OUR REF: (7) in EP2/N4/G/ 11 0 Pt.2 Environmental Protection Department Branch Office YOUR REF: -s :=:+sm 28th Floor, Southern Centre, TEL. NO.: 28351868 130 Hennessy Road, FAX NO : 2591 0558 Wan Chai, Hong Kong. E-MAIL: tfcl :I.Lt HOMEPAGE: http ://INWW. epd .gov.hk .J Cf June 2018 Environmental Impact Assessment (EIA) Ordinance, Cap. 499 Application for Variation of an Environmental Permit Project Title: Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS) (Application No. VEP-543/2018) I refer to your above application received on 8 June 2018 for variation of an enviromnenta1 pennit under Section 13(1) ofthe EIA Ordinance. Pursuant to Section 13(5) of the EIA Ordinance, we have amended the Enviromnental Pennit (No. EP-441 /2012). I attach the Enviromnental Pennit as amended (No. EP-441 /2012/A) for your use. Under Section 15 of the EIA Ordinance, the amended Environmental Permit will be placed on the EIA Ordinance Register. It will also be placed on the EIA Ordinance website (http://www.epd.gov.hk/eial). Please note that if you are aggrieved by any of the conditions imposed in this Permit, you may appeal under Section 17 of the EIA Ordinance within 30 days of receipt of this Pennit. Should you have any queries on the above application, please contact my colleague Mr. Tom TAM at 2835 1107. Yours sincerely, (Raymond W M WONG) Principal Environmental Protection Officer for Director of Environmental Protection Encl.

Transcript of Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A ....

Page 1: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

~tmsm OUR REF (7) in EP2N4G11 0 Pt2 Environmental Protection Department Jiijii~iH~~71~

~tlsm lt7i~HBranch Office YOUR REF tFJEw~

~ ~ii -s=+sm28th Floor Southern Centre TEL NO 28351868 i~ ~licf1 tttJt~ liiilY~yenii

130 Hennessy Road FAX NO 2591 0558 ~7-rulftl

Wan Chai Hong Kong E-MAIL tfcl ILt HOMEPAGE httpINWWepdgovhk

JCf June 2018

Environmental Impact Assessment (EIA) Ordinance Cap 499

Application for Variation of an Environmental Permit

Project Title Enhanced Ash Utilisation and Water Management Facilities

at the Castle Peak Power Station (CPPS)

(Application No VEP-5432018)

I refer to your above application received on 8 June 2018 for variation of an enviromnenta1 pennit under Section 13(1) ofthe EIA Ordinance

Pursuant to Section 13(5) of the EIA Ordinance we have amended the Enviromnental Pennit (No EP-441 2012) I attach the Enviromnental Pennit as amended (No EP-441 2012A) for your use

Under Section 15 of the EIA Ordinance the amended Environmental Permit will be placed on the EIA Ordinance Register It will also be placed on the EIA Ordinance website (httpwwwepdgovhkeial)

Please note that if you are aggrieved by any of the conditions imposed in this Permit you may appeal under Section 17 of the EIA Ordinance within 30 days of receipt of this Pennit

Should you have any queries on the above application please contact my colleague Mr Tom TAM at 2835 1107

Yours sincerely

(Raymond W M WONG) Principal Environmental Protection Officer for Director of Environmental Protection

Encl

Environmental Permit No EP-441 2012A IplusmnJHlf 0J ~ ~~ 5Vt EP -44112 0 I 2 A

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE (CHAPTER 499)

SECTIONS 10 and 13 ~ iJt ~ IH1 f5 1~ fj~J

( ~ 499ll) ~ 10 amp 13 ~

ENVIRONMENTAL PERMIT TO DECOMMISSION CONSTRUCT AND OPERATE A DESIGNATED PROJECT

m~-~~amp~~m~I~~sect~~m~~m

PART A MAIN PERMIT) A~ lt~OJm~~~7t)

Pursuant to Section I 0 of the Environmental Impact Assessment Ordinance (EIAO) the Director of Environmental

Protection (the Director) granted the environmental permit (No EP-44 I20I2) to the Castle Peak Power Company

Limited (hereinafter referred to as the Permit Holder) on 23 July 2012 Pursuant to Section 13 of the EIAO the

Director amends the Enviro1m1ental Permit (No EP-44 120 12) based on the application for variation of enviromnental

pennit (No VEP-5432018) and the amendments as described below are incorporated into this Environmental Permit

(No EP-44 12012A) This Envirom11ental Permit as amended is for the decorm11issioning construction and operation

of the designated project(s) described in Part B of this Permit subject to the conditions specified in Part C of this Pem1it

The issue of this environmental pennit is based on the documents approvals or pem1issions described below

H~sect lt ~plusmnJllyen3~~iJZ1311ffif9n ci~~iJZflffif9n mto 1b~89mJE I I~plusmnJlfw~~~~lt~) ~ 20 12 if 1 Fl 23 BIFHIfamp5dt EP-44 120 12 Bg~plusmnJltilfOJ~1Httfyli~iltf[~0EJ CHyenJ tilfOJ~fJ=i A ) bull f~~~~ijJffif9U~ 13 ~Bgiji)E I ~

~Jyen~i5ft VEP-54320 I8 Bg]I[)(JJltilfOJ~Ej3~~~1~n7~i5ft EP-441 20 12 8JIplusmnJttilfOJ~ bull =i~~~~n8~a1pound

~plusmnJltilfOJ~IJ c~i5dt EP-44 I20 I2A) I tJfF19Wf~~ - ~i~Lamp~yen11yen~0J~ 21illJ51TmBJ389tsectJEif~~sect I m~~

~~2jstilfOJsectN c fi~IJTJUBABg~tf bull 2jsI~plusmnJlti~OJsectN~~1J~f9UXf4- tlt~t~tilfOJ fffi~H

Application No

Ef3 IDHf~ ~ Document in the Register ~ tic rm _t 8~ x 14

VEP-5432018

( I) ProjectProfil e shyEnllanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station CPPS) (Register No PP-46820 12) If~~sect rm1r -~w~J~mmJJlt fie mamp t~n~ ~ lffi ti~ 1iffi fli 1c ~ sect ( ~tiifffi~i5t~ PP-468 20I2)

(2) The Directors letter of permission to apply directly for environmental permit dated 27 June 20 12 (Ref 17) in EP2N4G Il 0)

~ ~ 20 12 1f 6 Fl 27 B ~ tplusmnl ttt ~t ][ EJ3 tiH~PJHlf OJ m 89 fsect (tf (tit~iSdt 17) in EP2 N4 GI 10)

(3) Application for Environmental Permit submitted by the Pem1it Holder on 29 June 20 12 (Application No AEP-441 2012) tilf OJ ill m ~ A ~ 2 0 I 2 1f- 6 Fl 2 9 BmX RJ tilf OJ ~ EJ3 ~JH EJ3 sect~ ~ ~~51~ AE P-441 20 12)

(4) Enviro1m1ental permit issued on 23 July 2012 (Environmental Permit No EP-44120 I 2)

- 1 shy

Environmental Permit No EP-4412012A f_fi plusmnJHt PJ m ~j 5b1 EP-44120 12A

(5) Application for Variation of an Envirorunental Permit No VEP-5432018 submitted by the Pennit Holder on 8 June 2018 ~tPJmyen-tfA1i1 2o 18 1f 6 ~ s a~x(lgfcampffiplusmnJUtPJmEf3~~ lt Ef3~~~~-i 5fft VE P-543 20 18)

Application No

rp ~iU r~amp5b1

Date ofApplication

Ef~)JBM

List ofAmendments Incorporated into this Environmental Permit

88~~-~~PJ-~~-D~sect

Date ofAmendment

f~DBM

YEP-5432018 8 June20 18 20 1 8 1f_ 6~ 8 B

1 Vary Scale and Scope of Designated Project in Part B of Environmental Permit No EP-44 120 12 iampfftplusmnJ~tPJm~j5fft E P -44 1 20 12 B f5B8J fsect~If~t~sect Bgmf~Wililll

2 Vary Figure I of Environmental Pem1it No EP-441 201 2

fiampffi~~PJ~~I~bt EP -44 12 0 12 89ril I

3 Vary Condition 22 in Part C ofEnvirorunental Permit No EP-44 I20 12

iampffiplusmnJ~tPJm~liSUt EP-441 2012 C fmiddotMJ flff-14 22 J~

rflune 20 18

20 181f 6 fllJ8

J-9 June 20 18 20 18116 )=J21EI

Date RW~

- 2 shy

Environmental Permit No EP-44112012A ~ lJHlf DJ~~~ 5Vf EP-441 2012A

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (1sect ~IfiJi El ~myen)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the Permit) l )U 13 7ls ~rJ iJHlf DJ ~ Cf f~ ~ DJ -m )Asect~ pJT 1Hll H9 jsect 5E I f~ lJi El 89 g)i l3jj

Title of Designated Project Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Stat ion (CPPS)

(Th is designated project is hereafter referred to as the Project)

bull w g~ -m Rij mJJlt ue mamp ~ ~ if~ ~~ 1iiE 1~ ft r~ El

( lSmJJIm~EllM Im~El )

Nature of Designated Project (i) To partial deconm1ission the west coal stockyard and

(ii)

Ci)

To construct and operate a waste disposal faci lity for Pulverized Fuel Ash (PFA)

w~ ~fl- ~ f r= 751~ 7t iffi f~~ ~l 1~ amp

Location of Designated Project The Project is located at Castle Peak Power Station at Lung Yiu Street Tuen Mun The location of the Project is shown in Figure I of this Pem1it

I fE J~ El 1I m- et F~ ff~ ~~ fu H9 wLlJ ~~~ o I f~ ~ Fl H9 tit liUi ~ 7f m-7lsf5tDJ~[f] l 0

Scale and Scope of Designated Project

The project includes partial deconunissioning of the west coal stockyard demolition of two existing PFA silos construction of one PFA silo and enhancement work to water management facilities

Im~El~Mm~W~$7tiffibullm~ - m~~oo~~~mmJJlt fBi ~ bull~~ - J mmJJlt ~ reg- tJ amp 1~ ft ~ ~~m ~ rm g9 niE s9 I fr= 0

--=

- 3 shy

Environmental Permit No EP-44 12012A lPjHlf PJ sectfHIBet EP-4412012A

PART C (PERMIT CONDITIONS) C$ (~EJ[f~flf)

I General Conditions -Nf~flf

11 The Pem1it Holder and any person working on the Project shall comply with all conditions set out in this Permit Any non-compliance by any person may constitute a contravention of the Enviroru11ental Impact Assessment Ordinance (EIAO) (Cap499) and may become the subject of appropriate action being taken under the EIAO

~PJmM~Aampff~~-I~~sect~Aplusmn~m~~ltfs~PJmbull~~~Mamiddotff~Aplusmn $(0 ~ f ~~ ltfs glf PJ m~ middotfJ57L bull PJ tiE ii amp ( ~ iJt ~~ gSjZf-[5 ~ fJU) ( iHSJZ ~ 19~) (m 499Jl) ~m~ middot ~bull~ormbull=~-~~~bullbullff~ middot

I 2 The Pennit Holder shall ensure full compliance with all legislation from time to time in force including without limitation to the Noise Control Ordinance (Cap 400) Air Pollution Control Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) and Waste Disposal Ordinance (Cap 354) This Pem1it does not of itself constitute any ground of defense against any proceedings instituted under any legislation or imply any approval under any legislation

~ormM~A~~m~~~~~~mff$~~m~middotMillf~~lt~~~~bull~ gt lt~ 4o o 1li ) c~g w ~-5 ~ ~u 11~ 170 lt~ 3 1 1 ~ ) lt1K ~-5 ~ ~H~ 17~ gt ltm358 l ) tJ amp ltg t~ ~ rpoundIfl~ 17~ gt ltm3 5 4li ) bull glf or gfPls ~ f fr 1lvt t[UJ~ 1f fOJ )~ 17~ m~ ~ )idf fE Jyen fjltj ~e~~-~~ middot ~mbulle~$~bull~e~m middot

13 The Permit Holder sha ll make copies of tllis Pem1it together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sitesoffices covered by this Permit Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register

glf PJ m M I A~ fP ~ ltfs glf PJ sectIpound 81 fJ lt$ bull~ f5J lt$ glf PJ mPiT i1b 81 PJT ~ x 14 ampltfs glf PJ mAfiB ff i11xmiddot~m~amp~~mmA~e~~~~~ ~ormM~~~M~I~ ubull~bull ~ middot R1Ni1bltfs~PJm middot ~Mltfs~PJmMi11~M~xamp~~$~~m~x middot

14 The Permit Holder shall give a copy of this Pem1it to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in this Permit The site(s) refers to site(s) of decormnission constmction and operate of the Project and shall mean the same hereafter

~PJmM~AmMltfs~PJmiddot~-~~~~I~~ftWAmiddot~~~~Aplusmn~~~S ltfs~PJ-~M fWm~middot I~~mM~--~amp-UI~~sect~I~middotTxMm amp~I~ifj~[5]-~~

15 The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular s ite entrancesexits or at a convenient location for publics information at all times The Pennit Holder shall ensure that the most updated infonnation about the Pennit including any amended Permit is displayed at such locations If the Permit Holder sunmiddotenders a part or the whole of the Pem1it the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cancelled Permit shall be removed from display at the Project site(s)

glf PJ sectIpound M(sectj A~~ ~ I fE ~ El 81 I ~ ~ ff ~ ]j[ $[ i tfl D ~ - ~ 1J f5e ~ lr6 middot M H~ ~ ~ ~ ltfs ~orbull~bullmiddot~m0~~e oo ~~~~ft middot~ orm M~Am~~~~reg~~~~~ ~ltfs~PJm lt~Mff~~-n~~PJm) ~amp~ftMmiddot~PJmM~A~~~~PJm~ m~~~Mmiddot~~~~ili~~amp~~~bull middot ~~(sectj~~~orm~mf5J~~amp ~middot bullbull B~ m~jlj bull poundC) ~~ 5if ~ ~ PJ m16 ~fi ~ I__r~ sect ~I j~ ~ T bull f yenf R~ middot~ ~

~ ~to-O ~ ~~ ~

Environmental Permit No EP-44112012A Ji iJl gf CiJ ~ ~~ SJt EP-441120 12 A

16 The Pennit Holder shall decommission construct and operate the Project in accordance with the project description in Pa11 B of this Pennit

17 The Pemlit Holder shall ensure that the Project is designed decommissioned constructed and operated in accordance with the information and all recommendations described in the Project Profile (Register No PP-46820 12) the application for variation of an environmental pennit including all attachments (Application No VEP-54320 18) other relevant documents in the Register the infonnation or nlitigation measures described in this Pennit and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of pennit conditions contained in this Pennit and mitigation measures to be recommended under on going surveillance and monitoring activities during all stages of the Project Where recommendations refened to in the documents of the Register are not expressly refened to in this Permit such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit

~PJmM~A~~~I~sect~~~ - M~--~amp-~ ~ ~~T~~MampmE~~ If~~sect IW11 lt1fcfflH~5bt PP-46 82 01 2) PJTsectJiBJl8J~W4amp~r_Ul~ ~20fPJHt CiJ ~ $ g~ X ftj sect tr5 PJT ~ lift fj ( $ g~ ~~ Slt YEP- 54 3 I 2 0 1 8 ) sect c iffi Ps 8) ~ fiE ffi ~m X ftj ~CiJ~M~~~~M~bullmmEffimiddot~CiJ~pgmiddot~-~~-amp~~~mWamp m~~m~xmbullbull~bullmmE ~amprrr~sect~~mbullfi~Mm~aamp~~r ff Ptr bull ~fi 81 ~~ ffiP m1iffi bull 1f c w i7S 81 x ftf PJT i1tt bull ~fi fro)9 ~ rr z~s sectt PJ sect11 ~ lii 7amp if ~u m~J[I

n 1iffi ~1ft bull ~~ I ~ ~n~ sectt CJ ~ BJlum ~ ~ ~ ~t if~ n deg

18 All submissions as required under this Pem1it shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the Directors comments or otherwise as specified by the Director

rtr ~ ~ glf PJ ~m~m~ampyen ii~ 81 x ftf ~~ rr un~ bull amp81 ~ 5 cfro ~ I Htt 1flm F3 I7S c~ ~~=bullamp~1Ttsect~) I ~bullbullamp~i5LIJotJ11~IEamp~~JTmx middot

19 All submissions approved by the Director all submissions deposited without comments by the Director or all submissions rectified in accordance with comments by the Director under this Pennit shall be construed as part of the permit conditions described in Part C of this Pernlit Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions Any non-compliance with the subnlissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap 499)

bullampm~~m~m~x middot bullamp~~~~~J~M~~~x middot ~mbull~CJ~m~ ~-amp~~-~-IE~M~mxxmiddot~~~bull~~PJ~c$~~~~PJ~bull~ -$~middotm~x~~ff~bulln~~~mbullamp~bullm~middot~~~~~~PJ~bulln BJHl Jif ~ ofro ~ ff fiiJ r f1 ~mx x ftf 81 middot~ )5t bull ~u CJ tlli ~ amp P ~ J3 ~ sectt 13 11~ 190 c~ 49 9 ~) 8Jnl~

110 The Pennit Holder shall release all finalized submissions as required under this Pennit to the public by depositing copies in the EIAO Register Office or in any other places or any intemet websites as specified by the Director or by any other means as specified by the Director for public inspection For this purpose the Permit Holder shall provide sufficient copies of the submissions

~PJ~M~A~reM~~~CiJ~nl~m~~X~M0H~0~Aplusmn~mmiddotn$~ re~~XW~~~Ii~~~~~bullm1f~w~bullbullmiddot~~~bullm~~ff~~~ ~n~~bullampm~~ff~~-~~~middot~bullampm~~a~n$middot~~0~-~o~ftmiddot ~PJ~m~A~m~~~-~~bull 0

- 5shy

111

112

11 3

2

21

22

2 3

Environmental Permit No EP-44 112012A I1PJH9= CJ ~ ~1i 5dt EP-441 2012A

All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27F Southom Centre 130 Hennessy Road Wanchai Hong Kong) Electronic copies of all fmalized submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies

~CJmm~~~ampm~~M~~~~~--~~~um~~~-bull~bullm~8~~ lff 190~ g2 ffiHJJPJ ~ ( IJUIl 1g ~ )f tt fr H fb ~~ lli 130~ I~ ill cp 27I ) bull fin ~ f3t sect9= PJ ~m~t~xs~~ff~m s~~~-r-xamp I ~~~~tJ~~~ff~sect cHTML ) cM4 o~~xt~xamp )fa if tMl ~~ ft f~ ~ ( PDF ) ( M I 0 3~~X 1~ Xamp )~ 1F ll ~F ~ 1~ ~ ft [5] Mz ~~ ~I I

liJrpound$15JB~mx bull

The Pennit Holder shall notify the Director in wn tmg the commencement date(s) of decommissioning and construction of the Project at least two weeks prior to the commencement of decommissioning and construction of the Project The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date(s) of the decommissioning and construction

~PJ~M~A~~I~~EI~MilampRmiddotI~~~~ ~ ~~m~=poundMUmiddotOO~~ ~~~ampRmiddotI~~~IBM~W-ft middot ~ ~ampRmiddot~~IBM~~ffOO~~ ~ ~CJ mM~A~~~ ~u bulloo~~~wbullft middot

For the purpose of th is Permit commencement of decommiss ioning and construction does not include works related to site clearance and preparation or other works as agreed by the Director

Jg~fi~CJ~~rMlampbullbullIm~~H J ~~~~~I~~~ampffi~~Im ~ ~W ftf5Jfg8~~1~IfE middot

Specific Conditions

~Apound f~ftf

All measures described in the Project Profile (Register No PP-46820 12) submitted on 22 May 2012 shall be fully implemented

~ 20 12if 5 f3 22 BmX 8~ I fE r~ El flii ir ( ~ g[ ffiHi 5Lit PP- 468I 20 l 2 ) iJ 1E M1 8~ fill ~m ntE I ~ ~ ~ ~K yenA 11 bull

The Permit Holder shall submit an updated Contamination Assessment Plan (CAP) and a Contamination Assessment Report (CAR) at least one month before the pa11ial decommissioning works of west coal stockyard

~~~~~$~~bullbullbull~~~~~-f3~~CJ~M~A~~mx~~~~~~ 13 gt nm amp ~s sectSJZ ft ~ middot The Permit Holder shall employ an independent checker to audit the implementation of all mitigation measures recommended in the Project Profile (Register No PP-4682012) and to confinn in writing in the monthly audit repo11 full implementation of the mitigation measures during and upon completion of the decommissioning and construction works

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 2: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

Environmental Permit No EP-441 2012A IplusmnJHlf 0J ~ ~~ 5Vt EP -44112 0 I 2 A

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE (CHAPTER 499)

SECTIONS 10 and 13 ~ iJt ~ IH1 f5 1~ fj~J

( ~ 499ll) ~ 10 amp 13 ~

ENVIRONMENTAL PERMIT TO DECOMMISSION CONSTRUCT AND OPERATE A DESIGNATED PROJECT

m~-~~amp~~m~I~~sect~~m~~m

PART A MAIN PERMIT) A~ lt~OJm~~~7t)

Pursuant to Section I 0 of the Environmental Impact Assessment Ordinance (EIAO) the Director of Environmental

Protection (the Director) granted the environmental permit (No EP-44 I20I2) to the Castle Peak Power Company

Limited (hereinafter referred to as the Permit Holder) on 23 July 2012 Pursuant to Section 13 of the EIAO the

Director amends the Enviro1m1ental Permit (No EP-44 120 12) based on the application for variation of enviromnental

pennit (No VEP-5432018) and the amendments as described below are incorporated into this Environmental Permit

(No EP-44 12012A) This Envirom11ental Permit as amended is for the decorm11issioning construction and operation

of the designated project(s) described in Part B of this Permit subject to the conditions specified in Part C of this Pem1it

The issue of this environmental pennit is based on the documents approvals or pem1issions described below

H~sect lt ~plusmnJllyen3~~iJZ1311ffif9n ci~~iJZflffif9n mto 1b~89mJE I I~plusmnJlfw~~~~lt~) ~ 20 12 if 1 Fl 23 BIFHIfamp5dt EP-44 120 12 Bg~plusmnJltilfOJ~1Httfyli~iltf[~0EJ CHyenJ tilfOJ~fJ=i A ) bull f~~~~ijJffif9U~ 13 ~Bgiji)E I ~

~Jyen~i5ft VEP-54320 I8 Bg]I[)(JJltilfOJ~Ej3~~~1~n7~i5ft EP-441 20 12 8JIplusmnJttilfOJ~ bull =i~~~~n8~a1pound

~plusmnJltilfOJ~IJ c~i5dt EP-44 I20 I2A) I tJfF19Wf~~ - ~i~Lamp~yen11yen~0J~ 21illJ51TmBJ389tsectJEif~~sect I m~~

~~2jstilfOJsectN c fi~IJTJUBABg~tf bull 2jsI~plusmnJlti~OJsectN~~1J~f9UXf4- tlt~t~tilfOJ fffi~H

Application No

Ef3 IDHf~ ~ Document in the Register ~ tic rm _t 8~ x 14

VEP-5432018

( I) ProjectProfil e shyEnllanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station CPPS) (Register No PP-46820 12) If~~sect rm1r -~w~J~mmJJlt fie mamp t~n~ ~ lffi ti~ 1iffi fli 1c ~ sect ( ~tiifffi~i5t~ PP-468 20I2)

(2) The Directors letter of permission to apply directly for environmental permit dated 27 June 20 12 (Ref 17) in EP2N4G Il 0)

~ ~ 20 12 1f 6 Fl 27 B ~ tplusmnl ttt ~t ][ EJ3 tiH~PJHlf OJ m 89 fsect (tf (tit~iSdt 17) in EP2 N4 GI 10)

(3) Application for Environmental Permit submitted by the Pem1it Holder on 29 June 20 12 (Application No AEP-441 2012) tilf OJ ill m ~ A ~ 2 0 I 2 1f- 6 Fl 2 9 BmX RJ tilf OJ ~ EJ3 ~JH EJ3 sect~ ~ ~~51~ AE P-441 20 12)

(4) Enviro1m1ental permit issued on 23 July 2012 (Environmental Permit No EP-44120 I 2)

- 1 shy

Environmental Permit No EP-4412012A f_fi plusmnJHt PJ m ~j 5b1 EP-44120 12A

(5) Application for Variation of an Envirorunental Permit No VEP-5432018 submitted by the Pennit Holder on 8 June 2018 ~tPJmyen-tfA1i1 2o 18 1f 6 ~ s a~x(lgfcampffiplusmnJUtPJmEf3~~ lt Ef3~~~~-i 5fft VE P-543 20 18)

Application No

rp ~iU r~amp5b1

Date ofApplication

Ef~)JBM

List ofAmendments Incorporated into this Environmental Permit

88~~-~~PJ-~~-D~sect

Date ofAmendment

f~DBM

YEP-5432018 8 June20 18 20 1 8 1f_ 6~ 8 B

1 Vary Scale and Scope of Designated Project in Part B of Environmental Permit No EP-44 120 12 iampfftplusmnJ~tPJm~j5fft E P -44 1 20 12 B f5B8J fsect~If~t~sect Bgmf~Wililll

2 Vary Figure I of Environmental Pem1it No EP-441 201 2

fiampffi~~PJ~~I~bt EP -44 12 0 12 89ril I

3 Vary Condition 22 in Part C ofEnvirorunental Permit No EP-44 I20 12

iampffiplusmnJ~tPJm~liSUt EP-441 2012 C fmiddotMJ flff-14 22 J~

rflune 20 18

20 181f 6 fllJ8

J-9 June 20 18 20 18116 )=J21EI

Date RW~

- 2 shy

Environmental Permit No EP-44112012A ~ lJHlf DJ~~~ 5Vf EP-441 2012A

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (1sect ~IfiJi El ~myen)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the Permit) l )U 13 7ls ~rJ iJHlf DJ ~ Cf f~ ~ DJ -m )Asect~ pJT 1Hll H9 jsect 5E I f~ lJi El 89 g)i l3jj

Title of Designated Project Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Stat ion (CPPS)

(Th is designated project is hereafter referred to as the Project)

bull w g~ -m Rij mJJlt ue mamp ~ ~ if~ ~~ 1iiE 1~ ft r~ El

( lSmJJIm~EllM Im~El )

Nature of Designated Project (i) To partial deconm1ission the west coal stockyard and

(ii)

Ci)

To construct and operate a waste disposal faci lity for Pulverized Fuel Ash (PFA)

w~ ~fl- ~ f r= 751~ 7t iffi f~~ ~l 1~ amp

Location of Designated Project The Project is located at Castle Peak Power Station at Lung Yiu Street Tuen Mun The location of the Project is shown in Figure I of this Pem1it

I fE J~ El 1I m- et F~ ff~ ~~ fu H9 wLlJ ~~~ o I f~ ~ Fl H9 tit liUi ~ 7f m-7lsf5tDJ~[f] l 0

Scale and Scope of Designated Project

The project includes partial deconunissioning of the west coal stockyard demolition of two existing PFA silos construction of one PFA silo and enhancement work to water management facilities

Im~El~Mm~W~$7tiffibullm~ - m~~oo~~~mmJJlt fBi ~ bull~~ - J mmJJlt ~ reg- tJ amp 1~ ft ~ ~~m ~ rm g9 niE s9 I fr= 0

--=

- 3 shy

Environmental Permit No EP-44 12012A lPjHlf PJ sectfHIBet EP-4412012A

PART C (PERMIT CONDITIONS) C$ (~EJ[f~flf)

I General Conditions -Nf~flf

11 The Pem1it Holder and any person working on the Project shall comply with all conditions set out in this Permit Any non-compliance by any person may constitute a contravention of the Enviroru11ental Impact Assessment Ordinance (EIAO) (Cap499) and may become the subject of appropriate action being taken under the EIAO

~PJmM~Aampff~~-I~~sect~Aplusmn~m~~ltfs~PJmbull~~~Mamiddotff~Aplusmn $(0 ~ f ~~ ltfs glf PJ m~ middotfJ57L bull PJ tiE ii amp ( ~ iJt ~~ gSjZf-[5 ~ fJU) ( iHSJZ ~ 19~) (m 499Jl) ~m~ middot ~bull~ormbull=~-~~~bullbullff~ middot

I 2 The Pennit Holder shall ensure full compliance with all legislation from time to time in force including without limitation to the Noise Control Ordinance (Cap 400) Air Pollution Control Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) and Waste Disposal Ordinance (Cap 354) This Pem1it does not of itself constitute any ground of defense against any proceedings instituted under any legislation or imply any approval under any legislation

~ormM~A~~m~~~~~~mff$~~m~middotMillf~~lt~~~~bull~ gt lt~ 4o o 1li ) c~g w ~-5 ~ ~u 11~ 170 lt~ 3 1 1 ~ ) lt1K ~-5 ~ ~H~ 17~ gt ltm358 l ) tJ amp ltg t~ ~ rpoundIfl~ 17~ gt ltm3 5 4li ) bull glf or gfPls ~ f fr 1lvt t[UJ~ 1f fOJ )~ 17~ m~ ~ )idf fE Jyen fjltj ~e~~-~~ middot ~mbulle~$~bull~e~m middot

13 The Permit Holder sha ll make copies of tllis Pem1it together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sitesoffices covered by this Permit Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register

glf PJ m M I A~ fP ~ ltfs glf PJ sectIpound 81 fJ lt$ bull~ f5J lt$ glf PJ mPiT i1b 81 PJT ~ x 14 ampltfs glf PJ mAfiB ff i11xmiddot~m~amp~~mmA~e~~~~~ ~ormM~~~M~I~ ubull~bull ~ middot R1Ni1bltfs~PJm middot ~Mltfs~PJmMi11~M~xamp~~$~~m~x middot

14 The Permit Holder shall give a copy of this Pem1it to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in this Permit The site(s) refers to site(s) of decormnission constmction and operate of the Project and shall mean the same hereafter

~PJmM~AmMltfs~PJmiddot~-~~~~I~~ftWAmiddot~~~~Aplusmn~~~S ltfs~PJ-~M fWm~middot I~~mM~--~amp-UI~~sect~I~middotTxMm amp~I~ifj~[5]-~~

15 The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular s ite entrancesexits or at a convenient location for publics information at all times The Pennit Holder shall ensure that the most updated infonnation about the Pennit including any amended Permit is displayed at such locations If the Permit Holder sunmiddotenders a part or the whole of the Pem1it the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cancelled Permit shall be removed from display at the Project site(s)

glf PJ sectIpound M(sectj A~~ ~ I fE ~ El 81 I ~ ~ ff ~ ]j[ $[ i tfl D ~ - ~ 1J f5e ~ lr6 middot M H~ ~ ~ ~ ltfs ~orbull~bullmiddot~m0~~e oo ~~~~ft middot~ orm M~Am~~~~reg~~~~~ ~ltfs~PJm lt~Mff~~-n~~PJm) ~amp~ftMmiddot~PJmM~A~~~~PJm~ m~~~Mmiddot~~~~ili~~amp~~~bull middot ~~(sectj~~~orm~mf5J~~amp ~middot bullbull B~ m~jlj bull poundC) ~~ 5if ~ ~ PJ m16 ~fi ~ I__r~ sect ~I j~ ~ T bull f yenf R~ middot~ ~

~ ~to-O ~ ~~ ~

Environmental Permit No EP-44112012A Ji iJl gf CiJ ~ ~~ SJt EP-441120 12 A

16 The Pennit Holder shall decommission construct and operate the Project in accordance with the project description in Pa11 B of this Pennit

17 The Pemlit Holder shall ensure that the Project is designed decommissioned constructed and operated in accordance with the information and all recommendations described in the Project Profile (Register No PP-46820 12) the application for variation of an environmental pennit including all attachments (Application No VEP-54320 18) other relevant documents in the Register the infonnation or nlitigation measures described in this Pennit and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of pennit conditions contained in this Pennit and mitigation measures to be recommended under on going surveillance and monitoring activities during all stages of the Project Where recommendations refened to in the documents of the Register are not expressly refened to in this Permit such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit

~PJmM~A~~~I~sect~~~ - M~--~amp-~ ~ ~~T~~MampmE~~ If~~sect IW11 lt1fcfflH~5bt PP-46 82 01 2) PJTsectJiBJl8J~W4amp~r_Ul~ ~20fPJHt CiJ ~ $ g~ X ftj sect tr5 PJT ~ lift fj ( $ g~ ~~ Slt YEP- 54 3 I 2 0 1 8 ) sect c iffi Ps 8) ~ fiE ffi ~m X ftj ~CiJ~M~~~~M~bullmmEffimiddot~CiJ~pgmiddot~-~~-amp~~~mWamp m~~m~xmbullbull~bullmmE ~amprrr~sect~~mbullfi~Mm~aamp~~r ff Ptr bull ~fi 81 ~~ ffiP m1iffi bull 1f c w i7S 81 x ftf PJT i1tt bull ~fi fro)9 ~ rr z~s sectt PJ sect11 ~ lii 7amp if ~u m~J[I

n 1iffi ~1ft bull ~~ I ~ ~n~ sectt CJ ~ BJlum ~ ~ ~ ~t if~ n deg

18 All submissions as required under this Pem1it shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the Directors comments or otherwise as specified by the Director

rtr ~ ~ glf PJ ~m~m~ampyen ii~ 81 x ftf ~~ rr un~ bull amp81 ~ 5 cfro ~ I Htt 1flm F3 I7S c~ ~~=bullamp~1Ttsect~) I ~bullbullamp~i5LIJotJ11~IEamp~~JTmx middot

19 All submissions approved by the Director all submissions deposited without comments by the Director or all submissions rectified in accordance with comments by the Director under this Pennit shall be construed as part of the permit conditions described in Part C of this Pernlit Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions Any non-compliance with the subnlissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap 499)

bullampm~~m~m~x middot bullamp~~~~~J~M~~~x middot ~mbull~CJ~m~ ~-amp~~-~-IE~M~mxxmiddot~~~bull~~PJ~c$~~~~PJ~bull~ -$~middotm~x~~ff~bulln~~~mbullamp~bullm~middot~~~~~~PJ~bulln BJHl Jif ~ ofro ~ ff fiiJ r f1 ~mx x ftf 81 middot~ )5t bull ~u CJ tlli ~ amp P ~ J3 ~ sectt 13 11~ 190 c~ 49 9 ~) 8Jnl~

110 The Pennit Holder shall release all finalized submissions as required under this Pennit to the public by depositing copies in the EIAO Register Office or in any other places or any intemet websites as specified by the Director or by any other means as specified by the Director for public inspection For this purpose the Permit Holder shall provide sufficient copies of the submissions

~PJ~M~A~reM~~~CiJ~nl~m~~X~M0H~0~Aplusmn~mmiddotn$~ re~~XW~~~Ii~~~~~bullm1f~w~bullbullmiddot~~~bullm~~ff~~~ ~n~~bullampm~~ff~~-~~~middot~bullampm~~a~n$middot~~0~-~o~ftmiddot ~PJ~m~A~m~~~-~~bull 0

- 5shy

111

112

11 3

2

21

22

2 3

Environmental Permit No EP-44 112012A I1PJH9= CJ ~ ~1i 5dt EP-441 2012A

All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27F Southom Centre 130 Hennessy Road Wanchai Hong Kong) Electronic copies of all fmalized submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies

~CJmm~~~ampm~~M~~~~~--~~~um~~~-bull~bullm~8~~ lff 190~ g2 ffiHJJPJ ~ ( IJUIl 1g ~ )f tt fr H fb ~~ lli 130~ I~ ill cp 27I ) bull fin ~ f3t sect9= PJ ~m~t~xs~~ff~m s~~~-r-xamp I ~~~~tJ~~~ff~sect cHTML ) cM4 o~~xt~xamp )fa if tMl ~~ ft f~ ~ ( PDF ) ( M I 0 3~~X 1~ Xamp )~ 1F ll ~F ~ 1~ ~ ft [5] Mz ~~ ~I I

liJrpound$15JB~mx bull

The Pennit Holder shall notify the Director in wn tmg the commencement date(s) of decommissioning and construction of the Project at least two weeks prior to the commencement of decommissioning and construction of the Project The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date(s) of the decommissioning and construction

~PJ~M~A~~I~~EI~MilampRmiddotI~~~~ ~ ~~m~=poundMUmiddotOO~~ ~~~ampRmiddotI~~~IBM~W-ft middot ~ ~ampRmiddot~~IBM~~ffOO~~ ~ ~CJ mM~A~~~ ~u bulloo~~~wbullft middot

For the purpose of th is Permit commencement of decommiss ioning and construction does not include works related to site clearance and preparation or other works as agreed by the Director

Jg~fi~CJ~~rMlampbullbullIm~~H J ~~~~~I~~~ampffi~~Im ~ ~W ftf5Jfg8~~1~IfE middot

Specific Conditions

~Apound f~ftf

All measures described in the Project Profile (Register No PP-46820 12) submitted on 22 May 2012 shall be fully implemented

~ 20 12if 5 f3 22 BmX 8~ I fE r~ El flii ir ( ~ g[ ffiHi 5Lit PP- 468I 20 l 2 ) iJ 1E M1 8~ fill ~m ntE I ~ ~ ~ ~K yenA 11 bull

The Permit Holder shall submit an updated Contamination Assessment Plan (CAP) and a Contamination Assessment Report (CAR) at least one month before the pa11ial decommissioning works of west coal stockyard

~~~~~$~~bullbullbull~~~~~-f3~~CJ~M~A~~mx~~~~~~ 13 gt nm amp ~s sectSJZ ft ~ middot The Permit Holder shall employ an independent checker to audit the implementation of all mitigation measures recommended in the Project Profile (Register No PP-4682012) and to confinn in writing in the monthly audit repo11 full implementation of the mitigation measures during and upon completion of the decommissioning and construction works

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 3: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

Environmental Permit No EP-4412012A f_fi plusmnJHt PJ m ~j 5b1 EP-44120 12A

(5) Application for Variation of an Envirorunental Permit No VEP-5432018 submitted by the Pennit Holder on 8 June 2018 ~tPJmyen-tfA1i1 2o 18 1f 6 ~ s a~x(lgfcampffiplusmnJUtPJmEf3~~ lt Ef3~~~~-i 5fft VE P-543 20 18)

Application No

rp ~iU r~amp5b1

Date ofApplication

Ef~)JBM

List ofAmendments Incorporated into this Environmental Permit

88~~-~~PJ-~~-D~sect

Date ofAmendment

f~DBM

YEP-5432018 8 June20 18 20 1 8 1f_ 6~ 8 B

1 Vary Scale and Scope of Designated Project in Part B of Environmental Permit No EP-44 120 12 iampfftplusmnJ~tPJm~j5fft E P -44 1 20 12 B f5B8J fsect~If~t~sect Bgmf~Wililll

2 Vary Figure I of Environmental Pem1it No EP-441 201 2

fiampffi~~PJ~~I~bt EP -44 12 0 12 89ril I

3 Vary Condition 22 in Part C ofEnvirorunental Permit No EP-44 I20 12

iampffiplusmnJ~tPJm~liSUt EP-441 2012 C fmiddotMJ flff-14 22 J~

rflune 20 18

20 181f 6 fllJ8

J-9 June 20 18 20 18116 )=J21EI

Date RW~

- 2 shy

Environmental Permit No EP-44112012A ~ lJHlf DJ~~~ 5Vf EP-441 2012A

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (1sect ~IfiJi El ~myen)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the Permit) l )U 13 7ls ~rJ iJHlf DJ ~ Cf f~ ~ DJ -m )Asect~ pJT 1Hll H9 jsect 5E I f~ lJi El 89 g)i l3jj

Title of Designated Project Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Stat ion (CPPS)

(Th is designated project is hereafter referred to as the Project)

bull w g~ -m Rij mJJlt ue mamp ~ ~ if~ ~~ 1iiE 1~ ft r~ El

( lSmJJIm~EllM Im~El )

Nature of Designated Project (i) To partial deconm1ission the west coal stockyard and

(ii)

Ci)

To construct and operate a waste disposal faci lity for Pulverized Fuel Ash (PFA)

w~ ~fl- ~ f r= 751~ 7t iffi f~~ ~l 1~ amp

Location of Designated Project The Project is located at Castle Peak Power Station at Lung Yiu Street Tuen Mun The location of the Project is shown in Figure I of this Pem1it

I fE J~ El 1I m- et F~ ff~ ~~ fu H9 wLlJ ~~~ o I f~ ~ Fl H9 tit liUi ~ 7f m-7lsf5tDJ~[f] l 0

Scale and Scope of Designated Project

The project includes partial deconunissioning of the west coal stockyard demolition of two existing PFA silos construction of one PFA silo and enhancement work to water management facilities

Im~El~Mm~W~$7tiffibullm~ - m~~oo~~~mmJJlt fBi ~ bull~~ - J mmJJlt ~ reg- tJ amp 1~ ft ~ ~~m ~ rm g9 niE s9 I fr= 0

--=

- 3 shy

Environmental Permit No EP-44 12012A lPjHlf PJ sectfHIBet EP-4412012A

PART C (PERMIT CONDITIONS) C$ (~EJ[f~flf)

I General Conditions -Nf~flf

11 The Pem1it Holder and any person working on the Project shall comply with all conditions set out in this Permit Any non-compliance by any person may constitute a contravention of the Enviroru11ental Impact Assessment Ordinance (EIAO) (Cap499) and may become the subject of appropriate action being taken under the EIAO

~PJmM~Aampff~~-I~~sect~Aplusmn~m~~ltfs~PJmbull~~~Mamiddotff~Aplusmn $(0 ~ f ~~ ltfs glf PJ m~ middotfJ57L bull PJ tiE ii amp ( ~ iJt ~~ gSjZf-[5 ~ fJU) ( iHSJZ ~ 19~) (m 499Jl) ~m~ middot ~bull~ormbull=~-~~~bullbullff~ middot

I 2 The Pennit Holder shall ensure full compliance with all legislation from time to time in force including without limitation to the Noise Control Ordinance (Cap 400) Air Pollution Control Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) and Waste Disposal Ordinance (Cap 354) This Pem1it does not of itself constitute any ground of defense against any proceedings instituted under any legislation or imply any approval under any legislation

~ormM~A~~m~~~~~~mff$~~m~middotMillf~~lt~~~~bull~ gt lt~ 4o o 1li ) c~g w ~-5 ~ ~u 11~ 170 lt~ 3 1 1 ~ ) lt1K ~-5 ~ ~H~ 17~ gt ltm358 l ) tJ amp ltg t~ ~ rpoundIfl~ 17~ gt ltm3 5 4li ) bull glf or gfPls ~ f fr 1lvt t[UJ~ 1f fOJ )~ 17~ m~ ~ )idf fE Jyen fjltj ~e~~-~~ middot ~mbulle~$~bull~e~m middot

13 The Permit Holder sha ll make copies of tllis Pem1it together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sitesoffices covered by this Permit Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register

glf PJ m M I A~ fP ~ ltfs glf PJ sectIpound 81 fJ lt$ bull~ f5J lt$ glf PJ mPiT i1b 81 PJT ~ x 14 ampltfs glf PJ mAfiB ff i11xmiddot~m~amp~~mmA~e~~~~~ ~ormM~~~M~I~ ubull~bull ~ middot R1Ni1bltfs~PJm middot ~Mltfs~PJmMi11~M~xamp~~$~~m~x middot

14 The Permit Holder shall give a copy of this Pem1it to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in this Permit The site(s) refers to site(s) of decormnission constmction and operate of the Project and shall mean the same hereafter

~PJmM~AmMltfs~PJmiddot~-~~~~I~~ftWAmiddot~~~~Aplusmn~~~S ltfs~PJ-~M fWm~middot I~~mM~--~amp-UI~~sect~I~middotTxMm amp~I~ifj~[5]-~~

15 The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular s ite entrancesexits or at a convenient location for publics information at all times The Pennit Holder shall ensure that the most updated infonnation about the Pennit including any amended Permit is displayed at such locations If the Permit Holder sunmiddotenders a part or the whole of the Pem1it the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cancelled Permit shall be removed from display at the Project site(s)

glf PJ sectIpound M(sectj A~~ ~ I fE ~ El 81 I ~ ~ ff ~ ]j[ $[ i tfl D ~ - ~ 1J f5e ~ lr6 middot M H~ ~ ~ ~ ltfs ~orbull~bullmiddot~m0~~e oo ~~~~ft middot~ orm M~Am~~~~reg~~~~~ ~ltfs~PJm lt~Mff~~-n~~PJm) ~amp~ftMmiddot~PJmM~A~~~~PJm~ m~~~Mmiddot~~~~ili~~amp~~~bull middot ~~(sectj~~~orm~mf5J~~amp ~middot bullbull B~ m~jlj bull poundC) ~~ 5if ~ ~ PJ m16 ~fi ~ I__r~ sect ~I j~ ~ T bull f yenf R~ middot~ ~

~ ~to-O ~ ~~ ~

Environmental Permit No EP-44112012A Ji iJl gf CiJ ~ ~~ SJt EP-441120 12 A

16 The Pennit Holder shall decommission construct and operate the Project in accordance with the project description in Pa11 B of this Pennit

17 The Pemlit Holder shall ensure that the Project is designed decommissioned constructed and operated in accordance with the information and all recommendations described in the Project Profile (Register No PP-46820 12) the application for variation of an environmental pennit including all attachments (Application No VEP-54320 18) other relevant documents in the Register the infonnation or nlitigation measures described in this Pennit and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of pennit conditions contained in this Pennit and mitigation measures to be recommended under on going surveillance and monitoring activities during all stages of the Project Where recommendations refened to in the documents of the Register are not expressly refened to in this Permit such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit

~PJmM~A~~~I~sect~~~ - M~--~amp-~ ~ ~~T~~MampmE~~ If~~sect IW11 lt1fcfflH~5bt PP-46 82 01 2) PJTsectJiBJl8J~W4amp~r_Ul~ ~20fPJHt CiJ ~ $ g~ X ftj sect tr5 PJT ~ lift fj ( $ g~ ~~ Slt YEP- 54 3 I 2 0 1 8 ) sect c iffi Ps 8) ~ fiE ffi ~m X ftj ~CiJ~M~~~~M~bullmmEffimiddot~CiJ~pgmiddot~-~~-amp~~~mWamp m~~m~xmbullbull~bullmmE ~amprrr~sect~~mbullfi~Mm~aamp~~r ff Ptr bull ~fi 81 ~~ ffiP m1iffi bull 1f c w i7S 81 x ftf PJT i1tt bull ~fi fro)9 ~ rr z~s sectt PJ sect11 ~ lii 7amp if ~u m~J[I

n 1iffi ~1ft bull ~~ I ~ ~n~ sectt CJ ~ BJlum ~ ~ ~ ~t if~ n deg

18 All submissions as required under this Pem1it shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the Directors comments or otherwise as specified by the Director

rtr ~ ~ glf PJ ~m~m~ampyen ii~ 81 x ftf ~~ rr un~ bull amp81 ~ 5 cfro ~ I Htt 1flm F3 I7S c~ ~~=bullamp~1Ttsect~) I ~bullbullamp~i5LIJotJ11~IEamp~~JTmx middot

19 All submissions approved by the Director all submissions deposited without comments by the Director or all submissions rectified in accordance with comments by the Director under this Pennit shall be construed as part of the permit conditions described in Part C of this Pernlit Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions Any non-compliance with the subnlissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap 499)

bullampm~~m~m~x middot bullamp~~~~~J~M~~~x middot ~mbull~CJ~m~ ~-amp~~-~-IE~M~mxxmiddot~~~bull~~PJ~c$~~~~PJ~bull~ -$~middotm~x~~ff~bulln~~~mbullamp~bullm~middot~~~~~~PJ~bulln BJHl Jif ~ ofro ~ ff fiiJ r f1 ~mx x ftf 81 middot~ )5t bull ~u CJ tlli ~ amp P ~ J3 ~ sectt 13 11~ 190 c~ 49 9 ~) 8Jnl~

110 The Pennit Holder shall release all finalized submissions as required under this Pennit to the public by depositing copies in the EIAO Register Office or in any other places or any intemet websites as specified by the Director or by any other means as specified by the Director for public inspection For this purpose the Permit Holder shall provide sufficient copies of the submissions

~PJ~M~A~reM~~~CiJ~nl~m~~X~M0H~0~Aplusmn~mmiddotn$~ re~~XW~~~Ii~~~~~bullm1f~w~bullbullmiddot~~~bullm~~ff~~~ ~n~~bullampm~~ff~~-~~~middot~bullampm~~a~n$middot~~0~-~o~ftmiddot ~PJ~m~A~m~~~-~~bull 0

- 5shy

111

112

11 3

2

21

22

2 3

Environmental Permit No EP-44 112012A I1PJH9= CJ ~ ~1i 5dt EP-441 2012A

All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27F Southom Centre 130 Hennessy Road Wanchai Hong Kong) Electronic copies of all fmalized submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies

~CJmm~~~ampm~~M~~~~~--~~~um~~~-bull~bullm~8~~ lff 190~ g2 ffiHJJPJ ~ ( IJUIl 1g ~ )f tt fr H fb ~~ lli 130~ I~ ill cp 27I ) bull fin ~ f3t sect9= PJ ~m~t~xs~~ff~m s~~~-r-xamp I ~~~~tJ~~~ff~sect cHTML ) cM4 o~~xt~xamp )fa if tMl ~~ ft f~ ~ ( PDF ) ( M I 0 3~~X 1~ Xamp )~ 1F ll ~F ~ 1~ ~ ft [5] Mz ~~ ~I I

liJrpound$15JB~mx bull

The Pennit Holder shall notify the Director in wn tmg the commencement date(s) of decommissioning and construction of the Project at least two weeks prior to the commencement of decommissioning and construction of the Project The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date(s) of the decommissioning and construction

~PJ~M~A~~I~~EI~MilampRmiddotI~~~~ ~ ~~m~=poundMUmiddotOO~~ ~~~ampRmiddotI~~~IBM~W-ft middot ~ ~ampRmiddot~~IBM~~ffOO~~ ~ ~CJ mM~A~~~ ~u bulloo~~~wbullft middot

For the purpose of th is Permit commencement of decommiss ioning and construction does not include works related to site clearance and preparation or other works as agreed by the Director

Jg~fi~CJ~~rMlampbullbullIm~~H J ~~~~~I~~~ampffi~~Im ~ ~W ftf5Jfg8~~1~IfE middot

Specific Conditions

~Apound f~ftf

All measures described in the Project Profile (Register No PP-46820 12) submitted on 22 May 2012 shall be fully implemented

~ 20 12if 5 f3 22 BmX 8~ I fE r~ El flii ir ( ~ g[ ffiHi 5Lit PP- 468I 20 l 2 ) iJ 1E M1 8~ fill ~m ntE I ~ ~ ~ ~K yenA 11 bull

The Permit Holder shall submit an updated Contamination Assessment Plan (CAP) and a Contamination Assessment Report (CAR) at least one month before the pa11ial decommissioning works of west coal stockyard

~~~~~$~~bullbullbull~~~~~-f3~~CJ~M~A~~mx~~~~~~ 13 gt nm amp ~s sectSJZ ft ~ middot The Permit Holder shall employ an independent checker to audit the implementation of all mitigation measures recommended in the Project Profile (Register No PP-4682012) and to confinn in writing in the monthly audit repo11 full implementation of the mitigation measures during and upon completion of the decommissioning and construction works

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 4: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

Environmental Permit No EP-44112012A ~ lJHlf DJ~~~ 5Vf EP-441 2012A

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (1sect ~IfiJi El ~myen)

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the Permit) l )U 13 7ls ~rJ iJHlf DJ ~ Cf f~ ~ DJ -m )Asect~ pJT 1Hll H9 jsect 5E I f~ lJi El 89 g)i l3jj

Title of Designated Project Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Stat ion (CPPS)

(Th is designated project is hereafter referred to as the Project)

bull w g~ -m Rij mJJlt ue mamp ~ ~ if~ ~~ 1iiE 1~ ft r~ El

( lSmJJIm~EllM Im~El )

Nature of Designated Project (i) To partial deconm1ission the west coal stockyard and

(ii)

Ci)

To construct and operate a waste disposal faci lity for Pulverized Fuel Ash (PFA)

w~ ~fl- ~ f r= 751~ 7t iffi f~~ ~l 1~ amp

Location of Designated Project The Project is located at Castle Peak Power Station at Lung Yiu Street Tuen Mun The location of the Project is shown in Figure I of this Pem1it

I fE J~ El 1I m- et F~ ff~ ~~ fu H9 wLlJ ~~~ o I f~ ~ Fl H9 tit liUi ~ 7f m-7lsf5tDJ~[f] l 0

Scale and Scope of Designated Project

The project includes partial deconunissioning of the west coal stockyard demolition of two existing PFA silos construction of one PFA silo and enhancement work to water management facilities

Im~El~Mm~W~$7tiffibullm~ - m~~oo~~~mmJJlt fBi ~ bull~~ - J mmJJlt ~ reg- tJ amp 1~ ft ~ ~~m ~ rm g9 niE s9 I fr= 0

--=

- 3 shy

Environmental Permit No EP-44 12012A lPjHlf PJ sectfHIBet EP-4412012A

PART C (PERMIT CONDITIONS) C$ (~EJ[f~flf)

I General Conditions -Nf~flf

11 The Pem1it Holder and any person working on the Project shall comply with all conditions set out in this Permit Any non-compliance by any person may constitute a contravention of the Enviroru11ental Impact Assessment Ordinance (EIAO) (Cap499) and may become the subject of appropriate action being taken under the EIAO

~PJmM~Aampff~~-I~~sect~Aplusmn~m~~ltfs~PJmbull~~~Mamiddotff~Aplusmn $(0 ~ f ~~ ltfs glf PJ m~ middotfJ57L bull PJ tiE ii amp ( ~ iJt ~~ gSjZf-[5 ~ fJU) ( iHSJZ ~ 19~) (m 499Jl) ~m~ middot ~bull~ormbull=~-~~~bullbullff~ middot

I 2 The Pennit Holder shall ensure full compliance with all legislation from time to time in force including without limitation to the Noise Control Ordinance (Cap 400) Air Pollution Control Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) and Waste Disposal Ordinance (Cap 354) This Pem1it does not of itself constitute any ground of defense against any proceedings instituted under any legislation or imply any approval under any legislation

~ormM~A~~m~~~~~~mff$~~m~middotMillf~~lt~~~~bull~ gt lt~ 4o o 1li ) c~g w ~-5 ~ ~u 11~ 170 lt~ 3 1 1 ~ ) lt1K ~-5 ~ ~H~ 17~ gt ltm358 l ) tJ amp ltg t~ ~ rpoundIfl~ 17~ gt ltm3 5 4li ) bull glf or gfPls ~ f fr 1lvt t[UJ~ 1f fOJ )~ 17~ m~ ~ )idf fE Jyen fjltj ~e~~-~~ middot ~mbulle~$~bull~e~m middot

13 The Permit Holder sha ll make copies of tllis Pem1it together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sitesoffices covered by this Permit Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register

glf PJ m M I A~ fP ~ ltfs glf PJ sectIpound 81 fJ lt$ bull~ f5J lt$ glf PJ mPiT i1b 81 PJT ~ x 14 ampltfs glf PJ mAfiB ff i11xmiddot~m~amp~~mmA~e~~~~~ ~ormM~~~M~I~ ubull~bull ~ middot R1Ni1bltfs~PJm middot ~Mltfs~PJmMi11~M~xamp~~$~~m~x middot

14 The Permit Holder shall give a copy of this Pem1it to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in this Permit The site(s) refers to site(s) of decormnission constmction and operate of the Project and shall mean the same hereafter

~PJmM~AmMltfs~PJmiddot~-~~~~I~~ftWAmiddot~~~~Aplusmn~~~S ltfs~PJ-~M fWm~middot I~~mM~--~amp-UI~~sect~I~middotTxMm amp~I~ifj~[5]-~~

15 The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular s ite entrancesexits or at a convenient location for publics information at all times The Pennit Holder shall ensure that the most updated infonnation about the Pennit including any amended Permit is displayed at such locations If the Permit Holder sunmiddotenders a part or the whole of the Pem1it the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cancelled Permit shall be removed from display at the Project site(s)

glf PJ sectIpound M(sectj A~~ ~ I fE ~ El 81 I ~ ~ ff ~ ]j[ $[ i tfl D ~ - ~ 1J f5e ~ lr6 middot M H~ ~ ~ ~ ltfs ~orbull~bullmiddot~m0~~e oo ~~~~ft middot~ orm M~Am~~~~reg~~~~~ ~ltfs~PJm lt~Mff~~-n~~PJm) ~amp~ftMmiddot~PJmM~A~~~~PJm~ m~~~Mmiddot~~~~ili~~amp~~~bull middot ~~(sectj~~~orm~mf5J~~amp ~middot bullbull B~ m~jlj bull poundC) ~~ 5if ~ ~ PJ m16 ~fi ~ I__r~ sect ~I j~ ~ T bull f yenf R~ middot~ ~

~ ~to-O ~ ~~ ~

Environmental Permit No EP-44112012A Ji iJl gf CiJ ~ ~~ SJt EP-441120 12 A

16 The Pennit Holder shall decommission construct and operate the Project in accordance with the project description in Pa11 B of this Pennit

17 The Pemlit Holder shall ensure that the Project is designed decommissioned constructed and operated in accordance with the information and all recommendations described in the Project Profile (Register No PP-46820 12) the application for variation of an environmental pennit including all attachments (Application No VEP-54320 18) other relevant documents in the Register the infonnation or nlitigation measures described in this Pennit and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of pennit conditions contained in this Pennit and mitigation measures to be recommended under on going surveillance and monitoring activities during all stages of the Project Where recommendations refened to in the documents of the Register are not expressly refened to in this Permit such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit

~PJmM~A~~~I~sect~~~ - M~--~amp-~ ~ ~~T~~MampmE~~ If~~sect IW11 lt1fcfflH~5bt PP-46 82 01 2) PJTsectJiBJl8J~W4amp~r_Ul~ ~20fPJHt CiJ ~ $ g~ X ftj sect tr5 PJT ~ lift fj ( $ g~ ~~ Slt YEP- 54 3 I 2 0 1 8 ) sect c iffi Ps 8) ~ fiE ffi ~m X ftj ~CiJ~M~~~~M~bullmmEffimiddot~CiJ~pgmiddot~-~~-amp~~~mWamp m~~m~xmbullbull~bullmmE ~amprrr~sect~~mbullfi~Mm~aamp~~r ff Ptr bull ~fi 81 ~~ ffiP m1iffi bull 1f c w i7S 81 x ftf PJT i1tt bull ~fi fro)9 ~ rr z~s sectt PJ sect11 ~ lii 7amp if ~u m~J[I

n 1iffi ~1ft bull ~~ I ~ ~n~ sectt CJ ~ BJlum ~ ~ ~ ~t if~ n deg

18 All submissions as required under this Pem1it shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the Directors comments or otherwise as specified by the Director

rtr ~ ~ glf PJ ~m~m~ampyen ii~ 81 x ftf ~~ rr un~ bull amp81 ~ 5 cfro ~ I Htt 1flm F3 I7S c~ ~~=bullamp~1Ttsect~) I ~bullbullamp~i5LIJotJ11~IEamp~~JTmx middot

19 All submissions approved by the Director all submissions deposited without comments by the Director or all submissions rectified in accordance with comments by the Director under this Pennit shall be construed as part of the permit conditions described in Part C of this Pernlit Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions Any non-compliance with the subnlissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap 499)

bullampm~~m~m~x middot bullamp~~~~~J~M~~~x middot ~mbull~CJ~m~ ~-amp~~-~-IE~M~mxxmiddot~~~bull~~PJ~c$~~~~PJ~bull~ -$~middotm~x~~ff~bulln~~~mbullamp~bullm~middot~~~~~~PJ~bulln BJHl Jif ~ ofro ~ ff fiiJ r f1 ~mx x ftf 81 middot~ )5t bull ~u CJ tlli ~ amp P ~ J3 ~ sectt 13 11~ 190 c~ 49 9 ~) 8Jnl~

110 The Pennit Holder shall release all finalized submissions as required under this Pennit to the public by depositing copies in the EIAO Register Office or in any other places or any intemet websites as specified by the Director or by any other means as specified by the Director for public inspection For this purpose the Permit Holder shall provide sufficient copies of the submissions

~PJ~M~A~reM~~~CiJ~nl~m~~X~M0H~0~Aplusmn~mmiddotn$~ re~~XW~~~Ii~~~~~bullm1f~w~bullbullmiddot~~~bullm~~ff~~~ ~n~~bullampm~~ff~~-~~~middot~bullampm~~a~n$middot~~0~-~o~ftmiddot ~PJ~m~A~m~~~-~~bull 0

- 5shy

111

112

11 3

2

21

22

2 3

Environmental Permit No EP-44 112012A I1PJH9= CJ ~ ~1i 5dt EP-441 2012A

All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27F Southom Centre 130 Hennessy Road Wanchai Hong Kong) Electronic copies of all fmalized submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies

~CJmm~~~ampm~~M~~~~~--~~~um~~~-bull~bullm~8~~ lff 190~ g2 ffiHJJPJ ~ ( IJUIl 1g ~ )f tt fr H fb ~~ lli 130~ I~ ill cp 27I ) bull fin ~ f3t sect9= PJ ~m~t~xs~~ff~m s~~~-r-xamp I ~~~~tJ~~~ff~sect cHTML ) cM4 o~~xt~xamp )fa if tMl ~~ ft f~ ~ ( PDF ) ( M I 0 3~~X 1~ Xamp )~ 1F ll ~F ~ 1~ ~ ft [5] Mz ~~ ~I I

liJrpound$15JB~mx bull

The Pennit Holder shall notify the Director in wn tmg the commencement date(s) of decommissioning and construction of the Project at least two weeks prior to the commencement of decommissioning and construction of the Project The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date(s) of the decommissioning and construction

~PJ~M~A~~I~~EI~MilampRmiddotI~~~~ ~ ~~m~=poundMUmiddotOO~~ ~~~ampRmiddotI~~~IBM~W-ft middot ~ ~ampRmiddot~~IBM~~ffOO~~ ~ ~CJ mM~A~~~ ~u bulloo~~~wbullft middot

For the purpose of th is Permit commencement of decommiss ioning and construction does not include works related to site clearance and preparation or other works as agreed by the Director

Jg~fi~CJ~~rMlampbullbullIm~~H J ~~~~~I~~~ampffi~~Im ~ ~W ftf5Jfg8~~1~IfE middot

Specific Conditions

~Apound f~ftf

All measures described in the Project Profile (Register No PP-46820 12) submitted on 22 May 2012 shall be fully implemented

~ 20 12if 5 f3 22 BmX 8~ I fE r~ El flii ir ( ~ g[ ffiHi 5Lit PP- 468I 20 l 2 ) iJ 1E M1 8~ fill ~m ntE I ~ ~ ~ ~K yenA 11 bull

The Permit Holder shall submit an updated Contamination Assessment Plan (CAP) and a Contamination Assessment Report (CAR) at least one month before the pa11ial decommissioning works of west coal stockyard

~~~~~$~~bullbullbull~~~~~-f3~~CJ~M~A~~mx~~~~~~ 13 gt nm amp ~s sectSJZ ft ~ middot The Permit Holder shall employ an independent checker to audit the implementation of all mitigation measures recommended in the Project Profile (Register No PP-4682012) and to confinn in writing in the monthly audit repo11 full implementation of the mitigation measures during and upon completion of the decommissioning and construction works

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 5: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

Environmental Permit No EP-44 12012A lPjHlf PJ sectfHIBet EP-4412012A

PART C (PERMIT CONDITIONS) C$ (~EJ[f~flf)

I General Conditions -Nf~flf

11 The Pem1it Holder and any person working on the Project shall comply with all conditions set out in this Permit Any non-compliance by any person may constitute a contravention of the Enviroru11ental Impact Assessment Ordinance (EIAO) (Cap499) and may become the subject of appropriate action being taken under the EIAO

~PJmM~Aampff~~-I~~sect~Aplusmn~m~~ltfs~PJmbull~~~Mamiddotff~Aplusmn $(0 ~ f ~~ ltfs glf PJ m~ middotfJ57L bull PJ tiE ii amp ( ~ iJt ~~ gSjZf-[5 ~ fJU) ( iHSJZ ~ 19~) (m 499Jl) ~m~ middot ~bull~ormbull=~-~~~bullbullff~ middot

I 2 The Pennit Holder shall ensure full compliance with all legislation from time to time in force including without limitation to the Noise Control Ordinance (Cap 400) Air Pollution Control Ordinance (Cap 311 ) Water Pollution Control Ordinance (Cap 358) and Waste Disposal Ordinance (Cap 354) This Pem1it does not of itself constitute any ground of defense against any proceedings instituted under any legislation or imply any approval under any legislation

~ormM~A~~m~~~~~~mff$~~m~middotMillf~~lt~~~~bull~ gt lt~ 4o o 1li ) c~g w ~-5 ~ ~u 11~ 170 lt~ 3 1 1 ~ ) lt1K ~-5 ~ ~H~ 17~ gt ltm358 l ) tJ amp ltg t~ ~ rpoundIfl~ 17~ gt ltm3 5 4li ) bull glf or gfPls ~ f fr 1lvt t[UJ~ 1f fOJ )~ 17~ m~ ~ )idf fE Jyen fjltj ~e~~-~~ middot ~mbulle~$~bull~e~m middot

13 The Permit Holder sha ll make copies of tllis Pem1it together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sitesoffices covered by this Permit Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the Register

glf PJ m M I A~ fP ~ ltfs glf PJ sectIpound 81 fJ lt$ bull~ f5J lt$ glf PJ mPiT i1b 81 PJT ~ x 14 ampltfs glf PJ mAfiB ff i11xmiddot~m~amp~~mmA~e~~~~~ ~ormM~~~M~I~ ubull~bull ~ middot R1Ni1bltfs~PJm middot ~Mltfs~PJmMi11~M~xamp~~$~~m~x middot

14 The Permit Holder shall give a copy of this Pem1it to the person(s) in charge of the site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated in this Permit The site(s) refers to site(s) of decormnission constmction and operate of the Project and shall mean the same hereafter

~PJmM~AmMltfs~PJmiddot~-~~~~I~~ftWAmiddot~~~~Aplusmn~~~S ltfs~PJ-~M fWm~middot I~~mM~--~amp-UI~~sect~I~middotTxMm amp~I~ifj~[5]-~~

15 The Permit Holder shall display conspicuously a copy of this Permit on the Project site(s) at all vehicular s ite entrancesexits or at a convenient location for publics information at all times The Pennit Holder shall ensure that the most updated infonnation about the Pennit including any amended Permit is displayed at such locations If the Permit Holder sunmiddotenders a part or the whole of the Pem1it the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cancelled Permit shall be removed from display at the Project site(s)

glf PJ sectIpound M(sectj A~~ ~ I fE ~ El 81 I ~ ~ ff ~ ]j[ $[ i tfl D ~ - ~ 1J f5e ~ lr6 middot M H~ ~ ~ ~ ltfs ~orbull~bullmiddot~m0~~e oo ~~~~ft middot~ orm M~Am~~~~reg~~~~~ ~ltfs~PJm lt~Mff~~-n~~PJm) ~amp~ftMmiddot~PJmM~A~~~~PJm~ m~~~Mmiddot~~~~ili~~amp~~~bull middot ~~(sectj~~~orm~mf5J~~amp ~middot bullbull B~ m~jlj bull poundC) ~~ 5if ~ ~ PJ m16 ~fi ~ I__r~ sect ~I j~ ~ T bull f yenf R~ middot~ ~

~ ~to-O ~ ~~ ~

Environmental Permit No EP-44112012A Ji iJl gf CiJ ~ ~~ SJt EP-441120 12 A

16 The Pennit Holder shall decommission construct and operate the Project in accordance with the project description in Pa11 B of this Pennit

17 The Pemlit Holder shall ensure that the Project is designed decommissioned constructed and operated in accordance with the information and all recommendations described in the Project Profile (Register No PP-46820 12) the application for variation of an environmental pennit including all attachments (Application No VEP-54320 18) other relevant documents in the Register the infonnation or nlitigation measures described in this Pennit and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of pennit conditions contained in this Pennit and mitigation measures to be recommended under on going surveillance and monitoring activities during all stages of the Project Where recommendations refened to in the documents of the Register are not expressly refened to in this Permit such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit

~PJmM~A~~~I~sect~~~ - M~--~amp-~ ~ ~~T~~MampmE~~ If~~sect IW11 lt1fcfflH~5bt PP-46 82 01 2) PJTsectJiBJl8J~W4amp~r_Ul~ ~20fPJHt CiJ ~ $ g~ X ftj sect tr5 PJT ~ lift fj ( $ g~ ~~ Slt YEP- 54 3 I 2 0 1 8 ) sect c iffi Ps 8) ~ fiE ffi ~m X ftj ~CiJ~M~~~~M~bullmmEffimiddot~CiJ~pgmiddot~-~~-amp~~~mWamp m~~m~xmbullbull~bullmmE ~amprrr~sect~~mbullfi~Mm~aamp~~r ff Ptr bull ~fi 81 ~~ ffiP m1iffi bull 1f c w i7S 81 x ftf PJT i1tt bull ~fi fro)9 ~ rr z~s sectt PJ sect11 ~ lii 7amp if ~u m~J[I

n 1iffi ~1ft bull ~~ I ~ ~n~ sectt CJ ~ BJlum ~ ~ ~ ~t if~ n deg

18 All submissions as required under this Pem1it shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the Directors comments or otherwise as specified by the Director

rtr ~ ~ glf PJ ~m~m~ampyen ii~ 81 x ftf ~~ rr un~ bull amp81 ~ 5 cfro ~ I Htt 1flm F3 I7S c~ ~~=bullamp~1Ttsect~) I ~bullbullamp~i5LIJotJ11~IEamp~~JTmx middot

19 All submissions approved by the Director all submissions deposited without comments by the Director or all submissions rectified in accordance with comments by the Director under this Pennit shall be construed as part of the permit conditions described in Part C of this Pernlit Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions Any non-compliance with the subnlissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap 499)

bullampm~~m~m~x middot bullamp~~~~~J~M~~~x middot ~mbull~CJ~m~ ~-amp~~-~-IE~M~mxxmiddot~~~bull~~PJ~c$~~~~PJ~bull~ -$~middotm~x~~ff~bulln~~~mbullamp~bullm~middot~~~~~~PJ~bulln BJHl Jif ~ ofro ~ ff fiiJ r f1 ~mx x ftf 81 middot~ )5t bull ~u CJ tlli ~ amp P ~ J3 ~ sectt 13 11~ 190 c~ 49 9 ~) 8Jnl~

110 The Pennit Holder shall release all finalized submissions as required under this Pennit to the public by depositing copies in the EIAO Register Office or in any other places or any intemet websites as specified by the Director or by any other means as specified by the Director for public inspection For this purpose the Permit Holder shall provide sufficient copies of the submissions

~PJ~M~A~reM~~~CiJ~nl~m~~X~M0H~0~Aplusmn~mmiddotn$~ re~~XW~~~Ii~~~~~bullm1f~w~bullbullmiddot~~~bullm~~ff~~~ ~n~~bullampm~~ff~~-~~~middot~bullampm~~a~n$middot~~0~-~o~ftmiddot ~PJ~m~A~m~~~-~~bull 0

- 5shy

111

112

11 3

2

21

22

2 3

Environmental Permit No EP-44 112012A I1PJH9= CJ ~ ~1i 5dt EP-441 2012A

All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27F Southom Centre 130 Hennessy Road Wanchai Hong Kong) Electronic copies of all fmalized submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies

~CJmm~~~ampm~~M~~~~~--~~~um~~~-bull~bullm~8~~ lff 190~ g2 ffiHJJPJ ~ ( IJUIl 1g ~ )f tt fr H fb ~~ lli 130~ I~ ill cp 27I ) bull fin ~ f3t sect9= PJ ~m~t~xs~~ff~m s~~~-r-xamp I ~~~~tJ~~~ff~sect cHTML ) cM4 o~~xt~xamp )fa if tMl ~~ ft f~ ~ ( PDF ) ( M I 0 3~~X 1~ Xamp )~ 1F ll ~F ~ 1~ ~ ft [5] Mz ~~ ~I I

liJrpound$15JB~mx bull

The Pennit Holder shall notify the Director in wn tmg the commencement date(s) of decommissioning and construction of the Project at least two weeks prior to the commencement of decommissioning and construction of the Project The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date(s) of the decommissioning and construction

~PJ~M~A~~I~~EI~MilampRmiddotI~~~~ ~ ~~m~=poundMUmiddotOO~~ ~~~ampRmiddotI~~~IBM~W-ft middot ~ ~ampRmiddot~~IBM~~ffOO~~ ~ ~CJ mM~A~~~ ~u bulloo~~~wbullft middot

For the purpose of th is Permit commencement of decommiss ioning and construction does not include works related to site clearance and preparation or other works as agreed by the Director

Jg~fi~CJ~~rMlampbullbullIm~~H J ~~~~~I~~~ampffi~~Im ~ ~W ftf5Jfg8~~1~IfE middot

Specific Conditions

~Apound f~ftf

All measures described in the Project Profile (Register No PP-46820 12) submitted on 22 May 2012 shall be fully implemented

~ 20 12if 5 f3 22 BmX 8~ I fE r~ El flii ir ( ~ g[ ffiHi 5Lit PP- 468I 20 l 2 ) iJ 1E M1 8~ fill ~m ntE I ~ ~ ~ ~K yenA 11 bull

The Permit Holder shall submit an updated Contamination Assessment Plan (CAP) and a Contamination Assessment Report (CAR) at least one month before the pa11ial decommissioning works of west coal stockyard

~~~~~$~~bullbullbull~~~~~-f3~~CJ~M~A~~mx~~~~~~ 13 gt nm amp ~s sectSJZ ft ~ middot The Permit Holder shall employ an independent checker to audit the implementation of all mitigation measures recommended in the Project Profile (Register No PP-4682012) and to confinn in writing in the monthly audit repo11 full implementation of the mitigation measures during and upon completion of the decommissioning and construction works

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 6: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

Environmental Permit No EP-44112012A Ji iJl gf CiJ ~ ~~ SJt EP-441120 12 A

16 The Pennit Holder shall decommission construct and operate the Project in accordance with the project description in Pa11 B of this Pennit

17 The Pemlit Holder shall ensure that the Project is designed decommissioned constructed and operated in accordance with the information and all recommendations described in the Project Profile (Register No PP-46820 12) the application for variation of an environmental pennit including all attachments (Application No VEP-54320 18) other relevant documents in the Register the infonnation or nlitigation measures described in this Pennit and mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of pennit conditions contained in this Pennit and mitigation measures to be recommended under on going surveillance and monitoring activities during all stages of the Project Where recommendations refened to in the documents of the Register are not expressly refened to in this Permit such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit

~PJmM~A~~~I~sect~~~ - M~--~amp-~ ~ ~~T~~MampmE~~ If~~sect IW11 lt1fcfflH~5bt PP-46 82 01 2) PJTsectJiBJl8J~W4amp~r_Ul~ ~20fPJHt CiJ ~ $ g~ X ftj sect tr5 PJT ~ lift fj ( $ g~ ~~ Slt YEP- 54 3 I 2 0 1 8 ) sect c iffi Ps 8) ~ fiE ffi ~m X ftj ~CiJ~M~~~~M~bullmmEffimiddot~CiJ~pgmiddot~-~~-amp~~~mWamp m~~m~xmbullbull~bullmmE ~amprrr~sect~~mbullfi~Mm~aamp~~r ff Ptr bull ~fi 81 ~~ ffiP m1iffi bull 1f c w i7S 81 x ftf PJT i1tt bull ~fi fro)9 ~ rr z~s sectt PJ sect11 ~ lii 7amp if ~u m~J[I

n 1iffi ~1ft bull ~~ I ~ ~n~ sectt CJ ~ BJlum ~ ~ ~ ~t if~ n deg

18 All submissions as required under this Pem1it shall be rectified and resubmitted in accordance with the comments if any made by the Director within one month of the receipt of the Directors comments or otherwise as specified by the Director

rtr ~ ~ glf PJ ~m~m~ampyen ii~ 81 x ftf ~~ rr un~ bull amp81 ~ 5 cfro ~ I Htt 1flm F3 I7S c~ ~~=bullamp~1Ttsect~) I ~bullbullamp~i5LIJotJ11~IEamp~~JTmx middot

19 All submissions approved by the Director all submissions deposited without comments by the Director or all submissions rectified in accordance with comments by the Director under this Pennit shall be construed as part of the permit conditions described in Part C of this Pernlit Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions Any non-compliance with the subnlissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap 499)

bullampm~~m~m~x middot bullamp~~~~~J~M~~~x middot ~mbull~CJ~m~ ~-amp~~-~-IE~M~mxxmiddot~~~bull~~PJ~c$~~~~PJ~bull~ -$~middotm~x~~ff~bulln~~~mbullamp~bullm~middot~~~~~~PJ~bulln BJHl Jif ~ ofro ~ ff fiiJ r f1 ~mx x ftf 81 middot~ )5t bull ~u CJ tlli ~ amp P ~ J3 ~ sectt 13 11~ 190 c~ 49 9 ~) 8Jnl~

110 The Pennit Holder shall release all finalized submissions as required under this Pennit to the public by depositing copies in the EIAO Register Office or in any other places or any intemet websites as specified by the Director or by any other means as specified by the Director for public inspection For this purpose the Permit Holder shall provide sufficient copies of the submissions

~PJ~M~A~reM~~~CiJ~nl~m~~X~M0H~0~Aplusmn~mmiddotn$~ re~~XW~~~Ii~~~~~bullm1f~w~bullbullmiddot~~~bullm~~ff~~~ ~n~~bullampm~~ff~~-~~~middot~bullampm~~a~n$middot~~0~-~o~ftmiddot ~PJ~m~A~m~~~-~~bull 0

- 5shy

111

112

11 3

2

21

22

2 3

Environmental Permit No EP-44 112012A I1PJH9= CJ ~ ~1i 5dt EP-441 2012A

All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27F Southom Centre 130 Hennessy Road Wanchai Hong Kong) Electronic copies of all fmalized submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies

~CJmm~~~ampm~~M~~~~~--~~~um~~~-bull~bullm~8~~ lff 190~ g2 ffiHJJPJ ~ ( IJUIl 1g ~ )f tt fr H fb ~~ lli 130~ I~ ill cp 27I ) bull fin ~ f3t sect9= PJ ~m~t~xs~~ff~m s~~~-r-xamp I ~~~~tJ~~~ff~sect cHTML ) cM4 o~~xt~xamp )fa if tMl ~~ ft f~ ~ ( PDF ) ( M I 0 3~~X 1~ Xamp )~ 1F ll ~F ~ 1~ ~ ft [5] Mz ~~ ~I I

liJrpound$15JB~mx bull

The Pennit Holder shall notify the Director in wn tmg the commencement date(s) of decommissioning and construction of the Project at least two weeks prior to the commencement of decommissioning and construction of the Project The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date(s) of the decommissioning and construction

~PJ~M~A~~I~~EI~MilampRmiddotI~~~~ ~ ~~m~=poundMUmiddotOO~~ ~~~ampRmiddotI~~~IBM~W-ft middot ~ ~ampRmiddot~~IBM~~ffOO~~ ~ ~CJ mM~A~~~ ~u bulloo~~~wbullft middot

For the purpose of th is Permit commencement of decommiss ioning and construction does not include works related to site clearance and preparation or other works as agreed by the Director

Jg~fi~CJ~~rMlampbullbullIm~~H J ~~~~~I~~~ampffi~~Im ~ ~W ftf5Jfg8~~1~IfE middot

Specific Conditions

~Apound f~ftf

All measures described in the Project Profile (Register No PP-46820 12) submitted on 22 May 2012 shall be fully implemented

~ 20 12if 5 f3 22 BmX 8~ I fE r~ El flii ir ( ~ g[ ffiHi 5Lit PP- 468I 20 l 2 ) iJ 1E M1 8~ fill ~m ntE I ~ ~ ~ ~K yenA 11 bull

The Permit Holder shall submit an updated Contamination Assessment Plan (CAP) and a Contamination Assessment Report (CAR) at least one month before the pa11ial decommissioning works of west coal stockyard

~~~~~$~~bullbullbull~~~~~-f3~~CJ~M~A~~mx~~~~~~ 13 gt nm amp ~s sectSJZ ft ~ middot The Permit Holder shall employ an independent checker to audit the implementation of all mitigation measures recommended in the Project Profile (Register No PP-4682012) and to confinn in writing in the monthly audit repo11 full implementation of the mitigation measures during and upon completion of the decommissioning and construction works

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 7: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

111

112

11 3

2

21

22

2 3

Environmental Permit No EP-44 112012A I1PJH9= CJ ~ ~1i 5dt EP-441 2012A

All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the EIAO Register Office (currently at 27F Southom Centre 130 Hennessy Road Wanchai Hong Kong) Electronic copies of all fmalized submissions required under this Pem1it shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version 13 or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies

~CJmm~~~ampm~~M~~~~~--~~~um~~~-bull~bullm~8~~ lff 190~ g2 ffiHJJPJ ~ ( IJUIl 1g ~ )f tt fr H fb ~~ lli 130~ I~ ill cp 27I ) bull fin ~ f3t sect9= PJ ~m~t~xs~~ff~m s~~~-r-xamp I ~~~~tJ~~~ff~sect cHTML ) cM4 o~~xt~xamp )fa if tMl ~~ ft f~ ~ ( PDF ) ( M I 0 3~~X 1~ Xamp )~ 1F ll ~F ~ 1~ ~ ft [5] Mz ~~ ~I I

liJrpound$15JB~mx bull

The Pennit Holder shall notify the Director in wn tmg the commencement date(s) of decommissioning and construction of the Project at least two weeks prior to the commencement of decommissioning and construction of the Project The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date(s) of the decommissioning and construction

~PJ~M~A~~I~~EI~MilampRmiddotI~~~~ ~ ~~m~=poundMUmiddotOO~~ ~~~ampRmiddotI~~~IBM~W-ft middot ~ ~ampRmiddot~~IBM~~ffOO~~ ~ ~CJ mM~A~~~ ~u bulloo~~~wbullft middot

For the purpose of th is Permit commencement of decommiss ioning and construction does not include works related to site clearance and preparation or other works as agreed by the Director

Jg~fi~CJ~~rMlampbullbullIm~~H J ~~~~~I~~~ampffi~~Im ~ ~W ftf5Jfg8~~1~IfE middot

Specific Conditions

~Apound f~ftf

All measures described in the Project Profile (Register No PP-46820 12) submitted on 22 May 2012 shall be fully implemented

~ 20 12if 5 f3 22 BmX 8~ I fE r~ El flii ir ( ~ g[ ffiHi 5Lit PP- 468I 20 l 2 ) iJ 1E M1 8~ fill ~m ntE I ~ ~ ~ ~K yenA 11 bull

The Permit Holder shall submit an updated Contamination Assessment Plan (CAP) and a Contamination Assessment Report (CAR) at least one month before the pa11ial decommissioning works of west coal stockyard

~~~~~$~~bullbullbull~~~~~-f3~~CJ~M~A~~mx~~~~~~ 13 gt nm amp ~s sectSJZ ft ~ middot The Permit Holder shall employ an independent checker to audit the implementation of all mitigation measures recommended in the Project Profile (Register No PP-4682012) and to confinn in writing in the monthly audit repo11 full implementation of the mitigation measures during and upon completion of the decommissioning and construction works

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 8: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

Environmental Permit No EP-4412012A ~ tJ ~t CJ m~~ 5ft EP-441 2012A

Notes tt

1 This Pem1it consists of three pa1ts namely Patt A (Main Pem1it) Part B (Description of Designated Project) and Part C (Pennit Conditions) Any person relying on this pennit should obtain independent legal advice on the legal implications under the EIAO and the following notes are for general information only

21s~tCJ~~~~3ffB bull IP Afff ( ~tCJmplusmn~fff55) middot BffB ( tsect~Ifj~ sect flgsect)iBJsect) bull ampcg[) c ~t CJ mfim ff ) bull ff fCJ ms i ~t CJ m 81 Aplusmn ~ mt 1ft ~yen fJii fJU81 t If B-~wsectiiJ 1M n t If J

5 middot ~lbttfWR (~-Mt~~ffl bull

2 If there is a breach of any conditions of tlus Pem1it the Director or his authorized officer may with the consent of the Secretary for the Environment order the cessation of associated work until the remedial action is taken in respect of the resu ltant environmental damage and in that case the Pemut Holder shall not carry out any associated works without the pennission of the Director or his authorized officer

~wamp21s~CJmBl e~bullmiddotWsectbullmmaA~~bullm~m~~amp~~~~CJ~~~ ~m~Imiddotbull~~CJmM~A~M~~Bl~mmm~~M~ft~~~ middot ~~ffl~~middot ~CJmM~A~wampbull~mmA~BlmCJmiddot~m~ftff~ffi~I middot

3 The Pennit Holder may apply under Section 13 of the EIAO to the Director for a variation of the conditions of this Pem1it The Pennit Holder shall replace the original pennit displayed on the Project site by the amended pennit

sectt CJ m M ~ACJ t~ ~ 1ft ~yen fJii fJU ~ 131~ H1 m~ loJ w amp fl g~ ~ ~~t CJ msg fimff bull ~t CJ m M~A~re~S~BJ~CJmmiddotVM~Imiddotsect~I~~amp~~~~~CJm middot

4 A person who assumes the responsibility for the whole or a part of the Project may before he assumes responsibility of the Project apply under Section 12 of the EIAO to the Director for a further envirom11ental pennit

~WIsectBJ~middot-MftiFJigRffFJ~gAmiddot~~-ftff2MmiddotCJffimiddot~~-~m l 2 ~~-~loJWampIfl-~BlffltJ~CJID middot

5 Under Section 14 of the EIAO the Director may with the consent of the Secretary for the Enviromnent suspend vary or cancel this Permit The suspended varied or cancelled Pennit shall be removed from display at the Project site

f~~IHyenffJU~ l4 fiJiBlmJE middot WftCJ~~tJ~)Bj-ampBJ~~~IQB~fHtJ ~~-Ifil5iJ~ m~CJm middot mbull~mM-~~-~~Bl~CJm~m~IbullEIBli~~~middot~~amp~ middot

6 If this Pem1it is cancelled or surrendered during decommission construction or operate of the Project another enviromnental pennit must be obtained under the EIAO before the Project could be continued It is an offence under Section 26 ( 1) of the EIAO to decommission construct or operate a designated project listed in Schedule 2 of the EIAO without a valid environmental pennit

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 9: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

Environmental Permit No EP-4412012A EP~Hlf 0J m~~ 5dt EP-441120 12 A

7 Any person who decommissions constructs or operates the Project contrary to the conditions in the Pennit and is convicted of an offence under the EIAO is liable

~ff~A~Wamp~OJm~-~~M~--~-~-I~middotsectmiddotmbull~~-~middot~~ 18 ~ -

(i) on a first conviction on indictment to a fine of $2 million and to imprisonment for 6 months

(ii) on a second or subsequent conviction on indictment to a fine of $5 million and to imprisonment for 2 years

(iii) on a first summary conviction to a fine at level 6 and to impriso1m1ent for 6 months

(iv) on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1 year and

(v) in any case where the offence is of a continuing nature the court or magistrate may impose a fine of $10000 for each day on which he is satisfied the offence continued

~ 11 1cr m 57L ~ 31o ~ ~ ft m5 t~ ~n -ti jf bull 91J 5t lilt bull ~ U g- or ampx t f~ ~~ ~~ ~ ft ~ ~t ~ m- 7i ~ ~ FJ ~~ 1o ooon deg

8 The Permit Holder may appeal against any condition of this Pennit under Section 17 of the EIAO within 30 days of receipt of this Pennit

~ or m~~A~ tl ~j sectlf PJ m1~ 307i 11 bull PJ t~ bull ~ ~srz f f7U ~ 17iffl wt sectlf or ms9 ff fDJ iffi 14 tJHf _t WF bull

9 The Notes are for general reference only and that the Permit Holder should refer to the EIAO for details and seek independent legal advice

_t~ttmR~-0-~ffl middot ~~~~~- middot ~PJmiddot~~A~-~~~~~ampmiddot~-~ )i 1$ ~ Ji 0

- 8shy

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 10: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

KEY PLAN

Ulllmiddot

SEA iiiJ

NOR~SOUTHCOALSTOCKYARD

iyeniiIUtttJ~

I - 1-1

~ ~

-- shy ~~~STAIDNLOTOOINJARY

PROCESS WATERTANlt[=J secttreglWflf(tlU

STAGE 1FLTERS

- =ti1WifUMamp STAGE 2FLTERS jilflj~

PROCESS WATERIClLISaiGINT ~llffsecttiiU121Tl1- M(Jpound1

[=J w~~~~~llE[)~

[=J ~~~~~~ GSSJ REAACED BYRE-CONSTR1JCTlONOFA f-EW SILO

frffiillilift-JlWlWifiiA

=--=

11

middot ~tT ~ ~ middot~ _

Bj

~ I A ----I -J-shy I ~middot~middot ------------shy~ middot--shy1shy ------1shy SEA

t]

Environmental Perm it No EP-441 2012A ILo ~lJMT~blifrtlrPmiddotJliiT 0 J iili~gt1lll711L

Figure 1 [i] 1

~ Project Title Enhanced Ash Ut ilisatio n and Water Management Facilities at the Castle Peak Power Station

- Project Location Plan (This figure is modified rrom Figure 12 or the Environ mental Review Report rrom Application ror Var iation or the Environment a Permit No VEP-5432018)

I~JJsectffll middotilimiddot~~~~Rfflamp~~~~-~~fulJiEl

-I~JJ 13 ftfllfilpfslll~~iampl3 Jiampllft~filJ[ifilfVEP-54320 t81lftiiJUi~li t2 )

Page 11: Covering letter - Environmental Protection Department · Environmental Permit No.: EP-441 /2012/A . I!±JHlf 0J ~~~ 5Vt : EP -44112 0 I 2/ A . ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE