Sierra Readymix (Pvt.) Ltd.
CP, Productivity, EMSIntegrated Strategy for
Sustainability (SISS)
All About how we plan for our Children
Director / General Manager
Sierra Readymix (Pvt.) Ltd.
8/8/2019 CP Presentation DGM
http://slidepdf.com/reader/full/cp-presentation-dgm 2/7
Against All Odds
Slump in construction industry in Western Province
Rapidly increasing Material Costs
Incremented overheads
Shrinking Gross Profit
Training, Job Enrichment was never compromised
CP workgroup committed with limited resources
With an ambitious Work plan
Understanding CP is not about a Award or monitory gain BUTCorporate & Individual Obligation for our Future Generation
Against All odds SRL TEAM committed to contribute IN OUR OWNSIMPLE WAYS though we do not maintain paper indications.
8/8/2019 CP Presentation DGM
http://slidepdf.com/reader/full/cp-presentation-dgm 3/7
SRL GO GREEN INITIATIVE
ExternalStakeholders &
Community
Company
Departmental
CEA & Legal Compliance Supply Chain
Environmental footprint
Eco-Friendly CSR
Environmental Policy
Environmental footprint
reduction
Waste Minimization Waste Utilization
Reduction of
Consumption
8/8/2019 CP Presentation DGM
http://slidepdf.com/reader/full/cp-presentation-dgm 4/7
ROADMAP Short Term
1 paper - 2 sides concept
Employees Switch off Consciousness
Natural Light Utilization
Vehicle washing, water tank filling to be monitored by flow meters
Separate electricity meters to be installed to workshop, batching plant,
pre casting yard
Electronic Mail based communication system within internal end external
parties
Hard copied Documents backed up in electronic format instead of paper
based archive
8/8/2019 CP Presentation DGM
http://slidepdf.com/reader/full/cp-presentation-dgm 5/7
ROADMAP Long Term
By 2011 July SRL is committed to be in position to bid for ISO 14001 EMS
certification
Improve facility for rainwater harvesting by 50% by 2012
Expand facility for Down cycled water storing
Weigh bridge to be installed for better mapping of material inflow.
Provision of IT facilities to all departments to ensure tertiary level data input
also made in electronic format.
Pursuing Green Globe requirements only as a measure of improving EMSstandards.
By 2015 modifying office building using natural lighting only
8/8/2019 CP Presentation DGM
http://slidepdf.com/reader/full/cp-presentation-dgm 6/7
Our Unquantified Unrecorded Commitment
which you will not find in Black & White Unaccounted 7 Acre Company maintained Sierra Green Reserve at
Kaduwela maintained with the vision to offset production related
Carbon Foot Print.
Eco-CSR aimed at renewable energy generation, reuse, recycle andknowledge dissemination.
1 Paper-2 sides, switch off consciousness, Check & Print etc.
Inherent by SRL TEAM & families.
No Need to Waste & Nothing is Waste mentality Inherent by ourworkforce
Top to Bottom Commitment as simple tasks for The Bigger Picture
8/8/2019 CP Presentation DGM
http://slidepdf.com/reader/full/cp-presentation-dgm 7/7
In a Nutshell it is
All About how we plan for our Children