Michael Martin - Cert IV - Codes and Standards 2012
CPCCBC4001A Apply building codes and standards to the construction
process for low rise building projects
Lesson Five – Alternative solutions and exercises
Michael Martin - Cert IV - Codes and Standards 2012
Todays Lesson
• Handout (Nil)• Review last weeks exercise• Exercise in Plan Variations and possible
compliance
Michael Martin - Cert IV - Codes and Standards 2012
Review last exercise
Michael Martin - Cert IV - Codes and Standards 2012
Exercise
• The client has proposed that there be the addition of a 1.2 high x 2.1 long window to the east wall of the garage.
Michael Martin - Cert IV - Codes and Standards 2012
Review Answers• BCA 2012, interpretation 1.1.1.2
– page 26, habitable room– Page 28, private garage
• BCA 2012, Classification 1.3.2– Class 10a a non-habitable building page 36
• BCA 2012 performance provisions 2.4 – O2.4.4 and O2.4.5 page 71 – F2.4.4 and F2.4.5 page 72– P2.44.4 and P2.4.5 page 73 – 74
• BCA 2012, part 3 acceptable construction– 3.3.3.2 covers lintel sizes, yet flashings and other elements will need to be considered also
• AS for brickwork, glazing, etc.• Council – consider approvals, now view to neighbours, permission, etc.
• Today - What else did you get? For a simple window !
Michael Martin - Cert IV - Codes and Standards 2012
Exercise 2
• For the same plan set “Und”• The client has come to you with a proposed
variation, to the store area under the stairs?
Michael Martin - Cert IV - Codes and Standards 2012
Michael Martin - Cert IV - Codes and Standards 2012
Clients Proposal
• Because the store area is adjacent to the laundry and kitchen, plumbing is also?
• Therefore it should be feasible to change the store area to a WC
• Because they believe the extra toilet would be an advantage with their 3 children.
• Investigate the space for size and all compliance issues or non-compliance ?
Michael Martin - Cert IV - Codes and Standards 2012
Reference list
• ABCB National Construction Code Awareness Resource Kit
• http: www.google.com.au (for some images)• All Australian Architecture, “Und” Plan set and
associated documents