TSS Report (3G)
Cover
A.Site Location Details
B1.BBU Equipment Implementation
B2.RRU Equipment Implementation
B3.Power Implementation
B4.Existing Transmission
B5.Tower & Ant Implementation
C1.Radio Frequency Part Sector#1
C2.Radio Frequency Part Sector#2
C3.Radio Frequency Part Sector#3
C4.Radio Frequency Part Sector#4
C5. Obstacle Diagram.
C6. Sketch plan of Rooftop site or Greenfield site (Top View,)
C7. Sketch Equipment Room Floor Plan Layout
D1. PHOTOS LIST (Indoor)
D2. PHOTOS LIST (Outdoor)
D3. PHOTOS LIST (RF)
Site Acquisition Reports
![Page 2: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/2.jpg)
ข้�อมู�ลตำ�แหน่ งที่��ตำ� �งสถน่ที่��
รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"ไฟฟ%รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"ส&�อส�ญญณ์เด�มู
แบบหล�งคหร&อแบบบน่ที่��ด�น่ที่��ตำ�ดตำ��งเสอกี่ศ
รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์" BBU รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์" RRU
รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"บน่tower
![Page 3: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/3.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
HSPA BFKT TSS Report
Site Id: CRI0002
Site Name: GRF /Ban Rong Suaten
![Page 4: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/4.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
HSPA BFKT TSS Report
![Page 5: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/5.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A1.Site Location Details ข้�อมู�ลตำ�แหน่ งที่��ตำ��งสถน่ที่��
Site ID CRI0002 Candidate A Region North
Site Name GRF /Ban Rong Suaten Building Name N/A Status N/A
Phase (2G) N/A Phase (3G) Ph.3
AddressN/A
Moo BanN/A
Trok/SoiN/Aบ้�น่เลข้ที่�� หมู� บ้�น่
RoadN/A
Tumbon/SubdistrictN/A
Amphur/Districtเมู&องถน่น่
ProvinceChiang rai
Postal Code57100
Telephone-
จั�งหวั�ด รห�สไปรษณี�ย์! โที่รศั�พที่!
19.9272 99.8416
Site Type
ประเภที่ข้องสถน่ที่�� อครส�ง พื้&�น่ที่��ว งเปล
Area Type
ล�กี่ษณ์ะชุ�มูชุน่ หน่แน่ น่ ปน่กี่ลง ชุน่เมู&อง ชุน่บที่Equipment Location Lease space Width (M)
8Length (M)
6Height (M)
N/Aตำ�แหน่ งที่��ตำ��งอ�ปกี่รณ์" พื้&�น่ที่��เชุ Antenna height AGL (M)
40Ground height ASL (M)
N/A
Survey Information:
Survey Date: 26-Aug-11
Function Name TMV Name
SA: (Site Acquisition) TMV
C&I: (Construction & Implementation) TMV
RF: (RF Engineer) TMV
TRSP: (Transmission Planning) TMV
Landlord Representative: TMV
Comments:
ตำรอก/ซอย์
ตำ�บ้ล/แข้วัง อ�เภอ/เข้ตำ
Coordinates Latitude(E): (WGS 84, FROM GPS WITH 3 SATELLITES, 5 DIGITS AFTER DECIMAL FOR DECIMAL FORMAT)
Coordinates Longitude(N): (WGS 84, FROM GPS WITH 3 SATELLITES, 5 DIGITS AFTER DECIMAL FOR DECIMAL FORMAT)
อครพื้ณ์�ชุย"/ตำ.กี่แถว
กี่ว�ง (เมูตำร ยว (เมูตำร) ส�ง (เมูตำร)
ควมูส�งข้องเสอกี่ศ เหน่&อระด�บพื้&�น่ด�น่ (เมูตำร) ควมูส�งข้องพื้&�น่ด�น่เหน่&อระด�บน่��ที่ะเล (เมูตำร)
Vendor /Subcon
ShopHouse Highrise Building Greenfield
Urban Suburban Rural
Indoor Outdoor
Dense Urban
![Page 6: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/6.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A2.Site Accessกรเข้�ออกสถน่ที่��
Accesstime
ระยะเวลเข้�ออกี่สถน่ที่��Contract Detail for Access Name
TMVTelephone
-บ�คคลตำ�ดตำ อเพื้&�อเข้�ออกี่สถน่ที่�� โที่รศ�พื้ที่"Parking
ที่��จอดรถ มู� ไมู มู�Access Route
เส�น่ที่งกี่รเข้�ออกี่ ใชุ�ที่งเข้�ออกี่สธรณ์ะ ใชุ�ที่งเข้�ออกี่ส วน่ตำ�ว สร�งที่งเข้�ออกี่แยกี่ตำ งหกี่Road Type
ชุน่�ดถน่น่ คอน่กี่ร�ตำ 5 เมูตำร ด�น่ เมูตำร ยงมูะตำอย เมูตำร อ&�น่ ๆ
ให� ไมู ให�
ให� ไมู ให�
Any Specific comments relating to access
ตำลอดเวล 24 ชุ��วโมูง 7 ว�น่ กี่�หน่ดเวลกี่รเข้�-ออกี่
ชุ&�อ - น่มูสกี่�ล
Is the site provider give the key to access the building/sites
เจ�ข้องสถน่ที่��ให�กี่�ญแจเข้�ออกี่อครหร&อไมู Is access to the site from the piblic road solely owned by the site provider
ที่งเข้�ออกี่จกี่ถน่น่สธรณ์ะไปย�งสถน่�เป4น่พื้&�น่ที่��ข้องเจ�ข้องสถน่ที่��คน่เด�ยวหร&อไมู
เข้�ออกี่ตำ�ดตำ อ TMV (GRF)ค�แน่ะน่�เพื้��มูเตำ�มูที่��เกี่��ยวข้�องกี่�บกี่รเข้�ออกี่สถน่ที่��
Concrete Soil Asphalt Other
24 hours, 7 days Limited Access
Yes No
Public Access Private Access Build Separate Access
Yes No
Yes No
![Page 7: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/7.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A2.Site Accessกรเข้�ออกสถน่ที่��
-
ไมู มู�
สร�งที่งเข้�ออกี่แยกี่ตำ งหกี่
เมูตำร
ไมู ให�
ไมู ให�
Other
Build Separate Access
![Page 8: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/8.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A3.Construction Detailsรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��ง
Staircase DimensionWidth (m.) 1 Height (m.) 1
ข้น่ดข้องบ�น่ไดElevator Dimension
Width (m.) N/A Length (m.) N/A Height (m.) N/Aข้น่ดข้องล�ฟที่"Elevator Load Capacity(Kg.)
N/Aน่��หน่�กี่บรรที่�กี่ข้องล�ฟที่"Access Door Dimension
Width (m.) 2.4 Length (m.) N/A Height (m.) N/Aข้น่ดข้องประตำ�ที่งเข้�Road Type
คอน่กี่ร�ตำ 5 เมูตำร ด�น่ เมูตำร ยงมูะตำอย เมูตำร อ&�น่ ๆ
ชุน่�ดข้องพื้&�น่ถน่น่Is parking available for construction vehicles?
มู� ไมู มู�Building Type
ประเภที่ข้องอคร คอน่กี่ร�ตำ ไมู� คอน่กี่ร�ตำ และ ไมู� อ&�น่ ๆ
Condition of building and rooftop
สภพื้ข้องอครและดดฟ% ด� พื้อใชุ� ไมู ค อยด� อ&�น่ ๆNumber of Floors
Floor(s) N/Aจ�น่วน่ชุ��น่Building Age
Year(s) N/Aอย�ข้องอครGeneral Comments relating to construction
รยละเอ�ยดที่��วๆไปเกี่��ยวกี่�บกี่รตำ�ดตำ��ง
ที่��จอดรถเพื้�ยงพื้อส�หร�บรถข้น่อ�ปกี่รณ์"ตำ�ดตำ��ง
Yes No
Concrete and timber OtherConcrete Timber
FairGood Poor Other
![Page 9: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/9.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A3.Construction Detailsรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��ง
1
N/A
N/A
N/A
เมูตำร
ไมู มู�
อ&�น่ ๆ
อ&�น่ ๆ
N/A
N/A
Other
Other
![Page 10: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/10.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
NodeB Site type (Marco or IBC)
NodeB configuration
Site type
Floor Type
พื้&�น่ห�น่กี่รวด
Room dimension (LxWxH) meter. L (m) : 2.1 W (m) : 3.2 H (m) : 3
There’s space for BBU
BBU DC power cable length / PGND Length BBU DC power cable (m) : 2 BBU PGND power cable (m) : 5
Trunk cable with the Iub interface Trunk cable length (m) :
LAN cable with the Iub interface LAN cable length (m) : 2
Optic cable with the Iub interface Optic cable length (m) : 15 Peer end connector type : LC/FC
Type of DDF (to connect with)
How many available port :
Alarm Cable Cable Length (m) : 2 Capacity of existing DDF :
Comments of Implementation Team :
B1.BBU Equipment Implementation รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี! BBU
How to install BBU(H86mm x W442mm x D310mm, 12kg/BBU)
กี่รตำ�ดตำ��ง BBU
Peer end connector type(If any) :
Peer end connector type(If any) :
Location of New DDF(In case of new DDF)
Tie E1 cable(In case of Tie from New to Existing DDF)
Macro IBC (Pico)
S1 S1/1/1S1/1 S1/1/1/1
Existing Room Building Roof top Container Building Container Greenfield
Sun Shelter RoofTop Sun Shelter Greenfield Other :
Container FL Cement FL Raised FL Wooden FL
Other:
Yes No
Existing DDF Panel Existing DDF Box
New DDF panel New DDF Box (Wall) Other :
Need Length (m) :No Need
19' Rack
APM30
Eltek Outdoor
Emerson Outdoor Emerson Indoor Other :
No Need (Use Existing) DDF panel in 19' rackDDF panel in APM30 DDF panel in EltekDDF panel in Emerson DDF Box on wall
Other
Eltek Indoor
![Page 11: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/11.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Sector S1 S2 S3 S4
Space for RRU 850 MHz
How to install HW RRU
Installation kit for RRU 3804 model
Structure Modification for RRU Needed
There's space for New Antenna (at least 2.6m height)
Structure modification for New Antenna needed
60 60 60
Ground Bar for RRU
Length of Ground Cable RRU 15 m. 15 m. 15 m. m.
Length of Ground Cable Filter m. m. m. m.
2 2 2
N/A N/A N/A
Comments of Implementation Team
B2.RRU Equipment Implementationรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี! RRU
Space Available for RRU on existing structure (RRU 3804: 485mm x 285mm x 170mm, 20kg/RRU)
Length of power cable RRU (RRU-DC ) ( m)
Length of Optic Cable(BBU to RRU) ( m)
Jumper Length between RRU and Ant (m)(Not over 14m)
Feeder 7/8' Length (m)In case, lower jumper > 14m
Jumper Length between RRU and Ant / combiner (Not over 14m) ควมูยวข้องสย Jumper
Space available for 2.1GHz in future (in case need modification of structure, take final result)
Space available for MIMO additional 3G RRU (in case need modification of structure, take final result)
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
2 5
10 20
30 40
50 60
70120
Other :
100150
2 5
10 20
30 40
50 60
70120
Other :
100150
2 5
10 20
30 40
50 60
70120
Other :
100150
2 5
10 20
30 40
50 60
70120
Other :
100150
Distribution Centralized
PoleTowerWall
Ladder
Open Rack
Other :
PoleTowerWall
Ladder
Open Rack
Other :
PoleTowerWall
Ladder
Open Rack
Other :
PoleTowerWall
Ladder
Open Rack
Other :
10 2030 40
50 70
100
Other:
10 20
30 40
50 70
100
Other:
10 20
30 40
50 70
100
Other:
10 20
30 40
50 70
100
Other:
No need
2m. 3 เส�น่2m. 2 เส�น่
No need
2m. 3เส�น่2m. 2 เส�น่
No need
2m., 3 เส�น่2m. 2 เส�น่
No need
2m. 3 เส�น่2m. 2 เส�น่
![Page 12: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/12.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ไฟฟ,
A
Sector S1 S2 S3
A A
Additional Rectifier needed for long BBU-RRU distance?N/A N/A N/A
Power Mode DC available? (Y/N)
How many independence DC power
Total Power Supply Capacity (A) A
Remaining Power Current (A) A
Capacity of existing battery (AH) AH
Add New AC Breaker (pcs) 1 pcs
Power input for AC Power Cabinent
AC power cable length 15 meter
PGND cable length 15 meter
รย์ละเอ�ย์ดกรป-กเสไฟฟ,
เจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่
ที่งรถไฟ รยละเอ�ยดเพื้��มูเจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่
Comments of Implementation Team
B3.Power Implementation
Power Consumption of BBU (Max. 250W, Typical</=100W)
Power Consumption per RRU (20W/40W): 210W/240W
Existing DC Circuit breakers available If yes how many slot leave
1. เสไฟฟ%ป5กี่ใน่โฉน่ดที่��ด�น่แปลกี่ที่��เชุ เที่ น่��น่ 1.1 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��
1.2 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��1.3 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��
2. กี่รเด�น่สยไฟฟ%มู�กี่รข้�มู/ พื้ด ผ่ น่อะไรบ�ง
2.1 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��2.2 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��
Yes No
1 2
Y (>/= 4 slot) Y (>8 slot)
Container FL Cement FL Raised FL Wooden FL
Single Phase Three Phase
ใชุ / ไมู ใชุ โปรดกี่รอกี่รยละเอ�ยดเพื้��มู
ถน่น่ คลอง /ที่��ด�น่ผ่��อ&�น่ โปรดกี่รอกี่
![Page 13: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/13.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
![Page 14: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/14.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ไฟฟ,
A
S3 S4
A A
N/A
A
A
AH
pcs
meter
meter
*
*
*
*
รยละเอ�ยดเพื้��มู *
*
*
No
2
No (<4 slot)
Raised FL Wooden FL Other
Other
/ ไมู ใชุ โปรดกี่รอกี่รยละเอ�ยดเพื้��มู
/ที่��ด�น่ผ่��อ&�น่ โปรดกี่รอกี่ อ&�น่
![Page 15: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/15.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
![Page 16: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/16.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
B4.IPRAN Transmission
Transmission Implementation
Infrastructure of Transmission (LL, MW, Optic)
IPRAN equipment DC power cable length / PGND Length DC Power Cable (m.) PGND power cable (m.)
2 2
Patch Cord Cable (m.) Peer End Connector type ______
10 LC/FCLAN cable for Downlink interface, length (m)
LAN Cable (m.) Peer End Connector type ______ (if any)
2 RJ45How many available port
Location of New DDF
Tie E1 cable
Length(m.)
Location of New ODF
DDF or ODF PGND length PGND power cable (m.)
5Comments of Transmission Team
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ส.�อส�ญญณี IPRAN
There're space for IPRAN equipment มู�ที่&�น่ที่��ตำ�ดตำ��งอ�ปกี่รณ์" IPRAN
How to install IPRAN equipment (PTN910) กี่รตำ�ดตำ��งอ�ปกี่รณ์" IPRAN
PTN910: 442 (W) x 220 (D) x 1 U(H)
ควมูยวสยไฟ และ สยกี่รวด"ข้องอ�ปกี่รณ์" IPRAN (PTN910)
Optic cable for Uplink interface, length (m)
ควมูยวข้องสย LAN และประเภที่ห�วตำ อ
Type of DDF (to connect with) ประเภที่ข้อง DDF
Type of DDF ประเภที่ข้อง DDF
ถ�ตำ�องกี่ร DDF ใหมู ตำ�องกี่รแบบ
ตำ�องมู� สย Tie E1 ระหว ง DDF เด�มูกี่�บข้องใหมู หร&อไมู
ถ�ตำ�องกี่ร ODF ใหมู ตำ�องกี่รแบบ
LL MW Optic
Yes
No
19” Rack
21” Rack
23” Rack
APM30
Emerson
Eltek
Existing DDF Panel
Existing DDF Box
New DDF Panel
New DDF Box (Wall)
75 Ohm 120 Ohm
No Need (Use Existing) DDF panel in 19' rack
DDF panel in APM30
DDF panel in 23' rackDDF panel in 21' rack
Other
Need No Need
No Need (Use Existing) ODF panel in 19' rack
ODF panel in APM30
ODF panel in 23' rackODF panel in 21' rack
Other
Etc.
Wall Mount
![Page 17: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/17.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
B4.IPRAN Transmission
Transmission Implementation
2
LC/FC
Peer End Connector type ______ (if any)
RJ45
5
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ส.�อส�ญญณี IPRAN
DDF panel in 19' rack
DDF panel in 23' rack
Other
No Need
ODF panel in 19' rack
ODF panel in 23' rack
Other
Etc.
Wall Mount
![Page 18: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/18.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Building height (m) from earth
Tower type
Tower height (m.)
40 m From tower ground to top of tower
Existing Antenna height (m 40 m From tower ground (Not include building)
New Antenna height (m) 40 m From tower ground (Not include building)
Height from floor level to bottom of antenna 39 m From tower ground to bottom of antenna (Not include building)
Total New Antenna height (m) 40 m Ant to Earth
RRU height (m) from tower ground 39 m RRU to ground
Existing 2G Antenna height (m
New 3G Antenna mounting Type
New Structure Type (if applicable)
Comments of Implementation Team
B5.Tower & Ant Implementation
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!บ้น่ TOWER
Can existing structure support new configuration (Yes/No)
Pole Guyed Mast Self Support Wall Mout OtherElectrical Pole
A B C D Special Modify
Type 1.1
Type 2.1
Type 3 (2G/3G Single RAN that can reduce antenna)
Special Modify (Remark) ______________________
Yes No
Pole Guyed Mast Self Support Wall Mout
Other
Electrical Pole
Type 1.2 (Need Retrofit) Type 1.3 (Additional New Pole)
Type 2.2 Type 2.3
togetherwe can makeit convergence Type 1 (Add)
Before
After
2G
3G(850)
2G 2G
3G (850)
2G 2G
Vertical position preferred
togetherwe can makeit convergence
Type 2.1, 2.2, 2.3 (Swapped)
Type 2.2
Before
2G 3G (850)
2G 2G
3G (850)
Type 2.1(Swap and add)
2G 2G
2G
2G 2G3G (850)
Vertical Horizontal
3G
Type 2.3
3G 3G
![Page 19: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/19.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
STUB23
m From tower ground to top of tower
m From tower ground (Not include building)
m From tower ground (Not include building)
m From tower ground to bottom of antenna (Not include building)
m Ant to Earth
m RRU to ground
B5.Tower & Ant Implementation
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!บ้น่ TOWER
Special Modify
Electrical Pole
Type 1.3 (Additional New Pole)
![Page 20: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/20.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C1.Radio Frequency Part Sector#1
RF Sector1Antenna And Feeder System Implementation – Sector 1
Existing 2G New 3G
Antenna Type: UMWD 06516 2D 5473_800_ET02
Coverage Objective: 65 80
Number of Antennae: 1 1
Antenna Orientation: 10 10
Mechanical Tilt: 0 2
Electrical Tilt: 2 2
RET Installed
Height to Middle of Antenna: (Antenna Height) 40 40
Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER
Antenna Support Height: 40 40
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable) 15 8 N/A
Feeder Length: (m) N/A N/A
Space Available for antenna of 3G 2.1GHz N/A
Filter N/A N/A
TMA N/A N/A
Diplexer N/A N/A
Comment of Sector1:
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
![Page 21: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/21.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C1.Radio Frequency Part Sector#1
RF Sector1Antenna And Feeder System Implementation – Sector 1
New 3G
5473_800_ET02
80
1
10
2
2
40
D: N/A m
TOWER
40
1
N/A
N/A
*
N/A
N/A
N/A
No
No
![Page 22: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/22.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C2.Radio Frequency Part Sector#2
RF Sector2Antenna And Feeder System Implementation – Sector 2
Existing 2G New 3G
Antenna Type: UMWD 06516 2D 5473_800_ET02
Coverage Objective: 65 80
Number of Antennae: 1 1
Antenna Orientation: 120 100
Mechanical Tilt: 0 2
Electrical Tilt: 2 2
RET Installed
Height to Middle of Antenna: (Antenna Height) 40 40
Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER
Antenna Support Height: 40 40
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable) 15 8 N/A
Feeder Length: (m) N/A N/A
Space Available for antenna of 3G 2.1GHz N/A
Filter N/A N/A
TMA N/A N/A
Diplexer N/A N/A
Comment of Sector2 :
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
![Page 23: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/23.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C2.Radio Frequency Part Sector#2
RF Sector2Antenna And Feeder System Implementation – Sector 2
New 3G
5473_800_ET02
80
1
100
2
2
*
40
D: N/A m
TOWER
40
1
N/A
N/A
*
N/A
N/A
N/A
No
No
![Page 24: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/24.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C3.Radio Frequency Part Sector#3
RF Sector3Antenna And Feeder System Implementation – Sector 3
Existing 2G New 3G
Antenna Type: PCSD18 09015 2D 5473_800_ET02
Coverage Objective: 65 90
Number of Antennae: 2 1
Antenna Orientation: 240 240
Mechanical Tilt: 0 2
Electrical Tilt: 2 4
RET Installed
Height to Middle of Antenna: (Antenna Height) 40 40
Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER
Antenna Support Height: 40 40
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable) 15 8 N/A
Feeder Length: (m) N/A N/A
Space Available for antenna of 3G 2.1GHz N/A
Filter N/A N/A
TMA N/A N/A
Diplexer N/A N/A
Comment of Sector3 :
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
![Page 25: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/25.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C3.Radio Frequency Part Sector#3
RF Sector3Antenna And Feeder System Implementation – Sector 3
New 3G
5473_800_ET02
90
1
240
2
4
*
40
D: N/A m
TOWER
40
1
N/A
N/A
*
N/A
N/A
N/A
No
No
![Page 26: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/26.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C4.Radio Frequency Part Sector#4
RF Sector4Antenna And Feeder System Implementation – Sector 4
Existing 2G New 3G
Antenna Type:
Coverage Objective:
Number of Antennae:
Antenna Orientation:
Mechanical Tilt:
Electrical Tilt:
RET Installed
Height to Middle of Antenna: (Antenna Height)
Antenna Distance from Edge of Bldg (see picture below) H:
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower)
Antenna Support Height:
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable)
Feeder Length: (m)
Space Available for antenna of 3G 2.1GHz
Filter
TMA
Diplexer
Comment of Sector4 :
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
![Page 27: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/27.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C4.Radio Frequency Part Sector#4
RF Sector4Antenna And Feeder System Implementation – Sector 4
New 3G
*
m D: m
*
Yes No
Vertical (m)
Horizontal (m)
Yes No
![Page 28: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/28.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C5. Obstacle Diagram.
#
1 N/A
2 N/A
3 N/A
4
5
ถ�ไมู มู�ส��งกี่�ดข้วงกี่ร�ณ์ ใส X ใน่กี่ล องที่งซ้�ยมู&อObstacles: describe all obstructing obstacles within 500 meters,
which are of a height equal to or higher than the siteส��งกี่�ดข้วง: อธ�บยถ.งส��งกี่�ดข้วงภยใน่ร�ศมู� 500 เมูตำร ซ้.�งมู�ควมูส�งเที่ หร&อ ส�งกี่ว สถน่�
Azimuthที่�ศที่ง
Distanceระยะที่ง
Height AGLควมูส�งเหน่&อพื้&�น่ด�น่
200m
100m
0
30
60
90
120
150
240
210
180
300
330
270
N
300m
400m
500m
(If there are no obstacles mark here with a "X"
![Page 29: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/29.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
6
![Page 30: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/30.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
ถ�ไมู มู�ส��งกี่�ดข้วงกี่ร�ณ์ ใส X ใน่กี่ล องที่งซ้�ยมู&อObstacles: describe all obstructing obstacles within 500 meters,
which are of a height equal to or higher than the site อธ�บยถ.งส��งกี่�ดข้วงภยใน่ร�ศมู� 500 เมูตำร ซ้.�งมู�ควมูส�งเที่ หร&อ ส�งกี่ว สถน่�
Descriptionรยละเอ�ยด
200m
100m
0
30
60
90
120
150
240
210
180
300
330
270
N
300m
400m
500m
(If there are no obstacles mark here with a "X"
![Page 31: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/31.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
![Page 32: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/32.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C6. Sketch plan of Rooftop site or Greenfield site (Top View,)
แบ้บ้หล�งคหร.อแบ้บ้บ้น่ที่��ด)น่ที่��ตำ)ดตำ��งเสอกศั(Remember to indicate North direction on the sketch)
โปรดระบ้*ที่)ศัเหน่.อบ้น่แบ้บ้1. Please identify proposed location of guy anchor and antennas
โปรดระบ้*ตำ�แหน่ งคร วัๆ ข้องกรตำ)ดตำ��งเสอกศั2. Please include location of any other antennas
โปรดระบ้*ตำ�แหน่ งข้องเสอกศัอ.�น่ที่��ตำ)ดตำ��งอย์�
Before
After
![Page 33: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/33.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C6. Sketch plan of Rooftop site or Greenfield site (Top View,)
แบ้บ้หล�งคหร.อแบ้บ้บ้น่ที่��ด)น่ที่��ตำ)ดตำ��งเสอกศั(Remember to indicate North direction on the sketch)
โปรดระบ้*ที่)ศัเหน่.อบ้น่แบ้บ้
![Page 34: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/34.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C7. Sketch Equipment Room Floor Plan Layout
1. Please identify proposed location of all new Equipment2. Please include location of existing Equipment
![Page 35: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/35.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C7. Sketch Equipment Room Floor Plan Layout
![Page 36: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/36.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
D1. PHOTOS LIST (Indoor)
Access Road
Front site/building view
![Page 37: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/37.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Site Drawing View
Check AC main breaker and DC PDB slot
Addto new CB 50 A
![Page 38: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/38.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
DC power supply
N/A
DC Equipment Ground BAR
![Page 39: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/39.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
Feeder window hole
N/A
Transmission, DDF and connector type
![Page 40: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/40.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
Room Free Space - 1
N/A
Room Free Space - 2
![Page 41: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/41.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
APM30 or 19’ New Rack location (if any)
BBU Equipment location
NEW Eltex
![Page 42: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/42.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Indoor Cable ladder
![Page 43: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/43.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
D2. PHOTOS LIST (Outdoor)
RRU Location Sector1
RRU Location Sector2
2G
3G
3G
2G
![Page 44: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/44.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
RRU Location Sector3
RRU Location Sector4 (If any)
3G
2G
![Page 45: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/45.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Outdoor Cable ladder
Outdoor groung bar
![Page 46: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/46.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Tower ground bar
Outdoor feeder tray
![Page 47: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/47.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Feeder installation standard
Feeder Clamp installation standard
![Page 48: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/48.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Rooftop Front site view
Rooftop Back site view
![Page 49: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/49.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Rooftop Right site view
Equipment mounted (if any)
![Page 50: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/50.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
D3. PHOTOS LIST (RF)
Panoramic 0 Degree
Panoramic 30 degree
![Page 51: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/51.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
![Page 52: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/52.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 60 degree
Panoramic 90 degree
Panoramic 120 degree
![Page 53: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/53.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 150 degree
Panoramic 180 degree
![Page 54: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/54.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 210 degree
Panoramic 240 degree
![Page 55: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/55.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 270 degree
Panoramic 300 degree
![Page 56: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/56.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 330 degree
Antenna Location Sector1
![Page 57: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/57.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Antenna Location Sector2
Antenna Location Sector3
![Page 58: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/58.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
Antenna Location Sector4 (If any)
Sector1 10 Degree view
![Page 59: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/59.jpg)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Sector2 100 Degree view
Sector3 240 Degree view
![Page 60: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/60.jpg)
Site ID ______ Site Name ________ Candidate___ Phase3G ___ ___ Date ______
Site Acquisition Reports
Please remember to check the following on first visit.
No Description Check
1 Equipment Type & Location
2 Antenna Height and Type
3
4 Power to run equipment (MDB, AC breaker Brand, Spare slots)
5 Height of structure (use 50m tapes to get accurate measurement)
6 Description of how to get to site written from major point of town or road junction.
7 Space available indoor or on the roof or mast.
8 Owners name and address and if we have 24 hour access (if not who has the keys)
and correct in all the information you write into this SAR).
Photos and more photos included access, danger points, power out let, 360 degree photos from roof every 30 degrees. Photo everything!!!!
IMPORTANT – take your time, do not leave the site before you have collected all the information !!
REMEMBER – the information you collect must be understood by other people as well (be short, precise
![Page 61: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/61.jpg)
Annex 9-1.5 TSSR form (excel)
1 Site info2 Equipment3 RF
![Page 62: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/62.jpg)
Site ID A1. Site Location Details Site ID Candidate RegionBKAxxx1 CRI0002A NorthBKAxxx2BKAxxx3BKAxxx4
![Page 63: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/63.jpg)
Site Name Building Name Status Phase (2G) Phase (3G) Address Moo Ban Trok/SoiGRF /Ban RoN/A N/A N/A Ph.3 N/A N/A N/A
![Page 64: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/64.jpg)
Road Tumbon/Subdistrict Amphur/District Province Postal Code Telephone Lattiude(E)N/A N/A เมู&อง Chiang rai 57100 - 19.9272
![Page 65: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/65.jpg)
Longitude(N) Site Type Area Type Equipment Location Antenna Height AGL99.8416 ShopHouse Urban 40
![Page 66: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/66.jpg)
Ground Height ASL Survey Date SA Name C&I Name RF Name TRSP NameN/A 26/8/54
![Page 67: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/67.jpg)
Landlord Representation Comment A2. Site Access Access Time
![Page 68: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/68.jpg)
Contact Detail for access Parking Access route Road Type Key to access the buildingTMV : -
![Page 69: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/69.jpg)
Public road to site Site access comment A3. Site Provider Details Name Address
![Page 70: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/70.jpg)
Moo Ban Trok/Soi Road Tumbon/Subdistrict Amphur/District Province Postal Code
![Page 71: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/71.jpg)
Telephone Mobile Fax Type of Ownership Site Provider's Interest General Comments
![Page 72: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/72.jpg)
A4. Agent Contact Details Name Company Name Telephone Mobile Fax
![Page 73: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/73.jpg)
General Comments A5. Acquisition Details Estamate Rent
![Page 74: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/74.jpg)
Estimate acquistion timescale Under Mortgage Standard Lease
![Page 75: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/75.jpg)
Any acquisition requirements General Comments relating to Acquisition
![Page 76: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/76.jpg)
A6. Existing Infrastruction & Co-location Operator/Owner Antenna Type
![Page 77: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/77.jpg)
Distance from site Height A7. Site Hazard Details Underground cables
![Page 78: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/78.jpg)
Underground pipes Tripping hazards Slippery Surfaces Unprotected Staircase Animal
![Page 79: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/79.jpg)
Dangerous fumes Unprotected skylights Unprotected Edges
![Page 80: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/80.jpg)
A8. Construction Details Staircase dimension Elevator demension1 : 1 N/A : N/A : N/A
![Page 81: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/81.jpg)
Elevator Load Capacity Access Dorr Dimension Space available for craneN/A 2.4 : N/A : N/A 5
![Page 82: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/82.jpg)
Parking available for vehicles Building Type Condition of Building and rooftop
![Page 83: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/83.jpg)
General Comments relating to Construction A9. Power Authorities Company Name
![Page 84: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/84.jpg)
Contact Person Address Moo Ban Trok/Soi Road Tumbon/Subdistrict Amphur/District
![Page 85: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/85.jpg)
Province Postal Code Telephone Mobile Fax Existing Power Supply Supply Tye
![Page 86: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/86.jpg)
Power Detail Distance to Power Supply The Power Supply has to cross
![Page 87: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/87.jpg)
Describe ground conditions General Comments relating to Power
![Page 88: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/88.jpg)
Site ID B1. BBU Equipment Implementation NodeB Site TypeBKAxxx1BKAxxx2BKAxxx3
![Page 89: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/89.jpg)
NodeB Configuration Site Type Site Type (other) Floor Type Floor Type (other)
![Page 90: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/90.jpg)
Room Dimension Space for BBU How to install BBU2.1x3.2x3
![Page 91: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/91.jpg)
BBU DC Power Cable Length BBU PGND Power Cable Length2 5
![Page 92: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/92.jpg)
Trunk cable with the lub interface_Length
Trunk cable with the lub interface_Peer end connector type
![Page 93: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/93.jpg)
2
LAN cable with the lub interface_Length
LAN cable with the lub interface_Peer end connector type
![Page 94: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/94.jpg)
Type of DDF15 LC/FC
Optic cable with the lub interface_Length
Optic cable with the lub interface_Peer end connector type
![Page 95: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/95.jpg)
Type of DDF (other) Location of new DDF Tie E1 CableHow many available port of existing DDF
![Page 96: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/96.jpg)
Tie E1 Cable_Length Alarm Cable Length2
Alarm Cable_Capacity of existing DDF
![Page 97: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/97.jpg)
Comments of Implemntation Team B2. RRU Equipment Implementation SectorS1S2S3S4
![Page 98: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/98.jpg)
Space for RRU 2100 MHz Space available for RRU on existing structure
![Page 99: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/99.jpg)
How to install HW RRU Installation kit for RRU xxx model
![Page 100: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/100.jpg)
Structure Modification for RRU Needed Space for New Antenna
![Page 101: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/101.jpg)
Structure Modification for new Antenna Needed Length of Power Cable RRU
![Page 102: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/102.jpg)
Ground Bar for RRU Length of Optic Cable Jumper Length between RRU and Ant222
![Page 103: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/103.jpg)
Feeder 7/8" Fix-Length Top Jumper Length of Power Cable RRUN/AN/AN/A
![Page 104: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/104.jpg)
Space available for MIMO additonal 3G RRU Comments of Implementation Team
![Page 105: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/105.jpg)
B3. Power Implementation Power Consumption of BBU xxxx SectorS1S2S3S4
![Page 106: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/106.jpg)
Power Consumption RRU Additional Rectifier needed for long BBU-RRU distance0 N/A0 N/A0 N/A0
![Page 107: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/107.jpg)
Power Mode DC available Independence DC Power Total Power Supply Capacity
![Page 108: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/108.jpg)
Remaining Power Current Capacity of existing battery Existing DC Circuit Breakers available
![Page 109: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/109.jpg)
Add New Breaker Cabinet Basement Power input for Power Cabinet AC Power Cable Length1 15
![Page 110: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/110.jpg)
Comments of Implemntation Team B4. Existing Transmission
![Page 111: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/111.jpg)
Infrastructure of Transmission Transmission Connection with Leased Line
![Page 112: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/112.jpg)
Using Optic Fiber Solution Internal Copper Wire Space for ODF
![Page 113: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/113.jpg)
Space for ADM/Switch Node Existing Transmission Interface Type of Existing Transmission
![Page 114: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/114.jpg)
Communication Sites Surrounding Comments of Implemntation Team#REF!
![Page 115: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/115.jpg)
B5. Tower & Antenna Implementation Building Height from Earth Tower Type#REF!
![Page 116: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/116.jpg)
Tower Height Existing Antenna Height New Antenna Hegith#REF! #REF! #REF!
![Page 117: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/117.jpg)
Height from floor level to bottom of antenna Total New Antenna Height#REF! #REF!
![Page 118: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/118.jpg)
RRU Height from Tower Ground Existing 2G Antenna Mounting Type#REF!
![Page 119: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/119.jpg)
New 3G Antenna Mounting Type Existing Structure Support New Configuration
![Page 120: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/120.jpg)
New Structure Type Comments of Implemntation Team#REF!
![Page 121: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/121.jpg)
Site C1. Radio Frequency Part Sector1 Antenna TypeCRI0002 Existing 2G UMWD 06516 2
New 3G 5473_800_ET02
![Page 122: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/122.jpg)
Coverage Objective Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt65 1 10 0 280 1 10 2 2
![Page 123: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/123.jpg)
RET Installed Height to Middle of Antenna Antenna Distance from Edge of Building40 N/A40 N/A;N/A
![Page 124: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/124.jpg)
Antenna Support Type Antenna Support Height Isolation requirement for 3G AntennaTOWER 40TOWER 40
![Page 125: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/125.jpg)
Feeder Type Feeder Length Filter TMA Dipixer Comment of Sector115 8 N/A N/A N/A N/AN/A N/A N/A N/A N/A
![Page 126: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/126.jpg)
C2. Radio Frequency Part Sector2 Antenna Type Coverage ObjectiveUMWD 06516 2 655473_800_ET02 80
![Page 127: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/127.jpg)
Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt1 120 0 21 100 2 2
![Page 128: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/128.jpg)
Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type40 N/A TOWER40 N/A;N/A TOWER
![Page 129: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/129.jpg)
Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length40 15 8 N/A40 N/A N/A
![Page 130: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/130.jpg)
Filter TMA Dipixer Comment of Sector2N/A N/A N/AN/A N/A N/A
![Page 131: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/131.jpg)
C3. Radio Frequency Part Sector3 Antenna Type Coverage ObjectivePCSD18 09015 655473_800_ET02 90
![Page 132: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/132.jpg)
Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt2 240 0 21 240 2 4
![Page 133: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/133.jpg)
Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type40 N/A TOWER40 N/A;N/A TOWER
![Page 134: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/134.jpg)
Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length40 15 8 N/A40 N/A N/A
![Page 135: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/135.jpg)
Comment of Sector3 Filter TMA DipixerN/A N/A N/AN/A N/A N/A
![Page 136: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/136.jpg)
C4. Radio Frequency Part Sector4 Antenna Type Coverage Objective
![Page 137: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/137.jpg)
Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt
![Page 138: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/138.jpg)
Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type
;
![Page 139: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/139.jpg)
Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length
![Page 140: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/140.jpg)
Comment of Sector4 Filter TMA Dipixer C5. Obstacle Diagram
![Page 141: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/141.jpg)
Obstacle surrounding Azimuth Distance Geight AGL DescriptionYes N/A 0 0 0
N/A 0 0 0N/A 0 0 0
0 0 0 00 0 0 00 0 0 0
![Page 142: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/142.jpg)
TSSR Summary CRI0002
Err:508 Site Name GPS Data Lat-Long Site Type Area Type
CRI0002 GRF /Ban Ro 19.9272 99.8416
![Page 143: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/143.jpg)
Equipment Location Lease space (WxLxH) m.
outdoor 8 6 N/A Macro Other
NodeB Site type (Marco or IBC)
NodeB configuration
![Page 144: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/144.jpg)
Cabinet for install BBU
0 2 5 0
NodeB configuration
BBU DC power cable length (m.)
BBU PGND Cablelength (m.)
Trunk Cablelength (m.)
![Page 145: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/145.jpg)
Type of DDF
0 15 0 0 2
LAN Cable length(m.)
Patch CordSingle ModeFC-LC (m.)
Tie E1 cablelength (m.)
AlarmCable (m.)
![Page 146: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/146.jpg)
40 60 40 60 40 60 0 300
RRU DC Power cable Sector1 (m.)
RRU DC Power cable Sector2 (m.)
RRU DC Power cable Sector3 (m.)
RRU DC Power cable Sector4 (m.)
Over All RRUDC Power cable (m.)
![Page 147: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/147.jpg)
7 7 7
RRUGround Cable LengthSector1 (m.)
RRUGround Cable LengthSector2 (m.)
RRUGround Cable LengthSector3 (m.)
![Page 148: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/148.jpg)
0 21 0
RRUGround Cable LengthSector4 (m.)
Over All RRUGround Cable Length (m.)
Filter Ground Cable Sector1 Length (m.)
![Page 149: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/149.jpg)
0 0 0
Filter Ground Cable Sector2 Length (m.)
Filter Ground Cable Sector3 Length (m.)
Filter Ground Cable Sector4 Length (m.)
![Page 150: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/150.jpg)
0 40 40 40
OverallFilter Ground CableLength (m.)
CPRI MM LC-LCCable Length (m.)Sector 1
CPRI MM LC-LCCable Length (m.)Sector 2
CPRI MM LC-LCCable Length (m.)Sector 3
![Page 151: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/151.jpg)
CPRI MM LC-LCCable Length (m.)Sector 4
Jumper lengthRRU to Ant Sector 1 (m.)
Jumper lengthRRU to Ant Sector 2 (m.)
Jumper lengthRRU to Ant Sector 3 (m.)
2m. 2 เส�น่ 2m. 2 เส�น่ 2m. 2 เส�น่
![Page 152: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/152.jpg)
Yes 1 15 15
Jumper lengthRRU to Ant Sector 4 (m.)
Power Mode AC available? (Y/N)
Add New Breaker
AC Power Cable Length (m.)
PGND Cable length (m.)
![Page 153: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/153.jpg)
Sector 1
RET Filter
Kathrein 800 10305 Type 1.1 No 40
Antenna Type
Antenna Scenario
AntennaHeightfrom ground (m.)
![Page 154: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/154.jpg)
Sector 1 Sector 2
RET
0 1 Kathrein 800 10305 Type 1.1 No
Isolation from2G Ant. requirement for 3G Antenna installation:
Vertical (m.)At least 0.5 meter
Hoizontal (m.)At least 0.4 meter
Antenna Type
Antenna Scenario
![Page 155: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/155.jpg)
Sector 2
Filter
No 40 0 1
Isolation from2G Ant. requirement for 3G Antenna installation:
AntennaHeightfrom ground (m.)
Vertical (m.)At least 0.5 meter
Hoizontal (m.)At least 0.4 meter
![Page 156: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/156.jpg)
Sector 3
RET Filter
Kathrein 800 10305 Type 1.1 No No 40 0
Isolation from2G Ant. requirement for 3G Antenna installation:
Antenna Type
Antenna Scenario
AntennaHeightfrom ground (m.)
Vertical (m.)At least 0.5 meter
![Page 157: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/157.jpg)
Sector 3 Sector 4
RET Filter
1 0 0
Isolation from2G Ant. requirement for 3G Antenna installation:
Isolation from2G Ant. requirement for 3G Antenna installation:
Hoizontal (m.)At least 0.4 meter
Antenna Type
Antenna Scenario
AntennaHeightfrom ground (m.)
Vertical (m.)At least 0.5 meter
![Page 158: Cri0002 3g Bfkt Tssr Ok](https://reader036.fdocuments.us/reader036/viewer/2022081412/5410f13a7bef0a0e638b45d4/html5/thumbnails/158.jpg)
Sector 4
0
Isolation from2G Ant. requirement for 3G Antenna installation:
Hoizontal (m.)At least 0.4 meter