CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002...
-
Upload
adam-murphy -
Category
Documents
-
view
212 -
download
0
Transcript of CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002...
![Page 1: CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002 (Klaus Röhrich)](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfc61a28abf838ca7075/html5/thumbnails/1.jpg)
CREATIVE SERVICESComprehensive Solutions in Science and Technology
1
EDG WP6 meeting, 30.10.2002(Klaus Röhrich)
![Page 2: CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002 (Klaus Röhrich)](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfc61a28abf838ca7075/html5/thumbnails/2.jpg)
CREATIVE SERVICES 30.10.2002 2
activity
• Our Clients are SME and International Organisations.
• Our missions involve desktop work as well as conception
and construction of electro-mechanical devices.
• Recently, emphasis has changed towards software
production and testing.
• Today a large fraction of our turnover is made in
mathematics, statistics and software development.
CREATIVE SERVICES provides technical and scientific assistance in product development
and research projects.
![Page 3: CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002 (Klaus Röhrich)](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfc61a28abf838ca7075/html5/thumbnails/3.jpg)
CREATIVE SERVICES 30.10.2002 3
about us
• SARL since 1995, 7 associates, 30.000 €• Technoparc St.Genis-Pouilly, France
• offices, workshop space as necessary
• full time physicists (two)• part-time engineers (varying)
+ partners ( )
+ consultants
• Connections with CERN personal background partnership contract optical fibre link
![Page 4: CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002 (Klaus Röhrich)](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfc61a28abf838ca7075/html5/thumbnails/4.jpg)
CREATIVE SERVICES 30.10.2002 4
work examples
• Scientific workVirus inactivation in protein samples (RIMM)
Electro-magnetic calorimeter for e/ separation (CERN)
• Technical and engineeringSmall versatile shredder (RIMM, patent)
Microwave infectious waste steriliser (ACME)
• Informatics and computingAuction participation via the Internet "V@E" ( NETENCHERES)
Population model "4SPopMod", Cost-Effect analysis "MCLeague" (WHO)
• Teaching and proposal writing"Systematic SW Testing", "Effective Test Management" (SYNSPACE)
EU LSF (CERN/ISOLDE)
![Page 5: CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002 (Klaus Röhrich)](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfc61a28abf838ca7075/html5/thumbnails/5.jpg)
CREATIVE SERVICES 30.10.2002 5
Real-Time Auctionon the Internet
Java "bidder "s
C++"auctioneer"
Central data base(MS ACCESS)
On-line Catalogue(CAZAN SA)
work example : V@E
Java "supplier"
![Page 6: CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002 (Klaus Röhrich)](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfc61a28abf838ca7075/html5/thumbnails/6.jpg)
CREATIVE SERVICES 30.10.2002 6
why we might be useful for SW testing
• software development (FORTRAN, C++, Java,...) as physicists in research and as company for industrial clients
• experience in software process/product quality with ISO 9126/GEQ, SPICE (ISO 15504)/CMM
• systematic testing and test planning/management in theory (teaching) and practice ( )
test planning (priority, constraints, contingencies) test approach (quality/coverage criteria) test suites tools for automation execution coverage analysis, error analysis, metrics
![Page 7: CREATIVE SERVICES Comprehensive Solutions in Science and Technology 1 EDG WP6 meeting, 30.10.2002 (Klaus Röhrich)](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfc61a28abf838ca7075/html5/thumbnails/7.jpg)
CREATIVE SERVICES 30.10.2002 7
thank you
EDG WP6 meeting, 30.10.2002(Klaus Röhrich)