CS-EE 480 Fall 2006
September, 2006 1University of Portland School of Engineering
Project Pilot RockStanford’s Restaurant and Bar
lighting design
TeamEthan Prevost
Kristin Glanville
AdvisorDr. VanDeGrift
Industry RepresentativeMr. Jonathan Fant
CS-EE 480 Fall 2006
September, 2006 2University of Portland School of Engineering
Overview
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
• Conclusions
CS-EE 480 Fall 2006
September, 2006 3University of Portland School of Engineering
Introduction
• The project is a lighting design schematic for a Stanford’s Restaurant and Bar being built at the Northgate Mall in Seattle, Washington.
• A 3-dimensional fully enclosed model will be used to demonstrate the lighting.
• The intensity of the lighting will be presented using the simulator program AGI.
CS-EE 480 Fall 2006
September, 2006 4University of Portland School of Engineering
Layout of the Restaurant
CS-EE 480 Fall 2006
September, 2006 5University of Portland School of Engineering
Scorecard – Previous Plans
• Visit a Stanford’s Restaurant and take measurements using a light meter.
• Layout the placement of the light fixtures.
• Simulate the lights in AGI making sure that we have the proper light levels.
• Start calculating and setting up the circuits.
CS-EE 480 Fall 2006
September, 2006 6University of Portland School of Engineering
Additional Accomplishments
• Determined preliminary light fixtures.
• Calculated the area of each room.
• Received our Product Approval and Plan Approval.
CS-EE 480 Fall 2006
September, 2006 7University of Portland School of Engineering
Plans
• Begin calculations of wattage per square foot.
• Layout the initial placement of the luminaires.
• Simulate the lights in AGI making sure that we have the proper light levels.
CS-EE 480 Fall 2006
September, 2006 8University of Portland School of Engineering
MilestonesNumber Description Original
9/26/06Previous9/26/06
Present11/03/06
1 Product Approval 10/07/06 10/07/06 11/22/06
2 Plan Approval 11/10/06 11/10/06 11/22/06
3 Visit Stanford’s Restaurant 11/5/06 11/05/06 11/05/06
4 First Placement of Light Fixtures
12/01/06 12/01/06 12/01/06
4 Design Release 12/08/06 12/08/06 12/08/06
5 Architectural Model Built 02/16/07 02/16/07 02/16/07
9 TOP’s Approval 02/23/07 02/23/07 02/23/07
7 Light Circuitry added to Model
03/16/07 03/16/07 03/16/07
8 Prototype Release 04/13/07 04/13/07 04/13/07
10 Founder’s Day 04/17/07 04/17/07 04/17/07
11 Final Report 04/23/07 04/23/07 04/23/07
CS-EE 480 Fall 2006
September, 2006 9University of Portland School of Engineering
Concerns/Issues
• Delay in the delivery of reference books.
• Preliminary design exceeding the allowed energy usage.
• Availability of product information for custom fixtures.
CS-EE 480 Fall 2006
September, 2006 10University of Portland School of Engineering
Conclusions
• Schedule changed, but on track with new one.
• Hope to have the preliminary lighting layout done by the end of the semester.