Critical challenges and dimensions to successful implementation of a large programme of inter-related capital projects
Neville Searle, Associate, Hatch Goba
© Hatch Ltd 2013
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Agenda
• Background
• Large programme of inter-related projects
• Critical challenges
• Dimensions
• Successful implementation
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Background – personal experience...
1. Initiate: Combined/separate ‘salt & pepper’ teams, commercial/finance, PMP
2. Plan: Corridor concept studies, Project Lifecycle Process (PLP)
3. Monitor & Control: Project management practice
4. Execute: Integrated rail, port, terminal programme with a common objective
5. Close: Share the knowledge for other programmes
PMBok & Hatch: Portfolio (Programme) > Programme (Corridor) > Project (Project, Study)
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Large programme of inter-related projects
• Large capital expansion programme, including four operating customers, 40+ projects &
studies, 1100+ contracts, 44 million construction manhours, LTIFR 0.22, 0.0041% IR lost
time, from 2005-201 and continuing...
• Railway lines – Sishen-Saldanha iron ore, Hotazel-PE/Ngqura manganese, Ermelo-
Richards Bay coal lines
• Port marine works – Ngqura quay, Cape Town quay, Durban entrance widening and
quays, Saldanha Bay dredging, others
• Terminals – Ngqura, Cape Town, Durban container terminals; Durban Point car terminal;
PE manganese terminal; Richards Bay dry bulk terminal; Saldanha Bay iron ore terminal
• Inter-related project – Sishen-Saldanha iron ore rail, port, terminal (and mines)
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Large programme of inter-related projects and studies
C
C
C
Cape Town
Saldana Bay
Port Elizabeth
East London
Durban
Richards Bay
© Hatch Ltd 2013
Ngqura
Dry bulk terminal
*
*
* Project awards
Sishen/Beeshoek
Entrance widening
And many more concept, prefeasibility and feasibility studies
Iron ore
Container terminalContainer terminalManganese terminal
Container terminal
Car terminal
Iron ore
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
…and take all the empties back for re-use
..into 400 of these 150,000 ton vessels....via 2 of these…..over 860Km of this single track…
© Hatch Ltd 2013
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Oreline – South Africa’s 60mtpa iron ore export corridor
Upgrade the system from 24mtpa to 60mtpa without disrupting ongoing operations
Mine & process 60Mtpa … load and move 600,000 of these… in 3.5Km, 342 X 100t wagon trains..
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Critical Challenges
• Consistency and Control - ensure all studies and projects deliver to the overall
programme scope, schedule, budget and ... governance and standards
• Regulation & governance – PFMA, procurement, internal & external audit, gate reviews
• Capital cash flow projections – operations & projects
• Owner’s controls – SHERQ and procurement
• Multiple practices – project management, engineering, procurement, construction.....
• Terminology – prefeasibility, feasibility study
• Programme management – with various project management approaches
• Scale – ‘Mega’, ‘major’ projects, planning studies, execution projects
• Reporting – ‘tome’ vs. dashboard...
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Critical Challenges – Reporting MONTHLY PROJECT MANAGER'S DASHBOARD REPORT
Project Status (R / A / G):
Corridor: Current Budget (R billion):
Project No: Project Title: Project Start:
FEL Phase: 4 Project Manager: Forecast Project Completion:
Date of last assessment
Date of last LTI
% of planned observations achieved (current month)
Hrs current month
Date of last assessment
No. Findings
No. Closed
No. Open
Last environmental audit result
Date of las t environmental audit Date of last assessment
FFC of HMG managed scope in R'm (i.e. excludes deferred scope) (Note: negative indicates shortfall on budget)
(Note: negative indicates increase over baseline)
Has the FFC changed this month (y/n) y
Forecast Raised to date
Actual Rejected
Variance Approved
Variance % Under cons ideration Date of last maturity assessment
Project Start
1
2
3
4
5
6
7
8
9
Project Delivery Complete
Project Close-out complete
(Note: negative equals a reduction in days)
Has the critical path changed this month (y/n) n
Planned Progress
Actual Progress
Variance
(Note: negative equals under performance) Date of last maturity assessment
527 697Total Hrs to date
Latest
27 672
Actuals
Outstanding critical findings
R 0.0Forecast R 0.0 R 0.0FYTD Costflow Performance against Rev 10.1 baseline:
Forecast Forecast Major
0
Record of Decision 24-Apr-06
0
0
3
0 12
this month
3
31-Oct-06 0 0
ENVIRONMENTAL
ROD and EMP Milestone dates IncidentsNCR's
MilestoneBaseline
(yyyy/ mm / dd)Actual
EMP
Minor
last month
COST
R 0.0
2009/10
94%
Aug-08
12
R 0.0
Postmasburg:
Port Link & Salkor Yard:
Power Upgrade:
Yard Automation:
0
07-Mar-11
09-Apr-10
30-Jun-10
Wagon Jacking Station - H/O
to date
R 0.0
Original Approved
Changes
Current
Budget
Committed
R 0.0 R 0.0
R 0.0
R 0.0
R 0.0
0.8%
Current Baseline (latest CAPIC) R 0.0
Variance
106
84.7%
To date
21-Oct-10
8231-Aug-11
04-Oct-10
28-Oct-10
0
9
129
0.3%
-4.5%-0.8% -5.3%
19-Jul-11
1.1% 90.0%
Performance (Last Month)
22-Jun-10
Wagon Workshop - H/O
30-Jun-10Salkor Yard-H/O to Operations
Salkor Yard Access Rds - H/O
For month
Salkor Yard - Perway - H/O
30-Jun-10
Port Link - H/O to Operations
30-Jun-10
Salkor/Port - Yard Autom. - H/O
Salkor Yard - Earthworks - H/O
30-Jun-10
Port Link - Elec. Services - H/O
Budget / FFC
14
0
63
Total
92
SCHEDULE
R 0.0 R 0.0
Variance% 0%
Current forecast
No.
R 0.0R 0.0
0%
Current Target (Rev 10.1)
R 0.0
R 0.0
PCN's
R 0.0 R 0.0
31
R 0.0
25-Nov-10
0
R 0.0
R 0.0
0
0%
Change in
forecast C alenda r
D ays
Key Project Milestones
(Milestones, Gate Review s, Key
Peer Reviews etc.)
Latest
18-Feb-11
Value
(R'm)
11-Feb-11
Forecast
18-Mar-11
09-Feb-11
R 0.0
2013 +
R 0.0
Previous
R 0.0R 0.0
Annual cost flow forecast (R'm)
0%
R 0.0
Jul-09
120
0
-14
64
Practice Assessment
Latest
R 0.0
0%
25-Feb-11
19-May-11
12-Sep-11
0
21-Nov-11
87%
12
Current
baseline vs
forecast
0
120
62
125
42
this month
10-Feb-11
18-Apr-11
last month
03-Dec-10
12-Aug-10
04-Feb-11
0
16-Feb-11
0%
LTIFR
Dec-10
0
2012/13
VarianceFFC
R 0.0
Forecast
Prev.
FAC
1
LTI MTC
0 0
93%
Dominic Singery 20-Mar-12
Oreline R 0.000
500119
SAFETY
EXECUTIVE SUMMARY
Injuries for the month
R 0.0R 0.0
Project to date (200K hrs)
133 804Hrs since last LTI
to date
Expended
0.37
R 0.0
R 0.0
R 0.0
R 0.0
R 0.0
R 0.0
R 0.0
Budget
Prior Years
R 0.0
R 0.0 R 0.0 R 0.0 R 0.0
2010/11 2011/12
R 0.0
Actual
Current
Approved
Baseline
Original
Approved
Baseline
R 0.0
R 0.0R 0.0
R 0.0
0%
Variance
Cost Flow
this month
(R'm)
21-Oct-10
31-Aug-11
For month
21-Nov-11
26-Sep-11
30-Jun-10
28-Sep-10
Performance (This Month)
2.8% 87.5%
30-Jun-10
2.0% 92.0%
Previous
101
Movement this month
This month (to date)
0%
21-Nov-11
89%
Last month (to date)
Nov-09
R 0.0
R 0.0
Practice Assessment
93%
0%
Oreline Rail Expansion - Phase 1C 01-Sep-08
Compliance Audit
February-11
R 0.0
R 0.0
R 0.0
0
G
Practice Assessment
Previous Latest
Postmasburg:
Port Link & Salkor Yard:
Pow er Upgrade:
Yard Automation:
To date
19-May-11
20-Mar-1220-Mar-1210-Dec-11
16-Mar-11
92%
25-Feb-11
9
R 0.0
R 0.0
R 0.0
R 0.0
Project Cost Report (R'm) - to date
0
10-Dec-10
92% 83%
Jun-10
Jan-11
Practice Assessment
Latest
0
Obs.
0
Previous
PM Practice Assessment
Previous Latest
0% 84%
94%
Postmasburg:
Port Link & Salkor Yard:
Power Upgrade:
Yard Automation:
Dates of audits
Nov-10
Postmasburg:
Port Link & Salkor Yard:
Pow er Upgrade:
Yard Automation:
01-Sep-08
21-Nov-11
Nov-10
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0
10 000
20 000
30 000
40 000
50 000
60 000
70 000
Feb
-10
Mar-
10
Ap
r-10
Ma
y-1
0
Jun
-10
Jul-
10
Au
g-1
0
Se
p-1
0
Oct-
10
No
v-1
0
De
c-1
0
Jan
-11
LT
IFR
HR
S/M
on
th
Month
LTIFR Chart (12 month rolling)
Monthly Hrs Monthly LTIFR LTIFR Base Line
R 0
R 50
R 100
R 150
R 200
R 250
R 300
R 0
R 10
R 20
R 30
R 40
R 50
R 60
Ap
r-1
0
May
-10
Jun
-10
Jul-
10
Au
g-1
0
Se
p-1
0
Oct-
10
No
v-1
0
De
c-1
0
Jan
-11
Feb-1
1
Mar-
11
R' m
illi
on
(cu
mu
lati
ve)
R' m
illi
on
(m
on
thly
)
2010/2011 Cost Flow Performance against Rev 10.1 baseline
Monthly baseline 10.1
Monthly Actual
Month on Month Reforecast
Cumulative baseline 10.1
Cumulative forecast
Cumulative actual
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
0%
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%
11%
12%
13%
14%
15%
16%
17%
18%
Se
p-0
8
Oct-
08
No
v-0
8
De
c-0
8
Jan
-09
Feb
-09
Mar-
09
Ap
r-09
Ma
y-0
9
Jun
-09
Jul-
09
Au
g-0
9
Se
p-0
9
Oct-
09
No
v-0
9
De
c-0
9
Jan
-10
Feb
-10
Mar-
10
Ap
r-10
Ma
y-1
0
Jun
-10
Jul-
10
Au
g-1
0
Se
p-1
0
Oct-
10
No
v-1
0
De
c-1
0
Jan
-11
Feb
-11
Mar-
11
Ap
r-11
Ma
y-1
1
Jun
-11
Jul-
11
Au
g-1
1
Se
p-1
1
Oct-
11
Project Progress CurveCurrent monthly baseline
Monthly actual
Monthly reforecast
Current cumulative baseline
Cumulative forecast
Cumulative actual
Original cumulative baseline
Health & Safety
Environment
Cost
Schedule
PM Overall
Engineering, construction, risk, quality... overleaf
Show me how I am measured..
And I will show you how I will perform
Traffic Lights
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Dimensions
• Four dimensions
• Horizontal – Separate operations from projects;
programme > corridor > project > area.
• Vertical – Practices (Knowledge Areas) – PM, controls, engineering, etc.
• Depth – PLP phases – concept, prefeasibility, feasibility, execution, Close
• PMBoK Process Groups – Initiate, plan, execute, monitor & control, close each
study and project (Commercial, Setup, Execute, Controls, Close-out)
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
What to do and When to do it? (Scope, Schedule, Cost)W
ho
to
do
it
an
d H
ow
to
do
it?
(To
ols
, P
rocesses, P
eo
ple
)
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Programme, Project and Practice Matrix
Healthy Conflict
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
PLP Front End Loading phases
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
Project PLP Phases (& Process Groups)
FEL-1
Concept
FEL-2
Pre-feasibility
FEL-3 Feasibility
FEL-4 Execution
Discipline (Knowledge Area)
Setup
Execute
Close
Close
Execute
Setup
Close
Execute
Setup
Close
Execute
Setup
PM, Controls, Schedule, Cost, Quality, Resource, Risk, Communications, Procurement
* * * * * * * * * * * *
Engineering, Construction* * * * * * * * * * * *
Document Management, Health & Safety
* * * * * * * * * * * *
Environmental & Sustainable Development
* * * * * * * * * * * *
Business Case, Operational Readiness
* * * * * * * * * * * *
Industrial Relations, Legal Accountability
* * * * * * * * * * * *
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
PMBoK stages, practices and PLP phases
PMBoK
Large
Capital
Project
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Successful implementation
Looking back from a programme perspective...
1. Initiate: Owner/contractor integrated programme management organisation
2. Plan: Programme and practice functional execution plans, processes, templates,
procedures, systems/tools, PLP
3. Execute: Recruit and train the team, ‘embed’ the systems (tools, processes),
execute the projects
4. Monitor & control: Internal & external audit, acquisition council, monthly
dashboard & programme reporting
5. Close: Handover to owner’s programme management organisation
© Hatch Limited, 2011Pro
gra
mm
eIm
ple
men
tati
on
Ch
allen
ges &
Dim
en
sio
ns
Sweat and Tears Curve
TimeProject
Start
Project
Finish
Successful
projectUnsuccessful project
Leve
l o
f E
ffo
rt
Planning &
Setup phase
Construction &
Commissioning phase
IMPLEMENTATION CHALLENGES FOR LARGE PROGRAMMES OF PROJECTS
Successful implementation
Moira Moses, Group Executive, Transnet Capital Projects, 2012:
“.... the joint venture provided almost two thousand resources... Hatch is to be commended on the management of all aspects of human capital”
“Industrial relations was always top of mind... with the result that minimal time was lost across the programme, even during the strikes...”
“What was incredibly helpful for me was the quality, accuracy and consistency of the Hatch reporting system”
“Hatch has certainly delivered on its mandate and provided value for money”
“I would like to thank you and all of the Hatch team who have contributed to the Transnet build programme. It has been a privilege working with such a great group of people”
Fazeel Christian, Acting Project Director, Oreline, 2011:
“In the 2 years I’ve been involved in this project, I’ve been privileged to work with an excellent project team. .. Well done to the team and thanks once again on behalf of Transnet.“
Dave Bush, TCP Director Oreline Corridor, 2010:
“HMG JV is responsible for a paradigm shift within TCP when it comes to safety performance and HMG will leave a legacy behind within TCP as well as Transnet“
Hyperlink to video