CSEPs SPA Rejections January/February 2008 update
description
Transcript of CSEPs SPA Rejections January/February 2008 update
2
Level of reporting
Rejections are reported at line level
This can inflate the rejection figures: If a file is resubmitted weekly without the error being corrected, each
month could contain up to five rejections for one item CSP01 rejections could be incurred for one project but multiple
shippers, further increasing the reported figures
3
CSEPs SPA rejections – January 2008
AQ01AQ02AQ03
AQ04
AQ05
CSP01
INV03LMP01
LMP02
LMP03
LMP05
LMP06
LMP07 SHP02
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Re
jec
tio
ns
AQ01
AQ02
AQ03
AQ04
AQ05
CSP01
INV01
INV02
INV03
INV04
LMP01
LMP02
LMP03
LMP04
LMP05
LMP06
LMP07
SHP01
SHP02
4
CSEPs SPA rejections – February 2008
AQ01AQ02AQ03
AQ04
AQ05
CSP01
INV03
LMP01LMP02
LMP03
LMP05LMP06
LMP07 SHP02
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Re
jec
tio
ns
AQ01
AQ02
AQ03
AQ04
AQ05
CSP01
INV01
INV02
INV03
INV04
LMP01
LMP02
LMP03
LMP04
LMP05
LMP06
LMP07
SHP01
SHP02
5
CSP01 – CSEP does not exist
Resolution: xoserve manually process rejections to enable resubmitted updates to accept
Current position: increases in January due to 480 brand new projects
CSP01 CSEP does not exist
02,0004,0006,0008,000
10,00012,00014,00016,000
Jun-
07
Jul-0
7
Aug
-07
Sep
-07
Oct
-07
Nov
-07
Dec
-07
Jan-
08
Feb
-08
6
CSP01 – project level
Number of projects received each month resulting in CSP01s:
CSP01 by project
1,541 1,560 1,5821,709
1,575
1,786
2,145 2,171
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
Jun
-07
Jul-
07
Au
g-0
7
Se
p-0
7
Oct
-07
No
v-0
7
De
c-0
7
Jan
-08
Fe
b-0
8
7
Impact of CSP01
Estimate of January CSP01 impacts:
36,375 supply points (of which 36,248 are domestic)
714 M kWh of AQ (555 M kWh domestic)
8
CSP01 rejections – Jan08 analysis
Not investigated – ring-fenced with IGTs 352
Not investigated – awaiting ref info 303
Still investigating 427
Investigated 1,063
Total 2,145
9
CSP01 rejections – Jan08 analysis
1,063 investigated
Successful: 515
Unsuccessful: 548
Total 1,063
10
CSP01 rejections – Jan08 analysis
548 Unsuccessful - reasons
Quoted 42 Accepted 176 Cancelled 49 Nest 7 Not found 255 With DN 4 Other 15 Total 548
11
AQ04 – Max CSEP AQ exceeded
Resolution: IGTs examine whether updates/AQs are valid Current position: low volumes attributed to system issue; validation
corrected October hence increase to previous levels
AQ04 Max CSEP AQ is exceeded
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Jun-
07
Jul-0
7
Aug
-07
Sep
-07
Oct
-07
Nov
-07
Dec
-07
Jan-
08
Feb
-08
12
AQ04 – project level
AQ04 by project
0
500
1,000
1,500
2,000
2,500
Oct-07 Nov-07 Dec-07 Jan-08 Feb-08
13
LMP01 – EUC incorrect for LMN
Resolution: IGTs should send updates using the EUC held by xoserve Current position: large increase May, peak in June, some reduction since
LMP01 EUC incorrect for LMN
0500
1,0001,5002,0002,5003,0003,5004,0004,500
Jun-
07
Jul-0
7
Aug
-07
Sep
-07
Oct
-07
Nov
-07
Dec
-07
Jan-
08
Feb
-08
14
LMP03 – LMN is not live
Resolution: IGTs should not send updates for non live LMNs Current position: large increase in January
LMP03 LMN is not live
01,0002,0003,0004,0005,0006,0007,0008,000
Jun-
07
Jul-0
7
Aug
-07
Sep
-07
Oct
-07
Nov
-07
Dec
-07
Jan-
08
Feb
-08
15
AQ03 – No change to supply point count or AQ
Resolution: IGTs should not send updates that do not change SPA data Large peak in October (AQ review?), great improvement in November,
maintained – not a current issue
AQ03 No change to SP count or AQ
0
5,000
10,000
15,000
20,000
25,000
Jun-
07
Jul-0
7
Aug
-07
Sep
-07
Oct
-07
Nov
-07
Dec
-07
Jan-
08
Feb
-08
16
LMP06 – A live or pending meter is present
Resolution: IGTs should not submit new domestic sites where an LMN already exists for project/shipper combination
Current position: volumes variable; reduced to normal levels Feb
LMP06 A live or pending meter is present
0500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
Jun-
07
Jul-0
7
Aug
-07
Sep
-07
Oct
-07
Nov
-07
Dec
-07
Jan-
08
Feb
-08