Building Blue ProjectSpruce Pond Sub-watershed, Franklin
Charles River Watershed Association
A Practical Example of Pollution Prevention in a Typical New England Suburban Town.
![Page 2: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/2.jpg)
Study Area: Spruce Pond Sub-watershed
![Page 3: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/3.jpg)
Sub-watershed Drainage Areas
![Page 4: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/4.jpg)
Existing Phosphorus Load by Drainage Area
![Page 5: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/5.jpg)
Design Parameters
• Reduce phosphorus in stormwater runoff by 43% to comply with expected permit
• Design with no credit given for street sweeping, fertilizer control or other practices
• Evaluate existing stormwater treatment for credit and/or retrofit
![Page 6: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/6.jpg)
Site 4A - 1: Central Park Terrace/North Park Street
![Page 7: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/7.jpg)
Fletcher Field Infiltration AreaProposed underground infiltration chamber to infiltrate 1” storm
INFILTRATION CHAMBER
DRAINAGE AREA 1,096,682 sqft
% IMPERVIOUS 32%
BMP AREA (AB) 14,775 sqft
BMP DEPTH (AD) 3 ft
ACTUAL WQV 30,941 cuft
ACTUAL WQD 1.00 in
![Page 8: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/8.jpg)
Site 4A – 3: Peck Street lot, Fletcher Field
![Page 9: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/9.jpg)
Peck Street Lot, Fletcher Field
BIORETENTION- 1” Storm
DRAINAGE AREA 34,474 sqft
% IMPERVIOUS 100%
WQV 2873 cf
DEPTH MEDIA (DF) 2.00 ft
PONDING HEIGHT (2X HF) 9 in
TF (FILTER TIME) 2 days
SURFACE AREA REQUIRED 1210 sqft
Bioretention area placed within reorganized parking lot
![Page 10: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/10.jpg)
Visualization: Bioretention garden in Parking Lot
![Page 11: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/11.jpg)
Peck Street lot – alternative design in park area
BIORETENTION- 0.4” Storm
DRAINAGE AREA 34,474 sqft
% IMPERVIOUS 100%
WQV 1149 cf
DEPTH MEDIA (DF) 2.00 ft
PONDING HEIGHT (2X HF) 9 in
TF (FILTER TIME) 2 days
SURFACE AREA REQUIRED 484 sqft
Alternative 2- Bioretention system placed on field instead of reorganizing parking lot
![Page 12: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/12.jpg)
Site 4B-2: Wachusett Street lot, Fletcher Field
![Page 13: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/13.jpg)
Parking lot alternatives
![Page 14: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/14.jpg)
Visualization: Vegetated Swale
![Page 15: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/15.jpg)
Visualization: Rain Garden in Fletcher Field
![Page 16: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/16.jpg)
Site 4c: Parmenter School
![Page 17: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/17.jpg)
Drainage Areas - Parmenter SchoolFour Bioretention areas dispersed across site to treat 1” storm
BIORETENTION - 1" storm
DRAINAGE AREA 93,422.05 sqft
IMPERVIOUS AREA 49,933.31 sqft
PERVIOUS AREA 43,488.74 sqft
WQV 4,107 cf
DEPTH MEDIA (DF) 2.00 ft
PONDING HEIGHT 6 in
TF (FILTER TIME) 2 days
SURFACE AREA REQUIRED 1826 sqft
![Page 18: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/18.jpg)
Drainage Area- Parmenter School (4C)
![Page 19: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/19.jpg)
Visualization: Rain Gardens in Front Lawn
![Page 20: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/20.jpg)
Visualization: Rain Gardens in Front Lawn
![Page 21: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/21.jpg)
Site 3G – 2: Cottage St./Union St.
BIORETENTION - 1" storm
DRAINAGE AREA 340,774.00 sqft
IMPERVIOUS AREA 270,628.70 sqft
PERVIOUS AREA 70,145.30 sqft
WQV 20,882 cf
DEPTH MEDIA (DF) 2.00 ft
PONDING HEIGHT (2X HF) 6 in
TF (FILTER TIME) 2 days
SURFACE AREA REQUIRED 9,281 sqft
Dispersed bioretention areas treating 1” storm across sub-drainage areas including:
• Cottage and Union Street on and off ROW retrofits
• On site retrofits on hardware store site, etc.
• Bump-outs at intersection of Geb & Saxon St.
![Page 22: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/22.jpg)
Visualization of Cottage Street Retrofits
![Page 23: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/23.jpg)
Computer optimization process
• “Best Engineering Judgment” design – S0• Computer Optimization:
– Define possible treatment types– Establish requirements for treatment types– Assign costs to treatment types
Optimal Design – S2
![Page 24: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/24.jpg)
Estimated cost range
Spruce Pond Subwatershed Restoration51 potential sites for stormwater improvements
• “Best Engineering Judgment”– 28 sites selected– ~ $4.6 m
• Optimized– 41 sites selected– ~ $2.9 m
![Page 25: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/25.jpg)
Preliminary Cost Comparison Cost Per Impervious Acre Treated
$0.00
$5,000.00
$10,000.00
$15,000.00
$20,000.00
$25,000.00
$30,000.00
CRWA S0 CRWA S2 EPA S1 EPA S2 EPA S3Scenario
Do
llar
($
$/impervious acre
![Page 26: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/26.jpg)
Proposed Drainage Area Retrofits
S0
Plan S0 Plan S2
![Page 27: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/27.jpg)
Lessons Learned
• Model optimization can save you money!
• Treat the first flush• Infiltration is the most cost
effective strategy• Treating large volumes is cost
effective but may not solve the whole problem
![Page 28: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/28.jpg)
Next Steps for Franklin
• New stormwater permit, expected by end of 2010– Develop a Phosphorus Control Plan within 5 years
– Implement Phosphorus Control Plan within 10 years
• Install several pilot projects to learn from experience
![Page 29: CRWA Pres 20100524](https://reader034.fdocuments.us/reader034/viewer/2022051816/54583de3af795998788b53d1/html5/thumbnails/29.jpg)
Special Thanks
• Jeff Nutting, Town Administrator• Bill Yadisernia, Robert Cantoreggi, Franklin DPW• James Esterbrook, Franklin GIS Department• Nick Alfieri, Franklin Conservation Commission• Beth Dahlstrom, Franklin Planning Department• Franklin Technical Advisory Committee