Creating the environment for business
National Emission Ceilings Directive Review
Workshop on Plans and Programmes of Air Quality and National Emission Ceilings Directives
Thursday 2nd September 2004
Alistair Ritchie, Entec [email protected]
2Creating the environment for business
Agenda
Project Objectives
Proposed Approach
Deliverables
Benefits to Member States
3Creating the environment for business
Project Objectives
“to provide support to the Commission in the review of the NEC Directive and to analyse in depth some aspects of its implementation”
Main tasks – 1: In depth analysis of NEC national programmes– 2: Feasibility of an emission ceiling for PM– 3: First draft NEC review report and recommendations for the
Thematic Strategy
4Creating the environment for business
Proposed Approach: Task 1In depth analysis of the NEC national programmes
Inter-comparison of NEC national programmes
Consistency of NEC national programmes with other submissions
Projections made under national programmes
Administrative and political procedure of adoption in Member States– Information request to be issued shortly– Scope– Benefits and importance
5Creating the environment for business
Proposed Approach: Task 1In depth analysis of the NEC national programmes
Outputs
– Analysis of NEC national programmes
– Proposals for additional essential questions for each Member State
– Proposals for guidelines to ensure harmonisation
6Creating the environment for business
Proposed Approach: Task 2Feasibility of an emission ceiling for Particulate Matter
Helen ApSimon, Imperial College London
Structure of research– Options for setting ceilings & potential benefits beyond air
quality limit values– Challenges in deriving ceilings & assessing compliance– Conclusions on the feasibility & related reporting requirements
Information sources
– Position Paper on PM; CAFE baseline scenario; AQEG work; PM Cost Curves; EMEP; additional information sources to be identified
7Creating the environment for business
Issues• PM size fraction
• Sectors / processes / fuels, considering chemical speciation
• Geographic locations
• Primary / secondary
• Absolute / relative valuesOutputs
– Clear recommendations for the introduction of emission ceiling for PM, with analysis of pros and cons and limitations of such an approach
Proposed Approach: Task 2Feasibility of an emission ceiling for Particulate Matter
8Creating the environment for business
Proposed Approach: Task 3NEC review report and recommendations
Review report required under Articles 9, 10 & 12 of NECD
Scope excludes proposals for modifications of ceilings and / or IEOs as well as further reductions aimed at meeting LTOs
Collation and review of data from:– Task 1 outputs – other EC contracts (IIASA, AEA, Milieu, Entec etc)– EEA– EMEP– Etc
Additional analysis to cover data gaps
9Creating the environment for business
Elements to consider within the review
Proposed Approach: Task 3NEC review report and recommendations
Policy Drivers
1. Policy drivers affecting NEC sourcesEmission
sourcesUncertainty
NECs
IEOs / LTOs5. Meeting IEOs / LTOs
(i) COST EFFECTIVE
(ii) MARGINAL CBA
(iii) IMPLEMENTATION
3. Meeting the NECs2. BAU emissions projections
4. Consequences for IEOs / LTOs
10Creating the environment for business
Outputs
– Technical report summarising results of additional analysis conducted by Entec
– First draft review report as required by the Directive
– Recommendations for the Thematic Strategy
Proposed Approach: Task 3NEC review report and recommendations
11Creating the environment for business
Inception report - delivered to EC
Interim report - December 2004
Draft final report - February 2005
Final report - March 2005
Deliverables
12Creating the environment for business
Guidelines to ensure harmonisation of national programmes
Clear recommendations for the potential introduction of a ceiling for PM
Identification of key administrative and policy measures to facilitate implementation of the NECD
Collation and review of significant quantity of relevant information in developing NECD review report
Benefits of this study to Member States