CREATING A PREMIER WEST AFRICAN GOLD PRODUCER EDV:TSX FACTSHEET NOVEMBER 2016 2016E PRODUCTION 575 koz GOLD MINES IN WEST AFRICA 5 TOP TIER PROJECTS 2 Endeavour Mining is a premier intermediate gold producer, focused on developing a portfolio of high quality mines in the prolific West-African region where it has established a solid operational and construction track record. Endeavour operates 5 mines in Côte d’Ivoire, Burkina Faso, Mali, and Ghana. In 2016, it expects to produce between 575koz and 610koz at an AISC of US$870 to US$920/oz. Endeavour is currently building its Houndé project in Burkina Faso, which is expected to become its flagship low-cost mine. The development of the Houndé project is expected to lift Endeavour’s group production to +900kozpa and decrease its average AISC to circa $800/oz by 2018, while exploration aims to extend all mine lives to +10 years. <US$920 2016E AISC/OZ

Transcript of CREATING A PREMIER WEST AFRICAN GOLD PRODUCER · CREATING A PREMIER WEST AFRICAN GOLD PRODUCER...

CREATING A PREMIER WEST AFRICAN GOLD PRODUCER

EDV:TSXFACTSHEET NOVEMBER 2016

2016E PRODUCTION575 kozGOLD MINES

IN WEST AFRICA5 TOP TIERPROJECTS2

Endeavour Mining is a premier intermediate gold producer, focused on developing a portfolio of high quality mines in the prolific West-African region where it has established a solid operational and construction track record. Endeavour operates 5 mines in Côte d’Ivoire, Burkina Faso, Mali, and Ghana. In 2016, it expects to produce between 575koz and 610koz at an AISC of US$870 to US$920/oz. Endeavour is currently building its Houndé project in Burkina Faso, which is expected to become its flagship low-cost mine. The development of the Houndé project is expected to lift Endeavour’s group production to +900kozpa and decrease its average AISC to circa $800/oz by 2018, while exploration aims to extend all mine lives to +10 years.

<US$9202016E AISC/OZ

2015 PRODUCTION INCREASED PRODUCTION AND DECREASED COSTS

INCREASED CASH GENERATION

EXTENDED MINE LIFE BY ADDING RESERVES

EMPLOYEES AS OF DECEMBER 2015

P+P RESERVES AS OF DECEMBER 20151

M+I RESOURCES AS OF DECEMBER 20151

Production, in koz AISC, in US$/oz

FCF before tax, WC & financing costs, in US$m *Excludes Agbaou capex

All amounts on a 100% basis 2 Ity Mine is included for the post-acquisition period of November 28

to December 31, 2015. During 2015, the Ity Mine produced 80,807 ounces1 Reserves and Resources inclusive of Karma

Keys facts & figures

Total

517koz

Total

6.7Moz

Total

12.8Moz

13%21%

29%36%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

45%

5%

11%

39%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

40%12%

14%

34%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

Total

3,500 people

28%22%

50%

Côte d’Ivoire

Mali

Ghana

Total

517koz

Total

6.7Moz

Total

12.8Moz

13%21%

29%36%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

45%

5%

11%

39%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

40%12%

14%

34%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

Total

3,500 people

28%22%

50%

Côte d’Ivoire

Mali

Ghana

Total

517koz

Total

6.7Moz

Total

12.8Moz

13%21%

29%36%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

45%

5%

11%

39%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

40%12%

14%

34%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

Total

3,500 people

28%22%

50%

Côte d’Ivoire

Mali

Ghana

Total

517koz

Total

6.7Moz

Total

12.8Moz

13%21%

29%36%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

45%

5%

11%

39%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

40%12%

14%

34%

Burkina Faso

Côte d’Ivoire

Mali

Ghana

Total

3,500 people

28%22%

50%

Côte d’Ivoire

Mali

Ghana

$1,137/oz

466koz

517koz

575-610koz

2013 2014 20152 2016 E

324koz$1,010/oz $922/oz

$870-920/oz

2013 2014 2015 2016 E

$28m* $30m

$80m

$135m

$1,264/ozrealized

Realized with$1,157/oz

Estimated withH1 $1,225/ozH2 $1,250/oz

$1,392/ozrealized

REDUCED NET DEBT

31-Dec-12 31-Dec-13 31-Dec-14 31-Dec-15

3.0Moz4.1Moz

6.1Moz6.7Moz

+93%

31-Dec-13 31-Dec-14 31-Dec-15

$227m$254m

$144m

-44%

[ [ [ [] ] ] ]

30-Sept-16

$14m

Endeavour now offers exposure to near and long-term growth potential in addition to current production

STRONG EXPOSURE TO GOLD

SIGNIFICANT PRODUCTION GROWTH

LONG-TERM UPSIDE

800koz

900kozc. 900koz

575-610koz

~80koz

517koz

700koz

400koz

600koz

300koz

500koz

200koz

100koz

2010 A 2013 A 2014 A 2015 A 2016 E 2019 E

Build Houndé & Ity CIL

Acquired Ity

Built Agbaou

Acquired Nzema and

Tabakoto

IMMEDIATE CASHFLOW NEAR-TERM GROWTH

from production from projects from exploration

AGBAOU MINE CÔTE D’IVOIRE QUICK FACTS

Ownership: 85%

Mine and Mill type:Up to 2.2 Mtpa Gravity/CIL plant Open Pit – Contractor Mining (BCM)

2016E Production:180-195koz @ US$550-600/oz AISC

Expected Mine Life:7 years from current Reserves

RECENT AND UPCOMING CATALYSTS

Accomplished- Record year in 2015, up 23% YoY - Fully repaid shareholder loans

in <2 years, in Nov 2015- 2015 drill results confirmed oxide

mineralization extensions

Upcoming- Continue to benefit from the soft ore with

high potential to add oxide reserves - Secondary crusher successfullycommissioned in July, providing increased processing flexibility

TABAKOTO MINEMALI QUICK FACTS

Ownership: 80-90% depending on pit

Mine and Mill type:1.4 Mtpa Gravity/CILTabakoto (UG), Segala (UG) & Kofi C (OP) Pit Mine

2016E Production: 155-175koz @ US$970-1,050/oz AISC

Expected Mine Life:4+ years from current Reserves

RECENT AND UPCOMING CATALYSTS

Accomplished- I n 2013 the mill was doubled from

2,000 tpd to 4,000 tpd- Segala ore production commenced inQ4 2014

- Kofi C deposit commenced in Q1 2015 - In 2015, switch to owner and contractor fleet resulting in increased productivity

Upcoming- Continue to optimize operation

and reduce costs- Considerable potential to expand and replace reserves

ITY MINECÔTE D’IVOIRE QUICK FACTS

Ownership: 55%

Mine and Mill type: 950ktpa Heap Leach Open pit / Heap Leach

2016E Production:70-80koz @ US$800-850/oz AISC

Mine Life:3 years from current Reserves + upside

RECENT AND UPCOMING CATALYSTS

Accomplished- Gained majority ownership in 2014- Producing at historic highs (+50% since

2012 level)- I ncreased heap leach capacity from

0.6mtpa to 1.0mtpa- I ncreased M&I resources since 2011 from 0.2Moz to 2.9Moz plus 0.5Moz Inferred

Upcoming- Continued exploration success

to prolong heap leach life at current production level

- Potential to increase ownership

5 GOLD MINES 4 WEST AFRICAN COUNTRIES

q West Africa’s Birimian greenstone belt is one of the most prospective and under-explored areas of the world

q West-Africa is a fast-growing gold region

q Endeavour has a successful track record of building and operating mines in West Africa

q Opportunity to consolidate region to benefit from cluster-based synergies

q Favorable mining jurisdictionsq Excellent and long-standing

government relationshipsKARMA MINEBURKINA FASOQUICK FACTS

Ownership: 90%

Mine and Mill type: 4 Mtpa Heap Leach Open Pit

Average Annual Production (y 1-5): 110-120koz @ <US$700/oz AISC

Expected Mine Life:8 years from current Reserves

RECENT AND UPCOMING CATALYSTS

Accomplished- First gold production achieved on April 11th 2016 - Started leach pad ore stacking and irrigating

in early March 2016

East LondonPort ElizabethCap de

Bonne-Espérance

Parc national Kruger

Durban

Le Cap

Welkom

Bloemfontein

Kimberley

Soweto

Pietermaritzburg

PRETORIA

Johannesburg

ACCRA

BAMAKOOUAGADOUGOU

ABIDJAN

Operations office

Tabakoto Mine

Ity Mine & CIL Project

Houndé Project

Karma Mine

Nzema Mine

Agbaou Mine

Spain

Tunisia

Italy

Cyprus

Jordan

SyriaLebanon

Israel

Palestine

AzerbaijanGeorgia

Turkey

Iran

Turkmenistan

Iraq

Sardegna (Ita.)

Sicilia

Malta

Djerba

Kriti (Crete)

Greece

Albania

Morocco

Algeria Libya

Sudan

Egypt

Kuwait

Qatar

Bahrain

U.E.A

Oman

Om

an

SaudiArabia

Yemen

Somalia

Eritrea

Ethiopia

KenyaUganda

Chad

Cameroon

GabonCongo

D. R. of Congo

CentralAfrican Republic

MALI

Portugal

Islas

CÔTE D’IVOIRE

GHANA

BURKINA FASO

Bioko(Equat. G.)

E. GuineaSao Tomeand Principe

Annobon (EG)

AngolaZambia

Malawi

Rwanda

Burundi

Tanzania

Mad

agas

car Réunion (Fr.)

Mauritus

ComorosMayotte (Fr.)

Farquhar Group(Sey.)

Seychelles

Suqutra (Yem.)

Farasan

Qeshm

Amirante Islands(Sey.)

Bassas da India (Fr.)

Europa (Fr.)

Djibouti

Botswana

Afrique du Sud

MozambiqueNamibie

Lesotho

Zimbabwe

Swaziland

5 GOLD MINES4 WEST AFRICAN COUNTRIES

WHY WEST AFRICA?

NZEMA MINEGHANA QUICK FACTS

Ownership: 90%

Mine and Mill type:1.6 Mtpa Gravity/CILOpen Pit – Contractor Mining (BCM)

2016E Production:90-100koz @ US$1,050-1,125/oz AISC

Expected Mine Life:4 years from current Reserves

RECENT AND UPCOMING CATALYSTS

Accomplished- I ncreased levels of purchased ore availability

is strategically being used to improve the mine’s economics, operating margins and in the preservation of the mine’s reserves in-situ

Upcoming- Benefit from accumulated ore stockpiles and

increased purchased ore- Nzema Adamus pushback ($13 million) in 2016 should give access to higher grades

2 TOP TIER PROJECTSIN WEST AFRICA

HOUNDÉ PROJECTBURKINA FASO

The construction of the Houndé Project was launched in April 2016. With its robust grade and low cash costs, Houndé ranks amongst West Africa’s high quality development projects.

QUICK FACTS

Ownership:90%

Status:Construction underway1st gold pour expected in Q4 2017P+P Reserves: 2.1Moz

M+I Resources: 2.5Moz

Mine Type:Open Pit

Mill Type:3.0 Mtpa Gravity/CIL

Upfront Capital:US$328M, inclusive of US$47M for owner-mining fleet

LOMP Avg Production: 190koz @ AISC <US$709/oz

Expected Mine Life:+10 years

Project Economics:NAV 5% of US$342M and IRR of 32% with US$1,250/oz

RECENT AND UPCOMING CATALYSTS

Accomplished- Construction progresing on time

and within budget- In line with objective of employing

90% burkinabés nationals

Upcoming- First gold pour expected in Q4 2017

BURKINA FASOOuagadougou

Houndé Project

QUICK FACTSOwnership: 55%

Status:Feasibility Study announced on Nov, 10

P+P Reserves (CIL): 1.9Moz

M+I Resources: 3.1Moz

Mine Type: Open Pit

Mill Type:3.0Mtpa CIL (upgraded from 2.0mtpa in PFS)

Upfront Capital: Approx. US$307M

LOMP Avg Production: 114kozpa @ US$603/oz AISC

Mine life:14 years

RECENT AND UPCOMING CATALYSTSAccomplished- Positive Feasibility Study - Positive metallugical tests- Positive support from local governmentUpcoming- Update of Feasibility Study to include the

- Potential to increase ownership

2 TOP TIER PROJECTSIN WEST AFRICA

ITY CIL PROJECTCÔTE D’IVOIRE

SIGNIFICANT CONSTRUCTION EXPERTISE IN WEST AFRICA

Endeavour has an experienced construction services team, with a proven track record of delivering West African projects on time and on budget. Its core construction services team has been successfully developing projects together for over 10 years.

Achievements of this core team include: - 7 projects built over past 10 years- $2.4 billion in total capex- All projects were delivered on time and within budget - Projects built notably in Côte d’Ivoire, Mali, Sierra Leone,

Ghana, and Senegal- Significant optimization on capex - Oversight from scoping study stage to production

Ity CIL Project is expected to give a second life to the Ity mine with a long 14-year mine life based on current reserves . The Feasibility Study outlined the potential for Ity to deliver average production of 165koz over the first 5 years at an AISC of US$507/oz.

CÔTE D’IVOIRE

Abidjan

Agbaou Mine

Ity CIL Project

recent high-grade Bakatouo and CollineSud discoveries and expected further resource conversion of existing deposits

Project Economics:NAV 5% of US$411M and IRR of 36% with US$1,250/oz

EXECUTIVE TEAM

Sébastien de Montessus CEO & President

Adriaan "Attie" Roux COO

Vincent Benoit EVP CFO & Corporate Development

Patrick Bouisset EVP Exploration & Growth

Morgan Carroll EVP Corporate Finance & General Counsel

Jeremy Langford EVP Construction Services

CONTACTS

Martino De CiccioVP Strategy and Investor [email protected] + 33 1 70 38 36 95

RESERVES AND RESOURCES AS OF DECEMBER 31ST, 2015

Mine/Project

Reserves Resources inclusive of reserves Reserves ResourceProven & Probable Measured & Indicated Inferred Gold Price lower cutoff

(Mt) Au g/t (koz) (Mt) Au g/t (koz) (Mt) Au g/t (koz) US$/oz Au g/tAgbaou 13.2 2.4 1,027 14.4 2.54 1,180 1.2 1.71 65 1,350 0.5Tabakoto 6.4 3.5 725 18.5 3.09 1,844 9.0 3.55 1,023 1,350 0.5 to 1.0Nzema 4.7 2.4 356 34.6 1.34 1,490 5.9 1.28 244 1,350 0.5Ity Mine & CIL 30.4 1.7 1,613 61.4 1.57 3,106 14.1 1.52 687 1,150 0 to 0.8Karma 33.2 0.9 949 75.2 1.08 2,621 65.3 1.13 2,362 1,250 0.2 to 0.5Hounde 30.6 2.1 2,075 37.9 2.09 2,551 3.2 2.62 274 1,300 0.5Total 6,744 12,793 4,655

HIGHLIGHTSFINANCIAL HIGHLIGHTS AS OF SEPTEMBER 30TH 2016

Revenue All-in sustaining margin

US$474million US$137million

LIQUIDITY AND FINANCING SOURCES AS OF SEPTEMBER 30TH 2016

Cash position Undrawn from the US$350 million RCF Equipment financing

US$137million US$210million US$50million

MARKET DATA

Shares outstanding as at October 31, 2016 Market cap as at November 7, 2016 Net debt as at September 2016Enterprise value as at November 7, 2016

93.4million US$1.67 billion

US$14 million US$1.81 billion

PRODUCTION/MINE-LEVEL AISCProduction, in koz on 100% basis Mine-level AISC in US$/oz

2014A 2015A 2016 Guidance 2014A 2015A 2016 GuidanceAgbaou 146,757 181,365 180,000 - 195,000 621 576 550 - 600Nzema 115,129 110,302 90,000 - 100,000 1,036 1,064 1,050 - 1,125Tabakoto 127,323 151,067 155,000 - 175,000 1,335 1,067 970 - 1,050

Ity1 5,689 70,000 - 80,000 n/a 683 800 - 850

n/a n/a 50,000 - 60,000 n/a n/a 750 - 850

Total 465,770 516,646 575,000 - 610,000 1,010 922 870 - 9201 Ity Mine is included for the post-acquisition period of November 28 to December 31, 2015.During 2015, the Ity Mine produced 80,807 ounces.