HIGH-TECH - OLD INFRASTRUCTUREInstalling a state-of-the-art Robotic OR suite in a 60 year old hospital
![Page 2: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/2.jpg)
AGENDA
1 Goals & Challenges
2 Design Process
3 Best Value Contract Award
4 Team Building/OAC Meetings
5 Working in a Live OR
6 Shutdowns
7 MEP Coordination
8 Summary
9 Questions
![Page 3: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/3.jpg)
PRESENTERS▪ Tom Peterson, Architect The Design Partnership
▪ Sean Wilkins Ray L. Hellwig Mechanical
▪ Craig Moore Ray L. Hellwig Mechanical
▪ Rick Schaffel, Contractor TCB Builders, Inc.
▪ Bruce Mace, Director UCSF Medical Center Facilities
![Page 4: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/4.jpg)
DESIGN
![Page 5: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/5.jpg)
Existing infrastructure
New OR ceiling 9” below beams
GOALS & CHALLENGES
1
Goals
▪ Create a state-of-the-art robotic OR
▪ A model for the future at UCSF
▪ On time and on budget
Challenges
▪ Don’t disrupt existing infrastructure
▪ 12’-0” between floors, 10’-2” to bottom of beams
▪ Raise ceilings to 9’-6”
▪ Seismic upgrades required
▪ Integration of all systems
![Page 6: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/6.jpg)
DESIGN PROCESS
Phase 1
▪ Replace HVAC
▪ Reorganize storage
2
![Page 7: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/7.jpg)
Phase 2
▪ Built 600 sf/ft robotic OR room
▪ Reconfigure storage areas
▪ Added scrub room, & soiled holding
DESIGN PROCESS
2
![Page 8: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/8.jpg)
DESIGN PROCESS
2
Phase 3
▪ Rebuilt OR 1 (Cysto Room)
▪ Demo and replace main desk
▪ New staff toilets
▪ Move corridor & rebuild storage
![Page 9: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/9.jpg)
DESIGN PROCESS
Phase 4
▪ Finished two offices and removed barriers
2
![Page 10: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/10.jpg)
building consensus
LISTEN TO EVERY USERTOUR SIMILAR FACILITIES
![Page 11: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/11.jpg)
11
existing conditions
EXISTING OR 1
![Page 12: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/12.jpg)
12
existing conditions
EXISTING FRONT DESK SPACEEXISTING OR 11 SPACE
![Page 13: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/13.jpg)
laser scanning to validate the model
EXISTING MECHANICAL SYSTEMS
![Page 14: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/14.jpg)
med modelingEXISTING OR SUITECase carts in corridorsStorage in all empty spacesPicking done in the OR
PROPOSED OR SUITEAdditional robotic OR
Redesigned central corewith modular storage system
Added storage on floor above
MedModeling simulated operations
![Page 15: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/15.jpg)
15
med modeling
![Page 16: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/16.jpg)
16Kavinsky Consulting, LLC 10/31/07 - 16
Number of Times each Preference Card Item was Used between 5/1/06 – 4/30/07
■ 776 items picked were never used during the year and should be eliminated from inventory.
■ 2467 items picked were only used 1-10 times / year and should be evaluated for staying in the inventory.
■ All preference cards need to be evaluated and updated based upon item usage data and physician input.
Number of Instrument and Supply Items Number of Times Items Used Breast GS GU Gyn GynOnc OHNS Ortho Pla RadOnc Other Total
0 40 113 83 107 91 99 103 72 3 65 776 1 - 10 98 385 344 241 287 255 480 131 30 216 2467
11 - 25 19 69 81 44 49 49 37 18 7 30 403 26 - 50 18 54 49 36 29 26 38 11 3 15 279
> 50 41 121 129 43 37 48 67 8 32 20 546
Total 216 742 686 471 493 477 725 240 75 346 4471
med modeling
![Page 17: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/17.jpg)
central core remodeling
BEFORE
![Page 18: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/18.jpg)
central core remodeling
AFTER
![Page 19: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/19.jpg)
3d modeling
![Page 20: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/20.jpg)
CONSTRUCTION
![Page 21: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/21.jpg)
▪ Prequalification
▪ Bid Job – Bids Remain Sealed
▪ Submit Best Value Questionnaire Response Package – With MEP
▪ University to evaluate and score best value packages
▪ Sealed bids are opened
▪ Project is awarded on lowest dollar amount per point
BEST VALUE CONTRACT AWARD
3
![Page 22: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/22.jpg)
best value results
![Page 23: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/23.jpg)
TEAM BUILDING/OAC MEETINGS
▪ Team ownerarchitects
engineerscontractorkey subs
facilitiesvendorsmedical professionals medical support staff
▪ Team creation of schedules
▪ Real time meeting minutes
4
![Page 24: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/24.jpg)
WORKING IN A LIVE OR
5
▪ Dust/infection control
▪ Noise mitigation
▪ Night and weekend work
▪ Hourly schedules
![Page 25: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/25.jpg)
noise mitigation
WORKING DIRECTLY WITH OR STAFF
![Page 26: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/26.jpg)
night and weekend work
WARMING CABINET INSTALLATION
![Page 27: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/27.jpg)
27
hourly schedules
![Page 28: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/28.jpg)
abatement conditions for demo
![Page 29: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/29.jpg)
field verification/existing conditions
![Page 30: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/30.jpg)
SHUTDOWNS
6
▪ 187 shutdown requests
▪ Communication (communication, communication, communication)
▪ Investigation, research and field visits
▪ Isolation and verification
▪ MOP – develop/review & verify/sign off
▪ Perform flawlessly
▪ SF-2 – shutdown and replacement
that which does not kill us… only makes us stronger
![Page 31: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/31.jpg)
31
187 shutdown requestsNEW OLYMPIC AND WORLD RECORD!
![Page 32: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/32.jpg)
32
shutdown requests
▪ Project number & descriptor
▪ Full contacts & emergency
▪ Request reasoning
▪ Type of request
▪ Location and description
▪ Attached photo documentation
▪ Estimated duration
▪ Target date & time
▪ Blue copy (internal)
▪ Scheduling (internal)
BOTH RECORDS STILL STANDING…
![Page 33: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/33.jpg)
THE MOST IMPORTANT TOOL ON YOUR BELTcommunication
![Page 34: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/34.jpg)
investigation60 YEARS, 2 BUILDINGS AND A LOT OF HISTORY
![Page 35: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/35.jpg)
So tell me, punk… do you feel lucky?
investigation
![Page 36: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/36.jpg)
isolation & verificationEVER SEVERED A LIVE FEED TO AN INTERVENTIONAL RADIOLOGY PROCEDURE?
![Page 37: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/37.jpg)
37
method of proceduresINEXPENSIVE INSURANCE TO PROTECT EVERYTHING
![Page 38: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/38.jpg)
perform flawlessly
▪ Do your homework thoroughly
▪ Don’t skip steps
▪ Communicate the plan with everyone and their mom
▪ Contingencies and redundancies as back-up
▪ Enforce the rules – prevent “creep”
▪ Safety is no accident
▪ Weekends & night time are your friends
▪ Communicate some more
▪ Trust, but verify
▪ In spite of all this – be flexible within the safety of your larger plan
PROPER PREPARATION PERMITS PERFECT PERFORMANCE
![Page 39: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/39.jpg)
sf-2 shutdownRIPPING THE GUTS OUT OF A LIVING OR SUITE OVER THE WEEKEND
![Page 40: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/40.jpg)
MEP COORDINATION
▪ Conventional drawing process
▪ BIM drawing process
▪ Clash detection
▪ BIM and facilities management
▪ BIM object information
▪ Importance of BIM
▪ Benefits of BIM for Facility Managers
7
![Page 41: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/41.jpg)
▪ Created in 2D, on paper
▪ Multiple drawings required to represent 3D views
▪ Redundancy and open to errors
conventional drawing process
![Page 42: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/42.jpg)
▪ Building and objects drawn in 2D and 3D
▪ 3D model easier to interpret and visualize
▪ Information attached to objects in the model
▪ 4D BIM – project scheduling incorporated into model
bim drawing process
![Page 43: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/43.jpg)
clash detection
![Page 44: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/44.jpg)
clash detection
MODELEDBUILT
![Page 45: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/45.jpg)
OR11
bim and facilities management
OR1
![Page 46: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/46.jpg)
bim object information
![Page 47: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/47.jpg)
importance of bim
![Page 48: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/48.jpg)
importance of bim
![Page 49: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/49.jpg)
benefits of bim for facility managers
▪ Improved space management
▪ Efficient use of energy
▪ Streamlined preventive maintenance
▪ Economical retrofits and renovations
▪ Enhanced lifecycle management
![Page 50: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/50.jpg)
SUMMARY
8
▪ BIM works – even for remodels
▪ Have a contingency plan
▪ Worked as a cohesive team
▪ Maintained communication and sensitivity
▪ Project finished ahead of schedule
▪ Project was under budget
![Page 51: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/51.jpg)
QUESTIONSThank you for your time!
9
![Page 52: CSHE High-Tech - Old Infrastructure](https://reader033.fdocuments.us/reader033/viewer/2022061222/54c14b9e4a795931688b459c/html5/thumbnails/52.jpg)
VIDEO & TOURSThank you for your time!
9