Engineers Responsibility
for Detailing ReinforcedConcrete Structures
Neal S. Anderson, PE, SE, FACI Vice President of Engineering
1
Dilbert !!
2
What is Rebar Detailing?
The art of placing reinforcing in aconcrete member to follow the
design intent
Thou shall follow the design &placing rules of ACI ,AASHTO, and CRSI . . . .
3
-
8/8/2019 CRSI Detailing
2/29
6/11/2008
Why is Detailing Important?
It is how the project gets builtNot everything gets caught
When problems occur . . . Delays in the project Cost implications Possible finger pointing
4
U.S. Detailing Practice
Structural Design A/EStructural Design A/E
BuildinBuildin Brid eBrid e
Drawings / Specs
Drawings / Specs
PlacingDrawingsPlacing
Drawings
Structural Placing
Drawings
Structural Placing
Drawings
5
Detailing of Rebar in Concrete
BuildingsBridges
Two Case StudiesWhat can we (SEs) do?
6
-
8/8/2019 CRSI Detailing
3/29
6/11/2008
Buildings
7
Building Deliverables
Drawings Structural Architectural
Project Specifications Section 03200 - Reinforcing
General Notes
8
ACI 318 Building Code
Dawn of timeCurrent version is2008
Governs buildingdesignContains info onreinforcing
9
-
8/8/2019 CRSI Detailing
4/29
6/11/2008
ACI 318, Section 1.2.1 Drawings, Details & Specs
Specified strength / grade ofreinforcementSize and location of all Structural elements Reinforcement Anchors
10
Reinforcement anchorage lengthsLap splices Location
ACI 318, Section 1.2.1 Drawings, Details & Specs
Length
Mechanical & welded splices Type Location
11
Building Drawings
Beams / girdersColumns
FoundationsPlans, sections, & details
12
-
8/8/2019 CRSI Detailing
5/29
6/11/2008
Building Drawings
Beam / irder table
Many elements are shown TYPICAL
Column schedule
13
Typical Beam Detail
14
m n
D e t a i
l s
T y p
i c a l
C o l
15
-
8/8/2019 CRSI Detailing
6/29
6/11/2008
Building Drawings
Structural (& arch) drawingsMany typical details chedules tables Bar size & spacing (#5 @ 12 o.c.)
Detailers role Placing plans development Bill of material for fabrication
16
Bridges
17
Bridge Deliverables
Drawings Structural rebar placing
Rebar schedules Civil
General / structural notesProject special provisions Rebar covered in Std Specs.
18
-
8/8/2019 CRSI Detailing
7/29
6/11/2008
Plans Bar Schedule
A. Bar ID (unique)
B. Quantity (or #)C. Rebar size
. o a eng(includingbends)
E. Depiction ofshape
A B C D E
(E) = Epoxy coated 19
Plans Bend DiagramsStirrups
L-bars
Straight with180 hook
Bar ID fromschedule 20
Rebar Markings for Deck
21
-
8/8/2019 CRSI Detailing
8/29
6/11/2008
Plans splices
Bridge deck plan
Contact lapsplice length
Splice locations &length
22
Bridge Drawings
Structural & placing drawingsVery prescriptive by DOT a E b E bars ~ deck h(E) & v(E) bars ~ wall
Detailers role Check engineers layout Bill of materials
23
Buildings vs. Bridges
Buildings - Private
Bidding package Lump sum
Bridges - Public
Bidding package Unit prices Itemized
Rebar lumped inChange ordersRFIs
Unique nature - notcookie cutter
Rebar Weight ~ plain & (E) Placing unit
Not many COs / RFIs
Bridges are moretypical
24
-
8/8/2019 CRSI Detailing
9/29
6/11/2008
Detailing Practice The Roles
25
Detailing Responsibilities
Admittedly, this is more focusedon the building sideWhat are the issues / concerns?Why worry? Costs Project delays Structural issues
26
Meet Mr. Detailer . . .
Detailer Technically trained individual Interprets contract
documents
Responsible for Placing plans development Bill of material for fabrication
They are not design professionals
27
-
8/8/2019 CRSI Detailing
10/29
6/11/2008
Meet Mr. SE . . .
Structural Engineer BSCE, MSCE, or PhD FE (EIT), PE, or SE
Responsible for Design of concrete Preparing design plans &
specifications Placing / shop drawing review Anything else to ensure our
designs get built properly
We are licensed design professionals 28
What are the perceived normalrelationships between SE anddetailer?
SE Point of View . . . .
How can this relationship beimproved?How do we solve the problems?Who takes the lead to avoidproblems?
29
SE Relationship Perception
Detailer prepares placing drawings SE and architectural drawings CRSI Manual of Standard Practice
SE rovides back round drawin s to Detailer to assist in starting plans Detailer verifies their scale & redraws if
necessary
SE expectations: Detailer to be properly trained or Working under the supervision of an
experienced detailer 30
-
8/8/2019 CRSI Detailing
11/29
6/11/2008
SE Relationship Perception
SE expects interpretation questions
during the preparation stage & priorto reviewing placing drawings
questions Placing drawings to be completewith unanswered issues cloudedSE will review promptly and clearlymark comments
31
SE Relationship Perception
SE will not transmit designchanges during the placingdrawing preparation During mark-ups
Detailer addresses mark-ups priorto fabricating & issuing finaldrawings
32
How Can SEs Get Better?
Recognize the tools available Publications
Get familiar with rebar detailing
Part 1
Make buildable designs Aids in placing drawing review
Field issues cannot always besolved with a BFH
33
-
8/8/2019 CRSI Detailing
12/29
6/11/2008
CRSI Manual of Std. Practice
First published byCRSI in 1927Industry StandardPractices for allactivities related tosteel reinforcing barsEssential referencefor the A / E
34
ACI Committee 315 Report
35
ACI Detailing Manual
Current Edition ~ 2004Contains ACI 315 reportIllustrative standards
Exam le drawin s Slabs Walls Footings Bridges Etc.
36
-
8/8/2019 CRSI Detailing
13/29
6/11/2008
a r B e n
d s
T y p
i c a l
B
37
a r B e n
d s
T y p
i c a l
B
38
Typical Stirrups
39
-
8/8/2019 CRSI Detailing
14/29
6/11/2008
Typical Column Ties
40
End Hook Dimensions
41
Stirrups and Ties
42
-
8/8/2019 CRSI Detailing
15/29
6/11/2008
Two What Went Wrongs
Continuous beamsSlab folds
43
Continuous Beam
44
SE Typical Screw Ups
Conflicting reinforcing over support Different sizes called on adj. beams
Too many bars for beam width
No direction on rebar location atintersecting beamsFull length bars not taken into accountCongestion over columns Take column reinforcing into consideration
45
-
8/8/2019 CRSI Detailing
16/29
6/11/2008
Slab Folds
46
Slab Folds Again
Two Way SlabsDifficult fordetailersSlab elevationdifferences andthe complexity ofa two-way slab
47
SE Typical Screw Ups
Detail is not cut on planExtent of fold not clearly shownFold not coordinated with architectural
depth exceeds maximum fold allowedFold location many bar lengths Framing bars Fill bars spliced to longer bars
48
-
8/8/2019 CRSI Detailing
17/29
6/11/2008
Typ. Detailer Screw-Ups
Slab reinforcing is replaced byfold reinforcing Two-way reinf. not considered
Other structural components invicinity are effectedIncorrect laps Location , length
49
Problem Resolution
Identify issues ASAP & communicateto all partiesShare possible solutions
ocumen , u o no po n ngersImplement best solution ASAP Keeps job moving
Learn from problems & dont repeat At least not on the same job
50
Improving the Relationship
Allow communication between parties
Provide Detailer with latest set of
contract documents Including architectural drawings
Encourage detailer to contact SEduring placing drawing preparation
Share lesson learned experiencefrom previous projects
51
-
8/8/2019 CRSI Detailing
18/29
6/11/2008
Improving the Relationship
Identify potential problemsahead of timeSim lif and standardize detailsFollow latest codes & practicesKeep Detailers trained andcurrent
52
Meetings !!
If needed, call early project meeting Detailer, Subs, & GC Discuss project misunderstandings
Sub / Detailer may request meeting Details confusing or not clear He/she proposes alternate detail Without changing intent, if these have
worked previously 53
Stretch Time . . . .
54
-
8/8/2019 CRSI Detailing
19/29
6/11/2008
How Can SEs Get Better?
Take the lead !!Identify potential issues indesi n hase
Part 2
Draw details to scale to visualize Detail / think out the tuffys Go beyond dots & lines Recognize congestion issues
55
SE Takes the Lead . . .
Design process begins with EOR / SEIn-house training of young engineers Starts ASAP upon hiring from college Mentorin from ex erienced en ineers In-house seminars, site visits, lessons
learned Clarify intent at pre-constr. meetingContact detailer early Initial placing drawings indicate a lack of
understanding of design intent 56
U.S. Bar Sizes
Diameterapprox.Based on
weight
Bar Size[metric]
#
Nominal Weight,lb/ft[Nominal Mass,kg/m ]
Diameter, in.[ mm ]
CrossSectionalArea, in. 2[mm 2]
3 [10] 0.3 76 [0. 560] 0. 375 [9 .5] 0 .11 [ 71]
4 [13] 0 .6 68 [0 .9 94 ] 0 .5 00 [1 2. 7] 0 .2 0 [ 12 9]
. . . . .
6 [19] 1 .5 02 [2 .2 35 ] 0 .7 50 [1 9. 1] 0 .4 4 [ 28 4]
7 [22] 2 .0 44 [3 .0 42 ] 0 .8 75 [2 2. 2] 0 .6 0 [ 38 7]
8 [25] 2 .6 70 [3 .9 73 ] 1 .0 00 [2 5. 4] 0 .7 9 [ 51 0]
9 [29] 3 .4 00 [5 .0 60 ] 1 .1 28 [2 8. 7] 1 .0 0 [ 64 5]
10 [32] 4 .3 03 [6 .4 04 ] 1 .2 70 [3 2. 3] 1 .2 7 [ 81 9]
11 [36] 5 .313 [7.907] 1 .410 [35 .8 ] 1 .56 [1006]
14 [43] 7 .650 [11 .38] 1 .693 [43 .0 ] 2 .25 [1452]
18 [57] 13.60 [20 .24] 2 .257 [57 .3 ] 4 .00 [2581] 57
-
8/8/2019 CRSI Detailing
20/29
6/11/2008
U.S. Bar Sizes
Figure 6-1 fromCRSIs Manual of Standard Practice
BarSize
NominalDiameter( in. )
OutsideDiameter( in. )
3 3/8 7/16
4 1/2 9/16
6 3/4 7/8
7 7/8 1
8 1 1-1/89 1.128 1-1/4
10 1 270 1-7/16
11 1.410 1-5/8
14 1 693 1-7/8
18 2 257 2-1/2 58
Common Problem Areas
Beam column jointsBrackets / haunches / ledges
T-JointsTop of columns
59 Avoid Congestion
Beam-Column Joints
60
-
8/8/2019 CRSI Detailing
21/29
6/11/2008
Beam-Column Joints
Perimeter ofColumn Reinf.
Think curtains orplanes of steelreinforcing
61
Beam-Column Joints
Congestion is a givenConsider making beams wider B 4 in 2 in each side Corner beam bars dont interfere
Consider beams Different depths or elevations Top & bottom bar interferences
62
Beam-Column Joint
63
-
8/8/2019 CRSI Detailing
22/29
6/11/2008
Column Brackets
Where located oncolumn?What is the size?Bar s acin ?How does thiseffect the strut-and-tie model?
64
Bottom Integrity Rebar
Lap outside column to avoidcongestion
65
Retaining Wall T-Joints
Easier for contractor
66
-
8/8/2019 CRSI Detailing
23/29
6/11/2008
Retaining Wall T-Joints
Performs better
67
Coupling Beams
68
Scale Drawing of Rebar
69
-
8/8/2019 CRSI Detailing
24/29
6/11/2008
f i g u r a
t i o n
F i n a l
C o
70
Shear Wall Ends L to M
71
Shear Wall Ends L to M
72
-
8/8/2019 CRSI Detailing
25/29
6/11/2008
Shear Wall Ends Special
73
Shear Wall Ends Special
74
Shear Wall Ends Special
75
-
8/8/2019 CRSI Detailing
26/29
6/11/2008
Column Ends Headed Bars
76
Punching Shear Studs
77
SE Need to Knows - Rebar
Standard rebar stock length (40 to) 60 ft
S ecial len ths ossible coordinate with mill or fabricator)
Try to use same steel gradethroughout project#14 & #18 may require lead time
78
-
8/8/2019 CRSI Detailing
27/29
6/11/2008
Use largest bar size possibleRepeat bar sizes & lengthsProvide minimum 4 - 6 in. a
SE Need to Knows - Rebar
79
between top barsFollow ACI 315 for bending detailsMinimize bar bends & hooksKeep bars in one plane
SE Need to Knows - Columns
Multi-story construction, usualpractice Limit column bar lengths to one story
For larger bars & couplers Two and three story heights possible Bar sizes of #9 & > have sufficient
stiffness to use free standing two
story heights.80
SE Need to Knows - Columns
Use same column size, vary Bar size
Concrete strength Lap splices permitted up to #11#14 & #18 bars have to bemechanically spliced or welded,if tension splice
81
-
8/8/2019 CRSI Detailing
28/29
6/11/2008
Rebar Splicing - Coupler
Couplers are: Grouted Threaded Screw type
Manufacturers literature
82
Rebar Splicing - Couplers
Couplers take up space Greater diameter than rebar
Sta er cou lersCan they be installed? Grouting Set screws
83
Better SEs - Review
Identify potential issues Draw details to scale to visualize
Detail / think out the tuffys Go beyond dots & lines Recognize congestion issues
Get familiar with rebar detailing
84
-
8/8/2019 CRSI Detailing
29/29
6/11/2008
What Can Mr. CRSI Do?
Manuals of Standard Practice
Keep current / up to date Reflect latest Code changes
Promote field experience importance Young engineers
Work with college professors Discuss importance of detailing Properly expressing design in contract docs
85