CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND AND PARKING LOT Mission Bay Park Improvement Fund Oversight Committee Meeting November 5, 2019

Transcript of CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park...

Page 1: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND AND PARKING LOT

Mission Bay Park Improvement Fund Oversight Committee MeetingNovember 5, 2019

Page 2: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

EXISTING CONDITIONS

N

2

3

1

4

6

7

8

5

1

2

3

4

PLAYGROUND

PARKING LOT

PICNIC SHELTER

COMFORT STATION

EXISTING PLAYGROUND

EXISTING PARKING LOT EXISTING CANOPY TREES

EXISTING PATH TO COMFORT STATIONEXISTING BAYSIDE WALK

EXISTING PICNIC TABLE

Play structure Swings Concrete Climber

CR

OW

N P

OIN

T D

R.

CO

RO

NA

OR

IEN

TE

RD

.

MOORLAND DR.

LA MANCHA DR.

LA CIMA DR.

5

6

7

8

BAYSIDE WALK WITH PICNIC TABLES

BASKETBALL COURTS

CROWN POINT BEACH

MISSION BAY

Page 3: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

SCOPE OF WORK

1

2

3

4

5

6

7

8

9

Accessible path of travel*

Re-surface and re-stripe parking lot. Re-grade access aisles as needed to comply with ADA standards. Protect existing trees in place, extend planting islands to allow more space for existing trees.

Install / replace new curb ramps, city standard sidewalks, curb and gutter at full width of accessible parking stalls.

Re-grade and repair sidewalks at accessible paths of travel to meet ADA compliance.

Expand playground area, provide new play equipment for various age group, new seating area and new playground surfacing. Add shade structures.

Add new concrete pad along path of travel for trash and recycling receptacles.

Relocate trash receptacles away from existing bench. Demarcate wheelchair space at existing bench.

Replace existing concrete pad and replace table with new accessible picnic table.

Remove (1) existing tree and add (3) 36” box trees around the new playground area.

Replace existing grill with ADA compliant equipment.

* Confirm accessible path of travel does not have more than 1/2” gap at paving joints at all locations. Any joints with larger than 1/2” gap to be filled.

SCOPE ITEMS

6

5

7

7

1

2

2

3

4

8

9

3

CO

RO

NA

OR

IEN

TE

RD

.

3

N

Page 4: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

OVERALL SITE PLAN

0’25’50’ 50’

1

2

3

4

5

6

7

8

10

9

11

PLAYGROUND EQUIPMENT AND POURED-IN-PLACE RUBBER SAFETY SURFACING

PARKING LOT, RESURFACED AND RESTRIPED

EXPANDED PLANTING AREA AT EXISTING TREES

ADA PARKING STALLS

CURB RAMP AND WALKWAY

REPLACED CONCRETE WALKWAY AT NON-COMPLIANT PATH

ACCESSIBLE PICNIC TABLE AT EXISTING CONCRETE RAD

RELOCATED TRASH & RECYCLING RECEPTACLES AT NEW CONCRETE PAD

ACCESSIBLE BBQ GRILL AT EXISTING PICNIC AREA

RELOCATED PICNIC TABLE

REPLACEMENT TREE PLANTING

ACCESSIBLE PATH

LIMIT OF WORK

LEGEND

2

4

4

1

5

5

7

8

6

CO

RO

NA

OR

IEN

TE

RD

.

3

9

3

3

N

10

10

10

1011

11

3

3

11

6

6

Page 5: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

PLAYGROUND ENLARGEMENT PLAN

2-122-5

5-12

ACCESSIBLE ROUTES AGE

1

2

3

4

5

6

7

8

9

10

11

48" LOOKOUT TOWER WITH DOUBLE SLIDE

72" LOOKOUT TOWER WITH SPIRAL SLIDE

48" LOOKOUT TOWER WITH ROLLER SLIDE

WAVE CLIMBER

WAVE BRIDGE

SURFBOARD CLIMBER

SWINGS WITH (2) BUCKET SEATS, (1) HARNESS SEAT AND (3) BELT SEATS

"WE-SAW" GROUP SEE-SAW

SADDLE SPINNER TRIO

SWIRL SPINNER

GROUP SPINNER "BOAT"

"SQUIGGLE-KNOT" BUOY BRIDGE & LOLLI LADDER

SENSORY STATION

PULSE TEMPO SOUND PLAY

DOLPHIN AND BUBBLE PLAY

ENTRY BOARDWALK AND PLAZA SEAT WALLS

TODDLER PICNIC TABLES

RELOCATED PICNIC TABLE

LEGEND

0’10’20’ 20’N

12

13

14

15

16

17

18

1

2

3

4

5

6

7

8

9

10

11

12

13

1415

1617

18

18

18

18

POURED-IN-PLACE RUBBER SURFACING, TOT TURF SUPREME

Page 6: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

PLAY FEATURES: 2-5 YEAR AREA

5

2

3

4

1

HORIZONTAL LADDER

SADDLE SPINNER TRIOKEY MAP WIGGLE LADDER 48" TOWER WITH DOUBLE SLIDE AND TALKING TUBES (ON DECK AND GROUND)

DOLPHINS AND BUBBLE PLAY

48" LOOKOUT TOWER WITH WAVE CLIMBERS

1

1

2 3

4 5

Page 7: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

PLAY FEATURES: 2-12 YEAR AREA

KEY MAP

SURFBOARD CLIMBER

3-BAY SWINGS WITH (2) BUCKET SWINGS, (3) BELT SWINGS AND (1) HARNESS SWING

SPINNER "BOAT" WE-SAW

PULSE TEMPO SOUND PLAY

SENSORY STATION

1

2

3

4

5

6

1 2 3

4

5 6

Page 8: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

PLAY FEATURES: 5-12 YEAR AREA

KEY MAP BUOY BRIDGE 72" LOOKOUT TOWER WITH WAVE BRIDGE AND SPIRAL SLIDE

LOLLI LADDER 48" LOOKOUT TOWER WITH ROLLER SLIDE, PLAY PANELS AND TALKING TUBES

5

24

1 2

4 5

1

SWIRL SPINNER

3

3

Page 9: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

SITE FURNISHINGS

SHADE OPTIONS

109SRE ACCESSIBLE PICNIC TABLE, OUTDOOR CREATIONS 115FSS TODDLER TABLE, OUTDOOR CREATIONS3001AG GROUP BBQ W/ADJUSTABLE GRILL, OUTDOOR CREATIONS

HEXAGON SHADE STRUCTURE, USA SHADESINGLE POST PYRAMID CANTILEVER SHADE, USA SHADE COOLTOPPERS FULL SAIL, LSI (INTEGRATED WITH PLAY EQUIPMENT)

Page 10: CROWN POINT NORTH IMPROVEMENTS - PLAYGROUND …...playground and parking lot. mission bay park improvement fund oversight committee meeting ... place rubber safety surfacing. parking

THANK YOU!