    Engineers Responsibility

    for Detailing ReinforcedConcrete Structures

    Neal S. Anderson, PE, SE, FACI Vice President of Engineering

    1

    Dilbert !!

    2

    What is Rebar Detailing?

    The art of placing reinforcing in aconcrete member to follow the

    design intent

    Thou shall follow the design &placing rules of ACI ,AASHTO, and CRSI . . . .

    3

  • 8/8/2019 CRSI Detailing

    2/29

    6/11/2008

    Why is Detailing Important?

    It is how the project gets builtNot everything gets caught

    When problems occur . . . Delays in the project Cost implications Possible finger pointing

    4

    U.S. Detailing Practice

    Structural Design A/EStructural Design A/E

    BuildinBuildin Brid eBrid e

    Drawings / Specs

    Drawings / Specs

    PlacingDrawingsPlacing

    Drawings

    Structural Placing

    Drawings

    Structural Placing

    Drawings

    5

    Detailing of Rebar in Concrete

    BuildingsBridges

    Two Case StudiesWhat can we (SEs) do?

    6

  • 8/8/2019 CRSI Detailing

    3/29

    6/11/2008

    Buildings

    7

    Building Deliverables

    Drawings Structural Architectural

    Project Specifications Section 03200 - Reinforcing

    General Notes

    8

    ACI 318 Building Code

    Dawn of timeCurrent version is2008

    Governs buildingdesignContains info onreinforcing

    9

  • 8/8/2019 CRSI Detailing

    4/29

    6/11/2008

    ACI 318, Section 1.2.1 Drawings, Details & Specs

    Specified strength / grade ofreinforcementSize and location of all Structural elements Reinforcement Anchors

    10

    Reinforcement anchorage lengthsLap splices Location

    ACI 318, Section 1.2.1 Drawings, Details & Specs

    Length

    Mechanical & welded splices Type Location

    11

    Building Drawings

    Beams / girdersColumns

    FoundationsPlans, sections, & details

    12

  • 8/8/2019 CRSI Detailing

    5/29

    6/11/2008

    Building Drawings

    Beam / irder table

    Many elements are shown TYPICAL

    Column schedule

    13

    Typical Beam Detail

    14

    m n

    D e t a i

    l s

    T y p

    i c a l

    C o l

    15

  • 8/8/2019 CRSI Detailing

    6/29

    6/11/2008

    Building Drawings

    Structural (& arch) drawingsMany typical details chedules tables Bar size & spacing (#5 @ 12 o.c.)

    Detailers role Placing plans development Bill of material for fabrication

    16

    Bridges

    17

    Bridge Deliverables

    Drawings Structural rebar placing

    Rebar schedules Civil

    General / structural notesProject special provisions Rebar covered in Std Specs.

    18

  • 8/8/2019 CRSI Detailing

    7/29

    6/11/2008

    Plans Bar Schedule

    A. Bar ID (unique)

    B. Quantity (or #)C. Rebar size

    . o a eng(includingbends)

    E. Depiction ofshape

    A B C D E

    (E) = Epoxy coated 19

    Plans Bend DiagramsStirrups

    L-bars

    Straight with180 hook

    Bar ID fromschedule 20

    Rebar Markings for Deck

    21

  • 8/8/2019 CRSI Detailing

    8/29

    6/11/2008

    Plans splices

    Bridge deck plan

    Contact lapsplice length

    Splice locations &length

    22

    Bridge Drawings

    Structural & placing drawingsVery prescriptive by DOT a E b E bars ~ deck h(E) & v(E) bars ~ wall

    Detailers role Check engineers layout Bill of materials

    23

    Buildings vs. Bridges

    Buildings - Private

    Bidding package Lump sum

    Bridges - Public

    Bidding package Unit prices Itemized

    Rebar lumped inChange ordersRFIs

    Unique nature - notcookie cutter

    Rebar Weight ~ plain & (E) Placing unit

    Not many COs / RFIs

    Bridges are moretypical

    24

  • 8/8/2019 CRSI Detailing

    9/29

    6/11/2008

    Detailing Practice The Roles

    25

    Detailing Responsibilities

    Admittedly, this is more focusedon the building sideWhat are the issues / concerns?Why worry? Costs Project delays Structural issues

    26

    Meet Mr. Detailer . . .

    Detailer Technically trained individual Interprets contract

    documents

    Responsible for Placing plans development Bill of material for fabrication

    They are not design professionals

    27

  • 8/8/2019 CRSI Detailing

    10/29

    6/11/2008

    Meet Mr. SE . . .

    Structural Engineer BSCE, MSCE, or PhD FE (EIT), PE, or SE

    Responsible for Design of concrete Preparing design plans &

    specifications Placing / shop drawing review Anything else to ensure our

    designs get built properly

    We are licensed design professionals 28

    What are the perceived normalrelationships between SE anddetailer?

    SE Point of View . . . .

    How can this relationship beimproved?How do we solve the problems?Who takes the lead to avoidproblems?

    29

    SE Relationship Perception

    Detailer prepares placing drawings SE and architectural drawings CRSI Manual of Standard Practice

    SE rovides back round drawin s to Detailer to assist in starting plans Detailer verifies their scale & redraws if

    necessary

    SE expectations: Detailer to be properly trained or Working under the supervision of an

    experienced detailer 30

  • 8/8/2019 CRSI Detailing

    11/29

    6/11/2008

    SE Relationship Perception

    SE expects interpretation questions

    during the preparation stage & priorto reviewing placing drawings

    questions Placing drawings to be completewith unanswered issues cloudedSE will review promptly and clearlymark comments

    31

    SE Relationship Perception

    SE will not transmit designchanges during the placingdrawing preparation During mark-ups

    Detailer addresses mark-ups priorto fabricating & issuing finaldrawings

    32

    How Can SEs Get Better?

    Recognize the tools available Publications

    Get familiar with rebar detailing

    Part 1

    Make buildable designs Aids in placing drawing review

    Field issues cannot always besolved with a BFH

    33

  • 8/8/2019 CRSI Detailing

    12/29

    6/11/2008

    CRSI Manual of Std. Practice

    First published byCRSI in 1927Industry StandardPractices for allactivities related tosteel reinforcing barsEssential referencefor the A / E

    34

    ACI Committee 315 Report

    35

    ACI Detailing Manual

    Current Edition ~ 2004Contains ACI 315 reportIllustrative standards

    Exam le drawin s Slabs Walls Footings Bridges Etc.

    36

  • 8/8/2019 CRSI Detailing

    13/29

    6/11/2008

    a r B e n

    d s

    T y p

    i c a l

    B

    37

    a r B e n

    d s

    T y p

    i c a l

    B

    38

    Typical Stirrups

    39

  • 8/8/2019 CRSI Detailing

    14/29

    6/11/2008

    Typical Column Ties

    40

    End Hook Dimensions

    41

    Stirrups and Ties

    42

  • 8/8/2019 CRSI Detailing

    15/29

    6/11/2008

    Two What Went Wrongs

    Continuous beamsSlab folds

    43

    Continuous Beam

    44

    SE Typical Screw Ups

    Conflicting reinforcing over support Different sizes called on adj. beams

    Too many bars for beam width

    No direction on rebar location atintersecting beamsFull length bars not taken into accountCongestion over columns Take column reinforcing into consideration

    45

  • 8/8/2019 CRSI Detailing

    16/29

    6/11/2008

    Slab Folds

    46

    Slab Folds Again

    Two Way SlabsDifficult fordetailersSlab elevationdifferences andthe complexity ofa two-way slab

    47

    SE Typical Screw Ups

    Detail is not cut on planExtent of fold not clearly shownFold not coordinated with architectural

    depth exceeds maximum fold allowedFold location many bar lengths Framing bars Fill bars spliced to longer bars

    48

  • 8/8/2019 CRSI Detailing

    17/29

    6/11/2008

    Typ. Detailer Screw-Ups

    Slab reinforcing is replaced byfold reinforcing Two-way reinf. not considered

    Other structural components invicinity are effectedIncorrect laps Location , length

    49

    Problem Resolution

    Identify issues ASAP & communicateto all partiesShare possible solutions

    ocumen , u o no po n ngersImplement best solution ASAP Keeps job moving

    Learn from problems & dont repeat At least not on the same job

    50

    Improving the Relationship

    Allow communication between parties

    Provide Detailer with latest set of

    contract documents Including architectural drawings

    Encourage detailer to contact SEduring placing drawing preparation

    Share lesson learned experiencefrom previous projects

    51

  • 8/8/2019 CRSI Detailing

    18/29

    6/11/2008

    Improving the Relationship

    Identify potential problemsahead of timeSim lif and standardize detailsFollow latest codes & practicesKeep Detailers trained andcurrent

    52

    Meetings !!

    If needed, call early project meeting Detailer, Subs, & GC Discuss project misunderstandings

    Sub / Detailer may request meeting Details confusing or not clear He/she proposes alternate detail Without changing intent, if these have

    worked previously 53

    Stretch Time . . . .

    54

  • 8/8/2019 CRSI Detailing

    19/29

    6/11/2008

    How Can SEs Get Better?

    Take the lead !!Identify potential issues indesi n hase

    Part 2

    Draw details to scale to visualize Detail / think out the tuffys Go beyond dots & lines Recognize congestion issues

    55

    SE Takes the Lead . . .

    Design process begins with EOR / SEIn-house training of young engineers Starts ASAP upon hiring from college Mentorin from ex erienced en ineers In-house seminars, site visits, lessons

    learned Clarify intent at pre-constr. meetingContact detailer early Initial placing drawings indicate a lack of

    understanding of design intent 56

    U.S. Bar Sizes

    Diameterapprox.Based on

    weight

    Bar Size[metric]

    #

    Nominal Weight,lb/ft[Nominal Mass,kg/m ]

    Diameter, in.[ mm ]

    CrossSectionalArea, in. 2[mm 2]

    3 [10] 0.3 76 [0. 560] 0. 375 [9 .5] 0 .11 [ 71]

    4 [13] 0 .6 68 [0 .9 94 ] 0 .5 00 [1 2. 7] 0 .2 0 [ 12 9]

    . . . . .

    6 [19] 1 .5 02 [2 .2 35 ] 0 .7 50 [1 9. 1] 0 .4 4 [ 28 4]

    7 [22] 2 .0 44 [3 .0 42 ] 0 .8 75 [2 2. 2] 0 .6 0 [ 38 7]

    8 [25] 2 .6 70 [3 .9 73 ] 1 .0 00 [2 5. 4] 0 .7 9 [ 51 0]

    9 [29] 3 .4 00 [5 .0 60 ] 1 .1 28 [2 8. 7] 1 .0 0 [ 64 5]

    10 [32] 4 .3 03 [6 .4 04 ] 1 .2 70 [3 2. 3] 1 .2 7 [ 81 9]

    11 [36] 5 .313 [7.907] 1 .410 [35 .8 ] 1 .56 [1006]

    14 [43] 7 .650 [11 .38] 1 .693 [43 .0 ] 2 .25 [1452]

    18 [57] 13.60 [20 .24] 2 .257 [57 .3 ] 4 .00 [2581] 57

  • 8/8/2019 CRSI Detailing

    20/29

    6/11/2008

    U.S. Bar Sizes

    Figure 6-1 fromCRSIs Manual of Standard Practice

    BarSize

    NominalDiameter( in. )

    OutsideDiameter( in. )

    3 3/8 7/16

    4 1/2 9/16

    6 3/4 7/8

    7 7/8 1

    8 1 1-1/89 1.128 1-1/4

    10 1 270 1-7/16

    11 1.410 1-5/8

    14 1 693 1-7/8

    18 2 257 2-1/2 58

    Common Problem Areas

    Beam column jointsBrackets / haunches / ledges

    T-JointsTop of columns

    59 Avoid Congestion

    Beam-Column Joints

    60

  • 8/8/2019 CRSI Detailing

    21/29

    6/11/2008

    Beam-Column Joints

    Perimeter ofColumn Reinf.

    Think curtains orplanes of steelreinforcing

    61

    Beam-Column Joints

    Congestion is a givenConsider making beams wider B 4 in 2 in each side Corner beam bars dont interfere

    Consider beams Different depths or elevations Top & bottom bar interferences

    62

    Beam-Column Joint

    63

  • 8/8/2019 CRSI Detailing

    22/29

    6/11/2008

    Column Brackets

    Where located oncolumn?What is the size?Bar s acin ?How does thiseffect the strut-and-tie model?

    64

    Bottom Integrity Rebar

    Lap outside column to avoidcongestion

    65

    Retaining Wall T-Joints

    Easier for contractor

    66

  • 8/8/2019 CRSI Detailing

    23/29

    6/11/2008

    Retaining Wall T-Joints

    Performs better

    67

    Coupling Beams

    68

    Scale Drawing of Rebar

    69

  • 8/8/2019 CRSI Detailing

    24/29

    6/11/2008

    f i g u r a

    t i o n

    F i n a l

    C o

    70

    Shear Wall Ends L to M

    71

    Shear Wall Ends L to M

    72

  • 8/8/2019 CRSI Detailing

    25/29

    6/11/2008

    Shear Wall Ends Special

    73

    Shear Wall Ends Special

    74

    Shear Wall Ends Special

    75

  • 8/8/2019 CRSI Detailing

    26/29

    6/11/2008

    Column Ends Headed Bars

    76

    Punching Shear Studs

    77

    SE Need to Knows - Rebar

    Standard rebar stock length (40 to) 60 ft

    S ecial len ths ossible coordinate with mill or fabricator)

    Try to use same steel gradethroughout project#14 & #18 may require lead time

    78

  • 8/8/2019 CRSI Detailing

    27/29

    6/11/2008

    Use largest bar size possibleRepeat bar sizes & lengthsProvide minimum 4 - 6 in. a

    SE Need to Knows - Rebar

    79

    between top barsFollow ACI 315 for bending detailsMinimize bar bends & hooksKeep bars in one plane

    SE Need to Knows - Columns

    Multi-story construction, usualpractice Limit column bar lengths to one story

    For larger bars & couplers Two and three story heights possible Bar sizes of #9 & > have sufficient

    stiffness to use free standing two

    story heights.80

    SE Need to Knows - Columns

    Use same column size, vary Bar size

    Concrete strength Lap splices permitted up to #11#14 & #18 bars have to bemechanically spliced or welded,if tension splice

    81

  • 8/8/2019 CRSI Detailing

    28/29

    6/11/2008

    Rebar Splicing - Coupler

    Couplers are: Grouted Threaded Screw type

    Manufacturers literature

    82

    Rebar Splicing - Couplers

    Couplers take up space Greater diameter than rebar

    Sta er cou lersCan they be installed? Grouting Set screws

    83

    Better SEs - Review

    Identify potential issues Draw details to scale to visualize

    Detail / think out the tuffys Go beyond dots & lines Recognize congestion issues

    Get familiar with rebar detailing

    84

  • 8/8/2019 CRSI Detailing

    29/29

    6/11/2008

    What Can Mr. CRSI Do?

    Manuals of Standard Practice

    Keep current / up to date Reflect latest Code changes

    Promote field experience importance Young engineers

    Work with college professors Discuss importance of detailing Properly expressing design in contract docs

    85

    Questions?