CSC444F'05 Lecture 2 1
Lecture will start at 7pm
No Tutorial Today
CSC444F'05 Lecture 2 2
Planning
(Course Web Site: http://ccnet.utoronto.ca/20059/csc444h1f/)
Read chapters 1 & 2 from PSP for next week.Read chapters 1-5 from PSD for Oct.3
CSC444F'05 Lecture 2 3
Lectures
• I wrote a manuscript for you guys:– Professional Software Development, 2005.
– I will be following it closely
– Tentative Schedule (first time course - may vary significantly)
Lecture Date Topics Chapters
1 Sep 12 Top-10 Practices, Introduction to Planning 1,2
2 Sep 19 Release Planning Overview, Capacity Constraint 3,4
3 Sep 26 Discipline in Programming (practicum intro)
4 Oct 3 Quantitative Capacity Constraint, Sample RP 5,A,C
Oct 10 Thanksgiving – no lecture
5 Oct 17 Stochastic Capacity Constraint, Sample SRP 6,B,C
6 Oct 24 Releases, Versions 7,8
7 Oct 31 MIDTERM Source Control, Build, Testing 9,10
8 Nov 7 Defect & Feature Tracking 11,12
9 Nov 14 Spillover / Process Control 13
10 Nov 21 Architectural Clarity 14
11 Nov 28 Business Aspects 15,16
CSC444F'05 Lecture 2 4
Capability Maturity Model
• Developed at Carnegie-Melon Software Engineering Institute by Watts Humphrey.
• Classifies an organization’s process maturity into 5 levels.– Each level is a group of practices.– The CMM is a roadmap for process improvement.– Should have substantially all practices in place for a lower level before
proceeding to the next
• Can be certified to a certain CMM level– Some similarities to
• Malcolm Baldrige• ISO 9000
• Not universally agreed to be a good thing– But everyone agrees to pretend
CSC444F'05 Lecture 2 5
CMM Levels
CSC444F'05 Lecture 2 6
CSC444F'05 Lecture 2 7
Relationship to ISO9000
• ISO 9000– Set of quality standards
– Subset relate to software development
• In essence– Must document the process
– Must maintain “quality records”• These are auditable to ensure the process is being carried out
• The process can be anything
CSC444F'05 Lecture 2 8
Relationship to Top10
• Practices necessary to achieve CMM Level 2 (Repeatable).
• With enough Level 3 (defined) added to attain ISO9000.
• With some Level 4 (quantitatively managed) sprinkled in where most effective:– Defect arrival / departure rates
– Estimates versus actuals
– Metrics on process step completion
– Defect attribution
CSC444F'05 Lecture 2 9
Planning
• Most important aspect of CMM Level 2
• Common flaws:– Make no plans
– Make a plan, but don’t track it
– Use Microsoft Project
CSC444F'05 Lecture 2 10
Why Plan?
• Not always a good thing– If no expected date
– If no other expectations (e.g., expected functionality)
– Planning can only slow you down
• Required when– External pressures come to bear on release dates
• Usually only happens a bit later in a software company’s business evolution– Not right at the start
– Necessary for “crossing the chasm”
CSC444F'05 Lecture 2 11
Crossing the Chasm, Geoffrey Moore (1991)
CSC444F'05 Lecture 2 12
Gantt Charts Considered Harmful
CSC444F'05 Lecture 2 13
Planning Essentials
• What are we building?
• By when will it be ready?
• How many people will it take?
Answer these and nothing more:not “who will be doing what?”nor “what are the detailed tasks required?”nor “in what order must the tasks be performed?”
CSC444F'05 Lecture 2 14
Implementation Plans
• Once planning is complete can then transform into a detailed plan– E.g., Microsoft Project
• Detailed plan should not contradict the release plan
• Not all of the project needs details beyond– Who do we assign it to
– But some parts do
• These plans may not be necessary– If no great inter-dependencies that can’t be worked out as you go
• They hinder change as they are so cumbersome to change
CSC444F'05 Lecture 2 15
Of Mice and Men
• The essence of planning is uncertainty– Plans never “go according to plan”
– Must embrace change, not close our eyes to it
• Therefore:– Must track the plan always
– Must react quickly to adverse situations
– Must embrace changes in direction
– Must re-plan quickly
CSC444F'05 Lecture 2 16
Internal Changes
• Estimation errors– Initial estimates contain a significant (one-sided) margin of error.
– As plan progresses, variance in estimates lower
• Developer-power leaving the project– Illness
– Parental leave
– Resignations
– Budget cuts
– Unexpected vacation plans
– Unexpectedly low work hours
– Unexpectedly low productivity
CSC444F'05 Lecture 2 17
External Changes
• New (big) customer desiring new functionality
• Competitor release a product
• Collaboration opportunities
• Acquisitions and mergers
• Sudden changes in customer needs– E.g., regulatory changes affecting them
CSC444F'05 Lecture 2 18
The Difficult Question• What are we building?
– May be hard for 1st release– Subsequent releases will have a big wish list– Pick the best looking ones, most demanded ones– Marketing product management decision
• What will make us the most sales?
• By when will it be ready?– Too soon:
• Customers won’t be ready for a new release– Won’t want to install– Won’t want to learn– Won’t want to pay for it
– Too late• Customers will forget about you• Competitors will pass you• Foregone revenues
• How any developers?– Usually fixed for next release
• Difficult question– Can we do all 3 at once?
CSC444F'05 Lecture 2 19
A Common Happening• Often organizations will answer all three questions, but not address the
difficult one!
• Development management will want to please their masters, and will tend to agree to too much in a spirit of “gung-ho!”
– Some managers firmly believe that over-commitment is the road to productivity.– “It’s a stretch, but we’ll pull it off”
• Coders will say “it can’t be done”– but “that’s all they ever say”.
• Massive sate of denial will set in.– Everybody will hope for a miracle
• Nobody will accept any blame– Development management: we told you it would be a stretch– Coders: we said it could never be done– Marketing: you should have said something earlier– CEO: you all told me it was going fine– Yourdon’s “Death March”.