# Estimate Cost : Rs. 900.00 Lakhs# Admn. Sanction : GO Rt. No. 344 dt. 15.02.2014 of the PR &
RD (RWS-II) Dept, Govt., of Andhra Pradesh. Hyderabad. of PR&RD (RWS-II) Department
# Source of water : Gargeya project
# Habitations to be covered :
# Name of Contractor: M/s VSA infra projects pvt.Ltd,Hyd.
.
CPWS Scheme to Piler & 8other Habitations
Mandal : Piler TotalHabitations: 9 9
Salient features of the Project
DescriptionNo. Amount
(Rs. in Lakhs)
Drilling of Bore wells 1 7.20
Pump sets (In the Bore wells) 1 16.20
Construction of 5m dia Intake well cum Pump House at Gargeya Project
1 15.00
Construction of foot bridge at Intake well 1 35.00
Constuction of 150KL GLBR near Kuravapalle 1 10.80
Contd….
Description No. Amount (Rs. in Lakhs)
Construction 0f 9x6mts Watchman quarters at Piler and head works
1 7.00
Construction of Slow sand filters of size 22x11 at kothapalle
1 10.00
Providing Pumping & Transmission lines 1 615.00
From intake well to 150KL GLBR (50HP VT pumpsets 2 No)
1 10.00
From existing 250 KL sumpwell to 250kl OHBR at R&B guest house (Suitable horizontal submersible pumpsets 12 HP 2 Nos)
1 22.80
Power supply 1 27.00
Construction 0f 6x4mts Watchman quarters at Piler and head worksConstuction of 150KL GLBR near Kuravapalle
1 6.60
Present stage of workDescription of Item Stage
a. Off-take point The Proposed source Grageya project was located near village Balamvaripalle which is at a distance of 10KM from the Piler town. The Gargeya project is an irrigation project which is having 98 mcft of storage capacity and having dead storage of 16 mcft and capacity of the reservoir above sluice is 82mcft.The total water requirement t for Piler and 8 other habitations is 4275 LPM (43mcft).
b. Bore well and SP Sets completed
c. GLBR completed
D Power supply Progress
>
>
>
Description of Item Stage
e. Head works:
(i) In take well Earth work completed
(ii) Foot bridge Earth work completed
f. Pipes(Pumping Main):
(i) 400mm K7- DI pipes 400m Procured
(ii) 150mm K9- DI pipes 3800m Procured
(iii) 350mm K7-DI Pipes 11000m Procured
>
>
>
>
Contd…. Present stage of work
>
THANK YOU
SUPERINTENDING ENGINEER
RWS&S CIRCLE, CHITTOOR
END