CP144260CAMPUS UTILITY SYSTEMPre-Submittal Conference August 26, 2011
![Page 2: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/2.jpg)
OVERVIEW Introductory Remarks / Submittal
Requirements Program Goals Planning Goals Construction Goals Questions and Answers Facility Tour
![Page 3: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/3.jpg)
INTRODUCTIONSSUBMITTAL REQUIREMENTSKatherine A. Dunklau, Construction Phase Manager
![Page 4: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/4.jpg)
PROJECT TEAM (TO DATE)
![Page 5: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/5.jpg)
CM/GC RFQ SUBMITTAL Two Step Process
Prequalification Submittal Direct, Concise, Organized
Short list – interviews and fee proposal Fee Proposal – one copy, sealed
Minimum Requirements
Addenda
![Page 6: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/6.jpg)
PROGRAM GOALSEd Barton, Lutz Daily & BrainBryan Birosak, Director, Power House
![Page 7: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/7.jpg)
PROJECT SCOPEMulti-phase project Renovations to
existing plant (WDEP)
New energy plant (EDEP)
CW distribution at Kittredge
New/renovations to existing distribution system
![Page 8: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/8.jpg)
PLANNING GOALSPhil Simpson, Planning Phase Manager
![Page 9: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/9.jpg)
PLANNING PHASE RESPONSIBILITIES Design
responsibilities Manage Schematic
Design & Design Development
Secure entitlements related to design
Ensure programmatic objectives & entitlements are met
Construction responsibilities Exterior material
approvals Quality assurance
for stonework Quality assurance
for landscape & site features
Communication interface
![Page 10: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/10.jpg)
IMPORTANT ITEMS FROM A CM/GC
Transparency Partnering session Open detail in
estimates Advising the design
team between formal reviews
Constructability Review Are we realistic?
Construction Mitigation Interface &
communication planning
Sexual Harassment policies
Staging requirements Landscape
preservation & restoration
Sustainability practices
![Page 11: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/11.jpg)
CONSTRUCTION GOALSKatherine A. Dunklau, Construction Phase Manager
![Page 12: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/12.jpg)
PRELIMINARY SCHEDULE
Kittredge Distribution
WDEP (Renovations to Existing)
EDEP (New Plant)
Campus Distribution
0 5 10 15 20 25 30 35 40
DesignConstruction
![Page 14: CP144260 Campus Utility System](https://reader036.fdocuments.us/reader036/viewer/2022062323/56816268550346895dd2d5ac/html5/thumbnails/14.jpg)
SITE WALKDistribution Pathway – Phil Simpson
WDEP – Bryan Birosak