CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock...

10
CS-EE 480 Fall 2006 September, 2006 1 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team Ethan Prevost Kristin Glanville Advisor Dr. VanDeGrift Industry Representative Mr. Jonathan Fant

Transcript of CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock...

Page 1: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 1University of Portland School of Engineering

Project Pilot RockStanford’s Restaurant and Bar

lighting design

TeamEthan Prevost

Kristin Glanville

AdvisorDr. VanDeGrift

Industry RepresentativeMr. Jonathan Fant

Page 2: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 2University of Portland School of Engineering

Overview

• Introduction

• Scorecard

• Additional Accomplishments

• Plans

• Issues/Concerns

• Conclusions

Page 3: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 3University of Portland School of Engineering

Introduction

• The project is a lighting design schematic for a Stanford’s Restaurant and Bar being built at the Northgate Mall in Seattle, Washington.

• A 3-dimensional fully enclosed model will be used to demonstrate the lighting.

• The intensity of the lighting will be presented using the simulator program AGI.

Page 4: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 4University of Portland School of Engineering

Layout of the Restaurant

Page 5: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 5University of Portland School of Engineering

Scorecard – Previous Plans

• Visit a Stanford’s Restaurant and take measurements using a light meter.

• Layout the placement of the light fixtures.

• Simulate the lights in AGI making sure that we have the proper light levels.

• Start calculating and setting up the circuits.

Page 6: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 6University of Portland School of Engineering

Additional Accomplishments

• Determined preliminary light fixtures.

• Calculated the area of each room.

• Received our Product Approval and Plan Approval.

Page 7: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 7University of Portland School of Engineering

Plans

• Begin calculations of wattage per square foot.

• Layout the initial placement of the luminaires.

• Simulate the lights in AGI making sure that we have the proper light levels.

Page 8: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 8University of Portland School of Engineering

MilestonesNumber Description Original

9/26/06Previous9/26/06

Present11/03/06

1 Product Approval 10/07/06 10/07/06 11/22/06

2 Plan Approval 11/10/06 11/10/06 11/22/06

3 Visit Stanford’s Restaurant 11/5/06 11/05/06 11/05/06

4 First Placement of Light Fixtures

12/01/06 12/01/06 12/01/06

4 Design Release 12/08/06 12/08/06 12/08/06

5 Architectural Model Built 02/16/07 02/16/07 02/16/07

9 TOP’s Approval 02/23/07 02/23/07 02/23/07

7 Light Circuitry added to Model

03/16/07 03/16/07 03/16/07

8 Prototype Release 04/13/07 04/13/07 04/13/07

10 Founder’s Day 04/17/07 04/17/07 04/17/07

11 Final Report 04/23/07 04/23/07 04/23/07

Page 9: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 9University of Portland School of Engineering

Concerns/Issues

• Delay in the delivery of reference books.

• Preliminary design exceeding the allowed energy usage.

• Availability of product information for custom fixtures.

Page 10: CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

CS-EE 480 Fall 2006

September, 2006 10University of Portland School of Engineering

Conclusions

• Schedule changed, but on track with new one.

• Hope to have the preliminary lighting layout done by the end of the semester.