029029 PM NAME: MISSING 000MISSING 000Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Capital Infrastructure Improvements, UpgAgency: Capital Development Board Analyst: Kyle BeachyLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,533,449.11 06-02-15 6,533,449.11 06-02-15 .00 .00 .00 6,533,449.11

Total 6,533,449.11 6,533,449.11 .00 .00 .00 6,533,449.11____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Capital Infrastructure Improvements, UpgCapital Infrastructure Improvements, Upg

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 543: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 543Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--000000--171171 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: LS Lump Sum PLA: NDescription: Various Art-in-Architecture Projects forAgency: Capital Development Board Analyst: CDB CDBLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 996,339.73 04-15-21 996,339.73 04-15-21 .00 .00 996,339.73 .00

Total 996,339.73 996,339.73 .00 .00 996,339.73 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Various Art-in-Architecture Projects forVarious Art-in-Architecture Projects for

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 544: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 544Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--000000--174174 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Facility Condition Assessment ServicesAgency: Capital Development Board Analyst: Michelette ThompsonLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-01-21 :: :

A/E Id: 32808 : :A/E Name: HDR Architecture, Inc. : :A/E Contact: Matthew Skarr : :A/E Telephone: (312)470-9501 : :Date Selected: 07-14-20 : :Contract Date: 09-22-21 ________________________________________________________________________________Est. Project Cost: 2,500,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

215 2,500,000.00 09-21-21 2,500,000.00 09-21-21 1,872,853.00 .00 627,147.00 .00

Total 2,500,000.00 2,500,000.00 1,872,853.00 .00 627,147.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Facility Condition Assessment ServicesFacility Condition Assessment Services

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-04-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 07-02-2607-02-2695-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

HDR Architecture, Inc. 21010610 ( 0 ) ( 0 ) 07-02-2607-02-26

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

HDR Architecture, Inc. 21010610 10 1,872,853.00 .00 0 1,872,853.00 .00 0 1,872,853.00 0***** Contract Totals ********** Contract Totals ***** 1,872,853.00 .00 0 1,872,853.00 .00 0 1,872,853.00 0

Page 545: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 545Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--000000--175175 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Construction Management Services - NorthAgency: Capital Development Board Analyst: CDB CDBLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 34627 : :A/E Name: STV Construction, Inc. : :A/E Contact: : :A/E Telephone: (312)553-4167 : :Date Selected: 07-14-20 : :Contract Date: 10-25-20 ________________________________________________________________________________Est. Project Cost: 2,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,000,000.00 11-23-20 2,000,000.00 11-23-20 .00 .00 2,000,000.00 .00

Total 2,000,000.00 2,000,000.00 .00 .00 2,000,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Construction Management Services - NorthConstruction Management Services - North

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2306-30-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

STV Construction, Inc. 21020110 ( 0 ) ( 0 ) 06-30-2306-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

STV Construction, Inc. 21020110 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 546: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 546Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--000000--176176 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Construction Management Services - CentrAgency: Capital Development Board Analyst: CDB CDBLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 2,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,000,000.00 11-23-20 2,000,000.00 11-23-20 .00 .00 2,000,000.00 .00

Total 2,000,000.00 2,000,000.00 .00 .00 2,000,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Construction Management Services - CentrConstruction Management Services - Centr

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 547: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 547Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--001001--617617 PM NAME: CDB MISSING 000CDB MISSING 000Project Status: AP Active Project Region:Project Type: LS Lump Sum PLA: NDescription: DCEO Grant MoneyAgency: Capital Development Board Analyst: MISSINGLocation: Statewide DCEOCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

990 2,956.50- 10-13-15 .00 05-19-11 .00 .00 .00 2,956.50-991 .00 10-03-13 .00 10-03-13 .00 .00 .00 .00

Total 2,956.50 .00 .00 .00 .00 2,956.50-____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: DCEO Grant MoneyDCEO Grant Money

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 548: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 548Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--050050--018018 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: AS Asbestos PLA: NDescription: AHERA ReinspectionAgency: Capital Development Board Analyst: Stan GralnickLocation: StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House: 99 - Mike Murphy

Senate:50 - Steve McClure : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

224 .00 09-20-12 .00 09-20-12 .00 .00 .00 .00

Total .00 .00 .00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: AHERA ReinspectionAHERA Reinspection

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 549: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 549Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--051051--002002 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Higher EducationAgency: Capital Development Board Analyst: Erin EoffLocation: Statewide For Educational Facilities (a)County: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 835,114.10 06-02-21 835,114.10 06-02-21 .00 .00 835,114.10 .00

Total 835,114.10 835,114.10 .00 .00 835,114.10 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Higher EducationHigher Education

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 550: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 550Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--055055--003003 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Emergency, Remobilization, & EscalationAgency: Capital Development Board Analyst: Erin EoffLocation: Statewide For State Agencies Facilities (e)County: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 49,219,036.18 11-12-21 9,219,943.13 11-12-21 .00 .00 30,779,781.18- 39,999,724.31999 .00 09-18-19 .00 09-18-19 .00 .00 .00 .00

Total 49,219,036.18 9,219,943.13 .00 .00 30,779,781.18 39,999,724.31____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Emergency, Remobilization, & EscalationEmergency, Remobilization, & Escalation

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 551: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 551Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--055055--004004 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: LS Lump Sum PLA: NDescription: Close Out ProjectsAgency: Capital Development Board Analyst: Erin EoffLocation: Statewide For State Agencies Facilities (e)County: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 123,408.49 06-14-21 123,408.49 06-14-21 .00 .00 123,408.49 .00

Total 123,408.49 123,408.49 .00 .00 123,408.49 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Close Out ProjectsClose Out Projects

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 552: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 552Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--055055--005005 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: LS Lump Sum PLA: NDescription: Deferred Maintenance 3E State FacilitiesAgency: Capital Development Board Analyst: Erin EoffLocation: Statewide For State Agencies Facilities (e)County: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 .00 06-27-19 .00 06-27-19 .00 .00 .00 .00

Total .00 .00 .00 .00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Deferred Maintenance 3E State FacilitiesDeferred Maintenance 3E State Facilities

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 553: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 553Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--225225--001001 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Indefinite Delivery/Indefinite QuantityAgency: Capital Development Board Analyst: MISSINGLocation: Indefinite Delivery/Indefinite Quantity Services - NorthernCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 22186 : :A/E Name: Johnson Lasky Kindelin Archite : :A/E Contact: : :A/E Telephone: (312)357-1221 : :Date Selected: 07-09-19 : :Contract Date: 08-29-19 ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,000,000.00 06-03-21 1,000,000.00 06-03-21 101,286.35 55,364.48 898,713.65 .00

Total 1,000,000.00 1,000,000.00 101,286.35 55,364.48 898,713.65 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Indefinite Delivery/Indefinite QuantityIndefinite Delivery/Indefinite Quantity

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Johnson Lasky Kindelin Archi 20020110 ( 0 ) ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Johnson Lasky Kindelin Archi 20020110 10 .00 101,286.35 7 101,286.35 55,364.48 9 45,921.87 55***** Contract Totals ********** Contract Totals ***** .00 101,286.35 7 101,286.35 55,364.48 9 45,921.87 55

Page 554: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 554Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--250250--000000 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Indefinite Delivery/Indefinite QuantityAgency: Capital Development Board Analyst: MISSINGLocation: Indefinite Delivery/Indefinite Quantity Services - CentralCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 1698 : :A/E Name: Hurst-Rosche, Inc. : :A/E Contact: Anthony Tolliver : :A/E Telephone: (217)532-3959 : :Date Selected: 07-11-17 : :Contract Date: 08-17-17 ________________________________________________________________________________Est. Project Cost: 81,344.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 7,879.00 07-01-19 7,879.00 07-01-19 7,879.00 7,879.00 .00 .00141 77,080.48 06-23-20 77,080.48 06-23-20 72,520.48 66,612.87 4,560.00 .00708 7,023.30 06-27-18 7,023.30 06-27-18 7,023.30 7,023.30 .00 .00

Total 91,982.78 91,982.78 87,422.78 81,515.17 4,560.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Indefinite Delivery/Indefinite QuantityIndefinite Delivery/Indefinite Quantity

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-07-17 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-29-18 ( 0 )

Design Devel: 01-31-18 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-31-18 ( 0 )50%: ( 0 ) Final Accept: 06-15-18 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-1806-30-18 06-30-2006-30-2095-100%: 02-28-18 04-06-18 ( 37 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hurst-Rosche, Inc. 18000210 ( 0 ) ( 0 ) 06-30-2006-30-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hurst-Rosche, Inc. 18000210 10 2,524.50 84,499.50 15 87,024.00 81,116.39 46 5,907.61 93Hurst-Rosche, Inc. 6557 80 320.00 .00 0 320.00 320.00 1 .00 100Hurst-Rosche, Inc. INT7065 00 78.78 .00 0 78.78 78.78 3 .00 100***** Contract Totals ********** Contract Totals ***** 2,923.28 84,499.50 15 87,422.78 81,515.17 50 5,907.61 93

Page 555: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 555Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--250250--001001 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Indefinite Delivery/Indefinite QuantityAgency: Capital Development Board Analyst: MISSINGLocation: Indefinite Delivery/Indefinite Quantity Services - CentralCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: : :A/E Telephone: (217)363-3375 : :Date Selected: 07-09-19 : :Contract Date: 08-16-19 ________________________________________________________________________________Est. Project Cost: 708,655.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 25,984.00 10-01-20 25,984.00 10-01-20 25,984.00 24,984.00 .00 .00141 708,655.00 06-03-21 708,655.00 06-03-21 438,981.00 266,291.81 269,674.00 .00

Total 734,639.00 734,639.00 464,965.00 291,275.81 269,674.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Indefinite Delivery/Indefinite QuantityIndefinite Delivery/Indefinite Quantity

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-01-19 08-01-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-16-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-13-21 11-30-21 ( 0 )50%: 07-17-20 ( 0 ) Final Accept: 09-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: 11-15-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 20000110 ( 0 ) ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 20000110 10 .00 464,965.00 13 464,965.00 291,275.81 30 173,689.19 63***** Contract Totals ********** Contract Totals ***** .00 464,965.00 13 464,965.00 291,275.81 30 173,689.19 63

Page 556: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 556Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--275275--000000 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Indefinite Delivery/Indefinite QuantityAgency: Capital Development Board Analyst: MISSINGLocation: Indefinite Delivery/Indefinite Quantity Services - SouthernCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 10-17-19 :: :

A/E Id: 4424 : :A/E Name: White & Borgognoni Architects, : :A/E Contact: : :A/E Telephone: (618)529-3691 : :Date Selected: 07-11-17 : :Contract Date: 08-18-17 ________________________________________________________________________________Est. Project Cost: 205,250.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

11 72,575.00 07-01-19 72,575.00 07-01-19 49,184.84 49,184.84 23,390.16 .00141 320,515.68 05-17-21 320,515.68 05-17-21 107,402.46 107,402.46 213,113.22 .00

Total 393,090.68 393,090.68 156,587.30 156,587.30 236,503.38 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Indefinite Delivery/Indefinite QuantityIndefinite Delivery/Indefinite Quantity

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 06-04-18 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-01-19 10-02-18 ( 0 )

Design Devel: 06-04-18 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-01-19 02-25-19 ( 0 )50%: ( 0 ) Final Accept: 07-01-19 03-27-19 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-1806-30-18 06-30-2006-30-2095-100%: 07-19-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

White & Borgognoni Architect 18010210 ( 0 ) ( 0 ) 06-30-2006-30-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

White & Borgognoni Architect 18010210 10 11,878.46 144,708.84 16 156,587.30 156,587.30 25 .00 100***** Contract Totals ********** Contract Totals ***** 11,878.46 144,708.84 16 156,587.30 156,587.30 25 .00 100

Page 557: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 557Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 651651--275275--001001 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Indefinite Delivery/Indefinite QuantityAgency: Capital Development Board Analyst: MISSINGLocation: Indefinite Delivery/Indefinite Quantity Services - SouthernCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS :: :

A/E Id: 26859 : :A/E Name: Eggemeyer Associates Architect : :A/E Contact: : :A/E Telephone: (618)988-2380 : :Date Selected: 07-09-19 : :Contract Date: 08-08-19 ________________________________________________________________________________Est. Project Cost: 1,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,000,000.00 01-16-20 1,000,000.00 01-16-20 388,783.00 167,006.16 611,217.00 .00

Total 1,000,000.00 1,000,000.00 388,783.00 167,006.16 611,217.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Indefinite Delivery/Indefinite QuantityIndefinite Delivery/Indefinite Quantity

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-31-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-08-19 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-22 ( 0 )50%: ( 0 ) Final Accept: 06-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: 08-08-19 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Eggemeyer Associates Archite 20011210 ( 0 ) ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Eggemeyer Associates Archite 20011210 10 .00 388,783.00 11 388,783.00 167,006.16 9 221,776.84 43***** Contract Totals ********** Contract Totals ***** .00 388,783.00 11 388,783.00 167,006.16 9 221,776.84 43

Page 558: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 558Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 738738--020020--046046 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate ElevatorsAgency: Office of the Attorney General Analyst: Amber EvansLocation: Office of the Attorney General - Springfield, Sangamon CountCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 91 - Mark Luft

Senate:46 - David Koehler : CURRENT STATUS 11-08-21 :: :

A/E Id: 29455 : :A/E Name: Berners-Schober Associates Inc : :A/E Contact: : :A/E Telephone: (920)432-4865 : :Date Selected: 04-13-21 : :Contract Date: 05-27-21 ________________________________________________________________________________Est. Project Cost: 293,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 168,000.00 02-07-19 168,000.00 02-07-19 56,140.00 25,036.00 111,860.00 .00

Total 168,000.00 168,000.00 56,140.00 25,036.00 111,860.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Renovate ElevatorsRenovate Elevators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-20-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-12-22 ( 0 )

Design Devel: 07-16-21 07-28-21 ( 12 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-31-23 ( 0 )50%: 09-03-21 09-17-21 ( 14 ) Final Accept: 07-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 05-31-2405-31-2495-100%: 10-22-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Prather Tucker Associates, I 19032410 ( 0 ) ( 0 ) 10-15-2110-15-21Berners-Schober Associates I 21031910 ( 0 ) ( 0 ) 05-31-2405-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Prather Tucker Associates, I 19032410 10 10,240.00 .00 0 10,240.00 10,240.00 1 .00 100Berners-Schober Associates I 21031910 10 45,900.00 .00 0 45,900.00 14,796.00 1 31,104.00 32***** Contract Totals ********** Contract Totals ***** 56,140.00 .00 0 56,140.00 25,036.00 2 31,104.00 45

Page 559: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 559Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 738738--020020--048048 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Stone Joints/Seal ExteriorAgency: Office of the Attorney General Analyst: Amber EvansLocation: Office of the Attorney General - Springfield, Sangamon CountCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 91 - Mark Luft

Senate:46 - David Koehler : CURRENT STATUS 11-08-21 :: :

A/E Id: 34492 : :A/E Name: IDG Architects, Inc. : :A/E Contact: : :A/E Telephone: (832)448-2462 : :Date Selected: 09-10-19 : :Contract Date: 10-15-19 ________________________________________________________________________________Est. Project Cost: 183,152.62

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 183,152.62 01-11-21 183,152.62 01-11-21 24,527.62 14,168.22 158,625.00 .00

Total 183,152.62 183,152.62 24,527.62 14,168.22 158,625.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Replace Stone Joints/Seal ExteriorReplace Stone Joints/Seal Exterior

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-17-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 11-14-19 12-19-19 ( 35 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-02-20 ( 0 )

Design Devel: 11-14-19 12-19-19 ( 35 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-18-20 ( 0 )50%: ( 0 ) Final Accept: 11-18-20 ( 0 )75%: ( 0 ) A/E Cont End: 11-18-2111-18-21 06-30-2306-30-2395-100%: 01-17-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IDG Architects, Inc. 20040510 ( 0 ) ( 0 ) 06-30-2306-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IDG Architects, Inc. 20040510 10 23,075.00 .00 1 23,075.00 12,715.60 2 10,359.40 55Otto Baum Company, Inc. 7127 80 1,452.62 .00 0 1,452.62 1,452.62 1 .00 100***** Contract Totals ********** Contract Totals ***** 24,527.62 .00 1 24,527.62 14,168.22 3 10,359.40 58

Page 560: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 560Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--000000--007007 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Cooling Towers and Chillers - CaAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Secretary of State - StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 11-02-21 :: :

A/E Id: 5501 : :A/E Name: Ross & Baruzzini, Inc. : :A/E Contact: Randy Diemer : :A/E Telephone: (314)918-8383 : :Date Selected: 01-15-19 : :Contract Date: 07-31-19 ________________________________________________________________________________Est. Project Cost: 51,194,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 51,194,800.00 03-22-21 51,194,800.00 03-22-21 2,248,269.00 759,973.10 48,946,531.00 .00

Total 51,194,800.00 51,194,800.00 2,248,269.00 759,973.10 48,946,531.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 35.00% Description:Description: Replace Cooling Towers and Chillers - CaReplace Cooling Towers and Chillers - Ca

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-28-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-30-19 11-19-19 ( 20 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-20-20 07-16-20 ( 57 ) Prime Bid: 06-16-21 ( 0 )

Design Devel: 09-16-20 08-04-21 (322 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-13-23 ( 0 )50%: ( 0 ) Final Accept: 10-27-23 ( 0 )75%: ( 0 ) A/E Cont End: 11-15-2411-15-2495-100%: 04-07-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Ross & Baruzzini, Inc. 19012010 ( 0 ) ( 0 ) 11-15-2411-15-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Ross & Baruzzini, Inc. 19012010 10 126,169.00 2,122,100.00 1 2,248,269.00 759,973.10 18 1,488,295.90 34***** Contract Totals ********** Contract Totals ***** 126,169.00 2,122,100.00 1 2,248,269.00 759,973.10 18 1,488,295.90 34

Page 561: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 561Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--000000--009009 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Plumbing - Capitol ComplexAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Secretary of State - StatewideCounty: 998 - Statewide ________________________________________________________________________________Leg. Districts: House:119 - Multiple District

Senate:60 - Multiple Multiple : CURRENT STATUS 09-02-21 :: :

A/E Id: 28732 : :A/E Name: BRiC Partnership, LLC : :A/E Contact: Joel Vogt : :A/E Telephone: (618)277-5200 : :Date Selected: 01-15-19 : :Contract Date: 05-24-19 ________________________________________________________________________________Est. Project Cost: 27,900,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 27,900,000.00 03-22-21 27,900,000.00 03-22-21 4,057,433.00 1,337,845.75 23,842,567.00 .00

Total 27,900,000.00 27,900,000.00 4,057,433.00 1,337,845.75 23,842,567.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Replace Plumbing - Capitol ComplexReplace Plumbing - Capitol Complex

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-01-19 02-12-20 (134 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 02-01-22 ( 0 )

Design Devel: 12-19-20 02-02-21 ( 45 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-01-22 ( 0 )50%: 05-10-21 05-14-21 ( 4 ) Final Accept: 12-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2212-31-22 10-31-2310-31-2395-100%: 10-04-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BRiC Partnership, LLC 19001810 ( 0 ) ( 0 ) 10-31-2310-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BRiC Partnership, LLC 19001810 10 234,763.00 3,822,670.00 2 4,057,433.00 1,337,845.75 18 2,719,587.25 33***** Contract Totals ********** Contract Totals ***** 234,763.00 3,822,670.00 2 4,057,433.00 1,337,845.75 18 2,719,587.25 33

Page 562: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 562Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--010010--008008 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade North Patio for Public SafetyAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Michael J. Howlett Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 23126 : :A/E Name: FWAI Architects Inc. : :A/E Contact: Forrest Hoffman : :A/E Telephone: (217)528-3661 : :Date Selected: 04-12-11 : :Contract Date: 11-17-11 ________________________________________________________________________________Est. Project Cost: 790,570.56

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 807,570.06 09-09-19 807,570.06 09-09-19 780,572.49 767,751.50 9,998.07 16,999.50999 .00 08-18-14 .00 08-18-14 .00 .00 .00 .00

Total 807,570.06 807,570.06 780,572.49 767,751.50 9,998.07 16,999.50____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: PH. 1 Upgrade North Patio for Public SafPH. 1 Upgrade North Patio for Public Saf

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-07-11 ( 0 ) Assgn Bid: 06-13-13 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-03-12 04-03-12 ( 60 ) Assgn Re-Bid: 09-19-13 ( 0 )CORC Assessment Amt: .00 Schem Design: 02-03-12 04-03-12 ( 60 ) Prime Bid: 09-06-12 01-15-13 06-20-13 (156 )

Design Devel: ( 0 ) Prime Re-Bid: 09-26-13 ( 0 )25%: ( 0 ) Subst Compl: 09-15-13 12-31-14 ( 0 )50%: 09-30-12 ( 0 ) Final Accept: 11-15-13 02-28-15 ( 0 )75%: ( 0 ) A/E Cont End: 11-15-1411-15-14 10-01-2010-01-2095-100%: 10-31-12 03-05-13 (125 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

FWAI Architects Inc. 11041710 ( 0 ) ( 0 ) 10-01-2010-01-20Hanson Professional Services 6222 ( 0 ) ( 0 )Reliable Plumbing & Heating 14055483 12-16-13 01-29-14 04-29-14 09-24-14 12-12-14 (227 ) 08-01-16 ( 0 ) 12-31-1612-31-16Laverdiere Construction, Inc 14055581 12-16-13 01-29-14 04-29-14 09-29-14 12-18-14 (233 ) 11-30-14 06-01-15 (183 ) 11-30-1511-30-15

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

FWAI Architects Inc. 11041710 10 65,500.00 5,200.00 6 70,700.00 57,979.01 14 12,720.99 82Hanson Professional Services 6222 11 6,500.00 .00 0 6,500.00 6,500.00 1 .00 100Reliable Plumbing & Heating 14055483 83 143,850.00 6,608.94 3 150,458.94 150,358.94 7 100.00 100Laverdiere Construction, Inc 14055581 81 295,000.00 44,004.81 8 339,004.81 339,004.81 11 .00 100

Page 563: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 563Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** 510,850.00 55,813.75 17 566,663.75 553,842.76 33 12,820.99 98

Page 564: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 564Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--010010--008008 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade North Patio for Public SafetyAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Michael J. Howlett Building - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-20 :: :

A/E Id: 23126 : :A/E Name: FWAI Architects Inc. : :A/E Contact: Forrest Hoffman : :A/E Telephone: (217)528-3661 : :Date Selected: : :Contract Date: 11-17-11 ________________________________________________________________________________Est. Project Cost: 790,570.56

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 807,570.06 09-09-19 807,570.06 09-09-19 780,572.49 767,751.50 9,998.07 16,999.50999 .00 08-18-14 .00 08-18-14 .00 .00 .00 .00

Total 807,570.06 807,570.06 780,572.49 767,751.50 9,998.07 16,999.50____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 99.00% Description:Description: PH. 2 - Northwest Howlett StepsPH. 2 - Northwest Howlett Steps

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-18-19 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 10-01-2010-01-2095-100%: 10-22-18 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

R.D. Lawrence Construction C 19050381 06-12-19 07-11-19 10-09-19 12-04-19 ( 56 ) 12-08-19 08-27-20 (263 ) 12-07-2012-07-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

R.D. Lawrence Construction C 19050381 81 198,900.00 13,970.94 2 212,870.94 212,870.94 5 .00 100***** Contract Totals ********** Contract Totals ***** 198,900.00 13,970.94 2 212,870.94 212,870.94 5 .00 100

Page 565: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 565Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--020020--016016 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Roofing System - South and CenteAgency: Office of the Secretary of State Analyst: Amber EvansLocation: William G. Stratton Building - Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 1472 : :A/E Name: Sarti Architectural Group, Inc : :A/E Contact: : :A/E Telephone: (217)585-9111 : :Date Selected: 08-13-19 : :Contract Date: 12-12-19 ________________________________________________________________________________Est. Project Cost: 1,378,812.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,378,812.00 09-29-21 1,378,812.00 09-29-21 96,400.00 50,229.80 1,282,412.00 .00

Total 1,378,812.00 1,378,812.00 96,400.00 50,229.80 1,282,412.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Replace Roofing System - South and CenteReplace Roofing System - South and Cente

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-20-20 05-19-20 ( 60 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-20-20 05-12-20 ( 53 ) Prime Bid: 09-24-20 04-28-21 (216 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-30-21 ( 0 )50%: 05-29-20 02-02-21 (249 ) Final Accept: 08-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2206-30-2295-100%: 07-10-20 02-02-21 (207 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Sarti Architectural Group, I 20031110 ( 0 ) ( 0 ) 06-30-2206-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sarti Architectural Group, I 20031110 10 95,400.00 1,000.00 1 96,400.00 50,229.80 3 46,170.20 52***** Contract Totals ********** Contract Totals ***** 95,400.00 1,000.00 1 96,400.00 50,229.80 3 46,170.20 52

Page 566: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 566Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--045045--027027 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Plan and Begin Upgrade of High Voltage DAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Capitol ComplexCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 29490 : :A/E Name: Woolpert, Inc. : :A/E Contact: : :A/E Telephone: (618)632-7004 : :Date Selected: 07-13-10 : :Contract Date: 08-25-20 ________________________________________________________________________________Est. Project Cost: 36,509,916.35

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 36,585,622.23 07-01-18 5,085,622.23 11-06-19 4,639,554.30 2,683,235.76 370,362.05 75,705.88

Total 36,585,622.23 5,085,622.23 4,639,554.30 2,683,235.76 370,362.05 75,705.88____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 50.00% Description:Description: PH-1/Plan & Upgrade of High Voltage DistPH-1/Plan & Upgrade of High Voltage Dist

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 06-18-21 06-16-21 ( 2-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-16-22 ( 0 )

Design Devel: 06-18-21 06-22-21 ( 4 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-24-25 ( 0 )50%: 11-19-21 ( 0 ) Final Accept: 03-24-25 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2607-31-2695-100%: 06-17-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert, Inc. 11001410 ( 0 ) ( 0 ) 05-31-2005-31-20Woolpert, Inc. 20014210 ( 0 ) ( 0 ) 07-31-2607-31-26

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert, Inc. 11001410 10 204,700.00 1,104,345.00 4 1,309,045.00 1,250,015.05 14 59,029.95 96Woolpert, Inc. 20014210 10 3,070,608.00 .00 0 3,070,608.00 1,173,319.41 5 1,897,288.59 38***** Contract Totals ********** Contract Totals ***** 3,275,308.00 1,104,345.00 4 4,379,653.00 2,423,334.46 19 1,956,318.54 55

Page 567: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 567Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--045045--027027 PM NAME: Ed James 033Ed James 033Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Plan and Begin Upgrade of High Voltage DAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Capitol ComplexCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 05-18-15 :: :

A/E Id: 29490 : :A/E Name: Woolpert, Inc. : :A/E Contact: Andrew Kerkemeyer : :A/E Telephone: (618)632-7004 : :Date Selected: : :Contract Date: 01-26-11 ________________________________________________________________________________Est. Project Cost: 36,509,916.35

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 36,585,622.23 07-01-18 5,085,622.23 11-06-19 4,639,554.30 2,683,235.76 370,362.05 75,705.88

Total 36,585,622.23 5,085,622.23 4,639,554.30 2,683,235.76 370,362.05 75,705.88____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 100.00% Description:Description: PH-2 / Replace Howlett Bldg TransformerPH-2 / Replace Howlett Bldg Transformer

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-05-13 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 05-31-2005-31-2095-100%: 10-23-13 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Anderson Electric Inc. 14059085 02-25-14 03-25-14 09-21-14 09-12-14 ( 9-) 10-21-14 01-14-15 ( 85 ) 10-21-1510-21-15

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Anderson Electric Inc. 14059085 85 216,000.00 43,901.30 2 259,901.30 259,901.30 6 .00 100***** Contract Totals ********** Contract Totals ***** 216,000.00 43,901.30 2 259,901.30 259,901.30 6 .00 100

Page 568: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 568Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--045045--030030 PM NAME: Craig Butler 436Craig Butler 436Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Upgrade ElevatorsAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Capitol ComplexCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 09-02-21 :: :

A/E Id: 16668 : :A/E Name: Evan Lloyd Associates, Inc. : :A/E Contact: Timothy Smith : :A/E Telephone: (217)789-7011 : :Date Selected: 05-14-19 : :Contract Date: 10-08-19 ________________________________________________________________________________Est. Project Cost: 4,108,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,108,600.00 06-08-20 4,108,600.00 06-08-20 466,914.00 130,482.90 3,641,686.00 .00

Total 4,108,600.00 4,108,600.00 466,914.00 130,482.90 3,641,686.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Upgrade ElevatorsUpgrade Elevators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-23-19 07-23-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-06-20 04-08-20 ( 93 ) Prime Bid: 05-15-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-15-22 ( 0 )50%: 12-01-20 12-09-20 ( 8 ) Final Accept: 01-15-23 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-21 11-30-2311-30-2395-100%: 02-01-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Evan Lloyd Associates, Inc. 19004510 ( 0 ) ( 0 ) 11-30-2311-30-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Evan Lloyd Associates, Inc. 19004510 10 66,180.00 400,734.00 1 466,914.00 130,482.90 1 336,431.10 28***** Contract Totals ********** Contract Totals ***** 66,180.00 400,734.00 1 466,914.00 130,482.90 1 336,431.10 28

Page 569: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 569Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--100100--004004 PM NAME: Crystal Kitchen 468Crystal Kitchen 468Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace HVAC and PlumbingAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Motor Vehicle Services Facility - SpringfieldCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House: 96 - Sue Scherer

Senate:48 - Doris Turner : CURRENT STATUS 11-09-21 :: :

A/E Id: 28483 : :A/E Name: Hanson Professional Services I : :A/E Contact: Gary Clack : :A/E Telephone: (217)788-2450 : :Date Selected: 03-12-19 : :Contract Date: 07-31-19 ________________________________________________________________________________Est. Project Cost: 9,886,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 9,886,000.00 03-22-21 9,886,000.00 03-22-21 945,900.00 335,658.34 8,940,100.00 .00

Total 9,886,000.00 9,886,000.00 945,900.00 335,658.34 8,940,100.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Replace HVAC and PlumbingReplace HVAC and Plumbing

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-11-21 04-30-22 ( 0 )

Design Devel: 06-11-20 07-30-20 ( 49 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-14-22 07-17-23 ( 0 )50%: ( 0 ) Final Accept: 04-15-22 09-30-23 ( 0 )75%: ( 0 ) A/E Cont End: 03-28-2203-28-22 09-30-2409-30-2495-100%: 02-15-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Hanson Professional Services 19012210 ( 0 ) ( 0 ) 09-30-2409-30-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Hanson Professional Services 19012210 10 69,000.00 876,900.00 2 945,900.00 335,658.34 8 610,241.66 36***** Contract Totals ********** Contract Totals ***** 69,000.00 876,900.00 2 945,900.00 335,658.34 8 610,241.66 36

Page 570: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 570Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--110110--001001 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Update Fire Alarm and Sprinkler SystemAgency: Office of the Secretary of State Analyst: Amber EvansLocation: State Museum - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 28417 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Brian Snyder : :A/E Telephone: (309)689-9888 : :Date Selected: 08-13-19 : :Contract Date: 11-01-19 ________________________________________________________________________________Est. Project Cost: 887,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 887,600.00 01-26-21 887,600.00 01-26-21 846,207.79 593,675.33 41,392.21 .00

Total 887,600.00 887,600.00 846,207.79 593,675.33 41,392.21 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 80.00% Description:Description: Update Fire Alarm and Sprinkler SystemUpdate Fire Alarm and Sprinkler System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-01-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 12-02-19 12-18-19 ( 16 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-04-20 09-02-20 (121 )

Design Devel: 12-02-19 12-18-19 ( 16 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-14-21 ( 0 )50%: ( 0 ) Final Accept: 03-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-01-2204-01-2295-100%: 03-02-20 06-26-20 (116 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 20011410 ( 0 ) ( 0 ) 04-01-2204-01-22B & B Electric, Inc. 21047881 02-26-21 03-18-21 09-14-21 ( 0 ) 11-13-22 ( 0 ) 11-13-2211-13-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 20011410 10 82,250.00 11,600.00 3 93,850.00 58,141.08 4 35,708.92 62B & B Electric, Inc. 21047881 81 749,900.00 2,457.79 1 752,357.79 535,534.25 11 216,823.54 71***** Contract Totals ********** Contract Totals ***** 832,150.00 14,057.79 4 846,207.79 593,675.33 15 252,532.46 70

Page 571: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 571Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--110110--002002 PM NAME: Roger Kuhl 461Roger Kuhl 461Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Track LightingAgency: Office of the Secretary of State Analyst: Amber EvansLocation: State Museum - Springfield, Sangamon CountyCounty: 167 - Sangamon ________________________________________________________________________________Leg. Districts: House:100 - C. Davidsmeyer

Senate:50 - Steve McClure : CURRENT STATUS 11-08-21 :: :

A/E Id: 28417 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: : :A/E Telephone: (309)689-9888 : :Date Selected: 06-08-21 : :Contract Date: 09-20-21 ________________________________________________________________________________Est. Project Cost: 632,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 632,200.00 05-24-21 632,200.00 05-24-21 65,150.00 .00 567,050.00 .00

Total 632,200.00 632,200.00 65,150.00 .00 567,050.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Replace Track LightingReplace Track Lighting

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-30-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 12-01-21 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-01-21 ( 0 ) Prime Bid: 06-17-22 ( 0 )

Design Devel: 12-01-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-24-23 ( 0 )50%: 02-04-22 ( 0 ) Final Accept: 05-26-23 ( 0 )75%: ( 0 ) A/E Cont End: 03-17-2503-17-2595-100%: 04-11-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 21042710 ( 0 ) ( 0 ) 03-17-2503-17-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 21042710 10 65,150.00 .00 0 65,150.00 .00 0 65,150.00 0***** Contract Totals ********** Contract Totals ***** 65,150.00 .00 0 65,150.00 .00 0 65,150.00 0

Page 572: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 572Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 750750--130130--003003 PM NAME: Chima Uwanamodo 127Chima Uwanamodo 127Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate HVACAgency: Office of the Secretary of State Analyst: Amber EvansLocation: Chicago West Driver Services FacilityCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 8 - LaShawn Ford

Senate: 4 - Kimberly Lightford : CURRENT STATUS 09-01-21 :: :

A/E Id: 16618 : :A/E Name: Dynacept Engineering, Ltd. : :A/E Contact: : :A/E Telephone: (847)299-4848 : :Date Selected: 09-10-19 : :Contract Date: 11-06-19 ________________________________________________________________________________Est. Project Cost: 1,208,600.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,208,600.00 09-17-19 1,208,600.00 09-17-19 146,570.00 51,700.00 1,062,030.00 .00

Total 1,208,600.00 1,208,600.00 146,570.00 51,700.00 1,062,030.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 93.00% Description:Description: Renovate HVACRenovate HVAC

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-07-19 10-07-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 08-15-20 ( 0 )

Design Devel: 01-06-20 05-12-20 (127 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-15-21 ( 0 )50%: 03-16-20 08-12-20 (149 ) Final Accept: 06-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 04-15-2204-15-2295-100%: 05-25-20 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Dynacept Engineering, Ltd. 20021510 ( 0 ) ( 0 ) 04-15-2204-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Dynacept Engineering, Ltd. 20021510 10 133,400.00 13,170.00 1 146,570.00 51,700.00 2 94,870.00 35***** Contract Totals ********** Contract Totals ***** 133,400.00 13,170.00 1 146,570.00 51,700.00 2 94,870.00 35

Page 573: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 573Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 759759--000000--005005 PM NAME: Marcy Joerger 079Marcy Joerger 079Project Status: AP Active Project Region:Project Type: SC School Construction PLA: NDescription: ISBE Energy Efficiency GrantsAgency: IL State Board of Education Analyst: Marcy JoergerLocation: State Board of Education - StatewideCounty: 0 - NO COUNTY ________________________________________________________________________________Leg. Districts: House: 0 - LaShawn NO

Senate: 0 - : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 6,838,646.41 07-01-18 3,418,646.41 04-15-14 .00 .00 .00 3,418,646.41

Total 6,838,646.41 3,418,646.41 .00 .00 .00 3,418,646.41____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: ISBE Energy Efficiency GrantsISBE Energy Efficiency Grants

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 574: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 574Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 759759--011011--007007 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Renovate the Philip J. Rock Center and SAgency: IL State Board of Education Analyst: Erin EoffLocation: The Philip J. Rock Center and School - Glen EllynCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 48 - Terra Howard

Senate:24 - Suzy Hilton : CURRENT STATUS 10-19-21 :: :

A/E Id: 23199 : :A/E Name: LCM Architects, L.L.C. : :A/E Contact: : :A/E Telephone: (312)913-1717 : :Date Selected: 02-11-20 : :Contract Date: 06-16-20 ________________________________________________________________________________Est. Project Cost: 18,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 18,000,000.00 03-29-21 18,000,000.00 03-29-21 393,651.00 66,246.92 17,606,349.00 .00

Total 18,000,000.00 18,000,000.00 393,651.00 66,246.92 17,606,349.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 44.00% Description:Description: Renovate the Philip J. Rock Center and SRenovate the Philip J. Rock Center and S

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-12-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 10-05-20 10-05-20 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-23-21 09-01-21 ( 9 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2312-01-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

LCM Architects, L.L.C. 20024510 ( 0 ) ( 0 ) 12-01-2312-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

LCM Architects, L.L.C. 20024510 10 82,580.00 221,071.00 1 303,651.00 66,246.92 2 237,404.08 22C D B/Art In Architecture AIA DUMMY 49 90,000.00 .00 0 90,000.00 .00 0 90,000.00 0***** Contract Totals ********** Contract Totals ***** 172,580.00 221,071.00 1 393,651.00 66,246.92 2 327,404.08 17

Page 575: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 575Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 805805--000000--006006 PM NAME: Erin MISSING 000Erin MISSING 000Project Status: AP Active Project Region:Project Type: HE Higher Education PLA: NDescription: Capital Improvements @ Private College'sAgency: Illinois Board of Higher Education Analyst: Erin EoffLocation: Illinois Board of Higher Education - StatewideCounty: 0 - NO COUNTY Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 0 - Terra NO

Senate: 0 - : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 300,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

971 300,000,000.00 07-13-09 300,000,000.00 09-25-14 300,000,000.00 300,000,000.00 .00 .00

Total 300,000,000.00 300,000,000.00 300,000,000.00 300,000,000.00 .00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Capital Improvements @ Private College'sCapital Improvements @ Private College's

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 576: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 576Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 805805--030030--020020 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Correct Water Infiltration - Academic BuAgency: Illinois Board of Higher Education Analyst: Erin EoffLocation: Illinois Math and Science Academy - AuroraCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 83 - Barbara Hernandez

Senate:42 - Linda Holmes : CURRENT STATUS 11-10-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: Sandra Mendez : :A/E Telephone: (312)922-6400 : :Date Selected: 11-12-13 : :Contract Date: 03-21-14 ________________________________________________________________________________Est. Project Cost: 6,293,809.03

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 9,600,000.03 02-27-20 9,600,000.03 02-27-20 5,878,704.00 295,472.50 415,105.03 3,306,191.00

Total 9,600,000.03 9,600,000.03 5,878,704.00 295,472.50 415,105.03 3,306,191.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 5.00% Description:Description: Correct Water Infiltration - Academic BuCorrect Water Infiltration - Academic Bu

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-23-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-23-14 05-27-14 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-22-15 04-17-19 ( 0 )

Design Devel: 08-15-14 10-14-14 ( 60 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 02-24-17 01-18-21 ( 0 )50%: 11-21-14 12-17-14 ( 26 ) Final Accept: 04-21-17 03-19-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-24-1808-24-18 01-18-2201-18-2295-100%: 02-20-19 11-18-19 (271 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 14041210 ( 0 ) ( 0 ) 01-18-2201-18-22Master Design Build, LLC 21055281 06-01-21 08-06-21 08-01-22 ( 0 ) 08-31-22 ( 0 ) 08-31-2308-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 14041210 10 369,200.00 84,776.00 3 453,976.00 295,472.50 11 158,503.50 65Master Design Build, LLC 21055281 81 5,424,728.00 .00 0 5,424,728.00 .00 0 5,424,728.00 0***** Contract Totals ********** Contract Totals ***** 5,793,928.00 84,776.00 3 5,878,704.00 295,472.50 11 5,583,231.50 5

Page 577: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 577Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 805805--030030--023023 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Heating and Cooling SystemsAgency: Illinois Board of Higher Education Analyst: Erin EoffLocation: Illinois Math and Science Academy - AuroraCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 83 - Barbara Hernandez

Senate:42 - Linda Holmes : CURRENT STATUS 11-10-21 :: :

A/E Id: 29507 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Kent Locke : :A/E Telephone: (312)440-2300 : :Date Selected: 01-15-19 : :Contract Date: 02-25-19 ________________________________________________________________________________Est. Project Cost: 3,870,700.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,870,700.00 11-25-20 3,870,700.00 11-25-20 3,545,800.00 2,263,631.32 324,900.00 .00

Total 3,870,700.00 3,870,700.00 3,545,800.00 2,263,631.32 324,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 68.00% Description:Description: Replace Heating and Cooling SystemsReplace Heating and Cooling Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-29-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-16-19 01-30-20 (198 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-01-20 09-30-22 ( 0 )50%: 04-29-19 05-10-19 ( 11 ) Final Accept: 08-01-20 11-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-01-2107-01-21 11-01-2411-01-2495-100%: 06-03-19 11-27-19 (177 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 19022310 ( 0 ) ( 0 ) 11-01-2411-01-24Amber Mechanical Contractors 21046784 02-11-21 04-29-21 08-01-21 ( 0 ) 08-31-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 19022310 10 296,800.00 .00 1 296,800.00 242,500.00 13 54,300.00 82Amber Mechanical Contractors 21046784 84 3,249,000.00 .00 0 3,249,000.00 2,021,131.32 8 1,227,868.68 62***** Contract Totals ********** Contract Totals ***** 3,545,800.00 .00 1 3,545,800.00 2,263,631.32 21 1,282,168.68 64

Page 578: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 578Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 805805--030030--024024 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: ST Standard PLA: NDescription: Renovate Residence HallsAgency: Illinois Board of Higher Education Analyst: Erin EoffLocation: Illinois Math and Science Academy - AuroraCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 83 - Barbara Hernandez

Senate:42 - Linda Holmes : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 8,675,800.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,675,800.00 07-01-19 8,675,800.00 12-23-19 .00 .00 8,675,800.00 .00

Total 8,675,800.00 8,675,800.00 .00 .00 8,675,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Renovate Residence HallsRenovate Residence Halls

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 579: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 579Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--002002--019019 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: BI Budget Impasse Hold PLA: NDescription: Site Improvements - Central Quad DevelopAgency: Illinois Community College Board Analyst: Erin EoffLocation: Southwestern Illinois Community College - Belleville, St. ClCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:114 - LaToya Greenwood

Senate:57 - Christopher Belt : CURRENT STATUS 11-09-21 :: :

A/E Id: 29371 : :A/E Name: Wm. B. Ittner, Incorporated : :A/E Contact: Steve Raskin : :A/E Telephone: (618)624-2080 : :Date Selected: 08-12-14 : :Contract Date: 11-03-14 ________________________________________________________________________________Est. Project Cost: 880,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,688,900.00 07-01-18 808,900.00 06-03-14 115,805.00 20,508.83 95,296.17- 788,391.17

Total 1,688,900.00 808,900.00 115,805.00 20,508.83 95,296.17 788,391.17____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 20.00% Description:Description: Site Improvements - Central Quad DevelopSite Improvements - Central Quad Develop

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-29-14 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 02-27-15 02-26-15 ( 1-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 02-27-15 02-26-15 ( 1-) Prime Bid: 12-03-15 ( 0 )

Design Devel: 06-30-15 06-30-15 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-15-16 ( 0 )50%: ( 0 ) Final Accept: 11-15-16 ( 0 )75%: ( 0 ) A/E Cont End: 12-30-1712-30-17 07-15-2207-15-2295-100%: 10-30-15 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Wm. B. Ittner, Incorporated 15000110 ( 0 ) ( 0 ) 07-15-2207-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Wm. B. Ittner, Incorporated 15000110 10 18,401.00 97,404.00 3 115,805.00 20,508.83 3 95,296.17 18***** Contract Totals ********** Contract Totals ***** 18,401.00 97,404.00 3 115,805.00 20,508.83 3 95,296.17 18

Page 580: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 580Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--002002--020020 PM NAME: Mark Hendricks 437Mark Hendricks 437Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Replace Building Automation SystemAgency: Illinois Community College Board Analyst: Erin EoffLocation: Southwestern Illinois Community College - Belleville, St. ClCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:114 - LaToya Greenwood

Senate:57 - Christopher Belt : CURRENT STATUS 11-09-21 :: :

A/E Id: 29490 : :A/E Name: Woolpert, Inc. : :A/E Contact: : :A/E Telephone: (618)632-7004 : :Date Selected: 10-08-19 : :Contract Date: 12-16-19 ________________________________________________________________________________Est. Project Cost: 3,200,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,400,000.00 10-09-19 2,400,000.00 10-09-19 360,488.00 208,250.80 2,039,512.00 .00991 800,000.00 10-08-19 .00 101,336.00 .00 698,664.00 .00

Total 3,200,000.00 2,400,000.00 461,824.00 208,250.80 2,738,176.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 75.00% Description:Description: Replace Building Automation SystemReplace Building Automation System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-07-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 03-30-20 03-26-20 ( 4-) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-30-20 03-26-20 ( 4-) Prime Bid: 06-25-21 12-10-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-30-22 ( 0 )50%: 12-04-20 12-09-20 ( 5 ) Final Accept: 01-31-23 ( 0 )75%: ( 0 ) A/E Cont End: 04-21-2304-21-2395-100%: 09-20-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Woolpert, Inc. 20041010 ( 0 ) ( 0 ) 04-21-2304-21-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Woolpert, Inc. 20041010 10 .00 461,824.00 4 461,824.00 208,250.80 4 253,573.20 45***** Contract Totals ********** Contract Totals ***** .00 461,824.00 4 461,824.00 208,250.80 4 253,573.20 45

Page 581: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 581Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--002002--021021 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace FlooringAgency: Illinois Community College Board Analyst: Erin EoffLocation: Southwestern Illinois Community College - Belleville, St. ClCounty: 163 - St. Clair ________________________________________________________________________________Leg. Districts: House:114 - LaToya Greenwood

Senate:57 - Christopher Belt : CURRENT STATUS 11-02-21 :: :

A/E Id: 30880 : :A/E Name: FGM Architects Inc. : :A/E Contact: : :A/E Telephone: (312)948-8461 : :Date Selected: 07-13-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 409,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 307,050.00 04-23-21 307,050.00 04-23-21 .00 .00 307,050.00 .00991 102,350.00 07-06-21 .00 .00 .00 102,350.00 .00

Total 409,400.00 307,050.00 .00 .00 409,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Replace FlooringReplace Flooring

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

FGM Architects Inc. 22010510 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

FGM Architects Inc. 22010510 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 582: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 582Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--004004--008008 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roof - Building 1Agency: Illinois Community College Board Analyst: Erin EoffLocation: Black Hawk Community College - MolineCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 71 - Tony McCombie

Senate:36 - Neil Anderson : CURRENT STATUS 09-17-21 :: :

A/E Id: 31416 : :A/E Name: Demonica Kemper Architects, LL : :A/E Contact: Peter Eliopoulos : :A/E Telephone: (312)496-0000 : :Date Selected: 11-13-18 : :Contract Date: 03-05-19 ________________________________________________________________________________Est. Project Cost: 1,034,681.90

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 416,105.90 09-10-20 416,105.90 09-10-20 416,105.90 374,070.90 .00 .00991 618,576.00 09-23-19 417,773.60 10-21-21 533,273.10 417,773.60 85,302.90 .00

Total 1,034,681.90 833,879.50 949,379.00 791,844.50 85,302.90 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 70.00% Description:Description: Replace Roof - Building 1Replace Roof - Building 1

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-30-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 12-13-19 04-16-20 07-22-20 ( 97 )

Design Devel: 12-08-19 12-19-19 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-31-20 10-09-20 ( 0 )50%: ( 0 ) Final Accept: 09-25-20 11-09-20 ( 0 )75%: ( 0 ) A/E Cont End: 09-25-2109-25-21 03-09-2203-09-2295-100%: 02-10-20 04-15-20 ( 65 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Demonica Kemper Architects, 19001310 ( 0 ) ( 0 ) 03-09-2203-09-22Sterling Commercial Roofing, 21046181 01-12-21 03-31-21 06-29-21 ( 0 ) 07-13-21 ( 0 ) 07-13-2207-13-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Demonica Kemper Architects, 19001310 10 44,400.00 52,950.00 2 97,350.00 55,315.00 2 42,035.00 57Sterling Commercial Roofing, 21046181 81 852,029.00 .00 0 852,029.00 736,529.50 7 115,499.50 87***** Contract Totals ********** Contract Totals ***** 896,429.00 52,950.00 2 949,379.00 791,844.50 9 157,534.50 84

Page 583: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 583Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--004004--009009 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roofing System - Building 3Agency: Illinois Community College Board Analyst: Erin EoffLocation: Black Hawk Community College - MolineCounty: 161 - Rock Island ________________________________________________________________________________Leg. Districts: House: 71 - Tony McCombie

Senate:36 - Neil Anderson : CURRENT STATUS 09-17-21 :: :

A/E Id: 31416 : :A/E Name: Demonica Kemper Architects, LL : :A/E Contact: : :A/E Telephone: (312)496-0000 : :Date Selected: 12-10-19 : :Contract Date: 02-24-20 ________________________________________________________________________________Est. Project Cost: 2,259,939.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,598,179.00 09-10-20 1,598,179.00 09-10-20 1,550,651.25 1,527,964.25 47,527.75 .00991 661,760.00 02-19-20 148,207.57 09-23-21 516,883.75 148,207.57 144,876.25 .00

Total 2,259,939.00 1,746,386.57 2,067,535.00 1,676,171.82 192,404.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 76.00% Description:Description: Replace Roofing System - Building 3Replace Roofing System - Building 3

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-05-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-30-20 07-22-20 ( 83 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-20 ( 0 )50%: ( 0 ) Final Accept: 12-31-20 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2110-31-21 04-29-2204-29-2295-100%: 03-18-20 04-15-20 ( 28 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Demonica Kemper Architects, 20033010 ( 0 ) ( 0 ) 04-29-2204-29-22Sterling Commercial Roofing, 21046381 02-01-21 03-18-21 06-16-21 ( 0 ) 06-30-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Demonica Kemper Architects, 20033010 10 143,500.00 .00 1 143,500.00 84,938.00 1 58,562.00 59Sterling Commercial Roofing, 21046381 81 1,924,035.00 .00 0 1,924,035.00 1,591,233.82 6 332,801.18 83***** Contract Totals ********** Contract Totals ***** 2,067,535.00 .00 1 2,067,535.00 1,676,171.82 7 391,363.18 81

Page 584: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 584Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--006006--006006 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace East Campus Roofing SystemAgency: Illinois Community College Board Analyst: Erin EoffLocation: Blackhawk Community College - Kewanee, Henry CountyCounty: 73 - Henry ________________________________________________________________________________Leg. Districts: House: 74 - Daniel Swanson

Senate:37 - Win Stoller : CURRENT STATUS 11-03-21 :: :

A/E Id: 32355 : :A/E Name: Legat Architects, Inc. : :A/E Contact: Jeffery Stronkoski : :A/E Telephone: (309)517-5536 : :Date Selected: 07-13-21 : :Contract Date: 10-12-21 ________________________________________________________________________________Est. Project Cost: 1,874,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,405,875.00 04-23-21 1,405,875.00 04-23-21 150,600.00 .00 1,255,275.00 .00991 468,625.00 07-06-21 .00 .00 .00 468,625.00 .00

Total 1,874,500.00 1,405,875.00 150,600.00 .00 1,723,900.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Replace East Campus Roofing SystemReplace East Campus Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-31-21 08-31-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 11-08-21 ( 0 ) Prime Bid: 04-25-22 ( 0 )

Design Devel: 01-03-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-22 ( 0 )50%: ( 0 ) Final Accept: 09-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2308-31-2395-100%: 02-28-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Legat Architects, Inc. 22000410 ( 0 ) ( 0 ) 08-31-2308-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Legat Architects, Inc. 22000410 10 150,600.00 .00 0 150,600.00 .00 0 150,600.00 0***** Contract Totals ********** Contract Totals ***** 150,600.00 .00 0 150,600.00 .00 0 150,600.00 0

Page 585: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 585Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--010010--007007 PM NAME: Mark Jones 475Mark Jones 475Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Piping and Storm Sewer PumpsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Truman City College - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 13 - Gregory Harris

Senate: 7 - Mike Simmons : CURRENT STATUS 11-01-21 :: :

A/E Id: 31186 : :A/E Name: Delta Engineering Group, LLC : :A/E Contact: Mourad Djendi : :A/E Telephone: (312)377-7700 : :Date Selected: 10-08-19 : :Contract Date: 01-16-20 ________________________________________________________________________________Est. Project Cost: 1,700,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,275,000.00 10-09-19 1,275,000.00 10-09-19 134,219.50 18,361.00 1,140,780.50 .00991 425,000.00 09-25-19 .00 32,820.50 .00 392,179.50 .00

Total 1,700,000.00 1,275,000.00 167,040.00 18,361.00 1,532,960.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 50.00% Description:Description: Replace Piping and Storm Sewer PumpsReplace Piping and Storm Sewer Pumps

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 10-28-19 10-28-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-30-20 02-11-21 (318 ) Prime Bid: 02-04-22 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-23 ( 0 )50%: 08-02-21 08-04-21 ( 2 ) Final Accept: 02-01-24 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-22 12-01-2512-01-2595-100%: 11-08-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Delta Engineering Group, LLC 20022210 ( 0 ) ( 0 ) 12-01-2512-01-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Delta Engineering Group, LLC 20022210 10 35,758.00 131,282.00 2 167,040.00 18,361.00 2 148,679.00 11***** Contract Totals ********** Contract Totals ***** 35,758.00 131,282.00 2 167,040.00 18,361.00 2 148,679.00 11

Page 586: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 586Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--012012--005005 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: BI Budget Impasse Hold PLA: NDescription: Remodel culinary arts programAgency: Illinois Community College Board Analyst: Brad NellLocation: Kennedy-King College - Chicago, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 32 - Andre Thapedi

Senate:16 - Jacqueline Collins : CURRENT STATUS 10-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 22,895,000.00 07-01-18 .00 12-31-14 .00 .00 10,875,000.00- 10,875,000.00

Total 22,895,000.00 .00 .00 .00 10,875,000.00 10,875,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) .00% Description:Description: Remodel Culinary Arts ProgramRemodel Culinary Arts Program

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 587: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 587Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--012012--007007 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade Campus Building Automation SysteAgency: Illinois Community College Board Analyst: Erin EoffLocation: Kennedy-King College - Chicago, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 32 - Andre Thapedi

Senate:16 - Jacqueline Collins : CURRENT STATUS 11-02-21 :: :

A/E Id: 31186 : :A/E Name: Delta Engineering Group, LLC : :A/E Contact: Edgar Nunez : :A/E Telephone: (312)377-7700 : :Date Selected: 03-12-19 : :Contract Date: 04-26-19 ________________________________________________________________________________Est. Project Cost: 825,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 562,420.00 03-14-19 562,420.00 03-14-19 557,450.00 395,109.86 4,970.00 .00991 262,580.00 03-15-19 .00 161,250.00 .00 101,330.00 .00

Total 825,000.00 562,420.00 718,700.00 395,109.86 106,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 80.00% Description:Description: Upgrade Campus Building Automation SysteUpgrade Campus Building Automation Syste

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-04-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-30-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 06-01-20 06-30-21 ( 0 )50%: 08-19-19 09-06-19 ( 18 ) Final Accept: 06-29-20 07-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-01-2106-01-21 06-30-2306-30-2395-100%: 11-04-19 01-17-20 ( 74 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Delta Engineering Group, LLC 19023410 ( 0 ) ( 0 ) 06-30-2306-30-23Automatic Building Controls, 21044583 12-11-20 02-23-21 06-23-21 ( 0 ) 07-21-21 ( 0 ) 07-20-2207-20-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Delta Engineering Group, LLC 19023410 10 73,700.00 .00 1 73,700.00 51,279.86 9 22,420.14 70Automatic Building Controls, 21044583 83 645,000.00 .00 0 645,000.00 343,830.00 3 301,170.00 53***** Contract Totals ********** Contract Totals ***** 718,700.00 .00 1 718,700.00 395,109.86 12 323,590.14 55

Page 588: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 588Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--012012--009009 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Fire Alarm SystemAgency: Illinois Community College Board Analyst: Erin EoffLocation: Kennedy-King College - Chicago, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 32 - Andre Thapedi

Senate:16 - Jacqueline Collins : CURRENT STATUS 10-15-21 :: :

A/E Id: 20006 : :A/E Name: Singh & Associates Inc. : :A/E Contact: : :A/E Telephone: (312)629-0240 : :Date Selected: 07-13-21 : :Contract Date: 08-30-21 ________________________________________________________________________________Est. Project Cost: 1,610,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,207,500.00 07-14-21 1,207,500.00 07-14-21 38,805.00 .00 1,168,695.00 .00991 402,500.00 07-13-21 .00 12,935.00 .00 389,565.00 .00

Total 1,610,000.00 1,207,500.00 51,740.00 .00 1,558,260.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Replace Fire Alarm SystemReplace Fire Alarm System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-05-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: 10-04-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 03-31-2503-31-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Singh & Associates Inc. 22020210 ( 0 ) ( 0 ) 03-31-2503-31-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Singh & Associates Inc. 22020210 10 51,740.00 .00 0 51,740.00 .00 0 51,740.00 0***** Contract Totals ********** Contract Totals ***** 51,740.00 .00 0 51,740.00 .00 0 51,740.00 0

Page 589: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 589Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--014014--003003 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace RoofAgency: Illinois Community College Board Analyst: Erin EoffLocation: Harold Washington Community College - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 5 - Lamont Robinson,

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-02-21 :: :

A/E Id: 21303 : :A/E Name: Doyle & Associates Architects : :A/E Contact: James Cooper : :A/E Telephone: (312)922-5520 : :Date Selected: 03-12-19 : :Contract Date: 07-02-19 ________________________________________________________________________________Est. Project Cost: 1,520,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 675,000.00 03-14-19 675,000.00 03-14-19 675,000.00 629,227.00 .00 .00991 845,000.00 05-06-20 811,775.32 10-14-21 811,775.32 811,775.32 33,224.68 .00

Total 1,520,000.00 1,486,775.32 1,486,775.32 1,441,002.32 33,224.68 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 99.00% Description:Description: Replace RoofReplace Roof

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-26-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-01-19 ( 0 ) Prime Bid: 01-23-20 02-05-20 ( 13 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-18-20 04-04-21 ( 0 )50%: 08-19-19 08-29-19 ( 10 ) Final Accept: 10-16-20 05-04-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-18-2109-18-21 04-01-2304-01-2395-100%: 10-15-19 10-21-19 ( 6 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Doyle & Associates Architect 19023510 ( 0 ) ( 0 ) 04-01-2304-01-23A-1 Roofing Co. 21040681 07-13-20 08-06-20 12-04-20 04-04-21 (121 ) 01-03-21 09-15-21 (255 ) 01-03-2201-03-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Doyle & Associates Architect 19023510 10 93,400.00 .00 1 93,400.00 47,627.00 1 45,773.00 51A-1 Roofing Co. 21040681 81 1,299,000.00 94,375.32 2 1,393,375.32 1,393,375.32 9 .00 100***** Contract Totals ********** Contract Totals ***** 1,392,400.00 94,375.32 3 1,486,775.32 1,441,002.32 10 45,773.00 97

Page 590: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 590Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--014014--004004 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Restore ExteriorAgency: Illinois Community College Board Analyst: Erin EoffLocation: Harold Washington Community College - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 5 - Lamont Robinson,

Senate: 3 - Mattie Hunter : CURRENT STATUS 11-02-21 :: :

A/E Id: 29944 : :A/E Name: Specialty Consulting, Inc. : :A/E Contact: Paul Tsotsos : :A/E Telephone: (847)331-5233 : :Date Selected: 12-10-19 : :Contract Date: 02-19-20 ________________________________________________________________________________Est. Project Cost: 2,325,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,743,750.00 12-10-19 1,743,750.00 12-10-19 1,607,372.50 270,773.03 136,377.50 .00991 581,250.00 11-12-19 13,888.00 12-02-20 532,482.50 13,888.00 48,767.50 .00

Total 2,325,000.00 1,757,638.00 2,139,855.00 284,661.03 185,145.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 1.00% Description:Description: Restore ExteriorRestore Exterior

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-28-20 01-28-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-25-20 ( 0 ) Prime Bid: 06-08-21 06-23-21 ( 15 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-26-21 ( 0 )50%: 02-03-21 02-11-21 ( 8 ) Final Accept: 12-27-21 ( 0 )75%: ( 0 ) A/E Cont End: 09-01-2209-01-2295-100%: 04-02-21 04-21-21 ( 19 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Specialty Consulting, Inc. 20023610 ( 0 ) ( 0 ) 09-01-2209-01-22Old Veteran Construction, In 22047481 09-16-21 10-25-21 03-24-22 ( 0 ) 04-23-22 ( 0 ) 04-23-2304-23-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Specialty Consulting, Inc. 20023610 10 162,500.00 288,930.00 2 451,430.00 274,736.03 6 176,693.97 61Mertes Contracting Corporati 7103 80 9,925.00 .00 0 9,925.00 9,925.00 1 .00 100Old Veteran Construction, In 22047481 81 1,678,500.00 .00 0 1,678,500.00 .00 0 1,678,500.00 0***** Contract Totals ********** Contract Totals ***** 1,850,925.00 288,930.00 2 2,139,855.00 284,661.03 7 1,855,193.97 13

Page 591: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 591Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--015015--002002 PM NAME: Emily Zgonjanin 338Emily Zgonjanin 338Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: NDescription: Renovate Humboldt Park Voc/Educational CAgency: Illinois Community College Board Analyst: Erin EoffLocation: Humboldt Park Education CenterCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 4 - Delia Ramirez

Senate: 2 - Omar Aquino : CURRENT STATUS 08-02-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 5,525,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 10,525,000.00 07-01-18 5,000,000.00 06-21-12 25,000.00 .00 25,000.00- 5,000,000.00

Total 10,525,000.00 5,000,000.00 25,000.00 .00 25,000.00 5,000,000.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Renovate Humboldt Park Voc/Educational CRenovate Humboldt Park Voc/Educational C

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 592: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 592Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--016016--005005 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace ElevatorsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Malcolm X College - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS 11-10-21 :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: : :A/E Telephone: (312)922-6400 : :Date Selected: 11-13-19 : :Contract Date: 03-03-20 ________________________________________________________________________________Est. Project Cost: 19,112,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 14,612,500.00 06-01-20 14,612,500.00 06-01-20 1,310,070.00 625,729.00 13,302,430.00 .00991 875,000.00 12-19-19 .00 434,750.00 .00 440,250.00 .00

Total 15,487,500.00 14,612,500.00 1,744,820.00 625,729.00 13,742,680.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace ElevatorsReplace Elevators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-04-19 11-04-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-09-21 11-10-21 (215 )

Design Devel: 06-22-20 07-28-20 ( 36 ) Prime Re-Bid: 11-10-21 ( 0 )25%: ( 0 ) Subst Compl: 12-01-22 ( 0 )50%: 11-02-20 11-20-20 ( 18 ) Final Accept: 02-01-23 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2312-01-2395-100%: 01-25-21 04-08-21 ( 73 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Globetrotters Engineering Co 20022510 ( 0 ) ( 0 ) 12-01-2312-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Globetrotters Engineering Co 20022510 10 5,820.00 1,739,000.00 2 1,744,820.00 625,729.00 4 1,119,091.00 36***** Contract Totals ********** Contract Totals ***** 5,820.00 1,739,000.00 2 1,744,820.00 625,729.00 4 1,119,091.00 36

Page 593: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 593Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--016016--005005 PM NAME: Penny Varnava 490Penny Varnava 490Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace ElevatorsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Malcolm X College - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 9 - Lakesia Collins

Senate: 5 - Patricia Van : CURRENT STATUS :: :

A/E Id: 5041 : :A/E Name: Globetrotters Engineering Corp : :A/E Contact: : :A/E Telephone: (312)922-6400 : :Date Selected: : :Contract Date: 03-03-20 ________________________________________________________________________________Est. Project Cost: 19,112,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 14,612,500.00 06-01-20 14,612,500.00 06-01-20 1,310,070.00 625,729.00 13,302,430.00 .00991 875,000.00 12-19-19 .00 434,750.00 .00 440,250.00 .00

Total 15,487,500.00 14,612,500.00 1,744,820.00 625,729.00 13,742,680.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (D ) .00% Description:Description: Garage ElevatorsGarage Elevators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 594: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 594Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--018018--006006 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: YDescription: Olive-Harvey College new buildingAgency: Illinois Community College Board Analyst: Erin EoffLocation: Olive-Harvey Community College - ChicagoCounty: 31 - Cook Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 04-12-21 :: :

A/E Id: 30880 : :A/E Name: FGM Architects Inc. : :A/E Contact: David Yandel : :A/E Telephone: (312)948-8461 : :Date Selected: 08-14-12 : :Contract Date: 11-30-12 ________________________________________________________________________________Est. Project Cost: 55,341,342.41

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 46,694,074.00 03-06-20 46,694,074.00 03-06-20 39,323,591.40 39,040,223.28 10.00 7,370,472.60170 244,880.82 11-02-17 244,880.82 11-02-17 244,880.82 244,880.82 .00 .00971 1,000,000.00 09-12-02 1,000,000.00 09-12-02 134,960.19 134,960.19 .00 865,039.81991 15,689,000.00 03-13-19 13,096,940.69 06-14-21 13,849,548.61 13,129,074.75 1,839,451.39 .00

Total 63,627,954.82 61,035,895.51 53,552,981.02 52,549,139.04 1,839,461.39 8,235,512.41____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 99.00% Description:Description: PH-1 / General SitePH-1 / General Site

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-27-12 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-18-13 02-22-13 ( 4 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 30,534.00 Schem Design: 02-18-13 02-22-13 ( 4 ) Prime Bid: 02-03-14 10-10-13 (116-)

Design Devel: 05-27-13 05-28-13 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-10-15 ( 0 )50%: 08-12-13 ( 0 ) Final Accept: 11-02-15 ( 0 )75%: ( 0 ) A/E Cont End: 11-02-1611-02-16 07-15-2207-15-2295-100%: 10-21-13 08-26-13 ( 56-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

FGM Architects Inc. 13000310 ( 0 ) ( 0 ) 07-15-2207-15-22Gilbane Building Company 13002010 ( 0 ) ( 0 ) 07-31-2007-31-20Oakley Construction Company, 14054481 11-26-13 12-16-13 10-29-15 10-31-18 04-05-19 (254 ) 11-30-18 ( 0 ) 07-30-2007-30-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

FGM Architects Inc. 13000310 10 2,995,800.00 1,018,056.00 7 4,013,856.00 3,738,095.88 22 275,760.12 93Gilbane Building Company 13002010 10 3,625,999.00 2,197,420.00 11 5,823,419.00 5,771,304.18 38 52,114.82 99Bisping Construction Company 6390 40 13,879.87 .00 0 13,879.87 13,879.87 1 .00 100

Page 595: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 595Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Oakley Construction Company, 6391 40 5,760.00 .00 0 5,760.00 5,760.00 1 .00 100Vixen Construction, Inc. 6392 40 115,320.32 .00 0 115,320.32 115,320.32 1 .00 100C D B/Art In Architecture ART 49 4,975.00 2,142.00- 0 2,833.00 .00 0 2,833.00 0Krivanek & Breaux-Art & Desi 6842 49 2,000.00 .00 0 2,000.00 2,000.00 1 .00 100Barbara Cooper 19043249 49 2,000.00 .00 0 2,000.00 2,000.00 1 .00 100Watts Studio LLC 19043549 49 2,000.00 .00 0 2,000.00 2,000.00 1 .00 100McCarty David 18043449 49 2,000.00 .00 0 2,000.00 2,000.00 1 .00 100Barbara Cooper 19048449 49 147,500.00 47,215.00 0 194,715.00 194,715.00 7 .00 100Lucky Locators, Inc. 6747 50 550.00 .00 0 550.00 550.00 1 .00 100City Of Chicago 6900 50 .00 .00 0 .00 .00 0 .00 100Chas F. Bruckner & Son, Inc. INT6685 00 13,817.54 .00 0 13,817.54 13,817.54 1 .00 100MG Mechanical Contracting, I INT6686 00 11,965.58 .00 0 11,965.58 11,965.58 1 .00 100Great Lakes Plumbing & Heati INT6687 00 31,544.90 .00 0 31,544.90 31,544.90 1 .00 100Oakley Construction Company, 14054481 81 3,200,000.00 523,827.78 24 3,723,827.78 3,723,627.78 34 200.00 100***** Contract Totals ********** Contract Totals ***** 10,175,112.21 3,784,376.78 42 13,959,488.99 13,628,581.05 112 330,907.94 98

Page 596: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 596Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--018018--006006 PM NAME: Ebone White 390Ebone White 390Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: YDescription: Olive-Harvey College new buildingAgency: Illinois Community College Board Analyst: Erin EoffLocation: Olive-Harvey Community College - ChicagoCounty: 31 - Cook Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 03-16-21 :: :

A/E Id: 30880 : :A/E Name: FGM Architects Inc. : :A/E Contact: David Yandel : :A/E Telephone: (312)948-8461 : :Date Selected: : :Contract Date: 11-30-12 ________________________________________________________________________________Est. Project Cost: 55,341,342.41

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 46,694,074.00 03-06-20 46,694,074.00 03-06-20 39,323,591.40 39,040,223.28 10.00 7,370,472.60170 244,880.82 11-02-17 244,880.82 11-02-17 244,880.82 244,880.82 .00 .00971 1,000,000.00 09-12-02 1,000,000.00 09-12-02 134,960.19 134,960.19 .00 865,039.81991 15,689,000.00 03-13-19 13,096,940.69 06-14-21 13,849,548.61 13,129,074.75 1,839,451.39 .00

Total 63,627,954.82 61,035,895.51 53,552,981.02 52,549,139.04 1,839,461.39 8,235,512.41____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 22 (XP) 98.00% Description:Description: PH-2 / Pre Fab and SteelPH-2 / Pre Fab and Steel

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-18-13 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 30,534.00 Schem Design: 02-18-13 02-22-13 ( 4 ) Prime Bid: 02-03-14 11-13-13 ( 82-)

Design Devel: 05-27-13 05-28-13 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-10-15 ( 0 )50%: 08-12-13 08-23-13 ( 11 ) Final Accept: 11-02-15 ( 0 )75%: ( 0 ) A/E Cont End: 11-02-1611-02-16 07-15-2207-15-2295-100%: 10-21-13 09-20-13 ( 31-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Barton Malow Company 14056781 01-10-14 01-27-14 07-27-15 10-31-18 10-31-18 (192 ) 11-30-18 07-09-19 (221 ) 07-30-2007-30-20

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Barton Malow Company 14056781 81 4,674,000.00 191,466.59 17 4,865,466.59 4,865,466.59 18 .00 100***** Contract Totals ********** Contract Totals ***** 4,674,000.00 191,466.59 17 4,865,466.59 4,865,466.59 18 .00 100

Page 597: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 597Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--018018--006006 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: YDescription: Olive-Harvey College new buildingAgency: Illinois Community College Board Analyst: Erin EoffLocation: Olive-Harvey Community College - ChicagoCounty: 31 - Cook Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 11-01-21 :: :

A/E Id: 30880 : :A/E Name: FGM Architects Inc. : :A/E Contact: David Yandel : :A/E Telephone: (312)948-8461 : :Date Selected: : :Contract Date: 11-30-12 ________________________________________________________________________________Est. Project Cost: 55,341,342.41

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 46,694,074.00 03-06-20 46,694,074.00 03-06-20 39,323,591.40 39,040,223.28 10.00 7,370,472.60170 244,880.82 11-02-17 244,880.82 11-02-17 244,880.82 244,880.82 .00 .00971 1,000,000.00 09-12-02 1,000,000.00 09-12-02 134,960.19 134,960.19 .00 865,039.81991 15,689,000.00 03-13-19 13,096,940.69 06-14-21 13,849,548.61 13,129,074.75 1,839,451.39 .00

Total 63,627,954.82 61,035,895.51 53,552,981.02 52,549,139.04 1,839,461.39 8,235,512.41____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 33 (X ) 97.00% Description:Description: PH-3 / Building InteriorPH-3 / Building Interior

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 02-18-13 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 30,534.00 Schem Design: 02-18-13 02-22-13 ( 4 ) Prime Bid: 02-03-14 03-04-14 ( 29 )

Design Devel: 05-27-13 05-28-13 ( 1 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-10-15 ( 0 )50%: 08-12-13 08-23-13 ( 11 ) Final Accept: 11-02-15 ( 0 )75%: ( 0 ) A/E Cont End: 11-02-1611-02-16 07-15-2207-15-2295-100%: 10-21-13 01-03-14 ( 74 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Argo Electric Inc. 15041285 07-31-14 08-18-14 11-28-15 10-31-18 04-05-19 (224 ) 11-30-18 11-16-20 (717 ) 06-30-2106-30-21MG Mechanical Contracting, I 15041384 07-31-14 08-18-14 11-28-15 10-31-18 04-05-19 (224 ) 11-30-18 ( 0 ) 07-30-2007-30-20Great Lakes Plumbing & Heati 15041483 07-31-14 08-18-14 11-28-15 10-31-18 04-05-19 (224 ) 11-30-18 ( 0 ) 06-30-2106-30-21Chas F. Bruckner & Son, Inc. 15041582 07-31-14 08-18-14 11-28-15 10-31-18 04-05-19 (224 ) 11-30-18 08-07-20 (616 ) 06-30-2106-30-21Path Construction Company, I 15041681 07-31-14 08-18-14 11-28-15 10-31-18 08-27-19 (368 ) 11-30-18 ( 0 ) 06-30-2206-30-22United States Alliance Fire 150497442 10-07-14 10-23-14 11-28-15 10-31-18 04-05-19 (224 ) 11-30-18 05-13-20 (530 ) 06-30-2106-30-21

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Argo Electric Inc. 15041285 85 2,888,000.00 2,477,479.18 54 5,365,479.18 5,365,479.18 34 .00 100

Page 598: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 598Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

MG Mechanical Contracting, I 15041384 84 2,323,000.00 334,805.06 16 2,657,805.06 2,601,432.72 26 56,372.34 98Great Lakes Plumbing & Heati 15041483 83 3,459,751.00 1,206,098.17 31 4,665,849.17 4,665,749.17 26 100.00 100Chas F. Bruckner & Son, Inc. 15041582 82 1,565,990.00 557,133.21 22 2,123,123.21 2,123,123.21 29 .00 100Path Construction Company, I 15041681 81 13,996,700.00 5,514,881.46 134 19,511,581.46 18,895,119.76 34 616,461.70 97United States Alliance Fire 150497442 42 .00 398,532.36 11 398,532.36 398,532.36 14 .00 100***** Contract Totals ********** Contract Totals ***** 24,233,441.0010,488,929.44 268 34,722,370.44 34,049,436.40 163 672,934.04 98

Page 599: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 599Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--018018--008008 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Upgrade LaboratoriesAgency: Illinois Community College Board Analyst: Erin EoffLocation: Olive-Harvey Community College - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 34 - Nicholas Smith

Senate:17 - Elgie Sims, : CURRENT STATUS 11-01-21 :: :

A/E Id: 29318 : :A/E Name: Holabird & Root, LLC : :A/E Contact: karl Schuster : :A/E Telephone: (312)357-1771 : :Date Selected: 12-10-19 : :Contract Date: 04-03-20 ________________________________________________________________________________Est. Project Cost: 835,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 375,000.00 12-10-19 375,000.00 12-10-19 51,375.00 36,769.97 323,625.00 .00991 125,000.00 11-12-19 .00 17,125.00 .00 107,875.00 .00

Total 500,000.00 375,000.00 68,500.00 36,769.97 431,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 95.00% Description:Description: Upgrade LaboratoriesUpgrade Laboratories

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-29-20 01-29-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 06-29-20 08-04-20 ( 36 ) Prime Bid: 01-11-21 08-04-21 (205 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-06-21 ( 0 )50%: 08-24-20 10-16-20 ( 53 ) Final Accept: 10-04-21 ( 0 )75%: ( 0 ) A/E Cont End: 10-04-2210-04-2295-100%: 11-02-20 03-25-21 (143 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Holabird & Root, LLC 20023710 ( 0 ) ( 0 ) 10-04-2210-04-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Holabird & Root, LLC 20023710 10 68,500.00 .00 0 68,500.00 36,769.97 3 31,730.03 54***** Contract Totals ********** Contract Totals ***** 68,500.00 .00 0 68,500.00 36,769.97 3 31,730.03 54

Page 600: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 600Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--020020--008008 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Reglaze Curtain WallAgency: Illinois Community College Board Analyst: Erin EoffLocation: Richard J. Daley College - Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 22 - Angelica Guerrero-Cu

Senate:11 - Celina Villanueva : CURRENT STATUS 09-22-21 :: :

A/E Id: 31293 : :A/E Name: Moreno Architects Ltd. : :A/E Contact: Carolina Condeco : :A/E Telephone: (312)895-4438 : :Date Selected: 11-13-19 : :Contract Date: 01-06-20 ________________________________________________________________________________Est. Project Cost: 5,535,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,151,250.00 10-31-19 4,151,250.00 10-31-19 2,594,235.00 1,603,144.63 1,557,015.00 .00991 1,383,750.00 12-19-19 .00 864,745.00 .00 519,005.00 .00

Total 5,535,000.00 4,151,250.00 3,458,980.00 1,603,144.63 2,076,020.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 30.00% Description:Description: Reglaze Curtain WallReglaze Curtain Wall

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-06-19 11-06-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-25-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-15-21 ( 0 )50%: ( 0 ) Final Accept: 09-15-21 ( 0 )75%: 02-10-20 02-26-20 ( 16 ) A/E Cont End: 08-15-2208-15-2295-100%: 04-20-20 07-20-20 ( 91 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Moreno Architects Ltd. 20022610 ( 0 ) ( 0 ) 08-15-2208-15-22CMM Group, Inc. 21050881 05-13-21 05-27-21 08-15-21 ( 0 ) 09-15-21 ( 0 ) 09-15-2209-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Moreno Architects Ltd. 20022610 10 200,000.00 .00 0 200,000.00 105,309.03 6 94,690.97 53CMM Group, Inc. 21050881 81 3,258,980.00 .00 0 3,258,980.00 1,497,835.60 4 1,761,144.40 46***** Contract Totals ********** Contract Totals ***** 3,458,980.00 .00 0 3,458,980.00 1,603,144.63 10 1,855,835.37 46

Page 601: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 601Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--022022--006006 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace FlooringAgency: Illinois Community College Board Analyst: Erin EoffLocation: Wilbur Wright City College - ChicagoCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 19 - Lindsey LaPointe

Senate:10 - Robert Martwick : CURRENT STATUS 11-01-21 :: :

A/E Id: 32761 : :A/E Name: Petrea Collaborative, Corp. : :A/E Contact: : :A/E Telephone: (773)715-1825 : :Date Selected: 11-13-19 : :Contract Date: 01-06-20 ________________________________________________________________________________Est. Project Cost: 1,350,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,012,500.00 11-14-19 1,012,500.00 11-14-19 806,150.00 476,829.10 206,350.00 .00991 337,500.00 10-24-19 .00 219,650.00 .00 117,850.00 .00

Total 1,350,000.00 1,012,500.00 1,025,800.00 476,829.10 324,200.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 50.00% Description:Description: Replace FlooringReplace Flooring

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-27-19 11-27-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 07-23-20 09-02-20 ( 41 )

Design Devel: 03-23-20 04-10-20 ( 18 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-31-21 ( 0 )50%: ( 0 ) Final Accept: 01-14-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2208-31-2295-100%: 05-18-20 06-17-20 ( 30 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Petrea Collaborative, Corp. 20022910 ( 0 ) ( 0 ) 08-31-2208-31-22A.L.L. Masonry Construction 21050081 04-08-21 05-28-21 08-27-21 ( 0 ) 10-26-21 ( 0 ) 10-26-2210-26-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Petrea Collaborative, Corp. 20022910 10 147,200.00 .00 0 147,200.00 89,366.50 7 57,833.50 61A.L.L. Masonry Construction 21050081 81 878,600.00 .00 0 878,600.00 387,462.60 1 491,137.40 44***** Contract Totals ********** Contract Totals ***** 1,025,800.00 .00 0 1,025,800.00 476,829.10 8 548,970.90 47

Page 602: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 602Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--024024--042042 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Remodel Clock Tower Center and OrnamentaAgency: Illinois Community College Board Analyst: Erin EoffLocation: Danville Area Community College - Vermilion CountyCounty: 183 - Vermilion ________________________________________________________________________________Leg. Districts: House:104 - Michael Marron

Senate:52 - Scott Bennett : CURRENT STATUS 11-01-21 :: :

A/E Id: 29506 : :A/E Name: Bailey Edward Design, Inc. : :A/E Contact: Karla Smalley : :A/E Telephone: (217)363-3375 : :Date Selected: 11-17-20 : :Contract Date: 04-12-21 ________________________________________________________________________________Est. Project Cost: 4,354,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,265,800.00 07-01-20 2,265,800.00 08-04-20 50,516.50 .00 2,215,283.50 .00991 755,267.00 09-17-20 .00 13,062.50 .00 742,204.50 .00

Total 3,021,067.00 2,265,800.00 63,579.00 .00 2,957,488.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 20.00% Description:Description: Remodel Clock Tower Center and OrnamentaRemodel Clock Tower Center and Ornamenta

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-21-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 11-20-2511-20-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Bailey Edward Design, Inc. 21041610 ( 0 ) ( 0 ) 11-20-2511-20-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Bailey Edward Design, Inc. 21041610 10 52,250.00 .00 0 52,250.00 .00 0 52,250.00 0C D B/Art In Architecture AIA 49 11,329.00 .00 0 11,329.00 .00 0 11,329.00 0***** Contract Totals ********** Contract Totals ***** 63,579.00 .00 0 63,579.00 .00 0 63,579.00 0

Page 603: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 603Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--026026--015015 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roofing SystemAgency: Illinois Community College Board Analyst: Erin EoffLocation: Richland Community College - Decatur, Macon CountyCounty: 115 - Macon ________________________________________________________________________________Leg. Districts: House:101 - Dan Caulkins

Senate:51 - Chapin Rose : CURRENT STATUS 11-03-21 :: :

A/E Id: 3592 : :A/E Name: Steckel-Parker Architects, Inc : :A/E Contact: David Steckel : :A/E Telephone: (217)793-6444 : :Date Selected: 12-10-19 : :Contract Date: 03-04-20 ________________________________________________________________________________Est. Project Cost: 859,653.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 644,740.00 12-11-19 644,740.00 12-11-19 68,121.75 41,910.45 576,618.25 .00991 214,913.00 11-20-19 1,894.09 12-04-20 22,707.25 1,894.09 192,205.75 .00

Total 859,653.00 646,634.09 90,829.00 43,804.54 768,824.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 95.00% Description:Description: Replace Roofing SystemReplace Roofing System

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 04-29-20 06-11-20 ( 43 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 06-13-21 07-14-21 ( 31 )

Design Devel: 04-29-20 06-12-20 ( 44 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-10-22 ( 0 )50%: 02-01-21 ( 0 ) Final Accept: 05-09-22 ( 0 )75%: ( 0 ) A/E Cont End: 08-05-2208-05-22 08-05-2308-05-2395-100%: 03-29-21 04-13-21 ( 15 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Steckel-Parker Architects, I 20013710 ( 0 ) ( 0 ) 08-05-2308-05-23Henson Robinson Company 22049481 10-07-21 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Steckel-Parker Architects, I 20013710 10 24,928.00 65,901.00 2 90,829.00 43,804.54 3 47,024.46 48Henson Robinson Company 22049481 81 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 24,928.00 65,901.00 2 90,829.00 43,804.54 3 47,024.46 48

Page 604: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 604Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--026026--016016 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate Shilling Community Education CeAgency: Illinois Community College Board Analyst: Erin EoffLocation: Richland Community College - Decatur, Macon CountyCounty: 115 - Macon ________________________________________________________________________________Leg. Districts: House:101 - Dan Caulkins

Senate:51 - Chapin Rose : CURRENT STATUS 10-28-21 :: :

A/E Id: 21639 : :A/E Name: BLDD Architects, Inc. : :A/E Contact: : :A/E Telephone: (217)429-5105 : :Date Selected: 07-13-21 : :Contract Date: 09-17-21 ________________________________________________________________________________Est. Project Cost: 748,650.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 561,487.00 04-23-21 561,487.00 04-23-21 60,525.00 16,340.00 500,962.00 .00991 187,163.00 07-13-21 .00 20,175.00 .00 166,988.00 .00

Total 748,650.00 561,487.00 80,700.00 16,340.00 667,950.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 35.00% Description:Description: Renovate Shilling Community Education CeRenovate Shilling Community Education Ce

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-19-21 08-19-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-18-21 11-04-21 ( 17 ) Prime Bid: 05-02-22 ( 0 )

Design Devel: 12-13-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-22 ( 0 )50%: ( 0 ) Final Accept: 11-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2310-31-2395-100%: 02-07-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

BLDD Architects, Inc. 22000310 ( 0 ) ( 0 ) 10-31-2310-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

BLDD Architects, Inc. 22000310 10 80,700.00 .00 0 80,700.00 16,340.00 1 64,360.00 20***** Contract Totals ********** Contract Totals ***** 80,700.00 .00 0 80,700.00 16,340.00 1 64,360.00 20

Page 605: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 605Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--028028--027027 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Repair Roads and ConcreteAgency: Illinois Community College Board Analyst: Erin EoffLocation: College of DuPage - Glen Ellyn, DuPage CountyCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 48 - Terra Howard

Senate:24 - Suzy Hilton : CURRENT STATUS 10-27-21 :: :

A/E Id: 29543 : :A/E Name: V3 Companies, Ltd. : :A/E Contact: : :A/E Telephone: (630)724-9200 : :Date Selected: 05-14-19 : :Contract Date: 07-24-19 ________________________________________________________________________________Est. Project Cost: 574,360.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 423,575.00 09-09-19 423,575.00 09-09-19 293,550.00 .00 130,025.00 .00991 150,785.00 10-08-19 31,178.00 11-09-21 150,785.00 31,178.00 .00 .00999 22,036.96 05-03-21 22,036.96 05-03-21 .00 .00 22,036.96 .00

Total 596,396.96 476,789.96 444,335.00 31,178.00 152,061.96 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) .00% Description:Description: Repair Roads and ConcreteRepair Roads and Concrete

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-25-19 ( 0 ) Assgn Bid: 03-31-21 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 07-17-20 07-28-20 ( 11 ) Assgn Re-Bid: 06-23-21 ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-03-20 01-26-21 ( 0 )

Design Devel: 06-08-20 07-17-20 ( 39 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-18-20 06-25-23 ( 0 )50%: 09-09-20 09-10-20 ( 1 ) Final Accept: 08-18-20 06-30-23 ( 0 )75%: ( 0 ) A/E Cont End: 07-18-2107-18-21 07-18-2307-18-2395-100%: 11-13-20 11-16-20 ( 3 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

V3 Companies, Ltd. 19025810 ( 0 ) ( 0 ) 07-18-2307-18-23K-Five Construction Corporat 22048181 09-27-21 10-21-21 11-15-21 ( 0 ) 12-15-21 ( 0 ) 12-15-2212-15-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

V3 Companies, Ltd. 19025810 10 53,600.00 5,400.00 3 59,000.00 31,178.00 6 27,822.00 53K-Five Construction Corporat 22048181 81 385,335.00 .00 0 385,335.00 .00 0 385,335.00 0***** Contract Totals ********** Contract Totals ***** 438,935.00 5,400.00 3 444,335.00 31,178.00 6 413,157.00 7

Page 606: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 606Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--028028--028028 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Renovate Mechanical SystemsAgency: Illinois Community College Board Analyst: Erin EoffLocation: College of DuPage - Glen Ellyn, DuPage CountyCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 48 - Terra Howard

Senate:24 - Suzy Hilton : CURRENT STATUS 09-15-21 :: :

A/E Id: 5183 : :A/E Name: Enercon, Ltd. : :A/E Contact: : :A/E Telephone: (847)328-3555 : :Date Selected: 08-10-19 : :Contract Date: 10-01-19 ________________________________________________________________________________Est. Project Cost: 476,025.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 333,750.00 08-14-19 333,750.00 08-14-19 51,055.00 41,372.52 282,695.00 .00991 142,275.00 02-21-20 .00 11,045.00 .00 131,230.00 .00

Total 476,025.00 333,750.00 62,100.00 41,372.52 413,925.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 100.00% Description:Description: Renovate Mechanical SystemsRenovate Mechanical Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-03-19 09-03-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-30-19 01-07-20 ( 8 ) Prime Bid: 01-15-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 12-01-21 ( 0 )50%: 07-20-20 07-23-20 ( 3 ) Final Accept: 02-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-01-2212-01-2295-100%: 10-19-20 10-27-20 ( 8 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Enercon, Ltd. 20020910 ( 0 ) ( 0 ) 12-01-2212-01-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Enercon, Ltd. 20020910 10 17,920.00 44,180.00 2 62,100.00 41,372.52 4 20,727.48 67***** Contract Totals ********** Contract Totals ***** 17,920.00 44,180.00 2 62,100.00 41,372.52 4 20,727.48 67

Page 607: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 607Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--028028--029029 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Improve Grounds and Retention PondAgency: Illinois Community College Board Analyst: Erin EoffLocation: College of DuPage - Glen Ellyn, DuPage CountyCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 48 - Terra Howard

Senate:24 - Suzy Hilton : CURRENT STATUS 10-27-21 :: :

A/E Id: 19605 : :A/E Name: Engineering Resource Associate : :A/E Contact: : :A/E Telephone: (630)393-3060 : :Date Selected: 02-09-21 : :Contract Date: 03-23-21 ________________________________________________________________________________Est. Project Cost: 4,336,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,252,300.00 07-01-20 3,252,300.00 08-04-20 303,675.00 58,383.96 2,948,625.00 .00990 .00 09-16-20 .00 .00 .00 .00 .00991 1,084,100.00 09-16-20 .00 101,225.00 .00 982,875.00 .00

Total 4,336,400.00 3,252,300.00 404,900.00 58,383.96 3,931,500.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 44.00% Description:Description: Improve Grounds and Retention PondImprove Grounds and Retention Pond

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-23-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 07-27-21 ( 0 ) Prime Bid: 05-12-22 ( 0 )

Design Devel: 09-10-21 10-19-21 ( 39 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-15-23 ( 0 )50%: 12-21-21 ( 0 ) Final Accept: 05-15-23 ( 0 )75%: ( 0 ) A/E Cont End: 04-15-2504-15-2595-100%: 03-03-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Engineering Resource Associa 21021810 ( 0 ) ( 0 ) 04-15-2504-15-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Engineering Resource Associa 21021810 10 404,900.00 .00 0 404,900.00 58,383.96 1 346,516.04 15***** Contract Totals ********** Contract Totals ***** 404,900.00 .00 0 404,900.00 58,383.96 1 346,516.04 15

Page 608: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 608Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--028028--030030 PM NAME: Nia Jones 477Nia Jones 477Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace SkylightsAgency: Illinois Community College Board Analyst: Erin EoffLocation: College of DuPage - Glen Ellyn, DuPage CountyCounty: 43 - DuPage ________________________________________________________________________________Leg. Districts: House: 48 - Terra Howard

Senate:24 - Suzy Hilton : CURRENT STATUS 10-31-21 :: :

A/E Id: 21303 : :A/E Name: Doyle & Associates Architects : :A/E Contact: : :A/E Telephone: (312)922-5520 : :Date Selected: 07-13-21 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,342,625.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,002,260.00 04-23-21 1,002,260.00 04-23-21 .00 .00 1,002,260.00 .00991 340,365.00 06-08-21 .00 .00 .00 340,365.00 .00

Total 1,342,625.00 1,002,260.00 .00 .00 1,342,625.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 16.00% Description:Description: Replace SkylightsReplace Skylights

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Doyle & Associates Architect 22010410 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Doyle & Associates Architect 22010410 10 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 609: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 609Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--030030--025025 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace ChillerAgency: Illinois Community College Board Analyst: Erin EoffLocation: Elgin Community College - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 11-02-21 :: :

A/E Id: 34176 : :A/E Name: IMEG Corp. : :A/E Contact: Ryan Spaulding : :A/E Telephone: (630)527-2320 : :Date Selected: 05-14-19 : :Contract Date: 08-12-19 ________________________________________________________________________________Est. Project Cost: 2,006,500.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 435,725.00 05-17-19 435,725.00 05-17-19 435,725.00 163,404.10 .00 .00991 1,570,775.00 10-30-20 893,175.46 07-28-21 1,399,993.00 893,175.46 170,782.00 .00

Total 2,006,500.00 1,328,900.46 1,835,718.00 1,056,579.56 170,782.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 40.00% Description:Description: Replace ChillerReplace Chiller

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 06-20-19 ( 0 ) Assgn Bid: 08-05-20 ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 03-05-20 05-28-20 08-19-20 ( 83 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-15-21 ( 0 )50%: 01-14-20 01-17-20 ( 3 ) Final Accept: 04-15-21 ( 0 )75%: ( 0 ) A/E Cont End: 03-15-2203-15-2295-100%: 03-16-20 04-10-20 ( 25 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IMEG Corp. 19025910 ( 0 ) ( 0 ) 03-15-2203-15-22Antarctic Mechanical Service 21044785 12-21-20 02-23-21 11-23-21 ( 0 ) 12-23-21 ( 0 ) 12-23-2212-23-22Mechanical, Inc. 21044883 12-21-20 02-23-21 11-23-21 ( 0 ) 12-23-21 ( 0 ) 12-23-2212-23-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IMEG Corp. 19025910 10 103,100.00 42,200.00 1 145,300.00 114,095.60 3 31,204.40 79Antarctic Mechanical Service 21044785 85 399,862.00 1,444.00- 1 398,418.00 49,308.50 2 349,109.50 12Mechanical, Inc. 21044883 83 1,292,000.00 .00 0 1,292,000.00 893,175.46 4 398,824.54 69***** Contract Totals ********** Contract Totals ***** 1,794,962.00 40,756.00 2 1,835,718.00 1,056,579.56 9 779,138.44 58

Page 610: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 610Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--030030--026026 PM NAME: Keith Moore 466Keith Moore 466Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Replace Exterior Doors & Upgrade SecuritAgency: Illinois Community College Board Analyst: Erin EoffLocation: Elgin Community College - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 11-02-21 :: :

A/E Id: 29318 : :A/E Name: Holabird & Root, LLC : :A/E Contact: Jenn Kunsch : :A/E Telephone: (312)357-1771 : :Date Selected: 01-14-20 : :Contract Date: 04-03-20 ________________________________________________________________________________Est. Project Cost: 350,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 262,500.00 01-16-20 262,500.00 01-16-20 198,450.00 24,359.00 64,050.00 .00991 87,500.00 12-11-19 .00 66,150.00 .00 21,350.00 .00

Total 350,000.00 262,500.00 264,600.00 24,359.00 85,400.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 4.00% Description:Description: Replace Exterior Doors & Upgrade SecuritReplace Exterior Doors & Upgrade Securit

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-20-20 02-20-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 11-06-20 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-30-21 ( 0 )50%: 07-17-20 08-07-20 ( 21 ) Final Accept: 05-28-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-30-2205-30-2295-100%: 08-28-20 10-15-20 ( 48 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Holabird & Root, LLC 20024210 ( 0 ) ( 0 ) 05-30-2205-30-22Drive Construction, Inc. 21050781 04-15-21 05-04-21 10-24-21 ( 0 ) 11-21-21 ( 0 ) 11-21-2211-21-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Holabird & Root, LLC 20024210 10 43,900.00 .00 0 43,900.00 24,359.00 4 19,541.00 56Drive Construction, Inc. 21050781 81 220,700.00 .00 0 220,700.00 .00 0 220,700.00 0***** Contract Totals ********** Contract Totals ***** 264,600.00 .00 0 264,600.00 24,359.00 4 240,241.00 9

Page 611: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 611Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--030030--027027 PM NAME: Natasia McDade 474Natasia McDade 474Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Campus Doors and Install SecuritAgency: Illinois Community College Board Analyst: Erin EoffLocation: Elgin Community College - Kane CountyCounty: 89 - Kane ________________________________________________________________________________Leg. Districts: House: 43 - Anna Moeller

Senate:22 - Cristina Castro : CURRENT STATUS 11-01-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 3,105,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,328,750.00 04-23-21 2,328,750.00 04-23-21 .00 .00 2,328,750.00 .00991 776,250.00 07-12-21 .00 .00 .00 776,250.00 .00

Total 3,105,000.00 2,328,750.00 .00 .00 3,105,000.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Campus Doors and Install SecuritReplace Campus Doors and Install Securit

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 612: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 612Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--031031--001001 PM NAME: Robert Stowell 497Robert Stowell 497Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Renovate ExteriorAgency: Illinois Community College Board Analyst: Erin EoffLocation: Southwestern Illinois College - Sam Wolf Granite City CampusCounty: 119 - Madison ________________________________________________________________________________Leg. Districts: House:111 - Amy Elik

Senate:56 - Rachelle Crowe : CURRENT STATUS 11-02-21 :: :

A/E Id: 34404 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Jared Heller : :A/E Telephone: (618)236-2000 : :Date Selected: 03-12-19 : :Contract Date: 08-08-19 ________________________________________________________________________________Est. Project Cost: 636,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 323,800.00 07-24-19 323,800.00 07-24-19 73,300.00 35,482.60 250,500.00 .00991 312,200.00 06-12-19 .00 .00 .00 312,200.00 .00

Total 636,000.00 323,800.00 73,300.00 35,482.60 562,700.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 94.00% Description:Description: Renovate ExteriorRenovate Exterior

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 07-09-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 09-19-19 09-30-19 ( 11 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-19-19 10-01-19 ( 12 ) Prime Bid: 10-30-21 ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-30-22 ( 0 )50%: ( 0 ) Final Accept: 09-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-17-2110-17-21 09-17-2409-17-2495-100%: 08-30-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 19012410 ( 0 ) ( 0 ) 09-17-2409-17-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 19012410 10 18,240.00 55,060.00 1 73,300.00 35,482.60 2 37,817.40 49***** Contract Totals ********** Contract Totals ***** 18,240.00 55,060.00 1 73,300.00 35,482.60 2 37,817.40 49

Page 613: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 613Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--032032--025025 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: NDescription: Replace Hospitality FacilityAgency: Illinois Community College Board Analyst: Erin EoffLocation: William Rainey Harper College - Palatine, Cook CountyCounty: 31 - Cook Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House: 54 - Thomas Morrison

Senate:27 - Ann Gillespie : CURRENT STATUS 08-31-21 :: :

A/E Id: 30654 : :A/E Name: OWP/P Cannon Design, Inc. : :A/E Contact: : :A/E Telephone: (312)332-9600 : :Date Selected: 08-12-14 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 4,370,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,314,800.00 07-01-17 3,944,800.00 03-24-14 .00 .00 .00 3,944,800.00

Total 8,314,800.00 3,944,800.00 .00 .00 .00 3,944,800.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) .00% Description:Description: Replace Hospitality FacilityReplace Hospitality Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

OWP/P Cannon Design, Inc. 15040510 ( 0 ) ( 0 )M. A. Mortenson Company 15041810 ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

OWP/P Cannon Design, Inc. 15040510 10 .00 .00 0 .00 .00 0 .00 100M. A. Mortenson Company 15041810 10 .00 .00 0 .00 .00 0 .00 100C D B/Art In Architecture ART 49 19,724.00 19,724.00- 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 19,724.00 19,724.00- 0 .00 .00 0 .00 100

Page 614: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 614Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--032032--026026 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: BI Budget Impasse Hold PLA: NDescription: Upgrade Parking LotsAgency: Illinois Community College Board Analyst: Brad NellLocation: William Rainey Harper College - Palatine, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 54 - Thomas Morrison

Senate:27 - Ann Gillespie : CURRENT STATUS 08-31-21 :: :

A/E Id: 32114 : :A/E Name: SmithGroup, Inc. : :A/E Contact: : :A/E Telephone: (312)641-0770 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: .00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,780,100.00 07-01-18 1,370,100.00 02-26-13 210,800.00 102,201.96 108,598.04- 1,267,898.04

Total 2,780,100.00 1,370,100.00 210,800.00 102,201.96 108,598.04 1,267,898.04____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 36.00% Description:Description: Upgrade Parking LotsUpgrade Parking Lots

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-30-13 10-01-13 ( 1 ) Prime Bid: 06-02-14 03-02-15 05-20-15 ( 79 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-15 ( 0 )50%: ( 0 ) Final Accept: 12-31-15 ( 0 )75%: 09-08-14 09-18-14 ( 10 ) A/E Cont End: 10-31-1610-31-1695-100%: 11-03-14 03-04-15 (121 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

SmithGroup JJR, LLC 13040710 ( 0 ) ( 0 ) 10-31-1610-31-16SmithGroup, Inc. 13040710A ( 0 ) ( 0 ) 10-31-1610-31-16

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

SmithGroup JJR, LLC 13040710 10 175,800.00 135,171.90- 1 40,628.10 40,628.10 4 .00 100SmithGroup, Inc. 13040710A 10 170,171.90 .00 0 170,171.90 61,573.86 4 108,598.04 36***** Contract Totals ********** Contract Totals ***** 345,971.90 135,171.90- 1 210,800.00 102,201.96 8 108,598.04 49

Page 615: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 615Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--032032--028028 PM NAME: Blanca Rivera 391Blanca Rivera 391Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: YDescription: Repair Utility Tunnel InfrastructureAgency: Illinois Community College Board Analyst: Erin EoffLocation: William Rainey Harper College - Palatine, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 54 - Thomas Morrison

Senate:27 - Ann Gillespie : CURRENT STATUS 08-31-21 :: :

A/E Id: 20233 : :A/E Name: O & N Engineering-Development, : :A/E Contact: : :A/E Telephone: (312)432-0386 : :Date Selected: 01-14-20 : :Contract Date: 04-06-20 ________________________________________________________________________________Est. Project Cost: 543,300.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 407,475.00 01-16-20 407,475.00 01-16-20 42,000.00 18,910.00 365,475.00 .00991 135,825.00 12-03-19 .00 14,000.00 .00 121,825.00 .00

Total 543,300.00 407,475.00 56,000.00 18,910.00 487,300.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 97.00% Description:Description: Repair Utility Tunnel InfrastructureRepair Utility Tunnel Infrastructure

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-14-20 02-14-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-08-21 ( 0 )

Design Devel: 06-26-20 07-23-20 ( 27 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 09-30-21 ( 0 )50%: ( 0 ) Final Accept: 10-30-21 ( 0 )75%: 08-21-20 09-10-20 ( 20 ) A/E Cont End: 09-30-2209-30-2295-100%: 10-30-20 06-29-21 (242 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

O & N Engineering-Developmen 20024310 ( 0 ) ( 0 ) 09-30-2209-30-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

O & N Engineering-Developmen 20024310 10 56,000.00 .00 0 56,000.00 18,910.00 1 37,090.00 34***** Contract Totals ********** Contract Totals ***** 56,000.00 .00 0 56,000.00 18,910.00 1 37,090.00 34

Page 616: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 616Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--032032--029029 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: SL LEED Silver PLA: YDescription: Construct New Campus FacilityAgency: Illinois Community College Board Analyst: Erin EoffLocation: William Rainey Harper College - Palatine, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 54 - Thomas Morrison

Senate:27 - Ann Gillespie : CURRENT STATUS 11-02-21 :: :

A/E Id: 29318 : :A/E Name: Holabird & Root, LLC : :A/E Contact: Dennis Vovos : :A/E Telephone: (312)357-1771 : :Date Selected: 02-09-21 : :Contract Date: 04-01-21 ________________________________________________________________________________Est. Project Cost: 87,370,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 42,000,000.00 02-11-21 42,000,000.00 02-11-21 7,840,524.50 166,234.00 34,159,475.50 .00991 41,000,000.00 01-28-21 .00 502,891.50 .00 40,497,108.50 .00

Total 83,000,000.00 42,000,000.00 8,343,416.00 166,234.00 74,656,584.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 7.00% Description:Description: Construct New Campus FacilityConstruct New Campus Facility

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-25-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 03-21-22 ( 0 ) Prime Bid: ( 0 )

Design Devel: 09-05-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2708-31-2795-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Holabird & Root, LLC 21021910 ( 0 ) ( 0 ) 08-31-2708-31-27Affiliated Engineers, Inc. 21022510 ( 0 ) ( 0 ) 08-31-2708-31-27CORE Construction 21022610 ( 0 ) ( 0 )C D B - Fiscal FF&E DUMMY ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Holabird & Root, LLC 21021910 10 2,011,566.00 .00 0 2,011,566.00 166,234.00 3 1,845,332.00 8Affiliated Engineers, Inc. 21022510 10 .00 .00 0 .00 .00 0 .00 100CORE Construction 21022610 10 .00 .00 0 .00 .00 0 .00 100C D B - Fiscal FF&E DUMMY11 6,100,000.00 .00 0 6,100,000.00 .00 0 6,100,000.00 0

Page 617: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 617Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

C D B/Art In Architecture ART 49 231,850.00 .00 0 231,850.00 .00 0 231,850.00 0***** Contract Totals ********** Contract Totals ***** 8,343,416.00 .00 0 8,343,416.00 166,234.00 3 8,177,182.00 2

Page 618: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 618Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--032032--030030 PM NAME: Allison Maxwell 442Allison Maxwell 442Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace HVAC SystemsAgency: Illinois Community College Board Analyst: Erin EoffLocation: William Rainey Harper College - Palatine, Cook CountyCounty: 31 - Cook ________________________________________________________________________________Leg. Districts: House: 54 - Thomas Morrison

Senate:27 - Ann Gillespie : CURRENT STATUS 11-02-21 :: :

A/E Id: 26736 : :A/E Name: DLR Group inc. : :A/E Contact: Jonathan Mesik : :A/E Telephone: (312)382-9980 : :Date Selected: 07-13-21 : :Contract Date: 09-08-21 ________________________________________________________________________________Est. Project Cost: 1,725,902.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,020,014.00 04-23-21 1,020,014.00 04-23-21 138,300.00 .00 881,714.00 .00991 705,888.00 07-12-21 .00 46,100.00 .00 659,788.00 .00

Total 1,725,902.00 1,020,014.00 184,400.00 .00 1,541,502.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 1.00% Description:Description: Replace HVAC SystemsReplace HVAC Systems

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-09-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-07-22 ( 0 )

Design Devel: 01-24-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-06-23 ( 0 )50%: 04-18-22 ( 0 ) Final Accept: 11-03-23 ( 0 )75%: ( 0 ) A/E Cont End: 10-06-2510-06-2595-100%: 07-11-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

DLR Group inc. 22020310 ( 0 ) ( 0 ) 10-06-2510-06-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

DLR Group inc. 22020310 10 184,400.00 .00 0 184,400.00 .00 0 184,400.00 0***** Contract Totals ********** Contract Totals ***** 184,400.00 .00 0 184,400.00 .00 0 184,400.00 0

Page 619: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 619Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--034034--013013 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace Duct Heaters - Liberal Arts BuilAgency: Illinois Community College Board Analyst: Erin EoffLocation: Highland Community College - Freeport, Stephenson CountyCounty: 177 - Stephenson ________________________________________________________________________________Leg. Districts: House: 89 - Andrew Chesney

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 1747 : :A/E Name: Larson & Darby, Inc. : :A/E Contact: Raed Salem : :A/E Telephone: (815)484-0739 : :Date Selected: 11-13-19 : :Contract Date: 01-13-20 ________________________________________________________________________________Est. Project Cost: 150,440.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 106,219.00 10-23-19 106,219.00 10-23-19 106,219.00 11,626.40 .00 .00991 44,221.00 07-06-21 .00 38,531.00 .00 5,690.00 .00

Total 150,440.00 106,219.00 144,750.00 11,626.40 5,690.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 2.00% Description:Description: Replace Duct Heaters - Liberal Arts BuilReplace Duct Heaters - Liberal Arts Buil

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-15-19 11-15-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-14-20 05-26-21 (377 )

Design Devel: 01-27-20 08-07-20 (193 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-02-20 02-01-22 ( 0 )50%: ( 0 ) Final Accept: 11-27-20 04-01-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-02-2110-02-21 02-01-2402-01-2495-100%: 03-09-20 10-01-20 (206 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Larson & Darby, Inc. 20022710 ( 0 ) ( 0 ) 02-01-2402-01-24Mechanical, Inc. 22043383 08-09-21 09-13-21 12-12-21 ( 0 ) 01-11-22 ( 0 ) 01-11-2301-11-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Larson & Darby, Inc. 20022710 10 20,950.00 .00 2 20,950.00 11,626.40 1 9,323.60 56Mechanical, Inc. 22043383 83 123,800.00 .00 0 123,800.00 .00 0 123,800.00 0***** Contract Totals ********** Contract Totals ***** 144,750.00 .00 2 144,750.00 11,626.40 1 133,123.60 8

Page 620: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 620Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--034034--014014 PM NAME: Stetzen Fleming 262Stetzen Fleming 262Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Replace CarpetAgency: Illinois Community College Board Analyst: Erin EoffLocation: Highland Community College - Freeport, Stephenson CountyCounty: 177 - Stephenson ________________________________________________________________________________Leg. Districts: House: 89 - Andrew Chesney

Senate:45 - Brian Stewart : CURRENT STATUS 11-01-21 :: :

A/E Id: 32653 : :A/E Name: Studio ARQ, LLC : :A/E Contact: : :A/E Telephone: (312)846-6415 : :Date Selected: 07-13-21 : :Contract Date: 09-16-21 ________________________________________________________________________________Est. Project Cost: 575,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 431,250.00 04-23-21 431,250.00 04-23-21 47,550.00 .00 383,700.00 .00991 143,750.00 04-28-21 .00 15,850.00 .00 127,900.00 .00

Total 575,000.00 431,250.00 63,400.00 .00 511,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Replace CarpetReplace Carpet

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-24-21 08-24-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 10-18-21 10-22-21 ( 4 ) Prime Bid: 04-25-22 ( 0 )

Design Devel: 12-13-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-22 ( 0 )50%: ( 0 ) Final Accept: 11-30-22 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2310-31-2395-100%: 02-07-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Studio ARQ, LLC 22000210 ( 0 ) ( 0 ) 10-31-2310-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Studio ARQ, LLC 22000210 10 63,400.00 .00 0 63,400.00 .00 0 63,400.00 0***** Contract Totals ********** Contract Totals ***** 63,400.00 .00 0 63,400.00 .00 0 63,400.00 0

Page 621: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 621Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--035035--007007 PM NAME: Jacob Teegarden 470Jacob Teegarden 470Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Resurface Parking LotsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Heartland Community College - McLean CountyCounty: 113 - McLean ________________________________________________________________________________Leg. Districts: House:105 - Dan Brady

Senate:53 - Jason Barickman : CURRENT STATUS 10-27-21 :: :

A/E Id: 30058 : :A/E Name: Farnsworth Group, Inc. : :A/E Contact: Brandon Lott : :A/E Telephone: (309)663-8436 : :Date Selected: 03-12-19 : :Contract Date: 07-12-19 ________________________________________________________________________________Est. Project Cost: 225,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 160,835.00 03-19-19 160,835.00 03-19-19 144,327.15 124,428.75 16,507.85 .00991 64,165.00 01-29-19 25,527.65 06-09-21 36,691.75 25,527.65 27,473.25 .00

Total 225,000.00 186,362.65 181,018.90 149,956.40 43,981.10 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 99.50% Description:Description: Resurface Parking LotsResurface Parking Lots

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 04-24-19 04-24-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 01-20-20 03-05-20 ( 45 )

Design Devel: 08-26-19 09-18-19 ( 23 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-16-20 ( 0 )50%: ( 0 ) Final Accept: 04-16-20 ( 0 )75%: ( 0 ) A/E Cont End: 03-16-2103-16-21 03-29-2203-29-2295-100%: 10-21-19 12-16-19 ( 56 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Farnsworth Group, Inc. 19002910 ( 0 ) ( 0 ) 03-29-2203-29-22McLean County Asphalt Co. In 21041181 08-13-20 12-01-20 01-30-21 05-01-21 04-26-21 ( 86 ) 03-10-21 ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Farnsworth Group, Inc. 19002910 10 34,500.00 .00 2 34,500.00 17,604.00 2 16,896.00 51McLean County Asphalt Co. In 21041181 81 142,433.00 4,085.90 3 146,518.90 132,352.40 2 14,166.50 90***** Contract Totals ********** Contract Totals ***** 176,933.00 4,085.90 5 181,018.90 149,956.40 4 31,062.50 83

Page 622: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 622Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--035035--008008 PM NAME: Melissa Porter 455Melissa Porter 455Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Repair Parking Lots, Roads and SidewalksAgency: Illinois Community College Board Analyst: Erin EoffLocation: Heartland Community College - McLean CountyCounty: 113 - McLean ________________________________________________________________________________Leg. Districts: House:105 - Dan Brady

Senate:53 - Jason Barickman : CURRENT STATUS 11-01-21 :: :

A/E Id: 33733 : :A/E Name: Artisan Consulting Engineers, : :A/E Contact: Lee Aschim : :A/E Telephone: (815)519-9645 : :Date Selected: 11-13-19 : :Contract Date: 02-28-20 ________________________________________________________________________________Est. Project Cost: 1,000,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 750,000.00 11-14-19 750,000.00 11-14-19 585,148.50 56,821.10 164,851.50 .00991 250,000.00 08-14-19 .00 195,049.50 .00 54,950.50 .00

Total 1,000,000.00 750,000.00 780,198.00 56,821.10 219,802.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 20.00% Description:Description: Repair Parking Lots, Roads and SidewalksRepair Parking Lots, Roads and Sidewalks

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-07-20 01-07-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-22-20 02-03-21 (104 )

Design Devel: 04-27-20 05-28-20 ( 31 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 05-03-21 ( 0 )50%: 06-22-20 06-26-20 ( 4 ) Final Accept: 06-01-21 ( 0 )75%: ( 0 ) A/E Cont End: 05-03-2205-03-2295-100%: 08-31-20 09-16-20 ( 16 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Artisan Consulting Engineers 2002410 ( 0 ) ( 0 ) 05-03-2205-03-22H. J. Eppel & Co. 21055381 06-02-21 07-07-21 01-03-22 ( 0 ) 02-17-22 ( 0 ) 02-17-2302-17-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Artisan Consulting Engineers 2002410 10 112,700.00 .00 0 112,700.00 56,821.10 4 55,878.90 51H. J. Eppel & Co. 21055381 81 667,498.00 .00 0 667,498.00 .00 0 667,498.00 0***** Contract Totals ********** Contract Totals ***** 780,198.00 .00 0 780,198.00 56,821.10 4 723,376.90 7

Page 623: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 623Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--035035--009009 PM NAME: CDB CDB 622CDB CDB 622Project Status: AP Active Project Region:Project Type: IG Intergovernmental Agreement PLA: NDescription: Replace Fencing - Child Development LabAgency: Illinois Community College Board Analyst: Erin EoffLocation: Heartland Community College - McLean CountyCounty: 113 - McLean ________________________________________________________________________________Leg. Districts: House:105 - Dan Brady

Senate:53 - Jason Barickman : CURRENT STATUS :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 212,750.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 159,563.00 04-23-21 159,563.00 04-23-21 .00 .00 159,563.00 .00991 .00 04-27-21 .00 .00 .00 .00 .00

Total 159,563.00 159,563.00 .00 .00 159,563.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Fencing - Child Development LabReplace Fencing - Child Development Lab

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 624: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 624Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--036036--020020 PM NAME: Heather Oxley 441Heather Oxley 441Project Status: AP Active Project Region: 22Project Type: PL LEED Platinum PLA: YDescription: Construct Sustainability Education CenteAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Central College - East Peoria, Tazewell CountyCounty: 179 - Tazewell ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 10-27-21 :: :

A/E Id: 31416 : :A/E Name: Demonica Kemper Architects, LL : :A/E Contact: : :A/E Telephone: (312)496-0000 : :Date Selected: 02-10-15 : :Contract Date: 04-09-20 ________________________________________________________________________________Est. Project Cost: 13,600,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 7,553,700.00 09-23-21 7,553,700.00 09-23-21 1,127,100.00 464,100.00 3,792,900.00 2,633,700.00991 5,680,000.00 06-01-21 .00 .00 .00 5,680,000.00 .00999 108,936.90 09-23-21 108,936.90 09-23-21 108,936.90 108,936.90 .00 .00

Total 13,342,636.90 7,662,636.90 1,236,036.90 573,036.90 9,472,900.00 2,633,700.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Construct Sustainability Education CenteConstruct Sustainability Education Cente

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-09-20 01-09-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-11-20 05-29-20 ( 18 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 08-03-20 08-18-20 ( 15 ) Prime Bid: 07-05-21 08-18-21 ( 44 )

Design Devel: 11-09-20 02-15-21 ( 98 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 07-31-22 ( 0 )50%: 02-15-21 02-15-21 ( 0 ) Final Accept: 09-15-22 ( 0 )75%: ( 0 ) A/E Cont End: 07-31-2307-31-2395-100%: 05-24-21 04-12-21 ( 42-) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Demonica Kemper Architects, 15011310 ( 0 ) ( 0 ) 06-01-1706-01-17Demonica Kemper Architects, 20003210 ( 0 ) ( 0 ) 07-31-2307-31-23P.J. Hoerr, Inc. 22047241 09-10-21 10-14-21 10-14-22 ( 0 ) 11-13-22 ( 0 ) 11-13-2311-13-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Demonica Kemper Architects, 15011310 10 474,040.00 365,103.10- 0 108,936.90 108,936.90 1 .00 100Demonica Kemper Architects, 20003210 10 857,840.00 5,340.00- 1 852,500.00 460,100.00 2 392,400.00 54C D B/Art In Architecture ART 49 13,168.00 2,568.00- 1 10,600.00 .00 0 10,600.00 0Medwedeff, John 21055049 49 1,000.00 .00 0 1,000.00 1,000.00 1 .00 100

Page 625: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 625Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Sharon Bladholm 21054949 49 1,000.00 .00 0 1,000.00 1,000.00 1 .00 100Peot Projects Inc 21055149 49 1,000.00 .00 0 1,000.00 1,000.00 1 .00 100Beck Nicole 21054849 49 1,000.00 .00 0 1,000.00 1,000.00 1 .00 100C D B - Fiscal FF&E 60 260,000.00 .00 0 260,000.00 .00 0 260,000.00 0P.J. Hoerr, Inc. 22047241 41 .00 .00 0 .00 .00 0 .00 100***** Contract Totals ********** Contract Totals ***** 1,609,048.00 373,011.10- 2 1,236,036.90 573,036.90 7 663,000.00 46

Page 626: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 626Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--036036--022022 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Architectural PanelsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Central College - East Peoria, Tazewell CountyCounty: 179 - Tazewell ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 11-03-21 :: :

A/E Id: 34492 : :A/E Name: IDG Architects, Inc. : :A/E Contact: : :A/E Telephone: (832)448-2462 : :Date Selected: 01-15-19 : :Contract Date: 04-17-19 ________________________________________________________________________________Est. Project Cost: 743,125.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 452,025.00 01-28-19 452,025.00 01-28-19 452,025.00 106,214.93 .00 .00991 291,100.00 07-06-21 .00 289,422.27 .00 1,677.73 .00

Total 743,125.00 452,025.00 741,447.27 106,214.93 1,677.73 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 20.00% Description:Description: Replace Architectural PanelsReplace Architectural Panels

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-21-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 09-02-19 08-30-19 ( 3-) Prime Bid: 09-08-20 ( 0 )

Design Devel: 04-06-20 04-17-20 ( 11 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 03-31-21 ( 0 )50%: ( 0 ) Final Accept: 04-30-21 ( 0 )75%: ( 0 ) A/E Cont End: 06-30-2106-30-21 03-31-2203-31-2295-100%: 06-29-20 11-05-20 (129 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

IDG Architects, Inc. 19002110 ( 0 ) ( 0 ) 03-31-2203-31-22CAD Construction Inc. 22042681 08-03-21 08-18-21 03-21-22 ( 0 ) 05-20-22 ( 0 ) 05-20-2305-20-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

IDG Architects, Inc. 19002110 10 10,380.00 88,937.00 3 99,317.00 56,695.31 5 42,621.69 57CAD Construction Inc. 22042681 81 599,950.00 42,180.27 3 642,130.27 49,519.62 1 592,610.65 8***** Contract Totals ********** Contract Totals ***** 610,330.00 131,117.27 6 741,447.27 106,214.93 6 635,232.34 14

Page 627: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 627Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--036036--023023 PM NAME: Cory McCurley 469Cory McCurley 469Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Repair BridgeAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Central College - East Peoria, Tazewell CountyCounty: 179 - Tazewell ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 11-03-21 :: :

A/E Id: 31434 : :A/E Name: Midwest Engineering Associates : :A/E Contact: Robert Culp : :A/E Telephone: (309)222-8600 : :Date Selected: 12-10-19 : :Contract Date: 03-20-20 ________________________________________________________________________________Est. Project Cost: 266,738.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 150,000.00 12-11-19 150,000.00 12-11-19 150,000.00 100,952.24 .00 .00991 116,738.00 06-01-21 .00 108,086.26 .00 8,651.74 .00

Total 266,738.00 150,000.00 258,086.26 100,952.24 8,651.74 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 50.00% Description:Description: Repair BridgeRepair Bridge

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-09-20 01-09-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: 736.14 Schem Design: ( 0 ) Prime Bid: 09-01-20 11-05-20 02-17-21 (104 )

Design Devel: 05-18-20 07-16-20 ( 59 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 11-02-20 09-01-21 ( 0 )50%: ( 0 ) Final Accept: 11-30-20 ( 0 )75%: ( 0 ) A/E Cont End: 11-30-2111-30-2195-100%: 09-18-20 10-07-20 ( 19 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Midwest Engineering Associat 2002810 ( 0 ) ( 0 ) 11-30-2111-30-21Knapp Concrete Contractors, 21056081 07-02-21 08-04-21 10-24-21 ( 0 ) 12-23-21 ( 0 ) 12-23-2212-23-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Midwest Engineering Associat 2002810 10 23,900.00 .00 1 23,900.00 16,899.00 2 7,001.00 71Knapp Concrete Contractors, 21056081 81 220,762.00 13,424.26 2 234,186.26 84,053.24 1 150,133.02 36***** Contract Totals ********** Contract Totals ***** 244,662.00 13,424.26 3 258,086.26 100,952.24 3 157,134.02 39

Page 628: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 628Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--036036--025025 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovate Courtyard and ADA ImprovementsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Central College - East Peoria, Tazewell CountyCounty: 179 - Tazewell ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 10-29-21 :: :

A/E Id: 29121 : :A/E Name: Terra Engineering, Ltd. : :A/E Contact: : :A/E Telephone: (309)999-0123 : :Date Selected: 07-13-21 : :Contract Date: 09-28-21 ________________________________________________________________________________Est. Project Cost: 1,157,188.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 867,891.00 04-23-21 867,891.00 04-23-21 20,880.00 .00 847,011.00 .00991 289,297.00 07-06-21 .00 6,960.00 .00 282,337.00 .00

Total 1,157,188.00 867,891.00 27,840.00 .00 1,129,348.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 10.00% Description:Description: Renovate Courtyard and ADA ImprovementsRenovate Courtyard and ADA Improvements

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 08-17-21 08-17-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 12-21-21 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2312-31-2395-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Terra Engineering, Ltd. 22000110 ( 0 ) ( 0 ) 12-31-2312-31-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Terra Engineering, Ltd. 22000110 10 27,840.00 .00 0 27,840.00 .00 0 27,840.00 0***** Contract Totals ********** Contract Totals ***** 27,840.00 .00 0 27,840.00 .00 0 27,840.00 0

Page 629: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 629Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--036036--026026 PM NAME: Drew Stephenson 496Drew Stephenson 496Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Renovation at Library/Administration BuiAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Central College - East Peoria, Tazewell CountyCounty: 179 - Tazewell ________________________________________________________________________________Leg. Districts: House: 88 - Keith Sommer

Senate:44 - Sally Turner : CURRENT STATUS 10-29-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 6,885,066.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 5,163,800.00 07-01-20 5,163,800.00 04-06-21 .00 .00 5,163,800.00 .00

Total 5,163,800.00 5,163,800.00 .00 .00 5,163,800.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) 1.00% Description:Description: Renovation at Library/Administration BuiRenovation at Library/Administration Bui

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 630: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 630Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--040040--007007 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: SL LEED Silver PLA: NDescription: Construct Technology CenterAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Eastern Community Colleges - Lincoln Trail CollegeCounty: 33 - Crawford Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House:110 - Chris Miller

Senate:55 - Darren Bailey : CURRENT STATUS 10-27-21 :: :

A/E Id: 25902 : :A/E Name: Graham and Hyde Architects, In : :A/E Contact: : :A/E Telephone: (217)787-9380 : :Date Selected: 11-17-20 : :Contract Date: ________________________________________________________________________________Est. Project Cost: 11,160,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 15,939,800.00 07-01-18 15,939,800.00 08-04-20 504,225.00 .00 7,865,775.00 7,569,800.00991 2,790,000.00 11-02-20 .00 .00 .00 2,790,000.00 .00

Total 18,729,800.00 15,939,800.00 504,225.00 .00 10,655,775.00 7,569,800.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 2.00% Description:Description: Construct Technology CenterConstruct Technology Center

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Graham and Hyde Architects, 21012210 ( 0 ) ( 0 )C D B - Fiscal FF&E DUMMY ( 0 ) ( 0 )

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Graham and Hyde Architects, 21012210 10 .00 .00 0 .00 .00 0 .00 100C D B - Fiscal FF&E DUMMY11 462,375.00 .00 0 462,375.00 .00 0 462,375.00 0C D B/Art In Architecture AIA 49 41,850.00 .00 0 41,850.00 .00 0 41,850.00 0***** Contract Totals ********** Contract Totals ***** 504,225.00 .00 0 504,225.00 .00 0 504,225.00 0

Page 631: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 631Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--040040--008008 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: BI Budget Impasse Hold PLA: NDescription: Construct AC/Refigeration/Sheet Metal TeAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Eastern Community Colleges - Lincoln Trail CollegeCounty: 33 - Crawford Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House:110 - Chris Miller

Senate:55 - Darren Bailey : CURRENT STATUS 10-15-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 1,660,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 3,163,800.00 03-14-19 1,503,800.00 03-14-19 8,300.00 .00 .00 1,495,500.00

Total 3,163,800.00 1,503,800.00 8,300.00 .00 .00 1,495,500.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 1.50% Description:Description: Construct AC/Refigeration/Sheet Metal TeConstruct AC/Refigeration/Sheet Metal Te

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 632: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 632Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--042042--010010 PM NAME: Jerry Norris 415Jerry Norris 415Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Construct Applied Technology CenterAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Eastern Community Colleges - Olney Central College,County: 159 - Richland ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 10-27-21 :: :

A/E Id: 25902 : :A/E Name: Graham and Hyde Architects, In : :A/E Contact: : :A/E Telephone: (217)787-9380 : :Date Selected: 11-17-20 : :Contract Date: 10-19-21 ________________________________________________________________________________Est. Project Cost: 3,076,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 2,307,300.00 07-01-20 2,307,300.00 08-04-20 82,376.50 .00 2,224,923.50 .00991 769,100.00 11-02-20 .00 .00 .00 769,100.00 .00

Total 3,076,400.00 2,307,300.00 82,376.50 .00 2,994,023.50 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 5.00% Description:Description: Construct Applied Technology CenterConstruct Applied Technology Center

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 03-01-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 01-14-22 ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 01-14-22 ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End: 08-26-2508-26-2595-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Graham and Hyde Architects, 21031410 ( 0 ) ( 0 ) 08-26-2508-26-25

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Graham and Hyde Architects, 21031410 10 70,840.00 .00 0 70,840.00 .00 0 70,840.00 0C D B/Art In Architecture AIA 49 11,536.50 .00 0 11,536.50 .00 0 11,536.50 0***** Contract Totals ********** Contract Totals ***** 82,376.50 .00 0 82,376.50 .00 0 82,376.50 0

Page 633: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 633Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--043043--006006 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: NDescription: Replace Parking LotsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Eastern Community Colleges - Frontier Community ColCounty: 191 - Wayne ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 10-15-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 918,391.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 688,793.00 04-23-21 688,793.00 04-23-21 .00 .00 688,793.00 .00991 229,598.00 08-10-21 .00 .00 .00 229,598.00 .00

Total 918,391.00 688,793.00 .00 .00 918,391.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (B ) .00% Description:Description: Replace Parking LotsReplace Parking Lots

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 634: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 634Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--044044--013013 PM NAME: Luke Montgomery 454Luke Montgomery 454Project Status: AP Active Project Region: 33Project Type: BI Budget Impasse Hold PLA: NDescription: Construct Student CenterAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Eastern Community Colleges - Wabash Valley CollegeCounty: 185 - Wabash Media-worthy Project TrackingMedia-worthy Project Tracking________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 10-21-21 :: :

A/E Id: 0 : :A/E Name: NO FIRM : :A/E Contact: : :A/E Telephone: (000)000-0000 : :Date Selected: : :Contract Date: ________________________________________________________________________________Est. Project Cost: 4,460,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 8,489,400.00 07-01-18 4,029,400.00 01-07-15 .00 .00 .00 4,029,400.00

Total 8,489,400.00 4,029,400.00 .00 .00 .00 4,029,400.00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (H ) 1.00% Description:Description: Construct Student CenterConstruct Student Center

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: ( 0 )

Design Devel: ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: ( 0 )50%: ( 0 ) Final Accept: ( 0 )75%: ( 0 ) A/E Cont End:95-100%: ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

***** Contract Totals ********** Contract Totals ***** .00 .00 0 .00 .00 0 .00 100

Page 635: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 635Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--044044--014014 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Repair RoofAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Eastern Community Colleges - Wabash Valley CollegeCounty: 185 - Wabash ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 10-15-21 :: :

A/E Id: 29858 : :A/E Name: Wright & Calvert Design Group, : :A/E Contact: Jason Wright : :A/E Telephone: (618)263-3254 : :Date Selected: 01-15-19 : :Contract Date: 02-22-19 ________________________________________________________________________________Est. Project Cost: 368,200.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 219,533.00 01-28-19 219,533.00 01-28-19 219,533.00 163,495.70 .00 .00991 148,667.00 10-30-20 .00 130,067.00 .00 18,600.00 .00

Total 368,200.00 219,533.00 349,600.00 163,495.70 18,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 60.00% Description:Description: Repair RoofRepair Roof

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 02-06-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 04-25-19 08-08-19 (105 )

Design Devel: ( 0 ) Prime Re-Bid: 03-05-20 ( 0 )25%: ( 0 ) Subst Compl: 08-09-19 ( 0 )50%: ( 0 ) Final Accept: 10-09-19 ( 0 )75%: ( 0 ) A/E Cont End: 10-01-2010-01-20 10-01-2210-01-2295-100%: 04-05-19 05-15-19 ( 40 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Wright & Calvert Design Grou 19011910 ( 0 ) ( 0 ) 10-01-2210-01-22Arc Construction Co., Inc. 21051481 05-17-21 07-26-21 09-24-21 ( 0 ) 11-23-21 ( 0 ) 11-23-2211-23-22

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Wright & Calvert Design Grou 19011910 10 35,600.00 .00 1 35,600.00 20,569.40 2 15,030.60 58Arc Construction Co., Inc. 21051481 81 314,000.00 .00 0 314,000.00 142,926.30 1 171,073.70 46***** Contract Totals ********** Contract Totals ***** 349,600.00 .00 1 349,600.00 163,495.70 3 186,104.30 47

Page 636: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 636Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--044044--015015 PM NAME: Michael McGuire 593Michael McGuire 593Project Status: AP Active Project Region: 33Project Type: ST Standard PLA: YDescription: Upgrade the Electric ServiceAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Eastern Community Colleges - Wabash Valley CollegeCounty: 185 - Wabash ________________________________________________________________________________Leg. Districts: House:109 - Adam Niemerg

Senate:55 - Darren Bailey : CURRENT STATUS 10-15-21 :: :

A/E Id: 29858 : :A/E Name: Wright & Calvert Design Group, : :A/E Contact: : :A/E Telephone: (618)263-3254 : :Date Selected: 11-13-19 : :Contract Date: 12-20-19 ________________________________________________________________________________Est. Project Cost: 300,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 225,000.00 10-23-19 225,000.00 10-23-19 30,216.00 11,091.00 194,784.00 .00991 75,000.00 10-24-19 .00 5,375.00 .00 69,625.00 .00

Total 300,000.00 225,000.00 35,591.00 11,091.00 264,409.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 85.00% Description:Description: Upgrade the Electric ServiceUpgrade the Electric Service

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 12-05-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: 02-13-20 05-14-20 ( 91 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 09-14-21 ( 0 )

Design Devel: 02-13-20 05-14-20 ( 91 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 08-15-22 ( 0 )50%: 04-27-21 04-30-21 ( 3 ) Final Accept: 10-14-22 ( 0 )75%: ( 0 ) A/E Cont End: 01-15-2201-15-22 05-31-2405-31-2495-100%: 07-06-21 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Wright & Calvert Design Grou 20013010 ( 0 ) ( 0 ) 05-31-2405-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Wright & Calvert Design Grou 20013010 10 14,091.00 21,500.00 2 35,591.00 11,091.00 1 24,500.00 31***** Contract Totals ********** Contract Totals ***** 14,091.00 21,500.00 2 35,591.00 11,091.00 1 24,500.00 31

Page 637: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 637Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--046046--019019 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: YDescription: Replace Roads and Parking LotsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Valley Community College - Oglesby, LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 11-01-21 :: :

A/E Id: 30349 : :A/E Name: ESI Consultants Ltd. : :A/E Contact: Kevin Hayes : :A/E Telephone: (630)420-1700 : :Date Selected: 10-08-19 : :Contract Date: 02-11-20 ________________________________________________________________________________Est. Project Cost: 955,400.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 675,000.00 10-09-19 675,000.00 10-09-19 675,000.00 675,000.00 .00 .00991 280,400.00 04-20-21 106,509.33 11-04-21 250,493.01 106,509.33 29,906.99 .00

Total 955,400.00 781,509.33 925,493.01 781,509.33 29,906.99 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (X ) 100.00% Description:Description: Replace Roads and Parking LotsReplace Roads and Parking Lots

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 11-19-19 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: 05-07-20 06-25-20 ( 49 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-01-20 ( 0 )

Design Devel: 05-07-20 06-30-20 ( 54 ) Prime Re-Bid: 02-03-21 ( 0 )25%: ( 0 ) Subst Compl: 08-31-21 ( 0 )50%: ( 0 ) Final Accept: 10-31-21 ( 0 )75%: ( 0 ) A/E Cont End: 08-31-2208-31-2295-100%: 07-16-20 10-08-20 ( 84 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

ESI Consultants Ltd. 20032210 ( 0 ) ( 0 ) 08-31-2208-31-22Advanced Asphalt Co. 21055581 06-16-21 07-09-21 01-05-22 08-16-21 (142-) 02-04-22 ( 0 ) 02-04-2302-04-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

ESI Consultants Ltd. 20032210 10 84,800.00 .00 1 84,800.00 74,506.35 12 10,293.65 88Advanced Asphalt Co. 21055581 81 828,000.00 12,693.01 1 840,693.01 707,002.98 2 133,690.03 84***** Contract Totals ********** Contract Totals ***** 912,800.00 12,693.01 2 925,493.01 781,509.33 14 143,983.68 85

Page 638: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 638Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--046046--020020 PM NAME: Steve Halm 300Steve Halm 300Project Status: AP Active Project Region: 22Project Type: ST Standard PLA: NDescription: Upgrade Building ExteriorsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Illinois Valley Community College - Oglesby, LaSalle CountyCounty: 99 - LaSalle ________________________________________________________________________________Leg. Districts: House: 76 - Lance Yednock

Senate:38 - Sue Rezin : CURRENT STATUS 10-14-21 :: :

A/E Id: 35486 : :A/E Name: Design Mavens Architecture PLL : :A/E Contact: : :A/E Telephone: (309)304-3048 : :Date Selected: 08-10-21 : :Contract Date: 10-01-21 ________________________________________________________________________________Est. Project Cost: 2,156,250.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 1,617,188.00 04-23-21 1,617,188.00 04-23-21 176,300.00 .00 1,440,888.00 .00991 539,063.00 07-13-21 .00 .00 .00 539,063.00 .00

Total 2,156,251.00 1,617,188.00 176,300.00 .00 1,979,951.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) 3.00% Description:Description: Upgrade Building ExteriorsUpgrade Building Exteriors

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-15-21 09-15-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 05-30-22 ( 0 )

Design Devel: 11-29-21 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 01-31-23 ( 0 )50%: 02-07-22 ( 0 ) Final Accept: 02-28-23 ( 0 )75%: ( 0 ) A/E Cont End: 01-31-2401-31-2495-100%: 04-04-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Design Mavens Architecture P 22001010 ( 0 ) ( 0 ) 01-31-2401-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Design Mavens Architecture P 22001010 10 176,300.00 .00 0 176,300.00 .00 0 176,300.00 0***** Contract Totals ********** Contract Totals ***** 176,300.00 .00 0 176,300.00 .00 0 176,300.00 0

Page 639: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 639Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--048048--025025 PM NAME: Mohammed Haq 258Mohammed Haq 258Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Upgrade ElevatorsAgency: Illinois Community College Board Analyst: Erin EoffLocation: Joliet Junior College - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 86 - Lawrence Walsh,

Senate:43 - John Connor : CURRENT STATUS 10-07-21 :: :

A/E Id: 30811 : :A/E Name: Kluber, Inc. : :A/E Contact: Clayton Haldeman : :A/E Telephone: (630)406-1213 : :Date Selected: 12-10-19 : :Contract Date: 02-18-20 ________________________________________________________________________________Est. Project Cost: 1,335,783.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 450,000.00 12-11-19 450,000.00 12-11-19 450,000.00 74,597.00 .00 .00991 885,783.00 08-20-21 6,480.00 10-28-20 777,040.00 6,480.00 108,743.00 .00

Total 1,335,783.00 456,480.00 1,227,040.00 81,077.00 108,743.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (C ) 100.00% Description:Description: Upgrade ElevatorsUpgrade Elevators

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 01-15-20 01-15-20 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: 100,000.00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: 05-04-20 08-20-20 (108 ) Prime Bid: 04-30-21 03-31-21 ( 30-)

Design Devel: 11-23-20 12-02-20 ( 9 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 04-29-22 ( 0 )50%: ( 0 ) Final Accept: 05-31-22 ( 0 )75%: ( 0 ) A/E Cont End: 12-31-2112-31-21 04-30-2304-30-2395-100%: 02-01-21 02-05-21 ( 4 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Kluber, Inc. 2002910 ( 0 ) ( 0 ) 04-30-2304-30-23CMM Group, Inc. 22047781 09-21-21 11-02-21 11-01-22 ( 0 ) 12-01-22 ( 0 ) 12-01-2312-01-23

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Kluber, Inc. 2002910 10 26,320.00 113,290.00 2 139,610.00 81,077.00 9 58,533.00 58CMM Group, Inc. 22047781 81 1,087,430.00 .00 0 1,087,430.00 .00 0 1,087,430.00 0***** Contract Totals ********** Contract Totals ***** 1,113,750.00 113,290.00 2 1,227,040.00 81,077.00 9 1,145,963.00 7

Page 640: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …

CST0004 C A P I T A LC A P I T A L D E V E L O P M E N TD E V E L O P M E N T B O A R DB O A R D Page: 640Date 11/13/21 P R O J E C TP R O J E C T S T A T U SS T A T U S R E P O R TR E P O R T Time 4:02

Project Number: 810810--048048--026026 PM NAME: Nicole Scott 465Nicole Scott 465Project Status: AP Active Project Region: 11Project Type: ST Standard PLA: NDescription: Replace Air HandlersAgency: Illinois Community College Board Analyst: Erin EoffLocation: Joliet Junior College - Will CountyCounty: 197 - Will ________________________________________________________________________________Leg. Districts: House: 86 - Lawrence Walsh,

Senate:43 - John Connor : CURRENT STATUS :: :

A/E Id: 31186 : :A/E Name: Delta Engineering Group, LLC : :A/E Contact: : :A/E Telephone: (312)377-7700 : :Date Selected: 08-10-21 : :Contract Date: 10-22-21 ________________________________________________________________________________Est. Project Cost: 5,750,000.00

FUND SUMMARYFUND SUMMARY____________________________________________________________________________________________________________________________________

***Appropriated*** ***Released***Fund Amount Date Amount Date Obligated Expended Unobligated Lapsed

Approp

141 4,312,500.00 04-23-21 4,312,500.00 04-23-21 417,400.00 .00 3,895,100.00 .00991 1,437,500.00 07-22-21 .00 .00 .00 1,437,500.00 .00

Total 5,750,000.00 4,312,500.00 417,400.00 .00 5,332,600.00 .00____________________________________________________________________________________________________________________________________

PHASE NUMBER:PHASE NUMBER: 11 (D ) .00% Description:Description: Replace Air HandlersReplace Air Handlers

Appndx A Actual Diff Appndx A Revised Actual Diff

Scope Received: Orientation: 09-20-21 ( 0 ) Assgn Bid: ( 0 )C/O Board Level Amt: .00 Pgm Analysis: ( 0 ) Assgn Re-Bid: ( 0 )CORC Assessment Amt: .00 Schem Design: ( 0 ) Prime Bid: 10-10-22 ( 0 )

Design Devel: 02-14-22 ( 0 ) Prime Re-Bid: ( 0 )25%: ( 0 ) Subst Compl: 10-31-23 ( 0 )50%: 06-06-22 ( 0 ) Final Accept: 11-30-23 ( 0 )75%: ( 0 ) A/E Cont End: 10-31-2410-31-2495-100%: 08-01-22 ( 0 ) Ground Break:

Dedication:

CONSTRUCTION CONTRACT STATUSCONSTRUCTION CONTRACT STATUS____________________________________________________________________________________________________________________________________

Contract NOA ATP Substantial Completion Final Acceptance ContractNumber Scheduled Revised Actual Diff Scheduled Actual Diff End Date

Delta Engineering Group, LLC 22000710 ( 0 ) ( 0 ) 10-31-2410-31-24

CONTRACT AMOUNTS/PAYMENTSCONTRACT AMOUNTS/PAYMENTS____________________________________________________________________________________________________________________________________

Contract El Award Amt Change Orders Contract Payments to Date Contract %Number Cd Amount # To Date Amount # Balance Comp

Delta Engineering Group, LLC 22000710 10 417,400.00 .00 0 417,400.00 .00 0 417,400.00 0***** Contract Totals ********** Contract Totals ***** 417,400.00 .00 0 417,400.00 .00 0 417,400.00 0

Page 641: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 642: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 643: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 644: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 645: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 646: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 647: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 648: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 649: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 650: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 651: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 652: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 653: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 654: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 655: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 656: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 657: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 658: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 659: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 660: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 661: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 662: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 663: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 664: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 665: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 666: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 667: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 668: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 669: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 670: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 671: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 672: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 673: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 674: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 675: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 676: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 677: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 678: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 679: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 680: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 681: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 682: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 683: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 684: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 685: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 686: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 687: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 688: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 689: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 690: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 691: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 692: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 693: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 694: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 695: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 696: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 697: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 698: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 699: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 700: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 701: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 702: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 703: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 704: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 705: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 706: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 707: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 708: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 709: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 710: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 711: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 712: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 713: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 714: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 715: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 716: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 717: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 718: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 719: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 720: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 721: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 722: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 723: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 724: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 725: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 726: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 727: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 728: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 729: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 730: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 731: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 732: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 733: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 734: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 735: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 736: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 737: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 738: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 739: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 740: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 741: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 742: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 743: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 744: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 745: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 746: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 747: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 748: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 749: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 750: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 751: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 752: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 753: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 754: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 755: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 756: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 757: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 758: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 759: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 760: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 761: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 762: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 763: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 764: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 765: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 766: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 767: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 768: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 769: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 770: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 771: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 772: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 773: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 774: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 775: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 776: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 777: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 778: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 779: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 780: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 781: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 782: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 783: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 784: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 785: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 786: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 787: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 788: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 789: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 790: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 791: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 792: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 793: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 794: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 795: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 796: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 797: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 798: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 799: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 800: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 801: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 802: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 803: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 804: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 805: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 806: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 807: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 808: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 809: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 810: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 811: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 812: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 813: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 814: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 815: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 816: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 817: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 818: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 819: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 820: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 821: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 822: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 823: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 824: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 825: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 826: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 827: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 828: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 829: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 830: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 831: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 832: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 833: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 834: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 835: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 836: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 837: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 838: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 839: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 840: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 841: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 842: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 843: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …
Page 844: CST0004 CAPITAL DEVELOPMENT BOARD Page: 1 …