Curriculum Vitae – Craig Harrison Page 1 Personal Details Name: Craig Harrison PN: BTech (Marine Eng) Aust. Maritime, IEng IMarEng MIMarEST, M.A.I.M.S. CPS D.O.B: 29 June 1974 Nationality: Australian Profession: Project and Construction Manager Phone: +65 9156 4994 (Singapore) / +61 417 058 578 (Australia) Email: [email protected] Project and Construction Management Career Summary Over twenty years of experience in the international oil and gas sector, with 15 years specializing in project and construction management and marine surveying / consulting. I obtained my Bachelor of Technology in Marine Engineering in 1995 and a Class 1 Marine Engineering License in 2004. I am a Certified Practicing Surveyor, Incorporated Engineer and Marine Engineer, a Member of the Australian Institute of Marine Surveyors and Institute of Marine Engineering Science and Technology. In 2005 I commenced as Operations Superintendent for Upstream Petroleum Pty Ltd on the Basker-Manta-Gummy (greenfield) project in the Gippsland Basin, managing the field setup including re-commissioning the DP3 FPSO Crystal Ocean, and Project Managed two separate docking construction programs, the initial FPSO refurbishment and commissioning, and the Full Field Development (FFD) upgrades in Keppel Tuas Shipyard. I have been engaged as a Construction and Project Manager for several new construction, conversion and refurbishment projects in S.E. Asia and Australia, including: Upgrade and refurbishment of the FPSO Ningaloo Vision for Apache Energy Ltd at Keppel Tuas, Singapore. Conversion of the MT Stena Caribbean to FPSO Balai Mutiara for BC Petroleum at Keppel Tuas, Singapore. Refurbishment and hand-back of the FPSO Crystal Ocean at Keppel Gul in Singapore. Conversion of FSO Basker Spirit to Shuttle Tanker at Keppel Tuas, Singapore. New construction of an oil tanker for Caltex Australia in Vung-Tau, Vietnam. Pre-Conversion of the ex-HMAS Westralia to FPSO Shiraz. New construction of the Jasa Cocos Container barge in Westernport, Australia. Refurbishment of the MV Kinna LPG Carrier in Westernport, Australia. Reactivation and rectification of the FPSO Crystal Ocean at Keppel Tuas in Singapore Full Field Development upgrades to the FPSO Crystal Ocean at Keppel Tuas in Singapore Project and Construction Management Roles 2012 Dec – 2015 on going Apache Energy Ltd FPSO Construction Manager Plan and execute the refurbishment and upgrade of the FPSO Ningaloo Vision working both at Apache Energy’s office in Perth (2012 – early 2013) and at KEPPEL Shipyard (Tuas) in Singapore (2013 – 2015). Responsibilities include: Develop overall construction scope of work and undertake tendering process with shipyards including final yard selection and contract reviews. Scope includes rectification and upgrade of topside process modules, complete swivel replacement, hull and tank steel renewal, and turret/subsea modifications.

Transcript of Craig Harrison CV Download

Page 1: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 1

Personal Details Name: Craig Harrison PN: BTech (Marine Eng) Aust. Maritime, IEng IMarEng MIMarEST, M.A.I.M.S. CPS D.O.B: 29 June 1974 Nationality: Australian Profession: Project and Construction Manager Phone: +65 9156 4994 (Singapore) / +61 417 058 578 (Australia) Email: [email protected] Project and Construction Management Career Summary Over twenty years of experience in the international oil and gas sector, with 15 years specializing in project and construction management and marine surveying / consulting. I obtained my Bachelor of Technology in Marine Engineering in 1995 and a Class 1 Marine Engineering License in 2004. I am a Certified Practicing Surveyor, Incorporated Engineer and Marine Engineer, a Member of the Australian Institute of Marine Surveyors and Institute of Marine Engineering Science and Technology. In 2005 I commenced as Operations Superintendent for Upstream Petroleum Pty Ltd on the Basker-Manta-Gummy (greenfield) project in the Gippsland Basin, managing the field setup including re-commissioning the DP3 FPSO Crystal Ocean, and Project Managed two separate docking construction programs, the initial FPSO refurbishment and commissioning, and the Full Field Development (FFD) upgrades in Keppel Tuas Shipyard. I have been engaged as a Construction and Project Manager for several new construction, conversion and refurbishment projects in S.E. Asia and Australia, including:

• Upgrade and refurbishment of the FPSO Ningaloo Vision for Apache Energy Ltd at Keppel Tuas, Singapore.

• Conversion of the MT Stena Caribbean to FPSO Balai Mutiara for BC Petroleum at Keppel Tuas, Singapore.

• Refurbishment and hand-back of the FPSO Crystal Ocean at Keppel Gul in Singapore. • Conversion of FSO Basker Spirit to Shuttle Tanker at Keppel Tuas, Singapore. • New construction of an oil tanker for Caltex Australia in Vung-Tau, Vietnam. • Pre-Conversion of the ex-HMAS Westralia to FPSO Shiraz. • New construction of the Jasa Cocos Container barge in Westernport, Australia. • Refurbishment of the MV Kinna LPG Carrier in Westernport, Australia. • Reactivation and rectification of the FPSO Crystal Ocean at Keppel Tuas in Singapore • Full Field Development upgrades to the FPSO Crystal Ocean at Keppel Tuas in Singapore

Project and Construction Management Roles 2012 Dec – 2015 on going Apache Energy Ltd FPSO Construction Manager Plan and execute the refurbishment and upgrade of the FPSO Ningaloo Vision working both at Apache Energy’s office in Perth (2012 – early 2013) and at KEPPEL Shipyard (Tuas) in Singapore (2013 – 2015). Responsibilities include:

• Develop overall construction scope of work and undertake tendering process with shipyards including final yard selection and contract reviews. Scope includes rectification and upgrade of topside process modules, complete swivel replacement, hull and tank steel renewal, and turret/subsea modifications.

Page 2: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 2

• Participate and lead various HAZOPs, HAZIDs and Constructability reviews to ensure alignment across all Project stakeholders.

• Set-up Client shipyard office, warehouse and logistics supplier and systems, including recruitment of local inspectors/supervisors and implementation of document control system.

• Develop and implement Client specific reporting processes, agree and set KPIs, and develop comprehensive tracking metrics across all disciplines.

• Manage and monitor all construction activities (hull, machinery and topsides) against agreed schedule and discipline histograms. In particular, plan and execute the renewal of 580MT of steelwork along the cargo tank longitudinal bulkheads, ahead of schedule, as part of Special Survey 7.

• Develop and maintain formal reporting documentation including discipline organigrams and daily/monthly reports to ensure full visibility of Project activities to Client.

• Provide firm and pragmatic leadership of a multi-disciplined and cultural Client team (50+ men) comprising of Supervisors, Engineers, QAQC and HSE Inspectors.

• Initiate and manage Classification Society engagement and setup systems and processes to ensure regulatory compliance during demolition, construction and pre-commissioning phases and overall Project compliance against Local/National and International Standards and Codes.

• Facilitate inter-discipline discussions to ensure fault-free integration between hull, marine, topside and subsea systems.

• Ensure rigorous oversight in managing scope growth through minimizing Site Instructions and Variation Orders unrelated to contractual scope.

• Initiate and provide strict oversight on several contractual incentive schemes in order to advance the shipyard construction schedule

• Provide transparency in the selection and performance management of Client vendors, specialists and sub-contractors, and ensure all documentation and processes are auditable.

• Engage in performance management of non-performing suppliers/vendors and shipyard personnel when required to ensure compliance with Project goals.

• Ensure early identification of any deviation from agreed specification, schedule or budget, and implement corrective actions

• Ensure strong HSE leadership by implementing a shipyard HSE incentive scheme, employing additional Client HSE inspectors and overseeing 2.5 million man-hours LTI free.

• Provide strong and professional Client representation to the Shipyard commercial and operation’s department

• Manage the coordination of work-scope completion including punch-lists, hand-overs, ITR completions, certificates, and pre-commissioning activities to ensure a robust transition to the commissioning team.

2012 Jan – 2012 Dec BC Petroleum Sdn Bhd FPSO Conversion Manager / (Acting) EPV Delivery Manager Initially engaged during 2011 to undertake surveys of several vessels to determine suitability for conversion to an early production FPSO, for a joint venture between Petronas, ROC Oil and Dialog. In 2012, re-engaged as the Conversion Manager to manage the project execution phase from demolition to practical completion at KEPPEL shipyard (Tuas) in Singapore. Role encompasses:

• Fast-track conversion based methodology adopted by JV partners, requiring a hands-on practical approach in the demolition and construction phases of the MT Stena Caribbean into the FPSO Balai Mutiara.

• Coordinate plan approvals with Classification Society in parallel with detailed engineering design throughout the demolition and construction phase.

• Develop the cargo offtake philosophy and implement operational requirements into the design and construction phase.

• Set-up Client shipyard office, warehouse and logistics supplier and systems, including recruitment of local inspectors/supervisors and implementation of document control system.

Page 3: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 3

• Manage the extraction of the (CMMS) maintenance database onboard in order to develop preservation and maintenance procedures during construction, and obtain Classification Society approvals.

• Manage the execution of Special Survey 10 with Classification Society. • Develop and implement Client specific reporting processes, and develop comprehensive

tracking metrics across all disciplines. • Maintain formal reporting documentation including discipline organigrams and daily reports

to ensure full visibility of Project activities to JV partners. • Provide firm and pragmatic leadership of a multi-disciplined and cultural Client team (15

men) comprising of Engineers, Naval Architect and HSE/QAQC Inspectors. 2011 June – 2011 Dec ROC Oil Ltd FPSO Project Manager Project Manage the reinstatement and shipyard conversion scope of the Crystal Ocean FPSO from ROC Oil Ltd to Rubicon Offshore. Transition the vessel to/from lay-up to KEPPEL shipyard and manage the contractual docking repair scope, spares consolidation and contract negotiations. Role includes:

• Plan and manage the lay-up of the vessel in Labuan (Malaysia) including preparation of Classification Society approved lay-up preservation and maintenance procedures, crew employment, technical supervision and minor pre-docking works with sub-contractors.

• Coordinate and manage the sailing of the FPSO from lay-up across to KEPPEL (Gul) shipyard, setup the site office, warehouse and finalize contractual requirements with shipyard commercial department.

• Execute the contractually agreed repair and conversion works and work towards minimizing scope growth through firm adherence to the specification.

• Scope includes topsides TEG unit removal, internal turret modifications, gas turbine modifications, crane extension, process module upgrades, and the execution of Special Survey 10 with the Classification Society.

• Provide strong and professional Client representation to the Shipyard commercial department and Owner technical team, to facilitate the off-hire and hand-back of the FPSO from Charterer to Owner.

• Resolve disputes between Charterer and Owner involving hand-back condition and work towards minimizing repair work scope on site.

• Develop and implement Client specific reporting processes, and develop comprehensive tracking metrics across all disciplines.

• Maintain formal reporting documentation including discipline organigrams and daily reports to ensure full visibility of Project activities to Client.

2011 Jan – 2011 May (Short Term Contract) ROC Oil Ltd FSO Project / Construction Manager Contracted in to trouble-shoot the reinstatement of the Basker Spirit FSO from ROC Oil Ltd to TK Shipping. Plan and manage the contractual and project obligations throughout the required docking at KEPPEL shipyard in Singapore and reinstate the vessel as a Shuttle Tanker with DNV Classification Society. Role includes:

• Execute the demolition and rectification contract with the shipyard commercial department and setup site team including representatives from TK Shipping (Owner) and ROC Oil (Charterer).

• Coordinate all site works, including warehousing and logistics and manage the demolition and rectification scope of work which includes removal and reinstatement of vessel bow structure, forward mooring and cargo loading equipment.

• Facilitate inter-discipline discussions to ensure fault-free, re-integration between hull and marine systems enabling transparency to Classification Society and Owner.

Page 4: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 4

• Manage the coordination of work-scope completion including punch-lists, hand-overs, ITR completions, certificates, and pre-commissioning activities ensuring compliance with Classification Society and enabling a smooth hand-back to Owners (TK Shipping).

• Ensure early identification of any deviation from agreed specification, schedule or budget, and implement corrective actions

• Provide strong HSE leadership by implementing a shipyard HSE incentive scheme, employing additional Client HSE inspectors and overseeing a LTI free Project.

2010 July – 2011 Feb Caltex Australia Petroleum Pty Ltd Project / Construction Manager - Owner’s Representative Owner’s Project Manager at SMV shipyard in Vung-Tau Vietnam on behalf of Caltex Australia in relation to the new construction of a 55m motorised double hull fuel oil refueling vessel. Role includes:

• Set-up Client shipyard office, and initiate Client-Shipyard-Designer communication protocols and reporting structures, including organograms and document control processes.

• Develop and implement Client specific reporting processes, and develop comprehensive tracking metrics to measure project completion.

• Monitor all construction activities onsite against agreed schedule, manage low-competency workforce and implement schedule recovery measures.

• Daily QAQC inspections of hull, structural, machinery and coating works to ensure compliance against agreed design.

• Provide advice to Client on Project recovery plans due to under-performing Contractors, including detailed cost and risk analysis.

2009 Jan – 2010 Jan Commonwealth of Australia - Attorney-General’s Department Project / Construction Manager Provide project management services for the Commonwealth of Australia as their authorized representative in the design, construction, commissioning, and delivery of a container barge for the Cocos (Keeling) Islands. Details:

• Undertake Port site visits and requirements analysis to determine a performance specification for a 400MT container barge. Prepare RFTs for the market, review shipyard responses and provide award recommendation to the Government.

• Engage directly with preferred shipyard to ensure Client’s needs are fully understood, undertake constructability reviews with all stakeholders, and develop the construction, commissioning and delivery schedule in Microsoft Project.

• Develop all Inspection and Test Plans and undertake all QAQC site survey and material inspections across the Project, including shipyard, contractors and suppliers.

• Develop and implement Client specific reporting processes, agree and set KPIs, and develop comprehensive tracking metrics.

• Charter a heavy lift vessel; undertake loading surveys and delivery barge to the Cocos Island port. Project delivered on time and on budget.

2007 Feb – 2007 Dec AGR – Asia Pacific / HELIX Energy Solutions Conversion Manager (Marine) Participate in the FEED study on the proposed conversion of the ex-HMAS WESTRALIA to the extended well test production facility FPSO SHIRAZ. Manage the marine and topsides integration and develop a suite of documents for inclusion in the Basis of Design. Details:

• Undertake initial site survey of vessel to understand the feasibility for conversion to a FPSO and translate into economic evaluation for project costing.

Page 5: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 5

• Manage the re-commissioning of the ex-HMAS WESTRALIA with Flag State, Classification Society and Client. Undertake initial rectification works alongside Henderson facility to prepare vessel for conversion at PT Karimun in Indonesia.

• Participate and lead various HAZOPs, HAZIDs and Constructability reviews to ensure alignment across all Project stakeholders.

• Provide on-board training of temporary crew and manage the sail to PT Karimun (Indonesia). Undertake pre-conversion works as per the basis of design.

• Develop and maintain formal reporting documentation to ensure full visibility of Project activities to Client.

2005 Feb – 2006 Nov Upstream Petroleum Pty Ltd Operations Superintendent / DPA / CSO Engaged as the Operations Superintendent for the Basker-Manta-Gummy project, managing initial deployment, rectification, operations and full field development shipyard upgrades for the FPSO Crystal Ocean. Details:

• Manage the final commissioning and deployment of the vessel from lay-up condition at Keppel shipyard in Singapore to the Bass Strait, Australia.

• Develop a scope of work to enable oil production and execute a rectification program alongside South Wharf in Melbourne, focusing on E&I topside systems.

• Develop and maintain formal reporting documentation to ensure full visibility of Project activities to Client.

• Co-ordinate and supervise all offshore operations including marine engineering change management, and manage recruitment and training for offshore staff throughout EPT in 2005.

• Manage and monitor all hull and marine FFD construction activities in Keppel Tuas, Singapore during 2006, against agreed schedule and discipline histograms.

• Manage Classification Society engagement to ensure regulatory compliance during the rectification and upgrade phase.

• Facilitate inter-discipline discussions to ensure fault-free integration between hull, marine, topside and subsea systems.

• Ensure rigorous oversight in managing scope growth through minimizing Site Instructions and Variation Orders unrelated to contractual scope.

• Engage in performance management of non-performing suppliers/vendors and shipyard personnel when required to ensure compliance with Project goals.

Company Project Consulting Roles 2011 Ad-hoc Chevron Shipping Company LLC FPSO Senior Marine Consultant Provision of expert advice and onsite management of operational activities onboard the FPSO COSSACK PIONEER in order to facilitate the handover from Woodside Energy Ltd to Chevron Shipping Company. Activities focus on the coordination of pre-docking preparations including hydrocarbon process draining, tank washing, gas freeing and survey. 2011 Ad-hoc Caltex Australia Petroleum Pty Ltd Principal Marine Consultant Provide technical risk and safety advice to the Senior Environmental Advisor for Caltex Australia Petroleum and assist in undertaking an Australia-wide audit across Caltex’s hydrocarbon terminals around Australia.

Page 6: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 6

2010 Ad-hoc Woodside Energy Ltd / Sherwood Utilities Pty Ltd Principal Marine Consultant Implement a suite of offshore facility performance standards in accordance with identified major accident and environmental hazards (MAE/MAH), and ensure alignment with the facility safety case and technical integrity maintenance tasks for NGANHURRA and NORTHERN ENDEAVOUR FPSOs. Facilitate workshops with technical authorities, facility engineers, and technical safety and risk personnel at Woodside offices in order to ensure safety and environmental critical elements for offshore systems are managing a major accident event or major environmental hazard. Author a suite of Technical Integrity maintenance procedures, ensuring alignment against applicable performance criteria and implement changes to the CMMS (SAP). 2010 Ad-hoc Woodside Energy Ltd / Xodus Group Pty Ltd Senior Marine Consultant Review and develop the OHKA FPSO facility performance standards in order to ensure alignment with the facility safety case and environmental plan. Facilitate workshops with technical authorities, facility personnel and onshore support teams examining subsea / off-take moorings, oil / gas swivel, hydrocarbon containment systems, propulsion / steering machinery, cargo / ballast, and substructure systems 2009 Ad-hoc Caltex Australia Petroleum Pty Ltd Principal Marine Consultant Provision of expert advice in relation to the design and construction of a motorised fuel oil bunker barge. Undertake a requirements analysis and provide a technical performance specification, contractor service agreements, and shipyard construction contracts for the design, construction, testing and delivery of the vessel. 2009 Ad-hoc Caltex Refineries Australia Principal Marine Consultant Expert advice on field operations, risks, environmental and technical requirements for undertaking ship-to-ship crude oil transfers off the coast of NSW. Participate in risk workshops studying oil pollution requirements, personnel and equipment risks and provide onsite training of staff in underway mooring of oil tankers at sea. Provision (and acceptance) of part of the environmental submission to the Commonwealth of Australia, and provision of the ship-to-ship operations manual. 2009 Ad-hoc BHP Billiton Ltd Principal Marine Consultant Undertake a feasibility study for the offshore facility STYBARROW VENTURE to determine the capability to offtake oil condensate via tandem mooring to Suezmax size oil tankers. Undertake a high-level offshore mooring analysis, determine dynamic loads, identify operational control measures and ensure regulatory compliance. 2009 Ad-hoc Grace Line Ltd Principal Marine Consultant Undertake a feasibility study examining the long term effects of crude oil storage offshore on VLCC’s, including examination of vapour recovery systems, chemical treatments, environmental and personnel hazards and commercial impact.

Page 7: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 7

2008 Ad-hoc SBM Production Contractors Principal Marine Consultant Provide ongoing oil tanker and FPSO surveys and inspections as SBM Client representative in order to assess the operability and feasibility for future conversions and report on operational and technical matters as required. 2008 Ad-hoc Woodside Energy Ltd / Xodus Group Pty Ltd Senior Marine Consultant Review existing facility performance standards for the FPSOs COSSACK PIONEER, NGANHURRA and NORTHERN ENDEAVOUR and author a new suite of marine operational performance standards. Liaise with all WEL technical authorities, offshore staff and undertake an independent verification check of all work completed with Lloyds Register (Singapore). Participate in the compilation of the WEL guidance documents on the selection of safety critical elements and development of facility performance standards. 2008 Ad-hoc Gippsland Maritime Logistics Principal Marine Consultant Implement OHS system for start-up offshore supply and logistics company. Author a suite of operating procedures and policies ensuring compliance with ISM, ISPS, ISO 9001, ISO 14001 standards. Liaise with Commonwealth authorities in order to resolve statutory compliance issues and facilitate registration of existing offshore supply vessel. Provide a health, safety and environment management system for GML’s supply base in accordance with AS4804 and ISO 14001. 2008 Ad-hoc Commonwealth of Australia, Attorney-General’s Department Principal Marine Consultant Investigate and determine the requirements for the future strategic development of the Cocos (Keeling) Islands freight / passenger handling vessels. Undertake operational requirements analysis, procurement plan, and author the tender and contract documents for an un-motorised and motorised barge, and ferry. Liaise with State and Federal survey authorities in order to resolve statutory compliance issues with existing vessels, and provide project schedules, budgets, and Inspection and Test Plans to enable fast-track construction and delivery timetables. Consult on the future port construction and initiate discussion between key stakeholders to align the fixed infrastructure and mooring facilities design to ensure compatibility with the proposed vessels. 2008 Ad-hoc GeelongPort Corporation Principal Marine Consultant Undertake a Peer review of the Department of Justice’s draft Emergency Management Framework for Victorian Ports and provide comment and strategic forward plan for GeelongPort against each of the 30 recommendations. 2008 Ad-hoc Straits Resources Ltd Principal Marine Consultant Provide advice on the suitability and structure of Sebuku Jetty (Indonesia) used for coal exports. Comment on previous structural assessments; review the design calculations and recommendations for future use. Conduct an onsite operational review at the Mt Muro (Indonesia) mine site on the roll on – roll off ferry transporting Tasat – Rabu ore across the Barito River and report on operational, technical and safety procedures, including a design and stability assessment.

Page 8: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 8

2008 Ad-hoc City of Melbourne – Dockland Marine Principal Marine Consultant Undertake an operational risk review for Melbourne Dockland Marine’s operations and document findings in a format that is consistent with the key elements of the City of Melbourne’s Risk Management Framework. 2007 Ad-hoc City of Greater Geelong Principal Marine Consultant Undertake a design and operational review of Cunningham Pier and Alexander Thompson Jetty in Geelong in order to advise on the suitability of the mooring, fendering and structure to accommodate various sized cruise liners alongside without structural modifications or upgrades. 2006 Ad-hoc Patrick Ports – Hastings Principal Marine Consultant Conceive and implement crude oil transfers via ship-to-ship transfer within the Port of Hastings. Undertake environmental studies and submissions in consultation with stakeholders, regulatory authorities and facilitate all risk workshops. Author the hazard and risk management policies and procedures, permit to work system, STS operations manual and oil spill response plan and provide onsite operational management during off-takes. 2006 FenderCare Marine Ltd Alliance / Partnership Secure partnership with Fendercare Marine Ltd and provide strategic marine offshore expertise including provision of environmental compliance documentation in order to facilitate the transfer of oil and gas cargoes via ship to ship transfer within Australian waters. 2006 Ad-hoc Patrick Ports – Hastings Marine Consultant Undertake peer review of the Port of Hastings Fire Watch Tug risk assessment in order to determine the requirement for a fully-manned fire watch tug in the Port of Hastings. Provide oil/gas technical safety and risk expertise in order to evaluate existing plan. 2004 Dec – 2005 Feb (Short Term Contract) BP Shipping Australia Operations Superintendent

Provide offshore operational and technical expertise to BP’s Integrated Supply and Trading Division - Eastern Hemisphere.

Page 9: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 9

MEMBERSHIPS, QUALIFICATIONS, COURSES & EDUCATION Professional Recognition / Memberships / Panels

• Australasian Institute of Marine Surveyors o M.A.I.M.S. Jul 10 o CPS Nov 10

• Institute of Marine Engineering, Science and Technology (UK) o MIMarEST IMarEng Jan 10

• Engineering Council (UK) o IEng Jul 10

• Office of the Chief Investigator (OCI - VIC) o Member of the Technical Panel (Marine) Jul 07

• National Offshore Petroleum Safety Authority (NOPSA) o Member of the Technical Panel (Marine) Sept 08

Qualifications

• Engineer Class 1 (Chief Engineer) MCA Aug 04 • Engineer Class 1 (Chief Engineer) AMSA Mar 04 • Engineer Class 2 Motor AMSA Dec 00 • Engineer Watchkeeper Motor AMSA Apr 96

Courses / Certificates

• TBosiet Certificate ERGT (AUST) Mar 13 • Dynamic Positioning Course KONGSBERG (USA) Feb 06 • Oil Spill Management AMOSC (AUST) Oct 05 • CSO & SSO Certificate FERRIBY (AUST) Aug 05 • Snr Management Workshop PARTRAINING (UK) Nov 04 • Advanced Safety Auditing BP (UK) Nov 04 • Root Cause Analysis BP (UK) Oct 04 • AMOS M&P XANTIC (UK) Oct 04 • FRAMO Training FRANK MOHN (NDL) Oct 04 • ISPS Training CBT Sept 04 • Windows/NT Systems Training CBT Aug 04 • Freefall Lifeboat IDESS (PHIL) May 04 • Marine Electrical Maintenance STHTYNESIDE (UK) Apr 04 • Adv Medical First Aid ST JOHN’S (AUST) Jun 01 • Int’l Safety Management AMC (AUST) Jun 01 • Survival Craft & Rescue Boats AMC (AUST) Jun 01 • STCW 95 Upgrade AMC (AUST) Jun 01 • Adv Marine Fire Prevention TAFE (AUST) Dec 99 • Petroleum Tanker Safety AMC (AUST) Feb 96 • Liquefied Gas Tanker Safety AMC (AUST) Feb 96 • Chemical Tanker Safety AMC (AUST) Feb 96 • Inert Gas / Crude Oil Washing AMC (AUST) Feb 96 • Restricted Radiotelephony Cert. AMC (AUST) Feb 96

Education

• Bachelor of Technology – Marine Eng. AMC (AUST) Jun 96 • Marine Operations Cert. AMC (AUST) Jan 93 • Secondary Certificate (Yr12) BSHS Dec 91

Page 10: Craig Harrison CV Download

Curriculum Vitae – Craig Harrison

Page 10

EARLY EMPLOYMENT HISTORY 1998 – 2005 BP Maritime Services (BP) Marine Engineer 1997 - 1998 Bureau Veritas (BV) Marine and Industrial Surveyor 1996 - 1997 Shell Marine Personnel (IoM) Ltd Marine Engineer 1996 BHP Technical Services (BHP) Project Officer 1992 - 1996 BHP Transport Marine Engineer Trainee REFERENCES References available on request.